  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48481",
    "label": "Wharton County, Texas"
  },
  "records": [
    {
      "id": "aws-project-eagle-boling-wharton-county-tx",
      "state": "tx",
      "kind": "facility",
      "name": "AWS Project Eagle (Wharton County)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Wharton"
      ],
      "city": "Boling",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. TDLR accessibility project registrations are not localbuildingpermits,groundbreakingprooforcompletion. Fourx300million=1.2billionestimatedconstructioncost,notspendingcommitmentorIT-inclusivecapex.2700acreslandbanknotallDCfootprint;756240squarefeetderivedsumoffourfloorareas,notland. 1587USDpersquarefootderivednotpaidcost. OtherBastrop,DeSoto/Spectrum andnuclearadjacencyprojectsareseparate;noenergysupply,ITorwaterverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original TDLR architectural-barriers project registrations; estimated costs and filed timelines, not measured operating census.. ReviewCompleteisaccessibilityplan-reviewstatus,notcommissioning,occupancycertification,localbuildingpermitorutilityagreement. Allstart/completiondatesarefiledplans,noteventsverifiedonthosedates. BuildingBisAugust2027,whileA/C/DareJanuary2027;donotassignlaterdatetoDbecauseitisthefourthletter. AandDshare244EaglewoodbuthaveuniqueregistrationIDs;donotdeduplicatebyaddressaloneorcreatetwoindependentlyoperatingcampuses. Fourestimated300millioncostsarenotauditedspendingorIT-inclusivecampuscapex. No2700acrefootprint,MW,water,incentivesorendcustomerfromtheseregistrations.",
      "date": "",
      "events": [
        [
          "2026-06-25",
          "TDLR records date registration of Project Eagle Buildings A through D to June 25, 2026. These are four accessibility construction filings with scheduled dates, not four independently commissioned or operating campuses."
        ],
        [
          "2026-09-11",
          "Amazon published its Wharton County project update on September 11, 2026 and reported campus planning with site preparation already underway. This dates the account, not an exact first work day or commissioned service in each Project Eagle component."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://usdatacenterprojects.com/texas/aws-files-1-2-billion-permit-for-four-building-data-center-campus-in-wharton-county-texas",
          "host": "usdatacenterprojects.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825",
          "host": "tdlr.texas.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826",
          "host": "tdlr.texas.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832",
          "host": "tdlr.texas.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834",
          "host": "tdlr.texas.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://data.texas.gov/resource/tzyg-j7q4.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000",
          "host": "data.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Texas Commission on Environmental Quality source context"
        },
        {
          "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
          "host": "www.aboutamazon.com",
          "published": "2026-09-11",
          "date": "2026-09-11",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 29.27779,
        "lng": -96.2221,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round38-2026-10-14.json",
          "scope": "Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.",
          "fields": {
            "reported_context": "USDataCenterProjects reports four TexasTDLR filings forAWSProjectEagle nearBoling, each189060squarefeet/USD300millionestimatedcost, with August1,2026plannedstart and January/August2027completiontargets.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "TDLR accessibility project registrations are not localbuildingpermits,groundbreakingprooforcompletion. Fourx300million=1.2billionestimatedconstructioncost,notspendingcommitmentorIT-inclusivecapex.2700acreslandbanknotallDCfootprint;756240squarefeetderivedsumoffourfloorareas,notland. 1587USDpersquarefootderivednotpaidcost. OtherBastrop,DeSoto/Spectrum andnuclearadjacencyprojectsareseparate;noenergysupply,ITorwaterverified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://usdatacenterprojects.com/texas/aws-files-1-2-billion-permit-for-four-building-data-center-campus-in-wharton-county-texas",
              "host": "usdatacenterprojects.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round38-2026-10-14.json",
          "scope": "Original TDLR architectural-barriers project registrations; estimated costs and filed timelines, not measured operating census.",
          "fields": {
            "registered_buildings": [
              {
                "building": "A",
                "registration_number": "TABS2026023825",
                "registration_date": "2026-06-25",
                "registered_owner": "AMAZON DATA SERVICES, INC",
                "listed_tenant": "Not Assigned",
                "address_as_filed": "244 Eaglewood Road, Boling, Texas77420",
                "county": "Wharton",
                "filed_start_date": "2026-08-01",
                "filed_completion_date": "2027-01-01",
                "estimated_cost_usd": 300000000,
                "filed_building_sqft": 189060,
                "architectural_barriers_review_status": "Review Complete",
                "funding": "Privately funded, private land for private use",
                "source": {
                  "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825",
                  "sha256": "007491f5007d3713e5e6533bdbf675c24947787295f603617946ae1ae634add7",
                  "publication_date": null,
                  "publisher": "Texas Department of Licensing and Regulation"
                }
              },
