{
  "schema_version": 1,
  "source_compilation_context": {
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "51153",
    "label": "Prince William County, Virginia"
  },
  "records": [
    {
      "id": "amazon-devlin-tech-park-va",
      "state": "va",
      "kind": "facility",
      "name": "Amazon Devlin Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Prince William"
      ],
      "city": "Bristow",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Land price is not total construction spending. Zoning floor allowance is not commissioned space or proof of current operations. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://virginiabusiness.com/amazon-buys-189-acres-in-prince-william-tech-park-for-700m/",
          "host": "virginiabusiness.com",
          "date": "2025-11-18",
          "published": "2025-11-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.70393,
        "lng": -77.47812,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Reported Amazon purchase of 188.5 acres in Devlin Technology Park closed November 5 for 700 million USD.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Land price is not total construction spending. Zoning floor allowance is not commissioned space or proof of current operations.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://virginiabusiness.com/amazon-buys-189-acres-in-prince-william-tech-park-for-700m/",
              "host": "virginiabusiness.com",
              "date": "2025-11-18",
              "published": "2025-11-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Bristow · Prince William · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51153"
      }
    },
    {
      "id": "cloudhq-manassas-mcc-va",
      "state": "va",
      "kind": "facility",
      "name": "CloudHQ Manassas MCC Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Prince William"
      ],
      "city": "Manassas",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CloudHQ MCC full-campus and phased development scope. 382MW is full campus marketing total, not each building or energized load. Narrative says over375MW rather than exact382. RFSwithin20months is undated relative interval, not calendar opening. Mid2025construction/Q32026MCC7targets have not been independently observed. Referencepoint not verified parcel centroid. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://cloudhq.com/campus/mcc-campus/",
          "host": "cloudhq.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.71885,
        "lng": -77.49441,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "CloudHQ MCC full-campus and phased development scope",
          "fields": {
            "campus": "MCC",
            "operator_campus_reference_point": {
              "lat": 38.71955,
              "lon": -77.49819
            },
            "campus_area_sqft": 2232875,
            "headline_total_critical_it_mw": 382,
            "headline_available_critical_load_mw": 96,
            "data_centers": 7,
            "mcc5_status_description": "siteplan approved, ready for development",
            "mcc7_historical_target_service_quarter": "2026-Q3"
          },
          "notes": [
            "382MW is full campus marketing total, not each building or energized load. Narrative says over375MW rather than exact382. RFSwithin20months is undated relative interval, not calendar opening. Mid2025construction/Q32026MCC7targets have not been independently observed. Referencepoint not verified parcel centroid.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://cloudhq.com/campus/mcc-campus/",
              "host": "cloudhq.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 4",
          "scope": "CloudHQ continues to list MCC as a campus with mixed tenant and development contexts. MCC5 is described as ready for development and MCC7 retains an expired third quarter 2026 delivery target. The target and undated relative service interval do not establish actual completion or every building in operation. No present physical stage is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "CloudHQ continues to list MCC as a campus with mixed tenant and development contexts. MCC5 is described as ready for development and MCC7 retains an expired third quarter 2026 delivery target. The target and undated relative service interval do not establish actual completion or every building in operation. No present physical stage is promoted."
            }
          },
          "notes": [
            "CloudHQ continues to list MCC as a campus with mixed tenant and development contexts. MCC5 is described as ready for development and MCC7 retains an expired third quarter 2026 delivery target. The target and undated relative service interval do not establish actual completion or every building in operation. No present physical stage is promoted."
