{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48055",
    "label": "Caldwell County, Texas"
  },
  "records": [
    {
      "id": "powerhouse-uhland-caldwell-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "PowerHouse Caldwell County Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Caldwell"
      ],
      "city": "Uhland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Alexis Kramer, Bisnow May 5, 2026: Uhland administrator directly confirms resident pushback and county pathway for PowerHouse. Proposed 500 acres within 3,600-acre Caldwell Valley park/petition details are credited to Austin Business Journal, not independently filed documents read here. Petition is not verified release approval; no MW supplied. Texas county-authority summary is reported historical context, not current legal advice or proof every permit must issue. Regional 7.8 GW/120-company-project claims not campus capacity or operating counts. Not all fields, current operation, precise parcel or critical IT independently certified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/austin/news/data-center-development/powerhouse-plans-austin-suburb-data-center-skirt-city-control-134437",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 29.83666,
        "lng": -97.61968,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json",
          "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.",
          "fields": {},
          "notes": [
            "Alexis Kramer, Bisnow May 5, 2026: Uhland administrator directly confirms resident pushback and county pathway for PowerHouse. Proposed 500 acres within 3,600-acre Caldwell Valley park/petition details are credited to Austin Business Journal, not independently filed documents read here. Petition is not verified release approval; no MW supplied. Texas county-authority summary is reported historical context, not current legal advice or proof every permit must issue. Regional 7.8 GW/120-company-project claims not campus capacity or operating counts.",
            "Not all fields, current operation, precise parcel or critical IT independently certified."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/austin/news/data-center-development/powerhouse-plans-austin-suburb-data-center-skirt-city-control-134437",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Uhland · Caldwell · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48055"
      }
    },
    {
      "id": "tract-caldwell-valley-uhland-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Tract Caldwell Valley Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Caldwell"
      ],
      "city": "Uhland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Corrected named-site crosswalk; source does not verify PowerHouse Uhland.. Water1.5-to16.6MGDisMinnesotaproxy, notTexasdisclosure; missingreturnflowisnot100percentconsumption. Originalutilitycontract,sitepermits,currentconstructionandwaterplanunreviewed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. Automaticexcerptselectedunrelatedrealestatestory;actualmainbodyread.800jobsarefullbuildoutforecast,nothires.4GWpotentialnotadditive2plus4orcriticalIT/contractedservice. Initial360notobserveduse. Closed-loopwaterefficiencyintentionnotgallonallocation/zerowater. No-incentiverequestclaimsdatedMay2025city/countyonly,notalltimeallgovernmentawardabsence. NeighborUSD4billionPrimeprojectisnotTract/PowerHouse. USD1.7billionfundraise25GWportfolioandPhoenix20billionnotCaldwellcapex. Later2026landexpansionrequireseparatesource.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://centexdatacenters.org/projects/tract-caldwell-county",
          "host": "centexdatacenters.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://muskin-elam.com/1500-acre-data-center-campus-800-jobs-confirmed-for-small-town-in-caldwell-county/",
          "host": "muskin-elam.com",
          "date": "2025-05-08",
          "published": "2025-05-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 29.85155,
        "lng": -97.63594,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Corrected named-site crosswalk; source does not verify PowerHouse Uhland.",
          "fields": {
            "reported_context": "Tracker describes Tract Caldwell Valley land expansion inJanuary2026 toward2973acres and4GWultimate masterplan; initial360MWdesign and250MWcontracted timeline conflict in scope.",
            "critical_it_mw": null,
            "verified_texas_water_use_gpd": null
          },
          "notes": [
            "Water1.5-to16.6MGDisMinnesotaproxy, notTexasdisclosure; missingreturnflowisnot100percentconsumption. Originalutilitycontract,sitepermits,currentconstructionandwaterplanunreviewed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://centexdatacenters.org/projects/tract-caldwell-county",
              "host": "centexdatacenters.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round38-2026-10-14.json",
          "scope": "Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.",
          "fields": {
            "reported_context": "Public MuskinElam syndication ofJustinSayers/AustinBusinessJournal reporting quotesTractCIO:1515acresacquired,initial360MWplanned2028,2GWconservativeandapproximately4GWconditionalonrighton-siteenergymixovertenyears. HorizontalinfrastructureestimatedUSD50-to100million;fullcapexnotreleased.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Automaticexcerptselectedunrelatedrealestatestory;actualmainbodyread.800jobsarefullbuildoutforecast,nothires.4GWpotentialnotadditive2plus4orcriticalIT/contractedservice. Initial360notobserveduse. Closed-loopwaterefficiencyintentionnotgallonallocation/zerowater. No-incentiverequestclaimsdatedMay2025city/countyonly,notalltimeallgovernmentawardabsence. NeighborUSD4billionPrimeprojectisnotTract/PowerHouse. USD1.7billionfundraise25GWportfolioandPhoenix20billionnotCaldwellcapex. Later2026landexpansionrequireseparatesource.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://muskin-elam.com/1500-acre-data-center-campus-800-jobs-confirmed-for-small-town-in-caldwell-county/",
              "host": "muskin-elam.com",
              "date": "2025-05-08",
              "published": "2025-05-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Uhland · Caldwell · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48055"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
