{
  "schema_version": 1,
  "source_compilation_context": {
    "ut": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ut.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "49023",
    "label": "Juab County, Utah"
  },
  "records": [
    {
      "id": "blusky-ai-nephi-ut",
      "state": "ut",
      "kind": "facility",
      "name": "BluSky AI Nephi SkyMod Site",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Juab"
      ],
      "city": "Nephi",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. unrelated redevelopment fund hold. CRA fund page describes hotel development incentives, not BluSky AI. No project-specific site, incentive award, construction or capacity finding adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Separate named-site section personally read; not quantities for Walsenburg or all BluSky sites.. LOI is not closed lease or utility agreement. Prepared permits are not construction completion. Municipal29-to85MWsupply upgrade is not site criticalIT. No exact pickup, RFS, tariff, water demand or legal prohibition independently verified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.nephi.utah.gov/690/CRA-Fund",
          "host": "nephi.utah.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/",
          "host": "gazette.com",
          "date": "2026-03-28",
          "published": "2026-03-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://bluskyaidatacenters.com/investor-relations",
          "host": "bluskyaidatacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.70274,
        "lng": -112.7848,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "unrelated redevelopment fund hold",
          "fields": {},
          "notes": [
            "CRA fund page describes hotel development incentives, not BluSky AI. No project-specific site, incentive award, construction or capacity finding adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.nephi.utah.gov/690/CRA-Fund",
              "host": "nephi.utah.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Separate named-site section personally read; not quantities for Walsenburg or all BluSky sites.",
          "fields": {
            "reported_context": "Gazette quotes Nephi administrator saying four-MW project functionally approved with building permits awaiting pickup; no commissioned operation established",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "LOI is not closed lease or utility agreement. Prepared permits are not construction completion. Municipal29-to85MWsupply upgrade is not site criticalIT. No exact pickup, RFS, tariff, water demand or legal prohibition independently verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gazette.com/2026/03/28/ai-data-center-plans-baffle-small-southern-colorado-town/",
              "host": "gazette.com",
              "date": "2026-03-28",
              "published": "2026-03-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 41",
          "scope": "The current original issuer overview describes modular infrastructure strategy without an exact Nephi deployment account. The inherited original City CRA Fund page instead describes hotel incentives and does not establish a BluSky data center award, construction or operation. A general reinvestment fund, powered pad, lease intention and promised modular delivery are not exact computing service. No incentive or company role is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_generic_strategy_and_unrelated_city_hotel_fund_context",
              "scope": "The current original issuer overview describes modular infrastructure strategy without an exact Nephi deployment account. The inherited original City CRA Fund page instead describes hotel incentives and does not establish a BluSky data center award, construction or operation. A general reinvestment fund, powered pad, lease intention and promised modular delivery are not exact computing service. No incentive or company role is promoted."
            }
          },
          "notes": [
            "The current original issuer overview describes modular infrastructure strategy without an exact Nephi deployment account. The inherited original City CRA Fund page instead describes hotel incentives and does not establish a BluSky data center award, construction or operation. A general reinvestment fund, powered pad, lease intention and promised modular delivery are not exact computing service. No incentive or company role is promoted.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://bluskyaidatacenters.com/investor-relations",
              "host": "bluskyaidatacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.nephi.utah.gov/690/CRA-Fund",
              "host": "www.nephi.utah.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Nephi · Juab · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49023"
      }
    },
    {
      "id": "dcpc-mona-juab-county-ut",
      "state": "ut",
      "kind": "facility",
      "name": "DCPC Data Center Campus (north of Mona)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Juab"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Historical notice not hearing outcome or approved permit. Third printed identifierXB00-1412- ends with a hyphen; completeness unverified in parcel registry and no guessed suffix appended. Hearing venue is not data-center address. No ITMW, capital amount, current operating proof or researched parcel coordinate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-11-20",
          "Scheduled event: The original November 6 County notice schedules DCPC campus conditional use consideration November 20, 2024. This is a retained hearing schedule, not proof that a vote occurred or that construction or computing began."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://juabcounty.gov/notice-public-hearing-notice-conditional-use-permit-made-by-dcpc/",
          "host": "juabcounty.gov",
          "date": "2024-11-06",
          "published": "2024-11-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf",
          "host": "juabcounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 39.72629,
        "lng": -112.8105,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "named government source",
          "fields": {
            "historical_public_hearing_scheduled_date": "2024-11-20",
            "historical_public_hearing_local_time": "19:00",
            "historical_hearing_venue": "Juab County Commission Chambers,160NMain,Nephi,Utah",
            "applicant": "DCPC",
            "public_parcel_identifiers_complete": [
              "XB00-1436-1",
              "XB00-1436-2"
            ],
            "power_mode_proposed": "island power"
          },
          "notes": [
            "Historical notice not hearing outcome or approved permit. Third printed identifierXB00-1412- ends with a hyphen; completeness unverified in parcel registry and no guessed suffix appended. Hearing venue is not data-center address. No ITMW, capital amount, current operating proof or researched parcel coordinate.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://juabcounty.gov/notice-public-hearing-notice-conditional-use-permit-made-by-dcpc/",
              "host": "juabcounty.gov",
              "date": "2024-11-06",
              "published": "2024-11-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 41",
          "scope": "The original November 6, 2024 County notice identifies a DCPC campus application and schedules November 20 consideration. Later retained planning minutes describe additional DCPC parcel permits and the applicant account of an earlier campus permit. Those additional components are not automatically the exact inherited original application footprint, and the document has conflicting printed meeting headers. No current computing phase, exact final date, campuswide permission or operation is inferred from a schedule, an applicant statement or adjacent parcel approvals.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historic_dcpc_notice_and_separate_expansion_permissions_with_unresolved_component_scope",
              "scope": "The original November 6, 2024 County notice identifies a DCPC campus application and schedules November 20 consideration. Later retained planning minutes describe additional DCPC parcel permits and the applicant account of an earlier campus permit. Those additional components are not automatically the exact inherited original application footprint, and the document has conflicting printed meeting headers. No current computing phase, exact final date, campuswide permission or operation is inferred from a schedule, an applicant statement or adjacent parcel approvals."