          ],
          "sources": [
            {
              "url": "https://cloudhq.com/campus/mcc-campus/",
              "host": "cloudhq.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Manassas · Prince William · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51153"
      }
    },
    {
      "id": "corscale-gainesville-crossing-va",
      "state": "va",
      "kind": "facility",
      "name": "Gainesville Crossing Digital Campus (GCDC)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Prince William"
      ],
      "city": "Gainesville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.. AffiniusCapital original projectpage identifies GainesvilleCrossingGCDC withCorscale.130acres/fivebuildings/326MWFULLBUILDOUTpower have unspecifiedITbasis, not commissionedcriticalIT. Header1,020kRSF is rentable area, not automaticallygrosssitebuildingarea. Developer saysBuilding1stabilized andBuildings1 to 3fullyleased, but lease/stabilization isnot independentmeteredoperation. Buildings2Q22026/3Q32026completion and4 to 5Q22026construction are undated-page targets; datespassingnotobservedcompletion. Introone-on-sitesubstation vs featurestwo-on-sitesubstations is internal scope/versionconflict. LEEDanticipated/WUE-PUEclaims notcertifiedmeasurements; no regiondevoidofnaturaldisastersclaim adopted. GCDC isnotPWCDigitalGateway; unrelatedwithdrawalheadline doesnotcancelthiscampus. Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://affiniuscapital.com/projects/gcdc/",
          "host": "affiniuscapital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.6728,
        "lng": -77.47538,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-permit-execution-and-capacity-scope-review-round71-2026-10-15.json",
          "scope": "Originaloperator/localreporter orvisibleoriginalregulatorycopy, stage/date/numericalscopeexplicit.",
          "fields": {},
          "notes": [
            "AffiniusCapital original projectpage identifies GainesvilleCrossingGCDC withCorscale.130acres/fivebuildings/326MWFULLBUILDOUTpower have unspecifiedITbasis, not commissionedcriticalIT. Header1,020kRSF is rentable area, not automaticallygrosssitebuildingarea.",
            "Developer saysBuilding1stabilized andBuildings1 to 3fullyleased, but lease/stabilization isnot independentmeteredoperation. Buildings2Q22026/3Q32026completion and4 to 5Q22026construction are undated-page targets; datespassingnotobservedcompletion. Introone-on-sitesubstation vs featurestwo-on-sitesubstations is internal scope/versionconflict. LEEDanticipated/WUE-PUEclaims notcertifiedmeasurements; no regiondevoidofnaturaldisastersclaim adopted. GCDC isnotPWCDigitalGateway; unrelatedwithdrawalheadline doesnotcancelthiscampus.",
            "Notallfield/currentoperatingcensus/fullyexecutedcontract/actualpaymentorimpactcertification."
          ],
          "sources": [
            {
              "url": "https://affiniuscapital.com/projects/gcdc/",
              "host": "affiniuscapital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 7",
          "scope": "Affinius describes GCDC Building 1 as stabilized and Buildings 1 through 3 as fully leased. Other building completion and vertical construction quarters are forecasts, including expired 2026 quarters. Stabilization and leasing do not independently certify current physical operation, commissioning or delivery of the remaining buildings. Current physical stage remains unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "leasing_and_stabilization_not_current_physical_stage",
              "scope": "Affinius describes GCDC Building 1 as stabilized and Buildings 1 through 3 as fully leased. Other building completion and vertical construction quarters are forecasts, including expired 2026 quarters. Stabilization and leasing do not independently certify current physical operation, commissioning or delivery of the remaining buildings. Current physical stage remains unverified."
