{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48065",
    "label": "Carson County, Texas"
  },
  "records": [
    {
      "id": "fermi-matador-amarillo-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Project Matador",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Carson"
      ],
      "city": "Amarillo",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. Original FederalRegister91FR64702-64703/2026-20742 publishedOctober9,2026, datedOctober5/filedOctober8. NRCdraftEISforFOURPROPOSEDAP1000reactorsProjectMatadorNuclearUnits1-4inCARSONCOUNTYadjacentPantex; AmarillomarketlabelnotPotterCountyproof. Dockets05200051-54/NRC2026-0100. PreliminaryrecommendationtoissueCOLisCONTINGENTONSUCCESSFULSAFETYREVIEW, notissuedconstruction/operatinglicense/energizedreactorsorITcapacity. Applicant-preparedEISunderNRCsupervisionandagencyindependentreview; completeEISML26261A417NOTread. InitialJune17,2025application/Aug20supplement/Sep5acceptanceareseparatestages. PUBLICCOMMENTDEADLINENovember23,2026, NOtimeorphysicalhearingstated. Commentslaterconsideredifpractical; do notinventautomaticbanatmidnight. No submissions/emails/registrationperformed. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [
        [
          "2026-10-09",
          "The NRC published its Project Matador nuclear units draft environmental impact statement notice and request for comments on October 9, 2026. The November 23 comment deadline remained future at review. This is a draft review notice, not a combined license, construction approval or operational milestone."
        ],
        [
          "2026-10-21",
          "Fermi published a corrected shareholder financing letter on October 21, 2026, expressly replacing an earlier version from the same day. Its financing options, prospective capacity and delivery discussion are not completed financing for every phase, commissioned generation or operating data centers."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govinfo.gov/content/pkg/FR-2026-10-09/html/2026-20742.htm",
          "host": "govinfo.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://data.texas.gov/resource/5eqq-7nad.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000",
          "host": "data.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Texas Commission on Environmental Quality source context"
        },
        {
          "url": "https://investor.fermiamerica.com/fermi-provides-letter-to-shareholders-from-ceo-lee-mcintire-on-financing-fermi-s-next-chapter",
          "host": "investor.fermiamerica.com",
          "published": "2026-10-21",
          "date": "2026-10-21",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://fermiamerica.com/progress/",
          "host": "fermiamerica.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 35.40352,
        "lng": -101.35422,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "Original FederalRegister91FR64702-64703/2026-20742 publishedOctober9,2026, datedOctober5/filedOctober8. NRCdraftEISforFOURPROPOSEDAP1000reactorsProjectMatadorNuclearUnits1-4inCARSONCOUNTYadjacentPantex; AmarillomarketlabelnotPotterCountyproof. Dockets05200051-54/NRC2026-0100.",
            "PreliminaryrecommendationtoissueCOLisCONTINGENTONSUCCESSFULSAFETYREVIEW, notissuedconstruction/operatinglicense/energizedreactorsorITcapacity. Applicant-preparedEISunderNRCsupervisionandagencyindependentreview; completeEISML26261A417NOTread. InitialJune17,2025application/Aug20supplement/Sep5acceptanceareseparatestages.",
            "PUBLICCOMMENTDEADLINENovember23,2026, NOtimeorphysicalhearingstated. Commentslaterconsideredifpractical; do notinventautomaticbanatmidnight. No submissions/emails/registrationperformed.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://www.govinfo.gov/content/pkg/FR-2026-10-09/html/2026-20742.htm",
              "host": "govinfo.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "texas-registry-2026-10-17",
          "scope": "Official Texas registry source context, with initial eligibility and component triage. Not a physical-site census or current-stage review.",
          "fields": {
            "texas_registry_air_context": {
              "regulated_entity": "RN112258678",
              "registry_name": [
                "FERMI AMERICA PROJECT MATADOR"
              ],
              "program_contexts": [
                {
                  "program": "AIRNSR",
                  "identifiers": [
                    "181009",
                    "183462",
                    "GHGPSDTX254",
                    "GHGPSDTX271",
                    "PSDTX1670",
                    "PSDTX1704"
                  ]
                }
              ],
              "association_scope": "Explicit Fermi America Project Matador and Fermi customer in Carson County support broad existing Matador project context. Power generation is not operating data-center capacity.",
              "limits": "Registry authorizations, emissions reporting and historical customer affiliations can overlap. ACTIVE is a registry value, not proof of signed permit issuance, current operation, title or complete campus buildout. No generator MW, coordinates, street address or physical stage is promoted."
