      "date": "2026-11-18",
      "text": "Scheduled event: Storey County notice lists an EdgeCore topping-off and ribbon-cutting function at 3615 USA Parkway, McCarran, on November 18, 2026. This is a future ceremony, not proof of opening, commissioning or full-campus delivery. The county index links two PDFs under swapped labels; the cited document contains the actual EdgeCore notice.",
      "record": "EdgeCore Reno Data Center Campus",
      "state": "Nevada",
      "url": "/nevada/#edgecore-reno-campus-storey-county-nv",
      "kind": "scheduled_event",
      "sources": [
        {
          "url": "https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_11122026-1414",
          "host": "www.storeycounty.org",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "storey nnda 20261112 notice"
        }
      ]
    },
    {
      "date": "2026-11-02",
      "text": "Scheduled deadline: FERC notice sets comments and competing filings for DeepGreen P-15423-000 due at 5 p.m. Eastern Time. Application acceptance is not construction permission.",
      "record": "Cook Inlet Subsea-Compute & Infrastructure Hub",
      "state": "Alaska",
      "url": "/alaska/#deepgreen-cook-inlet-nikiski-ak",
      "kind": "scheduled_deadline",
      "sources": [
        {
          "url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf",
          "host": "govinfo.gov",
          "date": "2026-09-04",
          "published": "2026-09-04",
          "checked": "2026-10-15",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ]
    },
    {
      "date": "2026-10-29",
      "text": "Kentucky Power asks landowners for route feedback by this date",
      "record": "Muskie Data Campus",
      "state": "Kentucky",
      "url": "/kentucky/#terawulf-muskie-eastpark-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001628280-26-064757/wulf-20261001.htm",
          "host": "investors.terawulf.com",
          "date": "2026-10-05"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000109/wulfeasternkypr5-26x26.htm",
          "host": "sec.gov",
          "date": "2026-05-26"
        },
        {
          "url": "https://www.dailyindependent.com/news/terawulf-says-it-s-eager-to-bring-in-local-workforce/article_8b27725c-8077-4429-b744-59721c5c6f14.html",
          "host": "dailyindependent.com",
          "date": "2026-06-16"
        },
        {
          "url": "https://www.dailyindependent.com/news/plan-in-place-for-muskie-s-1-gigawatt-facility-kentucky-power-terawulf-announce-amended-agreement/article_1ba87f02-6f40-4852-80e9-521662ea8e2e.html",
          "host": "dailyindependent.com",
          "date": "2026-10-07"
        }
      ]
    },
    {
      "date": "2026-10-29",
      "text": "Scheduled event: The CPUC October 8 voting record holds Google-related draft resolution E-5455 to October 29, 2026 for further review. Next consideration is scheduled; approval, construction and an outcome are not established.",
      "record": "Google 5079-5087 Disk Drive Compute Campus (North San José)",
      "state": "California",
      "url": "/california/#google-disk-drive-alviso-san-jose-ca",
      "kind": "scheduled_event",
      "sources": [
        {
          "url": "https://ia.cpuc.ca.gov/agendadocs/3588_results.pdf",
          "host": "ia.cpuc.ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed government evidence"
        }
      ]
    },
    {
      "date": "2026-10-29",
      "text": "Scheduled event: Montana DEQ lists October 29, 2026 as the public-comment deadline for the proposed Big Sky Campus well and associated environmental review. This is not a hearing, an approval or proof of construction.",
      "record": "Big Sky Digital Infrastructure Campus",
      "state": "Montana",
      "url": "/montana/#quantica-bsdi-billings-mt",
      "kind": "scheduled_event",
      "sources": [
        {
          "url": "https://deq.mt.gov/News/pressrelease-folder/Big-Sky-Campus-well-09-29-2026",
          "host": "deq.mt.gov",
          "published": "2026-09-29",
          "date": "2026-09-29",
          "checked": "2026-10-16",
          "label": "Reviewed government evidence"
        }
      ]
    },
    {
      "date": "2026-10-28",
      "text": "Scheduled event: A Smithfield Gateway conditional use hearing is scheduled to begin October 28, 2026 for party status and scheduling, according to the Township published October 21 procedural correspondence. The date remains future at this review and does not establish an accomplished hearing, substantive permit approval or construction.",
      "record": "Smithfield Gateway Data Center",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#depg-smithfield-gateway-data-center-monroe-pa",
      "kind": "scheduled_event",
      "sources": [
        {
          "url": "https://smithfieldtownship.com/wp-content/uploads/2026/10/2026.10.21-Response-to-Applicant.pdf",
          "host": "smithfieldtownship.com",
          "published": "2026-10-21",
          "date": "2026-10-21",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-27",
      "text": "Scheduled event: Limerick Township lists an MCD 7 conditional use hearing continuation October 27, 2026. The future date remains scheduled at this check and is not an accomplished hearing, approval or construction milestone.",
      "record": "Limerick Township Data Center Campus (MCD 7)",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#mcd7-limerick-township-montgomery-county-pa",
      "kind": "scheduled_event",
      "sources": [
        {
          "url": "https://www.limerickpa.org/437/Conditional-Use-Hearings",
          "host": "www.limerickpa.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-26",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "WVNET Morgantown Data Center",
      "state": "West Virginia",
      "url": "/west-virginia/#wvnet-morgantown-data-center-wv",
      "kind": "record event",
      "sources": [
        {
          "url": "https://wvnet.edu/services/purchasing/wvnet-bids/",
          "host": "wvnet.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://wvnet.edu/services/purchasing/wvnet-bids/entry/856/",
          "host": "wvnet.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://wvnet.edu/gk-download/GH-vLHkHViAjqz6qwdzCCOD_vGHFcJpjNV2lhzBDTcHY4Fnrkvx2us4oHZYbZ-_YwCUWsMzbkZPtNaNVaR5brLTNc5PtrdL6Dq3r-ut77Dndk1ggTrGGQf99qcq5DsQ-5WiIodO7qOQax7iegU49b8FsRO1wkTrxoTRPCbePjT5QW8P4dlkQHFISOA7PDpakzySnegHZedqwgxqR26XWIfPnFXlzHJVj61Haj2LLBwwVwORuh9YYwqun93CjLy1qpkdPsLQXNa90gSa3lTAbN9PSvVgYf8dxSKVO/?gv-iframe=true",
          "host": "wvnet.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://www.wvhepc.edu/wp-content/uploads/2025/06/HEPC-Meeting-Agenda-6-27-2025.pdf",
          "host": "www.wvhepc.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://morgantownwv.gov/643/About-Us",
          "host": "morgantownwv.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ]
    },
    {
      "date": "2026-10-26",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "University of Connecticut Gant Data Center",
      "state": "Connecticut",
      "url": "/connecticut/#uconn-gant-data-center-storrs-ct",
      "kind": "record event",
      "sources": [
        {
          "url": "https://updc.media.uconn.edu/wp-content/uploads/sites/1525/2026/05/UConn-Quarterly-Construction-Report_03312026_web.pdf",
          "host": "updc.media.uconn.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://scheduling.uconn.edu/storrs-campus-areas/",
          "host": "scheduling.uconn.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://portal.ct.gov/CEQ/UCONN/EIE-Notice/UConn-Main-Accumulation-Area",
          "host": "portal.ct.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://its.uconn.edu/contact-info/",
          "host": "its.uconn.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=196+Auditorium+Road+Storrs+CT&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://portal.ct.gov/opm/-/media/opm/igpp/municipal-directories/municipalities-planning-region-cog.pdf?rev=e22636b55de446c4b6bb5e7d37b81810&hash=5FA6591861C9AFC393A28D510CFEA8A3",
          "host": "portal.ct.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://tigerweb.geo.census.gov/tigerwebmain/Files/bas26/tigerweb_bas26_county_ct.html",
          "host": "tigerweb.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ]
    },
    {
      "date": "2026-10-26",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "South Carolina State Data Center Columbia",
      "state": "South Carolina",
      "url": "/south-carolina/#south-carolina-state-data-center-columbia-sc",
      "kind": "record event",
      "sources": [
        {
          "url": "https://apps.sceis.sc.gov/SCSolicitationWeb/attachmentDisplay.do?attachName=Amendment+01&attachType=PDF&dateModified=04%2F09%2F2026+10%3A47%3A26+AM&phioClass=BBP_P_DOC&phioObject=005056AC75401FE18D83F1F2AE138C8A&solicitNumber=5400029320&type=S",
          "host": "apps.sceis.sc.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://sck12techinit.sc.gov/node/37",
          "host": "sck12techinit.sc.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4430+Broad+River+Road+Columbia+SC&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ]
    },
    {
      "date": "2026-10-26",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "Riverbend Technology Center at Former Alton Steel",
      "state": "Illinois",
      "url": "/illinois/#riverbend-technology-center-alton-il",
      "kind": "record event",
      "sources": [
        {
          "url": "https://cityofaltonil.gov/datacenter/",
          "host": "cityofaltonil.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://www.riverbendalton.com/",
          "host": "www.riverbendalton.com",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://www.cityofaltonil.gov/wp-content/uploads/2020/11/Alton_Community_Profile.pdf",
          "host": "www.cityofaltonil.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ]
    },
    {
      "date": "2026-10-26",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "Oregon State Kerr Corvallis Data Center",
      "state": "Oregon",
      "url": "/oregon/#osu-kerr-corvallis-data-center-or",
      "kind": "record event",
      "sources": [
        {
          "url": "https://osuosl.org/blog/osl-moving-to-state-data-center/",
          "host": "osuosl.org",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://facilities.oregonstate.edu/taking-back-control",
          "host": "facilities.oregonstate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://cio.oregonstate.edu/year-review-2025",
          "host": "cio.oregonstate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://www.corvallisoregon.gov/community/page/geography-demographics",
          "host": "www.corvallisoregon.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ]
    },
    {
      "date": "2026-10-26",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "Oregon State Data Center Salem",
      "state": "Oregon",
      "url": "/oregon/#oregon-state-data-center-salem-or",
      "kind": "record event",
      "sources": [
        {
          "url": "https://osuosl.org/blog/osl-moving-to-state-data-center/",
          "host": "osuosl.org",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://www.oregon.gov/jobs/Documents/PD-043850.pdf",
          "host": "www.oregon.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://cio.oregonstate.edu/year-review-2025",
          "host": "cio.oregonstate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://oregonbuys.gov/bso/external/bidDetail.sda?docId=S-10700-00014148&external=true&parentUrl=close",
          "host": "oregonbuys.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ]
    },
    {
      "date": "2026-10-26",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "Missouri State University Telecommunications Center Data Center",
      "state": "Missouri",
      "url": "/missouri/#missouri-state-telecommunications-center-springfield-mo",
      "kind": "record event",
      "sources": [
        {
          "url": "https://design.missouristate.edu/_Files/PlansAvailableForReview/25-017/25-017SchematicDesignNarrative.pdf",
          "host": "design.missouristate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://ntg.missouristate.edu/contacts/NTGDirections.aspx",
          "host": "ntg.missouristate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://map.missouristate.edu/location.aspx?id=7",
          "host": "map.missouristate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1001+E+Madison+Street+Springfield+MO&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ]
    },
    {
      "date": "2026-10-26",
      "text": "Scheduled event: The original Granville Township calendar schedules the named zoning appeal hearing for October 26, 2026 at six PM. Its event fields list an end of nine PM and Granville Event Center. This is a scheduled appeal, without an accomplished decision, construction or service.",
      "record": "Granville Township Data Center Campus (Loop Road)",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#pa-data-center-partners-granville-township-mifflin-pa",
      "kind": "scheduled_event",
      "sources": [
        {
          "url": "https://granvilletwp.org/events/event/zoning-hearing-board-appeal-lewistown-developers-llc/",
          "host": "granvilletwp.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-26",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "Colorado State Scott Bioengineering Data Center",
      "state": "Colorado",
      "url": "/colorado/#csu-scott-bioengineering-fort-collins-data-center-co",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.research.colostate.edu/research-it-resources/",
          "host": "www.research.colostate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://www.usengineering.com/project/colorado-state-university-suzanne-walter-scott-jr-bioengineering-building/",
          "host": "www.usengineering.com",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://admissions.colostate.edu/visits-events/directions-parking/",
          "host": "admissions.colostate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://www.larimer.gov/about-larimer-county",
          "host": "www.larimer.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ]
    },
    {
      "date": "2026-10-26",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "Arkansas State Data Center West",
      "state": "Arkansas",
      "url": "/arkansas/#arkansas-state-data-center-west-little-rock-ar",
      "kind": "record event",
      "sources": [
        {
          "url": "https://webftp.blr.arkansas.gov/Home/FTPDocument?path=Assembly%2F2015%2FSummary+Budget+Manuals%2FVol8ASummaryMainDoc2014.pdf",
          "host": "webftp.blr.arkansas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://arkleg.state.ar.us/Home/FTPDocument?path=%2FAssembly%2FMeeting+Attachments%2F685%2F828%2FACIT+Draft+Minutes+12+11+18.pdf",
          "host": "arkleg.state.ar.us",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://adeq.state.ar.us/home/pdssql/p_facil_details.aspx?AFIN=6002287&AFINDash=60-02287",
          "host": "adeq.state.ar.us",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ]
    },
    {
      "date": "2026-10-26",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "Arkansas State Data Center MAC",
      "state": "Arkansas",
      "url": "/arkansas/#arkansas-state-data-center-mac-little-rock-ar",
      "kind": "record event",
      "sources": [
        {
          "url": "https://sas.arkansas.gov/wp-content/uploads/2020/06/2015_annual_reportwebsite.pdf",
          "host": "sas.arkansas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://arkleg.state.ar.us/Home/FTPDocument?path=%2FAssembly%2FMeeting+Attachments%2F685%2F828%2FACIT+Draft+Minutes+12+11+18.pdf",
          "host": "arkleg.state.ar.us",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://adeq.state.ar.us/home/pdssql/p_facil_details.aspx?AFIN=6003554&AFINDash=60-03554",
          "host": "adeq.state.ar.us",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ]
    },
    {
      "date": "2026-10-25",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "Western Oregon University Computing Solutions Center",
      "state": "Oregon",
      "url": "/oregon/#western-oregon-computing-solutions-monmouth-or",
      "kind": "record event",
      "sources": [
        {
          "url": "https://cdn.wou.edu/board/files/2025/10/FAC-Docket-Mtg-No-42-Nov-4-2025.pdf",
          "host": "cdn.wou.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://wou.edu/ucs/php/WOU_EOC.pdf",
          "host": "wou.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ]
    },
    {
      "date": "2026-10-25",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "VCU Technology Operations Center",
      "state": "Virginia",
      "url": "/virginia/#vcu-technology-operations-center-richmond-va",
      "kind": "record event",
      "sources": [
        {
          "url": "https://news.vcu.edu/article/2025/09/whats-being-built-a-roundup-of-campus-construction-projects-at-vcu",
          "host": "news.vcu.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=707+W+Broad+Street+Richmond+VA&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ]
    },
    {
      "date": "2026-10-25",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "UW Stevens Point SRC Campus Data Center",
      "state": "Wisconsin",
      "url": "/wisconsin/#uwsp-src-campus-data-center-stevens-point-wi",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.uwsp.edu/news/article/library-and-student-resource-center/",
          "host": "www.uwsp.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://www.uwsp.edu/emergency-management/portage-county-community-alert/",
          "host": "www.uwsp.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ]
    },
    {
      "date": "2026-10-25",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "UNC Charlotte RUP 5 Data Center",
      "state": "North Carolina",
      "url": "/north-carolina/#uncc-rup5-campus-data-center-charlotte-nc",
      "kind": "record event",
      "sources": [
        {
          "url": "https://facilities.charlotte.edu/wp-content/uploads/sites/1297/2026/04/RUP-5-Data-Center-Expansion-NTB-Final.pdf",
          "host": "facilities.charlotte.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://facilities.charlotte.edu/wp-content/uploads/sites/1297/2024/06/Storm-Water-Master-Plan-Final-Report-201209101.pdf",
          "host": "facilities.charlotte.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ]
    },
    {
      "date": "2026-10-25",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "UC San Diego CSE Campus Data Center",
      "state": "California",
      "url": "/california/#ucsd-cse-campus-data-center-san-diego-ca",
      "kind": "record event",
      "sources": [
        {
          "url": "https://today.ucsd.edu/story/new-data-center-student-collaboration-space-put-people-at-the-heart-of-computer-science",
          "host": "today.ucsd.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://files.ceqanet.lci.ca.gov/7609-27/attachment/3xIuPJzVwiZDRoj_Opb9SbdUFu2a8xdlP3Ovnxi8GXuIVM0wKRx9QcWlPUfbfA9_JXHhHY2KBuv7yPwp0",
          "host": "files.ceqanet.lci.ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ]
    },
    {
      "date": "2026-10-25",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "New Hampshire DoIT Hazen Drive Data Center",
      "state": "New Hampshire",
      "url": "/new-hampshire/#nh-doit-hazen-concord-data-center-nh",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.gc.nh.gov/LBA/budget/FiscalItems/2-1-13%20Agenda%20Items.pdf",
          "host": "www.gc.nh.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=27+Hazen+Drive+Concord+NH&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ]
    },
    {
      "date": "2026-10-25",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "LSU Frey Data Center",
      "state": "Louisiana",
      "url": "/louisiana/#lsu-frey-baton-rouge-data-center-la",
      "kind": "record event",
      "sources": [
        {
          "url": "https://search.lsu.edu/its/files/fy24its-strategic-plan.pdf",
          "host": "search.lsu.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://www.lsu.edu/its/about/index.php",
          "host": "www.lsu.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://www.louisiana.gov/local-louisiana/East-Baton-Rouge-parish",
          "host": "www.louisiana.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://calendar.lsu.edu/frey_computing_services_center_104",
          "host": "calendar.lsu.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ]
    },
    {
      "date": "2026-10-25",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "LADPS Data Center at Independence Boulevard",
      "state": "Louisiana",
      "url": "/louisiana/#ladps-independence-baton-rouge-data-center-la",
      "kind": "record event",
      "sources": [
        {
          "url": "https://deq.louisiana.gov/assets/docs/Land/UST/2020_certificate_list.pdf",
          "host": "deq.louisiana.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://doa.louisiana.gov/media/ksia2ivj/state-phone-directory.pdf",
          "host": "doa.louisiana.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://doa.louisiana.gov/doa/ots/services-we-provide/various/tins/tin-15-01/",
          "host": "doa.louisiana.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ]
    },
    {
      "date": "2026-10-25",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "Fayetteville State University Butler Data Center",
      "state": "North Carolina",
      "url": "/north-carolina/#fayetteville-state-butler-campus-data-center-nc",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.uncfsu.edu/assets/Documents/Facilities%20Management/Designer%20Solicitation/Designer%20Selection%20Butler%20Telecom%20MEP%202022-03-15.pdf",
          "host": "www.uncfsu.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://www.uncfsu.edu/assets/Documents/Office%20of%20Legal%20Affairs/Policies/Emergency%20Operations%20Plan%20Rev.%2004-2024.pdf",
          "host": "www.uncfsu.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ]
    },
    {
      "date": "2026-10-25",
      "text": "Added to the atlas. Compilation date only, not opening or construction.",
      "record": "Arkansas Secondary State Data Center at ASP Troop L",
      "state": "Arkansas",
      "url": "/arkansas/#arkansas-secondary-state-data-center-lowell-ar",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.arkleg.state.ar.us/Home/FTPDocument?path=%2FAssembly%2FMeeting+Attachments%2F685%2F25083%2FEXHIBIT+D-IT+Communications+9.12.2022.pdf",
          "host": "www.arkleg.state.ar.us",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://webftp.blr.arkansas.gov/Home/FTPDocument?path=Assembly%2FMeeting+Attachments%2F000%2F26266%2FExhibit+D.03+-+DPS+-+Act+413+of+2021+DPS+Report+08-10-2023.pdf",
          "host": "webftp.blr.arkansas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://dps.arkansas.gov/law-enforcement/arkansas-state-police/services-programs/driver-examination/troop-l/",
          "host": "dps.arkansas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1120+W+Monroe+Avenue+Lowell+AR&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date only, not opening or construction.",
      "record": "Toro Company Bloomington Data Center",
      "state": "Minnesota",
      "url": "/minnesota/#toro-bloomington-data-center-mn",
      "kind": "record event",
      "sources": [
        {
          "url": "https://mn.gov/deed/assets/data-center-project-list_tcm1045-531119.pdf",
          "host": "mn.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://www.hennepin.us/-/media/hennepinus/business/work-with-hennepin-county/federal-housing-programs/Consolidated-Pool-Cities-2025.pdf",
          "host": "www.hennepin.us",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "TierPoint Philadelphia",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#tierpoint-philadelphia-pa",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.tierpoint.com/data-centers/pennsylvania/philadelphia/",
          "host": "www.tierpoint.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4775+League+Island+Boulevard%2C+Philadelphia%2C+PA+19112&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-75.1729854978408%2C39.88738628853755%2C-75.1601065021592%2C39.897267711462455&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "TierPoint Lehigh Valley",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#tierpoint-lehigh-valley-pa",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.tierpoint.com/data-centers/pennsylvania/lehigh-valley/",
          "host": "www.tierpoint.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3949+Schelden+Circle%2C+Bethlehem%2C+PA+18017&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "TierPoint Dallas Fort Worth",
      "state": "Texas",
      "url": "/texas/#tierpoint-fort-worth-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.tierpoint.com/data-centers/texas/fort-worth/",
          "host": "www.tierpoint.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=13701+Independence+Pkwy%2C+Fort+Worth%2C+TX+76177&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-97.25690373111576%2C32.974203288537545%2C-97.24512426888424%2C32.98408471146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "TierPoint Bethlehem",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#tierpoint-bethlehem-pa",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.tierpoint.com/data-centers/pennsylvania/bethlehem/",
          "host": "www.tierpoint.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3864+Courtney+Street%2C+Suite+130%2C+Bethlehem%2C+PA+18017&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3864+Courtney+Street%2C+Ste+130%2C+Bethlehem%2C+PA+18017&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal computing street query, interpolated reference only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-75.38252816439079%2C40.666729288537546%2C-75.3694998356092%2C40.67661071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date only, not opening or construction.",
      "record": "Prudential Plymouth Data Center",
      "state": "Minnesota",
      "url": "/minnesota/#prudential-plymouth-data-center-mn",
      "kind": "record event",
      "sources": [
        {
          "url": "https://mn.gov/deed/assets/data-center-project-list_tcm1045-531119.pdf",
          "host": "mn.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://collinsmn.com/portfolio-item/prudential-data-center/",
          "host": "collinsmn.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://www.hennepin.us/-/media/hennepinus/business/work-with-hennepin-county/federal-housing-programs/Consolidated-Pool-Cities-2025.pdf",
          "host": "www.hennepin.us",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "Lightedge San Diego Data Center 2",
      "state": "California",
      "url": "/california/#lightedge-san-diego-2-ca",
      "kind": "record event",
      "sources": [
        {
          "url": "https://lightedge.com/data-centers/san-diego-data-center/",
          "host": "lightedge.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=9725+Scranton+Road%2C+San+Diego%2C+CA+92121&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-117.20860926142305%2C32.89203528853755%2C-117.19684073857695%2C32.901916711462455&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "Lightedge Lenexa",
      "state": "Kansas",
      "url": "/kansas/#lightedge-lenexa-ks",
      "kind": "record event",
      "sources": [
        {
          "url": "https://lightedge.com/data-centers/lenexa-data-center/",
          "host": "lightedge.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=17501+West+98th+Street%2C+Lenexa%2C+KS+66219&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-94.79554417429969%2C38.94677328853755%2C-94.78283782570031%2C38.956654711462456&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "Lightedge Kansas City",
      "state": "Missouri",
      "url": "/missouri/#lightedge-kansas-city-mo",
      "kind": "record event",
      "sources": [
        {
          "url": "https://lightedge.com/data-centers/kansas-city-data-center/",
          "host": "lightedge.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=9050+NE+Underground+Drive%2C+Kansas+City%2C+MO+64161&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=9050+NE+Underground+Drive%2C+Pillar+312%2C+Kansas+City%2C+MO+64161&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal computing street query, interpolated reference only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-94.47933980305116%2C39.153528288537544%2C-94.46659619694883%2C39.16340971146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "Lightedge Austin Data Center 2",
      "state": "Texas",
      "url": "/texas/#lightedge-austin-2-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://lightedge.com/data-centers/austin-data-center/",
          "host": "lightedge.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=7000-B+Burleson+Road%2C+Austin%2C+TX+78744&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=7000-B+Burleson+Road%2C+Suite+100%2C+Austin%2C+TX+78744&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal computing street query, interpolated reference only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-97.71281856560773%2C30.19450428853755%2C-97.70138543439228%2C30.20438571146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date only, not opening or construction.",
      "record": "Fastenal Winona Data Center",
      "state": "Minnesota",
      "url": "/minnesota/#fastenal-winona-mn",
      "kind": "record event",
      "sources": [
        {
          "url": "https://mn.gov/deed/assets/data-center-project-list_tcm1045-531119.pdf",
          "host": "mn.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://crafter.fastenal.com/static-assets/pdfs/fcom/2025/q2/21-fastenal-2025-iso-27001_2022-2025-certificate-anab.pdf",
          "host": "crafter.fastenal.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2001+Theurer+Boulevard%2C+Winona%2C+MN+55987&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date only, not opening or construction.",
      "record": "Epic Hosting Rochester Data Center",
      "state": "Minnesota",
      "url": "/minnesota/#epic-hosting-rochester-mn",
      "kind": "record event",
      "sources": [
        {
          "url": "https://mn.gov/deed/assets/data-center-project-list_tcm1045-531119.pdf",
          "host": "mn.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=525",
          "host": "mbrweb.ferc.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://rochestermn.granicus.com/MinutesViewer.php?clip_id=4417&doc_id=2c1c3f8d-90aa-11ef-ab4b-005056a89546&view_id=1",
          "host": "rochestermn.granicus.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://rochestermn.granicus.com/MetaViewer.php?view_id=1&clip_id=4417&meta_id=105009",
          "host": "rochestermn.granicus.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://rochestermn.granicus.com/MetaViewer.php?view_id=1&clip_id=4417&meta_id=105008",
          "host": "rochestermn.granicus.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank Westway Park Campus",
      "state": "Texas",
      "url": "/texas/#databank-westway-park-campus-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/houston/westway-park-campus/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5150+Westway+Park+Blvd%2C+Houston%2C+TX+77041&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-95.56300011039781%2C29.83907928853755%2C-95.5516078896022%2C29.84896071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank Westminster Data Center",
      "state": "Colorado",
      "url": "/colorado/#databank-den4-westminster-co",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/denver/westminster/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=7579+W.+103rd+Avenue%2C+Westminster%2C+CO+80021&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-105.0859556691257%2C39.87856328853755%2C-105.0730783308743%2C39.888444711462455&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date only, not opening or construction.",
      "record": "DataBank Waco Data Center",
      "state": "Texas",
      "url": "/texas/#databank-act1-waco-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/waco/waco-700-austin-avenue/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=700+Austin+Avenue%2C+Waco%2C+TX+76701&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date only, not opening or construction.",
      "record": "DataBank SeaTac Data Center (Sabey Intergate East Building 2)",
      "state": "Washington",
      "url": "/washington/#databank-sea2-tukwila-wa",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/seattle/seatac/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3311+South+120th+Place%2C+Tukwila%2C+WA+98168&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://mkcclegisearch.kingcounty.gov/LegislationDetail.aspx?GUID=51BA9491-7232-4A23-ACF9-746C126ABBAE&ID=4135565&Options=&Search=",
          "host": "mkcclegisearch.kingcounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://www.databank.com/resources/press-releases/databank-expands-data-center-capacity-in-greater-seattle/",
          "host": "www.databank.com",
          "published": "2023-04-13",
          "date": "2023-04-13",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank Plano Campus",
      "state": "Texas",
      "url": "/texas/#databank-plano-campus-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/dallas/plano-campus/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=8375+Dominion+Pkwy%2C+Plano%2C+TX+75024&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-96.81828082409918%2C33.08026128853755%2C-96.80648717590081%2C33.090142711462455&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank Lithia Springs Campus",
      "state": "Georgia",
      "url": "/georgia/#databank-lithia-springs-campus-ga",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/atlanta/lithia-springs/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4764+Bakers+Ferry+Rd+SW%2C+South+Fulton%2C+GA+30336&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4764+Bakers+Ferry+Rd.+SW%2C+South+Fulton%2C+GA+30336&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal computing street query, interpolated reference only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.54909093361373%2C33.742035288537544%2C-84.53720706638627%2C33.75191671146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank IND2 Downtown Indianapolis Data Center",
      "state": "Indiana",
      "url": "/indiana/#databank-ind2-indianapolis-in",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/indianapolis/650-west-henry-street/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=650+West+Henry+Street%2C+Indianapolis%2C+IN+46225&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-86.17681410340005%2C39.75501928853755%2C-86.16395989659996%2C39.76490071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank IND1 Downtown Indianapolis Data Center",
      "state": "Indiana",
      "url": "/indiana/#databank-ind1-indianapolis-in",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/indianapolis/731-west-henry-street/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=731+West+Henry+Street%2C+Indianapolis%2C+IN+46225&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-86.17766309154752%2C39.75489228853755%2C-86.16480890845247%2C39.76477371146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank Houston Galleria Data Center",
      "state": "Texas",
      "url": "/texas/#databank-houston-galleria-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/houston/4201-southwest-freeway/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4201+Southwest+Freeway%2C+Houston%2C+TX+77027&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-95.45002554915796%2C29.72371028853755%2C-95.43864645084206%2C29.73359171146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date only, not opening or construction.",
      "record": "DataBank Downtown Dallas Data Center",
      "state": "Texas",
      "url": "/texas/#databank-dfw1-downtown-dallas-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/dallas/400-south-akard/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=400+South+Akard+Street%2C+Dallas%2C+TX+75202&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank Dallas LBJ Data Center",
      "state": "Texas",
      "url": "/texas/#databank-dfw7-lbj-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/dallas/lbj-freeway/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=6606+LBJ+Freeway%2C+Dallas%2C+TX+75240&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=6606+LBJ+Freeway+Suite+%23145%2C+Dallas%2C+TX+75240&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal computing street query, interpolated reference only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-96.79761308674772%2C32.919493288537545%2C-96.78584091325227%2C32.92937471146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank Dallas Empire Central Data Center",
      "state": "Texas",
      "url": "/texas/#databank-dfw4-empire-central-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/dallas/1100-empire-central-place/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1100+Empire+Central+Place%2C+Dallas%2C+TX+75247&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-96.8794883464692%2C32.817914288537544%2C-96.8677296535308%2C32.82779571146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank DFW6 Dallas Love Field",
      "state": "Texas",
      "url": "/texas/#databank-dfw6-love-field-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/dallas/love-field/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=8600+Harry+Hines+Boulevard%2C+Dallas%2C+TX+75207&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank DFW2 North Dallas",
      "state": "Texas",
      "url": "/texas/#databank-dfw2-richardson-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/dallas/richardson/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=904+Quality+Way%2C+Richardson%2C+TX+75081&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-96.72008490378848%2C32.96179628853755%2C-96.70830709621153%2C32.971677711462455&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date only, not opening or construction.",
      "record": "DataBank Austin Data Center",
      "state": "Texas",
      "url": "/texas/#databank-aus1-austin-tx",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/austin/austin/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=7218+McNeil+Drive%2C+Austin%2C+TX+78729&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank Atlanta West End complex",
      "state": "Georgia",
      "url": "/georgia/#databank-west-end-complex-ga",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/atlanta/1100-white-street-southwest/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1100+White+Street+Southwest%2C+Atlanta%2C+GA+30310&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://www.databank.com/data-centers/atlanta/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator complex and component identity context"
        },
        {
          "url": "https://www.databank.com/data-centers/atlanta/1150-white-street-southwest/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator complex and component identity context"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.42964099793599%2C33.728526288537545%2C-84.417759002064%2C33.73840771146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank ATL4 South Fulton Data Center",
