  "checked_on": "2026-10-29",
  "cohort": "Selected official restriction cohorts",
  "coverage_note": "Selected official instruments and accounts only. Adoption, effective day, stated end, current status and site applicability remain separate. This is not a complete legal inventory or a determination of an individual property.",
  "items": [
    {
      "adopted_on": "2026-09-14",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-09-14",
      "expires_on": "2027-07-01",
      "field_sources": {
        "effective_on": [
          "m01-frederick-order"
        ],
        "expires_on": [
          "m01-frederick-order"
        ],
        "status": [
          "m01-frederick-order",
          "m01-frederick-account"
        ]
      },
      "id": "restriction:frederick-md-20260914",
      "instrument_id": "Executive Order 05-2026",
      "instrument_url": "https://www.frederickcountymd.gov/ArchiveCenter/ViewFile/Item/17236",
      "instrument_verified": true,
      "jurisdiction": "Frederick County",
      "limits": "The signed exception concerns property with an approved APFO Letter of Understanding before June 17, 2025. The County page says existing construction is not stopped. No individual exemption, project cancellation, completed state report or blanket countywide physical shutdown is established. The order may be superseded or terminated earlier.",
      "next_scheduled_on": null,
      "original_pause_start_on": "2026-07-01",
      "scope": "Signed Executive Order 05 2026 directs a temporary hold on accepting, considering, processing and reviewing applications for Critical Digital Infrastructure facilities and associated substations, as determined by County staff. It replaces Order 04 2026. The current County page states new applications are not being accepted.",
      "sets_site_status": false,
      "source_ids": [
        "m01-frederick-order",
        "m01-frederick-account"
      ],
      "state": "md",
      "status": "in_effect",
      "status_as_of": "2026-10-23",
      "supersedes_instrument": "Executive Order 04-2026",
      "termination_on": null,
      "type": "zoning_pause",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-05-04",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-05-04",
      "expires_on": "2027-05-04",
      "field_sources": {
        "adopted_on": [
          "m01-rowan-law"
        ],
        "effective_on": [
          "m01-rowan-law"
        ],
        "expires_on": [
          "m01-rowan-law"
        ]
      },
      "id": "restriction:rowan-nc-20260504",
      "instrument_id": "Ordinance imposing one year moratorium adopted May 4, 2026",
      "instrument_url": "https://www.rowancountync.gov/DocumentCenter/View/57271/Ordinance-Imposing-One-Year-Moratorium-on-the-Development-of-Data-Centers-in-Rowan-County-PDF?bidId=",
      "instrument_verified": true,
      "jurisdiction": "Rowan County zoning jurisdiction",
      "limits": "The April 20 date is the legislative hearing, not adoption or commencement. Earlier termination by majority resolution is permitted. A complete later amendment and termination search is not verified, and no exact Long Ferry exemption is decided. A passed planning deadline is not completed rulemaking.",
      "next_scheduled_on": null,
      "scope": "The signed ordinance adopts a temporary restriction on specified data center development approvals within County zoning jurisdiction, with legally qualifying and listed ongoing project exceptions. The current County project index links the adopted ordinance.",
      "sets_site_status": false,
      "source_ids": [
        "m01-rowan-law",
        "m01-rowan-index"
      ],
      "state": "nc",
      "status": "adopted_current_status_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-09-21",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-09-21",
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m01-lovejoy-account"
        ],
        "effective_on": [
          "m01-lovejoy-account"
        ],
        "status": [
          "m01-lovejoy-account"
        ]
      },
      "id": "restriction:lovejoy-ga-20260921",
      "instrument_id": "Appendix A zoning amendments reported adopted September 21, 2026",
      "instrument_url": "https://www.cityoflovejoy.com/DocumentCenter/View/3000/LJ-Zoning-re-repeal-SAP-and-data-centers-REVISED",
      "instrument_verified": false,
      "jurisdiction": "City of Lovejoy city limits",
      "limits": "The downloadable ordinance has blank adoption and signature fields and is not certified as the signed final instrument. The linked draft and FAQ conflict on an unrelated housing density. The City account is the basis for the reported dates and prohibition. No Clayton County wide rule, forever guarantee, physical shutdown or residential project approval is inferred.",
      "next_scheduled_on": null,
      "scope": "The City current account reports adoption of zoning amendments prohibiting data centers within city limits on September 21, 2026, effective immediately. This is a City reported prohibition.",
      "sets_site_status": false,
      "source_ids": [
        "m01-lovejoy-account",
        "m01-lovejoy-linked-draft"
      ],
      "state": "ga",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "ban",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-07-21",
      "applies_to_all_projects": false,
      "approved_on": "2026-07-24",
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": "2026-12-01",
      "field_sources": {
        "adopted_on": [
          "m01-nashville-history"
        ],
        "approved_on": [
          "m01-nashville-history"
        ],
        "expires_on": [
          "m01-nashville-amendment",
          "m01-nashville-history"
        ]
      },
      "id": "restriction:nashville-tn-bl2026-1448",
      "instrument_id": "BL2026-1448 as amended",
      "instrument_url": "https://nashville.legistar.com/LegislationDetail.aspx?GUID=2A6E536A-95F6-46B9-993A-1F6E018DD389&ID=8063111&Options=ID%7CText%7C&Search=BL2026-1448",
      "instrument_verified": true,
      "jurisdiction": "Metropolitan Nashville and Davidson County",
      "limits": "The current Version 2 text report does not consolidate the adopted amendment. Both the substitute and amendment were reviewed together with history. The effective clause requires publication of notice; the actual newspaper publication day was not verified. No July 21 effective day, automatic expiration after zoning adoption or particular site determination is asserted.",
      "next_scheduled_on": null,
      "scope": "Official history records third reading passage as amended July 21, 2026 and Mayor approval July 24. Amendment No. 1 adds administrative appeals and replaces the earlier November 1 or zoning bill trigger with December 1, 2026. The substitute excludes the defined server room and certain workstations.",
      "sets_site_status": false,
      "source_ids": [
        "m01-nashville-history",
        "m01-nashville-substitute",
        "m01-nashville-amendment",
        "m01-nashville-current-text"
      ],
      "state": "tn",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "action_recorded_on": "2026-02-26",
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "id": "restriction:dorr-mi-20260226",
      "instrument_id": null,
      "instrument_url": "https://www.dorrtownshipmi.gov/wp-content/uploads/2026/08/2-26-2026.pdf",
      "instrument_verified": false,
      "jurisdiction": "Dorr Township",
      "limits": "The signed final ordinance, legal effective day, exact expiry and later amendment history were not verified. The meeting day and twelve month description are not substituted for legal commencement or an exact end day. No Microsoft project cancellation or physical stage change is established.",
      "next_scheduled_on": null,
      "scope": "Signed Township minutes record a six to zero vote authorizing signature of a data center moratorium ordinance, with an amended twelve month term.",
      "sets_site_status": false,
      "source_ids": [
        "m01-dorr-minutes"
      ],
      "state": "mi",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "term_description": "Twelve months in the authorized motion; commencement remains unknown.",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "id": "restriction:pittsfield-mi-current",
      "instrument_id": null,
      "instrument_url": null,
      "instrument_verified": false,
      "jurisdiction": "Pittsfield Charter Township",
      "limits": "Exact original adoption, legal effective day, exact expiry and signed moratorium text are not supplied by the selected notice. The future zoning hearing is not an enacted extension, repeal or automatic end of the moratorium.",
      "next_scheduled_on": "2026-10-28",
      "reported_expiry_month": "2026-11",
      "scope": "Current Township notice reports adoption of a temporary data center moratorium in 2025 with expiry in November 2026. It separately schedules the zoning amendment second hearing and reading for October 28, 2026.",
      "sets_site_status": false,
      "source_ids": [
        "m01-pittsfield"
      ],
      "state": "mi",
      "status": "officially_reported_term_incomplete",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "id": "restriction:loudoun-va-pause-proposal",
      "instrument_id": null,
      "instrument_url": null,
      "instrument_verified": false,
      "jurisdiction": "Loudoun County legislative applications",
      "limits": "This is a deferred proposal, not an enacted moratorium or approval ban. No legal effective day, expiry or future vote outcome is known from the selected notice. Existing administrative permissions and individual applications are not adjudicated.",
      "next_scheduled_on": "2026-11-17",
      "scope": "The October 20 County notice defers consideration of a proposed pause on Board action on legislative data center and substation applications to November 17, 2026.",
      "sets_site_status": false,
      "source_ids": [
        "m01-loudoun"
      ],
      "state": "va",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "zoning_pause",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "action_recorded_on": "2026-10-22",
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "action_recorded_on": [
          "m02-san-diego-order"
        ],
        "next_scheduled_on": [
          "m70-blog23",
          "m70-blog26"
        ],
        "status": [
          "m02-san-diego",
          "m02-san-diego-order"
        ],
        "scope": [
          "m70-blog23",
          "m70-blog26"
        ],
        "limits": [
          "m70-blog23",
          "m70-blog26"
        ]
      },
      "id": "restriction:san-diego-ca-proposed-20261022",
      "instrument_id": "Executive Order 2026 2 directs a proposed interim ordinance",
      "instrument_url": "https://www.sandiego.gov/sites/default/files/2026-10/mtg-eo-data-center-2026-2.pdf",
      "instrument_verified": false,
      "jurisdiction": "City of San Diego",
      "limits": "The Council office preview describes a proposed 45 day urgency ordinance requiring a four fifths vote. No accomplished adoption, legal commencement, expiry or extension is verified. The 10 a.m. clock is the session start, not an exact item opening time.",
      "next_scheduled_on": "2026-10-27",
      "scope": "The October 23 Council office update moves the expected moratorium discussion to Tuesday morning. The October 26 preview places proposed urgency ordinance item S510 in the October 27 morning Council session. This supersedes the earlier October 26 consideration reference and establishes no completed vote.",
      "sets_site_status": false,
      "source_ids": [
        "m02-san-diego",
        "m02-san-diego-order",
        "m70-blog23",
        "m70-blog26"
      ],
      "state": "ca",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "supporting_directive_verified": true,
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-02",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-06-02",
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m02-boulder"
