{
  "schema_version": 1,
  "source_compilation_context": {
    "wy": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/wy.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Retained county context, which can be broad or unresolved. No parcel or municipal jurisdiction is inferred. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "counties",
    "key": "56041",
    "label": "Uinta County, Wyoming"
  },
  "records": [
    {
      "id": "prometheus-hyperscale-evanston-wy",
      "state": "wy",
      "kind": "facility",
      "name": "Prometheus Hyperscale Atlas Industrial Park Data Center Campus",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Uinta"
      ],
      "city": "Evanston",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wyoming distinct recipient/type/capacity scopes. SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf",
          "host": "wyoleg.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf",
          "host": "wyoleg.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.28764,
        "lng": -110.54755,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Wyoming distinct recipient/type/capacity scopes",
          "fields": {
            "lunavi_government_described_use": "Cheyennecolocation",
            "h6coin_government_described_use": "NewcastleBitcoinmining",
            "prometheus_evanston_planned_power_gw": 1.2,
            "prometheus_evanston_power_basis": "notexplicitcriticalIT",
            "related_digital_cheyenne_planned_critical_it_mw_max": 302,
            "related_digital_campus_acres": 115,
            "related_digital_planned_capex_usd": 1200000000,
            "related_digital_first_building_area_sqft": 184000,
            "related_digital_first_building_completion_target": "late2026",
            "related_digital_anchor_tenant": "CoreWeave"
          },
          "notes": [
            "SamegovernmentrecipientnarrativeappearsinotherWyomingpacket,notindependentconfirmation. TaxqualificationdoesnotmakeminingAIoperationorenergizeproposedPrometheus.302MWITfullcampusmaximumnotfirstbuildingorcurrentload.1.2Bplannednotspent; late2026targetnotactualopening. Noactualtaxbenefitdollarsgiven.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf",
              "host": "wyoleg.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 71",
          "scope": "The selected original State program report explicitly describes a prospective Evanston computing campus separately from a planned Casper operation. This supports an agency listed proposal at the named city scope. Earlier tax exemption certification and a planned buildout do not establish actual construction, commissioned capacity or current computing operation. Private later permit accounts, carbon claims and the exact industrial park corporate crosswalk are not independently verified here.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_named_evanston_proposal",
              "scope": "The selected original State program report explicitly describes a prospective Evanston computing campus separately from a planned Casper operation. This supports an agency listed proposal at the named city scope. Earlier tax exemption certification and a planned buildout do not establish actual construction, commissioned capacity or current computing operation. Private later permit accounts, carbon claims and the exact industrial park corporate crosswalk are not independently verified here."
            },
            "source_read_scope": {
              "original_state_reports_physical_pages8_9_read": true,
              "evanston_and_casper_separate": true,
              "tax_certification_not_construction_or_operation": true,
              "no_capacity_carbon_or_role_changes": true
            }
          },
          "notes": [
            "The selected original State program report explicitly describes a prospective Evanston computing campus separately from a planned Casper operation. This supports an agency listed proposal at the named city scope. Earlier tax exemption certification and a planned buildout do not establish actual construction, commissioned capacity or current computing operation. Private later permit accounts, carbon claims and the exact industrial park corporate crosswalk are not independently verified here.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf",
              "host": "wyoleg.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf",
              "host": "wyoleg.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Evanston · Uinta · Source context reviewed",
      "status_scope": "The selected original State program report explicitly describes a prospective Evanston computing campus separately from a planned Casper operation. This supports an agency listed proposal at the named city scope. Earlier tax exemption certification and a planned buildout do not establish actual construction, commissioned capacity or current computing operation. Private later permit accounts, carbon claims and the exact industrial park corporate crosswalk are not independently verified here.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "56041"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