      "state": "Georgia",
      "url": "/georgia/#databank-atl4-south-fulton-ga",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/atlanta/200-selig-dr-sw/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=200+Selig+Dr+SW%2C+Atlanta%2C+GA+30336&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.54664664002823%2C33.752228288537545%2C-84.53476135997178%2C33.76210971146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date, not an opening or construction milestone.",
      "record": "DataBank ATL1 Midtown Atlanta Data Center",
      "state": "Georgia",
      "url": "/georgia/#databank-atl1-midtown-ga",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/atlanta/760-peachtree-street/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=760+W+Peachtree+St+NW%2C+Atlanta%2C+GA+30308&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.39333289509808%2C33.77032528853755%2C-84.38144510490191%2C33.780206711462455&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date only, not opening or construction.",
      "record": "C.H. Robinson Oronoco Data Center",
      "state": "Minnesota",
      "url": "/minnesota/#ch-robinson-oronoco-mn",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.chrobinson.com/-/media/chrglobal/documents/esg-report/chr-esg-report-english.pdf",
          "host": "www.chrobinson.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://mn.gov/deed/assets/data-center-project-list_tcm1045-531119.pdf",
          "host": "mn.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://www.raedi.com/wp-content/uploads/2015-RAEDI-Report.pdf",
          "host": "www.raedi.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://www.oronoco.com/notices-newsletters",
          "host": "www.oronoco.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        }
      ]
    },
    {
      "date": "2026-10-24",
      "text": "Added to the atlas. Admission date only, not opening or construction.",
      "record": "Best Buy Bloomington Data Center",
      "state": "Minnesota",
      "url": "/minnesota/#best-buy-bloomington-data-center-mn",
      "kind": "record event",
      "sources": [
        {
          "url": "https://mn.gov/deed/assets/data-center-project-list_tcm1045-531119.pdf",
          "host": "mn.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://www.mortenson.com/projects/best-buy-data-center",
          "host": "www.mortenson.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        },
        {
          "url": "https://files.dnr.state.mn.us/waters/watermgmt_section/appropriations/index-county-location-active.pdf",
          "host": "files.dnr.state.mn.us",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed primary project or county context"
        }
      ]
    },
    {
      "date": "2026-10-22",
      "text": "Loudoun County announced preliminary alternative use terms for the Amazon GWU campus and reported an intent to withdraw the data center application. Final agreements and actual withdrawal remained unconfirmed. This is the publication date.",
      "record": "Bridgefield Tech Center",
      "state": "Virginia",
      "url": "/virginia/#amazon-bridgefield-tech-center-ashburn-loudoun-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.loudoun.gov/m/newsflash/Home/Detail/10944",
          "host": "www.loudoun.gov",
          "published": "2026-10-22",
          "date": "2026-10-22",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-21",
      "text": "Fermi published a corrected shareholder financing letter on October 21, 2026, expressly replacing an earlier version from the same day. Its financing options, prospective capacity and delivery discussion are not completed financing for every phase, commissioned generation or operating data centers.",
      "record": "Project Matador",
      "state": "Texas",
      "url": "/texas/#fermi-matador-amarillo-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://investor.fermiamerica.com/fermi-provides-letter-to-shareholders-from-ceo-lee-mcintire-on-financing-fermi-s-next-chapter",
          "host": "investor.fermiamerica.com",
          "published": "2026-10-21",
          "date": "2026-10-21",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-10-20",
      "text": "The October 20, 2026 docket filing date records CEC Data Requests Set 3 for RB Inyokern. Staff requested further hazards information during environmental review. This is an administrative filing date, not construction commencement, a final exemption or physical operation.",
      "record": "RB Inyokern Data Center",
      "state": "California",
      "url": "/california/#rb-inyokern-data-center-ca",
      "kind": "announced",
      "sources": [
        {
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=273160&DocumentContentId=120923",
          "host": "efiling.energy.ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-20",
      "text": "Coweta County October 21, 2026 recap records October 20 Board approval of reversion of the former Project Peach REZONE 24 14 property from Light Industrial to Rural Conservation. This is a zoning action, not a data center opening, physical shutdown or an exact finding about construction activity.",
      "record": "Project Peach (CyrusOne Palmetto Data Center Campus)",
      "state": "Georgia",
      "url": "/georgia/#cyrusone-project-peach-palmetto-ga",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.coweta.ga.us/m/newsflash/Home/Detail/53",
          "host": "www.coweta.ga.us",
          "published": "2026-10-21",
          "date": "2026-10-21",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-20",
      "text": "The Supreme Court of Ohio decided case 2025 1497 on October 20, 2026 and denied Bristolville request for a mandamus writ compelling Lordstown site plan review. This is a denial of requested judicial relief about review duties, not a finding of physical closure or computing operation, and not a completed final construction permit decision.",
      "record": "Bristolville 25",
      "state": "Ohio",
      "url": "/ohio/#bristolville-25-lordstown-oh",
      "kind": "denied",
      "sources": [
        {
          "url": "https://courtnewsohio.gov/cases/2026/SCO/1020/251497.asp",
          "host": "courtnewsohio.gov",
          "published": "2026-10-20",
          "date": "2026-10-20",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.supremecourt.ohio.gov/rod/docs/pdf/0/2026/2026-Ohio-4073.pdf",
          "host": "www.supremecourt.ohio.gov",
          "published": "2026-10-20",
          "date": "2026-10-20",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-19",
      "text": "The original City of Concord Planning Board agenda bears an October 19, 2026 print date and lists the requested Locke Road micro data center for October 21 review. This dates the document account without independently establishing first publication, an accomplished hearing outcome, a later scheduled decision day or computing service.",
      "record": "Locke Road Micro Data Center",
      "state": "New Hampshire",
      "url": "/new-hampshire/#locke-road-micro-data-center-concord-nh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C",
          "host": "concordnh.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-15",
      "text": "Reported final closing deadline with Cleveland-Cliffs; outcome to be confirmed",
      "record": "Rubix Ashland Works Data Center Campus (also listed as Rubix Russell Campus)",
      "state": "Kentucky",
      "url": "/kentucky/#rubix-ashland-works-russell-greenup-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://glasgownews1.com/2026/07/22/developer-proposes-hyperscale-data-center-at-former-eastern-kentucky-steel-mill/",
          "host": "glasgownews1.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-to-russell-it-s-ultimately-up-to-you/article_eeb4e2d1-07a1-43e5-acce-38c007fefc33.html",
          "host": "dailyindependent.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-deadline-pushed-to-oct-15/article_8610bab4-cddd-4daa-81d4-d3e85cf9fbbd.html",
          "host": "dailyindependent.com",
          "date": "2026-09-25"
        },
        {
          "url": "https://www.dailyindependent.com/news/russell-at-standstill-in-zoning-process-mayor-adjourns-meeting-after-residents-speak-out-against-council/article_fd5f5982-14c8-4679-b3f9-93d427e229af.html",
          "host": "dailyindependent.com",
          "date": "2026-10-01"
        }
      ]
    },
    {
      "date": "2026-10-15",
      "text": "Kentucky Power open house on Muskie transmission line routes (scheduled)",
      "record": "Muskie Data Campus",
      "state": "Kentucky",
      "url": "/kentucky/#terawulf-muskie-eastpark-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001628280-26-064757/wulf-20261001.htm",
          "host": "investors.terawulf.com",
          "date": "2026-10-05"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000109/wulfeasternkypr5-26x26.htm",
          "host": "sec.gov",
          "date": "2026-05-26"
        },
        {
          "url": "https://www.dailyindependent.com/news/terawulf-says-it-s-eager-to-bring-in-local-workforce/article_8b27725c-8077-4429-b744-59721c5c6f14.html",
          "host": "dailyindependent.com",
          "date": "2026-06-16"
        },
        {
          "url": "https://www.dailyindependent.com/news/plan-in-place-for-muskie-s-1-gigawatt-facility-kentucky-power-terawulf-announce-amended-agreement/article_1ba87f02-6f40-4852-80e9-521662ea8e2e.html",
          "host": "dailyindependent.com",
          "date": "2026-10-07"
        }
      ]
    },
    {
      "date": "2026-10-15",
      "text": "Canaan published its September mining update including the three named WindHQ JV facilities, including Chief Mountain. October 15 is the publication date; September 30 is the reporting date. Neither is a facility opening or verified production allocation.",
      "record": "Chief Mountain Bitcoin Mine",
      "state": "Texas",
      "url": "/texas/#canaan-chief-mountain-andrews-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/canaan-inc-provides-september-2026-bitcoin-production-and-mining-operation-updates-302909913.html",
          "host": "www.prnewswire.com",
          "published": "2026-10-15",
          "date": "2026-10-15",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-15",
      "text": "Canaan published its September mining update including the three named WindHQ JV facilities, including Bear. October 15 is the publication date; September 30 is the reporting date. Neither is a facility opening or verified production allocation.",
      "record": "Bear Bitcoin Mine",
      "state": "Texas",
      "url": "/texas/#canaan-bear-andrews-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/canaan-inc-provides-september-2026-bitcoin-production-and-mining-operation-updates-302909913.html",
          "host": "www.prnewswire.com",
          "published": "2026-10-15",
          "date": "2026-10-15",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-15",
      "text": "Canaan published its September mining update including the three named WindHQ JV facilities, including Alborz. October 15 is the publication date; September 30 is the reporting date. Neither is a facility opening or verified production allocation.",
      "record": "Alborz Bitcoin Mine",
      "state": "Texas",
      "url": "/texas/#canaan-alborz-happy-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/canaan-inc-provides-september-2026-bitcoin-production-and-mining-operation-updates-302909913.html",
          "host": "www.prnewswire.com",
          "published": "2026-10-15",
          "date": "2026-10-15",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-14",
      "text": "The CPUC index published a revised draft of Resolution E5455 for the Google utility agreement. October 14 is the publication date. The draft header October 29 and unfilled adoption fields are not evidence of a completed vote, energization or opening.",
      "record": "Google 5079-5087 Disk Drive Compute Campus (North San José)",
      "state": "California",
      "url": "/california/#google-disk-drive-alviso-san-jose-ca",
      "kind": "announced",
      "sources": [
        {
          "url": "https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M623/K979/623979096.PDF",
          "host": "docs.cpuc.ca.gov",
          "published": "2026-10-14",
          "date": "2026-10-14",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        },
        {
          "url": "https://docs.cpuc.ca.gov/SearchRes.aspx?DocFormat=ALL&DocTitle=E-5455",
          "host": "docs.cpuc.ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-14",
      "text": "The original Festus October 14, 2026 notice publishes a qualification based request for project communication, permit review and coordination assistance for the CRG computing proposal. This is a procurement notice rather than final computing permission, construction or operation.",
      "record": "Festus Data Center Campus",
      "state": "Missouri",
      "url": "/missouri/#crg-festus-data-center-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.festusmo.gov/m/newsflash/home/detail/235",
          "host": "www.festusmo.gov",
          "published": "2026-10-14",
          "date": "2026-10-14",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-13",
      "text": "Judge-Executive McNeill names Meta; Fiscal Court unanimously approves agreement/resolution",
      "record": "Mason County hyperscale data center and technology campus (Meta)",
      "state": "Kentucky",
      "url": "/kentucky/#mason-county-hyperscale-campus-maysville-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.wcpo.com/news/northern-kentucky/meta-announced-as-partner-in-2-000-acre-controversial-maysville-data-center",
          "host": "wcpo.com",
          "date": "2026-10-13"
        },
        {
          "url": "https://www.maysville-online.com/news/327718/meta-announced-as-data-center-project-developer-in-mason-county",
          "host": "maysville-online.com",
          "date": "2026-10-13"
        },
        {
          "url": "https://cms3.revize.com/revize/masoncountyky/Summary%20-%20Development%20%26%20Community%20Benefits%20Agreement%20-%20Mason%20Co.%20Fiscal%20Court%20Meeting%20%2810.05.2026%29%20%5BFINAL%5D.pdf",
          "host": "cms3.revize.com",
          "date": "2026-10-06"
        },
        {
          "url": "https://www.weku.org/the-commonwealth/2026-05-26/mason-county-gives-final-approval-on-rezoning-properties-for-data-center-construction",
          "host": "weku.org",
          "date": "2026-05-26"
        }
      ]
    },
    {
      "date": "2026-10-13",
      "text": "WCPO reports a lawsuit has been filed over the project; no court ruling yet",
      "record": "Mason County hyperscale data center and technology campus (Meta)",
      "state": "Kentucky",
      "url": "/kentucky/#mason-county-hyperscale-campus-maysville-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.wcpo.com/news/northern-kentucky/meta-announced-as-partner-in-2-000-acre-controversial-maysville-data-center",
          "host": "wcpo.com",
          "date": "2026-10-13"
        },
        {
          "url": "https://www.maysville-online.com/news/327718/meta-announced-as-data-center-project-developer-in-mason-county",
          "host": "maysville-online.com",
          "date": "2026-10-13"
        },
        {
          "url": "https://cms3.revize.com/revize/masoncountyky/Summary%20-%20Development%20%26%20Community%20Benefits%20Agreement%20-%20Mason%20Co.%20Fiscal%20Court%20Meeting%20%2810.05.2026%29%20%5BFINAL%5D.pdf",
          "host": "cms3.revize.com",
          "date": "2026-10-06"
        },
        {
          "url": "https://www.weku.org/the-commonwealth/2026-05-26/mason-county-gives-final-approval-on-rezoning-properties-for-data-center-construction",
          "host": "weku.org",
          "date": "2026-05-26"
        }
      ]
    },
    {
      "date": "2026-10-13",
      "text": "Cipher furnished a Colchis update describing conditional Batch Zero status in an ERCOT audit process and future energization targets. This disclosure is not a final regulator approval or operating milestone.",
      "record": "Cipher Colchis Campus",
      "state": "Texas",
      "url": "/texas/#cipher-colchis-tom-green-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900dex991.htm",
          "host": "www.sec.gov",
          "published": "2026-10-13",
          "date": "2026-10-13",
          "checked": "2026-10-15",
          "label": "Issuer filing or furnished exhibit"
        }
      ]
    },
    {
      "date": "2026-10-12",
      "text": "The October 12, 2026 docket filing date records a separate resident public comment about the RB Inyokern proposal. The comment was submitted October 11. The filing date is distinct from its submission day and from the earlier well association comment; its concerns are not agency findings or verified impacts.",
      "record": "RB Inyokern Data Center",
      "state": "California",
      "url": "/california/#rb-inyokern-data-center-ca",
      "kind": "announced",
      "sources": [
        {
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?tn=273104&DocumentContentId=120831",
          "host": "efiling.energy.ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-09",
      "text": "The NRC published its Project Matador nuclear units draft environmental impact statement notice and request for comments on October 9, 2026. The November 23 comment deadline remained future at review. This is a draft review notice, not a combined license, construction approval or operational milestone.",
      "record": "Project Matador",
      "state": "Texas",
      "url": "/texas/#fermi-matador-amarillo-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.govinfo.gov/content/pkg/FR-2026-10-09/html/2026-20742.htm",
          "host": "www.govinfo.gov",
          "published": "2026-10-09",
          "date": "2026-10-09",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-07",
      "text": "The original City of Westfield archive records October 7, 2026 posting of the special October 13 Planning Board agenda listing the Servistar permit extension request. This dates the official notice account without independently establishing the meeting outcome, current permit force or physical facility closure.",
      "record": "Servistar Realties Westfield Data Center Campus",
      "state": "Massachusetts",
      "url": "/massachusetts/#servistar-westfield-ma",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.cityofwestfield.org/AgendaCenter",
          "host": "www.cityofwestfield.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.cityofwestfield.org/AgendaCenter/ViewFile/Agenda/_10132026-8701",
          "host": "www.cityofwestfield.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-06",
      "text": "County attorney presents development/community benefits agreement: Crisham LLC, 396 MW initial phase, IRB/PILOT structure, at least 130M infrastructure",
      "record": "Mason County hyperscale data center and technology campus (Meta)",
      "state": "Kentucky",
      "url": "/kentucky/#mason-county-hyperscale-campus-maysville-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://www.wcpo.com/news/northern-kentucky/meta-announced-as-partner-in-2-000-acre-controversial-maysville-data-center",
          "host": "wcpo.com",
          "date": "2026-10-13"
        },
        {
          "url": "https://www.maysville-online.com/news/327718/meta-announced-as-data-center-project-developer-in-mason-county",
          "host": "maysville-online.com",
          "date": "2026-10-13"
        },
        {
          "url": "https://cms3.revize.com/revize/masoncountyky/Summary%20-%20Development%20%26%20Community%20Benefits%20Agreement%20-%20Mason%20Co.%20Fiscal%20Court%20Meeting%20%2810.05.2026%29%20%5BFINAL%5D.pdf",
          "host": "cms3.revize.com",
          "date": "2026-10-06"
        },
        {
          "url": "https://www.weku.org/the-commonwealth/2026-05-26/mason-county-gives-final-approval-on-rezoning-properties-for-data-center-construction",
          "host": "weku.org",
          "date": "2026-05-26"
        }
      ]
    },
    {
      "date": "2026-10-05",
      "text": "Amended Kentucky Power ESA (executed Oct 1) doubles contracted capacity to 1 GW, moves phase 2 to 2029, adds 100 million dollars bill credits (PSC approval required)",
      "record": "Muskie Data Campus",
      "state": "Kentucky",
      "url": "/kentucky/#terawulf-muskie-eastpark-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001628280-26-064757/wulf-20261001.htm",
          "host": "investors.terawulf.com",
          "date": "2026-10-05"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000109/wulfeasternkypr5-26x26.htm",
          "host": "sec.gov",
          "date": "2026-05-26"
        },
        {
          "url": "https://www.dailyindependent.com/news/terawulf-says-it-s-eager-to-bring-in-local-workforce/article_8b27725c-8077-4429-b744-59721c5c6f14.html",
          "host": "dailyindependent.com",
          "date": "2026-06-16"
        },
        {
          "url": "https://www.dailyindependent.com/news/plan-in-place-for-muskie-s-1-gigawatt-facility-kentucky-power-terawulf-announce-amended-agreement/article_1ba87f02-6f40-4852-80e9-521662ea8e2e.html",
          "host": "dailyindependent.com",
          "date": "2026-10-07"
        }
      ]
    },
    {
      "date": "2026-10-01",
      "text": "MPSC conditionally approved DTE and Google electricity contracts in U-22058. Acceptance and other conditions apply; this is a utility-contract milestone, not local siting or construction permission, completed obligations, energized service or operation.",
      "record": "Project Cannoli",
      "state": "Michigan",
      "url": "/michigan/#project-cannoli-van-buren-township-wayne-county-mi",
      "kind": "approved",
      "sources": [
        {
          "url": "https://mi-psc.my.site.com/sfc/servlet.shepherd/version/download/068cs00002YBZ99AAH",
          "host": "mi-psc.my.site.com",
          "published": "2026-10-01",
          "date": "2026-10-01",
          "checked": "2026-10-16",
          "label": "October 1, 2026 MPSC order U-22058-0187; operative provisions pages 137 to 141"
        }
      ]
    },
    {
      "date": "2026-10-01",
      "text": "The City of De Soto October 2, 2026 notice reports Council approval of the second Beale supplemental agreement at its October 1 meeting. Revised water forecasts, infrastructure commitments and conditional community contributions remain distinct from actual demand, completed construction or paid benefits.",
      "record": "Beale Project Pilot (De Soto)",
      "state": "Kansas",
      "url": "/kansas/#beale-project-pilot-de-soto-ks",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.desotoks.us/m/newsflash/home/detail/357",
          "host": "www.desotoks.us",
          "published": "2026-10-02",
          "date": "2026-10-02",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-10-01",
      "text": "Applied Digital reported the second phase of Building 2 ready for service; further HPC campus construction continued.",
      "record": "Applied Digital Polaris Forge 1",
      "state": "North Dakota",
      "url": "/north-dakota/#applied-digital-polaris-forge-1-ellendale-nd",
      "kind": "milestone",
      "sources": [
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
          "host": "ir.applieddigital.com",
          "date": "2026-10-07",
          "published": "2026-10-07",
          "checked": "2026-10-15",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ]
    },
    {
      "date": "2026-09-30",
      "text": "The project transaction advisor reports that the RELLIS restructuring and sale closed September 30, 2026. This dates its reported transaction, not physical construction resumption, computing operation or an independently verified bankruptcy court finding.",
      "record": "RELLIS Data and Research Center",
      "state": "Texas",
      "url": "/texas/#rellis-data-research-center-bryan-brazos-county-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://marathoncapital.com/news-events/marathon-capital-advises-on-rellis-data-center-restructuring-and-recapitalization",
          "host": "marathoncapital.com",
          "published": "2026-10-21",
          "date": "2026-10-21",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-09-28",
      "text": "The original signed and sealed Township attestation certifies adoption of Ordinance 2026 03 at the September 28, 2026 public hearing. This dates the separate general zoning action without certifying complete review of its legal provisions, exact current property eligibility or a computing opening.",
      "record": "Granville Township Data Center Campus (Loop Road)",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#pa-data-center-partners-granville-township-mifflin-pa",
      "kind": "approved",
      "sources": [
        {
          "url": "https://granvilletwp.org/wp-content/uploads/2026/09/Ordinance-2026-3-Attested.pdf",
          "host": "granvilletwp.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-27",
      "text": "The original Lambda September 27, 2026 release announces the Chouteau campus development. This dates the issuer statement rather than an exact first construction day, installed computing hardware or commissioned service.",
      "record": "Lambda MidAmerica Industrial Park Data Center",
      "state": "Oklahoma",
      "url": "/oklahoma/#lambda-midamerica-industrial-park-chouteau-ok",
      "kind": "announced",
      "sources": [
        {
          "url": "https://lambda.ai/blog/new-lambda-data-center-in-oklahoma",
          "host": "lambda.ai",
          "published": "2026-09-27",
          "date": "2026-09-27",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-09-25",
      "text": "Nutley published its ON3 potential data center FAQ September 25, 2026, reporting that no construction application had been received. This is the government publication and its bounded receipt account, not a future absence finding or an individual permit decision.",
      "record": "ON3 Data Center (275 Kingsland Street)",
      "state": "New Jersey",
      "url": "/new-jersey/#prism-on3-nutley-data-center-nj",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.nutleynj.org/news/post/23273/",
          "host": "www.nutleynj.org",
          "published": "2026-09-25",
          "date": "2026-09-25",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-25",
      "text": "Liquid Web original RSS published the Lansing DC3 completed maintenance update September 25, 2026. The feed contains separate scheduled, in progress and completed states. This records the dated company service update, not a data center opening, energization, exact physical work time or completion of all planned capacity expansion.",
      "record": "Liquid Web Lansing DC3 (2703 Ena Drive)",
      "state": "Michigan",
      "url": "/michigan/#liquid-web-dc3-lansing-mi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://status.liquidweb.com/history.rss",
          "host": "status.liquidweb.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-09-25",
      "text": "Cipher announced an amended Barber Lake lease and phased future hall delivery/rent milestones from Q4 2026 through Q1 2027; no actual opening date is established by this announcement.",
      "record": "Cipher Digital Barber Lake",
      "state": "Texas",
      "url": "/texas/#cipher-barber-lake-colorado-city-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-expands-barber-lake-lease-term-20-years",
          "host": "investors.cipherdigital.com",
          "published": "2026-09-25",
          "date": "2026-09-25",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        }
      ]
    },
    {
      "date": "2026-09-24",
      "text": "Deadline extended again to Oct 15 ('no more extensions'); Boyd J-E Chaney says county will wait for Russell",
      "record": "Rubix Ashland Works Data Center Campus (also listed as Rubix Russell Campus)",
      "state": "Kentucky",
      "url": "/kentucky/#rubix-ashland-works-russell-greenup-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://glasgownews1.com/2026/07/22/developer-proposes-hyperscale-data-center-at-former-eastern-kentucky-steel-mill/",
          "host": "glasgownews1.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-to-russell-it-s-ultimately-up-to-you/article_eeb4e2d1-07a1-43e5-acce-38c007fefc33.html",
          "host": "dailyindependent.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-deadline-pushed-to-oct-15/article_8610bab4-cddd-4daa-81d4-d3e85cf9fbbd.html",
          "host": "dailyindependent.com",
          "date": "2026-09-25"
        },
        {
          "url": "https://www.dailyindependent.com/news/russell-at-standstill-in-zoning-process-mayor-adjourns-meeting-after-residents-speak-out-against-council/article_fd5f5982-14c8-4679-b3f9-93d427e229af.html",
          "host": "dailyindependent.com",
          "date": "2026-10-01"
        }
      ]
    },
    {
      "date": "2026-09-21",
      "text": "The City official FAQ and current release report adoption of a citywide data center prohibition September 21, 2026. This is a separate municipal policy action, not approval of this project or a countywide law.",
      "record": "Lovejoy Data Center Campus (Stillwater Development)",
      "state": "Georgia",
      "url": "/georgia/#stillwater-lovejoy-panhandle-road-clayton-ga",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.cityoflovejoy.com/DocumentCenter/View/3005/City_of_Lovejoy_Proposed_Zoning_Amendments_FAQ-Sept29_2026",
          "host": "www.cityoflovejoy.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-21",
      "text": "The City September 22 account reports City Council adoption of a hyperscale data center moratorium September 21, 2026. This is the reported City policy action, not approval or cancellation of an individual Karis project, a countywide measure or a verified effective day.",
      "record": "Karis Dubuque County Data Center",
      "state": "Iowa",
      "url": "/iowa/#karis-dubuque-county-ia",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.cityofdubuque.org/CivicSend/ViewMessage/message/301420",
          "host": "www.cityofdubuque.org",
          "published": "2026-09-22",
          "date": "2026-09-22",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-17",
      "text": "The City October 1 consent packet reports that Council voted September 17, 2026 to affirm the application denial and separately waive the waiting period for a new application. The draft signature and date lines remain blank. This reported vote does not approve a replacement application, certify a final executed instrument or establish physical shutdown.",
      "record": "Lex Developments AI Data Center (former Hoku polysilicon site)",
      "state": "Idaho",
      "url": "/idaho/#lex-developments-pocatello-id",
      "kind": "denied",
      "sources": [
        {
          "url": "https://pocatello.gov/AgendaCenter/ViewFile/Item/5674?fileID=15373",
          "host": "pocatello.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-16",
      "text": "The City reports that the Planning Commission held the September 16, 2026 hearing on the DC Rapids application and denied it. The same City process description separates that body recommendation from Council action. The exact later Council outcome is not established by this review.",
      "record": "Wisconsin Rapids Data Center",
      "state": "Wisconsin",
      "url": "/wisconsin/#pch-wi-holdings-wisconsin-rapids-wood-county-wi",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.wirapids.gov/612/Papermill-Redevelopment",
          "host": "www.wirapids.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-16",
      "text": "The original Hallam September 16, 2026 Planning Commission minutes record four members supporting a recommendation on the revised computing application to the Board. A recommendation is separate from a completed final Board permit vote or computing construction.",
      "record": "Crusoe Hallam Data Center (Monolith Olive Creek campus)",
      "state": "Nebraska",
      "url": "/nebraska/#crusoe-monolith-hallam-lancaster-ne",
      "kind": "announced",
      "sources": [
        {
          "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-16-2026-Planning-Commision-minutes.pdf",
          "host": "villageofhallamnebraska.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-15",
      "text": "Hilliard published its fuel cell permit appeal withdrawal account September 15, 2026. This records the City publication and reported case action, not an independently verified ERAC filing day, data hall opening or endorsement of every project impact.",
      "record": "AWS Scioto Darby Campus",
      "state": "Ohio",
      "url": "/ohio/#aws-scioto-darby-hilliard-oh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://hilliardohio.gov/city-of-hilliard-ends-fuel-cell-permit-appeal-calls-for-stronger-local-input/",
          "host": "hilliardohio.gov",
          "published": "2026-09-15",
          "date": "2026-09-15",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-14",
      "text": "Google publicly announced that it was exploring a potential Lea County, New Mexico data center. Discussions and details remained open; this is not an approval, construction start or opening.",
      "record": "Google Lea County evaluation",
      "state": "New Mexico",
      "url": "/new-mexico/#google-lea-county-evaluation-nm",
      "kind": "announced",
      "sources": [
        {
          "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/lea-county-new-mexico/",
          "host": "blog.google",
          "published": "2026-09-14",
          "date": "2026-09-14",
          "checked": "2026-10-16",
          "label": "Google potential Lea County project announcement"
        }
      ]
    },
    {
      "date": "2026-09-14",
      "text": "The original Hallam September 14, 2026 Board minutes record all five trustees voting to table a resident proposal for a single facility limit until further planning information and the October Board meeting. This is postponement rather than enactment of a Village computing ban or numerical limit.",
      "record": "Crusoe Hallam Data Center (Monolith Olive Creek campus)",
      "state": "Nebraska",
      "url": "/nebraska/#crusoe-monolith-hallam-lancaster-ne",
      "kind": "announced",
      "sources": [
        {
          "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-14-26-minutes.pdf",
          "host": "villageofhallamnebraska.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-11",
      "text": "Edged published its Council Bluffs OMA01 1 and OMA01 2 structural framework milestone account September 11, 2026. The company reports topping out of the two buildings that day. This records the company account and does not establish campus operation or delivery of all marketed capacity.",
      "record": "Edged Council Bluffs Data Center Campus (Project Lola)",
      "state": "Iowa",
      "url": "/iowa/#edged-council-bluffs-ia",
      "kind": "announced",
      "sources": [
        {
          "url": "https://edged.us/news/edged-us-celebrates-topping-out-of-oma01-1-and-oma01-2-in-council-bluffs",
          "host": "edged.us",
          "published": "2026-09-11",
          "date": "2026-09-11",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-09-11",
      "text": "The original St Louis Board Bill 74 history records introduction and committee referral on September 11, 2026. A bill describing repeal of prior Armory incentive ordinances is not independently verified enactment, effective repeal or computing commissioning.",
      "record": "Armory Innovation District Data Center",
      "state": "Missouri",
      "url": "/missouri/#armory-innovation-district-st-louis-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.stlouis-mo.gov/government/city-laws/board-bills/boardbill.cfm?BBId=17912&bbDetail=true",
          "host": "www.stlouis-mo.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-11",
      "text": "Amazon published its Wharton County project update on September 11, 2026 and reported campus planning with site preparation already underway. This dates the account, not an exact first work day or commissioned service in each Project Eagle component.",
      "record": "AWS Project Eagle (Wharton County)",
      "state": "Texas",
      "url": "/texas/#aws-project-eagle-boling-wharton-county-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.aboutamazon.com/news/aws/amazon-data-centers-locations-news",
          "host": "www.aboutamazon.com",
          "published": "2026-09-11",
          "date": "2026-09-11",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-09-10",
      "text": "Aligned published its Project Phoenix Shippingport groundbreaking announcement September 10, 2026. This records the dated company announcement and ceremony account, not independent verification of excavation, completion of planned blasting or operating data center service.",
      "record": "Shippingport Industrial Park",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#aligned-shippingport-pa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://aligneddc.com/press-release/project-phoenix-data-center-shippingport-pa/",
          "host": "aligneddc.com",
          "published": "2026-09-10",
          "date": "2026-09-10",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-09-08",
      "text": "Airway Heights published its Apricus reclaimed water FAQ September 8, 2026. This records the City public account of an early proposal and its limited water role, not an executed agreement, final data center approval or verification of the inherited Rock Point alias.",
      "record": "Rock Point Data Center Project",
      "state": "Washington",
      "url": "/washington/#apricus-rock-point-data-center-west-plains-wa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://cawh.org/general-news/reclaimed-water/",
          "host": "cawh.org",
          "published": "2026-09-08",
          "date": "2026-09-08",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-04",
      "text": "Cleveland-Cliffs closing deadline extended from Aug 31 to Sept 25",
      "record": "Rubix Ashland Works Data Center Campus (also listed as Rubix Russell Campus)",
      "state": "Kentucky",
      "url": "/kentucky/#rubix-ashland-works-russell-greenup-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://glasgownews1.com/2026/07/22/developer-proposes-hyperscale-data-center-at-former-eastern-kentucky-steel-mill/",
          "host": "glasgownews1.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-to-russell-it-s-ultimately-up-to-you/article_eeb4e2d1-07a1-43e5-acce-38c007fefc33.html",
          "host": "dailyindependent.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-deadline-pushed-to-oct-15/article_8610bab4-cddd-4daa-81d4-d3e85cf9fbbd.html",
          "host": "dailyindependent.com",
          "date": "2026-09-25"
        },
        {
          "url": "https://www.dailyindependent.com/news/russell-at-standstill-in-zoning-process-mayor-adjourns-meeting-after-residents-speak-out-against-council/article_fd5f5982-14c8-4679-b3f9-93d427e229af.html",
          "host": "dailyindependent.com",
          "date": "2026-10-01"
        }
      ]
    },
    {
      "date": "2026-09-04",
