  "schema_version": 1,
  "source_compilation_context": {
    "ut": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ut.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "49027",
    "label": "Millard County, Utah"
  },
  "records": [
    {
      "id": "blusky-ai-delta-millard-county-ut",
      "state": "ut",
      "kind": "facility",
      "name": "BluSky AI Delta Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Millard"
      ],
      "city": "Delta",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. BluSky originalGlobeNewswire July29,2025 syndicatedbyManilaTimes: NONBINDINGLOI for25acres/up50MW atCreekstoneDelta. Definitive documents/closing stillfuture, expectedQ4then/late2026groundbreaking. Not completedlandpurchase/PPA/ITenergization. CreekstonebroaderDeltaGigasite notallBluSkyownedIT. Milford51.6acre/9.3MW isSEPARATEproject. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.manilatimes.net/2025/07/29/tmt-newswire/globenewswire/blusky-ai-inc-signs-letter-of-intent-to-acquire-25-acres-with-up-to-50-mw-of-capacity-in-strategic-expansion/2158223",
          "host": "manilatimes.net",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://bluskyaidatacenters.com/investor-relations",
          "host": "bluskyaidatacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.07334,
        "lng": -113.10051,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "BluSky originalGlobeNewswire July29,2025 syndicatedbyManilaTimes: NONBINDINGLOI for25acres/up50MW atCreekstoneDelta. Definitive documents/closing stillfuture, expectedQ4then/late2026groundbreaking. Not completedlandpurchase/PPA/ITenergization. CreekstonebroaderDeltaGigasite notallBluSkyownedIT. Milford51.6acre/9.3MW isSEPARATEproject.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://www.manilatimes.net/2025/07/29/tmt-newswire/globenewswire/blusky-ai-inc-signs-letter-of-intent-to-acquire-25-acres-with-up-to-50-mw-of-capacity-in-strategic-expansion/2158223",
              "host": "manilatimes.net",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 41",
          "scope": "The current original issuer overview describes a modular compute strategy targeting powered land assets but does not name this exact Utah component or report its physical deployment. Secondary copies of earlier site letters of intent, available power and passed deployment forecasts are not adopted as commissioned computing. Another BluSky site or a similarly named carbon company is not substituted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "generic_issuer_strategy_without_exact_named_site_phase",
              "scope": "The current original issuer overview describes a modular compute strategy targeting powered land assets but does not name this exact Utah component or report its physical deployment. Secondary copies of earlier site letters of intent, available power and passed deployment forecasts are not adopted as commissioned computing. Another BluSky site or a similarly named carbon company is not substituted."
            }
          },
          "notes": [
            "The current original issuer overview describes a modular compute strategy targeting powered land assets but does not name this exact Utah component or report its physical deployment. Secondary copies of earlier site letters of intent, available power and passed deployment forecasts are not adopted as commissioned computing. Another BluSky site or a similarly named carbon company is not substituted.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://bluskyaidatacenters.com/investor-relations",
              "host": "bluskyaidatacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Delta · Millard · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49027"
      }
    },
    {
      "id": "creekstone-delta-ut",
      "state": "ut",
      "kind": "facility",
      "name": "Creekstone Energy Delta Gigasite",
      "group": "building",
      "status": "Site infrastructure underway",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Millard"
      ],
      "city": "Delta",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 10GW ultimate company aim with integrated generation, not verified IT load or current capacity. 50percent post-performance reduction is not upfront grant or172Mpaid. Exact executed agreement and actual tax performance not reviewed. No evaporative cooling claim does not mean zero domestic water or zero emissions. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/",
          "host": "business.utah.gov",
          "date": "2026-04-09",
          "published": "2026-04-09",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.creekstone.energy/",
          "host": "www.creekstone.energy",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 39.10653,
        "lng": -113.13674,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "named government source",
          "fields": {
            "government_tax_incentive_announcement": "2026-04-09",
            "planned_investment_usd": 17082408000,
            "investment_timeline_years": 20,
            "expected_new_jobs": 106,
            "tax_program": "post-performance REDTIF",
            "announced_credit_rate_percent": 50,
            "projected_new_state_tax_revenue_usd": 344381185,
            "operator_full_build_capacity_goal_gw": 10,
            "construction_start_qualified_period": "late2025"
          },
          "notes": [
            "10GW ultimate company aim with integrated generation, not verified IT load or current capacity. 50percent post-performance reduction is not upfront grant or172Mpaid. Exact executed agreement and actual tax performance not reviewed. No evaporative cooling claim does not mean zero domestic water or zero emissions.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/",
              "host": "business.utah.gov",
              "date": "2026-04-09",
              "published": "2026-04-09",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Site infrastructure underway",
              "basis": "The current Delta project description reports construction underway and specifically identifies the gas interconnect as under construction. Utah’s April 9, 2026 release also reports campus construction began in late 2025.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "This is work on an integrated power and digital-infrastructure development. It does not establish completed data halls, operating IT capacity or the first day of construction."