        ],
        "effective_on": [
          "m02-boulder"
        ],
        "status": [
          "m02-boulder"
        ]
      },
      "id": "restriction:boulder-co-dc260003",
      "instrument_id": "DC 26 0003 County reported moratorium",
      "instrument_url": "https://bouldercounty.gov/property-and-land/land-use/planning/land-use-code-update/dc-26-0003/",
      "instrument_verified": false,
      "jurisdiction": "Boulder County unincorporated areas",
      "limits": "The selected page supplies no signed moratorium instrument or exact expiry day. The County explicitly excludes incorporated cities such as Boulder and Longmont from this code update. A stated interest in prohibiting uses is not an adopted permanent ban. No project exemption or later extension is decided.",
      "next_scheduled_on": null,
      "reported_term_months": 6,
      "scope": "The current County code update page says Commissioners enacted a temporary moratorium effective June 2, 2026 for six months. During that period the planning department does not accept data center applications while it considers land use code changes.",
      "sets_site_status": false,
      "source_ids": [
        "m02-boulder"
      ],
      "state": "co",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-10-08",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m02-manatee"
        ],
        "status": [
          "m02-manatee"
        ]
      },
      "id": "restriction:manatee-fl-ordinance2642",
      "instrument_id": "Ordinance 26 42 reported adopted",
      "instrument_url": "https://www.mymanatee.org/connect/news-and-information/news-and-information/article-detail/board-of-county-commissioners/2026/10/09/manatee-county-commissioners-approve-12-month-data-center-moratorium",
      "instrument_verified": false,
      "jurisdiction": "Manatee County unincorporated areas",
      "limits": "The County states a twelve month term or earlier repeal, with an extension possible. The selected account does not supply the signed ordinance, its exact legal effective day or an exact expiry. The July 28 direction and September 17 recommendation are distinct from October 8 adoption. This is not a permanent prohibition or a determination of a pending property application.",
      "next_scheduled_on": null,
      "reported_term_months": 12,
      "scope": "The County account with an October 8, 2026 dateline reports adoption of Ordinance 26 42 after the second and final hearing. It describes a temporary pause on new data center related building permits, site plans, development orders and agreements, special permit uses, rezonings and comprehensive plan applications in unincorporated areas.",
      "sets_site_status": false,
      "source_ids": [
        "m02-manatee"
      ],
      "state": "fl",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-05-06",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "county": "Los Angeles",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m02-monterey-park",
          "m02-mp-2278"
        ],
        "status": [
          "m02-monterey-park",
          "m02-mp-2278"
        ]
      },
      "id": "restriction:monterey-park-ca-ordinance2278",
      "instrument_id": "Ordinance 2278 with separate 2276 and 2279 context",
      "instrument_url": "https://montereypark.ca.gov/DocumentCenter/View/19133/Ord-2278-Data-Center-Prohibition---Regular",
      "instrument_verified": false,
      "jurisdiction": "City of Monterey Park",
      "limits": "The uploaded 2278 copy has blank signature lines. Its thirty day clause is retained without converting it into a verified exact effective day or a present legal conclusion. The separate urgency Ordinance 2276 declares April 20 adoption and immediate effect; the separate 2279 ties effectiveness to Measure NDC. No election result, final execution, retroactive enforcement, later litigation or individual permit outcome is verified. The June 21, 2023 retroactivity clause is not represented as the 2026 adoption day.",
      "next_scheduled_on": null,
      "scope": "The City current document index lists Ordinance 2278 as a citywide data center prohibition adopted May 6, 2026. Its text prohibits the defined use in every zone, subject to preemption, while allowing subordinate associated data or server rooms incidental to the primary use. The text declares adoption and a thirty day effective condition.",
      "sets_site_status": false,
      "source_ids": [
        "m02-monterey-park",
        "m02-mp-2276",
        "m02-mp-2278",
        "m02-mp-2279"
      ],
      "state": "ca",
      "status": "adopted_current_status_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "ban",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-09",
      "applies_to_all_projects": false,
      "approved_on": "2026-06-11",
      "checked_on": "2026-10-23",
      "effective_on": "2026-06-11",
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m02-seattle-0",
          "m02-seattle-bill"
        ],
        "approved_on": [
          "m02-seattle-0",
          "m02-seattle-bill"
        ],
        "effective_on": [
          "m02-seattle-0"
        ],
        "status": [
          "m02-seattle-0",
          "m02-seattle-bill"
        ]
      },
      "id": "restriction:seattle-wa-ordinance127447",
      "instrument_id": "Ordinance 127447, Council Bill 121214",
      "instrument_url": "https://seattle.legistar.com/View.ashx?M=F&ID=15591933&GUID=FF4AF581-2436-47CB-82BA-B0AC4D72590F",
      "instrument_verified": true,
      "jurisdiction": "City of Seattle",
      "limits": "The definition uses capacity over 20 MVA with the other listed criteria, not a 20 MW electricity demand threshold. A facility operating on the effective day can qualify for an expansion exception of no more than an additional 20 MVA under section 2. Six months refers to possible renewal periods, not the original 365 day term. Later amendments, early termination and current eligibility have not been fully reviewed. No exact calculated expiry or outcome of the required later hearing is promoted.",
      "next_scheduled_on": null,
      "reported_term_days": 365,
      "scope": "Signed Ordinance 127447 was passed June 9, 2026 and approved June 11. Its immediate effect requires both Council passage and mayoral approval. It pauses applications to establish or expand the defined data centers or change use to them in all City zones for 365 days from effectiveness, subject to extension or earlier termination.",
      "sets_site_status": false,
      "source_ids": [
        "m02-seattle",
        "m02-seattle-bill",
        "m02-seattle-0"
      ],
      "state": "wa",
      "status": "adopted_current_status_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-02-24",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m02-marengo"
        ],
        "reported_publication_on": [
          "m02-marengo"
        ],
        "status": [
          "m02-marengo"
        ]
      },
      "id": "restriction:marengo-mi-ordinance20261",
      "instrument_id": "Ordinance 2026 1 declared adopted copy",
      "instrument_url": "https://marengomi.gov/wp-content/uploads/2026/02/2026-1-Data-Center-Moratorium.pdf",
      "instrument_verified": false,
      "jurisdiction": "Marengo Township, Calhoun County",
      "limits": "The certification text reports publication March 6, but the attestation and signature lines are blank and the following notice form also has blank dates. Publication and an executed certification have not been independently verified. The exact legal effective day, exact expiry and later Township amendments remain unknown. The waiver process concerns a future extension and is not an automatic exemption.",
      "next_scheduled_on": null,
      "reported_publication_on": "2026-03-06",
      "reported_term_years": 1,
      "scope": "The original Township document declares adoption of Ordinance 2026 1 on February 24, 2026. It states a one year moratorium on the specified consideration, permitting and establishment activities, subject to extension or the implementation of data center regulations. Section 7 makes effect dependent on publication.",
      "sets_site_status": false,
      "source_ids": [
        "m02-marengo"
      ],
      "state": "mi",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "action_recorded_on": "2026-09-09",
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "action_recorded_on": [
          "m02-newark"
        ],
        "proposal_disposition": [
          "m02-newark"
        ],
        "status": [
          "m02-newark"
        ]
      },
      "id": "restriction:newark-nj-file261273",
      "instrument_id": "Proposed file 26 1273",
      "instrument_url": "https://newark.legistar.com/LegislationDetail.aspx?GUID=8BA72AD2-597E-4B54-AB88-8CE2B4E80645&ID=8199707&Options=&Search=",
      "instrument_verified": false,
      "jurisdiction": "City of Newark",
      "limits": "A pass result for returning the proposal is not passage or enactment of the moratorium. No adopted restriction, legal start, expiry or next scheduled hearing is verified. The historical proposal disposition remains explicit; a pending replacement ordinance is not inferred.",
      "next_scheduled_on": null,
      "proposal_disposition": "returned_to_administration",
      "scope": "The official docket for file 26 1273 contains a proposed one year data center moratorium. Its current history records Returned to Administration on September 9, 2026. The listed Pass result describes that return motion.",
      "sets_site_status": false,
      "source_ids": [
        "m02-newark"
      ],
      "state": "nj",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-07-14",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "ends_on_trigger": "DPS submits its report of the final generic environmental impact statement and associated findings statement",
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m02-new-york-order",
          "m02-new-york"
        ],
        "ends_on_trigger": [
          "m02-new-york-order"
        ],
        "status": [
          "m02-new-york-order"
        ]
      },
      "id": "restriction:new-york-eo62",
      "instrument_id": "Executive Order 62",
      "instrument_url": "https://www.governor.ny.gov/executive-order/no-62-establishing-temporary-moratorium-data-centers-new-york-while-state-develops",
      "instrument_verified": true,
      "jurisdiction": "New York State DEC discretionary permissions",
      "limits": "The order expressly excludes local government permissions from this hold. Manufacturing, research, education and medical care exclusions retain their statutory scope. The news account describes up to one year, but the operative hold has a report trigger and no fixed calendar expiry. The separate twelve month water report deadline is not the moratorium end. Completion of the environmental review, later orders, court action, present legal effect and individual project eligibility have not been verified. No exact separate effective day is supplied.",
      "next_scheduled_on": null,
      "scope": "Executive Order 62 dated July 14, 2026 directs DEC to hold qualifying discretionary construction or expansion applications that were not determined complete before the order. The hold lasts until DPS submits the final generic environmental impact statement report and associated findings. The definition includes a 50 MW capability threshold and other characteristics, with specified primary use exclusions.",
      "sets_site_status": false,
      "source_ids": [
        "m02-new-york",
        "m02-new-york-order"
      ],
      "state": "ny",
      "status": "adopted_current_status_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-08-03",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-08-03",
      "expires_on": "2027-02-03",
      "field_sources": {
        "adopted_on": [
          "m03-harpersville-law"
        ],
        "effective_on": [
          "m03-harpersville-law"
        ],
        "expires_on": [
          "m03-harpersville"
