{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48221",
    "label": "Hood County, Texas"
  },
  "records": [
    {
      "id": "comanche-circle-sailfish-hood-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Comanche Circle",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hood"
      ],
      "city": "Tolar",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Failed pause is not adoption or approval of any project. County authority arguments and residents water concerns are attributed; not a court holding or verified site consumption. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/",
          "host": "texastribune.org",
          "date": "2026-02-10",
          "published": "2026-02-10",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.43003,
        "lng": -97.83209,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "moratorium-proposal-rejected",
            "reported_finding": "Texas Tribune reports Hood County voted 3-2 against a proposed six-month industrial-development pause. Comanche Circle / Sailfish is one proposal discussed.",
            "report_display_date": "2026-02-10",
            "independently_verified_current_status": null
          },
          "notes": [
            "Failed pause is not adoption or approval of any project. County authority arguments and residents water concerns are attributed; not a court holding or verified site consumption.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.texastribune.org/2026/02/10/texas-hood-county-rejects-data-center-development-pause-ai/",
              "host": "texastribune.org",
              "date": "2026-02-10",
              "published": "2026-02-10",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Tolar · Hood · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48221"
      }
    },
    {
      "id": "fort-spunky-pacifico-energy-hood-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Fort Spunky",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hood"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Grid requests and water forecasts are not actual demand. Requested court relief is not an award. Comanche Circle water figures are separate and disputed. Hood moratorium votes failed. Round twenty's later Hill County rescission reporting takes precedence over this older account. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.texastribune.org/2026/06/02/texas-data-centers-hood-county-local-control-rural-water-power/",
          "host": "texastribune.org",
          "date": "2026-06-02",
          "published": "2026-06-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.44102,
        "lng": -97.84408,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "Texas Tribune reports Fort Spunky's concept approval was revoked after a water request was denied, followed by Pacifico litigation.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Grid requests and water forecasts are not actual demand. Requested court relief is not an award. Comanche Circle water figures are separate and disputed. Hood moratorium votes failed. Round twenty's later Hill County rescission reporting takes precedence over this older account.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.texastribune.org/2026/06/02/texas-data-centers-hood-county-local-control-rural-water-power/",
              "host": "texastribune.org",
              "date": "2026-06-02",
              "published": "2026-06-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hood · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48221"
      }
    },
    {
      "id": "mara-granbury-hood-tx",
      "state": "tx",
      "kind": "facility",
      "name": "MARA Granbury Facility",
      "group": "operating",
      "status": "Filing reported operations",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Hood"
      ],
      "city": "Granbury",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Colleen DeGuzman, TexasTribune October9,2025, clarification14:50Central, original onsite/company/county reporting: Granbury-area MARA noise dispute and then-future MitchellBend incorporation vote. No2025 election result/current2026 ordinance inferred.67% immersion conversion is company claim; resident readings and county-funded October2024 study use different protocols/locations. Report quotes study caveat that typical mine operation during monitoring could not be confirmed. No measured universal85dB breach or medical causation adopted.1.2B investment is company TEXAS-SITES total, not this mine alone. Statewide counts, legal/tax shortcuts and household equivalences not current census/legal advice. Republish copies are duplicate text, not extra sources. Not all fields, current operation, permits, exact parcel or critical IT independently verified. Original historical acoustic-study method, metric and operational/source-attribution limits.. Not current noise, causal health evidence or an applicable-law compliance judgment.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.texastribune.org/2025/10/09/texas-hood-county-crypto-noise-incorporate-city/",
          "host": "texastribune.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://hoodcountytx.documents-on-demand.com/document/446290f6-6aa7-ef11-a428-000c29a59557/2024.11.01%20Cryptocurrency%20Mine%20Sound%20Level%20Investigation",
          "host": "hoodcountytx.documents-on-demand.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1507605/000150760526000007/mara-20251231.htm",
          "host": "www.sec.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "MARA Holdings reviewed source"
        },
        {
          "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000007/0001507605-26-000007.pdf",
          "host": "ir.mara.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000022/mara-20260630.htm",
          "host": "ir.mara.com",
          "published": "2026-08-06",
          "date": "2026-08-06",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 32.40711,
        "lng": -97.83008,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json",
          "scope": "Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.",
          "fields": {},
          "notes": [
            "Colleen DeGuzman, TexasTribune October9,2025, clarification14:50Central, original onsite/company/county reporting: Granbury-area MARA noise dispute and then-future MitchellBend incorporation vote. No2025 election result/current2026 ordinance inferred.67% immersion conversion is company claim; resident readings and county-funded October2024 study use different protocols/locations. Report quotes study caveat that typical mine operation during monitoring could not be confirmed. No measured universal85dB breach or medical causation adopted.1.2B investment is company TEXAS-SITES total, not this mine alone. Statewide counts, legal/tax shortcuts and household equivalences not current census/legal advice. Republish copies are duplicate text, not extra sources.",
            "Not all fields, current operation, permits, exact parcel or critical IT independently verified."