            }
          },
          "notes": [
            "Affinius describes GCDC Building 1 as stabilized and Buildings 1 through 3 as fully leased. Other building completion and vertical construction quarters are forecasts, including expired 2026 quarters. Stabilization and leasing do not independently certify current physical operation, commissioning or delivery of the remaining buildings. Current physical stage remains unverified.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://affiniuscapital.com/projects/gcdc/",
              "host": "affiniuscapital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gainesville · Prince William · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51153"
      }
    },
    {
      "id": "dulles-cloud-south-gainesville-prince-william-va",
      "state": "va",
      "kind": "facility",
      "name": "Dulles Cloud South (Dulles South Innovation Center)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Prince William"
      ],
      "city": "Gainesville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Planning-stage denial, not an operating-site shutdown. Industrial square footage and traffic forecasts are not commissioned server floor or measured traffic. Later official record still needed. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.potomaclocal.com/2026/07/08/prince-william-board-rejects-dulles-south-data-center-proposal-in-gainesville/",
          "host": "potomaclocal.com",
          "date": "2026-07-08",
          "published": "2026-07-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.7343,
        "lng": -77.45483,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "plan-amendment-denied",
            "reported_finding": "Potomac Local reports board denied Dulles South Comprehensive Plan Amendment on July 7, 2026.",
            "report_display_date": "2026-07-08",
            "independently_verified_current_status": null
          },
          "notes": [
            "Planning-stage denial, not an operating-site shutdown. Industrial square footage and traffic forecasts are not commissioned server floor or measured traffic. Later official record still needed.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.potomaclocal.com/2026/07/08/prince-william-board-rejects-dulles-south-data-center-proposal-in-gainesville/",
              "host": "potomaclocal.com",
              "date": "2026-07-08",
              "published": "2026-07-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gainesville · Prince William · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51153"
      }
    },
    {
      "id": "oath-manassas-va",
      "state": "va",
      "kind": "facility",
      "name": "Oath, Inc.",
      "group": "operating",
      "status": "Agency-listed operating",
      "crypto": false,
      "type": "Data center (agency classification)",
      "counties": [
        "Prince William"
      ],
      "city": "Manassas",
      "address": "7777 Infantry Ridge Rd, Manassas, VA, 20109",
      "who": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "DEQ air-registration classification only. No individual permit order, whole-campus operation, current operator/owner, opening day, power/water quantity or verified parcel is established. The source has no row-specific as-of date. Checked October 16, 2026 is a retrieval/review date, not a facility milestone. Postal city is not verified municipal or county jurisdiction. No map point is adopted; the agency coordinates may represent an entrance or centroid and have reference/currency limits. Oath, Inc. is the literal agency registrant label. No current Yahoo, Verizon or successor operator/ownership relationship is inferred.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000",
          "host": "gisdata.deq.virginia.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Virginia DEQ data-center-flagged air-site registry"
        },
        {
          "url": "https://gisdata.deq.virginia.gov/mapper_ext/DataFactSheets/Air_Datasets/Active_Air_Sites_Fact_Sheet.pdf",
          "host": "gisdata.deq.virginia.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Virginia DEQ air-dataset scope and reference-coordinate limits"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=7777+Infantry+Ridge+Rd%2C+Manassas%2C+VA+20109&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Unique Census county of the exact published street"
        }
      ],
      "loc": {
        "lat": 38.69623,
        "lng": -77.52163,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Virginia DEQ registration 72368",
      "reviewed_evidence": [
        {
          "overlay": "S2-Virginia-DEQ-20261016",
          "scope": "Explicit Virginia DEQ data-center registration research context; no physical-site or operator certification.",
          "fields": {
            "agency_registration_number": "72368",
            "agency_registered_name": "Oath, Inc.",
            "agency_registered_address": "7777 Infantry Ridge Rd, Manassas, VA, 20109",
            "agency_source_description": "Diesel Engine Driven Emergency Generator Sets",
            "agency_principal_product": "Data Center",
            "agency_data_center_flag": "Y",
            "agency_air_operational_status": "Operating",
            "agency_scope_limits": "The dataset is reference information, not a legal location description or a current permit order. Coordinates can represent a facility entrance or centroid; underlying source dates may predate retrieval.",
            "identity_review_scope": "Reviewed all 1869 canonical IDs, the original 2136 inventory names including 36 held Virginia IDs, existing published address fields and all 198 agency registrations. Name leads were manually inspected; broad park/one/initial matching is not identity evidence. No matching record or exact published-street registration was found for this named/addressed registration. Nearby inherited points are leads only. No original commercial-directory facts or geometry are adopted. This admits a registry research context, not a certified distinct physical site."
