{
  "schema_version": 1,
  "source_compilation_context": {
    "tn": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tn.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "47011",
    "label": "Bradley County, Tennessee"
  },
  "records": [
    {
      "id": "project-river-data-center-bradley-county-tn",
      "state": "tn",
      "kind": "facility",
      "name": "Project River Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bradley"
      ],
      "city": "Cleveland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Project River industrial energy campus and job components. 900=525+250+125onsiteacrossDC/plant/biomass,not900DCjobs.1700indirectseparateandforecastnotcurrentheadcount. Goingupwordingnotdatedconstructionpermitproof. Selfsuppliedwater/powerandquietclaimsunmeasured;noITMWorenergizationdate. Noactualtenantnamed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://projectriver.energy/",
          "host": "projectriver.energy",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://projectriver.energy/the-project/",
          "host": "projectriver.energy",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 35.15368,
        "lng": -84.85945,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Project River industrial energy campus and job components",
          "fields": {
            "project": "Project River",
            "location": "Cleveland and Bradley County, Tennessee",
            "energy_plan": "onsite biomass and natural gas, grid peaking and backup",
            "water_plan": "biomass moisture recovery and closed loop",
            "forecast_permanent_onsite_jobs_total": 900,
            "forecast_data_center_jobs": 525,
            "forecast_generation_jobs": 250,
            "forecast_biomass_handling_jobs": 125,
            "forecast_indirect_forestry_jobs": 1700
          },
          "notes": [
            "900=525+250+125onsiteacrossDC/plant/biomass,not900DCjobs.1700indirectseparateandforecastnotcurrentheadcount. Goingupwordingnotdatedconstructionpermitproof. Selfsuppliedwater/powerandquietclaimsunmeasured;noITMWorenergizationdate. Noactualtenantnamed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://projectriver.energy/",
              "host": "projectriver.energy",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 34",
          "scope": "The current original Project River page describes a future industrial energy campus that could serve a data center or several other industries. It explicitly says no end user offtake agreement or commitment is in place. A data center is a possible anchor rather than a verified committed compute development. Its phased monthly commissioning sequence and present tense power, water, noise and jobs claims are proposal marketing, not actual operations or measured environmental outcomes. The exact individual data center phase remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "conditional_compute_anchor_without_committed_end_user_or_physical_stage",
              "scope": "The current original Project River page describes a future industrial energy campus that could serve a data center or several other industries. It explicitly says no end user offtake agreement or commitment is in place. A data center is a possible anchor rather than a verified committed compute development. Its phased monthly commissioning sequence and present tense power, water, noise and jobs claims are proposal marketing, not actual operations or measured environmental outcomes. The exact individual data center phase remains unclear."
            }
          },
          "notes": [
            "The current original Project River page describes a future industrial energy campus that could serve a data center or several other industries. It explicitly says no end user offtake agreement or commitment is in place. A data center is a possible anchor rather than a verified committed compute development. Its phased monthly commissioning sequence and present tense power, water, noise and jobs claims are proposal marketing, not actual operations or measured environmental outcomes. The exact individual data center phase remains unclear.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://projectriver.energy/the-project/",
              "host": "projectriver.energy",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cleveland · Bradley · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "47011"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