        ],
        "status": [
          "m03-harpersville-law",
          "m03-harpersville"
        ]
      },
      "id": "restriction:harpersville-al-20260803",
      "instrument_id": "Ordinance 2026 08 03 03",
      "instrument_url": "https://www.harpersvilleal.gov/DocumentCenter/View/861/ORD---2026-08-03-03---Data-Center-Moratoriumpdf",
      "instrument_verified": true,
      "jurisdiction": "Town of Harpersville corporate limits and police jurisdiction as permitted by law",
      "limits": "The ordinance extends to corporate limits or police jurisdiction only to the extent permitted by law. It is not a Shelby County wide ban or a finding about an individual property. Earlier termination or later extension is possible. All four scanned pages were actually viewed, including signatures and posting attestation; the October 26 informational session is not a vote outcome.",
      "next_scheduled_on": null,
      "scope": "The signed and attested Town ordinance adopts a six month hold on the specified zoning, rezoning, new business licenses, building permits and other municipal approvals for new or expanded data centers. Adoption and immediate effect are August 3, 2026. The current Town study schedule states expiry February 3, 2027.",
      "sets_site_status": false,
      "source_ids": [
        "m03-harpersville",
        "m03-harpersville-law"
      ],
      "source_read_scope": {
        "all_pages_visually_read": true,
        "visual_pages": [
          1,
          2,
          3,
          4
        ]
      },
      "state": "al",
      "status": "in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-30",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-06-30",
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m03-washington-md"
        ],
        "effective_on": [
          "m03-washington-md"
        ],
        "status": [
          "m03-washington-md"
        ]
      },
      "id": "restriction:washington-md-20260630",
      "instrument_id": "County reported June 30 moratorium",
      "instrument_url": "https://www.washco-md.net/news/washington-county-statement-on-temporary-moratorium-for-data-centers-in-washington-county/",
      "instrument_verified": false,
      "jurisdiction": "Washington County Maryland unincorporated areas",
      "limits": "The account explicitly distinguishes Hagerstown and other incorporated municipalities, with a separate statutory annexation qualification. It does not establish a rule for every municipality. The underlying signed instrument, exact expiry and individual project eligibility are unverified. Staff noise, setback and other study topics on the page are proposals, not adopted standards.",
      "next_scheduled_on": null,
      "reported_term_months": 12,
      "scope": "The County September 30 account says the Board approved a twelve month application, plan and request moratorium June 30, 2026, effective immediately. It explains that the rule applies to unincorporated County areas and remains subject to later modification or extension.",
      "sets_site_status": false,
      "source_ids": [
        "m03-washington-md"
      ],
      "state": "md",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-04-01",
      "affected_zone_codes": [
        "CC-A",
        "CG-A",
        "UM",
        "DD",
        "ML",
        "MG"
      ],
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": "2027-02-11",
      "field_sources": {
        "adopted_on": [
          "m03-cincinnati"
        ],
        "expires_on": [
          "m03-cincinnati"
        ],
        "original_pause_start_on": [
          "m03-cincinnati",
          "m03-cincinnati-law-240"
        ],
        "status": [
          "m03-cincinnati"
        ]
      },
      "id": "restriction:cincinnati-oh-idc89",
      "instrument_id": "IDC Overlay 89, reported extension",
      "instrument_url": "https://cincyweb.cincinnati-oh.gov/planning/projects/active/interim-development-control-overlay-89-data-centers-and-zoning-study/",
      "instrument_verified": false,
      "jurisdiction": "City of Cincinnati specified IDC 89 zoning districts",
      "limits": "This is an interim review control, not a blanket refusal to accept all applications or a City wide data center ban. The March 6 report recommends extension and contains review criteria; it is not the final adopted extension instrument. The original ordinance download had a transport hold. Exact extension effectiveness, later changes and individual applications are unverified. Proposed review criteria are not certified as final code.",
      "next_scheduled_on": null,
      "original_pause_start_on": "2026-02-11",
      "reported_action": "extension",
      "scope": "The current City study page reports establishment of Interim Development Control Overlay 89 on February 11, 2026 and a nine month extension April 1, expiring February 11, 2027. The accompanying staff report describes additional Planning Commission review of specified data center permits and approvals in listed zones.",
      "sets_site_status": false,
      "source_ids": [
        "m03-cincinnati",
        "m03-cincinnati-law-240"
      ],
      "source_read_scope": {
        "map_geometry_not_promoted": true,
        "staff_report_text_pages": [
          1,
          2,
          3,
          4,
          6,
          7
        ]
      },
      "state": "oh",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "study_period",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-24",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-06-24",
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m03-snohomish-0",
          "m03-snohomish-3"
        ],
        "effective_on": [
          "m03-snohomish-3"
        ],
        "later_docket_action_on": [
          "m03-snohomish"
        ],
        "status": [
          "m03-snohomish",
          "m03-snohomish-0",
          "m03-snohomish-3"
        ]
      },
      "id": "restriction:snohomish-wa-ordinance26026",
      "instrument_id": "Emergency Ordinance 26 026",
      "instrument_url": "https://snohomish.legistar.com/View.ashx?M=F&ID=15651712&GUID=DE8BC08D-EDAF-4845-A365-BFC421D79680",
      "instrument_verified": true,
      "jurisdiction": "Snohomish County unincorporated areas",
      "later_docket_action_on": "2026-08-19",
      "limits": "The definition includes a total planned electrical load of at least two megawatts and other criteria. This is not a City of Snohomish rule. The docket final action on August 19 does not replace the original June 24 start. County Executive lines on the selected ordinance are blank; the enactment notice is the separate basis for immediate effect. No exact calculated expiry, completed renewal, later code replacement or individual permission is certified.",
      "next_scheduled_on": null,
      "reported_term_months": 6,
      "scope": "Council signed and attested Emergency Ordinance 26 026 is dated June 24, 2026. The official enactment notice explicitly confirms adoption and immediate effect June 24. It holds the filing, acceptance, processing and approval of applications to establish, expand or change use to defined data centers in unincorporated County zones for six months, subject to renewal.",
      "sets_site_status": false,
      "source_ids": [
        "m03-snohomish",
        "m03-snohomish-0",
        "m03-snohomish-3"
      ],
      "source_read_scope": {
        "enactment_notice_text_pages": [
          1,
          2
        ],
        "later_related_file_not_audited": true,
        "ordinance_text_pages": [
          3,
          4,
          5
        ],
        "ordinance_visual_pages": [
          5
        ]
      },
      "state": "wa",
      "status": "adopted_current_status_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "reported_on": [
          "m03-skagit"
        ],
        "status": [
          "m03-skagit"
        ]
      },
      "id": "restriction:skagit-wa-reported-moratorium",
      "instrument_id": "County reported moratorium with instrument access hold",
      "instrument_url": "https://www.skagitcounty.net/Common/Documents/LFDocs/COMMISSIONERS000039/00/00/0b/00000b44.pdf",
      "instrument_verified": false,
      "jurisdiction": "Skagit County outside incorporated cities and towns",
      "limits": "The linked instrument host robots request did not establish access, so its legal text was not adopted. The June 1 article date is not treated as the exact adoption or effective day. Exact commencement, expiry, signed final text, later amendment and individual exceptions remain unknown. The July 14 scheduled hearing is not assumed to have occurred or changed the rule.",
      "next_scheduled_on": null,
      "reported_on": "2026-06-01",
      "scope": "The official June 1 County account reports adoption of a data center moratorium outside incorporated municipalities. The account describes covered facilities as larger than 2000 square feet or having anticipated load of at least two megawatts, and directs a public code study.",
      "sets_site_status": false,
      "source_ids": [
        "m03-skagit"
      ],
      "state": "wa",
      "status": "officially_reported_term_incomplete",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-22",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m03-spokane-meeting"
        ],
        "status": [
          "m03-spokane-law-account",
          "m03-spokane-meeting"
        ]
      },
      "id": "restriction:spokane-wa-ordinancec36887",
      "instrument_id": "Emergency Ordinance C36887 reported passed",
      "instrument_url": "https://my.spokanecity.org/citycouncil/meetings/2026/06/22/legislative-meeting/",
      "instrument_verified": false,
      "jurisdiction": "City of Spokane",
      "limits": "City of Spokane is distinct from Spokane County. The complete final ordinance and the exact mixed activity clause were not reviewed in the advertised large agenda packet. No exact mayoral approval, legal effective day, calculated expiry, later extension or site eligibility is certified. The scheduled July 22 hearing is not an accomplished decision.",
      "next_scheduled_on": null,
      "reported_term_years": 1,
      "scope": "The City June 22 meeting record reports passage of Emergency Ordinance C36887, and the June 23 official account describes a one year citywide hold on the specified applications to establish or expand data centers. A mixed activity amendment is reported separately.",
      "sets_site_status": false,
      "source_ids": [
        "m03-spokane-law-account",
        "m03-spokane-meeting"
      ],
      "state": "wa",
      "status": "adopted_current_status_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-05-18",
      "applies_to_all_projects": false,
      "approved_on": "2026-05-20",
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m03-denver",
          "m03-denver-7"
        ],
        "approved_on": [
          "m03-denver",
          "m03-denver-7"
        ],
        "status": [
          "m03-denver",
          "m03-denver-7"
        ]
      },
      "id": "restriction:denver-co-bill260431",
      "instrument_id": "Council Bill 26 0431 approved copy",
      "instrument_url": "https://denver.legistar.com/View.ashx?M=F&ID=15494229&GUID=886C2DC6-F50E-47BA-8549-6BE8C094251F",
      "instrument_verified": true,
      "jurisdiction": "City and County of Denver",
      "limits": "The selected signed copy has blank publication notice lines and supplies no separate exact legal effective day. Its term is one year from effectiveness, or earlier once both the municipal code and zoning code data center amendments are effective; the later of those two amendment days controls that alternative. No exact expiry, completed code amendments or individual site outcome is inferred. The ordinance number field is blank and is not filled from the bill number.",
      "next_scheduled_on": null,
      "reported_term_years": 1,
