{
  "schema_version": 1,
  "source_compilation_context": {
    "tx": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/tx.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "48495",
    "label": "Winkler County, Texas"
  },
  "records": [
    {
      "id": "cipher-black-pearl-wink-tx",
      "state": "tx",
      "kind": "facility",
      "name": "Cipher Digital Black Pearl",
      "group": "operating",
      "status": "Operating phase",
      "crypto": false,
      "type": "HPC data center; former bitcoin mining use",
      "counties": [
        "Winkler"
      ],
      "city": "Wink",
      "address": "",
      "who": "Cipher Digital",
      "mw": null,
      "power": "",
      "power_note": "Black Pearl:300 MW gross capacity contracted for phased HPC delivery. This is not IT load, metered consumption, current delivered capacity or a physical-completion total. Source period June 30,2026; later partial delivery does not prove all 300 MW operational.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "One primary-source research record. Named site and county context are supported; exact physical identity and parcel remain unresolved. No site point is established.",
      "date": "",
      "events": [
        [
          "2026-08-04",
          "Cipher announced initial Black Pearl HPC capacity delivery during August and rent commencement; remaining halls and phases continued construction. This is the disclosure date, not an exact physical handover day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update",
          "host": "investors.cipherdigital.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://investors.cipherdigital.com/node/11731/html",
          "host": "investors.cipherdigital.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm",
          "host": "www.sec.gov",
          "published": "2026-06-08",
          "date": "2026-06-08",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        },
        {
          "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
          "host": "comptroller.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed government record"
        },
        {
          "url": "https://echodata.epa.gov/echo/echo_rest_services.get_facilities?p_sic=7374&output=JSON&responseset=1000&tablelist=Y&maplist=N&summarylist=Y&qcolumns=1%2C2%2C3%2C4%2C5%2C6%2C7%2C17%2C15%2C19%2C20%2C21%2C23%2C24%2C32%2C97%2C88%2C89%2C90%2C93%2C144%2C106%2C108%2C100",
          "host": "echodata.epa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "EPA registry context; not proof of operation"
        }
      ],
      "loc": {
        "lat": 31.84999,
        "lng": -103.04844,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wink · Winkler County · no site point",
      "reviewed_evidence": [
        {
          "overlay": "S2-Texas-Comptroller-20261015",
          "scope": "Current named-site stage only; power contracts, historical use, site energization, tenant fit-out and full delivery remain separate.",
          "fields": {
            "provider_brand": "Cipher Digital",
            "provider_role": "developer",
            "texas_program_scope": "Exact program rows and participant roles retained. Effective/exemption dates are not opening, closure, actual tenancy, legal title or realized savings.",
            "epa_registry_scope": {
              "registry_id": "110071658844",
              "identity": "Named Cipher facility/city context matches the issuer disclosure; agency program status is not the facility operating stage.",
              "precision": "EPA coordinates are not adopted. Black Pearl reports 17,483 m accuracy with no collection method; Odessa reports address matching and 30 m accuracy. Neither independently verifies a building center."
            },
            "current_stage": "Initial HPC capacity delivered and rent commenced in August 2026; remaining Phase I fit-out and Phase II construction continue. The initial operating phase does not establish full 300 MW completion.",
            "historical_mining_scope": "Former bitcoin-mining use is a separate period. June 2026 filing describes retrofit; earlier mining production is not evidence of current mining after the HPC conversion.",
            "capacity_scope": "300 MW gross contracted HPC capacity is the lease/site scope, not current delivered IT load, consumption or proof all halls are operating.",
            "program_role_change": "Earlier Cipher-only qualifying entry ends 2026-01-22; later large-project entry effective 2026-01-23 lists Amazon in occupant/operator roles. Those administrative dates do not establish physical closure or reopening."
          },
          "notes": [
            "This is a scoped source review, not certification of every field or a distinct physical-site count. No parcel, roof center or new map point is established."
          ],
          "sources": [
            {
              "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update",
              "host": "investors.cipherdigital.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://investors.cipherdigital.com/node/11731/html",
              "host": "investors.cipherdigital.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm",
              "host": "www.sec.gov",
              "published": "2026-06-08",
              "date": "2026-06-08",
              "checked": "2026-10-15",
              "label": "Issuer filing or furnished exhibit"
            },
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/0001193125-26-419743-index.htm",
              "host": "www.sec.gov",
              "published": "2026-10-13",
              "date": "2026-10-13",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            },
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed government record"
            },
            {
              "url": "https://echodata.epa.gov/echo/echo_rest_services.get_facilities?p_sic=7374&output=JSON&responseset=1000&tablelist=Y&maplist=N&summarylist=Y&qcolumns=1%2C2%2C3%2C4%2C5%2C6%2C7%2C17%2C15%2C19%2C20%2C21%2C23%2C24%2C32%2C97%2C88%2C89%2C90%2C93%2C144%2C106%2C108%2C100",
              "host": "echodata.epa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "EPA registry context; not proof of operation"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "texas_current_program_contexts": {
              "checked": "2026-10-17",
              "reference_rows": [
                {
                  "association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.",
                  "registered_name": "Cipher Black Pearl LLC Data Center",
                  "program": "Qualifying data center",
                  "registration_number": "DC470713-OW1"
                },
                {
                  "association_scope": "Reference-list row association only, using the retained earlier direct-company identity review and unchanged source cells. Not a physical-site, street-address, current-service or tax-benefit certification.",
                  "registered_name": "Cipher Black Pearl LLC Data Center",
                  "program": "Qualifying large data center project",
                  "registration_number": "LD089477-OW1"
                }
              ],
              "scope": "Current source cells reconciled to earlier explicit associations, plus separately reviewed new bridges. Earlier operator reviews retain their own dates. No current tax savings, physical completion or coordinates inferred."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php",
              "host": "comptroller.texas.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Current qualifying data-center and large-project registered lists"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "raw_status": "partly operating",
      "status_field": "current_status",
      "status_scope": "Initial delivered HPC component only, disclosed August 4 and reaffirmed in the October 13 furnished update as of September 30. Remaining halls/phases are construction, not fully operating capacity.",
      "event_evidence": [
        {
          "date": "2026-08-04",
          "text": "Cipher announced initial Black Pearl HPC capacity delivery during August and rent commencement; remaining halls and phases continued construction. This is the disclosure date, not an exact physical handover day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update",
              "host": "investors.cipherdigital.com",
              "published": "2026-08-04",
              "date": "2026-08-04",
              "checked": "2026-10-15",
              "label": "Reviewed company source"
            }
          ]
        }
      ],
      "typed_power_facts": [
        {
          "measure": "contracted_gross_capacity",
          "value": 300,
          "unit": "MW",
          "as_of": "2026-06-30",
          "as_of_basis": "source_dated",
          "observed_on": "2026-10-15",
          "basis": "contracted",
          "scope": "Black Pearl:300 MW gross capacity contracted for phased HPC delivery. This is not IT load, metered consumption, current delivered capacity or a physical-completion total. Source period June 30,2026; later partial delivery does not prove all 300 MW operational.",
          "sources": [
            "https://investors.cipherdigital.com/node/11731/html"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "48495"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
