{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48417",
    "label": "Shackelford County, Texas"
  },
  "records": [
    {
      "id": "vantage-frontier-shackelford-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Vantage Frontier Campus",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Shackelford"
      ],
      "city": "",
      "address": "",
      "who": "Vantage Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Compute capacity is not measured gross utility demand. Future delivery window has not been independently verified. Jobs combine construction and operations, not5000permanent. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
          "host": "vantage-dc.com",
          "date": "2025-08-19",
          "published": "2025-08-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 32.73597,
        "lng": -99.35405,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_investment_usd_min_exclusive": 25000000000,
            "planned_gpu_compute_capacity_gw": 1.4,
            "campus_acres": 1200,
            "planned_buildings": 10,
            "planned_area_sqft": 3700000,
            "construction_stage_at_release": "begun",
            "first_building_delivery_target": "2026-H2",
            "forecast_jobs_construction_and_operations_min_exclusive": 5000
          },
          "notes": [
            "Compute capacity is not measured gross utility demand. Future delivery window has not been independently verified. Jobs combine construction and operations, not5000permanent.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
              "host": "vantage-dc.com",
              "date": "2025-08-19",
              "published": "2025-08-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Under construction",
              "basis": "Vantage’s August 19, 2025 announcement explicitly says construction had begun on the named Frontier campus. The current Shackelford County page continues to describe the first building’s delivery as scheduled for the second half of 2026.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The scheduled window is not proof of delivery, occupancy or operation. Planned buildings and campus IT or GPU-compute envelopes are not counted as completed or metered capacity."
          },
          "notes": [
            "The scheduled window is not proof of delivery, occupancy or operation. Planned buildings and campus IT or GPU-compute envelopes are not counted as completed or metered capacity.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
              "host": "vantage-dc.com",
              "published": "2025-08-19",
              "date": "2025-08-19",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            },
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 15, October 23, 2026",
          "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The August 19, 2025 Frontier source names Shackelford County and a second half 2026 delivery target. This role does not verify later delivery, full campus capacity, water savings or commissioning.",
          "fields": {
            "company_association": {
              "name": "Vantage Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The August 19, 2025 Frontier source names Shackelford County and a second half 2026 delivery target. This role does not verify later delivery, full campus capacity, water savings or commissioning."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Vantage Data Centers explicitly identifies the named campus or building in its own source. The developer role is an attributed provider brand relationship, not independently verified legal ownership or current operation of every phase. Proposed and delivered components remain separate. No status, location, address, physical date, quantity, certification, environmental outcome or incentive eligibility is promoted. The August 19, 2025 Frontier source names Shackelford County and a second half 2026 delivery target. This role does not verify later delivery, full campus capacity, water savings or commissioning.",
            "Publication dates and stated targets remain separate from actual physical milestones."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
              "host": "vantage-dc.com",
              "published": "2025-08-19",
              "date": "2025-08-19",
              "checked": "2026-10-23",
              "label": "First party exact campus or code text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Shackelford · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. Vantage’s August 19, 2025 announcement explicitly says construction had begun on the named Frontier campus. The current Shackelford County page continues to describe the first building’s delivery as scheduled for the second half of 2026. The scheduled window is not proof of delivery, occupancy or operation. Planned buildings and campus IT or GPU-compute envelopes are not counted as completed or metered capacity.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48417"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