      "scope": "The Council and Mayor signed copy of Council Bill 26 0431 records Council passage May 18, 2026 and mayoral approval May 20. Its operative clauses hold the specified applications for new or expanded primary use data centers and preserve pending applications from becoming inactive during the hold.",
      "sets_site_status": false,
      "source_ids": [
        "m03-denver",
        "m03-denver-7"
      ],
      "source_read_scope": {
        "publication_lines_blank": true,
        "text_pages": [
          1,
          2,
          3
        ],
        "visual_pages": [
          3
        ]
      },
      "state": "co",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-10-08",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-10-08",
      "expires_on": "2027-10-31",
      "field_sources": {
        "adopted_on": [
          "m03-lexington-law-history",
          "m03-lexington-signed"
        ],
        "effective_on": [
          "m03-lexington-law-history",
          "m03-lexington-signed"
        ],
        "expires_on": [
          "m03-lexington-signed",
          "m03-lexington"
        ],
        "original_pause_start_on": [
          "m03-lexington-signed",
          "m03-lexington"
        ],
        "status": [
          "m03-lexington",
          "m03-lexington-law-history",
          "m03-lexington-signed"
        ]
      },
      "id": "restriction:lexington-ky-resolution4382026",
      "instrument_id": "Resolution R 438 2026",
      "instrument_url": "https://lexington.legistar.com/View.ashx?M=F&ID=16055309&GUID=12C712EF-30F8-43EB-A046-AC1397EE9A18",
      "instrument_verified": true,
      "jurisdiction": "Lexington Fayette Urban County",
      "limits": "Section 5 preserves an exception for applications already filed, if any. No exact individual exemption, existing facility shutdown, later zoning proposal outcome or full court review is inferred. October 6 committee action is distinct from the October 8 enacted extension. The engagement download wrappers and normal headless downloads failed to deliver a PDF; the independent official legislative docket and its signed three page resolution supplied the verified instrument.",
      "next_scheduled_on": null,
      "original_pause_start_on": "2026-06-09",
      "reported_action": "extension",
      "scope": "Signed and attested Resolution 438 2026 was passed October 8, 2026 and becomes effective on passage. It extends the specified zone map amendment, development plan and permit approval moratorium until October 31, 2027. The current official engagement page and enacted docket confirm the extension.",
      "sets_site_status": false,
      "source_ids": [
        "m03-lexington",
        "m03-lexington-law-history",
        "m03-lexington-signed"
      ],
      "source_read_scope": {
        "all_resolution_pages_visually_read": true,
        "official_full_docket_text_read": true,
        "signed_resolution_visual_pages": [
          1,
          2,
          3
        ]
      },
      "state": "ky",
      "status": "in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-09-22",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m03-pima"
        ],
        "status": [
          "m03-pima"
        ]
      },
      "id": "restriction:pima-az-resolution202656",
      "instrument_id": "Resolution 2026 56, docket approval with prepared text limitation",
      "instrument_url": "https://pima.legistar.com/View.ashx?M=F&ID=15860968&GUID=FCCDB6FB-FD3D-4B34-BE73-9A3AB907023A",
      "instrument_verified": false,
      "jurisdiction": "Pima County development jurisdiction",
      "limits": "The prepared resolution has blank Board Chair and Clerk signature lines, while an attorney form approval is signed. It is not certified as the final executed text. The staff recommendation and requested meeting day do not independently establish enactment; the docket approval is the separate basis for the recorded adoption. Exact legal commencement, expiry, later litigation and the eligibility of Project Blue, Project Gravel or any other site remain unverified.",
      "next_scheduled_on": null,
      "reported_term_days": 120,
      "scope": "The current official docket marks Resolution 2026 56 approved on September 22, 2026. The attached prepared text describes a 120 day hold on future new data center development without the specified issued site improvement or construction permits, with a Board waiver process.",
      "sets_site_status": false,
      "source_ids": [
        "m03-pima",
        "m03-pima-1"
      ],
      "source_read_scope": {
        "board_signatures_blank": true,
        "prepared_resolution_text_pages": [
          4,
          5,
          6,
          7
        ],
        "signature_visual_pages": [
          7
        ],
        "unrelated_private_comment_letters_not_read_or_published": true
      },
      "state": "az",
      "status": "adopted_current_status_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-10-06",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-10-06",
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m04-c45-oakland-instrument",
          "m04-c45-oakland-history"
        ],
        "effective_on": [
          "m04-c45-oakland-instrument"
        ],
        "status": [
          "m04-c45-oakland-instrument",
          "m04-c45-oakland-history"
        ]
      },
      "id": "restriction:oakland-ca-ordinance13899",
      "instrument_id": "Ordinance 13899 C.M.S.",
      "instrument_url": "https://oakland.legistar.com/View.ashx?M=F&ID=16061258&GUID=FE63DAEB-29A2-4617-A8B8-63F0D607ABC5",
      "instrument_verified": true,
      "jurisdiction": "City of Oakland",
      "limits": "The October 13 filing stamp is not the adoption date. The instrument holds specified approvals, not every application acceptance or processing step. Its narrow exception covers incidental and subordinate server rooms for an existing principal use using existing water, electrical and HVAC supply; unrelated server operation is excluded. This is City authority, not all Alameda County. No calculated expiry, later extension, Behring project stage or individual exemption is certified.",
      "next_scheduled_on": null,
      "reported_term_days": 45,
      "scope": "Attested Ordinance 13899 C.M.S. was adopted October 6, 2026 with seven affirmative votes and becomes effective immediately. It holds the listed permits, entitlements and agreements for new data centers for forty five days from adoption, subject to earlier replacement regulations or a later enacted extension.",
      "sets_site_status": false,
      "source_ids": [
        "m04-c45-oakland-instrument",
        "m04-c45-oakland-history"
      ],
      "source_read_scope": {
        "all_eight_pages_visually_read": true,
        "filing_stamp_not_adoption_day": true,
        "visual_pages": [
          1,
          2,
          3,
          4,
          5,
          6,
          7,
          8
        ]
      },
      "state": "ca",
      "status": "in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-10-22",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-10-22",
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m04-m04-clackamas-adopt"
        ],
        "effective_on": [
          "m04-m04-clackamas-adopt"
        ],
        "status": [
          "m04-m04-clackamas-adopt"
        ],
        "scope": [
          "m75-clackamas-0",
          "m75-clackamas-1"
        ],
        "limits": [
          "m75-clackamas-0",
          "m75-clackamas-1"
        ]
      },
      "id": "restriction:clackamas-or-20261022",
      "instrument_id": "County reported October 22 temporary moratorium",
      "instrument_url": "https://www.clackamas.us/news/2026-10-22/clackamas-county-commissioners-unanimously-approve-temporary-data-center-moratorium",
      "instrument_verified": false,
      "jurisdiction": "Clackamas County unincorporated areas",
      "limits": "The680page packet is not a signed instrument: resolution number and signatures are blank. Only pages2through8 reviewed. Existing immediate effect account retained; no calculated expiry or current eligibility. Possible extension requires a further hearing and findings; it is not automatic.",
      "next_scheduled_on": null,
      "reported_term_days": 120,
      "scope": "County account and draft minutes report October22adoption. Packet text covers new applications for new or expanded data centers as primary uses in unincorporated areas, including colocation, cloud, AI and mining. It excludes telecommunications facilities principally carrying communications rather than hosting or processing end user data.",
      "sets_site_status": false,
      "source_ids": [
        "m04-m04-clackamas-adopt",
        "m04-m04-clackamas",
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "state": "or",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "reported_approval_on": [
          "m04-m04-stjoseph-faq",
          "m04-m04-stjoseph-press"
        ],
        "status": [
          "m04-m04-stjoseph-faq",
          "m04-m04-stjoseph-press"
        ]
      },
      "id": "restriction:st-joseph-mo-reported-pause",
      "instrument_id": "City reported twelve month application pause",
      "instrument_url": "https://www.stjosephmo.gov/DocumentCenter/View/22254/Data-Center-Development-FAQ-PDF?bidId=",
      "instrument_verified": false,
      "jurisdiction": "City of St Joseph Missouri",
      "limits": "July 21 is retained as the City account date of approval, without certifying the exact enacted instrument or legal effective day. The underlying emergency ordinance, exact expiry, later amendment and individual exceptions were not verified. Proposed consultant contracts and proposed future standards are not final zoning. This Missouri City is distinct from St Joseph Minnesota, St Joseph Tennessee and similarly named counties.",
      "next_scheduled_on": null,
      "reported_approval_on": "2026-07-21",
      "reported_term_months": 12,
      "scope": "The current official development FAQ and September 24 City release describe a current twelve month pause on new data center applications and attribute approval to a July 21 Council meeting. The City describes consultant work on future zoning and development standards during that pause.",
      "sets_site_status": false,
      "source_ids": [
        "m04-m04-stjoseph-faq",
        "m04-m04-stjoseph-press"
      ],
      "source_read_scope": {
        "city_release_text_pages": [
          1,
          2
        ],
        "enacted_ordinance_not_verified": true,
        "faq_text_pages": [
          1,
          2,
          3
        ]
      },
      "state": "mo",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "zoning_pause",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "next_scheduled_on": [
          "m04-h3-lysander"
        ],
        "status": [
          "m04-m04-lysander-law",
          "m04-h3-lysander"
        ]
      },
      "id": "restriction:lysander-ny-local-law42026",
      "instrument_id": "Posted Local Law 4 of 2026 with filing verification hold",
      "instrument_url": "https://lysanderny.gov/sites/default/files/2026-04/data_storage_moratorium_ll_no._4_docx.pdf",
      "instrument_verified": false,
      "jurisdiction": "Town of Lysander",
      "limits": "The posted law text has no completed enactment or Secretary of State filing proof. Exact adoption, filing, legal commencement and original expiry remain unknown. The unapproved minutes proposed May 9, 2027 as an extension endpoint; the hearing motion does not enact that extension. Board hardship relief is described separately from suspended Zoning Board jurisdiction. The ordinary old host redirects to the current Town government host were recorded before capture, with no denied request or alternate identity.",
      "next_scheduled_on": "2026-11-05",
      "reported_term_months": 6,
      "scope": "The Town posted Local Law 4 of 2026 text describes a six month hold on accepting covered applications, beginning upon filing with the Secretary of State. The October 1 unapproved meeting minutes describe an existing moratorium and record a motion authorizing a November 5 extension hearing.",