              {
                "building": "B",
                "registration_number": "TABS2026023826",
                "registration_date": "2026-06-25",
                "registered_owner": "AMAZON DATA SERVICES, INC",
                "listed_tenant": "Not Assigned",
                "address_as_filed": "258 Eaglewood Road, Boling, Texas77420",
                "county": "Wharton",
                "filed_start_date": "2026-08-01",
                "filed_completion_date": "2027-08-01",
                "estimated_cost_usd": 300000000,
                "filed_building_sqft": 189060,
                "architectural_barriers_review_status": "Review Complete",
                "funding": "Privately funded, private land for private use",
                "source": {
                  "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826",
                  "sha256": "44e02d9a4610e9a1d7923405be3f1f4fd587301bc84b858bb3fac88dd3d596ce",
                  "publication_date": null,
                  "publisher": "Texas Department of Licensing and Regulation"
                }
              },
              {
                "building": "C",
                "registration_number": "TABS2026023832",
                "registration_date": "2026-06-25",
                "registered_owner": "AMAZON DATA SERVICES, INC",
                "listed_tenant": "Not Assigned",
                "address_as_filed": "240 Eaglewood Road, Boling, Texas77420",
                "county": "Wharton",
                "filed_start_date": "2026-08-01",
                "filed_completion_date": "2027-01-01",
                "estimated_cost_usd": 300000000,
                "filed_building_sqft": 189060,
                "architectural_barriers_review_status": "Review Complete",
                "funding": "Privately funded, private land for private use",
                "source": {
                  "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832",
                  "sha256": "4502ce87801efc4ad7651df66d2b5d5c77cbdcd826670251e00f07cb30d6d62f",
                  "publication_date": null,
                  "publisher": "Texas Department of Licensing and Regulation"
                }
              },
              {
                "building": "D",
                "registration_number": "TABS2026023834",
                "registration_date": "2026-06-25",
                "registered_owner": "AMAZON DATA SERVICES, INC",
                "listed_tenant": "Not Assigned",
                "address_as_filed": "244 Eaglewood Road, Boling, Texas77420",
                "county": "Wharton",
                "filed_start_date": "2026-08-01",
                "filed_completion_date": "2027-01-01",
                "estimated_cost_usd": 300000000,
                "filed_building_sqft": 189060,
                "architectural_barriers_review_status": "Review Complete",
                "funding": "Privately funded, private land for private use",
                "source": {
                  "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834",
                  "sha256": "be57dbfec270f9f66815efc0df1378bda308c3b877871f4460073d1e7f182443",
                  "publication_date": null,
                  "publisher": "Texas Department of Licensing and Regulation"
                }
              }
            ],
            "derived_estimated_construction_cost_sum_usd": 1200000000,
            "derived_filed_building_area_sum_sqft": 756240,
            "campus_building_permit_verified": false,
            "actual_construction_start_verified": false,
            "actual_completion_verified": false,
            "critical_it_mw": null,
            "secured_utility_mw": null
          },
          "notes": [
            "ReviewCompleteisaccessibilityplan-reviewstatus,notcommissioning,occupancycertification,localbuildingpermitorutilityagreement. Allstart/completiondatesarefiledplans,noteventsverifiedonthosedates. BuildingBisAugust2027,whileA/C/DareJanuary2027;donotassignlaterdatetoDbecauseitisthefourthletter. AandDshare244EaglewoodbuthaveuniqueregistrationIDs;donotdeduplicatebyaddressaloneorcreatetwoindependentlyoperatingcampuses. Fourestimated300millioncostsarenotauditedspendingorIT-inclusivecampuscapex. No2700acrefootprint,MW,water,incentivesorendcustomerfromtheseregistrations.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825",
              "host": "tdlr.texas.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826",
              "host": "tdlr.texas.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832",
              "host": "tdlr.texas.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834",
              "host": "tdlr.texas.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "texas-registry-2026-10-17",
          "scope": "Official Texas registry source context, with initial eligibility and component triage. Not a physical-site census or current-stage review.",
          "fields": {
            "texas_registry_air_context": {
              "regulated_entity": "RN112500293",
              "registry_name": [
                "AWS-PROJECT EAGLE"
              ],
              "program_contexts": [
                {
                  "program": "AIRNSR",
                  "identifiers": [
                    "185226"
                  ]
                }
              ],
              "association_scope": "Explicit AWS Project Eagle, Amazon Data Services and Wharton County support existing Project Eagle research context; no address or issued-permit/operating-stage inference.",
              "limits": "Registry authorizations, emissions reporting and historical customer affiliations can overlap. ACTIVE is a registry value, not proof of signed permit issuance, current operation, title or complete campus buildout. No generator MW, coordinates, street address or physical stage is promoted."
