{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48371",
    "label": "Pecos County, Texas"
  },
  "records": [
    {
      "id": "amazon-pecos-county-data-center-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Amazon Pecos County Data Center Campus",
      "group": "proposed",
      "status": "Operator-announced campus",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Pecos"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Amazon Pecos County statement. No numeric IT MW, investment, opening date or permanent-versus-construction job split in reviewed statement. Solar/battery/produced-water options exploratory. Statement about ratepayer effects is developer claim, not adjudicated tariff finding. Publication day not present in saved body; metadata candidate not treated as event date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs",
          "host": "aboutamazon.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 30.78087,
        "lng": -102.72358,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Amazon Pecos County statement",
          "fields": {
            "project_county": "Pecos County, Texas",
            "developer_described_initial_power": "new on-site generation with intended later grid connection",
            "water_plan": "non-potable water; exploring produced-water use",
            "operator_expected_jobs_description": "thousands of new jobs"
          },
          "notes": [
            "No numeric IT MW, investment, opening date or permanent-versus-construction job split in reviewed statement. Solar/battery/produced-water options exploratory. Statement about ratepayer effects is developer claim, not adjudicated tariff finding. Publication day not present in saved body; metadata candidate not treated as event date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs",
              "host": "aboutamazon.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "status-continuation-2026-10-19",
          "scope": "Amazon describes a planned data center campus in Pecos County.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_announced_campus",
              "scope": "Amazon describes a planned data center campus in Pecos County."
            }
          },
          "notes": [
            "This supports the announced project only. Promised energy, water, rate and employment outcomes are not measured facts or evidence of operation."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs",
              "host": "www.aboutamazon.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pecos · Source context reviewed",
      "status_scope": "Amazon describes a planned data center campus in Pecos County.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48371"
      }
    },
    {
      "id": "gw-ranch-pacifico-energy-pecos-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "GW Ranch",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Pecos"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 7.65 GW figure describes planned gas generation, not operating or critical IT demand. Permit emissions ceilings are not actual emissions. Solar MW and battery power are not energy in MWh. Future grid and produced-water options are not secured service or perpetual off-grid commitments. Original transaction and air permit remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://constructionreviewonline.com/amazon-backs-7-65-gw-gas-plant-in-texas-to-power-new-ai-data-center-campus/",
          "host": "constructionreviewonline.com",
          "date": "2026-08-08",
          "published": "2026-08-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.pacificoenergy.com/gw-ranch",
          "host": "www.pacificoenergy.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 30.8254,
        "lng": -102.77219,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Construction Review reports an Amazon-planned Pecos County campus at GW Ranch with Pacifico Energy generation, quoting Amazon confirmation.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The 7.65 GW figure describes planned gas generation, not operating or critical IT demand. Permit emissions ceilings are not actual emissions. Solar MW and battery power are not energy in MWh. Future grid and produced-water options are not secured service or perpetual off-grid commitments. Original transaction and air permit remain unreviewed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://constructionreviewonline.com/amazon-backs-7-65-gw-gas-plant-in-texas-to-power-new-ai-data-center-campus/",
              "host": "constructionreviewonline.com",
              "date": "2026-08-08",
              "published": "2026-08-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 53",
          "scope": "The current original GW Ranch page describes a private grid power generation campus under development, with approved air permitting and future first power targets. A power development and an air authorization do not establish a particular computing building physical stage, occupancy or operating service. No generation capacity is transferred to an IT quantity and no current computing stage is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "power_campus_not_exact_computing_facility",
              "scope": "The current original GW Ranch page describes a private grid power generation campus under development, with approved air permitting and future first power targets. A power development and an air authorization do not establish a particular computing building physical stage, occupancy or operating service. No generation capacity is transferred to an IT quantity and no current computing stage is promoted."
