  "schema_version": 1,
  "source_compilation_context": {
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "51197",
    "label": "Wythe County, Virginia"
  },
  "records": [
    {
      "id": "solis-arx-progress-park-wythe-va",
      "state": "va",
      "kind": "facility",
      "name": "Solis Arx Progress Park Data Center Campus",
      "group": "proposed",
      "status": "County listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Wythe"
      ],
      "city": "Max Meadows",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wythe county SolisArx identity and Fluidstack update. Presentation about acquisition is not independently inspected executed closing document. Data-center-ready marketing of park for decade does not establish completed facility or critical IT service. No quantitative tax award, IT MW, actual capex or exact operations date adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-12-05",
          "Wythe County current project page identifies December 5, 2025 as the Solis Arx Progress Park project announcement day. The account is a development announcement, not a construction start, final building permit or data center opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wytheco.org/418/Solis-Arx",
          "host": "wytheco.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.wytheco.org/418/Solis-ArxFluidstack",
          "host": "www.wytheco.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.wytheco.org/m/faq",
          "host": "www.wytheco.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.wytheco.org/AgendaCenter/ViewFile/Minutes/_06092026-147",
          "host": "www.wytheco.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 36.91686,
        "lng": -81.07906,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Wythe county SolisArx identity and Fluidstack update",
          "fields": {
            "agency": "Wythe County, Virginia",
            "project": "Solis Arx / Fluidstack",
            "location": "Progress Park",
            "planned_tract_acres": 99,
            "announcement_date": "2025-12-05",
            "county_reported_fluidstack_acquisition_presentation_date": "2026-06-09",
            "development": "multiple phases"
          },
          "notes": [
            "Presentation about acquisition is not independently inspected executed closing document. Data-center-ready marketing of park for decade does not establish completed facility or critical IT service. No quantitative tax award, IT MW, actual capex or exact operations date adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wytheco.org/418/Solis-Arx",
              "host": "wytheco.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 20",
          "scope": "Wythe County current Solis Arx and Fluidstack page describes a Progress Park development announced December 5, 2025 and a June 9, 2026 presentation about future plans. County listed development describes that project context. The County FAQ says it does not yet have construction plans for review. Progress Park covenants and the separate proposed County zoning process are not universal countywide data center standards. The documents do not establish current physical construction or operation, and their acquisition account does not change the inherited name or provider role.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_listed_park_development_not_construction_or_countywide_permission",
              "scope": "Wythe County current Solis Arx and Fluidstack page describes a Progress Park development announced December 5, 2025 and a June 9, 2026 presentation about future plans. County listed development describes that project context. The County FAQ says it does not yet have construction plans for review. Progress Park covenants and the separate proposed County zoning process are not universal countywide data center standards. The documents do not establish current physical construction or operation, and their acquisition account does not change the inherited name or provider role."
            },
            "regulatory_scope": {
              "park_covenants_not_countywide_zoning": true,
              "faq_no_construction_plans_statement_not_site_inspection": true,
              "separate_county_zoning_proposal_not_enacted_from_this_review": true,
              "june09_minutes_project_section_visually_read": 31,
              "provider_role_and_project_identity_unchanged": true
            }
          },
          "notes": [
            "Wythe County current Solis Arx and Fluidstack page describes a Progress Park development announced December 5, 2025 and a June 9, 2026 presentation about future plans. County listed development describes that project context. The County FAQ says it does not yet have construction plans for review. Progress Park covenants and the separate proposed County zoning process are not universal countywide data center standards. The documents do not establish current physical construction or operation, and their acquisition account does not change the inherited name or provider role.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.wytheco.org/418/Solis-ArxFluidstack",
              "host": "www.wytheco.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.wytheco.org/m/faq",
              "host": "www.wytheco.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.wytheco.org/AgendaCenter/ViewFile/Minutes/_06092026-147",
              "host": "www.wytheco.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Max Meadows · Wythe · Source context reviewed",
      "status_scope": "Wythe County current Solis Arx and Fluidstack page describes a Progress Park development announced December 5, 2025 and a June 9, 2026 presentation about future plans. County listed development describes that project context. The County FAQ says it does not yet have construction plans for review. Progress Park covenants and the separate proposed County zoning process are not universal countywide data center standards. The documents do not establish current physical construction or operation, and their acquisition account does not change the inherited name or provider role.",