      "text": "The September 4, 2026 Federal Register publication date announces acceptance for filing of the DeepGreen preliminary permit application. Acceptance is not an issued construction permission, actual project commencement or a physical opening.",
      "record": "Cook Inlet Subsea-Compute & Infrastructure Hub",
      "state": "Alaska",
      "url": "/alaska/#deepgreen-cook-inlet-nikiski-ak",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.govinfo.gov/content/pkg/FR-2026-09-04/pdf/2026-18151.pdf",
          "host": "www.govinfo.gov",
          "published": "2026-09-04",
          "date": "2026-09-04",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-09-03",
      "text": "Meta announced its Kuna data center online and serving traffic; this dates the announcement, not an independently observed energization.",
      "record": "Meta Kuna Data Center",
      "state": "Idaho",
      "url": "/idaho/#meta-kuna-id",
      "kind": "announcement",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2026/09/kuna-we-are-online/",
          "host": "datacenters.atmeta.com",
          "date": "2026-09-03",
          "published": "2026-09-03",
          "checked": "2026-10-15",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ]
    },
    {
      "date": "2026-09-03",
      "text": "Cartersville City Council approved Project Indo Z26-05 rezoning and concurrent variances in separate 6-0 votes, with three conditions and ordinance reference 44-26. Zoning approval does not establish final permits, power availability, construction or operation.",
      "record": "DataBank Project Indo",
      "state": "Georgia",
      "url": "/georgia/#databank-indo-cartersville-ga",
      "kind": "approved",
      "sources": [
        {
          "url": "https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf",
          "host": "mccmeetings.blob.core.usgovcloudapi.net",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Signed September 3, 2026 council minutes, pages 1-2 and 7"
        }
      ]
    },
    {
      "date": "2026-08-26",
      "text": "The currently linked Crossroads applicant narrative is dated August 26, 2026 and requests a special use permit and a separate public utility conformity review. This dates the document, not its receipt, a hearing, approval, construction or operation.",
      "record": "Crossroads Technology Campus",
      "state": "Virginia",
      "url": "/virginia/#rck-crossroads-technology-campus-spotsylvania-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.spotsylvania.va.us/DocumentCenter/View/40289/5th-Submission-Narrative-?bidId=",
          "host": "www.spotsylvania.va.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-25",
      "text": "The County published correspondence dated August 25, 2026 corrects a stated noise reference in its August 20 Tuckahoe completeness letter. This dates that clarification, not a measured impact, enacted project condition or computing operation.",
      "record": "Tuckahoe Technology Park",
      "state": "Virginia",
      "url": "/virginia/#tract-tuckahoe-technology-park-goochland-county-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.goochlandva.us/DocumentCenter/View/13962/82026-Completeness-Letter-Clarification---Proposed--Revised-Noise-Limits",
          "host": "www.goochlandva.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-21",
      "text": "Electric-service agreement approval dated August 21, reported in TeraWulf’s August 24 announcement. Up to 482 MW is service capacity, not IT delivery, building approval or operation.",
      "record": "Justified Data Campus",
      "state": "Kentucky",
      "url": "/kentucky/#terawulf-hawesville-ky",
      "kind": "approved",
      "sources": [
        {
          "url": "https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus",
          "host": "investors.terawulf.com",
          "published": "2026-08-24",
          "date": "2026-08-24",
          "checked": "2026-10-16",
          "label": "Electric-service approval announcement"
        }
      ]
    },
    {
      "date": "2026-08-20",
      "text": "The County completeness letter dated August 20, 2026 requests additional information for the named Tuckahoe application. This dates the agency letter, not an application denial, a measured noise impact or physical construction.",
      "record": "Tuckahoe Technology Park",
      "state": "Virginia",
      "url": "/virginia/#tract-tuckahoe-technology-park-goochland-county-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.goochlandva.us/DocumentCenter/View/13953/Completeness-Review-Letter---82026",
          "host": "www.goochlandva.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-19",
      "text": "The original Hallam August 19, 2026 Planning Commission minutes record a unanimous pause to obtain further information and the discussed sound study. This is a procedural action rather than a general enacted Village moratorium or a final computing permit decision.",
      "record": "Crusoe Hallam Data Center (Monolith Olive Creek campus)",
      "state": "Nebraska",
      "url": "/nebraska/#crusoe-monolith-hallam-lancaster-ne",
      "kind": "announced",
      "sources": [
        {
          "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/8-19-26-Planning-Commision-minutes.pdf",
          "host": "villageofhallamnebraska.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-18",
      "text": "The original Southaven Mayor August 18, 2026 publication reports a training center relocation contract and future land exchange involving MZX Tech. This is the public statement date rather than completed title transfer, computing permission, actual campus construction or operation.",
      "record": "xAI Tulane Road Data Center (Southaven)",
      "state": "Mississippi",
      "url": "/mississippi/#xai-tulane-road-southaven-ms",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.southaven.org/Blog.aspx?IID=239",
          "host": "www.southaven.org",
          "published": "2026-08-18",
          "date": "2026-08-18",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-13",
      "text": "The original Laramie County action history records August 13, 2026 approval of postponing review of the Tembo HUB 1 office support request. The passed action concerns postponement rather than computing commissioning, approval of the full campus or an accomplished later office permit.",
      "record": "Project Tembo",
      "state": "Wyoming",
      "url": "/wyoming/#tallgrass-project-jade-cheyenne-wy",
      "kind": "announced",
      "sources": [
        {
          "url": "https://laramiecounty.legistar.com/LegislationDetail.aspx?GUID=32BDBB37-BAF4-4FC8-A8E7-34812FE2FCE7&ID=8165034&Options=&Search=",
          "host": "laramiecounty.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-13",
      "text": "IREN announced Horizon 1 delivery to and acceptance by Microsoft. This announcement date does not independently establish first power or a physical opening day.",
      "record": "IREN Horizon  -  Childress, TX",
      "state": "Texas",
      "url": "/texas/#iren-horizon-childress-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1878848/000114036126032638/ef20080141_ex99-1.htm",
          "host": "www.sec.gov",
          "published": "2026-08-13",
          "date": "2026-08-13",
          "checked": "2026-10-16",
          "label": "IREN furnished Horizon 1 delivery announcement"
        }
      ]
    },
    {
      "date": "2026-08-12",
      "text": "WhiteFiber issued its corrected quarterly results release August 12, 2026, reporting active customer deployment and initial billing at NC 1. This dates issuer publication, not the first physical commissioning day, full contracted load or completion of every planned campus phase.",
      "record": "WhiteFiber NC-1 AI Data Center Campus",
      "state": "North Carolina",
      "url": "/north-carolina/#whitefiber-nc1-madison-nc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/whitefiber-inc-reports-second-quarter-2026-results-302848971.html",
          "host": "www.prnewswire.com",
          "published": "2026-08-12",
          "date": "2026-08-12",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-08-12",
      "text": "Bayonne official August 14 account records City Council adoption of Ordinance O 26 74 on August 12, 2026. This is the municipal law action, not an individual New Hook Road permit denial or cancellation. Applicable vested rights and the exact effective day remain separately unresolved.",
      "record": "69-71 New Hook Road Data Center (Constable Hook)",
      "state": "New Jersey",
      "url": "/new-jersey/#new-hook-road-data-center-bayonne-nj",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.bayonnenj.org/News/View/12378/mayor-nadrowski-and-city-council-approve-ordinance-prohibiting-data-centers-in-bayonne",
          "host": "www.bayonnenj.org",
          "published": "2026-08-14",
          "date": "2026-08-14",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-10",
      "text": "Keel published its second quarter development update August 10, 2026, reporting Panther Creek land use approvals and separately discussing mining decommissioning and future HPC construction. The publication does not supply an exact approval day or HPC commissioning date.",
      "record": "Panther Creek HPC/AI Data Center Campus",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#panther-creek-hpc-ai-campus-nesquehoning-pa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results",
          "host": "ir.keelinfra.com",
          "published": "2026-08-10",
          "date": "2026-08-10",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-08-10",
      "text": "Keel published its second quarter update August 10, 2026, reporting the named Moses Lake mining shutdown during April and prospective HPC conversion work. This is the publication day, not an invented exact shutdown date or HPC opening.",
      "record": "Moses Lake Facility",
      "state": "Washington",
      "url": "/washington/#bitfarms-moses-lake-wa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results",
          "host": "ir.keelinfra.com",
          "published": "2026-08-10",
          "date": "2026-08-10",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-08-10",
      "text": "Keel published its second quarter development update August 10, 2026, reporting Sharon land use approvals and separately discussing mining decommissioning and future HPC construction. The publication does not supply an exact approval day or HPC commissioning date.",
      "record": "Bitfarms Sharon Facility (former Westinghouse plant)",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#bitfarms-sharon-pa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ir.keelinfra.com/news-releases/news-release-details/keel-infrastructure-reports-second-quarter-2026-results",
          "host": "ir.keelinfra.com",
          "published": "2026-08-10",
          "date": "2026-08-10",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-08-06",
      "text": "MARA signed its quarterly filing August 6, 2026, identifying existing Hannibal data center operations beside the contemplated Long Ridge assets. This is the dated company filing, not an exact existing facility opening or commissioning of future HPC capacity.",
      "record": "MARA Hannibal Data Center",
      "state": "Ohio",
      "url": "/ohio/#mara-hannibal-monroe-oh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000022/0001507605-26-000022.pdf",
          "host": "ir.mara.com",
          "published": "2026-08-06",
          "date": "2026-08-06",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-06",
      "text": "The City published its withdrawal acknowledgment August 6, 2026. This is the dated official application account, not a physical shutdown or verified construction of replacement housing.",
      "record": "Lovejoy Data Center Campus (Stillwater Development)",
      "state": "Georgia",
      "url": "/georgia/#stillwater-lovejoy-panhandle-road-clayton-ga",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.cityoflovejoy.com/DocumentCenter/View/2959/PressRel-CityOfLovejoy---080626",
          "host": "www.cityoflovejoy.com",
          "published": "2026-08-06",
          "date": "2026-08-06",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-06",
      "text": "The county report records the commission recommendation for Camelback Creek CPA260008 and Z260019 on August 6, 2026. This is the commission hearing outcome. September 2 Board consideration was scheduled, and a final Board vote, construction permit and operation are not established by this report.",
      "record": "Camelback Creek",
      "state": "Arizona",
      "url": "/arizona/#arizona-land-consulting-camelback-creek-tonopah-az",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10497?fileID=102599",
          "host": "www.maricopa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-06",
      "text": "The county report records the Planning and Zoning Commission recommendation for Balterra CPA260007 and Z260018 on August 6, 2026. This is the commission hearing outcome, not final Board approval, a construction permit or a physical opening.",
      "record": "Balterra",
      "state": "Arizona",
      "url": "/arizona/#arizona-land-consulting-balterra-tonopah-az",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10496?fileID=102598",
          "host": "www.maricopa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-05",
      "text": "The current County account records receipt of the formal Tuckahoe Technology Park conditional use application on August 5, 2026. This dates the reported submission, not acceptance as complete, approval, construction or computing operation.",
      "record": "Tuckahoe Technology Park",
      "state": "Virginia",
      "url": "/virginia/#tract-tuckahoe-technology-park-goochland-county-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.goochlandva.us/1480/Tuckahoe-Technology-Park",
          "host": "www.goochlandva.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-05",
      "text": "Q2 earnings call: CEO Paul Prager says Muskie could expand to as much as 2 GW",
      "record": "Muskie Data Campus",
      "state": "Kentucky",
      "url": "/kentucky/#terawulf-muskie-eastpark-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001628280-26-064757/wulf-20261001.htm",
          "host": "investors.terawulf.com",
          "date": "2026-10-05"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000109/wulfeasternkypr5-26x26.htm",
          "host": "sec.gov",
          "date": "2026-05-26"
        },
        {
          "url": "https://www.dailyindependent.com/news/terawulf-says-it-s-eager-to-bring-in-local-workforce/article_8b27725c-8077-4429-b744-59721c5c6f14.html",
          "host": "dailyindependent.com",
          "date": "2026-06-16"
        },
        {
          "url": "https://www.dailyindependent.com/news/plan-in-place-for-muskie-s-1-gigawatt-facility-kentucky-power-terawulf-announce-amended-agreement/article_1ba87f02-6f40-4852-80e9-521662ea8e2e.html",
          "host": "dailyindependent.com",
          "date": "2026-10-07"
        }
      ]
    },
    {
      "date": "2026-08-05",
      "text": "The Governor published its account of continuing Gamma facility construction August 5, 2026, separately reporting Beta online. This records the dated government account, not an exact construction start or completion of the future Gamma facility.",
      "record": "Empire AI Gamma",
      "state": "New York",
      "url": "/new-york/#empire-ai-gamma-buffalo-ny",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new",
          "host": "www.governor.ny.gov",
          "published": "2026-08-05",
          "date": "2026-08-05",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-05",
      "text": "The Governor published the Empire AI Beta fully online account August 5, 2026. The release separately describes the future Gamma facility. This is the publication date and not an exact physical activation day or commissioning of Gamma.",
      "record": "Empire AI Beta",
      "state": "New York",
      "url": "/new-york/#empire-ai-beta-buffalo-ny",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new",
          "host": "www.governor.ny.gov",
          "published": "2026-08-05",
          "date": "2026-08-05",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-04",
      "text": "Rochester Colo published its announcement dated August 4, 2026 describing acquisition and continuing facility services. This records the dated company account and does not change any Atlas corporate role or establish a new facility opening day.",
      "record": "Rochester Colo",
      "state": "New York",
      "url": "/new-york/#rochester-colo-pittsford-ny",
      "kind": "announced",
      "sources": [
        {
          "url": "https://rochestercolo.com/",
          "host": "rochestercolo.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-08-04",
      "text": "Cipher announced initial Black Pearl HPC capacity delivery during August and rent commencement; remaining halls and phases continued construction. This is the disclosure date, not an exact physical handover day.",
      "record": "Cipher Digital Black Pearl",
      "state": "Texas",
      "url": "/texas/#cipher-black-pearl-wink-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://investors.cipherdigital.com/news-releases/news-release-details/cipher-digital-provides-second-quarter-2026-business-update",
          "host": "investors.cipherdigital.com",
          "published": "2026-08-04",
          "date": "2026-08-04",
          "checked": "2026-10-15",
          "label": "Reviewed company source"
        }
      ]
    },
    {
      "date": "2026-08-04",
      "text": "The County reports that its Board announced formal withdrawal of the AWS conceptual site development plan application on August 4, 2026. This dates the County announcement, not an independently established withdrawal filing day or physical closure of an operating facility.",
      "record": "AWS Calvert County Data Center Campus",
      "state": "Maryland",
      "url": "/maryland/#aws-calvert-cliffs-md",
      "kind": "withdrawn",
      "sources": [
        {
          "url": "https://www.choosecalvert.com/4059/Amazon-Web-Services",
          "host": "www.choosecalvert.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-08-03",
      "text": "Yondr published its Manassas site acquisition and planned campus announcement on August 3, 2026. The source describes expected operation in 2029. This is the release date and acquisition account, not an actual construction start or opening.",
      "record": "Yondr Manassas Data Center Campus",
      "state": "Virginia",
      "url": "/virginia/#yondr-cerberus-manassas-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.yondrgroup.com/newsroom/press-release/yondr-and-cerberus-acquire-40-acre-site-for-72mw-northern-virginia-data-center/",
          "host": "www.yondrgroup.com",
          "published": "2026-08-03",
          "date": "2026-08-03",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-07-30",
      "text": "The Oregon Governor original release dated July 30, 2026 directs termination of the State land sale contract for the proposed Mill Creek computing project. This dates the public direction rather than independently read completion of that termination, a general computing ban or physical closure.",
      "record": "Oakline at Mill Creek",
      "state": "Oregon",
      "url": "/oregon/#verrus-oakline-mill-creek-salem-or",
      "kind": "announced",
      "sources": [
        {
          "url": "https://apps.oregon.gov/oregon-newsroom/OR/GOV/Posts/Post/governor-kotek-directs-state-to-withdraw-land-for-proposed-salem-data-center-site",
          "host": "apps.oregon.gov",
          "published": "2026-07-30",
          "date": "2026-07-30",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-07-28",
      "text": "Galaxy published its McGregor campus acquisition and development announcement July 28, 2026. The reported land and development agreements and conditional future power schedule do not certify an exact construction start or current computing operation.",
      "record": "Project Merlin (Helios II)",
      "state": "Texas",
      "url": "/texas/#galaxy-digital-mcgregor-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.galaxy.com/newsroom/galaxy-expands-data-center-footprint-with-acquisition-of-500-acre-campus-in-mcgregor-texas",
          "host": "www.galaxy.com",
          "published": "2026-07-28",
          "date": "2026-07-28",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-07-28",
      "text": "Meta published an El Paso venture announcement describing construction underway and a forecast 2028 capacity rollout. The date does not establish financial close or construction start.",
      "record": "Meta El Paso AI Data Center Campus",
      "state": "Texas",
      "url": "/texas/#meta-el-paso-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/",
          "host": "about.fb.com",
          "published": "2026-07-28",
          "date": "2026-07-28",
          "checked": "2026-10-16",
          "label": "El Paso construction and venture announcement"
        }
      ]
    },
    {
      "date": "2026-07-28",
      "text": "The original Fortitude investor index dates its Grand Island energization announcement July 28, 2026. This is the index statement date; the linked full release was not read, and actual computing commissioning or the exact first energization day is not independently certified.",
      "record": "Fortitude Grand Island Nebraska Facility",
      "state": "Nebraska",
      "url": "/nebraska/#fortitude-grand-island-ne",
      "kind": "announced",
      "sources": [
        {
          "url": "https://fortitudemining.com/investors/",
          "host": "fortitudemining.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-07-23",
      "text": "Ashland adopts restrictive data center zoning leaving about 20 acres of its Ashland Works portion usable",
      "record": "Rubix Ashland Works Data Center Campus (also listed as Rubix Russell Campus)",
      "state": "Kentucky",
      "url": "/kentucky/#rubix-ashland-works-russell-greenup-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://glasgownews1.com/2026/07/22/developer-proposes-hyperscale-data-center-at-former-eastern-kentucky-steel-mill/",
          "host": "glasgownews1.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-to-russell-it-s-ultimately-up-to-you/article_eeb4e2d1-07a1-43e5-acce-38c007fefc33.html",
          "host": "dailyindependent.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-deadline-pushed-to-oct-15/article_8610bab4-cddd-4daa-81d4-d3e85cf9fbbd.html",
          "host": "dailyindependent.com",
          "date": "2026-09-25"
        },
        {
          "url": "https://www.dailyindependent.com/news/russell-at-standstill-in-zoning-process-mayor-adjourns-meeting-after-residents-speak-out-against-council/article_fd5f5982-14c8-4679-b3f9-93d427e229af.html",
          "host": "dailyindependent.com",
          "date": "2026-10-01"
        }
      ]
    },
    {
      "date": "2026-07-23",
      "text": "The City of Humboldt, Humboldt Utilities and Chamber published their joint project release July 23, 2026 and reported the nearby cryptocurrency facility under construction. This dates the official account, not the first physical work day, construction completion or computing operation.",
      "record": "Humboldt Bitcoin Mining Facility (near Gibson County Industrial Park)",
      "state": "Tennessee",
      "url": "/tennessee/#humboldt-gibson-county-bitcoin-mine-tn",
      "kind": "announced",
      "sources": [
        {
          "url": "https://humboldtchamber.com/local-officials-release-details-on-humboldt-data-center/",
          "host": "humboldtchamber.com",
          "published": "2026-07-23",
          "date": "2026-07-23",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-07-22",
      "text": "Meta announced its Temple data center online and serving traffic; this dates the announcement, not an independently observed energization.",
      "record": "Meta Temple Data Center",
      "state": "Texas",
      "url": "/texas/#meta-temple-tx",
      "kind": "announcement",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
          "host": "datacenters.atmeta.com",
          "date": "2026-07-22",
          "published": "2026-07-22",
          "checked": "2026-10-15",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ]
    },
    {
      "date": "2026-07-22",
      "text": "The current City of Emporia account reports establishment of its Digital Infrastructure Overlay and Kanza Park zoning actions on July 22, 2026. It expressly distinguishes these actions from approval of a data center for construction or current computing service.",
      "record": "Flint Hills Digital Campus",
      "state": "Kansas",
      "url": "/kansas/#kanza-park-flint-hills-emporia-ks",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.emporiaks.gov/1592/Digital-Infrastructure-Overlay-District",
          "host": "www.emporiaks.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-07-21",
      "text": "Rubix town hall in Russell: 55 million dollars Cleveland-Cliffs purchase agreement; asks city to lift moratorium by Aug 31",
      "record": "Rubix Ashland Works Data Center Campus (also listed as Rubix Russell Campus)",
      "state": "Kentucky",
      "url": "/kentucky/#rubix-ashland-works-russell-greenup-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://glasgownews1.com/2026/07/22/developer-proposes-hyperscale-data-center-at-former-eastern-kentucky-steel-mill/",
          "host": "glasgownews1.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-to-russell-it-s-ultimately-up-to-you/article_eeb4e2d1-07a1-43e5-acce-38c007fefc33.html",
          "host": "dailyindependent.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-deadline-pushed-to-oct-15/article_8610bab4-cddd-4daa-81d4-d3e85cf9fbbd.html",
          "host": "dailyindependent.com",
          "date": "2026-09-25"
        },
        {
          "url": "https://www.dailyindependent.com/news/russell-at-standstill-in-zoning-process-mayor-adjourns-meeting-after-residents-speak-out-against-council/article_fd5f5982-14c8-4679-b3f9-93d427e229af.html",
          "host": "dailyindependent.com",
          "date": "2026-10-01"
        }
      ]
    },
    {
      "date": "2026-07-20",
      "text": "The original NNSA July 20, 2026 release selects Amentum for Savannah River Site lease negotiations and explicitly distinguishes selection from a final lease award. This dates the agency account rather than executed leasing or commissioned computing.",
      "record": "Savannah River Site AI Data Center (Amentum)",
      "state": "South Carolina",
      "url": "/south-carolina/#srs-ai-data-center-savannah-river-site-sc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site",
          "host": "www.energy.gov",
          "published": "2026-07-20",
          "date": "2026-07-20",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-07-20",
      "text": "Hut 8 announced Beacon Point Phase 2, reporting a second 352 MW IT lease and 704 MW contracted IT across the campus. This is not a commissioning event.",
      "record": "Hut 8 Beacon Point AI Campus",
      "state": "Texas",
      "url": "/texas/#hut8-beacon-point-robstown-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.hut8.com/news-insights/press-releases/hut-8-fully-commercializes-1-gw-beacon-point-ai-data-center-campus-with-second-352-mw-it-lease",
          "host": "www.hut8.com",
          "published": "2026-07-20",
          "date": "2026-07-20",
          "checked": "2026-10-16",
          "label": "Beacon Point Phase 2 announcement"
        }
      ]
    },
    {
      "date": "2026-07-17",
      "text": "Scheduled deadline: Alaska DNR extended the STAK preliminary lease comment deadline to 4:30 p.m. Alaska Daylight Time; a final decision is not established.",
      "record": "Stak Energy North Slope Data Center",
      "state": "Alaska",
      "url": "/alaska/#stak-energy-north-slope-ak",
      "kind": "scheduled_deadline",
      "sources": [
        {
          "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=224224",
          "host": "aws.state.ak.us",
          "date": "2026-06-17",
          "published": "2026-06-17",
          "checked": "2026-10-15",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ]
    },
    {
      "date": "2026-07-16",
      "text": "The original signed Granville Township letter dated July 16, 2026 informs the applicant that its submission is incomplete for a missing traffic study certification and requests another filing. This dates the official letter account rather than a merits denial, physical closure or computing opening.",
      "record": "Granville Township Data Center Campus (Loop Road)",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#pa-data-center-partners-granville-township-mifflin-pa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://granvilletwp.org/wp-content/uploads/2026/07/Giorgione.pdf",
          "host": "granvilletwp.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-07-14",
      "text": "Greenup County moratorium adopted, exempting industrial parks/EastPark; Boyd County follows 2026-07-21 with EastPark exemption",
      "record": "Muskie Data Campus",
      "state": "Kentucky",
      "url": "/kentucky/#terawulf-muskie-eastpark-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://investors.terawulf.com/sec-filings/all-sec-filings/content/0001628280-26-064757/wulf-20261001.htm",
          "host": "investors.terawulf.com",
          "date": "2026-10-05"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000109/wulfeasternkypr5-26x26.htm",
          "host": "sec.gov",
          "date": "2026-05-26"
        },
        {
          "url": "https://www.dailyindependent.com/news/terawulf-says-it-s-eager-to-bring-in-local-workforce/article_8b27725c-8077-4429-b744-59721c5c6f14.html",
          "host": "dailyindependent.com",
          "date": "2026-06-16"
        },
        {
          "url": "https://www.dailyindependent.com/news/plan-in-place-for-muskie-s-1-gigawatt-facility-kentucky-power-terawulf-announce-amended-agreement/article_1ba87f02-6f40-4852-80e9-521662ea8e2e.html",
          "host": "dailyindependent.com",
          "date": "2026-10-07"
        }
      ]
    },
    {
      "date": "2026-07-13",
      "text": "Meta announced an expansion of its Richland Parish/Hyperion project, describing 5 GW of future compute capacity. The release is not a first-power or operating milestone.",
      "record": "Meta Hyperion",
      "state": "Louisiana",
      "url": "/louisiana/#meta-hyperion-richland-parish-la",
      "kind": "announced",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/",
          "host": "datacenters.atmeta.com",
          "published": "2026-07-13",
          "date": "2026-07-13",
          "checked": "2026-10-16",
          "label": "Hyperion expansion announcement"
        }
      ]
    },
    {
      "date": "2026-07-10",
      "text": "Mayor's letter to community discloses Rubix proposal and Q&A",
      "record": "Rubix Ashland Works Data Center Campus (also listed as Rubix Russell Campus)",
      "state": "Kentucky",
      "url": "/kentucky/#rubix-ashland-works-russell-greenup-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://glasgownews1.com/2026/07/22/developer-proposes-hyperscale-data-center-at-former-eastern-kentucky-steel-mill/",
          "host": "glasgownews1.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-to-russell-it-s-ultimately-up-to-you/article_eeb4e2d1-07a1-43e5-acce-38c007fefc33.html",
          "host": "dailyindependent.com",
          "date": "2026-07-22"
        },
        {
          "url": "https://www.dailyindependent.com/news/rubix-deadline-pushed-to-oct-15/article_8610bab4-cddd-4daa-81d4-d3e85cf9fbbd.html",
          "host": "dailyindependent.com",
          "date": "2026-09-25"
        },
        {
          "url": "https://www.dailyindependent.com/news/russell-at-standstill-in-zoning-process-mayor-adjourns-meeting-after-residents-speak-out-against-council/article_fd5f5982-14c8-4679-b3f9-93d427e229af.html",
          "host": "dailyindependent.com",
          "date": "2026-10-01"
        }
      ]
    },
    {
      "date": "2026-07-09",
      "text": "MARA published its Matagorda planned campus acquisition announcement July 9, 2026. The planned computing uses and future power dates do not establish an operating campus or an executed tenant lease.",
      "record": "Site MAT 1177",
      "state": "Texas",
      "url": "/texas/#mara-site-mat-1177-matagorda-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ir.mara.com/news-events/press-releases/detail/1424/mara-signs-agreement-with-hif-to-acquire-strategic-powered-land-site-in-texas",
          "host": "ir.mara.com",
          "published": "2026-07-09",
          "date": "2026-07-09",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-07-09",
      "text": "PointOne published a Remington Technology Park release on July 9, 2026 reporting a fuel cell equipment yard rezoning amendment and campus construction. This dates the developer publication, not the exact first physical work day, a verified operating power plant or computing operation.",
      "record": "Remington Technology Park",
      "state": "Virginia",
      "url": "/virginia/#pointone-remington-technology-park-fauquier-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.pointonecorp.com/news/pointone-receives-approval-for-remington-technology-park-fuel-cell-equipment-yard",
          "host": "www.pointonecorp.com",
          "published": "2026-07-09",
          "date": "2026-07-09",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-07-09",
      "text": "San Jose signed a categorical CEQA exemption for the proposed 300 Holger Way reuse. This is an environmental review action, not issuance of every permit, observed tenant work or an opening.",
      "record": "300 Holger Way Data Center (Menlo Equities conversion)",
      "state": "California",
      "url": "/california/#menlo-equities-300-holger-way-san-jose-ca",
      "kind": "approved",
      "sources": [
        {
          "url": "https://files.ceqanet.lci.ca.gov/336867-1/attachment/vA_1jJIqvW9fLOZtHXIqFpDPTX4aqQxB-al9TUgH270N4ahzuusAZlaJskGTdoDJu21I1wdo2hIDs5Lp0",
          "host": "files.ceqanet.lci.ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-07-06",
      "text": "The original Boulder City City parcel proposal page identifies the TS2 City parcel proposal as withdrawn on July 6, 2026. This is scoped to that City land proposal, separate from the federal parcel project, subsequent appeals and any physical computing closure.",
      "record": "Townsite Solar 2 Boulder City Data Center",
      "state": "Nevada",
      "url": "/nevada/#townsite-solar-2-boulder-city-nv",
      "kind": "withdrawn",
      "sources": [
        {
          "url": "https://www.bcnv.org/1174/TS2-Data-Center-Proposal-Withdrawn-76202",
          "host": "www.bcnv.org",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-07-06",
      "text": "TeraWulf announced an Anthropic lease for approximately 401 MW critical IT at Justified. Initial second-half-2027 and full early-2028 delivery are future targets.",
      "record": "Justified Data Campus",
      "state": "Kentucky",
      "url": "/kentucky/#terawulf-hawesville-ky",
      "kind": "announced",
      "sources": [
        {
          "url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack",
          "host": "investors.terawulf.com",
          "published": "2026-07-06",
          "date": "2026-07-06",
          "checked": "2026-10-16",
          "label": "Anthropic lease announcement"
        }
      ]
    },
    {
      "date": "2026-07-06",
      "text": "Galaxy announced delivery of Helios Phase I to CoreWeave; this is the announcement date, not an independently established physical completion day.",
      "record": "Galaxy Helios Data Center Campus",
      "state": "Texas",
      "url": "/texas/#galaxy-helios-dickens-county-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.galaxy.com/newsroom/galaxy-completes-phase-i-of-its-helios-data-center-campus",
          "host": "www.galaxy.com",
          "published": "2026-07-06",
          "date": "2026-07-06",
          "checked": "2026-10-15",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-07-06",
      "text": "TeraWulf published its Abernathy interest sale agreement announcement on July 6, 2026. The later second quarter filing reports that the Company no longer holds the interest. This records the dated financial announcement, not a physical construction start, data center opening or shutdown.",
      "record": "Fluidstack Abernathy AI Campus",
      "state": "Texas",
      "url": "/texas/#fluidstack-abernathy-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack",
          "host": "investors.terawulf.com",
          "published": "2026-07-06",
          "date": "2026-07-06",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-07-02",
      "text": "MARA Note 18 records execution and simultaneous closing of its MAT 1177 LLC membership acquisition on July 2, 2026. The acquired rights include owned land, land under contract and a utility agreement, with later development milestones. This is a reported company transaction, not completed campus construction or computing service.",
      "record": "Site MAT 1177",
      "state": "Texas",
      "url": "/texas/#mara-site-mat-1177-matagorda-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ir.mara.com/sec-filings/all-sec-filings/content/0001507605-26-000022/mara-20260630.htm",
          "host": "ir.mara.com",
          "published": "2026-08-06",
          "date": "2026-08-06",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-07-01",
      "text": "Hammond published its development agreement expiration notice on July 1, 2026, saying conditions for the proposed 301 Digital Crossroads project were not met by June 30 and no further extension of that agreement would be offered. This is the dated City notice, not an operating data center shutdown or the closure of an adjacent facility.",
      "record": "CoreWeave Digital Crossroads",
      "state": "Indiana",
      "url": "/indiana/#coreweave-digital-crossroads-hammond-in",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
          "host": "www.gohammond.com",
          "published": "2026-07-01",
          "date": "2026-07-01",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-07-01",
      "text": "Phoenix City Council adopted the 5C special permit waiver item as revised by the July 1 Law Department memo. This is a scoped land use waiver action, not all permits, a construction start or an opening.",
      "record": "5C Data Centers PHX01",
      "state": "Arizona",
      "url": "/arizona/#5c-data-centers-phx01-phoenix-az",
      "kind": "approved",
      "sources": [
        {
          "url": "https://webapi.legistar.com/v1/phoenix/matters/35495/texts/35595",
          "host": "webapi.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        },
        {
          "url": "https://webapi.legistar.com/v1/phoenix/matters/35495/histories",
          "host": "webapi.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-30",
