{
  "schema_version": 1,
  "source_compilation_context": {
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "51085",
    "label": "Hanover County, Virginia"
  },
  "records": [
    {
      "id": "hhhunt-hunting-hawk-technology-park-hanover-va",
      "state": "va",
      "kind": "facility",
      "name": "Hunting Hawk Technology Park",
      "group": "stopped",
      "status": "County-reported application withdrawal",
      "raw_status": "stopped",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hanover"
      ],
      "city": "Glen Allen",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. 468-acre, ten-building scheme and annual tax estimates were forecasts. Exact filing receipt and later replacement not independently retained. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://virginiabusiness.com/developer-withdraws-hanover-data-center-campus-proposal/",
          "host": "virginiabusiness.com",
          "date": "2026-01-29",
          "published": "2026-01-29",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hanovercounty.gov/m/newsflash/Home/Detail/1076",
          "host": "www.hanovercounty.gov",
          "published": "2026-01-29",
          "date": "2026-01-29",
          "checked": "2026-10-19",
          "label": "Original county or city record for the qualified stage"
        },
        {
          "url": "https://www.hanovercounty.gov/List.aspx?MID=235",
          "host": "www.hanovercounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original county or city record for the qualified stage"
        }
      ],
      "loc": {
        "lat": 37.75983,
        "lng": -77.49136,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "rezoning-application-withdrawn",
            "reported_finding": "Virginia Business reports HHHunt withdrew Hunting Hawk rezoning application, announced to supervisors after planning denial recommendation.",
            "report_display_date": "2026-01-29",
            "independently_verified_current_status": null
          },
          "notes": [
            "468-acre, ten-building scheme and annual tax estimates were forecasts. Exact filing receipt and later replacement not independently retained.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://virginiabusiness.com/developer-withdraws-hanover-data-center-campus-proposal/",
              "host": "virginiabusiness.com",
              "date": "2026-01-29",
              "published": "2026-01-29",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "county-status-2026-10-19",
          "scope": "Hanover County reports the Hunting Hawk data center request was withdrawn. Its original hearing notice identifies the Hunting Hawk Technology Park cases.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_reported_application_withdrawal",
              "scope": "Hanover County reports the Hunting Hawk data center request was withdrawn. Its original hearing notice identifies the Hunting Hawk Technology Park cases."
            }
          },
          "notes": [
            "This report concerns the withdrawn application. It does not rule out later proposals for the land. A Planning Commission recommendation is different from an applicant's withdrawal or a final Board decision. An exact effective withdrawal date is not established here."
          ],
          "sources": [
            {
              "url": "https://www.hanovercounty.gov/m/newsflash/Home/Detail/1076",
              "host": "www.hanovercounty.gov",
              "published": "2026-01-29",
              "date": "2026-01-29",
              "checked": "2026-10-19",
              "label": "Original county or city record for the qualified stage"
            },
            {
              "url": "https://www.hanovercounty.gov/List.aspx?MID=235",
              "host": "www.hanovercounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original county or city record for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Glen Allen · Hanover · Source context reviewed",
      "status_scope": "Hanover County reports the Hunting Hawk data center request was withdrawn. Its original hearing notice identifies the Hunting Hawk Technology Park cases.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51085"
      }
    },
    {
      "id": "tract-mountain-road-technology-park-hanover-va",
      "state": "va",
      "kind": "facility",
      "name": "Mountain Road Technology Park",
      "group": "stopped",
      "status": "County-reported application denial",
