{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48451",
    "label": "Tom Green County, Texas"
  },
  "records": [
    {
      "id": "beacon-westline-dove-creek-san-angelo-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Westline Site / Dove Creek Technology Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Tom Green"
      ],
      "city": "San Angelo (Tankersley area, unincorporated)",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. Will McDaniel, Concho Observer, June26,2026 report identifies Beacon/Westline and links the original TCEQ plain-language application summary. Its claim of about1177tons/year CARBON DIOXIDE conflicts with the original table, which labels1177.2 as CARBON MONOXIDE. Do not copy CO2, gasoline/coal equivalents or the internally inconsistent concrete-volume analogy. Narrative permit-will-authorize wording describes application purpose, not an issued construction permit. Expedited review and lawyer jurisdiction assertions do not establish final approval or current legal authority. Original summary is reviewed separately below. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification. Lucas Banda, San Angelo LIVE, June2,2026 original meeting report says commissioners chose NOT TO ADVANCE proposed12month Precinct4 moratorium. This is not a countywide enacted moratorium, project approval, or independent current legal opinion. Draft thresholds5MW storage/generation and1000sf data-center area were not enacted by this vote. Original minutes/road-use contract unread. Developer describes about1240buildable acres near FM2335/US67, spring/summer2027 start and2-4year construction,1200construction/300+operations-maintenance jobs. All plans/forecasts, not actual spending, hiring or delivered IT. Closed-loop, potable well and possible desalination do not mean zero water; claims of no rate effects/noise mitigation are unverified promises. Backup grid/coordination in interview differs from no-grid-reliance wording in application; no executed connection/ESA inspected. Original TCEQ-hosted public application summary, English page1 of2 visually read; Spanish page2 not read. Westline TX Holdings LLC, CN606525921, Westline2335 RN112471305; initial permit applications184380/GHGPSDTX275/PSDTX1710. Location FM2335 about0.25mi south ofUS67, Tom Green County. No exact surveyed parcel inferred. It explicitly describes submitted APPLICATION/PROPOSED annual emissions, onsite natural-gas RICE generation and diesel outage generators, with expedited PROCESSING. It is not an issued permit, current measured emissions or critical IT capacity. CO is1177.2tons/year; CO2 is NOT quantified in this table. Particulate total, PM10 andPM2.5 overlap and must not be added. SCR/oxidation systems and fuel descriptions are proposed mitigation, not inspected compliance. No PDF text/OCR extracted.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/",
          "host": "conchoobserver.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://sanangelolive.com/news/county/2026-06-02/tom-green-county-commissioners-reject-data-center-moratorium",
          "host": "sanangelolive.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/184380-pls-english.pdf",
          "host": "tceq.texas.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 31.40456,
        "lng": -100.46248,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-original-proposals-and-pollutant-correction-round75-2026-10-15.json",
          "scope": "Named original operator, government announcement or original reported project context.",
          "fields": {},
          "notes": [
            "Will McDaniel, Concho Observer, June26,2026 report identifies Beacon/Westline and links the original TCEQ plain-language application summary. Its claim of about1177tons/year CARBON DIOXIDE conflicts with the original table, which labels1177.2 as CARBON MONOXIDE. Do not copy CO2, gasoline/coal equivalents or the internally inconsistent concrete-volume analogy.",
            "Narrative permit-will-authorize wording describes application purpose, not an issued construction permit. Expedited review and lawyer jurisdiction assertions do not establish final approval or current legal authority. Original summary is reviewed separately below.",
            "Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."
          ],
          "sources": [
            {
              "url": "https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/",
              "host": "conchoobserver.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-original-proposals-and-pollutant-correction-round75-2026-10-15.json",
          "scope": "Named original operator, government announcement or original reported project context.",
          "fields": {},
          "notes": [
            "Lucas Banda, San Angelo LIVE, June2,2026 original meeting report says commissioners chose NOT TO ADVANCE proposed12month Precinct4 moratorium. This is not a countywide enacted moratorium, project approval, or independent current legal opinion. Draft thresholds5MW storage/generation and1000sf data-center area were not enacted by this vote. Original minutes/road-use contract unread.",
            "Developer describes about1240buildable acres near FM2335/US67, spring/summer2027 start and2-4year construction,1200construction/300+operations-maintenance jobs. All plans/forecasts, not actual spending, hiring or delivered IT. Closed-loop, potable well and possible desalination do not mean zero water; claims of no rate effects/noise mitigation are unverified promises. Backup grid/coordination in interview differs from no-grid-reliance wording in application; no executed connection/ESA inspected.",
            "Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."
