{
  "schema_version": 1,
  "source_compilation_context": {
    "ut": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ut.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "49013",
    "label": "Duchesne County, Utah"
  },
  "records": [
    {
      "id": "nine-mile-data-myton-duchesne-county-ut",
      "state": "ut",
      "kind": "facility",
      "name": "Nine Mile Data Center (Uinta Basin Data Center Project)",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Duchesne"
      ],
      "city": "Myton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NineMiledata-centerland-use staff report,notfinalpermit. RecommendationanddraftmotionnotPlanningCommissionvotedpermit. Solar/naturalgaspowerplantsreviewedunderseparateapplications,notincludedinthisCUPscope.18monthinactivityrule dependsactualissuance,notautomaticallyexpiryOctober2027. NoITMWorbuildingcompletioninreviewedfindingpages. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://duchesne.utah.gov/wp-content/uploads/2026/03/Findings-Report-Nine-Mile-Data-LLC-040226.pdf",
          "host": "duchesne.utah.gov",
          "date": "2026-04-02",
          "published": "2026-04-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.29811,
        "lng": -110.42598,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "NineMiledata-centerland-use staff report,notfinalpermit",
          "fields": {
            "staff_findings_report_date": "2026-04-02",
            "applicant_represented_entity": "EnergenceUtahLLC",
            "application_complete_date": "2026-03-11",
            "data_center_project_acres": 960.32,
            "published_project_parcels": [
              "00-0009-5871",
              "00-0027-8311",
              "00-0034-9496",
              "00-0009-5947"
            ],
            "published_location_description": "offWellsDrawRoad,southeastofBridgeland,southwestofSouthMytonBench",
            "review_stage": "staffrecommendationforconditionaluseapproval"
          },
          "notes": [
            "RecommendationanddraftmotionnotPlanningCommissionvotedpermit. Solar/naturalgaspowerplantsreviewedunderseparateapplications,notincludedinthisCUPscope.18monthinactivityrule dependsactualissuance,notautomaticallyexpiryOctober2027. NoITMWorbuildingcompletioninreviewedfindingpages.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://duchesne.utah.gov/wp-content/uploads/2026/03/Findings-Report-Nine-Mile-Data-LLC-040226.pdf",
              "host": "duchesne.utah.gov",
              "date": "2026-04-02",
              "published": "2026-04-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 41",
          "scope": "The April 2, 2026 original staff findings report explicitly identifies the proposed Nine Mile Data computing development and its March 11 complete application. Agency listed proposal is limited to that staff review. The report contains a recommended approval motion and an unsigned recommendation line, rather than a recorded Planning Commission vote or issued final permit. Solar and gas facilities are separate applications. Staff quotations of County and state rules do not establish current statutory compliance, a verified permit issue day, actual construction or computing operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_nine_mile_staff_recommendation_not_final_cup_or_operation",
              "scope": "The April 2, 2026 original staff findings report explicitly identifies the proposed Nine Mile Data computing development and its March 11 complete application. Agency listed proposal is limited to that staff review. The report contains a recommended approval motion and an unsigned recommendation line, rather than a recorded Planning Commission vote or issued final permit. Solar and gas facilities are separate applications. Staff quotations of County and state rules do not establish current statutory compliance, a verified permit issue day, actual construction or computing operation."
            }
          },
          "notes": [
            "The April 2, 2026 original staff findings report explicitly identifies the proposed Nine Mile Data computing development and its March 11 complete application. Agency listed proposal is limited to that staff review. The report contains a recommended approval motion and an unsigned recommendation line, rather than a recorded Planning Commission vote or issued final permit. Solar and gas facilities are separate applications. Staff quotations of County and state rules do not establish current statutory compliance, a verified permit issue day, actual construction or computing operation.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://duchesne.utah.gov/wp-content/uploads/2026/03/Findings-Report-Nine-Mile-Data-LLC-040226.pdf",
              "host": "duchesne.utah.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Myton · Duchesne · Source context reviewed",
      "status_scope": "The April 2, 2026 original staff findings report explicitly identifies the proposed Nine Mile Data computing development and its March 11 complete application. Agency listed proposal is limited to that staff review. The report contains a recommended approval motion and an unsigned recommendation line, rather than a recorded Planning Commission vote or issued final permit. Solar and gas facilities are separate applications. Staff quotations of County and state rules do not establish current statutory compliance, a verified permit issue day, actual construction or computing operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49013"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