      "text": "The City published its June 30, 2026 Mayor statement about the proposed Menomonie data center and ordinance work, distinguishing the earlier tax incentive negotiation pause from stopping the project. This dates the official statement, not an exact land closing, original concern day, completed ordinance adoption or computing opening.",
      "record": "Menomonie Data Center Campus",
      "state": "Wisconsin",
      "url": "/wisconsin/#menomonie-data-center-wi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://menomonie-wi.gov/DocumentCenter/View/2963/63026-Press-Release-Data-Center-Ordinance-Update-PDF",
          "host": "menomonie-wi.gov",
          "published": "2026-06-30",
          "date": "2026-06-30",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-29",
      "text": "Keel’s second-quarter filing reports that Bitcoin mining at Scrubgrass ceased on June 29, 2026 while energy sales continued. This closes the mining activity, not the entire power site; future HPC/AI development is separate.",
      "record": "Scrubgrass Generating Plant",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#bitfarms-scrubgrass-kennerdell-pa",
      "kind": "closed",
      "sources": [
        {
          "url": "https://ir.keelinfra.com/static-files/8ca60e67-771d-4b01-9f19-725026877e1a",
          "host": "ir.keelinfra.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed primary filing"
        }
      ]
    },
    {
      "date": "2026-06-25",
      "text": "TDLR records date registration of Project Eagle Buildings A through D to June 25, 2026. These are four accessibility construction filings with scheduled dates, not four independently commissioned or operating campuses.",
      "record": "AWS Project Eagle (Wharton County)",
      "state": "Texas",
      "url": "/texas/#aws-project-eagle-boling-wharton-county-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023825",
          "host": "www.tdlr.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023826",
          "host": "www.tdlr.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023832",
          "host": "www.tdlr.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026023834",
          "host": "www.tdlr.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-23",
      "text": "Microsoft published its first Mount Pleasant facility operating announcement on June 23, 2026. It separately reports equipment startup activities during April. June 23 is the release date, not a manufactured exact opening day or completion of every campus phase.",
      "record": "Microsoft Mount Pleasant Data Center Campus",
      "state": "Wisconsin",
      "url": "/wisconsin/#microsoft-mount-pleasant-wi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
          "host": "news.microsoft.com",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-06-23",
      "text": "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Maiden opening, an executed incentive amendment or three independent project announcements.",
      "record": "Microsoft Maiden Data Center",
      "state": "North Carolina",
      "url": "/north-carolina/#microsoft-maiden-catawba-county-nc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
          "host": "www.catawbacountync.gov",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
          "host": "www.conovernc.gov",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-23",
      "text": "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Hickory opening, an executed incentive amendment or three independent project announcements.",
      "record": "Microsoft Hickory Data Center",
      "state": "North Carolina",
      "url": "/north-carolina/#microsoft-hickory-catawba-county-nc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
          "host": "www.catawbacountync.gov",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
          "host": "www.conovernc.gov",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-23",
      "text": "Catawba County published its joint Microsoft programme statement on June 23, 2026, with a City of Conover copy. The statement covers the programme across three municipalities. This is the source publication date, not an individual Conover opening, an executed incentive amendment or three independent project announcements.",
      "record": "Microsoft Conover Data Center",
      "state": "North Carolina",
      "url": "/north-carolina/#microsoft-conover-catawba-county-nc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/",
          "host": "www.catawbacountync.gov",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.conovernc.gov/m/newsflash/Home/Detail/41",
          "host": "www.conovernc.gov",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-22",
      "text": "The University research laboratory published its Medical AI Core room conversion account on June 22, 2026. It describes work underway and a year end goal, without independently establishing completed construction, an exact work start day or commissioned room operation.",
      "record": "UH Cancer Center Data Center - Medical AI Core (PAC-AID)",
      "state": "Hawaii",
      "url": "/hawaii/#uh-cancer-center-medai-core-honolulu-hi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://shepherdresearchlab.cc.hawaii.edu/news/new-medical-ai-center-pac-aid-hawaii-pacific/",
          "host": "shepherdresearchlab.cc.hawaii.edu",
          "published": "2026-06-22",
          "date": "2026-06-22",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-18",
      "text": "The County published a Lake Anna construction and water planning update on June 18, 2026. This dates publication of the account, not the exact construction start, actual completion of future water works or computing operation.",
      "record": "Lake Anna Technology Campus (LATC)",
      "state": "Virginia",
      "url": "/virginia/#aws-lake-anna-technology-campus-louisa-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.louisacounty.gov/Blog.aspx?IID=59",
          "host": "www.louisacounty.gov",
          "published": "2026-06-18",
          "date": "2026-06-18",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-17",
      "text": "The June 17, 2026 publication date of the State notice reports an extension of comments on the STAK preliminary lease decision to July 17. The notice is not a final lease grant, construction start or physical operation.",
      "record": "Stak Energy North Slope Data Center",
      "state": "Alaska",
      "url": "/alaska/#stak-energy-north-slope-ak",
      "kind": "announced",
      "sources": [
        {
          "url": "https://aws.state.ak.us/OnlinePublicNotices/Notices/View.aspx?id=224224",
          "host": "aws.state.ak.us",
          "published": "2026-06-17",
          "date": "2026-06-17",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-16",
      "text": "The original Holyoke Council minutes record June 16, 2026 adoption of the general computing zoning order by nine votes to four, after a specific MGHPCC amendment. The separate study committee order was referred to committee. This records Council action rather than an independently read mayoral signature, legal commencement or exact Chestnut River project denial or physical closure.",
      "record": "Chestnut River Holyoke Data Center (former Hampden Papers complex)",
      "state": "Massachusetts",
      "url": "/massachusetts/#chestnut-river-holyoke-ma",
      "kind": "approved",
      "sources": [
        {
          "url": "https://storage.googleapis.com/proudcity/holyokema/2026/04/item-3-june-16-2026-city-council-meeting-minutes-b22fb633.pdf",
          "host": "storage.googleapis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-15",
      "text": "DataBank announced a $650 million Red Oak construction-financing upsize to a $2.65 billion campus package, separate from an $800 million corporate revolver. This dated financing announcement is not project expenditure, an opening or an independently verified loan-instrument review.",
      "record": "Red Oak Campus",
      "state": "Texas",
      "url": "/texas/#databank-red-oak-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.databank.com/resources/press-releases/databank-closes-1-45-billion-in-new-financing-across-two-transactions/",
          "host": "www.databank.com",
          "published": "2026-06-15",
          "date": "2026-06-15",
          "checked": "2026-10-16",
          "label": "DataBank June 15 financing announcement"
        }
      ]
    },
    {
      "date": "2026-06-15",
      "text": "Google announced an expansion investment for its existing Jackson County campus; this was an announcement, not completion of the expansion.",
      "record": "Google Jackson County Campus",
      "state": "Alabama",
      "url": "/alabama/#google-jackson-county-stevenson-al",
      "kind": "announcement",
      "sources": [
        {
          "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/alabama-investment-june-2026/",
          "host": "blog.google",
          "date": "2026-06-15",
          "published": "2026-06-15",
          "checked": "2026-10-15",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ]
    },
    {
      "date": "2026-06-12",
      "text": "The linked Pairmont impact statement is dated June 12, 2026 and describes a proposed conditional rezoning. This dates the applicant document, not a County receipt, hearing, approval, construction or computing operation.",
      "record": "Pairmont Data Center Campus",
      "state": "Virginia",
      "url": "/virginia/#eagle-rock-pairmont-data-center-campus-spotsylvania-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.spotsylvania.va.us/DocumentCenter/View/35471/3rd-Submission-Impact-Statement-",
          "host": "www.spotsylvania.va.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-10",
      "text": "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.",
      "record": "Caddo Parish Campus (with Amazon)",
      "state": "Louisiana",
      "url": "/louisiana/#stack-caddo-parish-la",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/",
          "host": "www.stackinfra.com",
          "published": "2026-06-10",
          "date": "2026-06-10",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-06-10",
      "text": "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.",
      "record": "Bossier Parish Campus (with Amazon)",
      "state": "Louisiana",
      "url": "/louisiana/#stack-bossier-parish-la",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/",
          "host": "www.stackinfra.com",
          "published": "2026-06-10",
          "date": "2026-06-10",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-06-10",
      "text": "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.",
      "record": "Amazon Web Services Caddo Parish Campus (Blanchard)",
      "state": "Louisiana",
      "url": "/louisiana/#aws-blanchard-caddo-parish-la",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/",
          "host": "www.stackinfra.com",
          "published": "2026-06-10",
          "date": "2026-06-10",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-06-10",
      "text": "The original STACK June 10, 2026 release explicitly reports construction already underway at the planned Caddo and Bossier campuses. The publication dates the construction account and community contribution announcement, without dating exact groundbreaking or commissioned computing.",
      "record": "Amazon Web Services Bossier Parish Campus (Benton)",
      "state": "Louisiana",
      "url": "/louisiana/#aws-benton-bossier-parish-la",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-partners-with-amazon-to-invest-in-northwest-louisiana-communities/",
          "host": "www.stackinfra.com",
          "published": "2026-06-10",
          "date": "2026-06-10",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-06-09",
      "text": "Soluna published its monthly update on June 9, 2026 and described Annie development for a potential customer, with capital formation and modular construction design underway. This dates the report and design work, not a physical construction start or computing operation.",
      "record": "Soluna Project Annie",
      "state": "Texas",
      "url": "/texas/#soluna-project-annie-paris-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.solunacomputing.com/news/monthly-update-june-2026/",
          "host": "www.solunacomputing.com",
          "published": "2026-06-09",
          "date": "2026-06-09",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-06-09",
      "text": "The original Clinton City June 9, 2026 publication describes the AWS former Delphi conversion and celebrates its investment. This dates the City statement rather than an exact first construction day, commissioned computing opening or accomplished future benefits.",
      "record": "AWS Clinton Data Center",
      "state": "Mississippi",
      "url": "/mississippi/#aws-clinton-hinds-ms",
      "kind": "announced",
      "sources": [
        {
          "url": "https://clintonms.org/awsdatacenter/",
          "host": "clintonms.org",
          "published": "2026-06-09",
          "date": "2026-06-09",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-06-04",
      "text": "Google and Intersect announced construction of the Meitner Energy Center, including a data center and separate co-located generation in Gray and Roberts Counties. Announcement date; exact physical construction-start and energization dates are not established.",
      "record": "Google Meitner Energy Center",
      "state": "Texas",
      "url": "/texas/#google-meitner-pampa-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/meitner-energy-center/",
          "host": "blog.google",
          "published": "2026-06-04",
          "date": "2026-06-04",
          "checked": "2026-10-16",
          "label": "Google official location source"
        }
      ]
    },
    {
      "date": "2026-06-01",
      "text": "The original Missoula County Bonner project timeline identifies June 1, 2026 as submission of the fifth special exception application and states that it was deemed incomplete. This application history is separate from the undated later withdrawal update and does not establish approval or operation.",
      "record": "Krambu Bonner Data Center (former UFP Edge building, Bonner Mill Industrial Park)",
      "state": "Montana",
      "url": "/montana/#krambu-bonner-mill-data-center-bonner-mt",
      "kind": "announced",
      "sources": [
        {
          "url": "https://missoulacountyvoice.com/bonner-data-center",
          "host": "missoulacountyvoice.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-28",
      "text": "Lockport issued its data center discussion suspension news release on May 28, 2026, saying future proposal discussions would pause pending broader regulatory frameworks and June workshops were cancelled. This is the dated City publication, not an exact ordinance adoption day, formal permit denial or physical facility closure.",
      "record": "Star Innovation District Data Center (Lockport)",
      "state": "Illinois",
      "url": "/illinois/#vme-lockport-star-innovation-district-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.cityoflockport.net/DocumentCenter/View/7669/CITY-OF-LOCKPORT-SUSPENDS-DATA-CENTER-DISCUSSIONS-PENDING-BROADER-REGULATORY-FRAMEWORKS?bidId=",
          "host": "www.cityoflockport.net",
          "published": "2026-05-28",
          "date": "2026-05-28",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-28",
      "text": "Flexential published its Hillsboro 4 and Hillsboro 5 real estate announcement May 28, 2026. This dates the issuer publication and its reported acquisition context rather than an independently verified property closing day, computing commissioning, first service day or a new company role.",
      "record": "Flexential Portland - Hillsboro 5",
      "state": "Oregon",
      "url": "/oregon/#flexential-portland-hillsboro-5-or",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.flexential.com/resources/press-release/flexential-secures-strategic-real-estate-ownership-hillsboro-oregon",
          "host": "www.flexential.com",
          "published": "2026-05-28",
          "date": "2026-05-28",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-05-28",
      "text": "Flexential published its Hillsboro 4 and Hillsboro 5 real estate announcement May 28, 2026. This dates the issuer publication and its reported acquisition context rather than an independently verified property closing day, computing commissioning, first service day or a new company role.",
      "record": "Flexential Portland - Hillsboro 4 (PDX04)",
      "state": "Oregon",
      "url": "/oregon/#flexential-portland-hillsboro-4-pdx04-or",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.flexential.com/resources/press-release/flexential-secures-strategic-real-estate-ownership-hillsboro-oregon",
          "host": "www.flexential.com",
          "published": "2026-05-28",
          "date": "2026-05-28",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-05-28",
      "text": "The appellate court issued its Fortistar transaction review memorandum and order May 28, 2026, affirming the judgment with costs. This is the dated court document, not an exact facility closure, operating permit revocation or AI commissioning event.",
      "record": "Digihost / Digi Power X  -  Fortistar North Tonawanda",
      "state": "New York",
      "url": "/new-york/#digihost-north-tonawanda-ny",
      "kind": "announced",
      "sources": [
        {
          "url": "https://earthjustice.org/wp-content/uploads/2026/05/cv_24_2101_clean_air_coalition_of_v_clean_air_coalition_of_memorandum_and_order_27.pdf",
          "host": "earthjustice.org",
          "published": "2026-05-28",
          "date": "2026-05-28",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-22",
      "text": "The original Iron County project page records that the Red Butte application was deemed incomplete on May 22, 2026. This is an application review event rather than approval, physical construction or computing operation.",
      "record": "Red Butte Energy and Data Center Campus",
      "state": "Utah",
      "url": "/utah/#brightnight-red-butte-newcastle-ut",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ironcountyut.gov/planning/data-center-projects",
          "host": "ironcountyut.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-21",
      "text": "The original Webster County May 21, 2026 update describes ongoing construction of its Rifle Range Road computing project. The linked original Conservation report names Lumon Solutions Marshfield LLC, but neither the statement nor report is computing commissioning.",
      "record": "Marshfield Data Center (Lumon Solutions)",
      "state": "Missouri",
      "url": "/missouri/#lumon-solutions-marshfield-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://webstercountymo.gov/commission-data-center-update-may-21/",
          "host": "webstercountymo.gov",
          "published": "2026-05-21",
          "date": "2026-05-21",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf",
          "host": "webstercountymo.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-20",
      "text": "Missouri’s governor reported Google’s New Florence infrastructure/data-center investment announcement. Announced development and future jobs; exact construction-start, completion and opening dates are not established.",
      "record": "Google Project Spade Campus",
      "state": "Missouri",
      "url": "/missouri/#google-spade-new-florence-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county",
          "host": "governor.mo.gov",
          "published": "2026-05-20",
          "date": "2026-05-20",
          "checked": "2026-10-16",
          "label": "Office of the Governor of Missouri reviewed primary source"
        }
      ]
    },
    {
      "date": "2026-05-18",
      "text": "The City published October 1 consent packet reports that the Hearing Examiner denied the Lex conditional use application May 18, 2026 and issued an amended denial May 19. This is the dated denial account, not a computing shutdown, a final court judgment or the exact signature day of the later draft Council instrument.",
      "record": "Lex Developments AI Data Center (former Hoku polysilicon site)",
      "state": "Idaho",
      "url": "/idaho/#lex-developments-pocatello-id",
      "kind": "denied",
      "sources": [
        {
          "url": "https://pocatello.gov/AgendaCenter/ViewFile/Item/5674?fileID=15373",
          "host": "pocatello.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-14",
      "text": "The original Conservation report is generated May 14, 2026 and the linked original DNR groundwater email is dated the same day. These are document dates for a resource review and forecast, not proof of site clearance, actual consumption or current aquifer measurements.",
      "record": "Marshfield Data Center (Lumon Solutions)",
      "state": "Missouri",
      "url": "/missouri/#lumon-solutions-marshfield-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf",
          "host": "webstercountymo.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-MO-DNR-email-re-impact-of-data-center-well.pdf",
          "host": "webstercountymo.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-14",
      "text": "Fisk University published its Quantum Leap campus master plan announcement May 14, 2026. This records the institution announcement and proposed technology center, not an exact construction start for that component or operation of a data center.",
      "record": "Fisk University Quantum Leap Innovation & Technology Center",
      "state": "Tennessee",
      "url": "/tennessee/#fisk-quantum-leap-nashville-tn",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.fisk.edu/main-featured/fisk-university-unveils-1-billion-master-plan-launching-new-era-of-innovation-and-sustainability/",
          "host": "www.fisk.edu",
          "published": "2026-05-14",
          "date": "2026-05-14",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-05-13",
      "text": "Town of Oneonta adopted Local Law 3 on May 13, 2026, as its signed May 14 clerk certificate records. This is the municipal law adoption, not approval or denial of the Eco Yotta application. Effectiveness depends on state filing, whose exact day is not established here.",
      "record": "Eco-Yotta Data Center (proposed, County Route 9)",
      "state": "New York",
      "url": "/new-york/#eco-yotta-oneonta-ny",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.townofoneonta.org/application/files/8017/7911/4044/LL_03_AFFECTING_A_TEMPORARY_MORATORIUM.pdf",
          "host": "www.townofoneonta.org",
          "published": "2026-05-14",
          "date": "2026-05-14",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-12",
      "text": "Monroe Township Planning Board deemed the Hexa Builders application 562 SP incomplete on May 12, 2026 and adopted resolution PB 27 26. This dates an adverse completeness disposition, without a final merits denial, permanent cancellation or physical computing closure.",
      "record": "Black Horse Pike Data Center (3043 Black Horse Pike)",
      "state": "New Jersey",
      "url": "/new-jersey/#hexa-builders-black-horse-pike-monroe-nj",
      "kind": "denied",
      "sources": [
        {
          "url": "https://monroetownshipnj.org/wp-content/uploads/2026/10/2026-05-12-PB-Special-Minutes.pdf",
          "host": "monroetownshipnj.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-07",
      "text": "The county June 10 agenda records May 7, 2026 commission recommendations for Wintersburg 313 CPA250011 and Z250034 by seven votes to zero. This is the commission outcome, not proof of the scheduled June 10 Board action, a construction permit or operation.",
      "record": "Wintersburg 313",
      "state": "Arizona",
      "url": "/arizona/#wintersburg-313-tonopah-az",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10316?fileID=100604",
          "host": "www.maricopa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-05",
      "text": "The original May 5, 2026 City Council minute account published in the May 19 packet records approval of the Lewis and Clark Ranch subarea planning ordinances. This is general land planning action, separate from a specific data center application, computing entitlement, executed complete instrument or physical computing stage.",
      "record": "Trammell Crow Lewis & Clark Ranch Data Center",
      "state": "Washington",
      "url": "/washington/#trammell-crow-lewis-clark-ranch-west-richland-wa",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.westrichland.org/AgendaCenter/ViewFile/Agenda/_05192026-403?packet=true",
          "host": "www.westrichland.org",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-04",
      "text": "The signed original County instrument records May 4, 2026 adoption and commencement of the data center development moratorium. Its separate April 20 hearing is not the adoption day. This is County policy context, not a finding that this individual project is denied, exempt or operating.",
      "record": "Long Ferry Road Data Center Campus (Rowan County)",
      "state": "North Carolina",
      "url": "/north-carolina/#long-ferry-road-rowan-county-nc",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.rowancountync.gov/DocumentCenter/View/57271/Ordinance-Imposing-One-Year-Moratorium-on-the-Development-of-Data-Centers-in-Rowan-County-PDF?bidId=",
          "host": "www.rowancountync.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-05-01",
      "text": "Plymouth Township published its receipt of the new 900 Conshohocken Road data center application May 1, 2026. It distinguishes an earlier withdrawn application and describes further review requirements. The publication date is not a permit approval, an exact application filing day or current construction.",
      "record": "MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant)",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#mlp-ventures-plymouth-township-conshohocken-pa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.plymouthtownship.org/plymouth-township-receives-zoning-hearing-board-application-for-proposed-data-center/",
          "host": "www.plymouthtownship.org",
          "published": "2026-05-01",
          "date": "2026-05-01",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-30",
      "text": "Switch published its Big Beaver Borough campus development announcement April 30, 2026. The release describes planned facilities and company commitments, not completed construction or operation.",
      "record": "Big Beaver Campus",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#switch-big-beaver-pa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.switch.com/switch-announces-new-data-center-campus-in-beaver-county-pennsylvania/",
          "host": "www.switch.com",
          "published": "2026-04-30",
          "date": "2026-04-30",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-04-29",
      "text": "DOE signed its Batch 1 Portsmouth environmental site assessment categorical exclusion determination April 29, 2026. The described first phase concerns assessment for a planned AI and cloud campus, not completed campus review, physical construction or computing service.",
      "record": "PORTS-Pike Technology Campus",
      "state": "Ohio",
      "url": "/ohio/#new-day-ports-technology-campus-piketon-oh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.energy.gov/nepa/articles/cx-270956-environmental-site-assessment-esa-batch-1-leased-property-portsmouth",
          "host": "www.energy.gov",
          "published": "2026-04-29",
          "date": "2026-04-29",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.energy.gov/sites/default/files/2026-04/CX-270956.pdf",
          "host": "www.energy.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-27",
      "text": "Oracle original April 27, 2026 release describes ongoing Jupiter construction and announces an updated fuel cell power design. This dates the issuer statement without certifying installed generation, completed construction, measured environmental benefits or computing operation.",
      "record": "Stargate Project Jupiter",
      "state": "New Mexico",
      "url": "/new-mexico/#stargate-project-jupiter-dona-ana-nm",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
          "host": "www.oracle.com",
          "published": "2026-04-27",
          "date": "2026-04-27",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-04-22",
      "text": "Monroe Township Council approved Ordinance O:20-2026 on April 22, 2026, removing computing uses from the Hexa Builders redevelopment plan. The final minutes date this limited legal action, without verifying publication, effective day, subsequent court outcome, physical construction or computing closure.",
      "record": "Black Horse Pike Data Center (3043 Black Horse Pike)",
      "state": "New Jersey",
      "url": "/new-jersey/#hexa-builders-black-horse-pike-monroe-nj",
      "kind": "approved",
      "sources": [
        {
          "url": "https://monroetownshipnj.org/wp-content/uploads/2026/07/04-22-26-Council-Meeting.pdf",
          "host": "monroetownshipnj.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://monroetownshipnj.org/wp-content/uploads/2026/04/O-20-2026-2.pdf",
          "host": "monroetownshipnj.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-21",
      "text": "The original Spanish Fork City minutes record April 21, 2026 work session discussion of the Volition proposal and further ordinance and documentation steps. The source explicitly says work sessions take no formal actions. This is a proposal discussion rather than approval, construction or computing operation.",
      "record": "Volition Spanish Fork Data Center",
      "state": "Utah",
      "url": "/utah/#volition-spanish-fork-ut",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.utah.gov/pmn/files/1430163.pdf",
          "host": "www.utah.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-21",
      "text": "Santa Clara Council history records adoption on April 21, 2026 of authority for the Memorex Junction substation agreement amendment and specified future capacity terms. The source says the ramp depends on infrastructure and other conditions. Authority to execute an amendment is not completed energization, actual power demand or a data center opening.",
      "record": "Skybox Santa Clara (1200 Memorex Drive)",
      "state": "California",
      "url": "/california/#skybox-santa-clara-1200-memorex-drive-ca",
      "kind": "approved",
      "sources": [
        {
          "url": "https://santaclara.legistar.com/LegislationDetail.aspx?FullText=1&GUID=161F4AAA-FD45-4D4B-B16C-C9A0C332E696&ID=7987607&Options=&Search=",
          "host": "santaclara.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-21",
      "text": "Meta announced its Tulsa data center development. This is the release date, not a construction start or an opening day.",
      "record": "Meta Project Anthem  -  Tulsa",
      "state": "Oklahoma",
      "url": "/oklahoma/#meta-anthem-tulsa-ok",
      "kind": "announced",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2026/04/hello-tulsa/",
          "host": "datacenters.atmeta.com",
          "published": "2026-04-21",
          "date": "2026-04-21",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-04-21",
      "text": "The original Ferguson April 21, 2026 minutes record public discussion of the former Emerson redevelopment and distinguish the forthcoming tax decision from computing permission. This discussion is not an accomplished later vote or computing construction.",
      "record": "Former Emerson Campus Data Center (Next Revolution Technologies)",
      "state": "Missouri",
      "url": "/missouri/#next-revolution-emerson-campus-ferguson-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.fergusoncity.com/DocumentCenter/View/8742/Council-Meeting-Minutes-4212026-outgoing",
          "host": "www.fergusoncity.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-21",
      "text": "EdgeCore announced combined AS01/AS02 construction financing. The $1.5 billion loan envelope is not an individual-site investment or a construction-start/opening day. Initial occupancy remained a future target.",
      "record": "EdgeCore AS02 Sterling project",
      "state": "Virginia",
      "url": "/virginia/#edgecore-as02-sterling-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia",
          "host": "edgecore.com",
          "published": "2026-04-21",
          "date": "2026-04-21",
          "checked": "2026-10-16",
          "label": "EdgeCore AS01/AS02 financing announcement"
        }
      ]
    },
    {
      "date": "2026-04-21",
      "text": "EdgeCore announced combined AS01/AS02 construction financing. The $1.5 billion loan envelope is not an individual-site investment or a construction-start/opening day. Initial occupancy remained a future target.",
      "record": "EdgeCore AS01 Sterling project",
      "state": "Virginia",
      "url": "/virginia/#edgecore-as01-sterling-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-secures-1-5-billion-of-construction-financing-for-two-fully-leased-hyperscale-data-centers-in-northern-virginia",
          "host": "edgecore.com",
          "published": "2026-04-21",
          "date": "2026-04-21",
          "checked": "2026-10-16",
          "label": "EdgeCore AS01/AS02 financing announcement"
        }
      ]
    },
    {
      "date": "2026-04-21",
      "text": "The original St Louis City April 21, 2026 release reports unanimous conditional use approval for the old warehouse computing project. Approval and required conditions do not establish construction, a recorded executed benefit agreement or computing operation.",
      "record": "Armory Innovation District Data Center",
      "state": "Missouri",
      "url": "/missouri/#armory-innovation-district-st-louis-mo",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.stlouis-mo.gov/government/departments/mayor/news/data-center-permit-approved.cfm",
          "host": "www.stlouis-mo.gov",
          "published": "2026-04-21",
          "date": "2026-04-21",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-20",
      "text": "Oak Ridge National Laboratory published its Frontier research account April 20, 2026. It describes actual allocated computing work, rather than announcing an exact physical opening or commissioning future systems.",
      "record": "Oak Ridge Leadership Computing Facility (Frontier supercomputer)",
      "state": "Tennessee",
      "url": "/tennessee/#ornl-oak-ridge-leadership-computing-facility-tn",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.ornl.gov/news/tag-teaming-turbulence-frontier-trains-ai-model-cosmic-storms/",
          "host": "www.ornl.gov",
          "published": "2026-04-20",
          "date": "2026-04-20",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-20",
      "text": "The City Farmington chronology records April 20, 2026 Council approval of dividing the Technology Park final plat into two additions and of updated development contracts. This dates the recorded planning action, without proving an individual computing building permit, construction start or operation.",
      "record": "Farmington Technology Park (Tract)",
      "state": "Minnesota",
      "url": "/minnesota/#tract-farmington-technology-park-mn",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park",
          "host": "www.farmingtonmn.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-15",
      "text": "The original County account explicitly reports that Council held a Project Altair public hearing April 15, 2026. A delayed third reading and unconfirmed separate information session are not final approval or physical construction.",
      "record": "Project Altair (Mid-Carolina Commerce Park II)",
      "state": "South Carolina",
      "url": "/south-carolina/#project-altair-newberry-county-sc",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers",
          "host": "www.newberrycounty.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-15",
      "text": "Scheduled event: The County April 2 notice schedules a hearing on Nebo North LLC data center application April 15, 2026. The passed date is retained as a schedule, without a verified hearing result or an accomplished decision.",
      "record": "Nebo North Data Center Campus (Project Nebo)",
      "state": "Utah",
      "url": "/utah/#setsquare-nebo-north-mona-juab-county-ut",
      "kind": "scheduled_event",
      "sources": [
        {
          "url": "https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/",
          "host": "juabcounty.gov",
          "published": "2026-04-02",
          "date": "2026-04-02",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-15",
      "text": "Gaines Charter Township certified minutes record the Planning Commission public hearing on the Microsoft rezoning request on April 15, 2026. The hearing included public concerns and company answers. The certified PDF has an incomplete motion continuation, so this event does not assert a final rezoning decision, current construction or operation.",
      "record": "Microsoft Gaines Township Data Center",
      "state": "Michigan",
      "url": "/michigan/#microsoft-gaines-township-mi",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.gainestownship.org/Documents/How%20Do%20I/Document%20Center/Meeting%20Agendas%20and%20Minutes/Planning%20Commission/April%2015%2C%202026%20Planning%20Commission%20Minutes.pdf?t=202606120538070",
          "host": "www.gainestownship.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-14",
      "text": "The Township May 5 agenda packet includes April 14, 2026 minutes reporting that the MCD 7 conditional use hearing opened and would continue later. This records that published minutes account, not certification of later approved minutes, a final permit vote or full testimony.",
      "record": "Limerick Township Data Center Campus (MCD 7)",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#mcd7-limerick-township-montgomery-county-pa",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.limerickpa.org/AgendaCenter/ViewFile/Agenda/_05052026-625",
          "host": "www.limerickpa.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-09",
      "text": "The county agenda records an April 9, 2026 commission recommendation on Baccara MCP250007. This is the planning commission outcome, not proof of the scheduled May 6 Board decision, construction permits or operation.",
      "record": "Project Baccara",
      "state": "Arizona",
      "url": "/arizona/#takanock-project-baccara-maricopa-county-az",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10264?fileID=100345",
          "host": "www.maricopa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-07",
      "text": "DataBank announced its Vernon joint venture with Goodman and prospective capacity delivery from December 2026 through September 2027. This is an announcement, not completed opening, energization or financial close.",
      "record": "Vernon LA Campus (with Goodman Group)",
      "state": "California",
      "url": "/california/#databank-vernon-la-ca",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.databank.com/resources/press-releases/databank-and-goodman-group-partner-to-open-new-landmark-data-center-in-los-angeles/",
          "host": "www.databank.com",
          "published": "2026-04-07",
          "date": "2026-04-07",
          "checked": "2026-10-16",