          },
          "notes": [
            "DEQ air-registration classification only. No individual permit order, whole-campus operation, current operator/owner, opening day, power/water quantity or verified parcel is established.",
            "The source has no row-specific as-of date. Checked October 16, 2026 is a retrieval/review date, not a facility milestone. Postal city is not verified municipal or county jurisdiction. No map point is adopted; the agency coordinates may represent an entrance or centroid and have reference/currency limits.",
            "Oath, Inc. is the literal agency registrant label. No current Yahoo, Verizon or successor operator/ownership relationship is inferred."
          ],
          "sources": [
            {
              "url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000",
              "host": "gisdata.deq.virginia.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Virginia DEQ data-center-flagged air-site registry"
            },
            {
              "url": "https://gisdata.deq.virginia.gov/mapper_ext/DataFactSheets/Air_Datasets/Active_Air_Sites_Fact_Sheet.pdf",
              "host": "gisdata.deq.virginia.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Virginia DEQ air-dataset scope and reference-coordinate limits"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 county context cohort 42, October 23, 2026",
          "scope": "Reviewed county of the exact current published street only. No site point, roof, parcel, legal title, municipal boundary, physical stage, party role or quantity is admitted. Existing native location and protected wrappers remain exact.",
          "fields": {
            "county_context": {
              "fips": [
                "51153"
              ],
              "names": [
                "Prince William"
              ],
              "point_admission": false
            }
          },
          "notes": [
            "The exact agency registration and complete registered street identify this bounded source record only. Air registry Active, Operating or Temporarily Shutdown classifications and the data center flag are not physical facility findings. The agency coordinates and current registry operator name are not adopted as a site point or party role.",
            "Reviewed county of the exact current published street only. No site point, roof, parcel, legal title, municipal boundary, physical stage, party role or quantity is admitted. Existing native location and protected wrappers remain exact.",
            "One unique Census county and its state county display polygon agree. The calculated coordinate remains research evidence only, with no public site point or destination. Postal Richmond and Manassas are not independent city jurisdiction findings.",
            "The original empty county and jurisdiction wrappers remain in conflicts and source history. The canonical published address stays byte exact."
          ],
          "sources": [
            {
              "url": "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000",
              "host": "gisdata.deq.virginia.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current exact registration address"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=7777+Infantry+Ridge+Rd%2C+Manassas%2C+VA+20109&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Unique Census county of the exact published street"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "raw_status": "operating",
      "status_field": "current_status",
      "status_scope": "DEQ air-registration classification only. No individual permit order, whole-campus operation, current operator/owner, opening day, power/water quantity or verified parcel is established.",
      "reviewed_area_context": {
        "checked": "2026-10-23",
        "confidence": "inference",
        "fips": [
          "51153"
        ],
        "review_id": "location-codex2-context042-oath-manassas-va",
        "scope": "Reviewed county of the exact current published street only. No site point, roof, parcel, legal title, municipal boundary, physical stage, party role or quantity is admitted. Existing native location and protected wrappers remain exact.",
        "source_urls": [
          "https://gisdata.deq.virginia.gov/arcgis/rest/services/public/EDMA/MapServer/294/query?where=PLA_DATA_CENTER_YN%3D%27Y%27&f=json&outFields=%2A&outSR=4326&returnGeometry=true&orderByFields=OBJECTID&resultRecordCount=1000",
          "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=7777+Infantry+Ridge+Rd%2C+Manassas%2C+VA+20109&benchmark=Public_AR_Current&vintage=Current_Current&format=json"
        ]
      },
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "51153"
      }
    },
    {
      "id": "prince-william-digital-gateway-va",
      "state": "va",
      "kind": "facility",
      "name": "Prince William Digital Gateway",
      "group": "stopped",
      "status": "Court-invalidated rezoning",
      "raw_status": "stopped",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Prince William"
      ],
      "city": "Gainesville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Original court docket and withdrawal instrument not retained. Reported developer termination supported, but no general county ban or cancellation of unrelated Dulles South inferred. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/",