          },
          "notes": [
            "This is work on an integrated power and digital-infrastructure development. It does not establish completed data halls, operating IT capacity or the first day of construction.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://www.creekstone.energy/",
              "host": "www.creekstone.energy",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            },
            {
              "url": "https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/",
              "host": "business.utah.gov",
              "published": "2026-04-09",
              "date": "2026-04-09",
              "checked": "2026-10-16",
              "label": "Reviewed government evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Delta · Millard · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current Delta project description reports construction underway and specifically identifies the gas interconnect as under construction. Utah’s April 9, 2026 release also reports campus construction began in late 2025. This is work on an integrated power and digital-infrastructure development. It does not establish completed data halls, operating IT capacity or the first day of construction.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49027"
      }
    },
    {
      "id": "joule-millard-county-ut",
      "state": "ut",
      "kind": "facility",
      "name": "Joule Energy and Data Center Campus",
      "group": "proposed",
      "status": "Project listed for development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Millard"
      ],
      "city": "Holden",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.. AmyJoiODonoghue DeseretNews October21,2025 originalJoulefounderinterviews:4000acreMillardfamilyland/ownwaterrightsandplannedclosedloop; existingrightnotproofnewusezeroimpactorindependentallocation.1.3GW FIRSTPHASEPOWERGENERATION, notcriticalIToradditionalcampusload. Founderssaycountyconditionalusepermitunanimouslygranted; underlyingpermit/airlicense/currentcompletionnotread. Groundbreakingfutureinreportnotobserved. Amazon/Google/Oracle/OpenAI/xAIarepotentialcustomerexamplesnotconfirmedtenants. Baxtel47Utahfacilities/600MWderivativemixedbasisnotadoptedcensus. Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.deseret.com/utah/2025/10/21/millard-county-data-center-to-break-ground-and-bring-promise-to-rural-utah/",
          "host": "deseret.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://joulepower.ai/",
          "host": "joulepower.ai",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.00413,
        "lng": -113.09443,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-acquisitions-regulatory-stage-and-site-crosswalks-round81-2026-10-15.json",
          "scope": "Original named-site/context, some road-and-footprint crosswalks limited; not independently certified operator/parcel.",
          "fields": {},
          "notes": [
            "AmyJoiODonoghue DeseretNews October21,2025 originalJoulefounderinterviews:4000acreMillardfamilyland/ownwaterrightsandplannedclosedloop; existingrightnotproofnewusezeroimpactorindependentallocation.1.3GW FIRSTPHASEPOWERGENERATION, notcriticalIToradditionalcampusload.",
            "Founderssaycountyconditionalusepermitunanimouslygranted; underlyingpermit/airlicense/currentcompletionnotread. Groundbreakingfutureinreportnotobserved. Amazon/Google/Oracle/OpenAI/xAIarepotentialcustomerexamplesnotconfirmedtenants. Baxtel47Utahfacilities/600MWderivativemixedbasisnotadoptedcensus.",
            "Acquisition/proposeduse/phasepower/regulatorreview/explicitstagepreserved, not allfields/IT/currentoperationcertified."
          ],
          "sources": [
            {
              "url": "https://www.deseret.com/utah/2025/10/21/millard-county-data-center-to-break-ground-and-bring-promise-to-rural-utah/",
              "host": "deseret.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 41",
          "scope": "The current original Joule account explicitly describes master planning of its Millard County energy and computing campus and claims an executed conditional use permit and generation equipment on order and in production. Project listed for development applies to that named campus plan. Equipment manufacturing, an executed permit claim and a future onsite power model do not independently establish data hall construction, delivered generation, commissioned computing, actual grid effects or measured environmental results.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_millard_master_planned_energy_and_compute_campus",
              "scope": "The current original Joule account explicitly describes master planning of its Millard County energy and computing campus and claims an executed conditional use permit and generation equipment on order and in production. Project listed for development applies to that named campus plan. Equipment manufacturing, an executed permit claim and a future onsite power model do not independently establish data hall construction, delivered generation, commissioned computing, actual grid effects or measured environmental results."
            }
          },
          "notes": [
            "The current original Joule account explicitly describes master planning of its Millard County energy and computing campus and claims an executed conditional use permit and generation equipment on order and in production. Project listed for development applies to that named campus plan. Equipment manufacturing, an executed permit claim and a future onsite power model do not independently establish data hall construction, delivered generation, commissioned computing, actual grid effects or measured environmental results.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://joulepower.ai/",
              "host": "joulepower.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Holden · Millard · Source context reviewed",
      "status_scope": "The current original Joule account explicitly describes master planning of its Millard County energy and computing campus and claims an executed conditional use permit and generation equipment on order and in production. Project listed for development applies to that named campus plan. Equipment manufacturing, an executed permit claim and a future onsite power model do not independently establish data hall construction, delivered generation, commissioned computing, actual grid effects or measured environmental results.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "49027"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}