          "label": "DataBank current facility or company statement"
        }
      ]
    },
    {
      "date": "2026-04-06",
      "text": "Shelbyville current City account records April 6, 2026 Council approval of the amended annexation and rezoning ordinance 26 3052 and the Prologis economic development agreement. The City says separate applications, permits and regulatory approvals are required before construction. This is the land use and agreement action, not a physical start or opening.",
      "record": "Prologis Shelbyville Data Center Campus",
      "state": "Indiana",
      "url": "/indiana/#prologis-shelbyville-in",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364",
          "host": "www.shelbyville.in.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-06",
      "text": "The County original account reports that Natelli hosted an Appeal Digital Park public information meeting on April 6, 2026. This dates the reported outreach meeting, not a County approval, executed property acquisition, construction or computing operation.",
      "record": "Appeal Digital Park",
      "state": "Maryland",
      "url": "/maryland/#natelli-appeal-digital-park-lusby-md",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.choosecalvert.com/4058/Natelli-Holdings",
          "host": "www.choosecalvert.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-04-02",
      "text": "Deep Green published a Lansing proposal analysis on April 2, 2026 and described a later Council vote as expected. This dates developer publication and does not establish the vote outcome or present construction, emissions or computing operation.",
      "record": "Deep Green Lansing Data Center",
      "state": "Michigan",
      "url": "/michigan/#deep-green-lansing-mi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://deepgreen.energy/blog/analysis-deep-green-data-centre-project-confirmed-to-reduce-overall-lansing-emissions",
          "host": "deepgreen.energy",
          "published": "2026-04-02",
          "date": "2026-04-02",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-04-01",
      "text": "The Beacon Center published its ExoticRidge Hawkins County case account April 1, 2026, describing the proposed cryptocurrency facility and a legal challenge. This dates the counsel publication, not a separately verified court filing day, judgment, physical start or operating mine.",
      "record": "ExoticRidge Bulls Gap Bitcoin Mine",
      "state": "Tennessee",
      "url": "/tennessee/#exoticridge-bulls-gap-tn",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.beacontn.org/exoticridge-v-hawkins-county-fighting-back-against-an-arbitrary-data-center-ban-in-east-tennessee/",
          "host": "www.beacontn.org",
          "published": "2026-04-01",
          "date": "2026-04-01",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-04-01",
      "text": "Operator reported opening: April 2 release explicitly describes the unveiling as yesterday; independent commissioning and all halls are not certified.",
      "record": "Edged Mesa Data Center",
      "state": "Arizona",
      "url": "/arizona/#edged-mesa-az",
      "kind": "operator_reported_opening",
      "sources": [
        {
          "url": "https://edged.us/news/edged-us-opens-waterless-ai-ready-data-center-in-the-heart-of-arizonas-silicon-desert-tech-corridor",
          "publisher": "Edged US"
        }
      ]
    },
    {
      "date": "2026-03-31",
      "text": "The certified Township Resolution 2026 05 records approval at the March 31, 2026 Special Meeting and formal opposition to siting the proposed Los Alamos facility. Its security and environmental justice allegations are attributed Board positions, not an independent threat classification, a court finding, permit denial or physical closure.",
      "record": "U-M / Los Alamos Research Computing Center",
      "state": "Michigan",
      "url": "/michigan/#umich-lanl-research-computing-ypsilanti-township-mi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://files.ypsitownship.org/Documents/Departments/Clerks-Office/Ordinances-Resolutions/2026/2026-Resolutions/Resolution-No.-2026-05-Data-Center-High-Value-Target-Risk.pdf?t=202606301548230",
          "host": "files.ypsitownship.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-31",
      "text": "The March 31, 2026 dated applicant letter withdraws the pending 1977 Saturn Street data center application and named entitlements. The City currently posts it under Withdrawn Data Center. This is the application withdrawal date reported by the applicant, not an exact physical closure or a determination about all future uses of the property.",
      "record": "DigiCo LAX1 (1977 Saturn Street)",
      "state": "California",
      "url": "/california/#digico-lax1-monterey-park-ca",
      "kind": "withdrawn",
      "sources": [
        {
          "url": "https://www.montereypark.ca.gov/1710/Data-Center-Information",
          "host": "www.montereypark.ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.montereypark.ca.gov/DocumentCenter/View/18798/26_03_31_SIGNED_LAX---Letter-to-City-of-Monterey-Park",
          "host": "www.montereypark.ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-24",
      "text": "The original Metrobloks March 24, 2026 release announces the Liberty computing campus proposal. This is the issuer announcement date rather than completed investment, construction, installed capacity or computing operation.",
      "record": "Metrobloks Liberty Campus",
      "state": "Missouri",
      "url": "/missouri/#metrobloks-liberty-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri",
          "host": "www.metrobloks.com",
          "published": "2026-03-24",
          "date": "2026-03-24",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-03-24",
      "text": "The County original application account reports Board approval of the DCIP Roan Road PUD rezoning and concept development plan March 24, 2026. This is the specific land use decision, not construction or operation and not the separate later hyperscale application.",
      "record": "DCIP DeSoto County Data Center (Roan Street)",
      "state": "Florida",
      "url": "/florida/#dcip-arcadia-roan-street-fl",
      "kind": "approved",
      "sources": [
        {
          "url": "https://desotobocc.com/431/Data-Center-Applications",
          "host": "desotobocc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-23",
      "text": "Van Meter workshop minutes record Council approval of Resolution 2026 25 authorizing a Microsoft development agreement on March 23, 2026, by five votes to zero. The minutes appear on page 8 of the April 13 packet. This is the recorded authorization, not an operating milestone, a completed construction permit or proof that all agreement conditions were met.",
      "record": "Microsoft Van Meter Data Center (Vision Park)",
      "state": "Iowa",
      "url": "/iowa/#microsoft-van-meter-ia",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.vanmeteria.gov/wp-content/uploads/4.13.2026-Regular-Business-Meeting-Packet-Final.pdf",
          "host": "www.vanmeteria.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-20",
      "text": "The original Coweta City March 20, 2026 notice publishes procedures for a scheduled April 6 Project Atlas hearing. This dates publication of the procedures rather than an accomplished hearing, vote, approval or physical stage. The December 2025 newsletter supplies no exact publication day.",
      "record": "Project Atlas at Coweta",
      "state": "Oklahoma",
      "url": "/oklahoma/#beale-project-atlas-coweta-ok",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.cityofcoweta-ok.gov/m/newsflash/Archive/Item/569?arcId=816",
          "host": "www.cityofcoweta-ok.gov",
          "published": "2026-03-20",
          "date": "2026-03-20",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-19",
      "text": "The original Trenton staff report records Council approval of the Prologis commercial and industrial fence permit on March 19, 2026. This dates the limited fence action, without final whole campus permission, vertical construction or commissioned service.",
      "record": "Prologis Project Mila",
      "state": "Ohio",
      "url": "/ohio/#prologis-mila-trenton-oh",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.ci.trenton.oh.us/AgendaCenter/ViewFile/Agenda/_03302026-550",
          "host": "www.ci.trenton.oh.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-19",
      "text": "CPUC adopted Resolution E5433 approving a modified PG&E utility work agreement for the proposed 888 Ross Drive data center and computing lab. This is the utility agreement approval date. Issuance was March 20 and completed energization or operation was not established.",
      "record": "Menlo Digital MD-SV1 (888-894 Ross Drive)",
      "state": "California",
      "url": "/california/#menlo-digital-md-sv1-ross-drive-sunnyvale-ca",
      "kind": "approved",
      "sources": [
        {
          "url": "https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M602/K988/602988978.PDF",
          "host": "docs.cpuc.ca.gov",
          "published": "2026-03-20",
          "date": "2026-03-20",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-19",
      "text": "The March 19, 2026 publication date of the State account announces plans for the new Dothan headquarters and data processing center. Construction is forecast, not reported to have started, and no opening is established.",
      "record": "Construction Partners Corporate Headquarters and Data Processing Center",
      "state": "Alabama",
      "url": "/alabama/#construction-partners-dothan-al",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.madeinalabama.com/2026/03/construction-partners-to-invest-20-million-in-new-dothan-headquarters/",
          "host": "www.madeinalabama.com",
          "published": "2026-03-19",
          "date": "2026-03-19",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-19",
      "text": "The original South Dakota PUC docket records March 19, 2026 filing of the blockchain interruptible service request. This is a filing date rather than the requested later approval, actual electricity delivery or computing operation.",
      "record": "CSRE Properties South Dakota Blockchain Facility (Ben French Substation)",
      "state": "South Dakota",
      "url": "/south-dakota/#csre-properties-blockchain-rapid-city-sd",
      "kind": "announced",
      "sources": [
        {
          "url": "https://puc.sd.gov/Dockets/Electric/2026/EL26-008.aspx",
          "host": "puc.sd.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-17",
      "text": "Google announced a Michigan data-center/energy collaboration and said it was evaluating Van Buren Township. The later county statement identifies Cannoli; the date is not final-plan approval, site-work commencement or 2700 MW of site IT capacity.",
      "record": "Project Cannoli",
      "state": "Michigan",
      "url": "/michigan/#project-cannoli-van-buren-township-wayne-county-mi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/clean-energy-reliability-michigan/",
          "host": "blog.google",
          "published": "2026-03-17",
          "date": "2026-03-17",
          "checked": "2026-10-16",
          "label": "Michigan development and grid-resource announcement"
        }
      ]
    },
    {
      "date": "2026-03-11",
      "text": "Portland Town Board adopted resolution 25 on March 11, 2026 expressing general concept approval of the proposed Sugar Hill Golf Course data center, subject to further plans, environmental assessment and regulatory review. This conditional concept action is not final development permission, construction or commissioned service.",
      "record": "Sugar Hill Data Center (proposed, former Sugar Hill Golf Course)",
      "state": "New York",
      "url": "/new-york/#four-winds-sugar-hill-portland-ny",
      "kind": "approved",
      "sources": [
        {
          "url": "https://static1.squarespace.com/static/648bc60c3305335b28132299/t/69e8c1f6d49cfe289dd24ce5/1776861686169/Meeting+Min+Mar.pdf",
          "host": "static1.squarespace.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-06",
      "text": "The original New Mexico Tech minutes record March 6, 2026 direction and authority for continued evaluation of a Green Data Center opportunity. The separate April 17 approval of the minutes does not date construction, an executed lease or computing service.",
      "record": "Green Data Socorro Campus",
      "state": "New Mexico",
      "url": "/new-mexico/#green-data-socorro-county-nm",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.nmt.edu/leadership/docs/2026-03-06-nmt-bor-regular-mtg-minutes-final.pdf",
          "host": "www.nmt.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-05",
      "text": "The county report records a March 5, 2026 commission recommendation on Hassayampa Ranch Z250047. The recommendation and scheduled April 8 Board consideration do not establish a final Board vote, construction permits, a start of work or customer operation.",
      "record": "Hassayampa Ranch Data Center",
      "state": "Arizona",
      "url": "/arizona/#arizona-land-consulting-hassayampa-ranch-tonopah-az",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.maricopa.gov/AgendaCenter/ViewFile/Item/10211?fileID=99867",
          "host": "www.maricopa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-05",
      "text": "The March 5, 2026 publication date of the national laboratory account documents its report of the previously deployed Humpback Creek computing pilot. It is not the physical opening day or an exact deployment day.",
      "record": "Greensparc Cordova Data Center (Humpback Creek Hydro)",
      "state": "Alaska",
      "url": "/alaska/#greensparc-cordova-ak",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.nlr.gov/news/detail/program/2026/in-alaska-a-data-center-inside-a-power-plant-inside-a-microgrid",
          "host": "www.nlr.gov",
          "published": "2026-03-05",
          "date": "2026-03-05",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-02",
      "text": "The original wetlands notice of decisions attributes hearing scheduling for the 234 Riverside Avenue data center to the March 2, 2026 meeting. This dates the reported scheduling action only; it does not establish that the April 6 hearing occurred, its outcome or physical operation.",
      "record": "ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue)",
      "state": "Connecticut",
      "url": "/connecticut/#renew-riverside-bristol-ct",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.bristolct.gov/DocumentCenter/View/51048/03-02-post-online",
          "host": "www.bristolct.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-03-02",
      "text": "Core Scientific published results including a proposed combined power expansion across Dalton and Pecos. March 2 is the publication date. Fleet energized power and a combined expansion figure are not a Pecos opening or an individual site capacity.",
      "record": "Core Scientific Pecos AI Campus",
      "state": "Texas",
      "url": "/texas/#core-scientific-pecos-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://investors.corescientific.com/news-events/press-releases/detail/127/core-scientific-announces-fourth-quarter-fiscal-year-2025-results",
          "host": "investors.corescientific.com",
          "published": "2026-03-02",
          "date": "2026-03-02",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-03-02",
      "text": "Pennsylvania Office of Open Records issued its Kline Township records appeal determination March 2, 2026. It grants the appeal in part and dismisses part as moot. This is the dated records decision account, not an environmental permit ruling, project denial or proof of later compliance.",
      "record": "AWS Kline Township Data Center Campus",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#aws-kline-township-schuylkill-pa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.openrecords.pa.gov/Appeals/DocketGetFile.cfm?id=257197",
          "host": "www.openrecords.pa.gov",
          "published": "2026-03-02",
          "date": "2026-03-02",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-02-26",
      "text": "Signed Dorr Township minutes record authorization of a 12 month temporary moratorium on new or expanded data centers on February 26, 2026, by six votes to zero. This approval concerns the moratorium, not approval or cancellation of the Microsoft project, an operating shutdown or a verified legal effective day.",
      "record": "Microsoft Dorr Township Data Center",
      "state": "Michigan",
      "url": "/michigan/#microsoft-dorr-township-mi",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.dorrtownshipmi.gov/wp-content/uploads/2026/08/2-26-2026.pdf",
          "host": "www.dorrtownshipmi.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-02-26",
      "text": "The original Governor February 26, 2026 release announces Penzance Bedington Campus and reports a State designation. This dates the public account, without establishing an exact certificate execution day, physical construction, commissioned computing or delivered community benefits.",
      "record": "Bedington Campus",
      "state": "West Virginia",
      "url": "/west-virginia/#penzance-bedington-berkeley-county-wv",
      "kind": "announced",
      "sources": [
        {
          "url": "https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact",
          "host": "governor.wv.gov",
          "published": "2026-02-26",
          "date": "2026-02-26",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-02-24",
      "text": "Google announced Pine Island as a future data center location and an Xcel Energy partnership. Publication date; not an opening or construction-start milestone.",
      "record": "Google Project Skyway (Pine Island)",
      "state": "Minnesota",
      "url": "/minnesota/#google-skyway-pine-island-mn",
      "kind": "announced",
      "sources": [
        {
          "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-pine-island/",
          "host": "blog.google",
          "published": "2026-02-24",
          "date": "2026-02-24",
          "checked": "2026-10-16",
          "label": "Google reviewed primary source"
        }
      ]
    },
    {
      "date": "2026-02-23",
      "text": "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.",
      "record": "Caddo Parish Campus (with Amazon)",
      "state": "Louisiana",
      "url": "/louisiana/#stack-caddo-parish-la",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion",
          "host": "www.opportunitylouisiana.gov",
          "published": "2026-02-23",
          "date": "2026-02-23",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/",
          "host": "www.stackinfra.com",
          "published": "2026-02-23",
          "date": "2026-02-23",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-02-23",
      "text": "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.",
      "record": "Bossier Parish Campus (with Amazon)",
      "state": "Louisiana",
      "url": "/louisiana/#stack-bossier-parish-la",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion",
          "host": "www.opportunitylouisiana.gov",
          "published": "2026-02-23",
          "date": "2026-02-23",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/",
          "host": "www.stackinfra.com",
          "published": "2026-02-23",
          "date": "2026-02-23",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-02-23",
      "text": "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.",
      "record": "Amazon Web Services Caddo Parish Campus (Blanchard)",
      "state": "Louisiana",
      "url": "/louisiana/#aws-blanchard-caddo-parish-la",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion",
          "host": "www.opportunitylouisiana.gov",
          "published": "2026-02-23",
          "date": "2026-02-23",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/",
          "host": "www.stackinfra.com",
          "published": "2026-02-23",
          "date": "2026-02-23",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-02-23",
      "text": "The original State and STACK February 23, 2026 announcements identify the coordinated Caddo and Bossier campus development. This is the public statement day rather than first construction, computing operation or additional physical campuses for each company record.",
      "record": "Amazon Web Services Bossier Parish Campus (Benton)",
      "state": "Louisiana",
      "url": "/louisiana/#aws-benton-bossier-parish-la",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion",
          "host": "www.opportunitylouisiana.gov",
          "published": "2026-02-23",
          "date": "2026-02-23",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-data-center-developments-supporting-economic-growth-in-louisiana/",
          "host": "www.stackinfra.com",
          "published": "2026-02-23",
          "date": "2026-02-23",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-02-11",
      "text": "The original Butte Silver Bow committee page reports that the Council granted Sabey a six month extension on February 11, 2026. This is an extension account without independently read completion, an inferred expiration day or a computing commissioning date.",
      "record": "Sabey Data Centers Butte Campus (Montana Connections)",
      "state": "Montana",
      "url": "/montana/#sabey-butte-mt",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.bsbmt.gov/3468/Ad--Hoc-Data-Center-Impact-Committee",
          "host": "www.bsbmt.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-02-11",
      "text": "Van Buren Township Planning Commission granted Project Cannoli preliminary site plan approval with conditions, 5 to 2. This is a preliminary planning milestone, not final plan approval, an issued building permit, satisfied conditions or operation.",
      "record": "Project Cannoli",
      "state": "Michigan",
      "url": "/michigan/#project-cannoli-van-buren-township-wayne-county-mi",
      "kind": "approved",
      "sources": [
        {
          "url": "https://vbtmi.gov/Document_Center/Agendas%20&%20Minutes/Planning%20Commission/2024/Minutes/2-11-26%20PC%20Min.pdf",
          "host": "vbtmi.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "February 11, 2026 planning minutes, page 20: preliminary approval with conditions"
        }
      ]
    },
    {
      "date": "2026-02-05",
      "text": "The February 5, 2026 State clearinghouse receipt date records a notice of exemption for proposed lease renewal at the existing Vacaville data center. This is an administrative receipt date, not a physical opening, a construction start, an executed lease or proof of computing operation.",
      "record": "California Department of Technology Vacaville Data Center (1020 Vaquero Circle)",
      "state": "California",
      "url": "/california/#cdt-vacaville-data-center-ca",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ceqanet.lci.ca.gov/2026020164",
          "host": "ceqanet.lci.ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-02-04",
      "text": "DNREC published notice of a Coastal Zone Act status decision for the Starwood proposal on February 4, 2026. This dates publication of the decision notice, not its underlying decision day, an appeal outcome, construction or computing operation.",
      "record": "Project Washington (Starwood Digital Ventures)",
      "state": "Delaware",
      "url": "/delaware/#starwood-digital-project-washington-de",
      "kind": "announced",
      "sources": [
        {
          "url": "https://dnrec.delaware.gov/public-notices/cce20260043/",
          "host": "dnrec.delaware.gov",
          "published": "2026-02-04",
          "date": "2026-02-04",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-01-26",
      "text": "Barrington Hills published its informational meeting cancellation notice on January 26, 2026. The developer declined the presentation, the February 2 meeting was cancelled and the Village considered the matter closed. This is the notice date, not a verified January 28 legal withdrawal, permit denial or physical closure.",
      "record": "Brennan Barrington Hills Data Center",
      "state": "Illinois",
      "url": "/illinois/#brennan-barrington-hills-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://barringtonhills-il.gov/canceled-02-02-26-special-informational-plan-commission-meeting/",
          "host": "barringtonhills-il.gov",
          "published": "2026-01-26",
          "date": "2026-01-26",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-01-22",
      "text": "Servpac published its January 22, 2026 account of MTP Building 2 groundbreaking and construction. The account forecasts second quarter completion without establishing the exact ceremony day, accomplished completion or commissioned service.",
      "record": "Servpac MTP Building 2",
      "state": "Hawaii",
      "url": "/hawaii/#servpac-mtp2-mililani-hi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://servpac.com/mtp-groundbreaking/",
          "host": "servpac.com",
          "published": "2026-01-22",
          "date": "2026-01-22",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-01-20",
      "text": "The final City Council minutes record the January 20, 2026 denial of the conditional use ordinance and associated variances and owner agreement for the Karis Critical proposal. The motion passed six to one with two abstentions. This is the exact Council legal action date and does not independently establish physical computing closure, a general ban or permanent abandonment.",
      "record": "Karis Critical Naperville Data Center",
      "state": "Illinois",
      "url": "/illinois/#karis-critical-naperville-il",
      "kind": "denied",
      "sources": [
        {
          "url": "https://naperville.legistar.com/View.ashx?M=M&ID=1355597&GUID=3323A6F2-7A6B-4ACA-84C4-FF5AC63F6632",
          "host": "naperville.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2026-01-20",
      "text": "Pine Island reports initial Project Skyway land-use approvals: rezoning, annexation, final plat/development plan and conditional use permit. Initial phase only; separate electric-service approval, construction and operation are not established.",
      "record": "Google Project Skyway (Pine Island)",
      "state": "Minnesota",
      "url": "/minnesota/#google-skyway-pine-island-mn",
      "kind": "approved",
      "sources": [
        {
          "url": "https://pineislandmn.gov/skyway",
          "host": "pineislandmn.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "City of Pine Island reviewed primary source"
        }
      ]
    },
    {
      "date": "2026-01-20",
      "text": "Crow Holdings announced its Stemmons Corridor data center campus with CleanArc. January 20 is the release date. Initial building delivery in late 2027 remained a forecast, not a completed opening.",
      "record": "Crow Holdings Stemmons Corridor Data Center Campus",
      "state": "Texas",
      "url": "/texas/#crow-holdings-cleanarc-stemmons-dallas-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.crowholdings.com/insights/crow-holdings-announces-245mw-flagship-data-center-campus-in-central-dallas/",
          "host": "www.crowholdings.com",
          "published": "2026-01-20",
          "date": "2026-01-20",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-01-14",
      "text": "The original Project Spring page labels its account updated January 14, 2026 and describes potential development and preliminary review. This dates the project update rather than a completed land purchase, rezoning vote, physical construction or computing opening.",
      "record": "Project Spring (Sand Springs)",
      "state": "Oklahoma",
      "url": "/oklahoma/#google-spring-sand-springs-ok",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.projectspringok.com/",
          "host": "www.projectspringok.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-01-12",
      "text": "RadiusDC announced its Indianapolis colocation development on January 12, 2026. The original issuer account distinguishes planned Indy I from future Indy II. The announcement does not establish accomplished construction, actual utility load or a computing opening.",
      "record": "RadiusDC Plainfield Campus (Indy I / Indy II)",
      "state": "Indiana",
      "url": "/indiana/#radiusdc-plainfield-hendricks-county-in",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-expands-its-footprint-with-edge-colocation-campus-in-indianapolis-in",
          "host": "www.radius-dc.com",
          "published": "2026-01-12",
          "date": "2026-01-12",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-01-12",
      "text": "The original Patmos January 12, 2026 release announces financing for continued conversion and infrastructure work at its Kansas City campus. The loan announcement is separate from exact completion of the forecast March work or computing commissioning across the campus.",
      "record": "Patmos KC Star Building Campus",
      "state": "Missouri",
      "url": "/missouri/#patmos-kansas-city-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.patmos.tech/news/patmos-secures-100m-cpace",
          "host": "www.patmos.tech",
          "published": "2026-01-12",
          "date": "2026-01-12",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2026-01-08",
      "text": "The original Mississippi Governor January 8, 2026 release names MACROHARDRR and reports ongoing building rehabilitation. Its February operating forecast and incentive approval do not certify that computing operation began or that nearby power infrastructure is the same facility.",
      "record": "MACROHARDRR (xAI Southaven Data Center III)",
      "state": "Mississippi",
      "url": "/mississippi/#xai-macrohardrr-southaven-ms",
      "kind": "announced",
      "sources": [
        {
          "url": "https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/",
          "host": "governorreeves.ms.gov",
          "published": "2026-01-08",
          "date": "2026-01-08",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-12-22",
      "text": "Pennsylvania DEP published its Project Gravity informational meeting notice December 22, 2025. The notice scheduled a January 6, 2026 meeting and a comment deadline. A past scheduled date does not establish that the meeting occurred or that permits were approved.",
      "record": "Project Gravity",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#project-gravity-archbald-lackawanna-county-pa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.pa.gov/agencies/dep/newsroom/2025-12-22-dep-to-host-informational-public-meeting-for-project-gravity-data-center-in-lackawanna-county",
          "host": "www.pa.gov",
          "published": "2025-12-22",
          "date": "2025-12-22",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-12-19",
      "text": "The City of Southfield published its Metrobloks proposal statement on December 19, 2025, describing a recent Council approval and later permitting and oversight. This dates publication, not the exact vote day, construction commencement or computing operation.",
      "record": "Metrobloks Southfield Data Center",
      "state": "Michigan",
      "url": "/michigan/#metrobloks-southfield-mi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.cityofsouthfield.com/news/city-southfield-statement-regarding-proposed-data-center",
          "host": "www.cityofsouthfield.com",
          "published": "2025-12-19",
          "date": "2025-12-19",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-12-18",
      "text": "The Weitz Company published its named Lighthouse construction account December 18, 2025. This is the publication date of the contractor account and does not establish an exact excavation start, completion, delivered capacity or operation.",
      "record": "Stargate Lighthouse Campus",
      "state": "Wisconsin",
      "url": "/wisconsin/#stargate-port-washington-wi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.weitz.com/groundbreaking-marks-new-era-for-data-center-infrastructure-in-wisconsin/",
          "host": "www.weitz.com",
          "published": "2025-12-18",
          "date": "2025-12-18",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-12-17",
      "text": "Hut 8 announced a 245 MW IT lease for River Bend. This is a commercial announcement, not an opening or physical construction-start day.",
      "record": "Hut 8 River Bend AI Data Center Campus",
      "state": "Louisiana",
      "url": "/louisiana/#hut8-river-bend-west-feliciana-la",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.hut8.com/news-insights/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value",
          "host": "www.hut8.com",
          "published": "2025-12-17",
          "date": "2025-12-17",
          "checked": "2026-10-16",
          "label": "River Bend lease announcement"
        }
      ]
    },
    {
      "date": "2025-12-12",
      "text": "Sangha issuer release states that full energization of its Ector County mining facility was announced during a December 12, 2025 ribbon ceremony and describes mining operation at the site. This is an attributed historical company report, not independent certification of current occupancy or all subsequent phases.",
      "record": "Sangha Renewables Ector County Bitcoin Mining Facility",
      "state": "Texas",
      "url": "/texas/#sangha-renewables-ector-county-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/sangha-renewables-inaugurates-20-mw-project-in-west-texas-energized-by-totalenergies-302639872.html",
          "host": "www.prnewswire.com",
          "published": "2025-12-12",
          "date": "2025-12-12",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-12-10",
      "text": "The city Notice of Determination records approval of the Rue Ferrari site development permit amendment on December 10, 2025. The source describes research and laboratory use. It does not establish an operating data center or an opening date.",
      "record": "Prologis 5853 Rue Ferrari",
      "state": "California",
      "url": "/california/#prologis-rue-ferrari-san-jose-ca",
      "kind": "approved",
      "sources": [
        {
          "url": "https://ceqanet.lci.ca.gov/2022010266/2",
          "host": "ceqanet.lci.ca.gov",
          "published": "2025-12-18",
          "date": "2025-12-18",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-12-08",
      "text": "DeKalb March 18, 2026 project table records City Council approval of Project Vector annexation, annexation agreement, rezoning and concept plan on December 8, 2025. Planning Commission recommendation on December 1 is separate. This is land use approval, not a physical construction start, building permit or opening.",
      "record": "Edged DeKalb Campus (Project Vector)",
      "state": "Illinois",
      "url": "/illinois/#edged-dekalb-project-vector-il",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-",
          "host": "www.cityofdekalb.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-12-05",
      "text": "Wythe County current project page identifies December 5, 2025 as the Solis Arx Progress Park project announcement day. The account is a development announcement, not a construction start, final building permit or data center opening.",
      "record": "Solis Arx Progress Park Data Center Campus",
      "state": "Virginia",
      "url": "/virginia/#solis-arx-progress-park-wythe-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.wytheco.org/418/Solis-ArxFluidstack",
          "host": "www.wytheco.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-11-21",
      "text": "The official November 22, 2025 EDA release caption dates the Chantilly Premier groundbreaking ceremony to November 21. The body says today; the caption supplies the selected ceremony day. This dates a reported ceremony, not the exact first physical work day, current stage or computing operation.",
      "record": "Chantilly Premier",
      "state": "Virginia",
      "url": "/virginia/#penzance-chantilly-premier-fairfax-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://fairfaxcountyeda.org/fairfax-county-penzance-officials-break-ground-next-generation-digital-infrastructure-project-to-power-the-worlds-deep-tech-future/",
          "host": "fairfaxcountyeda.org",
          "published": "2025-11-22",
          "date": "2025-11-22",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-11-20",
      "text": "CleanArc reported the start of construction at its VA1 campus in Caroline County. Announced capacity and delivery dates remain separate forecasts.",
      "record": "CleanArc VA1",
      "state": "Virginia",
      "url": "/virginia/#cleanarc-ruther-glen-va",
      "kind": "construction_start",
      "sources": [
        {
          "url": "https://www.cleanarcdatacenters.com/press-release/cleanarc-data-centers-breaks-ground-on-900mw-flagship-hyperscale-campus-in-virginia-2-2/2/",
          "host": "www.cleanarcdatacenters.com",
          "published": "2025-11-20",
          "date": "2025-11-20",
          "checked": "2026-10-15",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-11-20",
      "text": "The original Amazon Warren County release has publication metadata dated November 20, 2025 and announces plans for the campus. This is an issuer statement date rather than computing commissioning, installed capacity or an independently verified construction start.",
      "record": "AWS Project Steamboat - Warren County Data Center Campus",
      "state": "Mississippi",
      "url": "/mississippi/#aws-project-steamboat-warren-county-ms",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.aboutamazon.com/news/company-news/amazon-3-billion-mississippi-data-center-investment",
          "host": "www.aboutamazon.com",
          "published": "2025-11-20",
          "date": "2025-11-20",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-11-18",
      "text": "San Jose Council minutes record adoption of Resolution RES2025 395 on November 18, 2025, selecting Prologis as preferred developer and authorizing exclusive negotiations for the wastewater facility buffer lands. The action includes climate, recycled water, habitat and workforce negotiation directions. This is selection and negotiation authority, not final project entitlements, construction authorization or operation.",
      "record": "Prologis STEM Park",
      "state": "California",
      "url": "/california/#prologis-stem-park-zanker-road-san-jose-ca",
      "kind": "approved",
      "sources": [
        {
          "url": "https://sanjose.legistar.com/View.ashx?G=920296E4-80BE-4CA2-A78F-32C5EFCF78AF&GUID=3BA48E4A-A115-4917-A5FA-E341AC37105E&ID=1328261&M=M",
          "host": "sanjose.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-11-18",
      "text": "Pennsylvania DEP issued its Homer City plan approval comment response document dated November 18, 2025. It expressly distinguishes the generating station authorization from any data center authorization. This records the dated agency document, not a data center approval or opening.",
      "record": "Homer City Energy Campus",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#homer-city-energy-campus-pa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://files.dep.state.pa.us/RegionalResources/NWRO/NWROPortalFiles/Homer-City/Air/Final-AQ-Plan-Approval/Final%20Comment%20Response%20Document%2020251118.pdf",