          "host": "wtop.com",
          "date": "2026-07-02",
          "published": "2026-07-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.vacourts.gov/static/opinions/opncavwp/1584254.pdf",
          "host": "www.vacourts.gov",
          "published": "2026-03-31",
          "date": "2026-03-31",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.67741,
        "lng": -77.43643,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "final-developer-appeal-withdrawal-reported",
            "reported_finding": "InsideNoVa reporting via WTOP says QTS withdrew Supreme Court challenge and terminated Digital Gateway project after prior approvals were voided.",
            "report_display_date": "2026-07-02",
            "independently_verified_current_status": null
          },
          "notes": [
            "Original court docket and withdrawal instrument not retained. Reported developer termination supported, but no general county ban or cancellation of unrelated Dulles South inferred.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wtop.com/prince-william-county/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/",
              "host": "wtop.com",
              "date": "2026-07-02",
              "published": "2026-07-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 7",
          "scope": "The March 31, 2026 Court of Appeals opinion affirms invalidation of the Compass, Digital Gateway North and Digital Gateway South rezonings for notice defects. Court invalidated rezoning describes that legal decision only. The opinion retained a partial stay pending possible further appeal while excluding land disturbance and construction from the stay. This source alone does not determine all later appeals or establish a physical facility shutdown.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "court_invalidated_rezoning",
              "scope": "The March 31, 2026 Court of Appeals opinion affirms invalidation of the Compass, Digital Gateway North and Digital Gateway South rezonings for notice defects. Court invalidated rezoning describes that legal decision only. The opinion retained a partial stay pending possible further appeal while excluding land disturbance and construction from the stay. This source alone does not determine all later appeals or establish a physical facility shutdown."
            },
            "local_rule_context": {
              "decision_on": "2026-03-31",
              "reviewed_pdf_pages": [
                4,
                52,
                53
              ],
              "notice_law_versions": "The opinion applies the 2023 Virginia statute and 2018 county zoning ordinance to the challenged 2023 hearing. No current universal notice interval is inferred.",
              "scope": "The legal decision is separate from the comprehensive plan amendment, later appeal orders and any new application.",
              "existing_concern_id": "concern:va-digital-gateway-qts-appeal-withdrawal",
              "concern_duplicate_avoided": true,
              "native_event_hold": "A legal invalidation event is retained in this dated observation because the generic adopter vocabulary has no appropriate legal decision kind."
            }
          },
          "notes": [
            "The March 31, 2026 Court of Appeals opinion affirms invalidation of the Compass, Digital Gateway North and Digital Gateway South rezonings for notice defects. Court invalidated rezoning describes that legal decision only. The opinion retained a partial stay pending possible further appeal while excluding land disturbance and construction from the stay. This source alone does not determine all later appeals or establish a physical facility shutdown.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://www.vacourts.gov/static/opinions/opncavwp/1584254.pdf",
              "host": "www.vacourts.gov",
              "published": "2026-03-31",
              "date": "2026-03-31",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gainesville · Prince William · Source context reviewed",
      "status_scope": "The March 31, 2026 Court of Appeals opinion affirms invalidation of the Compass, Digital Gateway North and Digital Gateway South rezonings for notice defects. Court invalidated rezoning describes that legal decision only. The opinion retained a partial stay pending possible further appeal while excluding land disturbance and construction from the stay. This source alone does not determine all later appeals or establish a physical facility shutdown.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51153"
      }
    },
    {
      "id": "sharpless-wellington-road-bristow-va",
      "state": "va",
      "kind": "facility",
      "name": "Wellington Road Data Center Campus (Sharpless)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Prince William"
      ],
      "city": "Bristow",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. This is wetlands/streams-related Corps review, not proof of every local building, utility or operating approval. Approved instrument was not obtained by reporter at publication and has not been directly reviewed here. Google affiliation is attributed to DataCenterDynamics, not an independently examined corporate filing. Neighboring Microsoft 124 acres and nearly 4 million square feet concern separate parcels and cannot be assigned to Sharpless. Existing industrial zoning does not waive all remaining permits. Historic cleanup orders and ongoing groundwater treatment are not a blanket environmental clearance. No MW or current operating certification. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2023-11-10",
