{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48415",
    "label": "Scurry County, Texas"
  },
  "records": [
    {
      "id": "energy-vault-snyder-scurry-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Energy Vault Snyder AI Campus",
      "group": "proposed",
      "status": "Operator listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Scurry"
      ],
      "city": "Snyder",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Powered shell is not critical IT or actual computing load. The 25 MW phase and possible 500 MW site expansion are not additive. Ten modular units are not ten campuses. A later search excerpt gives a broader target, but its original body was unavailable. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://usdatacenterprojects.com/texas/energy-vault-breaks-ground-on-ai-data-center-campus-in-snyder-texas",
          "host": "usdatacenterprojects.com",
          "date": "2026-07-27",
          "published": "2026-07-27",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.energyvault.com/projects/snyder-ai",
          "host": "www.energyvault.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.energyvault.com/hubfs/EV_one-pager_Snyder-AI_v11-1.pdf",
          "host": "www.energyvault.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 32.74616,
        "lng": -100.91639,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "US Data Center Projects reports Energy Vault Snyder groundbreaking and an initial eight MW of powered shell targeted for early 2027.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Powered shell is not critical IT or actual computing load. The 25 MW phase and possible 500 MW site expansion are not additive. Ten modular units are not ten campuses. A later search excerpt gives a broader target, but its original body was unavailable.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://usdatacenterprojects.com/texas/energy-vault-breaks-ground-on-ai-data-center-campus-in-snyder-texas",
              "host": "usdatacenterprojects.com",
              "date": "2026-07-27",
              "published": "2026-07-27",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 21",
          "scope": "Energy Vault current Snyder AI project page describes a modular campus and targets initial commercial operation in the first quarter of 2027. Its linked undated fact sheet calls the deployment proposed and contains an older 2026 first capacity target. Operator listed development describes the named project listing, not an actual physical construction phase. The July 27 company release linked through its newsroom could not be captured after robots transport failure. Forecasts, modular delivery descriptions and rendered images do not establish operation, actual water use or an exact construction start.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_project_development_with_forecast_and_source_version_limits",
              "scope": "Energy Vault current Snyder AI project page describes a modular campus and targets initial commercial operation in the first quarter of 2027. Its linked undated fact sheet calls the deployment proposed and contains an older 2026 first capacity target. Operator listed development describes the named project listing, not an actual physical construction phase. The July 27 company release linked through its newsroom could not be captured after robots transport failure. Forecasts, modular delivery descriptions and rendered images do not establish operation, actual water use or an exact construction start."
            },
            "source_scope": {
              "current_phase_one_target": "Q1 2027",
              "undated_sheet_target": "2026",
              "forecast_conflict_not_reconciled_as_actual_delivery": true,
              "linked_release_access_held": true,
              "rendered_images_not_site_inspection": true
            }
          },
          "notes": [
            "Energy Vault current Snyder AI project page describes a modular campus and targets initial commercial operation in the first quarter of 2027. Its linked undated fact sheet calls the deployment proposed and contains an older 2026 first capacity target. Operator listed development describes the named project listing, not an actual physical construction phase. The July 27 company release linked through its newsroom could not be captured after robots transport failure. Forecasts, modular delivery descriptions and rendered images do not establish operation, actual water use or an exact construction start.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.energyvault.com/projects/snyder-ai",
              "host": "www.energyvault.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.energyvault.com/hubfs/EV_one-pager_Snyder-AI_v11-1.pdf",
              "host": "www.energyvault.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Snyder · Scurry · Source context reviewed",
      "status_scope": "Energy Vault current Snyder AI project page describes a modular campus and targets initial commercial operation in the first quarter of 2027. Its linked undated fact sheet calls the deployment proposed and contains an older 2026 first capacity target. Operator listed development describes the named project listing, not an actual physical construction phase. The July 27 company release linked through its newsroom could not be captured after robots transport failure. Forecasts, modular delivery descriptions and rendered images do not establish operation, actual water use or an exact construction start.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48415"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