            },
            "source_read_scope": {
              "selected_sections": [
                "GW Ranch introduction",
                "Development and first power targets"
              ],
              "no_power_water_or_air_fact_fields_changed": true
            }
          },
          "notes": [
            "The current original GW Ranch page describes a private grid power generation campus under development, with approved air permitting and future first power targets. A power development and an air authorization do not establish a particular computing building physical stage, occupancy or operating service. No generation capacity is transferred to an IT quantity and no current computing stage is promoted.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.pacificoenergy.com/gw-ranch",
              "host": "www.pacificoenergy.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pecos · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48371"
      }
    },
    {
      "id": "lancium-fort-stockton-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Lancium Fort Stockton Clean Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Pecos"
      ],
      "city": "Fort Stockton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. Historical completion targets not delivery evidence2026. Hundreds of millions and dozens jobs not exact values. Grid-flexible load is not proof carbon-free generation or current AI hosting.25MWis nested in325MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html",
          "host": "prnewswire.com",
          "date": "2021-09-15",
          "published": "2021-09-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 30.688,
        "lng": -102.71543,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-release-review-round6-2026-10-14.json",
          "scope": "named issuer release",
          "fields": {
            "groundbreaking_announcement": "2021-09-15",
            "first_stage_planned_power_mw": 25,
            "first_stage_completion_target": "2022-Q1",
            "full_capacity_target_mw": 325,
            "full_capacity_target_year": 2022,
            "initial_planned_area_sqft_min_exclusive": 100000,
            "initial_computing_use": "bitcoin mining and other high-throughput computing"
          },
          "notes": [
            "Historical completion targets not delivery evidence2026. Hundreds of millions and dozens jobs not exact values. Grid-flexible load is not proof carbon-free generation or current AI hosting.25MWis nested in325MW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html",
              "host": "prnewswire.com",
              "date": "2021-09-15",
              "published": "2021-09-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Fort Stockton · Pecos · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48371"
      }
    },
    {
      "id": "poolside-project-horizon-pecos-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Poolside Project Horizon AI Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Pecos"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Paul Ciampoli, APPA October15,2025 reproduces Poolside founders public announcement:2GW campus planned in eight250MW phases on568acres; CoreWeave anchor250MW15yearlease/500MWreserved future expansion is nested in overall plan, not2750MW. Immediate40000+GPUs coming viaCoreWeave beginningDecember2025 not proved installed atHorizon. Behind-meter aero-derivative/SCR/gridbackup/BESS designs not air permits, measured emissions or energization. Source saysWestTexas, not exact Pecos parcel. Founder statement as reproduced, not APPA regulator approval or independent completed-site audit. Not all fields, current operation, permits, exact parcel or critical IT independently verified. AirStreetPress/NathanBenaich October27,2025 firsthand investor perspective explicitly discloses Poolside portfolio affiliation. Names partofLongfellowRanch, planned2GW/eightphases/250MWCoreWeave anchor. Ranchname not exact campus boundary/county certification; no signed lease/ESA/airpermit or completedphase inspected. Investor advocacy is not independent confirmation of issuerclaims. Gridbackup/generation/BESS and existingwateraccess not proof zero water or carbon.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.publicpower.org/periodical/article/plans-unveiled-2-gw-artificial-intelligence-campus-west-texas",
          "host": "publicpower.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://press.airstreet.com/p/poolside-launches-project-horizon-ai-compute",
          "host": "press.airstreet.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://poolside.ai/",
          "host": "poolside.ai",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 30.87149,
        "lng": -102.6541,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json",
          "scope": "Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.",
          "fields": {},
          "notes": [
            "Paul Ciampoli, APPA October15,2025 reproduces Poolside founders public announcement:2GW campus planned in eight250MW phases on568acres; CoreWeave anchor250MW15yearlease/500MWreserved future expansion is nested in overall plan, not2750MW. Immediate40000+GPUs coming viaCoreWeave beginningDecember2025 not proved installed atHorizon. Behind-meter aero-derivative/SCR/gridbackup/BESS designs not air permits, measured emissions or energization. Source saysWestTexas, not exact Pecos parcel. Founder statement as reproduced, not APPA regulator approval or independent completed-site audit.",
            "Not all fields, current operation, permits, exact parcel or critical IT independently verified."
          ],
          "sources": [
            {
              "url": "https://www.publicpower.org/periodical/article/plans-unveiled-2-gw-artificial-intelligence-campus-west-texas",
              "host": "publicpower.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json",
          "scope": "Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.",
          "fields": {},
          "notes": [
            "AirStreetPress/NathanBenaich October27,2025 firsthand investor perspective explicitly discloses Poolside portfolio affiliation. Names partofLongfellowRanch, planned2GW/eightphases/250MWCoreWeave anchor. Ranchname not exact campus boundary/county certification; no signed lease/ESA/airpermit or completedphase inspected. Investor advocacy is not independent confirmation of issuerclaims. Gridbackup/generation/BESS and existingwateraccess not proof zero water or carbon.",
            "Not all fields, current operation, permits, exact parcel or critical IT independently verified."
          ],
          "sources": [
            {
              "url": "https://press.airstreet.com/p/poolside-launches-project-horizon-ai-compute",
              "host": "press.airstreet.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 53",
          "scope": "The selected current original Poolside home page discusses model products and general company services. It does not provide an exact current Project Horizon physical stage or a verified tenancy outcome. Historical partnership forecasts and secondary reports of contract changes do not independently establish current campus construction, closure or operator roles.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "generic_company_source_not_project_stage",
              "scope": "The selected current original Poolside home page discusses model products and general company services. It does not provide an exact current Project Horizon physical stage or a verified tenancy outcome. Historical partnership forecasts and secondary reports of contract changes do not independently establish current campus construction, closure or operator roles."
            },
            "source_read_scope": {
              "homepage_main_text_read": true,
              "project_horizon_not_substantively_established": true
            }
          },
          "notes": [
            "The selected current original Poolside home page discusses model products and general company services. It does not provide an exact current Project Horizon physical stage or a verified tenancy outcome. Historical partnership forecasts and secondary reports of contract changes do not independently establish current campus construction, closure or operator roles.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://poolside.ai/",
              "host": "poolside.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pecos · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48371"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