          "The U.S. Army Corps of Engineers published its Sharpless Wellington Road reauthorization notice. November 10, 2023 is the publication date. The December comment deadline is not permit issuance, completion or a physical shutdown."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.insidenova.com/news/business/army-corps-of-engineers-greenlights-bristow-data-center-complex/article_49d8ed9a-dd87-11ee-9f08-d383b6399e7e.html",
          "host": "insidenova.com",
          "date": "2024-03-08",
          "published": "2024-03-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://usace.contentdm.oclc.org/digital/api/collection/p16021coll15/id/3616/download",
          "host": "usace.contentdm.oclc.org",
          "published": "2023-11-10",
          "date": "2023-11-10",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.72222,
        "lng": -77.48303,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "InsideNoVa reports an Army Corps official confirmed approval of Sharpless’s four-building proposal at 6201 Wellington Road on a 181-acre former military-industrial site.",
            "independently_verified_current_operating_status": null,
            "operator_or_exact_site_identity_needs_crosswalk": true
          },
          "notes": [
            "This is wetlands/streams-related Corps review, not proof of every local building, utility or operating approval. Approved instrument was not obtained by reporter at publication and has not been directly reviewed here. Google affiliation is attributed to DataCenterDynamics, not an independently examined corporate filing. Neighboring Microsoft 124 acres and nearly 4 million square feet concern separate parcels and cannot be assigned to Sharpless. Existing industrial zoning does not waive all remaining permits. Historic cleanup orders and ongoing groundwater treatment are not a blanket environmental clearance. No MW or current operating certification.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.insidenova.com/news/business/army-corps-of-engineers-greenlights-bristow-data-center-complex/article_49d8ed9a-dd87-11ee-9f08-d383b6399e7e.html",
              "host": "insidenova.com",
              "date": "2024-03-08",
              "published": "2024-03-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 7",
          "scope": "The November 10, 2023 Corps notice names Sharpless and the restricted campus north of Wellington Road. It seeks reauthorization after changes in regulated waters, while describing earlier permit verifications. It is a permit and public comment record, not current operation, all required approvals or an observed construction start. The separate Microsoft MNZ07 notice is not assigned to this campus.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_regulatory_record_current_stage_held",
              "scope": "The November 10, 2023 Corps notice names Sharpless and the restricted campus north of Wellington Road. It seeks reauthorization after changes in regulated waters, while describing earlier permit verifications. It is a permit and public comment record, not current operation, all required approvals or an observed construction start. The separate Microsoft MNZ07 notice is not assigned to this campus."
            },
            "water_regulatory_context": {
              "notice_on": "2023-11-10",
              "permit_reference": "NAO-2019-00517",
              "earlier_permit_verification_context_only": true,
              "reviewed_pdf_pages": [
                1,
                2
              ],
              "current_compliance_or_measured_effects_established": false
            }
          },
          "notes": [
            "The November 10, 2023 Corps notice names Sharpless and the restricted campus north of Wellington Road. It seeks reauthorization after changes in regulated waters, while describing earlier permit verifications. It is a permit and public comment record, not current operation, all required approvals or an observed construction start. The separate Microsoft MNZ07 notice is not assigned to this campus.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://usace.contentdm.oclc.org/digital/api/collection/p16021coll15/id/3616/download",
              "host": "usace.contentdm.oclc.org",
              "published": "2023-11-10",
              "date": "2023-11-10",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Bristow · Prince William · Source context reviewed",
      "event_evidence": [
        {
          "date": "2023-11-10",
          "text": "The U.S. Army Corps of Engineers published its Sharpless Wellington Road reauthorization notice. November 10, 2023 is the publication date. The December comment deadline is not permit issuance, completion or a physical shutdown.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://usace.contentdm.oclc.org/digital/api/collection/p16021coll15/id/3616/download",
              "host": "usace.contentdm.oclc.org",
              "published": "2023-11-10",
              "date": "2023-11-10",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51153"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