          "host": "files.dep.state.pa.us",
          "published": "2025-11-18",
          "date": "2025-11-18",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-11-17",
      "text": "DOE signed its Batch 1 Portsmouth proposed property lease categorical exclusion determination November 17, 2025. This dates the agency property transfer review, not an executed computing lease, construction approval or operating campus.",
      "record": "PORTS-Pike Technology Campus",
      "state": "Ohio",
      "url": "/ohio/#new-day-ports-technology-campus-piketon-oh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.energy.gov/nepa/articles/cx-270875-4511a-086-lease-real-property-batch-1-property-portsmouth-gaseous-diffusion",
          "host": "www.energy.gov",
          "published": "2025-11-17",
          "date": "2025-11-17",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.energy.gov/sites/default/files/2025-11/CX-270875.pdf",
          "host": "www.energy.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-11-15",
      "text": "The original DEQ cover and permit state that Kraken permit 5262-05 became final and effective on November 15, 2025. This is an administrative permit date rather than a first computing opening or measured compliance finding.",
      "record": "NYDIG DFM Kraken Central Site",
      "state": "Montana",
      "url": "/montana/#nydig-dfm-kraken-richland-mt",
      "kind": "announced",
      "sources": [
        {
          "url": "https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5262-05.pdf",
          "host": "deq.mt.gov",
          "published": "2025-11-17",
          "date": "2025-11-17",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-11-12",
      "text": "Microsoft published its named Fairwater Atlanta operating account on November 12, 2025. The source reports operation beginning in October without an exact day. November 12 is the publication date, not a manufactured opening day or an operating certification for every Georgia campus.",
      "record": "Microsoft Fairwater Atlanta (Azure AI Superfactory)",
      "state": "Georgia",
      "url": "/georgia/#microsoft-fairwater-fayetteville-ga",
      "kind": "announced",
      "sources": [
        {
          "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
          "host": "news.microsoft.com",
          "published": "2025-11-12",
          "date": "2025-11-12",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-11-12",
      "text": "Meta announced its Beaver Dam data center development. This is the release date, not a construction start or an opening day.",
      "record": "Meta Beaver Dam Data Center Campus",
      "state": "Wisconsin",
      "url": "/wisconsin/#meta-beaver-dam-wi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2025/11/hello-beaver-dam/",
          "host": "datacenters.atmeta.com",
          "published": "2025-11-12",
          "date": "2025-11-12",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-11-06",
      "text": "Vantage published its VA4 campus announcement on November 6, 2025 and reported a groundbreaking celebration held that day. This records the company release and ceremony account, not an independently verified physical construction start, completed phase or data center opening.",
      "record": "Vantage Data Centers VA4 Stafford Campus",
      "state": "Virginia",
      "url": "/virginia/#vantage-stafford-va4-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-invests-2b-in-fredericksburg-virginia-region-to-deliver-fourth-campus-in-the-commonwealth/?trk=article-ssr-frontend-pulse_little-text-block",
          "host": "vantage-dc.com",
          "published": "2025-11-06",
          "date": "2025-11-06",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-11-05",
      "text": "Deep Green published its Lansing proposal announcement on November 5, 2025. The stated future construction window depended on approvals and is not an accomplished start or current service finding.",
      "record": "Deep Green Lansing Data Center",
      "state": "Michigan",
      "url": "/michigan/#deep-green-lansing-mi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://deepgreen.energy/news/deep-green-proposes-120-million-sustainable-data-center-investment-in-downtown-lansing",
          "host": "deepgreen.energy",
          "published": "2025-11-05",
          "date": "2025-11-05",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-11-05",
      "text": "Evolve and CloudBurst announced groundbreaking for the San Marcos campus. November 5 is the release date. The future first phase service target is not an observed opening, current construction inspection or delivered IT capacity.",
      "record": "CloudBurst San Marcos GigaCenter",
      "state": "Texas",
      "url": "/texas/#cloudburst-san-marcos-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas",
          "host": "evolveincorporated.com",
          "published": "2025-11-05",
          "date": "2025-11-05",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-10-30",
      "text": "The original Washington Department of Ecology site register dated October 30, 2025 describes prospective purchaser cleanup negotiations with STACK for proposed computing reuse at Columbia Gorge Aluminum. This dates the agency publication rather than an executed decree, completed cleanup, construction start or computing opening.",
      "record": "STACK Infrastructure Goldendale Data Center",
      "state": "Washington",
      "url": "/washington/#stack-infrastructure-goldendale-data-center-wa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://apps.ecology.wa.gov/publications/documents/2509041v.pdf",
          "host": "apps.ecology.wa.gov",
          "published": "2025-10-30",
          "date": "2025-10-30",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-10-30",
      "text": "Crusoe announced the Blue Energy partnership for a future campus near the Port of Victoria. October 30, 2025 is the release date confirmed by its newsroom. Future gas service and nuclear generation targets are not a completed opening or nuclear construction authorization.",
      "record": "Crusoe Victoria AI Factory",
      "state": "Texas",
      "url": "/texas/#crusoe-blue-energy-victoria-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.crusoe.ai/resources/newsroom/blue-energy-and-crusoe-partner-to-develop-nuclear-powered-ai-data-center",
          "host": "www.crusoe.ai",
          "published": "2025-10-30",
          "date": "2025-10-30",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.crusoe.ai/resources/newsroom?18bea8f7_page=3&1fdf54dd_page=2",
          "host": "www.crusoe.ai",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-10-30",
      "text": "The City Mayor update reports that Alterra presented MTEC to the Local Development Finance Authority on October 30, 2025 and that the authority agreed to enter a purchase agreement. This dates the reported administrative action, not completed purchase, final approval, construction or computing operation.",
      "record": "Alterra Marshall Technology & Energy Center",
      "state": "Michigan",
      "url": "/michigan/#alterra-development-marshall-mi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.cityofmarshall.com/DocumentCenter/View/2300/Statement-Regarding-MTEC-Update-May-2026",
          "host": "www.cityofmarshall.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-10-28",
      "text": "The original Missouri and Lambda October 28, 2025 releases announce a proposed Kansas City factory conversion and forecast an early 2026 launch. This dates the proposal announcement without certifying the forecast was accomplished or particular computing equipment was installed.",
      "record": "Lambda Kansas City AI Supercomputer",
      "state": "Missouri",
      "url": "/missouri/#lambda-kansas-city-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city",
          "host": "ded.mo.gov",
          "published": "2025-10-28",
          "date": "2025-10-28",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo",
          "host": "lambda.ai",
          "published": "2025-10-28",
          "date": "2025-10-28",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-10-14",
      "text": "The University published its HiPerGator generation unveiling account October 14, 2025 at East Campus. This is the original publication and named system account, not first opening of the whole data center or proof that every later storage migration was completed.",
      "record": "University of Florida Data Center (East Campus, HiPerGator)",
      "state": "Florida",
      "url": "/florida/#university-of-florida-data-center-gainesville-fl",
      "kind": "announced",
      "sources": [
        {
          "url": "https://news.ufl.edu/2025/10/hipergator-4-unveiling/",
          "host": "news.ufl.edu",
          "published": "2025-10-14",
          "date": "2025-10-14",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-10-13",
      "text": "The Google October 13, 2025 update reports continued construction of two Dorchester sites. This dates that historical construction account and does not establish exact current Ridgeville operation.",
      "record": "Google Ridgeville Data Center (Project Dawson)",
      "state": "South Carolina",
      "url": "/south-carolina/#google-ridgeville-sc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/",
          "host": "blog.google",
          "published": "2025-10-13",
          "date": "2025-10-13",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-10-10",
      "text": "Microsoft dated its Caledonia site project update October 10, 2025, saying it would not proceed with that particular site while continuing regional site work. This is the dated company update, not an exact legal withdrawal day, a physical facility shutdown or the closure of other Racine projects.",
      "record": "Project Nova Data Center Campus (Caledonia)",
      "state": "Wisconsin",
      "url": "/wisconsin/#microsoft-project-nova-caledonia-wi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-racine-county/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-10-07",
      "text": "Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 769 25 for the Florence Tech Park PUD amendment. The action adds data centers within a broader light industrial use framework and is separate from individual building permits, utility delivery and operation.",
      "record": "Florence Tech Park",
      "state": "Arizona",
      "url": "/arizona/#ryan-companies-florence-tech-park-az",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf",
          "host": "www.florenceaz.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-10-07",
      "text": "Town of Florence minutes report a seven to zero vote on October 7, 2025 adopting Ordinance 766 25 for the Dobson Farms East general plan place type change. This broad land use action is not a final individual data center entitlement, construction permit or opening.",
      "record": "Dobson Farms East",
      "state": "Arizona",
      "url": "/arizona/#edgecore-dobson-farms-east-florence-az",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.florenceaz.gov/wp-content/uploads/2025/08/November-4-2025-Agenda_Packet.pdf",
          "host": "www.florenceaz.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-10-07",
      "text": "The County project account reports that the Board denied removal of the previously proffered site plan on October 7, 2025. Later concept consistency review was not formal site plan approval. The denial concerns the proffer request and does not establish physical shutdown of a data center.",
      "record": "Cabin Field Road Data Center",
      "state": "Virginia",
      "url": "/virginia/#mesh-capital-cabin-field-road-data-center-campbell-va",
      "kind": "denied",
      "sources": [
        {
          "url": "https://www.campbellcountyva.gov/868/Community-Development-Cabin-Field-Road-S",
          "host": "www.campbellcountyva.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-10-06",
      "text": "Hall County staff account records an October 6, 2025 Planning Commission recommendation for Project Turbo with ten conditions by three affirmative votes, with one recusal and one absence. The recommendation does not establish a final Board approval or computing commissioning.",
      "record": "Project Turbo (Gainesville Data Center)",
      "state": "Georgia",
      "url": "/georgia/#project-turbo-okelly-road-gainesville-ga",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf",
          "host": "nyc3.digitaloceanspaces.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-10-06",
      "text": "CoreSite published a DE3 construction-progress announcement reporting a topping-off milestone. This is the publication day; the exact physical topping-off day and opening day are not established.",
      "record": "CoreSite DE3",
      "state": "Colorado",
      "url": "/colorado/#coresite-de3-denver-co",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.coresite.com/news/coresite-achieves-key-construction-milestone-for-new-de3-data-center-in-denver",
          "host": "www.coresite.com",
          "published": "2025-10-06",
          "date": "2025-10-06",
          "checked": "2026-10-16",
          "label": "CoreSite official construction progress announcement"
        }
      ]
    },
    {
      "date": "2025-10-02",
      "text": "Google and Entergy announced the West Memphis development within a wider Arkansas infrastructure investment. This is an announcement, not a construction start, opening or site-only investment allocation.",
      "record": "Google West Memphis Data Center Campus",
      "state": "Arkansas",
      "url": "/arkansas/#google-west-memphis-ar",
      "kind": "announced",
      "sources": [
        {
          "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
          "host": "blog.google",
          "published": "2025-10-02",
          "date": "2025-10-02",
          "checked": "2026-10-16",
          "label": "Original Arkansas infrastructure announcement"
        },
        {
          "url": "https://www.entergy.com/news/entergy-arkansas-powers-googles-4b-investment-in-the-state",
          "host": "www.entergy.com",
          "published": "2025-10-02",
          "date": "2025-10-02",
          "checked": "2026-10-16",
          "label": "Original Entergy announcement"
        }
      ]
    },
    {
      "date": "2025-10-01",
      "text": "The City of Altoona economic development site published its Tract campus announcement on October 1, 2025. The account describes planned development and prior land use work without independently establishing actual computing construction or service.",
      "record": "Tract Altoona Technology Park",
      "state": "Iowa",
      "url": "/iowa/#tract-altoona-ia",
      "kind": "announced",
      "sources": [
        {
          "url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/",
          "host": "altoonanow.org",
          "published": "2025-10-01",
          "date": "2025-10-01",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-09-30",
      "text": "Crusoe published its named Abilene Stargate first phase operational account on September 30, 2025. It reported early training and inference workloads on Oracle Cloud Infrastructure. This dates the issuer release rather than an inferred first workload or whole campus opening day.",
      "record": "Stargate Abilene",
      "state": "Texas",
      "url": "/texas/#stargate-abilene-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
          "host": "www.crusoe.ai",
          "published": "2025-09-30",
          "date": "2025-09-30",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-09-30",
      "text": "DOE published its Oak Ridge AI infrastructure solicitation September 30, 2025. A request for proposals and its later response deadline are not a lease award, construction start or operating facility.",
      "record": "Oak Ridge Reservation AI Data Center Sites (DOE land lease)",
      "state": "Tennessee",
      "url": "/tennessee/#doe-oak-ridge-reservation-ai-data-centers-tn",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.energy.gov/em/articles/us-energy-department-seeks-proposals-ai-data-centers-energy-projects-oak-ridge",
          "host": "www.energy.gov",
          "published": "2025-09-30",
          "date": "2025-09-30",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-09-30",
      "text": "Crusoe published its first phase Abilene operational announcement on September 30, 2025, saying that phase was up and running on Oracle Cloud Infrastructure. This is the release date, not the exact first workload or opening day, and does not certify completion of the entire planned campus.",
      "record": "Lancium Clean Campus (Crusoe / Stargate Site 1)",
      "state": "Texas",
      "url": "/texas/#lancium-crusoe-abilene-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live",
          "host": "www.crusoe.ai",
          "published": "2025-09-30",
          "date": "2025-09-30",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-09-23",
      "text": "The original SoftBank joint issuer publication carries a Texas September 23, 2025 dateline announcing the Lordstown Stargate selection, with host publication on September 24. This dates the announcement account and does not establish the exact groundbreaking day or achievement of the projected 2026 opening.",
      "record": "Stargate Lordstown Campus",
      "state": "Ohio",
      "url": "/ohio/#stargate-lordstown-oh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://group.softbank/en/news/press/20250924",
          "host": "group.softbank",
          "published": "2025-09-24",
          "date": "2025-09-24",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-09-19",
      "text": "The original Sequitor Edge September 19, 2025 release announces its Kearney development proposal and reports parcel sale approval. This is the issuer publication day rather than a verified earlier City vote, completed sale, construction or the forecast early 2027 computing opening.",
      "record": "Sequitor Edge Kearney Data Center",
      "state": "Nebraska",
      "url": "/nebraska/#sequitor-edge-kearney-ne",
      "kind": "announced",
      "sources": [
        {
          "url": "https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/",
          "host": "sequitoredge.com",
          "published": "2025-09-19",
          "date": "2025-09-19",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-09-18",
      "text": "The original LM Funding September 18, 2025 release reports closing acquisition of the Columbus mining site and equipment. The statement dates the reported transaction without changing corporate roles, certifying present mining output or dating the facility first opening.",
      "record": "Columbus Bitcoin Mining Facility (formerly Greenidge Columbus)",
      "state": "Mississippi",
      "url": "/mississippi/#greenidge-columbus-ms",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.power-compute.com/investors/news-events/press-releases/detail/168/lm-funding-america-closes-acquisition-of-11-mw-site-and",
          "host": "www.power-compute.com",
          "published": "2025-09-18",
          "date": "2025-09-18",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-09-15",
      "text": "Hall County staff account records five people speaking in opposition at the September 15, 2025 Planning Commission public hearing on Project Turbo. This dates the recorded hearing episode rather than the first concern, a final project disposition or measured impacts.",
      "record": "Project Turbo (Gainesville Data Center)",
      "state": "Georgia",
      "url": "/georgia/#project-turbo-okelly-road-gainesville-ga",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf",
          "host": "nyc3.digitaloceanspaces.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-09-10",
      "text": "Operator reported opening: September 11 release explicitly describes the opening celebration as yesterday; independent commissioning and all halls are not certified.",
      "record": "Edged Columbus",
      "state": "Ohio",
      "url": "/ohio/#edged-columbus-new-albany-oh",
      "kind": "operator_reported_opening",
      "sources": [
        {
          "url": "https://edged.us/news/columbus-grand-opening",
          "publisher": "Edged US"
        }
      ]
    },
    {
      "date": "2025-09-09",
      "text": "The September 9, 2025 publication date of the original Ameresco release announces plans with the Navy and CyrusOne for a computing facility at NAS Lemoore while agreements were being finalized. It is not an executed agreement, actual construction commencement, delivered generation or a physical opening.",
      "record": "CyrusOne AI Data Center at NAS Lemoore",
      "state": "California",
      "url": "/california/#cyrusone-nas-lemoore-ca",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ir.ameresco.com/news-events/press-releases/detail/715/ameresco-and-u-s-navy-partner-to-build-ai-optimized-data",
          "host": "ir.ameresco.com",
          "published": "2025-09-09",
          "date": "2025-09-09",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-09-04",
      "text": "RadiusDC published its Nashville I announcement September 4, 2025, reporting a ceremony that day. This records that dated company account and planned development, not independent proof of physical excavation or fulfillment of its 2026 opening forecast.",
      "record": "RadiusDC Nashville I",
      "state": "Tennessee",
      "url": "/tennessee/#radiusdc-nashville-i-tn",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-breaks-ground-on-largest-data-center-in-nashville",
          "host": "www.radius-dc.com",
          "published": "2025-09-04",
          "date": "2025-09-04",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-09-02",
      "text": "The September 2, 2025 minutes record a hearing on the Cabin Field Road request and a vote delaying action to October 7. The separate solar permit denial on the preceding agenda item is unrelated. This does not establish physical construction or closure.",
      "record": "Cabin Field Road Data Center",
      "state": "Virginia",
      "url": "/virginia/#mesh-capital-cabin-field-road-data-center-campbell-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.campbellcountyva.gov/AgendaCenter/ViewFile/ArchivedMinutes/_09022025-600",
          "host": "www.campbellcountyva.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-08-26",
      "text": "The original Port KC August 26, 2025 release announces the planned Kestrel Northland campus and forecasts first phase construction in 2026. This is an announcement date without proof the future construction start, full buildout or computing operation occurred.",
      "record": "Project Kestrel",
      "state": "Missouri",
      "url": "/missouri/#shenandoah-project-kestrel-kc-northland-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/",
          "host": "portkc.com",
          "published": "2025-08-26",
          "date": "2025-08-26",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-08-26",
      "text": "The City of Hutchinson FAQ reports that Council approved the named data center project final permits August 26, 2025. This dates the City administrative account, without independent certification of an issued building permit, physical construction or computing service.",
      "record": "AAIM Data Centers  -  Hutchinson (Minnesota 2 Energy Park)",
      "state": "Minnesota",
      "url": "/minnesota/#aaim-data-centers-hutchinson-mn",
      "kind": "approved",
      "sources": [
        {
          "url": "https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf",
          "host": "hutchinsonmn.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-08-21",
      "text": "EdgeConneX announced a Chicago AI facility development for Lambda alongside a separate Atlanta program. August 21, 2025 is the release date. The forecast 2026 service target and existing Chicago air cooled site do not establish that the new AI facility opened.",
      "record": "Lambda Chicago EdgeConneX AI Factory",
      "state": "Illinois",
      "url": "/illinois/#lambda-chicago-edgeconnex-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.edgeconnex.com/news/press-releases/edgeconnex-and-lambda-to-build-ai-factory-in-chicago-with-industry-leading-high-density-data-center-infrastructure/",
          "host": "www.edgeconnex.com",
          "published": "2025-08-21",
          "date": "2025-08-21",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-08-19",
      "text": "The original Saint Charles August 19, 2025 Council minutes record the Cumulus application as withdrawn by the applicant and state no Council action was required. This is the dated City record of the proposal outcome, without adopting the unread letter date, a Council denial or physical computing closure.",
      "record": "Project Cumulus (St. Charles)",
      "state": "Missouri",
      "url": "/missouri/#crg-project-cumulus-st-charles-mo",
      "kind": "withdrawn",
      "sources": [
        {
          "url": "https://www.stcharlescitymo.gov/AgendaCenter/ViewFile/Minutes/_08192025-1737",
          "host": "www.stcharlescitymo.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-08-07",
      "text": "The Port Authority FAQ reports City Council approval of project site annexation August 7, 2025. This is its bounded government account of that municipal action, not approval or operation of the data center, certification of every annexed parcel or a change to Atlas jurisdiction fields.",
      "record": "AWS Wilmington Data Center Campus",
      "state": "Ohio",
      "url": "/ohio/#aws-wilmington-clinton-oh",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.chooseclintoncountyoh.org/news/data-center-faqs",
          "host": "www.chooseclintoncountyoh.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-08-06",
      "text": "Edged published the Ankeny structural framework milestone account August 6, 2025. The release reports a topping out event the previous day, while full operation remains an end of 2026 target. This publication date is not a facility opening or exact commissioning day.",
      "record": "Edged Ankeny (Des Moines) Data Center",
      "state": "Iowa",
      "url": "/iowa/#edged-energy-ankeny-ia",
      "kind": "announced",
      "sources": [
        {
          "url": "https://edged.us/news/edged-tops-out-ultra-efficient-sustainable-data-center-in-des-moines-iowa-optimized-for-ai-inference-at-scale",
          "host": "edged.us",
          "published": "2025-08-06",
          "date": "2025-08-06",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-07-31",
      "text": "Holtec published its HI CLOUD redevelopment announcement July 31, 2025. This is the company publication date, not an exact construction start, data center opening or new reactor licensing event.",
      "record": "Holtec HI-CLOUD Indian Point data center campus (proposed)",
      "state": "New York",
      "url": "/new-york/#holtec-hi-cloud-indian-point-buchanan-ny",
      "kind": "announced",
      "sources": [
        {
          "url": "https://holtecinternational.com/hh-40-16/",
          "host": "holtecinternational.com",
          "published": "2025-07-31",
          "date": "2025-07-31",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-07-28",
      "text": "Port KC board unanimously authorized up to $10 billion in Project Mica taxable revenue bonds and related documents. This is financing authorization, not proof of issuance, a $10 billion subsidy, construction permission or operation.",
      "record": "Project Mica",
      "state": "Missouri",
      "url": "/missouri/#google-project-mica-kc-northland-mo",
      "kind": "approved",
      "sources": [
        {
          "url": "https://portkc.com/wp-content/uploads/2025/08/2025-07-28-Board-of-Commissioners-Meeting-Minutes.pdf",
          "host": "portkc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "July 28 2025 board minutes, page3 financing vote"
        }
      ]
    },
    {
      "date": "2025-07-24",
      "text": "EdgeCore announced $235 million ABS financing backed by stabilized, leased PH01 (26 MW reported IT). This is a financing announcement, not a physical opening day, expenditure or incentive.",
      "record": "EdgeCore Mesa Data Center Campus",
      "state": "Arizona",
      "url": "/arizona/#edgecore-mesa-az",
      "kind": "announced",
      "sources": [
        {
          "url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-completes-235-million-abs-financing",
          "host": "edgecore.com",
          "published": "2025-07-24",
          "date": "2025-07-24",
          "checked": "2026-10-16",
          "label": "Dated operator announcement"
        }
      ]
    },
    {
      "date": "2025-07-15",
      "text": "Vantage dated its original NV1 campus announcement July 15, 2025. The announcement projects a first building opening in the second quarter of 2026. This records the announcement day without treating that forecast as an accomplished opening or commissioning.",
      "record": "Vantage Data Centers NV1",
      "state": "Nevada",
      "url": "/nevada/#vantage-nv1-storey-county-nv",
      "kind": "announced",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/",
          "host": "vantage-dc.com",
          "published": "2025-07-15",
          "date": "2025-07-15",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-07-14",
      "text": "The original TDLR record dates registration of the AUS02 accessibility project July 14, 2025. Review Complete is an administrative review label and planned construction dates are not actual completion or computing operation.",
      "record": "AUS02 / Cedar Creek Campus",
      "state": "Texas",
      "url": "/texas/#edgeconnex-cedar-creek-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025023484",
          "host": "www.tdlr.texas.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-07-03",
      "text": "On July 3, 2025 the Town published an account of an Atlas Capital Group conceptual data center proposal at 132 Griffin Road North. This dates the Town publication, not presentation day, formal approval or physical work.",
      "record": "Atlas Capital Group Data Center (132 Griffin Road North)",
      "state": "Connecticut",
      "url": "/connecticut/#atlas-capital-bloomfield-ct",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.bloomfieldct.gov/m/newsflash/Archive/Item/201?arcId=344",
          "host": "www.bloomfieldct.gov",
          "published": "2025-07-03",
          "date": "2025-07-03",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-06-24",
      "text": "The Governor June 24, 2025 release announces the named Cielo Gaffney development. This dates the public announcement rather than physical construction or computing commissioning.",
      "record": "Cielo Digital Infrastructure Gaffney Campus",
      "state": "South Carolina",
      "url": "/south-carolina/#cielo-gaffney-cherokee-county-sc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development",
          "host": "governor.sc.gov",
          "published": "2025-06-24",
          "date": "2025-06-24",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-06-17",
      "text": "Pima County April 23, 2026 memorandum recounts the Board June 17, 2025 approval of the Project Blue specific plan zoning change and land acquisition agreement. This is a land use and agreement action, separate from construction, permit issuance and operation.",
      "record": "Project Blue",
      "state": "Arizona",
      "url": "/arizona/#beale-project-blue-pima-county-az",
      "kind": "approved",
      "sources": [
        {
          "url": "https://content.civicplus.com/api/assets/32428b1b-4a81-444a-92a4-72b1fa039655",
          "host": "content.civicplus.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-06-10",
      "text": "Yorkville Project Cardinal page explicitly records the June 10, 2025 annexation agreement public hearing as held, with public comments taken and the hearing closed. This is the hearing outcome only, not annexation approval, a building permit, a site closure or physical construction.",
      "record": "Project Cardinal Data Center Campus",
      "state": "Illinois",
      "url": "/illinois/#project-cardinal-yorkville-il",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne",
          "host": "www.yorkville.il.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-06-10",
      "text": "IBM published its Poughkeepsie quantum platform service and future Starling roadmap account June 10, 2025. This records the dated company publication, not an exact existing facility opening day or accomplishment of the future Starling system.",
      "record": "IBM Quantum Data Center, Poughkeepsie",
      "state": "New York",
      "url": "/new-york/#ibm-quantum-data-center-poughkeepsie-ny",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.ibm.com/quantum/blog/large-scale-ftqc",
          "host": "www.ibm.com",
          "published": "2025-06-10",
          "date": "2025-06-10",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-06-09",
      "text": "Falls Township published its Amazon campus and revised land development approval account June 9, 2025. The Township describes earlier March approvals without an exact voting day in this account. This is the publication date, not a data center opening or precise construction start.",
      "record": "Amazon Web Services Innovation Campus, Falls Township",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#aws-falls-township-pa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.fallstwp.com/resources/news/article/?id=10070",
          "host": "www.fallstwp.com",
          "published": "2025-06-09",
          "date": "2025-06-09",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-06-05",
      "text": "Oppidan published its June 5, 2025 account of the Connect Eagan groundbreaking and described the ground up project as underway. This dates issuer publication and reported construction context, not an independently established first work day, completion or commissioned computing.",
      "record": "Connect Data Centers - Eagan (powered by Oppidan)",
      "state": "Minnesota",
      "url": "/minnesota/#connect-data-centers-eagan-mn",
      "kind": "announced",
      "sources": [
        {
          "url": "https://oppidan.com/blog/connect-data-centers-powered-by-oppidan-breaks-ground-on-new-data-center-in-eagan",
          "host": "oppidan.com",
          "published": "2025-06-05",
          "date": "2025-06-05",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-06-04",
      "text": "Northern Data published its Pittsburgh AI and HPC opening announcement June 4, 2025. The account describes phased future capacity. This records the company announcement and does not resolve the different scope of the later general State policy wording or certify current operation of every expansion phase.",
      "record": "Ardent Data Centers Pittsburgh (McKees Rocks)",
      "state": "Pennsylvania",
      "url": "/pennsylvania/#ardent-pittsburgh-mckees-rocks-pa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://northerndata.de/eqs-news-test/northern-data-group-announces-opening-of-next-generation-ai-and-high-performance-68f477cf-en",
          "host": "northerndata.de",
          "published": "2025-06-04",
          "date": "2025-06-04",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-05-22",
      "text": "The May 22, 2025 State Properties Review Board minutes record a DAS BITS project update for the Groton data center at Building 230. The update discusses continued use and a future timeline, not a new physical opening or a completed relocation.",
      "record": "State of Connecticut Groton Data Center (Pfizer campus Building 230)",
      "state": "Connecticut",
      "url": "/connecticut/#ct-das-groton-data-center-ct",
      "kind": "announced",
      "sources": [
        {
          "url": "https://portal.ct.gov/das/-/media/das/state-properties-review-board/agendas-and-meetings/2025/2025-05-22mapp.pdf?rev=1c884d1c4b974a93ba45d0eefa1a0e43",
          "host": "portal.ct.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-05-22",
      "text": "The original NETL May 22, 2025 release explicitly reports ongoing CSE building construction in Morgantown. This dates the agency statement without establishing an exact construction start, future relocation of existing systems or present commissioned operation.",
      "record": "NETL Computational Science and Engineering Center",
      "state": "West Virginia",
      "url": "/west-virginia/#netl-computational-science-engineering-center-morgantown-wv",
      "kind": "announced",
      "sources": [
        {
          "url": "https://netl.doe.gov/node/14819",
          "host": "netl.doe.gov",
          "published": "2025-05-22",
          "date": "2025-05-22",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-05-13",
      "text": "CyrusOne published its Wood Dale topping out release on May 13, 2025, reporting that the final structural beam was raised that day. This records the dated construction account and ceremony, not a data center opening, completed campus or proof of current operating service.",
      "record": "CyrusOne Wood Dale Campus",
      "state": "Illinois",
      "url": "/illinois/#cyrusone-chi6-wood-dale-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.cyrusone.com/resources/press-releases/cyrusone-celebrates-wood-dale-topping-out-ceremony",
          "host": "www.cyrusone.com",
          "published": "2025-05-13",
          "date": "2025-05-13",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-05-05",
      "text": "MARA published its April mining update on May 5, 2025 and reported energized gas to power operations across Texas and North Dakota wellheads. This dates a company fleet report, not an exact commissioning day or current operation at one inherited map point.",
      "record": "MARA Flared/Stranded-Gas Mining Fleet (TX + ND)",
      "state": "Texas",
      "url": "/texas/#mara-flared-gas-fleet-tx-nd",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ir.mara.com/news-events/press-releases/detail/1394/mara-announces-bitcoin-production-and-mining-operation-updates-for-april-2025",
          "host": "ir.mara.com",
          "published": "2025-05-05",
          "date": "2025-05-05",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-04-09",
      "text": "Meta announced its Bowling Green in Middleton Township data center development. This is the release date, not a construction start or an opening day.",
      "record": "Meta Bowling Green (Project Accordion)",
      "state": "Ohio",
      "url": "/ohio/#meta-middleton-township-oh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2025/04/hello-bowling-green/",
          "host": "datacenters.atmeta.com",
          "published": "2025-04-09",
          "date": "2025-04-09",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-04-03",
      "text": "Clune published an account of visits to its active Prime Elk Grove and T5 Northlake construction projects on April 3, 2025. This is the report publication day; the exact tour day, later completion and operation are not established by that account.",
      "record": "T5 @ Chicago III (Northlake)",