          ],
          "sources": [
            {
              "url": "https://sanangelolive.com/news/county/2026-06-02/tom-green-county-commissioners-reject-data-center-moratorium",
              "host": "sanangelolive.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-original-proposals-and-pollutant-correction-round75-2026-10-15.json",
          "scope": "Named original operator, government announcement or original reported project context.",
          "fields": {},
          "notes": [
            "Original TCEQ-hosted public application summary, English page1 of2 visually read; Spanish page2 not read. Westline TX Holdings LLC, CN606525921, Westline2335 RN112471305; initial permit applications184380/GHGPSDTX275/PSDTX1710. Location FM2335 about0.25mi south ofUS67, Tom Green County. No exact surveyed parcel inferred.",
            "It explicitly describes submitted APPLICATION/PROPOSED annual emissions, onsite natural-gas RICE generation and diesel outage generators, with expedited PROCESSING. It is not an issued permit, current measured emissions or critical IT capacity. CO is1177.2tons/year; CO2 is NOT quantified in this table. Particulate total, PM10 andPM2.5 overlap and must not be added. SCR/oxidation systems and fuel descriptions are proposed mitigation, not inspected compliance. No PDF text/OCR extracted.",
            "Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."
          ],
          "sources": [
            {
              "url": "https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/184380-pls-english.pdf",
              "host": "tceq.texas.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "San Angelo (Tankersley area, unincorporated) · Tom Green · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48451"
      }
    },
    {
      "id": "cipher-colchis-tom-green-tx",
      "state": "tx",
      "kind": "project",
      "name": "Cipher Colchis Campus",
      "group": "proposed",
      "status": "In development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Tom Green"
      ],
      "city": "San Angelo",
      "address": "",
      "who": "Cipher Digital",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. JoeHyde SanAngeloLIVE June2,2026 originalpoliticalanalysis names CipherColchis1000MWplannedsite outsideSanAngelo, distinct SkyboxcitylandandBeaconDoveCreek. ExpectedBatchZero inclusion iscompanyexpectation, not finalERCOTlist/PUCapproval/energization. Anonymousofficial RedCreekcapacity doubts/speculationnotverifiedinterconnectionfinding; requested438GWpipeline notoperatingload/generation/energy. No ITbasis. Jurisdictional noabilitytoregulate assertionnotcurrentlegalopinion. Personalboycottallegationsirrelevant/notadopted. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [
        [
          "2026-10-13",
          "Cipher furnished a Colchis update describing conditional Batch Zero status in an ERCOT audit process and future energization targets. This disclosure is not a final regulator approval or operating milestone."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate",
          "host": "sanangelolive.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://cipherdigital.com/infrastructure/",
          "host": "cipherdigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
          "host": "www.sec.gov",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        }
      ],
      "loc": {
        "lat": 31.42547,
        "lng": -100.48531,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "JoeHyde SanAngeloLIVE June2,2026 originalpoliticalanalysis names CipherColchis1000MWplannedsite outsideSanAngelo, distinct SkyboxcitylandandBeaconDoveCreek. ExpectedBatchZero inclusion iscompanyexpectation, not finalERCOTlist/PUCapproval/energization.",
            "Anonymousofficial RedCreekcapacity doubts/speculationnotverifiedinterconnectionfinding; requested438GWpipeline notoperatingload/generation/energy. No ITbasis. Jurisdictional noabilitytoregulate assertionnotcurrentlegalopinion. Personalboycottallegationsirrelevant/notadopted.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate",
              "host": "sanangelolive.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.",
          "fields": {
            "provider_brand": "Cipher Digital",
            "provider_role": "developer",
            "current_stage": "Colchis is a named development-pipeline site. Future energization/capacity is conditional and does not establish construction completion, final regulatory approval or operating service.",
            "regulatory_scope": "October 13 furnished update describes 1 GW conditional Batch Zero base-load status within an ERCOT audit process, land secured/deposits funded and a 2028 target. This is issuer disclosure, not a final ERCOT decision or energized IT load."
          },
          "notes": [
            "This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."
          ],
          "sources": [
            {
              "url": "https://cipherdigital.com/infrastructure/",
              "host": "cipherdigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cipherdigital_businessup.htm",
              "host": "www.sec.gov",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "San Angelo · Tom Green · Source context reviewed",
      "status_scope": "Development pipeline only. Gross targets and energization forecasts remain conditional, with no operating or actual construction-completion claim.",
      "event_evidence": [
        {
          "date": "2026-10-13",
          "text": "Cipher furnished a Colchis update describing conditional Batch Zero status in an ERCOT audit process and future energization targets. This disclosure is not a final regulator approval or operating milestone.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48451"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