            }
          },
          "notes": [
            "AIRNSR and AIROP entries are registry contexts, not substitutes for signed permits. AIREI is emissions reporting, not a permit. Customer and status dates are not opening, completion or current ownership dates.",
            "The extract is a selected portion of Central Registry and the name/industry query is incomplete for all generator permits. Nonmatches are not evidence of absence."
          ],
          "sources": [
            {
              "url": "https://data.texas.gov/resource/5eqq-7nad.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000",
              "host": "data.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Texas Commission on Environmental Quality source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 21",
          "scope": "Fermi corrected October 21, 2026 shareholder letter describes financing and future delivery strategy for Project Matador. The progress page reports generation equipment acquired, in transit or being refurbished; these states are not commissioned power or operating data centers. The NRC October 9 notice requests comments on a draft environmental impact statement for four proposed nuclear units. It is not a combined license or nuclear construction authorization. The draft comment deadline November 23 remains future on the October 23 check. Exact individual data center building and operating phases remain unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "financing_equipment_logistics_and_draft_nuclear_review_not_commissioned_service",
              "scope": "Fermi corrected October 21, 2026 shareholder letter describes financing and future delivery strategy for Project Matador. The progress page reports generation equipment acquired, in transit or being refurbished; these states are not commissioned power or operating data centers. The NRC October 9 notice requests comments on a draft environmental impact statement for four proposed nuclear units. It is not a combined license or nuclear construction authorization. The draft comment deadline November 23 remains future on the October 23 check. Exact individual data center building and operating phases remain unclear."
            },
            "source_scope": {
              "nrc_document": "2026 20742",
              "nrc_publication_on": "2026-10-09",
              "future_comment_deadline": "2026-11-23",
              "four_proposed_nuclear_units_not_four_completed_data_centers": true,
              "gas_turbine_logistics_not_commissioning": true,
              "same_day_company_release_correction_explicit": true
            }
          },
          "notes": [
            "Fermi corrected October 21, 2026 shareholder letter describes financing and future delivery strategy for Project Matador. The progress page reports generation equipment acquired, in transit or being refurbished; these states are not commissioned power or operating data centers. The NRC October 9 notice requests comments on a draft environmental impact statement for four proposed nuclear units. It is not a combined license or nuclear construction authorization. The draft comment deadline November 23 remains future on the October 23 check. Exact individual data center building and operating phases remain unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://investor.fermiamerica.com/fermi-provides-letter-to-shareholders-from-ceo-lee-mcintire-on-financing-fermi-s-next-chapter",
              "host": "investor.fermiamerica.com",
              "published": "2026-10-21",
              "date": "2026-10-21",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://fermiamerica.com/progress/",
              "host": "fermiamerica.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.govinfo.gov/content/pkg/FR-2026-10-09/html/2026-20742.htm",
              "host": "www.govinfo.gov",
              "published": "2026-10-09",
              "date": "2026-10-09",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Amarillo · Carson · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-10-09",
          "text": "The NRC published its Project Matador nuclear units draft environmental impact statement notice and request for comments on October 9, 2026. The November 23 comment deadline remained future at review. This is a draft review notice, not a combined license, construction approval or operational milestone.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.govinfo.gov/content/pkg/FR-2026-10-09/html/2026-20742.htm",
              "host": "www.govinfo.gov",
              "published": "2026-10-09",
              "date": "2026-10-09",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2026-10-21",
          "text": "Fermi published a corrected shareholder financing letter on October 21, 2026, expressly replacing an earlier version from the same day. Its financing options, prospective capacity and delivery discussion are not completed financing for every phase, commissioned generation or operating data centers.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://investor.fermiamerica.com/fermi-provides-letter-to-shareholders-from-ceo-lee-mcintire-on-financing-fermi-s-next-chapter",
              "host": "investor.fermiamerica.com",
              "published": "2026-10-21",
              "date": "2026-10-21",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48065"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