      "sets_site_status": false,
      "source_ids": [
        "m04-m04-lysander-law",
        "m04-h3-lysander"
      ],
      "source_read_scope": {
        "posted_law_text_pages": [
          1,
          2
        ],
        "secretary_of_state_filing_not_verified": true,
        "unapproved_minutes_resolution": "237 2026"
      },
      "state": "ny",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:mamakating-ny-proposed-pause",
      "instrument_id": "October 20 proposed hearing rescheduling resolution",
      "instrument_url": "https://www.mamakating.gov/AgendaCenter/ViewFile/Agenda/_10202026-1061",
      "instrument_verified": false,
      "jurisdiction": "Town of Mamakating",
      "limits": "The agenda does not prove adoption of the rescheduling resolution, confirmation of the new hearing, enactment of a moratorium, term or effective date. No November 17 next scheduled field, completed vote or application hold is inferred. A separate budget hearing and its meeting details do not supply the moratorium outcome.",
      "next_scheduled_on": null,
      "scope": "The October 20 Town Board agenda proposes rescheduling a public hearing for a data center moratorium to November 17 at 6 PM. This records a proposed restriction process only.",
      "sets_site_status": false,
      "source_ids": [
        "m04-m04-mamakating"
      ],
      "source_read_scope": {
        "agenda_text_pages": [
          1
        ]
      },
      "state": "ny",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "next_scheduled_on": [
          "m05-h06-wiscasset",
          "m05-h06-wiscasset-ballot"
        ]
      },
      "id": "restriction:wiscasset-me-proposed-x19",
      "instrument_id": "Proposed X 19",
      "instrument_url": "https://www.wiscasset.gov/DocumentCenter/View/1743/Data-Center-Moratorium-Ordinance---Final",
      "instrument_verified": false,
      "jurisdiction": "Town of Wiscasset",
      "limits": "The text is a proposal despite its final filename. Proposed retroactive application to proceedings filed on or after November 3 is not a completed legal start. It excludes electronic equipment incidental to a business with another primary activity. Warrant Article 4 and sample ballot Question 2 refer to the same measure. No voter result, effective day, exact expiry or individual project effect is certified.",
      "next_scheduled_on": "2026-11-03",
      "proposed_retroactive_applicability_on": "2026-11-03",
      "proposed_term_months": 6,
      "scope": "The original Town sample ballot places proposed Data Center Moratorium X 19 before voters on November 3. The posted text would suspend acceptance, processing, review and approval of covered applications, with a six month term after enactment and possible later extensions.",
      "sets_site_status": false,
      "source_ids": [
        "m05-h06-wiscasset",
        "m05-h06-wiscasset-ballot",
        "m05-h06-wiscasset-law"
      ],
      "source_read_scope": {
        "ballot_text_pages": [
          1
        ],
        "proposed_law_text_pages": [
          1,
          2,
          3
        ]
      },
      "state": "me",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "next_scheduled_on": [
          "m05-h06-wells",
          "m05-h06-wells-ballot"
        ]
      },
      "id": "restriction:wells-me-proposed-retroactive-pause",
      "instrument_id": "Article 5 and proposed warrant Appendix 1",
      "instrument_url": "https://wellstown.org/DocumentCenter/View/8514/November-3-2026-Special-Town-Meeting-Warrant?bidId=",
      "instrument_verified": false,
      "jurisdiction": "Town of Wells",
      "limits": "The proposed 180 day term is measured from its June 16 Date of Applicability. June 16 is proposed retroactivity, not an adoption or verified effective date. Section 8 conditions immediate effect on Town Meeting enactment. The Board and Planning Board recommendations are not a voter result. Aggregate Data Center Area includes specified associated impervious surfaces, so the threshold is not simply building floor area. No exact end, existing blanket ban or project finding is inferred.",
      "next_scheduled_on": "2026-11-03",
      "proposed_retroactive_applicability_on": "2026-06-16",
      "proposed_term_days": 180,
      "scope": "Town ballot Article 5 asks voters on November 3 whether to enact the proposed retroactive moratorium. Appendix 1 in the warrant covers facilities meeting its aggregate Data Center Area threshold of 100000 square feet and would hold specified development activities, application processing and approvals.",
      "sets_site_status": false,
      "source_ids": [
        "m05-h06-wells",
        "m05-h06-wells-ballot",
        "m05-h06-wells-warrant"
      ],
      "source_read_scope": {
        "ballot_visual_pages": [
          1,
          2
        ],
        "unrelated_warrant_articles_not_adopted": true,
        "warrant_text_pages": [
          5,
          7,
          8,
          9,
          10
        ]
      },
      "state": "me",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:peru-me-proposed-2026-pause",
      "instrument_id": "Posted proposed Data Center Moratorium",
      "instrument_url": "https://townofperumaine.org/wp-content/uploads/2026/09/Temporary-Moratorium-of-the-Development-and-Permitting-of-Data-Centers.pdf",
      "instrument_verified": false,
      "jurisdiction": "Town of Peru",
      "limits": "The signatures and attestation on the proposed text do not establish voter enactment. The selected subject notice identifies a month only, and no exact data center ballot copy was verified. A separate general referendum information flyer does not resolve that subject crosswalk. No exact next vote day, start, end or current legal hold is inferred.",
      "next_scheduled_on": null,
      "proposed_term_days": 180,
      "scope": "The September 15 Town notice places a proposed data center moratorium on a November 2026 ballot. The posted proposed ordinance describes a 180 day term beginning immediately upon passage and an exception for routine upgrades to existing telecommunications facilities.",
      "sets_site_status": false,
      "source_ids": [
        "m05-h06-peru-notice",
        "m05-h06-peru-law"
      ],
      "source_read_scope": {
        "proposed_law_visual_pages": [
          1
        ],
        "signatures_not_voter_adoption": true
      },
      "state": "me",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "next_scheduled_on": [
          "m05-m05-northberwick-ballot"
        ]
      },
      "id": "restriction:north-berwick-me-proposed-ban",
      "instrument_id": "Question 2 proposed zoning amendment",
      "instrument_url": "https://www.townofnorthberwick.org/DocumentCenter/View/1615/November-2026-Referendum",
      "instrument_verified": false,
      "jurisdiction": "Town of North Berwick",
      "limits": "The actual sample ballot says Tuesday November 3, 2026 despite a November 4 label in the download URL. The proposed definition excludes accessory server rooms or information technology infrastructure below the stated aggregate area threshold. This is a proposed zoning prohibition, not an enacted ban or temporary moratorium. No result or legal effective day is certified.",
      "next_scheduled_on": "2026-11-03",
      "scope": "The original scanned sample ballot places Question 2, a proposed zoning amendment to define and prohibit data centers, before voters on November 3. The attached proposed land use table marks the use NO in every listed zoning district. Its definition has a 25000 square foot aggregate Data Center Area threshold.",
      "sets_site_status": false,
      "source_ids": [
        "m05-m05-northberwick-election",
        "m05-m05-northberwick-ballot",
        "m05-m05-northberwick-info"
      ],
      "source_read_scope": {
        "ballot_body_controls_over_url_label": true,
        "information_text_pages": [
          1,
          2,
          20,
          21
        ],
        "sample_ballot_visual_pages": [
          1,
          2
        ],
        "unrelated_comprehensive_plan_pages_not_adopted": true
      },
      "state": "me",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "ban",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:scarborough-me-reported-pause",
      "instrument_id": "Council member reported six month emergency moratorium",
      "instrument_url": "https://www.scarboroughmaine.org/stay-connected/town-news/default/~board/town-council-corner/post/your-voice-matters-1790889582481",
      "instrument_verified": false,
      "jurisdiction": "Town of Scarborough",
      "limits": "The columns explicitly state that the author views need not reflect official Council policy. This is an attributed account, not a verified enacted instrument. Exact Council vote day, legal start, retroactive applicability, expiry, extension and exceptions remain unknown. A secondary June 3 date or reported April retroactivity is not imported.",
      "next_scheduled_on": null,
      "reported_term_months": 6,
      "scope": "Two Council member columns hosted on the Town website describe a current data center moratorium. The July column says the Council passed a six month emergency moratorium in June; the October column calls it current and discusses public concern.",
      "sets_site_status": false,
      "source_ids": [
        "m05-m05-scarborough-current",
        "m05-m05-scarborough-report"
      ],
      "source_read_scope": {
        "both_town_hosted_columns_read": true,
        "individual_author_disclaimer_preserved": true
      },
      "state": "me",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-08-18",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m05-m05-gray",
          "m05-m05-gray-law-final"
        ],
        "retroactive_applicability_on": [
          "m05-m05-gray-law-final"
        ],
        "status": [
          "m05-m05-gray"
        ]
      },
      "id": "restriction:gray-me-2026-pause",
      "instrument_id": "Ordinance establishing a temporary moratorium on data centers",
      "instrument_url": "https://www.graymaine.org/DocumentCenter/View/1435/Data-Center-Moratorium?bidId=",
      "instrument_verified": true,
      "jurisdiction": "Town of Gray",
      "limits": "The July 14 retroactive Date of Applicability is not the August 18 enactment date or a separately verified legal effective date. The aggregate Data Center Area threshold is 50000 square feet and includes associated impervious surfaces. The ordinance includes conditional nullification language limited by statute. No calculated expiry, later extension, final permit nullification or individual project eligibility is inferred.",
      "next_scheduled_on": null,
      "reported_term_days": 180,
      "retroactive_applicability_on": "2026-07-14",
      "scope": "The Town August 20 account reports an ordinance enacted August 18 and a current temporary moratorium. The posted ordinance header also states enactment on August 18. Sections 4 and 5 hold covered development activities, applications and approvals and state a 180 day term from July 14, the Date of Applicability.",
      "sets_site_status": false,
      "source_ids": [
        "m05-m05-gray",
        "m05-m05-gray-law-final"
      ],
      "source_read_scope": {
        "law_text_pages": [
          1,
          2,
          3,
          4
        ],
        "legal_effective_day_not_separately_certified": true
      },
      "state": "me",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-01",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m05-m05-brunswick-minutes"
        ]
      },
      "id": "restriction:brunswick-me-2026-pause",
      "instrument_id": "June 1 Council adopted moratorium with final text verification hold",
      "instrument_url": "https://www.brunswickme.gov/AgendaCenter/ViewFile/Minutes/_06012026-3849",
      "instrument_verified": false,
      "jurisdiction": "Town of Brunswick",