      "raw_status": "stopped",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hanover"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. VPM LyndonGerman June1,2026 updatedJune3 reportsHanover4 to 3REJECTIONofMountainRoadTractrezoning, distinctfromAprilplanningrecommendation.427acresvsWTVRnearly430roundedscopes; noadditionalcampus. NewsrelativeWednesdayconsistentMay27butoriginalvoteminutesnotread; exactdaykeptuncertified. OtherHHHuntwithdrawal/differentTractAshland/Goochlandprojectsnotthisdenial. 600kgal/daywater and901Mtax2025 to 2044/350direct1100constructjobs are FORECASTSofrejectedproposal. $15Mwaterinfra/$6Mland-recreation are commitmentsnotverifiedpayments. First2029/full2036targets notactualopenings. Sourceprints900MWperday, a dimensionaluniterror; do notnormalizeintomeasuredMW/MWhorIT. Reporter/residentviewsremainattributed, notindependentlyprovenfutureharm/countywideban. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification. WTVR KelseyJones/CameronThompson originalreport corroborates4 to 3HanoverdenialWednesdaynight; metadataMay28,2026publication00:13EDT,notautomaticallyvoteday. Proposed430acres/$900M20yrtax/~1000constructionjobs are roundedforecastsofthefailedproposal, notactualspending/payments. Commitments towaterupgrades/noisestudies notperformanceproof. NewsroombodydisclosesAI-assistedplatformconversion; originaljournalistreportstillattributed. PlannedJune78acreBeaverdamcase andapprovedAshlandcampusseparate; currentcountyban notshown.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.vpm.org/news/2026-06-01/hanover-mountain-road-data-center-tract-davis-prichard-kirchner-dibble",
          "host": "vpm.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.wtvr.com/news/local-news/hanover-county/tract-data-center-vote-may-28-2026",
          "host": "wtvr.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hanovercounty.gov/m/newsflash/Home/Detail/1122",
          "host": "www.hanovercounty.gov",
          "published": "2026-05-28",
          "date": "2026-05-28",
          "checked": "2026-10-19",
          "label": "Original county or city record for the qualified stage"
        },
        {
          "url": "https://www.hanovercounty.gov/List.aspx?MID=237",
          "host": "www.hanovercounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original county or city record for the qualified stage"
        }
      ],
      "loc": {
        "lat": 37.7757,
        "lng": -77.50868,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json",
          "scope": "Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.",
          "fields": {},
          "notes": [
            "VPM LyndonGerman June1,2026 updatedJune3 reportsHanover4 to 3REJECTIONofMountainRoadTractrezoning, distinctfromAprilplanningrecommendation.427acresvsWTVRnearly430roundedscopes; noadditionalcampus. NewsrelativeWednesdayconsistentMay27butoriginalvoteminutesnotread; exactdaykeptuncertified. OtherHHHuntwithdrawal/differentTractAshland/Goochlandprojectsnotthisdenial.",
            "600kgal/daywater and901Mtax2025 to 2044/350direct1100constructjobs are FORECASTSofrejectedproposal. $15Mwaterinfra/$6Mland-recreation are commitmentsnotverifiedpayments. First2029/full2036targets notactualopenings. Sourceprints900MWperday, a dimensionaluniterror; do notnormalizeintomeasuredMW/MWhorIT. Reporter/residentviewsremainattributed, notindependentlyprovenfutureharm/countywideban.",
            "Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."
          ],
          "sources": [
            {
              "url": "https://www.vpm.org/news/2026-06-01/hanover-mountain-road-data-center-tract-davis-prichard-kirchner-dibble",
              "host": "vpm.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json",
          "scope": "Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.",
          "fields": {},
          "notes": [
            "WTVR KelseyJones/CameronThompson originalreport corroborates4 to 3HanoverdenialWednesdaynight; metadataMay28,2026publication00:13EDT,notautomaticallyvoteday. Proposed430acres/$900M20yrtax/~1000constructionjobs are roundedforecastsofthefailedproposal, notactualspending/payments. Commitments towaterupgrades/noisestudies notperformanceproof. NewsroombodydisclosesAI-assistedplatformconversion; originaljournalistreportstillattributed. PlannedJune78acreBeaverdamcase andapprovedAshlandcampusseparate; currentcountyban notshown.",
            "Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."
          ],
          "sources": [
            {
              "url": "https://www.wtvr.com/news/local-news/hanover-county/tract-data-center-vote-may-28-2026",
              "host": "wtvr.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "county-status-2026-10-19",
          "scope": "Hanover County reports denial of the rezoning and related permits for the Mountain Road Technology Park cases.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_reported_application_denial",
              "scope": "Hanover County reports denial of the rezoning and related permits for the Mountain Road Technology Park cases."
