{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48179",
    "label": "Gray County, Texas"
  },
  "records": [
    {
      "id": "google-meitner-pampa-tx",
      "state": "tx",
      "kind": "project",
      "name": "Google Meitner Energy Center",
      "group": "building",
      "status": "Construction announced",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Gray"
      ],
      "city": "Pampa",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The article implies an already completed Intersect acquisition; the original seller instead dates completion to March 10, 2026. A parent transaction does not prove site tenant identity. Direct and broader jobs differ, and off-grid or cooling assertions are not verified permit terms. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Transaction price is company acquisition consideration, not Pampa construction spending. This does not independently establish end tenant at Meitner. Existing grid-tied assets spun into IPX Power. Do not label all former Intersect generation/storage assets Google-owned;4.4GWsolar and8.8GWhstorage use different units and belong to described IPX portfolio.",
      "date": "",
      "events": [
        [
          "2026-06-04",
          "Google and Intersect announced construction of the Meitner Energy Center, including a data center and separate co-located generation in Gray and Roberts Counties. Announcement date; exact physical construction-start and energization dates are not established."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.newschannel10.com/2026/01/17/pampas-3-billion-ai-data-center-signals-new-era-growth-gray-county/",
          "host": "newschannel10.com",
          "date": "2026-01-16",
          "published": "2026-01-16",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.tpg.com/news-and-insights/tpg-announces-completion-of-4-75-billion-sale-of-intersect-to-google-launches-ipx-power-as-independent-power-producer",
          "host": "tpg.com",
          "date": "2026-03-10",
          "published": "2026-03-10",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/texas/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/meitner-energy-center/",
          "host": "blog.google",
          "published": "2026-06-04",
          "date": "2026-06-04",
          "checked": "2026-10-16",
          "label": "Google official location source"
        }
      ],
      "loc": {
        "lat": 35.40079,
        "lng": -100.81274,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "KFDA reports December groundbreaking for Meitner in Pampa and three planned 750,000-square-foot buildings.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The article implies an already completed Intersect acquisition; the original seller instead dates completion to March 10, 2026. A parent transaction does not prove site tenant identity. Direct and broader jobs differ, and off-grid or cooling assertions are not verified permit terms.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.newschannel10.com/2026/01/17/pampas-3-billion-ai-data-center-signals-new-era-growth-gray-county/",
              "host": "newschannel10.com",
              "date": "2026-01-16",
              "published": "2026-01-16",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "Original seller announcement dates completion of Google acquisition of Intersect digital power business to March10,2026; agreement announced December22,2025.",
            "parent_transaction_completion_announcement_date": "2026-03-10",
            "parent_transaction_agreement_announcement_date": "2025-12-22",
            "sale_price_usd_excluding_assumed_debt": 4750000000
          },
          "notes": [
            "Transaction price is company acquisition consideration, not Pampa construction spending. This does not independently establish end tenant at Meitner.",
            "Existing grid-tied assets spun into IPX Power. Do not label all former Intersect generation/storage assets Google-owned;4.4GWsolar and8.8GWhstorage use different units and belong to described IPX portfolio.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tpg.com/news-and-insights/tpg-announces-completion-of-4-75-billion-sale-of-intersect-to-google-launches-ipx-power-as-independent-power-producer",
              "host": "tpg.com",
              "date": "2026-03-10",
              "published": "2026-03-10",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "Pampa, Texas is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "current_development_scope": "The June 4, 2026 operator announcement explicitly announces construction of the Meitner Energy Center with Intersect in Gray and Roberts Counties. Data center and co-located generation remain separate; future coming-online language is not an accomplished energization.",
            "current_status_basis": "Google and Intersect announced construction of the Meitner Energy Center on June 4, 2026, in Gray and Roberts Counties. This is an operator construction announcement, not verified completion, an energized data center or commissioned generation. Existing inherited Gray County attributes and approximate point remain unchanged; broader source geography is separate."
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/texas/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/meitner-energy-center/",
              "host": "blog.google",
              "published": "2026-06-04",
              "date": "2026-06-04",
              "checked": "2026-10-16",
              "label": "Google official location source"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pampa · Gray · Source context reviewed",
      "status_scope": "Google and Intersect announced construction of the Meitner Energy Center on June 4, 2026, in Gray and Roberts Counties. This is an operator construction announcement, not verified completion, an energized data center or commissioned generation. Existing inherited Gray County attributes and approximate point remain unchanged; broader source geography is separate.",
      "event_evidence": [
        {
          "date": "2026-06-04",
          "text": "Google and Intersect announced construction of the Meitner Energy Center, including a data center and separate co-located generation in Gray and Roberts Counties. Announcement date; exact physical construction-start and energization dates are not established.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/meitner-energy-center/",
              "host": "blog.google",
              "published": "2026-06-04",
              "date": "2026-06-04",
              "checked": "2026-10-16",
              "label": "Google official location source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48179"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
