{
  "schema_version": 1,
  "source_compilation_context": {
    "va": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/va.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "51730",
    "label": "Petersburg city, Virginia"
  },
  "records": [
    {
      "id": "menlo-digital-jamestown-drive-petersburg-va",
      "state": "va",
      "kind": "facility",
      "name": "Menlo Digital Richmond Virginia Data Center (Jamestown Drive)",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [],
      "city": "Petersburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The substation and proposed computing figures are different bases, not 404 MW. By-right zoning is not all approvals, construction or commissioning. Later round-twenty-four reporting on abandoned Project Flash talks takes precedence over this story's earlier regional discussion. State-law, tax and statewide-moratorium assertions are not adopted without original legislation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.datacenterfrontier.com/site-selection/article/55395571/navigating-virginias-data-center-boom-policy-shifts-local-projects-and-future-challenges",
          "host": "datacenterfrontier.com",
          "date": "2026-08-05",
          "published": "2026-08-05",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://menlo-digital.com/portfolio/md-va3/",
          "host": "menlo-digital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 37.20395,
        "lng": -77.39194,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Data Center Frontier describes Menlo Digital's proposed four-building campus on 74 acres at 2255 Jamestown Drive, with 104 MW planned through a 300 MW substation.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The substation and proposed computing figures are different bases, not 404 MW. By-right zoning is not all approvals, construction or commissioning. Later round-twenty-four reporting on abandoned Project Flash talks takes precedence over this story's earlier regional discussion. State-law, tax and statewide-moratorium assertions are not adopted without original legislation.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.datacenterfrontier.com/site-selection/article/55395571/navigating-virginias-data-center-boom-policy-shifts-local-projects-and-future-challenges",
              "host": "datacenterfrontier.com",
              "date": "2026-08-05",
              "published": "2026-08-05",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 49",
          "scope": "The current Menlo Digital portfolio identifies MD VA3 at Jamestown Drive in Petersburg under new developments and says Coming Soon, with a conceptual campus plan. This supports a current named proposal only. Secured power advertising, planned buildings and the conceptual diagram do not establish actual physical construction, delivered utility service or computing operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_developer_proposal",
              "scope": "The current Menlo Digital portfolio identifies MD VA3 at Jamestown Drive in Petersburg under new developments and says Coming Soon, with a conceptual campus plan. This supports a current named proposal only. Secured power advertising, planned buildings and the conceptual diagram do not establish actual physical construction, delivered utility service or computing operation."
            }
          },
          "notes": [
            "The current Menlo Digital portfolio identifies MD VA3 at Jamestown Drive in Petersburg under new developments and says Coming Soon, with a conceptual campus plan. This supports a current named proposal only. Secured power advertising, planned buildings and the conceptual diagram do not establish actual physical construction, delivered utility service or computing operation.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://menlo-digital.com/portfolio/md-va3/",
              "host": "menlo-digital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Petersburg · Source context reviewed",
      "status_scope": "The current Menlo Digital portfolio identifies MD VA3 at Jamestown Drive in Petersburg under new developments and says Coming Soon, with a conceptual campus plan. This supports a current named proposal only. Secured power advertising, planned buildings and the conceptual diagram do not establish actual physical construction, delivered utility service or computing operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51730"
      }
    },
    {
      "id": "nuvu-county-drive-petersburg-va",
      "state": "va",
      "kind": "facility",
      "name": "NuVu County Drive Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [],
      "city": "Petersburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public excerpt was read; the full linked report was not. A stated 300 MW basis is unspecified and not commissioning. By-right treatment is not all permits, executed utility service or current construction. No exact approval day inferred from weeks-after wording; other Petersburg projects remain separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wtvr.com/news/local-news/tri-cities/data-center-projects-july-21-2026",
          "host": "wtvr.com",
          "date": "2026-07-21",
          "published": "2026-07-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.20665,
        "lng": -77.39487,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WTVR's Richmond BizSense excerpt reports NuVu's first Petersburg site-plan approval in the weeks after a January announcement, on a roughly 75-acre County Drive property.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Only the public excerpt was read; the full linked report was not. A stated 300 MW basis is unspecified and not commissioning. By-right treatment is not all permits, executed utility service or current construction. No exact approval day inferred from weeks-after wording; other Petersburg projects remain separate.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wtvr.com/news/local-news/tri-cities/data-center-projects-july-21-2026",
              "host": "wtvr.com",
              "date": "2026-07-21",
              "published": "2026-07-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Petersburg · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "51730"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