      "state": "Illinois",
      "url": "/illinois/#t5-chicago-iii-northlake-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.clunegc.com/clune-celebrates-international-data-center-day-with-revolution-workshop/",
          "host": "www.clunegc.com",
          "published": "2025-04-03",
          "date": "2025-04-03",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-03-28",
      "text": "Ecology issued Approval Order 25AQ E009 for condition updates and generator bypass changes at Microsoft Columbia on March 28, 2025. This is a named air permit amendment, not an opening, measured emissions finding or certification that every campus phase is operational.",
      "record": "Microsoft Columbia Data Center (Quincy)",
      "state": "Washington",
      "url": "/washington/#microsoft-columbia-quincy-wa",
      "kind": "approved",
      "sources": [
        {
          "url": "https://ecology.wa.gov/getattachment/1b71bbb6-0eaf-41fe-a696-191ec6376693/20250328MSColumbiaNOCTSD.pdf",
          "host": "ecology.wa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-03-27",
      "text": "Related published its northern South Works data center proposal on March 27, 2025 within a wider master plan. This is the release date, not construction, financing close, the southern quantum campus milestone or an opening of this data center.",
      "record": "Related Digital South Works Campus (8080 S DuSable Lake Shore Drive)",
      "state": "Illinois",
      "url": "/illinois/#related-digital-8080-lake-shore-chicago-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.related.com/press-releases/2025-03-27/related-companies-accelerates-push-data-centers-capitalization-related",
          "host": "www.related.com",
          "published": "2025-03-27",
          "date": "2025-03-27",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-03-26",
      "text": "T5 published its CHI V acquisition and planned development announcement on March 26, 2025. Construction is described prospectively and 2028 occupancy is a target. The publication date is not an exact construction start, utility energization or opening.",
      "record": "T5 @ Chicago V (CHI V)",
      "state": "Illinois",
      "url": "/illinois/#t5-chicago-v-elk-grove-village-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/t5-data-centers-expands-chicago-footprint-with-acquisition-of-fifth-data-center-chi-v-in-elk-grove-village-302411367.html",
          "host": "www.prnewswire.com",
          "published": "2025-03-26",
          "date": "2025-03-26",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-03-19",
      "text": "The village Compass update records the first permit for Building 1 and commencement of construction work on March 19, 2025. This is the reported start for that building, not construction or operation of every planned campus building.",
      "record": "Compass Datacenters Hoffman Estates Campus",
      "state": "Illinois",
      "url": "/illinois/#compass-hoffman-estates-il",
      "kind": "construction_start",
      "sources": [
        {
          "url": "https://www.arcgis.com/sharing/rest/content/items/a65ad687f0524c7aa731e2c89d850a53/data?f=json",
          "host": "www.arcgis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-03-06",
      "text": "Opti9 published its NY1 customer colocation case study March 6, 2025. This is the publication date of its service account, not an exact deployment day, commissioning date or independent certification of every performance claim.",
      "record": "Opti9 NY1 (formerly Webair NY-1), Garden City",
      "state": "New York",
      "url": "/new-york/#opti9-ny1-garden-city-ny",
      "kind": "announced",
      "sources": [
        {
          "url": "https://opti9tech.com/case-studies/healthcare-partners-colocations-and-cloud-solutions/",
          "host": "opti9tech.com",
          "published": "2025-03-06",
          "date": "2025-03-06",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-03-04",
      "text": "The original Clark County legislation page records March 4, 2025 as final action for the Post Road warehouse data center design review and labels the file Passed. This records the displayed County entitlement account without independently certifying construction, computing service, full conditions or a first opening.",
      "record": "Oppidan Post Road Data Center (Paradise)",
      "state": "Nevada",
      "url": "/nevada/#oppidan-paradise-post-road-clark-county-nv",
      "kind": "approved",
      "sources": [
        {
          "url": "https://clark.legistar.com/LegislationDetail.aspx?GUID=3C5385FC-3056-45ED-9732-34D4F7F4C84A&ID=7149479&Options=&Search=",
          "host": "clark.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-02-20",
      "text": "Massena Town Planning Board approved the ZeroC and Petawatt substation site plan four to zero on February 20, 2025. The minutes date this limited infrastructure action, not approval of every computing use, an accomplished construction start or commissioned service.",
      "record": "ZeroC / Petawatt Holdings Data Center Site (417 County Route 42)",
      "state": "New York",
      "url": "/new-york/#petawatt-zeroc-massena-ny",
      "kind": "approved",
      "sources": [
        {
          "url": "https://massena.us/AgendaCenter/ViewFile/Minutes/_02202025-1061",
          "host": "massena.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-02-20",
      "text": "Ecology Appendix B records that the Microsoft Columbia permit hearing was held on February 20, 2025 at the Quincy Business and Event Center, with a Spanish interpreter available virtually. Ecology reports no public attendance. Written comments in the separate extended comment period are not treated as testimony at this hearing.",
      "record": "Microsoft Columbia Data Center (Quincy)",
      "state": "Washington",
      "url": "/washington/#microsoft-columbia-quincy-wa",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://ecology.wa.gov/getattachment/1b71bbb6-0eaf-41fe-a696-191ec6376693/20250328MSColumbiaNOCTSD.pdf",
          "host": "ecology.wa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-02-19",
      "text": "The February 19, 2025 publication date of the original company release announces entry into the existing Auburn AUBix facility and a planned launch. This is not the exact physical opening, completion of every expansion or an independently verified delivered capacity.",
      "record": "Core Scientific Auburn Data Center (AUBix)",
      "state": "Alabama",
      "url": "/alabama/#core-scientific-auburn-al",
      "kind": "announced",
      "sources": [
        {
          "url": "https://investors.corescientific.com/news-events/press-releases/detail/107/core-scientific-announces-expansion-into-auburn-alabama-with-new-high-performance-computing-facility",
          "host": "investors.corescientific.com",
          "published": "2025-02-19",
          "date": "2025-02-19",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-02-17",
      "text": "The village Compass update records development approval for the campus at the February 17 Village Board meeting. This is the development approval date, not an opening.",
      "record": "Compass Datacenters Hoffman Estates Campus",
      "state": "Illinois",
      "url": "/illinois/#compass-hoffman-estates-il",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.arcgis.com/sharing/rest/content/items/a65ad687f0524c7aa731e2c89d850a53/data?f=json",
          "host": "www.arcgis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-02-11",
      "text": "STACK announced a planned Loudoun County campus. February 11, 2025 is the release date. The announced capacity and future delivery do not establish an opening, current construction or an operating load.",
      "record": "STACK NVA Loudoun 144MW Hyperscale Campus",
      "state": "Virginia",
      "url": "/virginia/#stack-nova-loudoun-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-expands-loudoun-county-footprint-with-144mw-hyperscale-campus/",
          "host": "www.stackinfra.com",
          "published": "2025-02-11",
          "date": "2025-02-11",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-01-27",
      "text": "The original City application packet records a January 27, 2025 file date for Etheridge Lakes. This is the application file date only, not approval, construction or computing operation.",
      "record": "Etheridge Lakes Data Center (Great Bridge)",
      "state": "Virginia",
      "url": "/virginia/#emerald-lakes-etheridge-lakes-data-center-chesapeake-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.cityofchesapeake.net/DocumentCenter/View/23727/PLN-REZ-2025-002---Etheridge-Lakes-Data-Centerpdf",
          "host": "www.cityofchesapeake.net",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-01-23",
      "text": "DPO issued its January 23, 2025 Wisconsin Rapids development announcement, describing plans and permits still being finalized before groundbreaking. This dates the original publication rather than construction, forecast energization or current computing operation.",
      "record": "DPO Wisconsin Rapids AI Computing Facility",
      "state": "Wisconsin",
      "url": "/wisconsin/#dpo-wisconsin-rapids-hpc-wi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/dpo-launches-200-million-ai-data-center-development-in-partnership-with-billerud-302359217.html",
          "host": "www.prnewswire.com",
          "published": "2025-01-23",
          "date": "2025-01-23",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-01-16",
      "text": "STACK published its Stafford Technology Campus development announcement on January 16, 2025. Planned data centers, substations and projected benefits remain proposal context in that source. The release day is not a physical construction start or opening.",
      "record": "Stafford Technology Campus",
      "state": "Virginia",
      "url": "/virginia/#stack-stafford-technology-campus-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/",
          "host": "www.stackinfra.com",
          "published": "2025-01-16",
          "date": "2025-01-16",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2025-01-16",
      "text": "PowerHouse, Poe and LG&E announced the Louisville development and utility-access forecasts. The date is an announcement, not a proved construction start, power delivery or opening.",
      "record": "PowerHouse Data Centers - Louisville (Camp Ground Road)",
      "state": "Kentucky",
      "url": "/kentucky/#powerhouse-louisville-ky",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-and-poe-companies-partner-to-develop-kentuckys-first-hyperscale-data-center-campus",
          "host": "www.powerhousedata.com",
          "published": "2025-01-16",
          "date": "2025-01-16",
          "checked": "2026-10-16",
          "label": "Original campus announcement"
        },
        {
          "url": "https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer",
          "host": "lge-ku.com",
          "published": "2025-01-16",
          "date": "2025-01-16",
          "checked": "2026-10-16",
          "label": "Original utility announcement"
        }
      ]
    },
    {
      "date": "2025-01-15",
      "text": "The original City of Reno Keystone FAQ reports Planning Commission conditional use approval on January 15, 2025 and says no appeal followed that decision. This is a land use approval account, separate from building completion, utility delivery and computing service.",
      "record": "CENTRA RNO2 (Keystone Data Center)",
      "state": "Nevada",
      "url": "/nevada/#centra-rno2-keystone-reno-nv",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300",
          "host": "www.reno.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-01-09",
      "text": "The original Mississippi Governor January 9, 2025 release announces the Meridian Compass campus and its future building program. This is an announcement date rather than computing operation, completed incentive certification or an accomplished building start.",
      "record": "Compass Datacenters Lauderdale County Hyperscale Campus",
      "state": "Mississippi",
      "url": "/mississippi/#compass-lauderdale-meridian-ms",
      "kind": "announced",
      "sources": [
        {
          "url": "https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/",
          "host": "governorreeves.ms.gov",
          "published": "2025-01-09",
          "date": "2025-01-09",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2025-01-07",
      "text": "Amazon published its Georgia infrastructure investment announcement January 7, 2025 and explicitly named Butts County. This is the source announcement day, not a physical construction or opening date.",
      "record": "AWS Butts County Data Center Campus",
      "state": "Georgia",
      "url": "/georgia/#aws-butts-county-ga",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure",
          "host": "www.aboutamazon.com",
          "published": "2025-01-07",
          "date": "2025-01-07",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-12-19",
      "text": "NorthWestern Energy original December 19, 2024 announcement describes existing Atlas Butte transmission service and forecasts additional energy supply beginning in 2026. This dates the announcement without certifying accomplished delivery, expansion or computing commissioning.",
      "record": "Atlas Power Butte Data Center",
      "state": "Montana",
      "url": "/montana/#atlas-power-butte-mt",
      "kind": "announced",
      "sources": [
        {
          "url": "https://northwesternenergy.com/about-us/our-company/2024/12/19/northwestern-energy-to-supply-power-for-butte-montana-data-center-atlas-power-group",
          "host": "northwesternenergy.com",
          "published": "2024-12-19",
          "date": "2024-12-19",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-12-17",
      "text": "The December 17, 2024 partnership announcement names Pueblo among future Prometheus locations. This dates the announcement only. It supplies no construction, computing operation or exact schedule for this Colorado site.",
      "record": "Prometheus Hyperscale Pueblo",
      "state": "Colorado",
      "url": "/colorado/#prometheus-hyperscale-pueblo-co",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prometheushyperscale.com/news/lumen-partners-with-prometheus-hyperscale-to-enhance-connectivity-for-sustainable-ai-driven-data-centers-",
          "host": "www.prometheushyperscale.com",
          "published": "2024-12-17",
          "date": "2024-12-17",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-12-17",
      "text": "The December 17, 2024 partnership announcement names Fort Morgan among future Prometheus locations. This dates the announcement only. It supplies no construction, computing operation or exact schedule for this Colorado site.",
      "record": "Prometheus Hyperscale Fort Morgan",
      "state": "Colorado",
      "url": "/colorado/#prometheus-hyperscale-fort-morgan-co",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prometheushyperscale.com/news/lumen-partners-with-prometheus-hyperscale-to-enhance-connectivity-for-sustainable-ai-driven-data-centers-",
          "host": "www.prometheushyperscale.com",
          "published": "2024-12-17",
          "date": "2024-12-17",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-12-12",
      "text": "The original Missouri DED December 12, 2024 publication reports the Kansas City Edged opening and says a ribbon ceremony occurred the prior day. The publication and ceremony are distinct from an independently verified exact first computing commissioning day.",
      "record": "Edged Kansas City",
      "state": "Missouri",
      "url": "/missouri/#edged-kansas-city-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million",
          "host": "ded.mo.gov",
          "published": "2024-12-12",
          "date": "2024-12-12",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-12-06",
      "text": "Los Alamos National Laboratory published its Michigan partnership announcement on December 6, 2024, describing a planned research computing development. This dates publication of the plan, not an executed building approval, physical start or current computing operation.",
      "record": "U-M / Los Alamos Research Computing Center",
      "state": "Michigan",
      "url": "/michigan/#umich-lanl-research-computing-ypsilanti-township-mi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.lanl.gov/media/news/1206-university-of-michigan-collaboration",
          "host": "www.lanl.gov",
          "published": "2024-12-06",
          "date": "2024-12-06",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-12-03",
      "text": "The signed Santa Clara resolution numbered 24 9409 records adoption of the initial study, mitigated negative declaration and monitoring programme for 1231 Comstock on December 3, 2024. Its operative text is environmental action although the portal labels the attachment Variance. This event does not certify the separate variance or use permit terms, construction completion or operation.",
      "record": "Prime Data Centers 1231 Comstock Street",
      "state": "California",
      "url": "/california/#prime-1231-comstock-santa-clara-ca",
      "kind": "approved",
      "sources": [
        {
          "url": "https://santaclara.legistar.com/View.ashx?M=F&ID=13610511&GUID=82E2A496-2338-49D0-880F-B7DE2B4AA673",
          "host": "santaclara.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-11-20",
      "text": "Scheduled event: The original November 6 County notice schedules DCPC campus conditional use consideration November 20, 2024. This is a retained hearing schedule, not proof that a vote occurred or that construction or computing began.",
      "record": "DCPC Data Center Campus (north of Mona)",
      "state": "Utah",
      "url": "/utah/#dcpc-mona-juab-county-ut",
      "kind": "scheduled_event",
      "sources": [
        {
          "url": "https://juabcounty.gov/notice-public-hearing-notice-conditional-use-permit-made-by-dcpc/",
          "host": "juabcounty.gov",
          "published": "2024-11-06",
          "date": "2024-11-06",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-11-20",
      "text": "Cologix published its Johnstown land acquisition and planned campus release on November 20, 2024. The anticipated 2025 first phase development remains a forecast in that source. This is the release date, not an exact construction start, power delivery or opening.",
      "record": "Cologix Johnstown AI-Ready Campus",
      "state": "Ohio",
      "url": "/ohio/#cologix-johnstown-oh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/",
          "host": "cologix.com",
          "published": "2024-11-20",
          "date": "2024-11-20",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-11-14",
      "text": "DC BLOX announced plans for a North Augusta hyperscale edge facility. This is the release date, not a construction start, opening or delivery date.",
      "record": "DC BLOX North Augusta Hyper Edge Data Center",
      "state": "South Carolina",
      "url": "/south-carolina/#dc-blox-north-augusta-sc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
          "host": "www.dcblox.com",
          "published": "2024-11-14",
          "date": "2024-11-14",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-11-14",
      "text": "DC BLOX announced plans for a Montgomery hyperscale edge facility. This is the release date, not a construction start, opening or delivery date.",
      "record": "DC BLOX Montgomery Data Center",
      "state": "Alabama",
      "url": "/alabama/#dc-blox-montgomery-al",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
          "host": "www.dcblox.com",
          "published": "2024-11-14",
          "date": "2024-11-14",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-11-11",
      "text": "MARA published its Ohio acquisition and operating capacity account November 11, 2024, explicitly naming Hopedale. The publication and historical operating account do not certify an exact opening day, current all phase operation or achievement of its later expansion target.",
      "record": "MARA Hopedale Data Center",
      "state": "Ohio",
      "url": "/ohio/#mara-hopedale-harrison-oh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ir.mara.com/news-events/press-releases/detail/1375/mara-adds-372-megawatts-of-capacity-in-ohio-with-152-megawatts-operational-and-220-megawatts-in-development",
          "host": "ir.mara.com",
          "published": "2024-11-11",
          "date": "2024-11-11",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-11-11",
      "text": "MARA published its Findlay development and capacity account November 11, 2024. This records the dated company publication, not an exact physical opening or verification that its year end 2025 expansion forecast was accomplished.",
      "record": "MARA Findlay Data Center",
      "state": "Ohio",
      "url": "/ohio/#mara-findlay-oh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ir.mara.com/news-events/press-releases/detail/1375/mara-adds-372-megawatts-of-capacity-in-ohio-with-152-megawatts-operational-and-220-megawatts-in-development",
          "host": "ir.mara.com",
          "published": "2024-11-11",
          "date": "2024-11-11",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-10-28",
      "text": "COPT Defense published its Des Moines area land acquisition and future shell development announcement October 28, 2024. Initial plans, zoning and estimated future capacity are not an accomplished data center construction start or operation.",
      "record": "COPT Defense Van Meter Data Center Shell Site",
      "state": "Iowa",
      "url": "/iowa/#copt-defense-properties-van-meter-ia",
      "kind": "announced",
      "sources": [
        {
          "url": "https://investors.copt.com/news-events/press-releases/detail/516/copt-defense-acquires-land-for-data-center-shell",
          "host": "investors.copt.com",
          "published": "2024-10-28",
          "date": "2024-10-28",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-10-25",
      "text": "Vantage published its OH1 campus announcement October 25, 2024 and reported an onsite groundbreaking ceremony that day. This is the dated company account, not independent proof of actual excavation or achievement of the later opening forecast.",
      "record": "Vantage Data Centers OH1",
      "state": "Ohio",
      "url": "/ohio/#vantage-oh1-new-albany-licking-county-oh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/vantage-data-centers-breaks-ground-on-192mw-campus-enters-growing-ohio-data-center-market-with-over-2-billion-investment-in-hyperscale-digital-infrastructure/",
          "host": "vantage-dc.com",
          "published": "2024-10-25",
          "date": "2024-10-25",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-10-23",
      "text": "The City Council report records the October 23, 2024 Planning Commission hearing and separate four to three denials of the proposed use permit and variances for 1231 Comstock. The later appeal and environmental actions are distinct. The hearing does not establish a permanent project cancellation or current physical status.",
      "record": "Prime Data Centers 1231 Comstock Street",
      "state": "California",
      "url": "/california/#prime-1231-comstock-santa-clara-ca",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://santaclara.legistar.com/LegislationDetail.aspx?From=RSS&FullText=1&GUID=0B254487-45AC-47F9-9963-F92C81AB0252&ID=7036667",
          "host": "santaclara.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-09-26",
      "text": "The Governor September 26, 2024 release names two planned Dorchester campuses, including Pine Hill in Ridgeville. This dates the announcement rather than an opening.",
      "record": "Google Ridgeville Data Center (Project Dawson)",
      "state": "South Carolina",
      "url": "/south-carolina/#google-ridgeville-sc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion",
          "host": "governor.sc.gov",
          "published": "2024-09-26",
          "date": "2024-09-26",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-09-24",
      "text": "Santa Clara adopted zoning-map correction 24-9367 for Bowers parcel 216-28-063 toLight Industrial; its effective-date clause states 30 calendar days after adoption. This is not a construction start or completion.",
      "record": "Bowers Data Center",
      "state": "California",
      "url": "/california/#coresite-bowers-santa-clara-ca",
      "kind": "approved",
      "sources": [
        {
          "url": "https://santaclara.legistar.com/View.ashx?GUID=357A3177-CAA7-4274-A108-5AEC65015649&ID=13338831&M=F",
          "host": "santaclara.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "City of Santa Clara bowers rezone"
        }
      ]
    },
    {
      "date": "2024-09-16",
      "text": "The original City of Lowell planning memorandum dated September 16, 2024 records staff review comments on the Markley site plan, including equipment clarification and screening progress. This dates the staff document rather than a final permit decision, measured impact, accomplished expansion or computing opening.",
      "record": "Markley Group One Lowell Data Center",
      "state": "Massachusetts",
      "url": "/massachusetts/#markley-lowell-ma",
      "kind": "announced",
      "sources": [
        {
          "url": "https://lowellma.gov/DocumentCenter/View/27797/Prince-Ave_2-and-1-Markley-Way-Comments",
          "host": "lowellma.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-09-10",
      "text": "The original Merrillville Citizen Advisory Committee memorandum records that the Karis zoning ordinance was approved by the Town Council on September 10, 2024. This dates the reported zoning action without establishing final whole campus permission, a computing opening, current construction or utility authorization.",
      "record": "Karis Critical Deep River Campus",
      "state": "Indiana",
      "url": "/indiana/#karis-critical-deep-river-merrillville-in",
      "kind": "approved",
      "sources": [
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/0paovsbc/data-center-citizen-advisory-committee-minutes-9924.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-09-04",
      "text": "DataBank announced a planned October 3 DEN5 grand-opening ceremony. The invitation does not verify the ceremony occurred or establish first-service or first-power day.",
      "record": "DataBank DEN5  -  Centennial II",
      "state": "Colorado",
      "url": "/colorado/#databank-den5-centennial-co",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.databank.com/resources/press-releases/databank-celebrates-grand-opening-of-newest-metro-denver-data-center/",
          "host": "www.databank.com",
          "published": "2024-09-04",
          "date": "2024-09-04",
          "checked": "2026-10-16",
          "label": "DataBank current facility or company statement"
        }
      ]
    },
    {
      "date": "2024-08-29",
      "text": "The South Carolina governor announced the Meta Aiken development in Sage Mill Industrial Park with a future service target. This is the publication date, not an opening or construction start day.",
      "record": "Meta Aiken Data Center",
      "state": "South Carolina",
      "url": "/south-carolina/#meta-aiken-county-sc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center",
          "host": "governor.sc.gov",
          "published": "2024-08-29",
          "date": "2024-08-29",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-08-27",
      "text": "Santa Clara adopted Bowers use-permit resolution 24-9358 and GPA24-9357, with conditional effective-date provisions. No construction, operating milestone or final engineering-capacity reconciliation is inferred.",
      "record": "Bowers Data Center",
      "state": "California",
      "url": "/california/#coresite-bowers-santa-clara-ca",
      "kind": "approved",
      "sources": [
        {
          "url": "https://santaclara.legistar.com/View.ashx?GUID=964DDE88-1E39-4E13-8048-89DC7926C673&ID=13279890&M=F",
          "host": "santaclara.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "City of Santa Clara bowers use permit"
        },
        {
          "url": "https://santaclara.legistar.com/View.ashx?GUID=1657B77B-E613-45F7-B515-F122D1D96818&ID=13279796&M=F",
          "host": "santaclara.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "City of Santa Clara bowers gpa"
        }
      ]
    },
    {
      "date": "2024-08-19",
      "text": "Merkle Standard published its Usk greenhouse account August 19, 2024. It reports an existing heat reuse mining project, rather than an exact data center opening or completion of every future campus phase.",
      "record": "Merkle Standard Usk Facility",
      "state": "Washington",
      "url": "/washington/#merkle-standard-usk-wa",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.merklestandard.com/reference-pages/community-support-articles/greenhouse-project-2",
          "host": "www.merklestandard.com",
          "published": "2024-08-19",
          "date": "2024-08-19",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-08-05",
      "text": "The original South Dakota PUC Leola service agreement index identifies August 5, 2024 as its filing day. This is a regulatory filing date without independently verified final service approval, delivered energy or computing operation.",
      "record": "Leola Data Center",
      "state": "South Dakota",
      "url": "/south-dakota/#leola-data-center-mcpherson-county-sd",
      "kind": "announced",
      "sources": [
        {
          "url": "https://puc.sd.gov/Dockets/Electric/2024/EL24-028.aspx",
          "host": "puc.sd.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-07-31",
      "text": "The operative body of the original Albuquerque decision states that the computing site plan was administratively approved on July 31, 2024. Its audit label separately says July 24 and its signing completion is dated August 1. This is a planning action without proof of completed conditions or computing operation.",
      "record": "Connect Albuquerque (Westpointe 40)",
      "state": "New Mexico",
      "url": "/new-mexico/#connect-data-centers-albuquerque-nm",
      "kind": "approved",
      "sources": [
        {
          "url": "https://documents.cabq.gov/planning/development-facilitation-team/PR-2020-004747%20-%20SI-2024-00451%20July%2031st%2C%202024%20Notice%20of%20Decision%20-%20signed.pdf",
          "host": "documents.cabq.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-07-25",
      "text": "DataBank announced IAD4 construction had begun. This is the announcement day, not an established physical start or opening day. Its Q1 2026 availability target remains unverified.",
      "record": "DataBank Ashburn campus",
      "state": "Virginia",
      "url": "/virginia/#databank-ashburn-campus-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.databank.com/resources/press-releases/databank-begins-developing-a-third-data-center-on-its-ashburn-virginia-campus/",
          "host": "www.databank.com",
          "published": "2024-07-25",
          "date": "2024-07-25",
          "checked": "2026-10-16",
          "label": "DataBank July 25, 2024 IAD4 construction announcement"
        }
      ]
    },
    {
      "date": "2024-07-22",
      "text": "DeKalb March 18, 2026 project table records City Council approval on July 22, 2024 of the Karis Peace and Gurler Roads amendment to Ordinance 2023 038. The Planning Commission recommendation was July 15. This is the land use amendment action, not a building permit, physical construction start or opening.",
      "record": "KARIS DeKalb Campus (Peace and Gurler Roads)",
      "state": "Illinois",
      "url": "/illinois/#karis-dekalb-campus-il",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-",
          "host": "www.cityofdekalb.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-07-18",
      "text": "EdgeCore announced its Culpeper land purchase and then-current initial 216/potential 432 MW plan. Early 2028 power delivery was a forecast; the current page advertises a different 196 MW plan and mid-2029 capacity target.",
      "record": "EdgeCore Culpeper Data Center Campus",
      "state": "Virginia",
      "url": "/virginia/#edgecore-culpeper-tech-zone-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-new-hyperscale-data-center-market-in-culpeper-virginia",
          "host": "edgecore.com",
          "published": "2024-07-18",
          "date": "2024-07-18",
          "checked": "2026-10-16",
          "label": "Dated operator announcement"
        }
      ]
    },
    {
      "date": "2024-07-11",
      "text": "The Apple letter in the original GOED packet bears July 11, 2024 and describes existing Reno operations and proposed expansion. This dates the issuer letter rather than an incentive award, first opening or completion of the expansion.",
      "record": "Apple Reno Data Center (Reno Technology Park)",
      "state": "Nevada",
      "url": "/nevada/#apple-reno-nv",
      "kind": "announced",
      "sources": [
        {
          "url": "https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf",
          "host": "goed.nv.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-07-02",
      "text": "Meta published its Cheyenne campus announcement on July 2, 2024. The announcement describes future completion and construction expectations. July 2 is the announcement date, not a manufactured exact construction start or opening day.",
      "record": "Meta Cheyenne Data Center",
      "state": "Wyoming",
      "url": "/wyoming/#meta-cheyenne-wy",
      "kind": "announced",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2024/07/hello-cheyenne/",
          "host": "datacenters.atmeta.com",
          "published": "2024-07-02",
          "date": "2024-07-02",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-06-10",
      "text": "Chesterton Council reported the named Provident and Brassie parties withdrawal of PUD and annexation petitions at its June 10, 2024 meeting. This dates the official Council account rather than an inferred letter day, permanent ban or physical computing closure.",
      "record": "Provident Chesterton Data Center Campus (former Brassie Golf Club)",
      "state": "Indiana",
      "url": "/indiana/#provident-chesterton-porter-county-in",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024",
          "host": "www.chestertonin.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-05-02",
      "text": "T5 published its May 2, 2024 original Grayslake campus announcement. Development and the stated fourth quarter 2027 capacity target were prospective; this dates the issuer publication rather than an accomplished construction or computing start.",
      "record": "T5 Chicago IV (CHI IV)",
      "state": "Illinois",
      "url": "/illinois/#t5-chicago-iv-grayslake-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://t5datacenters.com/resources/t5-data-centers-announces-further-expansion-into-chicago-suburbs-with-new-480-mw-data-center-campus/",
          "host": "t5datacenters.com",
          "published": "2024-05-02",
          "date": "2024-05-02",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-04-24",
      "text": "Adair County held its public hearing and first reading on proposed Ordinance 40 April 24, 2024. The minutes record a failed motion to abandon it and approval of amendments and a later reading, rather than final ordinance enactment or individual data center construction approval.",
      "record": "Applied Digital Adair County Data Center",
      "state": "Iowa",
      "url": "/iowa/#applied-digital-adair-ia",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://adaircounty.iowa.gov/files/meetings/2024-04-24_minutes_5812.pdf",
          "host": "adaircounty.iowa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-04-01",
      "text": "Microsoft reports that Boyd Farm construction began April 1, 2024 with clearing and grading. This is the issuer reported preliminary site construction day, rather than first vertical building, computing commissioning or a completed later forecast.",
      "record": "Microsoft Maiden Data Center",
      "state": "North Carolina",
      "url": "/north-carolina/#microsoft-maiden-catawba-county-nc",
      "kind": "construction_start",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/boyd-farms-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "published": "2024-04-30",
          "date": "2024-04-30",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-03-28",
      "text": "The Town of Tyrone dates Council zoning approval for the Microsoft project to March 28, 2024. This is zoning approval only. Site plan review, land disturbance permits, building permits and operation remain separate.",
      "record": "Microsoft Tyrone Campus (Project Rita)",
      "state": "Georgia",
      "url": "/georgia/#microsoft-tyrone-ga",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.tyronega.gov/datacenter",
          "host": "www.tyronega.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-03-21",
      "text": "The Town of Tyrone lists the Council public hearing for the Microsoft rezoning on March 21, 2024. This is the hearing date, not final approval or a physical milestone.",
      "record": "Microsoft Tyrone Campus (Project Rita)",
      "state": "Georgia",
      "url": "/georgia/#microsoft-tyrone-ga",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.tyronega.gov/datacenter",
          "host": "www.tyronega.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-03-20",
      "text": "Hunt Midwest announced Google at Hunt Midwest Business Center and identified JE Dunn as construction partner. This is a project announcement, not a confirmed construction start, actual investment spend or opening.",
      "record": "Google Kansas City Data Center (Hunt Midwest Business Center)",
      "state": "Missouri",
      "url": "/missouri/#google-hunt-midwest-kc-northland-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/",
          "host": "huntmidwest.com",
          "published": "2024-03-20",
          "date": "2024-03-20",
          "checked": "2026-10-16",
          "label": "Original Hunt Midwest Google project announcement"
        }
      ]
    },
    {
      "date": "2024-03-20",
      "text": "The original Hunt Midwest March 20, 2024 release announces the Google proposal at Hunt Midwest Business Center. This is an announcement day rather than an exact construction start or computing opening, and current regional development wording does not commission the campus.",
      "record": "Google Kansas City Data Center (Hunt Midwest Business Center)",
      "state": "Missouri",
      "url": "/missouri/#google-hunt-midwest-kc-northland-mo",
      "kind": "announced",
      "sources": [
        {
          "url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/",
          "host": "huntmidwest.com",
          "published": "2024-03-20",
          "date": "2024-03-20",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-03-14",
      "text": "Google announced an Arizona grid-energy agreement and described planned Mesa air cooling. The announcement is not a proved opening day or 430 MW of site IT capacity.",
      "record": "Google Redhawk Mesa Data Center Campus",
