{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48209",
    "label": "Hays County, Texas"
  },
  "records": [
    {
      "id": "cloudburst-san-marcos-tx",
      "state": "tx",
      "kind": "facility",
      "name": "CloudBurst San Marcos GigaCenter",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hays"
      ],
      "city": "San Marcos",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. Evolve project-participant page posted November24,2025 reproduces November5 issuer announcement of CloudBurst SanMarcosDataCenterI groundbreaking. Located in Hays/Guadalupe corridor, not the Houston design-firm office. Independent parcel/title/permit and current construction outcome unread. Participant company names are not two independent confirmations. Up to1.2GW AI/HPC capacity has no explicit criticalITbasis; first50MWQ42026 is a target included in campus total, not1.25GW or observedenergization.450000MMBtu/day gas-supply claim and potential1.8GWgeneration are different units/systems, not extraIT to addto1.2GW. Underlying gas agreement unread, and gas access is not electrical interconnection/air-permit approval. Qualitative water-efficiency promises notmeasuredconsumption. Other Oklahoma plans/200worldwideprojects experience not newUSoperatingcensus. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.",
      "date": "",
      "events": [
        [
          "2025-11-05",
          "Evolve and CloudBurst announced groundbreaking for the San Marcos campus. November 5 is the release date. The future first phase service target is not an observed opening, current construction inspection or delivered IT capacity."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas",
          "host": "evolveincorporated.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 30.05779,
        "lng": -98.03108,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-original-transactions-and-legal-stage-review-round73-2026-10-15.json",
          "scope": "Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.",
          "fields": {},
          "notes": [
            "Evolve project-participant page posted November24,2025 reproduces November5 issuer announcement of CloudBurst SanMarcosDataCenterI groundbreaking. Located in Hays/Guadalupe corridor, not the Houston design-firm office. Independent parcel/title/permit and current construction outcome unread. Participant company names are not two independent confirmations.",
            "Up to1.2GW AI/HPC capacity has no explicit criticalITbasis; first50MWQ42026 is a target included in campus total, not1.25GW or observedenergization.450000MMBtu/day gas-supply claim and potential1.8GWgeneration are different units/systems, not extraIT to addto1.2GW. Underlying gas agreement unread, and gas access is not electrical interconnection/air-permit approval. Qualitative water-efficiency promises notmeasuredconsumption. Other Oklahoma plans/200worldwideprojects experience not newUSoperatingcensus.",
            "Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."
          ],
          "sources": [
            {
              "url": "https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas",
              "host": "evolveincorporated.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 9",
          "scope": "Evolve and CloudBurst announced groundbreaking for San Marcos Data Center I in a November 5, 2025 release. The first phase service target in the fourth quarter of 2026 remains a forecast. The dated release does not independently establish current construction progress, completed service or allocation of the campus generation and master plan figures to an operating phase.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_groundbreaking_current_stage_held",
              "scope": "Evolve and CloudBurst announced groundbreaking for San Marcos Data Center I in a November 5, 2025 release. The first phase service target in the fourth quarter of 2026 remains a forecast. The dated release does not independently establish current construction progress, completed service or allocation of the campus generation and master plan figures to an operating phase."
            }
          },
          "notes": [
            "Evolve and CloudBurst announced groundbreaking for San Marcos Data Center I in a November 5, 2025 release. The first phase service target in the fourth quarter of 2026 remains a forecast. The dated release does not independently establish current construction progress, completed service or allocation of the campus generation and master plan figures to an operating phase.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas",
              "host": "evolveincorporated.com",
              "published": "2025-11-05",
              "date": "2025-11-05",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "San Marcos · Hays · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-11-05",
          "text": "Evolve and CloudBurst announced groundbreaking for the San Marcos campus. November 5 is the release date. The future first phase service target is not an observed opening, current construction inspection or delivered IT capacity.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas",
              "host": "evolveincorporated.com",
              "published": "2025-11-05",
              "date": "2025-11-05",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48209"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
