{
  "schema_version": 1,
  "source_compilation_context": {
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "51143",
    "label": "Pittsylvania County, Virginia"
  },
  "records": [
    {
      "id": "anchorstone-58-east-data-campus-ringgold-va",
      "state": "va",
      "kind": "facility",
      "name": "58 East Data Campus (Route 58 East Data Center Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Pittsylvania"
      ],
      "city": "Ringgold",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Article alternates up to 500 jobs and quoted about 200 full-time at build-out. No preferred exact job count or observed opening adopted. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://showcasemagazine.com/2024/11/15/permit-approved-for-ringgold-data-center-campus/",
          "host": "showcasemagazine.com",
          "date": "2024-11-15",
          "published": "2024-11-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.82144,
        "lng": -79.39711,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Reported unanimous special-use approval for Anchorstone 58 East campus after rezoning.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Article alternates up to 500 jobs and quoted about 200 full-time at build-out. No preferred exact job count or observed opening adopted.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://showcasemagazine.com/2024/11/15/permit-approved-for-ringgold-data-center-campus/",
              "host": "showcasemagazine.com",
              "date": "2024-11-15",
              "published": "2024-11-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ringgold · Pittsylvania · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51143"
      }
    },
    {
      "id": "stack-berry-hill-va",
      "state": "va",
      "kind": "facility",
      "name": "Berry Hill / Southern Virginia Megasite",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Pittsylvania"
      ],
      "city": "Berry Hill",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Reported minimum metrics $73.5 billion/2,050 jobs at $80,500 average differ from broader aspirational $100 billion over three decades/2,500 jobs in two decades; neither is already spent or employed. Proposed equipment tax $1.62 per $100 still required county vote in this source. Minimum annual $16.25 million for first 1,000 acres and possible $48.6 million for all 2,990 acres are alternative scale cases, not additive revenue or received taxes; start forecast fall 2027/2028. $1,000-per-job enterprise-zone incentive is conditional, not proof of cash awarded. Seven million gallons/day is megasite supply capability, not DC actual demand; Dan River flow/textile mill history are separate. Planned Appalachian Power agreement is not examined executed ESA. State tax-exemption budget outcome was pending; related headlines do not settle it. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://virginiabusiness.com/stack-100b-berry-hill-data-center-project/",
          "host": "virginiabusiness.com",
          "date": "2026-05-18",
          "published": "2026-05-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.84159,
        "lng": -79.41911,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Virginia Business reports unanimous local performance-agreement approval for Stack’s proposed Berry Hill campus, with multidecade investment and job milestones.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Reported minimum metrics $73.5 billion/2,050 jobs at $80,500 average differ from broader aspirational $100 billion over three decades/2,500 jobs in two decades; neither is already spent or employed. Proposed equipment tax $1.62 per $100 still required county vote in this source. Minimum annual $16.25 million for first 1,000 acres and possible $48.6 million for all 2,990 acres are alternative scale cases, not additive revenue or received taxes; start forecast fall 2027/2028. $1,000-per-job enterprise-zone incentive is conditional, not proof of cash awarded. Seven million gallons/day is megasite supply capability, not DC actual demand; Dan River flow/textile mill history are separate. Planned Appalachian Power agreement is not examined executed ESA. State tax-exemption budget outcome was pending; related headlines do not settle it.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://virginiabusiness.com/stack-100b-berry-hill-data-center-project/",
              "host": "virginiabusiness.com",
              "date": "2026-05-18",
              "published": "2026-05-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Berry Hill · Pittsylvania · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51143"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