      "state": "Arizona",
      "url": "/arizona/#google-redhawk-mesa-az",
      "kind": "announced",
      "sources": [
        {
          "url": "https://blog.google/company-news/outreach-and-initiatives/sustainability/google-carbon-free-data-center-arizona-/",
          "host": "blog.google",
          "published": "2024-03-14",
          "date": "2024-03-14",
          "checked": "2026-10-16",
          "label": "Mesa cooling design and grid-energy announcement"
        }
      ]
    },
    {
      "date": "2024-02-26",
      "text": "The original Continent 8 February 26, 2024 release names the Petersburg opening and existing South Charleston service. This dates the issuer account rather than exact first computing commissioning or an independently verified current compliance certificate.",
      "record": "Continent 8 West Virginia DC2",
      "state": "West Virginia",
      "url": "/west-virginia/#continent-8-west-virginia-dc2-petersburg-grant-county-wv",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/",
          "host": "www.continent8.com",
          "published": "2024-02-26",
          "date": "2024-02-26",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-02-26",
      "text": "The original Continent 8 February 26, 2024 release names the Petersburg opening and existing South Charleston service. This dates the issuer account rather than exact first computing commissioning or an independently verified current compliance certificate.",
      "record": "Continent 8 West Virginia DC1",
      "state": "West Virginia",
      "url": "/west-virginia/#continent-8-west-virginia-dc1-south-charleston-wv",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/",
          "host": "www.continent8.com",
          "published": "2024-02-26",
          "date": "2024-02-26",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-02-22",
      "text": "The Town of Tyrone lists the Planning Commission public hearing for the Microsoft rezoning on February 22, 2024. A hearing is separate from the later Council zoning approval and from construction permits.",
      "record": "Microsoft Tyrone Campus (Project Rita)",
      "state": "Georgia",
      "url": "/georgia/#microsoft-tyrone-ga",
      "kind": "hearing",
      "sources": [
        {
          "url": "https://www.tyronega.gov/datacenter",
          "host": "www.tyronega.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2024-02-01",
      "text": "The original MARA February 1, 2024 release publishes its intended operating transition at the acquired Kearney and Granbury mining sites. Its reported January 16 acquisition date differs from January 12 in the later original annual note. Neither date is silently corrected, and the forecast April transition is not certified as accomplished.",
      "record": "MARA Kearney Facility",
      "state": "Nebraska",
      "url": "/nebraska/#mara-kearney-buffalo-ne",
      "kind": "announced",
      "sources": [
        {
          "url": "https://ir.mara.com/news-events/press-releases/detail/1340/marathon-digital-holdings-to-assume-full-operational-control-of-its-recently-acquired-bitcoin-mining-sites",
          "host": "ir.mara.com",
          "published": "2024-02-01",
          "date": "2024-02-01",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2024-01-19",
      "text": "PowerHouse announced a site acquisition for its Reno development. This is the release date and does not establish the exact closing, construction start or opening day.",
      "record": "PowerHouse Reno Campus",
      "state": "Nevada",
      "url": "/nevada/#powerhouse-reno-storey-county-nv",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-nevada-site-for-powerhouse-reno-2",
          "host": "www.powerhousedata.com",
          "published": "2024-01-19",
          "date": "2024-01-19",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2023-12-20",
      "text": "QTS published a construction recap reporting that Irving 1 DC3 opened in March 2023. December 20 is the publication date, not the opening date. The recap does not establish operation of all planned campus facilities.",
      "record": "QTS Irving 1",
      "state": "Texas",
      "url": "/texas/#qts-irving-1-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://q.com/resources/a-year-of-growth-2023-construction-recap-2/",
          "host": "q.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2023-12-12",
      "text": "Sundt published its Compass Goodyear progress report on December 12, 2023. It described a December 8 Building 3 completion celebration and other halls with future commissioning. This is the report publication date, not a verified data center service opening or completion of every campus phase.",
      "record": "Compass Datacenters Goodyear Campus",
      "state": "Arizona",
      "url": "/arizona/#compass-goodyear-campus-az",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.sundt.com/2023/sundt-team-completes-building-at-compass-datacenters-campus-celebrating-major-milestone-with-toy-drive-for-local-nonprofits/",
          "host": "www.sundt.com",
          "published": "2023-12-12",
          "date": "2023-12-12",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2023-11-10",
      "text": "The U.S. Army Corps of Engineers published its Sharpless Wellington Road reauthorization notice. November 10, 2023 is the publication date. The December comment deadline is not permit issuance, completion or a physical shutdown.",
      "record": "Wellington Road Data Center Campus (Sharpless)",
      "state": "Virginia",
      "url": "/virginia/#sharpless-wellington-road-bristow-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://usace.contentdm.oclc.org/digital/api/collection/p16021coll15/id/3616/download",
          "host": "usace.contentdm.oclc.org",
          "published": "2023-11-10",
          "date": "2023-11-10",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2023-11-09",
      "text": "Aphorio Carter issuer release announced the Collierville data center property acquisition November 9, 2023. This dates publication of the property announcement, not an independently verified closing day, tenant identity or current computing operation.",
      "record": "Collierville Enterprise Data Center (FedEx World Technology Center Campus)",
      "state": "Tennessee",
      "url": "/tennessee/#aphorio-carter-collierville-tn",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/aphorio-carter-acquires-data-center-in-collierville-tn-301983903.html",
          "host": "www.prnewswire.com",
          "published": "2023-11-09",
          "date": "2023-11-09",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2023-11-08",
      "text": "CEC order 23-1108-07 granted the Bowers backup-generating small power plant exemption. This is a state-jurisdiction exemption, not final local construction/operation approval; filing/attestation followed onNovember 9.",
      "record": "Bowers Data Center",
      "state": "California",
      "url": "/california/#coresite-bowers-santa-clara-ca",
      "kind": "approved",
      "sources": [
        {
          "url": "https://efiling.energy.ca.gov/GetDocument.aspx?DocumentContentId=88264&tn=253061",
          "host": "efiling.energy.ca.gov",
          "published": "2023-11-09",
          "date": "2023-11-09",
          "checked": "2026-10-16",
          "label": "California Energy Commission bowers cec order"
        }
      ]
    },
    {
      "date": "2023-10-03",
      "text": "T5 published its Chicago III Northlake acquisition announcement on October 3, 2023. An acquisition and future development plan are not an exact construction start or opening.",
      "record": "T5 @ Chicago III (Northlake)",
      "state": "Illinois",
      "url": "/illinois/#t5-chicago-iii-northlake-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://t5datacenters.com/resources/t5-data-centers-acquires-third-location-in-tier-one-chicago-market/",
          "host": "t5datacenters.com",
          "published": "2023-10-03",
          "date": "2023-10-03",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2023-09-27",
      "text": "DC BLOX announced a Camp Hall land purchase and preliminary development plan. The release dateline does not establish the exact land closing, construction start or opening day.",
      "record": "DC BLOX Camp Hall Data Center Campus",
      "state": "South Carolina",
      "url": "/south-carolina/#dc-blox-camp-hall-berkeley-county-sc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.dcblox.com/dc-blox-purchases-land-secures-power-in-berkeley-county-south-carolina/",
          "host": "www.dcblox.com",
          "published": "2023-09-27",
          "date": "2023-09-27",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2023-09-05",
      "text": "The September 5, 2023 publication date of the University account announces the planned computing center and reports earlier Stage 1 approval. It does not establish the exact approval day, a construction start or an August 2026 actual completion.",
      "record": "University of Alabama High Performance Computing and Data Center",
      "state": "Alabama",
      "url": "/alabama/#university-of-alabama-hpc-tuscaloosa-al",
      "kind": "announced",
      "sources": [
        {
          "url": "https://news.ua.edu/2023/09/new-computing-center-expands-innovation-opportunities/",
          "host": "news.ua.edu",
          "published": "2023-09-05",
          "date": "2023-09-05",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2023-08-28",
      "text": "PSC rejects the contract, citing ratepayer risk",
      "record": "Ebon International Big Sandy cryptomining / data processing complex",
      "state": "Kentucky",
      "url": "/kentucky/#ebon-international-big-sandy-lawrence-ky",
      "kind": "record event",
      "sources": [
        {
          "url": "https://lpm.org/news/2023-08-29/regulators-reject-kentucky-power-contract-for-250m-cryptomining-facility",
          "host": "lpm.org",
          "date": "2023-08-29"
        },
        {
          "url": "https://www.utilitydive.com/news/kentucky-psc-aep-kentucky-power-cryptomining-power-supply-ebon/692237/",
          "host": "utilitydive.com",
          "date": "2023-08-30"
        },
        {
          "url": "https://www.kentuckynewera.com/cadiz_record/news/article_0865bed4-2e61-5d2b-9b99-fb842319238f.html",
          "host": "kentuckynewera.com",
          "date": "2024-11-28"
        }
      ]
    },
    {
      "date": "2023-08-10",
      "text": "The original NPPD minutes record August 10, 2023 adoption of resolution 23 40 authorizing preliminary transmission routing and public involvement for the proposed Jigowatt computing load. This is a utility planning action rather than completed transmission, computing construction or the forecast November 2025 service date.",
      "record": "Jigowatt Stanton Bitcoin Mine",
      "state": "Nebraska",
      "url": "/nebraska/#jigowatt-stanton-ne",
      "kind": "approved",
      "sources": [
        {
          "url": "https://docs.nppd.com/Board/2023/2023AugustMinutes.pdf",
          "host": "docs.nppd.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2023-07-20",
      "text": "The Port of Cascade Locks and Roundhouse joint original announcement is dated July 20, 2023 and announces discontinuation of their proposed computing project. This dates the public statement without assigning an unknown earlier underlying decision day, physical facility closure or a citywide computing ban.",
      "record": "Roundhouse Cascade Locks Data Center",
      "state": "Oregon",
      "url": "/oregon/#roundhouse-cascade-locks-or",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.portofcascadelocks.gov/july-20-2023-cascade-locks-port-and-roundhouse-inc-jointly-announce-decision-to-discontinue-datacenter-project",
          "host": "www.portofcascadelocks.gov",
          "published": "2023-07-20",
          "date": "2023-07-20",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2023-04-24",
      "text": "Continent 8 published its Convention Center modular expansion account April 24, 2023. The source separately reports an April 18 opening ceremony. This records the publication date and does not certify current operation of every later expansion phase.",
      "record": "Continent 8 Atlantic City (Convention Center)",
      "state": "New Jersey",
      "url": "/new-jersey/#continent-8-atlantic-city-convention-center-nj",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.continent8.com/continent-8-technologies-cuts-the-ribbon-on-stage-three-expansion-of-atlantic-city-data-center/",
          "host": "www.continent8.com",
          "published": "2023-04-24",
          "date": "2023-04-24",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2023-04-12",
      "text": "The CEC project history records an April 12, 2023 order certifying the Trade Zone Park final environmental impact report and granting the small power plant exemption. The exemption is a jurisdiction and environmental action allowing local permitting. It is not a final construction permit, operation or delivery of both SVY data center buildings.",
      "record": "STACK Trade Zone Park (SVYDC 05 / SVYDC 06)",
      "state": "California",
      "url": "/california/#stack-trade-zone-park-san-jose-ca",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.energy.ca.gov/powerplant/tradezonepark",
          "host": "www.energy.ca.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2023-02-14",
      "text": "The Town FAQ records a February 14, 2023 Council vote approving the Blackwell Road special use permit by four to three. This dates the reported land use action, not construction, commissioning, present permit validity or current computing operation.",
      "record": "Blackwell Road Data Center (Warrenton)",
      "state": "Virginia",
      "url": "/virginia/#amazon-blackwell-road-warrenton-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.warrentonva.gov/500/Frequently-Asked-Questions-FAQs",
          "host": "www.warrentonva.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2022-11-10",
      "text": "CoreSite published a CH2 media advisory describing a June 2020 opening and a planned community celebration. This is the publication date, not an exact physical opening or a completed future celebration.",
      "record": "CoreSite CH2",
      "state": "Illinois",
      "url": "/illinois/#coresite-ch2-chicago-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.coresite.com/news/media-advisory-coresite-celebrates-its-expanded-chicago-data-center-footprint-enabling-digital-transformation-in-a-rising-internet-hub",
          "host": "www.coresite.com",
          "published": "2022-11-10",
          "date": "2022-11-10",
          "checked": "2026-10-16",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2022-11-08",
      "text": "T5 published its Chicago II second phase and availability release on November 8, 2022. The account describes leasing and future delivery. This is the publication date, not a first opening or proof that the full forecast phase became available.",
      "record": "T5 Chicago II",
      "state": "Illinois",
      "url": "/illinois/#t5-chicago-ii-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://t5datacenters.com/resources/t5-chicagoii-final-phase/",
          "host": "t5datacenters.com",
          "published": "2022-11-08",
          "date": "2022-11-08",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2022-09-27",
      "text": "Ecology issued Approval Order 22AQ E035 on September 27, 2022 approving renewable diesel as an additional emergency engine fuel option at Microsoft MWH. The order concerns the existing facility and a fuel option. It is not an original opening, a new construction start or proof of actual fuel use.",
      "record": "Microsoft MWH Data Center",
      "state": "Washington",
      "url": "/washington/#microsoft-mwh-quincy-wa",
      "kind": "approved",
      "sources": [
        {
          "url": "https://ecology.wa.gov/getattachment/36d0e87e-dfce-44fc-b067-ed5760976950/20220927MicrosoftMWH.pdf",
          "host": "ecology.wa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2022-09-14",
      "text": "T5 Data Centers published its Charlotte Management and Operations renewal account September 14, 2022. This dates the provider publication, not an independently verified assessment day, a Tier certification, physical opening or present computing service.",
      "record": "T5@Charlotte",
      "state": "North Carolina",
      "url": "/north-carolina/#t5-charlotte-nc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://t5datacenters.com/resources/t5-charlotte-stamp-of-approval/",
          "host": "t5datacenters.com",
          "published": "2022-09-14",
          "date": "2022-09-14",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2022-09-07",
      "text": "Vision Net original release is dated September 7, 2022 and invites a September 9 Billings open house. This dates the invitation rather than independently verified completion of the ceremony or a first computing opening.",
      "record": "Vision Net Billings 2 (1030 Central Avenue)",
      "state": "Montana",
      "url": "/montana/#vision-net-billings-central-ave-billings-mt",
      "kind": "announced",
      "sources": [
        {
          "url": "https://vision.net/vision-net-opens-the-doors-on-its-newest-data-center/",
          "host": "vision.net",
          "published": "2022-09-07",
          "date": "2022-09-07",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2022-07-26",
      "text": "Aligned announced the Sterling campus development and a future first-phase target. The target does not establish actual delivery or current completion.",
      "record": "Aligned IAD-03",
      "state": "Virginia",
      "url": "/virginia/#aligned-iad-03-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://aligneddc.com/press-release/aligned-data-centers-expands-presence-in-northern-virginia-with-new-sterling-hyperscale-campus/",
          "host": "aligneddc.com",
          "published": "2022-07-26",
          "date": "2022-07-26",
          "checked": "2026-10-15",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2022-07-25",
      "text": "The original North Dakota Governor release dated July 25, 2022 announces the Nekoma acquisition and redevelopment agreement. This dates the announcement without certifying that redevelopment, computing operation or planned heat reuse subsequently began.",
      "record": "Bitzero Nekoma Data Center (Stanley R. Mickelsen Safeguard Complex)",
      "state": "North Dakota",
      "url": "/north-dakota/#bitzero-nekoma-nd",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center",
          "host": "www.governor.nd.gov",
          "published": "2022-07-25",
          "date": "2022-07-25",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2022-07-18",
      "text": "The original North Dakota Governor July 25, 2022 release reports that the local development authority Board accepted the Bitzero Nekoma bid on July 18, 2022. This is a reported historical bid decision rather than computing commissioning or completed redevelopment.",
      "record": "Bitzero Nekoma Data Center (Stanley R. Mickelsen Safeguard Complex)",
      "state": "North Dakota",
      "url": "/north-dakota/#bitzero-nekoma-nd",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center",
          "host": "www.governor.nd.gov",
          "published": "2022-07-25",
          "date": "2022-07-25",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2022-06-09",
      "text": "The company published its named Miami colocation location announcement June 9, 2022, describing services available that day. This is the source publication day and historical service account, not a newly inferred 2026 opening or new physical milestone.",
      "record": "iM Critical Miami Data Center",
      "state": "Florida",
      "url": "/florida/#im-critical-miami-fl",
      "kind": "announced",
      "sources": [
        {
          "url": "https://imcritical.com/about/newsroom/introducing-im-criticals-miami-data-center-miamis-next-gen-hub-for-mission-critical-colocation/",
          "host": "imcritical.com",
          "published": "2022-06-09",
          "date": "2022-06-09",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2022-06-02",
      "text": "The Montana Governor original June 2, 2022 release announces proposed Polson computing investment. This is an announcement date without proof that construction or computing service subsequently began.",
      "record": "Bitzero Polson Data Center (SKQ/Salish-Kootenai Dam)",
      "state": "Montana",
      "url": "/montana/#bitzero-polson-lake-county-mt",
      "kind": "announced",
      "sources": [
        {
          "url": "https://news.mt.gov/Governors-Office/Gov_Gianforte_Celebrates_Announcement_of_New_Investment_in_Data_Center_Montana_Jobs",
          "host": "news.mt.gov",
          "published": "2022-06-02",
          "date": "2022-06-02",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2022-04-11",
      "text": "Brookhaven published its Building 725 equipment deployment account April 11, 2022. The article distinguishes that relocation from the legacy building. This records the dated agency account, not an exact building commissioning day or certification of every current SCDF service location.",
      "record": "Brookhaven National Laboratory Scientific Data and Computing Center (Building 725)",
      "state": "New York",
      "url": "/new-york/#bnl-sdcc-b725-upton-ny",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.bnl.gov/newsroom/news.php?a=219365",
          "host": "www.bnl.gov",
          "published": "2022-04-11",
          "date": "2022-04-11",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2022-03-30",
      "text": "DPO published its March 30, 2022 original issuer account reporting mining operations at Hatfield from mid February. This dates publication, not an invented exact first operation day or independent verification of present load.",
      "record": "Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro)",
      "state": "Wisconsin",
      "url": "/wisconsin/#cascade-digital-power-hatfield-wi",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/digital-power-optimization-forms-partnership-to-combine-hydro-power-and-cryptocurrency-mining--cascade-digital-power-301513816.html",
          "host": "www.prnewswire.com",
          "published": "2022-03-30",
          "date": "2022-03-30",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2022-03-09",
      "text": "The original Northern Data March 9, 2022 release announces the proposed MidAmerica Oklahoma campus and future deployment targets. The later original annual report says the planned Oklahoma activities will not be pursued, but does not date that decision exactly. No completed computing opening or physical closure is inferred.",
      "record": "Northern Data North American Operational Center at Pryor",
      "state": "Oklahoma",
      "url": "/oklahoma/#northern-data-pryor-ok",
      "kind": "announced",
      "sources": [
        {
          "url": "https://northerndata.de/en/investor-relations/news/northern-data-partners-with-state-of-oklahoma-and-secures-a-home-for-up-to-70000-asic-systems-by-end-of-2024",
          "host": "northerndata.de",
          "published": "2022-03-09",
          "date": "2022-03-09",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2022-02-04",
      "text": "The operator original release publication date is February 4, 2022 and reports SLC 04 first phase completion. The source publication day is not silently made the exact physical opening date or the completion of every later phase.",
      "record": "Aligned SLC-04",
      "state": "Utah",
      "url": "/utah/#aligned-west-valley-city-ut",
      "kind": "announced",
      "sources": [
        {
          "url": "https://aligneddc.com/press-release/aligned-completes-phase-i-of-build-to-scale-salt-lake-metro-data-center/",
          "host": "aligneddc.com",
          "published": "2022-02-04",
          "date": "2022-02-04",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2022-01-25",
      "text": "The original Commerce January 25, 2022 release announces Greenidge Spartanburg plans. This dates a proposal account rather than completed computing operation or later cancellation.",
      "record": "Greenidge Spartanburg (South Carolina)",
      "state": "South Carolina",
      "url": "/south-carolina/#greenidge-spartanburg-sc",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.sccommerce.com/newsroom/greenidge-generation-establishing-operations-spartanburg-county",
          "host": "www.sccommerce.com",
          "published": "2022-01-25",
          "date": "2022-01-25",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2021-12-12",
      "text": "DNREC published an emergency generator permit amendment notice for the named JP Morgan facility on December 12, 2021. This dates the notice only; its January comment deadline and requested conditions are not a final permit or current computing operation.",
      "record": "JPMorgan Chase Core Data Center 1 (CDC1), Bear",
      "state": "Delaware",
      "url": "/delaware/#jpmorgan-chase-cdc1-bear-de",
      "kind": "announced",
      "sources": [
        {
          "url": "https://dnrec.delaware.gov/public-notices/title-v-synthetic-minor-permit-applications-jp-morgan/",
          "host": "dnrec.delaware.gov",
          "published": "2021-12-12",
          "date": "2021-12-12",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2021-07-12",
      "text": "Energy Harbor announced a supply partnership for the Standard Power Coshocton mining project on July 12, 2021. The release forecasts a December 2021 supply start; neither the forecast nor this announcement dates an accomplished computing opening.",
      "record": "Standard Power Coshocton",
      "state": "Ohio",
      "url": "/ohio/#standard-power-coshocton-oh",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/energy-harbor-partners-with-standard-power-to-provide-carbon-free-nuclear-power-to-new-ohio-bitcoin-blockchain-mining-center-301331473.html",
          "host": "www.prnewswire.com",
          "published": "2021-07-12",
          "date": "2021-07-12",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2021-06-28",
      "text": "Maryland Commerce published a Quantum Loophole master campus development account on June 28, 2021. This dates publication of the planned development and reported land purchase, not construction completion, a commissioned building or current operation across the master campus.",
      "record": "Quantum Frederick",
      "state": "Maryland",
      "url": "/maryland/#quantum-frederick-campus-md",
      "kind": "announced",
      "sources": [
        {
          "url": "https://business.maryland.gov/news/quantum-loophole-plans-develop-data-center-campus-maryland/",
          "host": "business.maryland.gov",
          "published": "2021-06-28",
          "date": "2021-06-28",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2021-06-02",
      "text": "Switch published its planned Rock campus announcement on June 2, 2021. The original account describes a planned campus and anticipated site preparation, without independently establishing accomplished construction, computing service or a first opening day.",
      "record": "Switch: The Rock (Round Rock)",
      "state": "Texas",
      "url": "/texas/#switch-the-rock-round-rock-tx",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.switch.com/switch-announces-fifth-prime-expansion-with-development-of-exascale-data-center-campus-in-texas/",
          "host": "www.switch.com",
          "published": "2021-06-02",
          "date": "2021-06-02",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2021-03-09",
      "text": "Evocative retains the March 9, 2021 original VPLS announcement about managing the Chappaqua data center infrastructure and NY2 facility. This dates the issuer announcement, without independent verification of present computing, an exact original opening or a later closure.",
      "record": "Evocative JFK2 (NY2) Chappaqua",
      "state": "New York",
      "url": "/new-york/#evocative-jfk2-chappaqua-ny",
      "kind": "announced",
      "sources": [
        {
          "url": "https://evocative.com/news/new-york-data-center-acquisition/",
          "host": "evocative.com",
          "published": "2021-03-09",
          "date": "2021-03-09",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2020-11-30",
      "text": "The November 30, 2020 original company publication reports that its Jonesboro Data Technology Center is open and serving charter customers. The publication date is retained as an announcement date, not an independently established exact physical opening day or a current capacity measurement.",
      "record": "Ritter Communications Data Technology Center",
      "state": "Arkansas",
      "url": "/arkansas/#ritter-communications-data-technology-center-jonesboro-ar",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.rittercommunications.com/newsroom/data-technology-center-opens",
          "host": "www.rittercommunications.com",
          "published": "2020-11-30",
          "date": "2020-11-30",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2020-11-12",
      "text": "DPO published its November 12, 2020 original issuer report of mining at the Sangha Hennepin facility. This dates publication of a historical operating account, without an exact first operating day or independent verification of present computing service.",
      "record": "Sangha Systems Hennepin (82 River North)",
      "state": "Illinois",
      "url": "/illinois/#sangha-systems-hennepin-il",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/digital-power-optimization-llc-begins-cryptocurrency-mining-operations-301172130.html",
          "host": "www.prnewswire.com",
          "published": "2020-11-12",
          "date": "2020-11-12",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2020-10-06",
      "text": "The October 6, 2020 publication date of the original T5 release announces the Newark acquisition and a planned additional building. It is not the acquisition closing date, an expansion completion date or a physical opening day.",
      "record": "T5@Silicon Valley",
      "state": "California",
      "url": "/california/#t5-silicon-valley-newark-ca",
      "kind": "announced",
      "sources": [
        {
          "url": "https://t5datacenters.com/resources/t5-data-centers-announces-new-enterprise-data-center-in-silicon-valley-ca/",
          "host": "t5datacenters.com",
          "published": "2020-10-06",
          "date": "2020-10-06",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2020-08-12",
      "text": "The state Notice of Determination records the CEC action for Mission College Data Center on August 12, 2020. This is the scoped environmental approval date, not all municipal permits or a facility opening.",
      "record": "Mission College Data Center",
      "state": "California",
      "url": "/california/#mission-college-data-center-santa-clara-ca",
      "kind": "approved",
      "sources": [
        {
          "url": "https://ceqanet.lci.ca.gov/2020040254/3",
          "host": "ceqanet.lci.ca.gov",
          "published": "2020-08-18",
          "date": "2020-08-18",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2020-06-19",
      "text": "The original Sandia June 19, 2020 issue publishes its 725E computing facility and sustainability certification account. This is the issue publication date rather than an independently dated certification award, exact construction completion day or first computing opening.",
      "record": "Sandia National Laboratories 725E High-Performance Computing Data Center",
      "state": "New Mexico",
      "url": "/new-mexico/#sandia-725e-hpc-data-center-albuquerque-nm",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.sandia.gov/labnews/2020/06/19/leedv4-gold/",
          "host": "www.sandia.gov",
          "published": "2020-06-19",
          "date": "2020-06-19",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2019-12-18",
      "text": "The original Mississippi State December 18, 2019 article explicitly dates the Orion ribbon ceremony that day and locates the system at the Portera center. This is a ceremony account rather than first computing commissioning; the later January 2020 reprint date remains distinct.",
      "record": "Mississippi State University HPC2  -  Malcolm A. Portera High Performance Computing Center",
      "state": "Mississippi",
      "url": "/mississippi/#msu-hpc2-portera-starkville-ms",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.newsarchive.msstate.edu/newsroom/article/2019/12/msu-noaa-celebrate-orion-supercomputer",
          "host": "www.newsarchive.msstate.edu",
          "published": "2019-12-18",
          "date": "2019-12-18",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2019-09-16",
      "text": "Aligned announced initial Ashburn phase capacity delivery with commissioning underway. This is not a whole-campus completion or opening date.",
      "record": "Aligned IAD-01",
      "state": "Virginia",
      "url": "/virginia/#aligned-iad-01-va",
      "kind": "announced",
      "sources": [
        {
          "url": "https://aligneddc.com/press-release/aligned-energy-completes-phase-one-of-ashburn-data-center-campus/",
          "host": "aligneddc.com",
          "published": "2019-09-16",
          "date": "2019-09-16",
          "checked": "2026-10-15",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2018-06-26",
      "text": "Continent 8 published its Ocean Resort Casino data center service announcement June 26, 2018. The publication is distinct from the casino opening day and does not independently certify the exact present data hall phase.",
      "record": "Continent 8 Atlantic City (Ocean Casino Resort)",
      "state": "New Jersey",
      "url": "/new-jersey/#continent-8-atlantic-city-ocean-casino-resort-nj",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.continent8.com/continent-8-data-centre-goes-live-at-ocean-resort-casino-new-jersey/",
          "host": "www.continent8.com",
          "published": "2018-06-26",
          "date": "2018-06-26",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2016-05-04",
      "text": "The posted draft minutes dated May 4, 2016 describe conditional infrastructure funding consideration for the Cirrus Middletown Technology Center. This is the date of the draft meeting account, not an executed funding agreement, released money, permit approval, construction start or computing operation.",
      "record": "Middletown Technology Center (Cirrus Delaware LLC)",
      "state": "Delaware",
      "url": "/delaware/#cirrus-delaware-middletown-technology-center-de",
      "kind": "announced",
      "sources": [
        {
          "url": "https://publicmeetings.delaware.gov/Document/35863_Minutes-Draft.pdf",
          "host": "publicmeetings.delaware.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2015-07-15",
      "text": "The Tennessee agency published its Litewire announcement July 15, 2015 and reported an already functional initial phase. The publication date is not an exact opening day or proof of current 2026 service.",
      "record": "Litewire McMinnville (former A.O. Smith Building)",
      "state": "Tennessee",
      "url": "/tennessee/#litewire-mcminnville-tn",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.tn.gov/ecd/news/2015/7/15/litewire-llc-to-open-new-facility-in-warren-county.html",
          "host": "www.tn.gov",
          "published": "2015-07-15",
          "date": "2015-07-15",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2014-11-03",
      "text": "The original C Spire November 3, 2014 release reports the official opening of the initial Starkville phase and describes customers using its services. This is the stated opening account, distinct from the earlier construction forecast, later ceremony publicity or independently verified first computing commissioning.",
      "record": "C Spire Starkville Data Center",
      "state": "Mississippi",
      "url": "/mississippi/#cspire-starkville-ms",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.cspire.com/cms/news/wireless/22000005/New%20C%20Spire%20%2423%20Million%20World-Class%20Enterprise%20Data%20Center%20Opens%20for%20Business",
          "host": "www.cspire.com",
          "published": "2014-11-03",
          "date": "2014-11-03",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2014-07-10",
      "text": "On July 10, 2014 the University of Delaware announced termination of its lease with The Data Centers LLC for the proposed STAR Campus project. This dates the University announcement and lease action, not physical closure of an operating facility.",
      "record": "STAR Campus Data Center & Cogeneration Plant (The Data Centers, LLC)",
      "state": "Delaware",
      "url": "/delaware/#the-data-centers-star-campus-newark-de",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www1.udel.edu/udaily/2015/jul/decision071014.html",
          "host": "www1.udel.edu",
          "published": "2014-07-10",
          "date": "2014-07-10",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2012-10-15",
      "text": "The original UCAR historical fact sheet records October 15, 2012 as the Cheyenne center grand opening. This is a ceremonial opening date rather than an independently established exact first computing or physical commissioning day.",
      "record": "NCAR-Wyoming Supercomputing Center",
      "state": "Wyoming",
      "url": "/wyoming/#ncar-wyoming-supercomputing-center-cheyenne-wy",
      "kind": "announced",
      "sources": [
        {
          "url": "https://news.ucar.edu/2151/ncar-wyoming-supercomputing-center-fact-sheet",
          "host": "news.ucar.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ]
    },
    {
      "date": "2012-03-06",
      "text": "The original Metro HCA project account records March 6, 2012 incentive approval under Ordinance BL2012 116. This is a dated incentive action, not computing commissioning, physical construction completion or current service.",
      "record": "HCA Information Technology & Services Data Center (Antioch)",
      "state": "Tennessee",
      "url": "/tennessee/#hca-it-services-data-center-nashville-tn",
      "kind": "approved",
      "sources": [
        {
          "url": "https://www.nashville.gov/departments/mayor/economic-opportunity/growth-incentives/growth-projects/hca-data-center",
          "host": "www.nashville.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ]
    },
    {
      "date": "2011-06-13",
      "text": "BNY Mellon published its Tennessee Processing Center and nearby business office expansion announcement June 13, 2011. This dates a historical issuer plan and does not establish the exact expansion completion day or current computing service.",
      "record": "BNY Mellon Tennessee Processing Center (Nashville)",
      "state": "Tennessee",
      "url": "/tennessee/#bny-mellon-tennessee-processing-center-nashville-tn",
      "kind": "announced",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/bny-mellons-continued-global-growth-prompts-expansion-of-tennessee-facilities-123740554.html",
          "host": "www.prnewswire.com",
          "published": "2011-06-13",
          "date": "2011-06-13",
          "checked": "2026-10-23",