            }
          },
          "notes": [
            "AIRNSR and AIROP entries are registry contexts, not substitutes for signed permits. AIREI is emissions reporting, not a permit. Customer and status dates are not opening, completion or current ownership dates.",
            "The extract is a selected portion of Central Registry and the name/industry query is incomplete for all generator permits. Nonmatches are not evidence of absence."
          ],
          "sources": [
            {
              "url": "https://data.texas.gov/resource/tzyg-j7q4.json?%24where=%28indus_type_cd_name+like+%27518210%25%27+OR+indus_type_cd_name+like+%27541513%25%27+OR+indus_typ_cd+in+%28%27518210%27%2C%27541513%27%29+OR+indus_typ_cd_1+in+%28%277374%27%2C%277376%27%29+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_name%29+like+%27%25DATA%25CENTRE%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTER%25%27+OR+upper%28reg_ent_desc_txt%29+like+%27%25DATA%25CENTRE%25%27%29&%24order=ref_num_txt%2Cprogram_code%2Cadditional_id_text%2Cref_num_txt_1%2Caffil_begin_dt&%24limit=5000",
              "host": "data.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Texas Commission on Environmental Quality source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 53",
          "scope": "Amazon September 11, 2026 Wharton County account describes a planned campus outside Boling and reports site preparation underway. Four current TDLR records separately identify Project Eagle Buildings A through D with June 25 registrations, scheduled dates and Review Complete labels. The larger announced campus and these four filed components are not an independently verified exact stage crosswalk. Site preparation at the wider campus does not certify construction or service in every filed building. No owner, operator, component identity, count, parcel or quantity field changes are made.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "campus_preparation_and_component_filings_stage_held",
              "scope": "Amazon September 11, 2026 Wharton County account describes a planned campus outside Boling and reports site preparation underway. Four current TDLR records separately identify Project Eagle Buildings A through D with June 25 registrations, scheduled dates and Review Complete labels. The larger announced campus and these four filed components are not an independently verified exact stage crosswalk. Site preparation at the wider campus does not certify construction or service in every filed building. No owner, operator, component identity, count, parcel or quantity field changes are made."
            },
            "source_read_scope": {
              "amazon_selected_section": "September 11 Wharton County project introduction and What we are building",
              "tdlr_project_details_read": [
                "TABS2026023825",
                "TABS2026023826",
                "TABS2026023832",
                "TABS2026023834"
              ],
              "larger_campus_to_four_components_crosswalk_unresolved": true,
              "technical_quantity_fields_not_exported": true
            }
          },
          "notes": [
            "Amazon September 11, 2026 Wharton County account describes a planned campus outside Boling and reports site preparation underway. Four current TDLR records separately identify Project Eagle Buildings A through D with June 25 registrations, scheduled dates and Review Complete labels. The larger announced campus and these four filed components are not an independently verified exact stage crosswalk. Site preparation at the wider campus does not certify construction or service in every filed building. No owner, operator, component identity, count, parcel or quantity field changes are made.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
              "host": "www.aboutamazon.com",
              "published": "2026-09-11",
              "date": "2026-09-11",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825",
              "host": "www.tdlr.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826",
              "host": "www.tdlr.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832",
              "host": "www.tdlr.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834",
              "host": "www.tdlr.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Boling · Wharton · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-06-25",
          "text": "TDLR records date registration of Project Eagle Buildings A through D to June 25, 2026. These are four accessibility construction filings with scheduled dates, not four independently commissioned or operating campuses.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825",
              "host": "www.tdlr.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826",
              "host": "www.tdlr.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832",
              "host": "www.tdlr.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834",
              "host": "www.tdlr.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2026-09-11",
          "text": "Amazon published its Wharton County project update on September 11, 2026 and reported campus planning with site preparation already underway. This dates the account, not an exact first work day or commissioned service in each Project Eagle component.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
              "host": "www.aboutamazon.com",
              "published": "2026-09-11",
              "date": "2026-09-11",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "48481"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}