{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48173",
    "label": "Glasscock County, Texas"
  },
  "records": [
    {
      "id": "marathon-digital-garden-city-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Marathon Digital Garden City Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Glasscock"
      ],
      "city": "Garden City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Agreement is not observed closing; gross 97.3 million before adjustments is not additive consideration. Site power is not critical IT demand. The article incorrectly places Ellendale in Texas in one passage; no location or outage event is transferred between the sites. Current operation remains unverified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://theminermag.com/news/2024-03-15/marathon-bitcoin-mining-applied-digital-garden-city-acquire",
          "host": "theminermag.com",
          "date": "2024-03-15",
          "published": "2024-03-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000007/0001507605-26-000007.pdf",
          "host": "ir.mara.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000022/mara-20260630.htm",
          "host": "ir.mara.com",
          "published": "2026-08-06",
          "date": "2026-08-06",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 31.86942,
        "lng": -101.52076,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The Miner Mag reports Marathon's agreement to acquire Applied Digital's 200 MW Garden City mining site, with an adjusted 87.3-million-USD price and a second-quarter closing target.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Agreement is not observed closing; gross 97.3 million before adjustments is not additive consideration. Site power is not critical IT demand. The article incorrectly places Ellendale in Texas in one passage; no location or outage event is transferred between the sites. Current operation remains unverified.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://theminermag.com/news/2024-03-15/marathon-bitcoin-mining-applied-digital-garden-city-acquire",
              "host": "theminermag.com",
              "date": "2024-03-15",
              "published": "2024-03-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 21",
          "scope": "MARA annual filing records acquisition of an operational Garden City site on April 1, 2024. Its later second quarter 2026 filing discusses storm damage to some mining equipment in the second quarter of 2025. Neither a historical operational acquisition nor an equipment impairment establishes the current whole facility phase, recovery, permanent closure or a new physical opening day. Portfolio results and Granbury operations are not transferred to Garden City. Current individual phase remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_operating_acquisition_and_prior_equipment_damage_not_current_phase",
              "scope": "MARA annual filing records acquisition of an operational Garden City site on April 1, 2024. Its later second quarter 2026 filing discusses storm damage to some mining equipment in the second quarter of 2025. Neither a historical operational acquisition nor an equipment impairment establishes the current whole facility phase, recovery, permanent closure or a new physical opening day. Portfolio results and Granbury operations are not transferred to Garden City. Current individual phase remains unclear."
            },
            "source_scope": {
              "acquisition_account_on": "2024-04-01",
              "damage_reporting_period": "second quarter 2025",
              "equipment_damage_not_whole_site_shutdown": true,
              "no_recovery_or_current_operation_inferred": true
            }
          },
          "notes": [
            "MARA annual filing records acquisition of an operational Garden City site on April 1, 2024. Its later second quarter 2026 filing discusses storm damage to some mining equipment in the second quarter of 2025. Neither a historical operational acquisition nor an equipment impairment establishes the current whole facility phase, recovery, permanent closure or a new physical opening day. Portfolio results and Granbury operations are not transferred to Garden City. Current individual phase remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000007/0001507605-26-000007.pdf",
              "host": "ir.mara.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000022/mara-20260630.htm",
              "host": "ir.mara.com",
              "published": "2026-08-06",
              "date": "2026-08-06",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Garden City · Glasscock · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48173"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
