{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48057",
    "label": "Calhoun County, Texas"
  },
  "records": [
    {
      "id": "crusoe-blue-energy-victoria-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Crusoe Victoria AI Factory",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Calhoun"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blue Energy and Crusoe proposed gas-to-nuclear campus. 1.5GW is planned nuclear generation, not IT or current operating power. Port name is not proof campus lies in Victoria County; page explicitly names Calhoun. Gas bridge2028and nuclear2031are forecasts, not licensed/energized. Original date and secondary page/template date differ; do not reset announcement to template date. No site exact parcel or NRC construction license read. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-10-30",
          "Crusoe announced the Blue Energy partnership for a future campus near the Port of Victoria. October 30, 2025 is the release date confirmed by its newsroom. Future gas service and nuclear generation targets are not a completed opening or nuclear construction authorization."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center",
          "host": "crusoe.ai",
          "date": "2025-10-30",
          "published": "2025-10-30",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12/query?where=1%3D1&outFields=GEOID%2CSTATE%2CCOUNTY%2CBASENAME%2CNAME%2CLSADC%2CCOUNTYCC%2COBJECTID&returnGeometry=true&outSR=4326&geometryPrecision=4&f=geojson&orderByFields=GEOID",
          "host": "tigerweb.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Retained generalized Census county reference"
        },
        {
          "url": "https://www.crusoe.ai/resources/newsroom?18bea8f7_page=3&1fdf54dd_page=2",
          "host": "www.crusoe.ai",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 28.50431,
        "lng": -96.60401,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Blue Energy and Crusoe proposed gas-to-nuclear campus",
          "fields": {
            "project_region": "Port of Victoria, Texas",
            "operator_named_campus_county": "Calhoun County, Texas",
            "planned_crusoe_campus_acres": 1600,
            "planned_nuclear_plant_generation_gw_max": 1.5,
            "early_gas_powered_service_target_year": 2028,
            "nuclear_generation_target_year": 2031,
            "partners": [
              "Blue Energy",
              "Crusoe"
            ],
            "original_heading_date": "2025-10-30",
            "secondary_template_date": "2026-08-18"
          },
          "notes": [
            "1.5GW is planned nuclear generation, not IT or current operating power. Port name is not proof campus lies in Victoria County; page explicitly names Calhoun. Gas bridge2028and nuclear2031are forecasts, not licensed/energized. Original date and secondary page/template date differ; do not reset announcement to template date. No site exact parcel or NRC construction license read.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center",
              "host": "crusoe.ai",
              "date": "2025-10-30",
              "published": "2025-10-30",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "site-location-correction-20261021-crusoe",
          "scope": "Crusoe explicitly corrects the campus county to Calhoun County, Texas. The Port of Victoria brand does not establish Victoria County or a legal municipality. Correct geographic text and jurisdiction context and suppress the inherited point. No replacement coordinate, physical stage, parcel, power plant or technical quantity promotion.",
          "fields": {
            "campus_county_correction": {
              "operator_named_campus_county": "Calhoun County, Texas",
              "superseded_county": "Victoria County, Texas",
              "municipality_established": false,
              "site_point_adopted": false,
              "power_plant_location_used_as_campus": false
            },
            "county_reference": {
              "name": "Calhoun County",
              "state": "TX",
              "county_fips": "48057",
              "vintage": "2025-01-01",
              "scale": "1:5,000,000",
              "scope": "Generalized display reference, not a project parcel or legal municipality."
            }
          },
          "notes": [
            "The retained older context already warned of the county discrepancy. This makes that correction explicit in current geographic fields.",
            "Planned generation, IT capacity and 2028/2031 forecasts remain separate. None is newly adopted here. County context is not a verified project parcel."
          ],
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center",
              "host": "www.crusoe.ai",
              "published": "2025-10-30",
              "date": "2025-10-30",
              "checked": "2026-10-20",
              "label": "Crusoe"
            },
            {
              "url": "https://tigerweb.geo.census.gov/arcgis/rest/services/Generalized_ACS2025/State_County/MapServer/12/query?where=1%3D1&outFields=GEOID%2CSTATE%2CCOUNTY%2CBASENAME%2CNAME%2CLSADC%2CCOUNTYCC%2COBJECTID&returnGeometry=true&outSR=4326&geometryPrecision=4&f=geojson&orderByFields=GEOID",
              "host": "tigerweb.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Retained generalized Census county reference"
            }
          ],
          "checked": "2026-10-20",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 9",
          "scope": "The Crusoe release heading and newsroom index identify the Blue Energy partnership announcement as October 30, 2025. A secondary August 18, 2026 template date is not used to reset publication. The source explicitly locates the campus in Calhoun County, as already retained. Future gas and nuclear generation targets are not a license, completed energization or current data center operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historic_partnership_forecasts_current_stage_held",
              "scope": "The Crusoe release heading and newsroom index identify the Blue Energy partnership announcement as October 30, 2025. A secondary August 18, 2026 template date is not used to reset publication. The source explicitly locates the campus in Calhoun County, as already retained. Future gas and nuclear generation targets are not a license, completed energization or current data center operation."
            },
            "source_date_and_jurisdiction_context": {
              "heading_and_newsroom_publication_on": "2025-10-30",
              "secondary_template_date": "2026-08-18",
              "county_explicitly_corrected_by_source": "Calhoun",
              "native_county_already_retained": true,
              "future_generation_targets_not_operating_capacity": true
            }
          },
          "notes": [
            "The Crusoe release heading and newsroom index identify the Blue Energy partnership announcement as October 30, 2025. A secondary August 18, 2026 template date is not used to reset publication. The source explicitly locates the campus in Calhoun County, as already retained. Future gas and nuclear generation targets are not a license, completed energization or current data center operation.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center",
              "host": "www.crusoe.ai",
              "published": "2025-10-30",
              "date": "2025-10-30",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.crusoe.ai/resources/newsroom?18bea8f7_page=3&1fdf54dd_page=2",
              "host": "www.crusoe.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Calhoun County · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-10-30",
          "text": "Crusoe announced the Blue Energy partnership for a future campus near the Port of Victoria. October 30, 2025 is the release date confirmed by its newsroom. Future gas service and nuclear generation targets are not a completed opening or nuclear construction authorization.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center",
              "host": "www.crusoe.ai",
              "published": "2025-10-30",
              "date": "2025-10-30",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.crusoe.ai/resources/newsroom?18bea8f7_page=3&1fdf54dd_page=2",
              "host": "www.crusoe.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "48057"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