            }
          },
          "notes": [
            "The original November 6, 2024 County notice identifies a DCPC campus application and schedules November 20 consideration. Later retained planning minutes describe additional DCPC parcel permits and the applicant account of an earlier campus permit. Those additional components are not automatically the exact inherited original application footprint, and the document has conflicting printed meeting headers. No current computing phase, exact final date, campuswide permission or operation is inferred from a schedule, an applicant statement or adjacent parcel approvals.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://juabcounty.gov/notice-public-hearing-notice-conditional-use-permit-made-by-dcpc/",
              "host": "juabcounty.gov",
              "published": "2024-11-06",
              "date": "2024-11-06",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf",
              "host": "juabcounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Juab · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-11-20",
          "text": "Scheduled event: The original November 6 County notice schedules DCPC campus conditional use consideration November 20, 2024. This is a retained hearing schedule, not proof that a vote occurred or that construction or computing began.",
          "kind": "scheduled_event",
          "sources": [
            {
              "url": "https://juabcounty.gov/notice-public-hearing-notice-conditional-use-permit-made-by-dcpc/",
              "host": "juabcounty.gov",
              "published": "2024-11-06",
              "date": "2024-11-06",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49023"
      }
    },
    {
      "id": "setsquare-nebo-north-mona-juab-county-ut",
      "state": "ut",
      "kind": "facility",
      "name": "Nebo North Data Center Campus (Project Nebo)",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Juab"
      ],
      "city": "Mona",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. April15notice not hearing outcome or approved permit. Two parcel identifiers end with hyphens; completeness not independently resolved in parcel registry, do not append guessed digits. Meeting160NMainNephi not campus address. Exact developer alias/coordinate/MW/investment not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-04-15",
          "Scheduled event: The County April 2 notice schedules a hearing on Nebo North LLC data center application April 15, 2026. The passed date is retained as a schedule, without a verified hearing result or an accomplished decision."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/",
          "host": "juabcounty.gov",
          "date": "2026-04-02",
          "published": "2026-04-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.65364,
        "lng": -112.78049,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "named government source",
          "fields": {
            "historical_hearing_scheduled_date": "2026-04-15",
            "historical_hearing_scheduled_local_time": "19:00",
            "applicant": "NeboNorthLLC",
            "printed_parcel_identifiers": [
              "XC00-2715-1",
              "XC00-2710-",
              "XC00-2705-"
            ],
            "printed_legal_location": "Sections13and14,Township11South,Range1West,SLBM"
          },
          "notes": [
            "April15notice not hearing outcome or approved permit. Two parcel identifiers end with hyphens; completeness not independently resolved in parcel registry, do not append guessed digits. Meeting160NMainNephi not campus address. Exact developer alias/coordinate/MW/investment not established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/",
              "host": "juabcounty.gov",
              "date": "2026-04-02",
              "published": "2026-04-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 41",
          "scope": "The original April 2, 2026 County notice identifies Nebo North LLC application to construct and operate a data center campus and schedules April 15 consideration. Agency listed proposal is limited to that named application notice. The passed hearing day does not establish that a hearing occurred, a final vote, issued permission, physical construction or operation. No permit expiration, exact site reference or quantity is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_nebo_north_application_notice_without_verified_final_result",
              "scope": "The original April 2, 2026 County notice identifies Nebo North LLC application to construct and operate a data center campus and schedules April 15 consideration. Agency listed proposal is limited to that named application notice. The passed hearing day does not establish that a hearing occurred, a final vote, issued permission, physical construction or operation. No permit expiration, exact site reference or quantity is promoted."