      "limits": "The earlier memorandum recommends approval and is not itself the vote. The minutes state that adopted text will be attached to the permanent record, but the final executed attachment was not verified in this pass. The proposal says immediate effect upon adoption. Exact final legal commencement, subsequent amendment, current disposition and expiry remain unverified, with no calculated date or new site status.",
      "next_scheduled_on": null,
      "reported_term_days": 180,
      "scope": "The original June 1 Council minutes record adoption of a data center moratorium with nine affirmative votes. The May 26 staff memorandum and attached proposal describe a 180 day pause covering new, enlarged or expanded data centers with electrical capacity of at least one megawatt.",
      "sets_site_status": false,
      "source_ids": [
        "m05-m05-brunswick-minutes",
        "m05-m05-brunswick-report"
      ],
      "source_read_scope": {
        "memorandum_and_proposed_law_text_pages": [
          2,
          3,
          4
        ],
        "minutes_text_pages": [
          3
        ],
        "private_commenter_names_not_exported": true
      },
      "state": "me",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-09-28",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m05-m05-bangor-prior-minutes"
        ],
        "original_pause_adopted_on": [
          "m05-m05-bangor-minutes"
        ]
      },
      "id": "restriction:bangor-me-ordinance26270",
      "instrument_id": "Ordinance 26 270 extension of Ordinance 26 138",
      "instrument_url": "https://www.bangormaine.gov/AgendaCenter/ViewFile/Agenda/_09282026-931",
      "instrument_verified": false,
      "jurisdiction": "City of Bangor",
      "limits": "The September 14 date on the packet ordinance is its introduction, not the final passage date. A minutes file linked under October 14 delivers September 28 minutes; the actual document heading and identical September 28 route control. The packet proposes immediate effect, but the final executed instrument and exact legal commencement were not separately verified. No calculated expiry, automatic current effect, approval outcome for any facility or universal absence of exceptions is certified.",
      "next_scheduled_on": null,
      "original_pause_adopted_on": "2026-04-13",
      "reported_term_days": 180,
      "scope": "Original April 13 Council minutes record passage of Ordinance 26 138 with nine affirmative votes, after a separate nine vote waiver of the two reading requirement. Original September 28 minutes record passage of extension Ordinance 26 270 with eight affirmative votes. The extension packet describes another 180 days, ending earlier if necessary zoning amendments become effective.",
      "sets_site_status": false,
      "source_ids": [
        "m05-m05-bangor-minutes",
        "m05-m05-bangor-prior-minutes",
        "m05-m05-bangor-extension-packet"
      ],
      "source_read_scope": {
        "april_packet_minutes_text_pages": [
          16
        ],
        "extension_minutes_text_pages": [
          3
        ],
        "extension_packet_text_pages": [
          6,
          13,
          44,
          45,
          46
        ],
        "unrelated_119_page_packet_content_not_adopted": true
      },
      "state": "me",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-07-07",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m06-m06-broomfield-index"
        ]
      },
      "id": "restriction:broomfield-co-ordinance2313",
      "instrument_id": "Ordinance 2313",
      "instrument_url": "https://www.broomfield.org/4283/City-Council-Ordinances",
      "instrument_verified": false,
      "jurisdiction": "City and County of Broomfield",
      "limits": "The linked final instrument redirects to itself and no eligible final text was obtained. Exact commencement, term, expiry, exceptions, later amendment and present legal effect remain unverified. No reported eighteen month term or assumed effective date is imported. No individual project finding is made.",
      "next_scheduled_on": null,
      "scope": "The current official ordinance index lists Ordinance 2313 under July 7, 2026 as adopted on second and final reading, and identifies a temporary data center moratorium. This is an official adoption entry, distinct from the June 2 first reading entry.",
      "sets_site_status": false,
      "source_ids": [
        "m06-m06-broomfield-index"
      ],
      "source_read_scope": {
        "final_instrument_redirect_loop_retained": true,
        "index_selected_sections": [
          "July 7",
          "June 2"
        ]
      },
      "state": "co",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-07-20",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m06-m06-monument-minutes"
        ]
      },
      "id": "restriction:monument-co-ordinance182026",
      "instrument_id": "Ordinance 18 2026",
      "instrument_url": "https://monumentco.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=4837,plainText=false)",
      "instrument_verified": false,
      "jurisdiction": "Town of Monument",
      "limits": "This read establishes the recorded adoption and discussion, not the separately posted executed ordinance terms. Exact legal commencement, expiry, exceptions, later amendment and present legal effect remain unverified. Accessory use is part of the stated subject rather than an assumed general exception. The source check is not the adoption day.",
      "next_scheduled_on": null,
      "reported_term_months": 6,
      "scope": "The original scanned July 20, 2026 Council minutes record a six to zero vote approving Ordinance 18 2026. The described pause covers acceptance or processing of specified permit and land development applications where a data center is a proposed principal or accessory use, and the minutes describe a six month term.",
      "sets_site_status": false,
      "source_ids": [
        "m06-m06-monument-minutes"
      ],
      "source_read_scope": {
        "minutes_visual_pages": [
          1,
          2,
          3,
          6
        ],
        "page6_blank": true,
        "public_portal_link_discovery_only": true,
        "recorded_vote": "six to zero",
        "remaining_pages_not_substantively_read": true,
        "temporary_signed_document_urls_not_exported": true
      },
      "state": "co",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-09",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m06-m06-buenavista-later-large"
        ],
        "proposed_expires_on": [
          "m06-m06-buenavista-large"
        ]
      },
      "id": "restriction:buena-vista-co-ordinance202613",
      "instrument_id": "Emergency Ordinance 2026 13",
      "instrument_url": "https://www.buenavistaco.gov/AgendaCenter/ViewFile/Agenda/_06232026-2161",
      "instrument_verified": false,
      "jurisdiction": "Town of Buena Vista",
      "limits": "The proposed text says immediate effect and December 9 termination, but has an unsigned adoption block and an emergency section discussing short term rentals rather than data centers. The final executed text and approval of these packet minutes were not separately verified. Proposed commencement, term and exceptions do not become certified final legal terms; no current application eligibility is inferred.",
      "next_scheduled_on": null,
      "proposed_expires_on": "2026-12-09",
      "scope": "The June 23 agenda packet includes the June 9 Board minutes, which record a carried motion adopting Emergency Ordinance 2026 13 with six named affirmative votes. The earlier June 9 packet contains a proposed ordinance covering principal use data centers and excluding accessory equipment that solely supports another use on the same lot.",
      "sets_site_status": false,
      "source_ids": [
        "m06-m06-buenavista-later-large",
        "m06-m06-buenavista-large"
      ],
      "source_read_scope": {
        "entire_132_and_larger_page_packets_not_read": true,
        "june23_packet_selected_text_pages": [
          36,
          40
        ],
        "june9_packet_selected_text_pages": [
          1,
          2,
          88,
          89,
          90,
          91
        ],
        "unrelated_rental_text_preserved_as_draft_anomaly": true
      },
      "state": "co",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:woodland-park-co-proposed-ordinance1525",
      "instrument_id": "Proposed Ordinance 1525 Series 2026",
      "instrument_url": "https://woodlandpark.gov/DocumentCenter/View/6979/Ordinance-1525-Series-2026-PN-Temp-Moratorium---on-Data-Centers",
      "instrument_verified": false,
      "jurisdiction": "City of Woodland Park",
      "limits": "The attachment records only June 18 first reading and retains blank final adoption and termination fields. Its stated seven days after publication rule depends on later final passage and publication that were not verified in this pass. The past hearing is not proof of passage. No current enacted term, effective day or expiry is certified.",
      "next_scheduled_on": null,
      "proposed_term_months": 12,
      "scope": "The original posted notice and attached first reading text describe proposed Ordinance 1525, with a July 16, 2026 hearing and a twelve month pause on data center applications and siting. The proposal excludes continued existing operation while subjecting expansions to the pause, and would prohibit the use by right in all districts.",
      "sets_site_status": false,
      "source_ids": [
        "m06-m06-woodlandpark"
      ],
      "source_read_scope": {
        "final_reading_and_termination_placeholders_retained": true,
        "proposed_notice_and_law_text_pages": [
          1,
          2,
          3
        ]
      },
      "state": "co",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-05-19",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m06-m06-jefferson"
        ]
      },
      "id": "restriction:jefferson-co-reported-20260519",
      "instrument_id": "County reported May 19 data center moratorium",
      "instrument_url": "https://www.jeffco.us/m/NewsFlash/Home/Detail/2596",
      "instrument_verified": false,
      "jurisdiction": "Jefferson County",
      "limits": "The selected source is the official County account rather than the executed resolution. Exact legal start and end, later changes and present legal effect remain unverified. The exception is conditional and no parcel qualification is certified. Applicability outside County review authority or inside any particular municipality is not independently established.",
      "next_scheduled_on": null,
      "reported_term_months": 10,
      "scope": "The County May 19, 2026 account reports a Board vote issuing a ten month pause on new development or rezoning applications for data centers. It describes an exception for land already specifically zoned for data centers through a Planned Development when the data center is at least 1500 feet from a dwelling.",
      "sets_site_status": false,
      "source_ids": [
        "m06-m06-jefferson"
      ],
      "source_read_scope": {
        "reported_exception_not_property_eligibility": true,
        "selected_official_news_body_read": true
      },
      "state": "co",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:grand-junction-co-proposed-2026-pause",
      "instrument_id": "Proposed data center temporary moratorium with blank ordinance number",
      "instrument_url": "https://www.gjcity.org/DocumentCenter/View/18539/Proposed-Ordinance-Data-Center-Temp-Moratorium?bidId=",
      "instrument_verified": false,
      "jurisdiction": "City of Grand Junction",
      "limits": "The proposed instrument retains a blank ordinance number. The selected source is prospective first reading material, and the October 21 outcome was not established. Its conditional thirty day effect after final passage and publication is not an exact verified start. No current enactment, expiry or effect on an individual project is inferred. The proposed text preserves applications accepted as complete before effect and existing lawful operations, while specified expansions remain covered. These are proposed exceptions, not individual qualifications.",
