{
  "schema_version": 1,
  "source_compilation_context": {
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "51075",
    "label": "Goochland County, Virginia"
  },
  "records": [
    {
      "id": "tract-tuckahoe-technology-park-goochland-county-va",
      "state": "va",
      "kind": "facility",
      "name": "Tuckahoe Technology Park",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Goochland"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Goochland formal application versus preapplication and unresolved completeness. Development areas are not seven buildings or operating centers. County page contains preapplication and formal sections; formal submission does not equal complete application or approved CUP. Draft conditions/noise studies not enacted limits or measured compliance. October calendar has no published events, not proof future hearing cannot be added. No critical IT MW, final outcome or commissioning adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-08-05",
          "The current County account records receipt of the formal Tuckahoe Technology Park conditional use application on August 5, 2026. This dates the reported submission, not acceptance as complete, approval, construction or computing operation."
        ],
        [
          "2026-08-20",
          "The County completeness letter dated August 20, 2026 requests additional information for the named Tuckahoe application. This dates the agency letter, not an application denial, a measured noise impact or physical construction."
        ],
        [
          "2026-08-25",
          "The County published correspondence dated August 25, 2026 corrects a stated noise reference in its August 20 Tuckahoe completeness letter. This dates that clarification, not a measured impact, enacted project condition or computing operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.goochlandva.us/1480/Tuckahoe-Technology-Park",
          "host": "goochlandva.us",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.goochlandva.us/1490/2026-Ordinance-Update",
          "host": "www.goochlandva.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.goochlandva.us/DocumentCenter/View/13953/Completeness-Review-Letter---82026",
          "host": "www.goochlandva.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.goochlandva.us/DocumentCenter/View/13962/82026-Completeness-Letter-Clarification---Proposed--Revised-Noise-Limits",
          "host": "www.goochlandva.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 37.72228,
        "lng": -77.91567,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Goochland formal application versus preapplication and unresolved completeness",
          "fields": {
            "agency": "Goochland County, Virginia",
            "project": "Tuckahoe Technology Park",
            "applicant": "VALCO2 Goochland LLC (Tract)",
            "case": "CU-2026-00014",
            "formal_cup_application_received": "2026-08-05",
            "staff_completeness_letter_date": "2026-08-20",
            "revision_posted_date": "2026-09-01",
            "proposed_site_acres": 871,
            "proposed_development_areas": 7,
            "location": "Technology Overlay District TODWest eastern designated growth area"
          },
          "notes": [
            "Development areas are not seven buildings or operating centers. County page contains preapplication and formal sections; formal submission does not equal complete application or approved CUP. Draft conditions/noise studies not enacted limits or measured compliance. October calendar has no published events, not proof future hearing cannot be added. No critical IT MW, final outcome or commissioning adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.goochlandva.us/1480/Tuckahoe-Technology-Park",
              "host": "goochlandva.us",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 50",
          "scope": "The current County project page identifies Tuckahoe Technology Park application materials and separate general ordinance changes. Its update says the County received a formal conditional use application on August 5, 2026, while the August 20 letter requests outstanding information and the August 25 clarification corrects a stated noise value. Listed proposal is limited to this named review process. General zoning amendments, revised submissions and a completeness letter do not establish a project approval, physical construction or computing operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_conditional_use_proposal",
              "scope": "The current County project page identifies Tuckahoe Technology Park application materials and separate general ordinance changes. Its update says the County received a formal conditional use application on August 5, 2026, while the August 20 letter requests outstanding information and the August 25 clarification corrects a stated noise value. Listed proposal is limited to this named review process. General zoning amendments, revised submissions and a completeness letter do not establish a project approval, physical construction or computing operation."
            },
            "source_read_scope": {
              "letter_selected_sections_pages": [
                1,
                2,
                3,
                9
              ],
              "clarification_text_pages": [
                1
              ],
              "remaining_letter_sections_and_later_revised_studies_not_substantively_reviewed": true
            }
          },
          "notes": [
            "The current County project page identifies Tuckahoe Technology Park application materials and separate general ordinance changes. Its update says the County received a formal conditional use application on August 5, 2026, while the August 20 letter requests outstanding information and the August 25 clarification corrects a stated noise value. Listed proposal is limited to this named review process. General zoning amendments, revised submissions and a completeness letter do not establish a project approval, physical construction or computing operation.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.goochlandva.us/1480/Tuckahoe-Technology-Park",
              "host": "www.goochlandva.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.goochlandva.us/1490/2026-Ordinance-Update",
              "host": "www.goochlandva.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.goochlandva.us/DocumentCenter/View/13953/Completeness-Review-Letter---82026",
              "host": "www.goochlandva.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.goochlandva.us/DocumentCenter/View/13962/82026-Completeness-Letter-Clarification---Proposed--Revised-Noise-Limits",
              "host": "www.goochlandva.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Goochland · Source context reviewed",
      "status_scope": "The current County project page identifies Tuckahoe Technology Park application materials and separate general ordinance changes. Its update says the County received a formal conditional use application on August 5, 2026, while the August 20 letter requests outstanding information and the August 25 clarification corrects a stated noise value. Listed proposal is limited to this named review process. General zoning amendments, revised submissions and a completeness letter do not establish a project approval, physical construction or computing operation.",
      "event_evidence": [
        {
          "date": "2026-08-05",
          "text": "The current County account records receipt of the formal Tuckahoe Technology Park conditional use application on August 5, 2026. This dates the reported submission, not acceptance as complete, approval, construction or computing operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.goochlandva.us/1480/Tuckahoe-Technology-Park",
              "host": "www.goochlandva.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2026-08-20",
          "text": "The County completeness letter dated August 20, 2026 requests additional information for the named Tuckahoe application. This dates the agency letter, not an application denial, a measured noise impact or physical construction.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.goochlandva.us/DocumentCenter/View/13953/Completeness-Review-Letter---82026",
              "host": "www.goochlandva.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2026-08-25",
          "text": "The County published correspondence dated August 25, 2026 corrects a stated noise reference in its August 20 Tuckahoe completeness letter. This dates that clarification, not a measured impact, enacted project condition or computing operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.goochlandva.us/DocumentCenter/View/13962/82026-Completeness-Letter-Clarification---Proposed--Revised-Noise-Limits",
              "host": "www.goochlandva.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51075"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
