{
  "schema_version": 1,
  "source_compilation_context": {
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "51171",
    "label": "Shenandoah County, Virginia"
  },
  "records": [
    {
      "id": "takanock-project-tallmadge-strasburg-va",
      "state": "va",
      "kind": "facility",
      "name": "Project Tallmadge",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Shenandoah"
      ],
      "city": "Strasburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Expected mid 2025 site approval/May land purchase,late 2027 construction and 2030 completion were forecasts, not observed outcomes. Takanock is not necessarily the eventual builder/operator. Early 4000 gallons/day estimate and derived 1.46 million/year are the SAME scenario, not additive; statewide 6.7 million/year benchmark is not site usage. Hydrogen-ready describes future optional backup-turbine capability, not present hydrogen fuel or zero-emission generation. Near-waterless cooling is attributed planned design subject to eventual operator. No exact MW, issued air permit or signed power agreement verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.nvdaily.com/nvdaily/strasburg-data-center-proposal-prompts-questions-on-water-use-hydrogen-oversight/article_de441640-97e6-528b-a0e8-74085176ceb3.html",
          "host": "nvdaily.com",
          "date": "2025-04-24",
          "published": "2025-04-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.projecttallmadge.com/",
          "host": "www.projecttallmadge.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://permits.virginia.gov/Permit/Details/167267",
          "host": "permits.virginia.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.85806,
        "lng": -78.57064,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Northern Virginia Daily describes Takanock’s proposed 87-acre Strasburg land-entitlement project, expected to be sold to an unnamed future operator for a two-million-square-foot data center.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Expected mid 2025 site approval/May land purchase,late 2027 construction and 2030 completion were forecasts, not observed outcomes. Takanock is not necessarily the eventual builder/operator. Early 4000 gallons/day estimate and derived 1.46 million/year are the SAME scenario, not additive; statewide 6.7 million/year benchmark is not site usage. Hydrogen-ready describes future optional backup-turbine capability, not present hydrogen fuel or zero-emission generation. Near-waterless cooling is attributed planned design subject to eventual operator. No exact MW, issued air permit or signed power agreement verified.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.nvdaily.com/nvdaily/strasburg-data-center-proposal-prompts-questions-on-water-use-hydrogen-oversight/article_de441640-97e6-528b-a0e8-74085176ceb3.html",
              "host": "nvdaily.com",
              "date": "2025-04-24",
              "published": "2025-04-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 49",
          "scope": "The current original Project Tallmadge page expressly describes a proposed campus with expected construction in 2027 through 2030. The current agency record identifies the same named campus with a plan review modification application in progress. Listed proposal is limited to that proposal. Agency target completion dates and applicant response targets are administrative forecasts, not public hearings, final permits, construction or computing operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_developer_proposal",
              "scope": "The current original Project Tallmadge page expressly describes a proposed campus with expected construction in 2027 through 2030. The current agency record identifies the same named campus with a plan review modification application in progress. Listed proposal is limited to that proposal. Agency target completion dates and applicant response targets are administrative forecasts, not public hearings, final permits, construction or computing operation."
            }
          },
          "notes": [
            "The current original Project Tallmadge page expressly describes a proposed campus with expected construction in 2027 through 2030. The current agency record identifies the same named campus with a plan review modification application in progress. Listed proposal is limited to that proposal. Agency target completion dates and applicant response targets are administrative forecasts, not public hearings, final permits, construction or computing operation.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.projecttallmadge.com/",
              "host": "www.projecttallmadge.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://permits.virginia.gov/Permit/Details/167267",
              "host": "permits.virginia.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Strasburg · Shenandoah · Source context reviewed",
      "status_scope": "The current original Project Tallmadge page expressly describes a proposed campus with expected construction in 2027 through 2030. The current agency record identifies the same named campus with a plan review modification application in progress. Listed proposal is limited to that proposal. Agency target completion dates and applicant response targets are administrative forecasts, not public hearings, final permits, construction or computing operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51171"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