            }
          },
          "notes": [
            "The county hearing notice matches REZ2025-00023 and CUP2025-00016 to this project. The May 27 meeting differs from May 28 publication. This is separate from Tract's Ashland/Hickory Hill campus and from Iron Horse. A later replacement proposal or current construction is not established."
          ],
          "sources": [
            {
              "url": "https://www.hanovercounty.gov/m/newsflash/Home/Detail/1122",
              "host": "www.hanovercounty.gov",
              "published": "2026-05-28",
              "date": "2026-05-28",
              "checked": "2026-10-19",
              "label": "Original county or city record for the qualified stage"
            },
            {
              "url": "https://www.hanovercounty.gov/List.aspx?MID=237",
              "host": "www.hanovercounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original county or city record for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hanover · Source context reviewed",
      "status_scope": "Hanover County reports denial of the rezoning and related permits for the Mountain Road Technology Park cases.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51085"
      }
    },
    {
      "id": "westdulles-iron-horse-hanover-va",
      "state": "va",
      "kind": "facility",
      "name": "Iron Horse Data Center Campus",
      "group": "proposed",
      "status": "County-listed application review",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hanover"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Deferral is not denial or approval.2024 TownofAshland approval andHanover denial concern different jurisdictions/earlier plan; do not merge them into one current approval. Proposed 75-footheight is a requested allowance, not built condition. Other MountainRoad denial/HickoryHill approval are separate projects. Resident emissions/well-impact concerns are not measured findings. NoMW, issued utility service, current construction or laterJulyoutcome adopted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.12onyourside.com/2026/06/19/iron-horse-data-center-proposal-deferred-hanover-county/",
          "host": "12onyourside.com",
          "date": "2026-06-19",
          "published": "2026-06-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hanovercounty.gov/m/newsflash/Home/Detail/1010",
          "host": "www.hanovercounty.gov",
          "published": "2025-10-20",
          "date": "2025-10-20",
          "checked": "2026-10-19",
          "label": "Original county or city record for the qualified stage"
        }
      ],
      "loc": {
        "lat": 37.72675,
        "lng": -77.48846,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "WWBT reports developer-requested deferral of IronHorse’s revised 78-acre Hanover rezoning/height request, with a July 16 planning hearing expected.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Deferral is not denial or approval.2024 TownofAshland approval andHanover denial concern different jurisdictions/earlier plan; do not merge them into one current approval. Proposed 75-footheight is a requested allowance, not built condition. Other MountainRoad denial/HickoryHill approval are separate projects. Resident emissions/well-impact concerns are not measured findings. NoMW, issued utility service, current construction or laterJulyoutcome adopted.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.12onyourside.com/2026/06/19/iron-horse-data-center-proposal-deferred-hanover-county/",
              "host": "12onyourside.com",
              "date": "2026-06-19",
              "published": "2026-06-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "county-status-2026-10-19",
          "scope": "Hanover County lists the Tradeport Hanover Land Iron Horse application as under review, with a future Board hearing.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_listed_application_review",
              "scope": "Hanover County lists the Tradeport Hanover Land Iron Horse application as under review, with a future Board hearing."
            }
          },
          "notes": [
            "This is the REZ2025-00010/SE2025-00009 application, separate from the earlier REZ2022-00008 case and an Ashland town approval. The October 28, 2026 hearing is scheduled, not an accomplished decision. Construction or completed buildings are not established."
          ],
          "sources": [
            {
              "url": "https://www.hanovercounty.gov/m/newsflash/Home/Detail/1010",
              "host": "www.hanovercounty.gov",
              "published": "2025-10-20",
              "date": "2025-10-20",
              "checked": "2026-10-19",
              "label": "Original county or city record for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hanover · Source context reviewed",
      "status_scope": "Hanover County lists the Tradeport Hanover Land Iron Horse application as under review, with a future Board hearing.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51085"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