          ],
          "sources": [
            {
              "url": "https://www.texastribune.org/2025/10/09/texas-hood-county-crypto-noise-incorporate-city/",
              "host": "texastribune.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-original-noise-and-water-reporting-review-round86-2026-10-15.json",
          "scope": "Original historical acoustic-study method, metric and operational/source-attribution limits.",
          "fields": {},
          "notes": [
            "Not current noise, causal health evidence or an applicable-law compliance judgment."
          ],
          "sources": [
            {
              "url": "https://hoodcountytx.documents-on-demand.com/document/446290f6-6aa7-ef11-a428-000c29a59557/2024.11.01%20Cryptocurrency%20Mine%20Sound%20Level%20Investigation",
              "host": "hoodcountytx.documents-on-demand.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_property_context": {
              "issuer": "MARA Holdings",
              "reporting_period": "2025-12-31",
              "source_name": "Granbury, Texas",
              "scope": "Named owned-site example within a regional portfolio. No separate operating-versus-total MW adoption, opening date or current whole-site certification."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1507605/000150760526000007/mara-20251231.htm",
              "host": "www.sec.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "MARA Holdings reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 21",
          "scope": "MARA annual filing describes Granbury as an owned operating site and explicitly reports energized mining hashrate as of December 31, 2025. Filing reported operations describes that named facility and reporting period. The later second quarter 2026 filing gives portfolio results without naming Granbury and does not independently update its individual physical phase. Aggregate inference strategy does not certify a completed campus AI conversion. No exact opening day, actual quantity, current nuisance merits outcome or provider role is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_granbury_operations_at_reported_period_not_aggregate_ai_conversion",
              "scope": "MARA annual filing describes Granbury as an owned operating site and explicitly reports energized mining hashrate as of December 31, 2025. Filing reported operations describes that named facility and reporting period. The later second quarter 2026 filing gives portfolio results without naming Granbury and does not independently update its individual physical phase. Aggregate inference strategy does not certify a completed campus AI conversion. No exact opening day, actual quantity, current nuisance merits outcome or provider role is adopted."
            },
            "source_scope": {
              "explicit_operations_as_of": "2025-12-31",
              "annual_filing_operations_pdf_page_visually_read": 11,
              "page_printed_number": 12,
              "later_q2_filing_does_not_name_granbury": true,
              "existing_noise_concerns_not_duplicated_or_resolved": true
            }
          },
          "notes": [
            "MARA annual filing describes Granbury as an owned operating site and explicitly reports energized mining hashrate as of December 31, 2025. Filing reported operations describes that named facility and reporting period. The later second quarter 2026 filing gives portfolio results without naming Granbury and does not independently update its individual physical phase. Aggregate inference strategy does not certify a completed campus AI conversion. No exact opening day, actual quantity, current nuisance merits outcome or provider role is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000007/0001507605-26-000007.pdf",
              "host": "ir.mara.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000022/mara-20260630.htm",
              "host": "ir.mara.com",
              "published": "2026-08-06",
              "date": "2026-08-06",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Granbury · Hood · Source context reviewed",
      "status_scope": "MARA annual filing describes Granbury as an owned operating site and explicitly reports energized mining hashrate as of December 31, 2025. Filing reported operations describes that named facility and reporting period. The later second quarter 2026 filing gives portfolio results without naming Granbury and does not independently update its individual physical phase. Aggregate inference strategy does not certify a completed campus AI conversion. No exact opening day, actual quantity, current nuisance merits outcome or provider role is adopted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48221"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