      "next_scheduled_on": null,
      "proposed_term_days": 365,
      "scope": "The official October 8 account reports an October 7 first reading and an October 21 hearing for a proposed pause. The linked proposed instrument would hold applications for data centers with projected electrical demand of at least one megawatt and end at the earlier of new specified code rules or 365 days from legal effect. The proposed threshold aggregates full development phases and specified facilities on the same or contiguous parcels under common ownership or control. Accessory computing solely supporting another lawful principal use is excluded.",
      "sets_site_status": false,
      "source_ids": [
        "m06-h08-grandjunction",
        "m06-h08-grandjunction-proposal-final"
      ],
      "source_read_scope": {
        "final_reading_outcome_not_verified": true,
        "news_body_read": true,
        "proposal_selected_text_pages": [
          1,
          2,
          3,
          4
        ]
      },
      "state": "co",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-08-18",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-08-28",
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m07-c50-calvert-law",
          "m07-c50-calvert"
        ],
        "effective_on": [
          "m07-c50-calvert"
        ],
        "recorded_on": [
          "m07-c50-calvert-law"
        ],
        "status": [
          "m07-c50-calvert-law",
          "m07-c50-calvert"
        ]
      },
      "id": "restriction:calvert-md-ordinance4226",
      "instrument_id": "Ordinance 42 26",
      "instrument_url": "https://www.calvertcountymd.gov/DocumentCenter/View/57423/42-26",
      "instrument_verified": true,
      "jurisdiction": "Calvert County",
      "limits": "The signed instrument separately shows recordation on August 19, which is not the reported August 28 start. Its commencement clause also requires recordation and summary publication and at least ten days after adoption. No exact expiry is calculated, later extension or early termination is inferred, or individual application eligibility is certified. The law does not establish physical shutdown of an existing facility.",
      "next_scheduled_on": null,
      "recorded_on": "2026-08-19",
      "reported_term_months": 6,
      "scope": "The executed Ordinance 42 26 is dated August 18, 2026 with five affirmative votes and no negative votes. The current County page expressly reports legal effect on August 28. The law holds new application acceptance and pending or new site plan approvals for data centers and bars specified dependent County permits for a new data center. Its term is six months after effect or earlier termination by Board resolution.",
      "sets_site_status": false,
      "source_ids": [
        "m07-c50-calvert-law",
        "m07-c50-calvert"
      ],
      "source_read_scope": {
        "county_current_notice_read": true,
        "first_summary_publication_copy_not_separately_reviewed": true,
        "law_visual_pages": [
          1,
          2,
          3,
          4,
          5
        ],
        "page5_blank": true
      },
      "state": "md",
      "status": "in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-07-21",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m07-m07-worcester-law",
          "m07-c50-worcester"
        ],
        "status": [
          "m07-c50-worcester"
        ]
      },
      "id": "restriction:worcester-md-resolution2618",
      "instrument_id": "Resolution 26 18",
      "instrument_url": "https://worcestermd.gov/sites/default/files/2026-09/Resolution%2026-18%20Moratorium%20Cable%20Landings%20Data%20Centers.pdf",
      "instrument_verified": true,
      "jurisdiction": "Worcester County",
      "limits": "The signed resolution and current account establish the recorded action and reported hold. A separate exact legal commencement clause and exact expiry day were not established, and no end is calculated. The resolution defines a cable landing station separately and excludes data storage, processing and computation from that definition. No municipal applicability outside County authority, final merits decision, site permission or physical facility stage is certified.",
      "next_scheduled_on": null,
      "reported_term_months": 12,
      "scope": "The executed Resolution 26 18 is passed July 21, 2026. The current County original account reports a temporary moratorium on permit applications and issuance for data centers and cable landing stations, along with related Board of Zoning Appeals proceedings, for twelve months or until rescinded. It states that pending and future applications are covered.",
      "sets_site_status": false,
      "source_ids": [
        "m07-m07-worcester-law",
        "m07-c50-worcester"
      ],
      "source_read_scope": {
        "county_current_account_read": true,
        "law_text_pages": [
          1,
          2
        ],
        "no_fourth_pdf_page": true,
        "signed_passage_visual_pages": [
          3
        ]
      },
      "state": "md",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-01-15",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-01-27",
      "expires_on": "2027-01-27",
      "field_sources": {
        "adopted_on": [
          "m07-m07-mountmorris-law"
        ],
        "effective_on": [
          "m07-m07-mountmorris-law"
        ],
        "expires_on": [
          "m07-m07-livingston"
        ],
        "status": [
          "m07-m07-mountmorris-law",
          "m07-m07-livingston"
        ]
      },
      "id": "restriction:mount-morris-ny-local-law22026",
      "instrument_id": "Local Law 2 of 2026",
      "instrument_url": "https://www.livingstoncountyny.gov/DocumentCenter/View/24671/T-Mount-Morris-Moratorium-January-2026",
      "instrument_verified": true,
      "jurisdiction": "Town of Mount Morris",
      "limits": "The January 15 adoption is separate from January 27 legal effect. The published expiry is taken from the County account rather than calculated. The law provides a written hardship variance process with a public hearing, so no universal project prohibition or automatic variance is inferred. A later amendment, individual eligibility or physical closure is not established.",
      "next_scheduled_on": null,
      "reported_term_months": 12,
      "scope": "The original filed Local Law 2 of 2026 certifies adoption on January 15, while its State Records stamp expressly shows January 27, 2026 filing. Section 8 makes the law effective upon filing with the Secretary of State. Section 4 imposes a twelve month pause on accepting applications for establishment, location, operation or construction of commercial data centers. The current County index expressly reports January 27, 2027 expiry.",
      "sets_site_status": false,
      "source_ids": [
        "m07-m07-mountmorris-law",
        "m07-m07-livingston"
      ],
      "source_read_scope": {
        "county_reported_end_not_calculated": true,
        "selected_text_pages": [
          2,
          4,
          5
        ],
        "state_filing_stamp_visual_pages": [
          1
        ],
        "state_stamp_controls_over_ocr_error": true
      },
      "state": "ny",
      "status": "in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": "2027-07-24",
      "field_sources": {
        "expires_on": [
          "m07-m07-livingston"
        ],
        "status": [
          "m07-m07-livingston"
        ]
      },
      "id": "restriction:york-ny-reported-local-law32026",
      "instrument_id": "County reported moratorium with linked Proposed Local Law 3 of 2026",
      "instrument_url": "https://www.livingstoncountyny.gov/DocumentCenter/View/24673/LL3-of-2026-Data-Center-Moratorium-York",
      "instrument_verified": false,
      "jurisdiction": "Town of York",
      "limits": "The County listed expiry is an official report, while the linked copy remains explicitly proposed. Final adoption, State filing, exact commencement and the enacted form of those draft exceptions were not independently verified. The proposed copy says effect on Secretary of State filing, but no filing day is invented from the reported end. No automatic project eligibility or physical status is inferred.",
      "next_scheduled_on": null,
      "proposed_term_months": 12,
      "scope": "The current County moratoria index lists the Town of York with a July 24, 2027 expiry. Its linked five page copy is headed Proposed Local Law 3 of 2026 and describes a twelve month pause, continuation limits for existing facilities, minor server room and emergency repair exceptions, and a hardship use variance route.",
      "sets_site_status": false,
      "source_ids": [
        "m07-m07-livingston",
        "m07-m07-york-law"
      ],
      "source_read_scope": {
        "county_reported_end_not_calculated": true,
        "linked_law_text_pages": [
          1,
          2,
          3,
          4,
          5
        ],
        "proposed_heading_retained": true
      },
      "state": "ny",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "action_recorded_on": "2026-08-20",
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "action_recorded_on": [
          "m07-m07-plattsburgh"
        ]
      },
      "id": "restriction:plattsburgh-ny-proposed-local-lawp22026",
      "instrument_id": "Proposed Local Law P 2 of 2026",
      "instrument_url": "https://cityofplattsburgh-ny.gov/department/news/public-hearing-local-law-p-2-2026",
      "instrument_verified": false,
      "jurisdiction": "City of Plattsburgh",
      "limits": "The selected original is an introduction and hearing notice, not an executed State filing or confirmed final vote. The City agenda index links meeting materials, but this bounded review did not substantively verify a final outcome from them. A past scheduled hearing is not passage. Proposed definitions, exceptions and term remain unverified as final law, and no exact start, expiry or project effect is certified.",
      "next_scheduled_on": null,
      "proposed_term_months": 12,
      "scope": "The original City hearing page states that Local Law P 2 of 2026 was introduced August 20 and schedules a September 3 hearing. Its proposed text would hold specified land use approvals for covered high energy computing uses for twelve months after State filing. Continued lawful operation and routine work without material demand or processing increases are treated separately from new, enlarged, converted or materially intensified uses.",
      "sets_site_status": false,
      "source_ids": [
        "m07-m07-plattsburgh",
        "m07-m07-plattsburgh-agendas"
      ],
      "source_read_scope": {
        "external_full_meeting_folder_bodies_not_read": true,
        "selected_draft_sections": [
          "Introduction",
          "Definition",
          "Temporary Moratorium",
          "Effective Date and Expiration"
        ]
      },
      "state": "ny",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:frankfort-town-ny-proposed-local-law32026",
      "instrument_id": "Proposed Town Local Law 3 of 2026 on the September 24 agenda",
      "instrument_url": "https://www.townoffrankfortny.gov/download/document/369",
      "instrument_verified": false,
      "jurisdiction": "Town of Frankfort",
      "limits": "The Town is distinct from the Village of Frankfort and their identically numbered local laws are not joined. Neither the elapsed hearing date nor a later agenda for approving minutes proves adoption, legal effect, term, expiry or an application outcome. Other energy sectors and later tax or parking laws are not attributed to this moratorium proposal without exact original text.",
      "next_scheduled_on": null,
      "scope": "The original Town September 24, 2026 agenda schedules a hearing on proposed Local Law 3, a moratorium on commercial cryptocurrency mining and data processing centers. The October 22 agenda proposes approval of the September 24 minutes, but does not itself supply the hearing outcome or an enacted moratorium text.",