            }
          },
          "notes": [
            "The original April 2, 2026 County notice identifies Nebo North LLC application to construct and operate a data center campus and schedules April 15 consideration. Agency listed proposal is limited to that named application notice. The passed hearing day does not establish that a hearing occurred, a final vote, issued permission, physical construction or operation. No permit expiration, exact site reference or quantity is promoted.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/",
              "host": "juabcounty.gov",
              "published": "2026-04-02",
              "date": "2026-04-02",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Mona · Juab · Source context reviewed",
      "status_scope": "The original April 2, 2026 County notice identifies Nebo North LLC application to construct and operate a data center campus and schedules April 15 consideration. Agency listed proposal is limited to that named application notice. The passed hearing day does not establish that a hearing occurred, a final vote, issued permission, physical construction or operation. No permit expiration, exact site reference or quantity is promoted.",
      "event_evidence": [
        {
          "date": "2026-04-15",
          "text": "Scheduled event: The County April 2 notice schedules a hearing on Nebo North LLC data center application April 15, 2026. The passed date is retained as a schedule, without a verified hearing result or an accomplished decision.",
          "kind": "scheduled_event",
          "sources": [
            {
              "url": "https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/",
              "host": "juabcounty.gov",
              "published": "2026-04-02",
              "date": "2026-04-02",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49023"
      }
    },
    {
      "id": "summit-group-holdings-dog-valley-juab-county-ut",
      "state": "ut",
      "kind": "facility",
      "name": "Dog Valley Data Center (McWilliams/Sperry rezone)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Juab"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Juab separate Summit rezoning recommendation and DCPC additional parcel permits. Summit vote is a recommendation, not final county rezoning, CUP, or opening. Separate DCPC permit votes must not be assigned to Summit. Developer jobs and construction timeframe are forecasts. DCPC two-building area wording is ambiguous about combined versus per-building area, so no numeric building-area field adopted. Stale Minutes 9/17/2025 heading on page 4 does not override explicit November19 cover and meeting date. Water and tax claims remain attributed proposals, not measured usage or guaranteed revenue. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf",
          "host": "juabcounty.gov",
          "date": "2025-11-19",
          "published": "2025-11-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.75065,
        "lng": -112.74807,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Juab separate Summit rezoning recommendation and DCPC additional parcel permits",
          "fields": {
            "meeting_date": "2025-11-19",
            "summit_project_applicant_representative": "Summit Group Holdings, Ryan Matthews",
            "summit_zone_change_landowners": [
              "Jim McWilliams",
              "Mike Sperry"
            ],
            "summit_planning_recommendation": "recommend county commission approve zone change",
            "summit_recommendation_vote": {
              "for": 3,
              "against": 2
            },
            "summit_developer_forecast_permanent_jobs_min": 75,
            "summit_developer_forecast_permanent_jobs_max": 100,
            "summit_developer_forecast_buildout_years": "5 to 10 or longer",
            "separate_dcpc_outcomes": [
              {
                "property": "Kay",
                "action": "Planning Commission approved additional conditional use permit with original conditions",
                "vote": "unanimous"
              },
              {
                "property": "Young Living",
                "action": "Planning Commission approved additional conditional use permit with original conditions",
                "vote": "unanimous"
              }
            ]
          },
          "notes": [
            "Summit vote is a recommendation, not final county rezoning, CUP, or opening. Separate DCPC permit votes must not be assigned to Summit. Developer jobs and construction timeframe are forecasts. DCPC two-building area wording is ambiguous about combined versus per-building area, so no numeric building-area field adopted. Stale Minutes 9/17/2025 heading on page 4 does not override explicit November19 cover and meeting date. Water and tax claims remain attributed proposals, not measured usage or guaranteed revenue.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf",
              "host": "juabcounty.gov",
              "date": "2025-11-19",
              "published": "2025-11-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 41",
          "scope": "The original County planning minutes identify Summit Group Holdings and the Dog Valley data center zone change discussion. The body records a recommendation to County Commissioners, rather than a final County rezoning or construction permission. Its cover and opening say November 19, 2025, while the printed page 4 header says September 17, 2025. That date conflict is retained without choosing an exact event day. Resource, tax and employment representations remain attributed forecasts and do not establish current physical stage or delivered benefits.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_dog_valley_recommendation_with_conflicting_printed_meeting_headers",
              "scope": "The original County planning minutes identify Summit Group Holdings and the Dog Valley data center zone change discussion. The body records a recommendation to County Commissioners, rather than a final County rezoning or construction permission. Its cover and opening say November 19, 2025, while the printed page 4 header says September 17, 2025. That date conflict is retained without choosing an exact event day. Resource, tax and employment representations remain attributed forecasts and do not establish current physical stage or delivered benefits."
            },
            "meeting_date_conflict": {
              "cover_and_opening": "2025-11-19",
              "page4_header": "2025-09-17",
              "actual_event_on": null,
              "scope": "The original file contains conflicting printed dates. No exact event day is adopted from this document alone."
            }
          },
          "notes": [
            "The original County planning minutes identify Summit Group Holdings and the Dog Valley data center zone change discussion. The body records a recommendation to County Commissioners, rather than a final County rezoning or construction permission. Its cover and opening say November 19, 2025, while the printed page 4 header says September 17, 2025. That date conflict is retained without choosing an exact event day. Resource, tax and employment representations remain attributed forecasts and do not establish current physical stage or delivered benefits.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf",
              "host": "juabcounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Juab · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49023"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
