  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48141",
    "label": "El Paso County, Texas"
  },
  "records": [
    {
      "id": "meta-el-paso-tx",
      "state": "tx",
      "kind": "project",
      "name": "Meta El Paso AI Data Center Campus",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "AI data center campus",
      "counties": [
        "El Paso"
      ],
      "city": "El Paso",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Expansion announcement, not full energization. Completion date absent. Texas renewable projects exceeding 5000 MW are statewide generation, not campus IT. Water restoration and 2030 targets are goals, not measured annual withdrawals. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-07-28",
          "Meta published an El Paso venture announcement describing construction underway and a forecast 2028 capacity rollout. The date does not establish financial close or construction start."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "host": "datacenters.atmeta.com",
          "date": "2026-03-26",
          "published": "2026-03-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/",
          "host": "about.fb.com",
          "published": "2026-07-28",
          "date": "2026-07-28",
          "checked": "2026-10-16",
          "label": "El Paso construction and venture announcement"
        }
      ],
      "loc": {
        "lat": 31.76867,
        "lng": -106.23478,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_capacity_mw": 1000,
            "power_basis": "not explicitly critical IT",
            "planned_investment_usd_min_exclusive": 10000000000,
            "operational_jobs_once_completed_min_exclusive": 300,
            "peak_construction_jobs_min_exclusive": 4000,
            "groundbreaking_year": 2025
          },
          "notes": [
            "Expansion announcement, not full energization. Completion date absent. Texas renewable projects exceeding 5000 MW are statewide generation, not campus IT. Water restoration and 2030 targets are goals, not measured annual withdrawals.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
              "host": "datacenters.atmeta.com",
              "date": "2026-03-26",
              "published": "2026-03-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-AI-Campus-Depth-20261016",
          "scope": "Named primary-source campus/phase status and technical scope; no whole-record, parcel, ownership or physical-site certification.",
          "fields": {
            "documented_construction": "The July 28 issuer announcement explicitly identifies the El Paso campus as under construction.",
            "future_compute_capacity_label": "Meta labels 1 GW as planned compute capacity, without establishing a utility/IT boundary or measured operation.",
            "capacity_rollout_target": "The venture expected capacity to begin coming online in 2028; year precision and forecast status are retained.",
            "announcement_date_scope": "The visible header shows July 28 and July 27, 2026; article:published_time is July 28. The dated event is the published announcement, not construction start or financial close.",
            "prospective_transaction_scope": "The announced venture expected an 80/20 BlackRock-funds/Meta interest and closing in coming days. Neither actual closing nor current legal title is established by that prospective wording."
          },
          "notes": [
            "The future compute label does not enter utility, IT or operating power totals. The venture announcement distinguishes transaction plans from observed construction.",
            "No opening, exact construction start, tenant occupancy, completed financial close or verified parcel is invented."
          ],
          "sources": [
            {
              "url": "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/",
              "host": "about.fb.com",
              "published": "2026-07-28",
              "date": "2026-07-28",
              "checked": "2026-10-16",
              "label": "El Paso construction and venture announcement"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "El Paso · El Paso · Source context reviewed",
      "status_scope": "Meta explicitly described the El Paso campus as under construction in its July 28, 2026 announcement. Capacity delivery and venture closing were prospective, not completed outcomes.",
      "event_evidence": [
        {
          "date": "2026-07-28",
          "text": "Meta published an El Paso venture announcement describing construction underway and a forecast 2028 capacity rollout. The date does not establish financial close or construction start.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/",
              "host": "about.fb.com",
              "published": "2026-07-28",
              "date": "2026-07-28",
              "checked": "2026-10-16",
              "label": "El Paso construction and venture announcement"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48141"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}