      "event_evidence": [
        {
          "date": "2025-12-05",
          "text": "Wythe County current project page identifies December 5, 2025 as the Solis Arx Progress Park project announcement day. The account is a development announcement, not a construction start, final building permit or data center opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.wytheco.org/418/Solis-ArxFluidstack",
              "host": "www.wytheco.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51197"
      }
    },
    {
      "id": "tac-data-centers-wythe-county-va",
      "state": "va",
      "kind": "facility",
      "name": "TAC Data Centers Wythe County Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Wythe"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.. Developerproposalnotapplicationapproval,localbuildingpermit,stateenvironmentalpermit,ownedlandorsignedutilityservice.765kVtransmissionvoltageisnotMWallocation. Norezoningrequirementreporteddoesnotmeanpermitexempt. Minimalwaterclaimisunspecifieddeveloperpromise,notzero/actualgallons. Nearby99acreSolisArxProgressParkprojectandotherVAprojectsseparate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://usdatacenterprojects.com/virginia/tac-data-centers-plans-gigawatt-scale-campus-in-wythe-county-virginia",
          "host": "usdatacenterprojects.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.tacdatacenters.com/",
          "host": "www.tacdatacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.wytheco.org/AgendaCenter/ViewFile/Minutes/_06092026-147",
          "host": "www.wytheco.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 36.92749,
        "lng": -81.09067,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round38-2026-10-14.json",
          "scope": "Personally read exact-project public section or complete named article; derivative database/AI aggregation, exact-site mismatch and generic directories receive no independent manual-ID credit.",
          "fields": {
            "reported_context": "USDataCenterProjects describes TACproposedWytheCounty1000acre/9-to11building/3.5-to4million-squarefootcampusover1GWplannedpower onRoggPartnershiplandnearI81/PulaskiCounty. Countyadministratorwelcomesproposal.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Developerproposalnotapplicationapproval,localbuildingpermit,stateenvironmentalpermit,ownedlandorsignedutilityservice.765kVtransmissionvoltageisnotMWallocation. Norezoningrequirementreporteddoesnotmeanpermitexempt. Minimalwaterclaimisunspecifieddeveloperpromise,notzero/actualgallons. Nearby99acreSolisArxProgressParkprojectandotherVAprojectsseparate.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://usdatacenterprojects.com/virginia/tac-data-centers-plans-gigawatt-scale-campus-in-wythe-county-virginia",
              "host": "usdatacenterprojects.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 20",
          "scope": "TAC current website describes a Northern Virginia project and a broader multi state pipeline, without crosswalking a specific Wythe County physical phase. Wythe June 9, 2026 minutes record residents discussing a reported TAC proposal and its scale or land use implications. The County minutes establish that the comments occurred, not the truth of every quoted news or developer claim, final project approval or current construction. The separate Progress Park Solis Arx site and the Northern Virginia project are not substituted. Physical stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "resident_comment_and_regional_pipeline_not_wythe_physical_phase",
              "scope": "TAC current website describes a Northern Virginia project and a broader multi state pipeline, without crosswalking a specific Wythe County physical phase. Wythe June 9, 2026 minutes record residents discussing a reported TAC proposal and its scale or land use implications. The County minutes establish that the comments occurred, not the truth of every quoted news or developer claim, final project approval or current construction. The separate Progress Park Solis Arx site and the Northern Virginia project are not substituted. Physical stage remains unclear."
            },
            "source_scope": {
              "county_meeting_on": "2026-06-09",
              "relevant_public_comment_pdf_pages_read": [
                6,
                7
              ],
              "page_visually_read": 6,
              "resident_report_not_independent_operator_verification": true,
              "northern_virginia_and_wythe_not_crosswalked": true
            }
          },
          "notes": [
            "TAC current website describes a Northern Virginia project and a broader multi state pipeline, without crosswalking a specific Wythe County physical phase. Wythe June 9, 2026 minutes record residents discussing a reported TAC proposal and its scale or land use implications. The County minutes establish that the comments occurred, not the truth of every quoted news or developer claim, final project approval or current construction. The separate Progress Park Solis Arx site and the Northern Virginia project are not substituted. Physical stage remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.tacdatacenters.com/",
              "host": "www.tacdatacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.wytheco.org/AgendaCenter/ViewFile/Minutes/_06092026-147",
              "host": "www.wytheco.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wythe · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51197"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}