{
  "schema_version": 1,
  "source_compilation_context": {
    "tn": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tn.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "47165",
    "label": "Sumner County, Tennessee"
  },
  "records": [
    {
      "id": "centersquare-gallatin-tn",
      "state": "tn",
      "kind": "facility",
      "name": "Centersquare Gallatin (NAS) Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Sumner"
      ],
      "city": "Gallatin",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Do not sum initial area and ultimate buildout or transfer operating headline to all planned phases. No current commissioning independently established. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.newschannel5.com/news/how-big-are-middle-tennessees-data-centers-a-look-at-facilities-already-operating",
          "host": "newschannel5.com",
          "date": "2026-06-12",
          "published": "2026-06-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.46924,
        "lng": -86.46062,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "WTVF distinguishes Gallatin CSquare phase-one82000-square-foot space from planned500000-square-foot full campus.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Do not sum initial area and ultimate buildout or transfer operating headline to all planned phases. No current commissioning independently established.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.newschannel5.com/news/how-big-are-middle-tennessees-data-centers-a-look-at-facilities-already-operating",
              "host": "newschannel5.com",
              "date": "2026-06-12",
              "published": "2026-06-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gallatin · Sumner · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "47165"
      }
    },
    {
      "id": "meta-gallatin-tn",
      "state": "tn",
      "kind": "facility",
      "name": "Meta Gallatin Data Center Campus",
      "group": "operating",
      "status": "Operator-reported traffic service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Sumner"
      ],
      "city": "Gallatin",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Dated operator opening statement. Full buildout capex is future/conditional in this release; 530 MW describes eight renewable projects, not this campus IT load. No 2026 operating measurement inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/",
          "host": "datacenters.atmeta.com",
          "date": "2024-11-14",
          "published": "2024-11-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/gallatin-data-center-info-sheet/",
          "host": "datacenters.atmeta.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/us-locations/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        }
      ],
      "loc": {
        "lat": 36.48303,
        "lng": -86.47567,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "historical_status_event": "serving traffic",
            "event_date": "2024-11-14",
            "forecast_fully_built_investment_usd_lower_bound": 1500000000,
            "operational_jobs_as_of_release_lower_bound": 100,
            "historic_groundbreaking_year": 2020
          },
          "notes": [
            "Dated operator opening statement. Full buildout capex is future/conditional in this release; 530 MW describes eight renewable projects, not this campus IT load. No 2026 operating measurement inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/",
              "host": "datacenters.atmeta.com",
              "date": "2024-11-14",
              "published": "2024-11-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "direct-pdf-review-round5-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "operator_labeled_data_center_investment_usd": 1500000000,
            "investment_is_lower_bound": true,
            "investment_geographic_label": "Tennessee",
            "historic_groundbreaking_year": 2020,
            "peak_construction_workers": 1100,
            "operator_reported_operational_jobs_lower_bound": 100,
            "local_school_nonprofit_direct_funding_usd_lower_bound": 2200000,
            "direct_funding_county_scope": "Sumner"
          },
          "notes": [
            "Undated operator info sheet. Investment label retains its city/state scope and does not independently establish expenditures at one building. Jobs/funding are operator figures with no separately established observation end-date. Renewables MW concern separate electricity-generation projects, not site IT demand. Water-positive/restoration statements are goals, not measured site water use.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/gallatin-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "service-status-2026-10-19",
          "scope": "Meta lists Gallatin as part of its global infrastructure in its currently served factsheet. Its November 14, 2024 announcement reports that the named center was serving traffic.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_traffic_service",
              "scope": "Meta lists Gallatin as part of its global infrastructure in its currently served factsheet. Its November 14, 2024 announcement reports that the named center was serving traffic."
            }
          },
          "notes": [
            "The 2024 traffic report is an earlier milestone. The undated factsheet does not establish when every building was commissioned. Its financial, jobs and environmental claims were not independently verified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/gallatin-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            },
            {
              "url": "https://datacenters.atmeta.com/2024/11/gallatin-we-are-online/",
              "host": "datacenters.atmeta.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            },
            {
              "url": "https://datacenters.atmeta.com/us-locations/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 07, October 23, 2026",
          "scope": "Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/gallatin-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named facility source, PDF first page visually reviewed where supplied"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gallatin · Sumner · Source context reviewed",
      "status_scope": "Meta lists Gallatin as part of its global infrastructure in its currently served factsheet. Its November 14, 2024 announcement reports that the named center was serving traffic.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "47165"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
