{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48039",
    "label": "Brazoria County, Texas"
  },
  "records": [
    {
      "id": "cleanspark-brazoria-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "CleanSpark Brazoria County (Second Texas) Campus",
      "group": "proposed",
      "status": "Operator-reported development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Brazoria"
      ],
      "city": "",
      "address": "",
      "who": "CleanSpark",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 600 includes initial300, not900. Demand/transmission capacity is not criticalIT or energized load. No final property-close day or original utility approval adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-expands-texas-footprint-with-major-power-acquisition-near-houston-to-support-scaled-ai-and-hpc-development-302660752.html",
          "host": "prnewswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-reports-second-fiscal-quarter-2026-results-302768585.html",
          "host": "prnewswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html",
          "host": "prnewswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm",
          "host": "www.sec.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-releases-january-2026-operational-update-302678881.html",
          "host": "www.prnewswire.com",
          "published": "2026-02-04",
          "date": "2026-02-04",
          "checked": "2026-10-22",
          "label": "Company issued county development release"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html",
          "host": "www.prnewswire.com",
          "published": "2026-10-09",
          "date": "2026-10-09",
          "checked": "2026-10-22",
          "label": "Issuer operational update, context only"
        }
      ],
      "loc": {
        "lat": 29.18959,
        "lng": -95.45127,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-primary-review-round17-2026-10-14.json",
          "scope": "Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.",
          "fields": {
            "announcement_date": "2026-01-14",
            "land_under_definitive_agreement_up_to_acres": 447,
            "initial_demand_load_mw": 300,
            "total_potential_mw": 600,
            "initial_closing_target": "2026-Q1, conditional",
            "ercot_approval_claim": "Company May11 release reports300MW approval; original ERCOT document not inspected."
          },
          "notes": [
            "600 includes initial300, not900. Demand/transmission capacity is not criticalIT or energized load. No final property-close day or original utility approval adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-expands-texas-footprint-with-major-power-acquisition-near-houston-to-support-scaled-ai-and-hpc-development-302660752.html",
              "host": "prnewswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-reports-second-fiscal-quarter-2026-results-302768585.html",
              "host": "prnewswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html",
              "host": "prnewswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "next-status-2026-10-19",
          "scope": "CleanSpark describes its Brazoria County property as part of its Texas data center development in its quarterly filing for June 30, 2026.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_development",
              "scope": "CleanSpark describes its Brazoria County property as part of its Texas data center development in its quarterly filing for June 30, 2026."
            }
          },
          "notes": [
            "This is the issuer's development account, not an SEC certification of a facility. Land rights and planned power agreements do not establish completed construction, commissioning or an operating AI campus. No land, power or financial quantity is adopted."
          ],
          "sources": [
            {
              "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm",
              "host": "www.sec.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check, October 22, 2026",
          "scope": "CleanSpark announced the named county data center development in its own issuer release, linked from its investor site to its public distributor. Developer is the provider brand role, not a property ownership or completed transaction finding. Announced development, grid classification and financing do not establish current construction or operation. No status, date, address, map point or quantity is promoted.",
          "fields": {
            "company_association": {
              "name": "CleanSpark",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "CleanSpark announced the named county data center development in its own issuer release, linked from its investor site to its public distributor. Developer is the provider brand role, not a property ownership or completed transaction finding. Announced development, grid classification and financing do not establish current construction or operation. No status, date, address, map point or quantity is promoted."
            },
            "provider_role": "developer"
          },
          "notes": [
            "CleanSpark announced the named county data center development in its own issuer release, linked from its investor site to its public distributor. Developer is the provider brand role, not a property ownership or completed transaction finding. Announced development, grid classification and financing do not establish current construction or operation. No status, date, address, map point or quantity is promoted.",
            "Source retrieval and document metadata do not establish a physical milestone date."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-releases-january-2026-operational-update-302678881.html",
              "host": "www.prnewswire.com",
              "published": "2026-02-04",
              "date": "2026-02-04",
              "checked": "2026-10-22",
              "label": "Company issued county development release"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html",
              "host": "www.prnewswire.com",
              "published": "2026-10-09",
              "date": "2026-10-09",
              "checked": "2026-10-22",
              "label": "Issuer operational update, context only"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Brazoria · Source context reviewed",
      "status_scope": "CleanSpark describes its Brazoria County property as part of its Texas data center development in its quarterly filing for June 30, 2026.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48039"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