      "sets_site_status": false,
      "source_ids": [
        "m07-m07-frankfort-september-agenda",
        "m07-m07-frankfort-october-agenda",
        "m07-m07-frankfort-meetings"
      ],
      "source_read_scope": {
        "october_agenda_text_pages": [
          1
        ],
        "september_agenda_text_pages": [
          1
        ],
        "town_meeting_index_2026_sections_read": true,
        "village_laws_not_substituted": true
      },
      "state": "ny",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:pavilion-mi-proposed-pause",
      "instrument_id": "Proposed Ordinance 184 and separate temporary moratorium authority draft",
      "instrument_url": "https://www.paviliontwpmi.gov/_files/ugd/222eb1_a75a165163a748a19a693be3c6d6e4d7.pdf",
      "instrument_verified": false,
      "jurisdiction": "Pavilion Charter Township",
      "limits": "The two posted copies have different conditional commencement clauses: publication after adoption in Ordinance 184 and eight days after publication in the separate zoning amendment. Neither a final adoption, actual publication, legal start or exact expiry is certified. The separate clauses are not combined into one legal clock. A past notice is not proof of passage and no specific proposal physical stage is inferred.",
      "next_scheduled_on": null,
      "proposed_term_years": 1,
      "scope": "The current official notice index links a scanned Ordinance 184 copy proposing a one year pause on acceptance and processing of data center applications, or until replacement rules take effect. It includes a past August 10, 2026 consideration notice, but its adoption line remains blank. The separate temporary moratorium authority draft also has blank ordinance and adoption fields.",
      "sets_site_status": false,
      "source_ids": [
        "m08-c51-pavilion-pause",
        "m08-c51-pavilion-authority",
        "m08-c51-pavilion"
      ],
      "source_read_scope": {
        "blank_adoption_fields_retained": true,
        "different_conditional_commencement_clocks_retained": true,
        "ordinance184_visual_pages": [
          1,
          2,
          3,
          4
        ],
        "separate_authority_visual_pages": [
          1,
          2,
          3
        ]
      },
      "state": "mi",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-02-18",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m08-m08-parma-law"
        ],
        "reported_publication_on": [
          "m08-m08-parma-law"
        ],
        "status": [
          "m08-m08-parma-law"
        ]
      },
      "id": "restriction:parma-mi-moratorium20263",
      "instrument_id": "Moratorium 2026 3, original Notice of Adoption",
      "instrument_url": "https://parmatwp.gov/wp-content/uploads/2026/02/2026-3-Publication.pdf",
      "instrument_verified": false,
      "jurisdiction": "Parma Township",
      "limits": "The one page notice states Publication Date February 27, 2026. It does not provide the underlying commencement or waiver text, so that stated publication day does not automatically become legal effect or a calculated expiry. The website article path date is not substituted for the notice body date. The complete instrument and current individual eligibility remain unverified.",
      "next_scheduled_on": null,
      "reported_publication_on": "2026-02-27",
      "reported_term_years": 1,
      "scope": "The original official Notice of Adoption records February 18, 2026 adoption of Moratorium 2026 3 and describes a one year pause on data center permitting, consideration, approval, location, construction, review and installation. The notice lists a Waiver section and an Effective Date section in the underlying instrument.",
      "sets_site_status": false,
      "source_ids": [
        "m08-m08-parma-law",
        "m08-m08-parma"
      ],
      "source_read_scope": {
        "notice_text_pages": [
          1
        ],
        "underlying_law_not_read": true,
        "waiver_terms_not_inferred_from_heading": true
      },
      "state": "mi",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-07-13",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": "2027-02-09",
      "extended_on": "2026-07-13",
      "field_sources": {
        "adopted_on": [
          "m08-c52-solon-extension"
        ],
        "expires_on": [
          "m08-c52-solon-extension"
        ],
        "extended_on": [
          "m08-c52-solon-extension"
        ],
        "original_pause_start_on": [
          "m08-c52-solon-extension"
        ],
        "previous_expires_on": [
          "m08-c52-solon-extension"
        ],
        "status": [
          "m08-c52-solon-extension"
        ]
      },
      "id": "restriction:solon-kent-mi-resolution2610",
      "instrument_id": "Resolution 26 10",
      "instrument_url": "https://www.solontwp.org/wp-content/uploads/2026/07/26-10-Extend-Moratorium-on-Data-Centers.pdf",
      "instrument_verified": true,
      "jurisdiction": "Township of Solon",
      "limits": "The extension incorporates the prior resolution terms, which were not independently read in full in this bounded pass. No exact separate commencement clause for the extension or individual project exception is invented. The explicit February 9 end is retained instead of a February 10 date in secondary pointers. Subsequent amendments, early termination and current property eligibility are unverified.",
      "next_scheduled_on": null,
      "original_pause_start_on": "2026-02-09",
      "previous_expires_on": "2026-08-10",
      "scope": "The signed original Resolution 26 10 records a July 13, 2026 Board meeting and five affirmative votes with no negative vote. It extends the Township application review moratorium for data centers and digital mining uses until the expressly written February 9, 2027 date. The document identifies the original pause as imposed February 9, 2026 and previously set to end August 10, 2026.",
      "sets_site_status": false,
      "source_ids": [
        "m08-c52-solon-extension"
      ],
      "source_read_scope": {
        "exact_end_from_instrument_not_calculated": true,
        "extension_visual_pages": [
          1,
          2,
          3,
          4
        ],
        "prior_resolution_full_terms_not_read": true,
        "signed_clerk_certification_read": true
      },
      "state": "mi",
      "status": "extended",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-05-11",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m08-m08-howell-law"
        ],
        "reported_web_posted_on": [
          "m08-m08-howell-law"
        ],
        "status": [
          "m08-m08-howell-law",
          "m08-m08-howell"
        ]
      },
      "id": "restriction:howell-livingston-mi-ordinance298",
      "instrument_id": "Ordinance 298, posted extension copy",
      "instrument_url": "https://howelltownshipmi.org/wp-content/uploads/2026/06/20260513155523130.pdf",
      "instrument_verified": false,
      "jurisdiction": "Howell Township, Livingston County",
      "limits": "The copy has blank supervisor and Clerk attestations and leaves newspaper publication and County filing dates blank. Its commencement is immediately after required publication, so website posting alone is not a verified exact legal start. No expiry is calculated, and a secondary report of a later October extension is not adopted without a later original. The earlier November 20, 2025 pause is historical context and no exact project waiver or current property eligibility is certified.",
      "next_scheduled_on": null,
      "reported_term_months": 6,
      "reported_web_posted_on": "2026-05-13",
      "scope": "The current Township ordinance index links Ordinance 298, a scanned data center moratorium extension copy. Its text records May 11, 2026 adoption and seven affirmative votes, extends the pause for six months after legal effect or earlier replacement rules and allows a conditional Board waiver on application. Its certification records website posting on May 13.",
      "sets_site_status": false,
      "source_ids": [
        "m08-m08-howell-law",
        "m08-m08-howell"
      ],
      "source_read_scope": {
        "blank_signatures_and_newspaper_day_retained": true,
        "later_secondary_extension_not_verified": true,
        "posted_copy_visual_pages": [
          1,
          2,
          3
        ]
      },
      "state": "mi",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-04-28",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m08-m08-frenchtown-minutes"
        ],
        "status": [
          "m08-m08-frenchtown-minutes"
        ]
      },
      "id": "restriction:frenchtown-monroe-mi-ordinance30019",
      "instrument_id": "Zoning Ordinance 300 19, adoption recorded in Board minutes",
      "instrument_url": "https://www.frenchtownmi.gov/AgendaCenter/ViewFile/Minutes/_04282026-200",
      "instrument_verified": false,
      "jurisdiction": "Frenchtown Charter Township",
      "limits": "The final adopted ordinance body, its exact commencement, term, exceptions and end were not established in this bounded pass. The earlier hearing notice and first reading are not substituted for final adoption or actual publication. No elapsed term calculation, current application eligibility or named campus physical closure is inferred from the action record.",
      "next_scheduled_on": null,
      "scope": "The original April 28, 2026 Board minutes record approval and adoption of Zoning Ordinance 300 19 by seven to zero after its second reading. The subject is a temporary moratorium for technology, data center and other high resource demand uses. The earlier March 17 public notice describes a separate proposed ordinance hearing and a March 10 resolution.",
      "sets_site_status": false,
      "source_ids": [
        "m08-m08-frenchtown-minutes",
        "m08-m08-frenchtown"
      ],
      "source_read_scope": {
        "earlier_notice_text_pages": [
          1
        ],
        "final_ordinance_text_not_read": true,
        "minutes_selected_text_pages": [
          1,
          2
        ],
        "recorded_vote": "seven to zero"
      },
      "state": "mi",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:flint-mi-resolution260191-agenda",
      "instrument_id": "Resolution 260191 as listed on June 8 final agenda",
      "instrument_url": "https://www.cityofflint.com/wp-content/uploads/2026/06/AGENDA.FCC-Meeting-June-8-2026-FINAL.pdf",
      "instrument_verified": false,
      "jurisdiction": "City of Flint",
      "limits": "Final describes the agenda revision, not adoption of every listed resolution. No original completed action, executed resolution or later term was verified. The past meeting date is not a vote result, and the proposed twelve month duration does not establish a start, expiry, present legal effect or a specific facility closure.",
      "next_scheduled_on": null,
      "proposed_term_months": 12,
      "scope": "The official June 8, 2026 final meeting agenda includes proposed Resolution 260191. Its summary describes a twelve month moratorium on data center applications, site plans, construction and renovations, with termination or extension conditions tied to Council action and replacement regulations.",
      "sets_site_status": false,
      "source_ids": [
        "m08-m08-flint"
      ],
      "source_read_scope": {
        "agenda_selected_text_pages": [
          1,
          5,
          6
        ],
        "final_agenda_not_final_adopted_resolution": true,
        "other_city_same_resolution_numbers_not_joined": true
      },
      "state": "mi",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "action_recorded_on": "2026-06-04",
      "adopted_on": "2026-05-12",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "action_recorded_on": [
          "m09-m09-hill-june4"
        ],
        "adopted_on": [
          "m09-m09-hill-may12"
        ],
        "reported_rescission_on": [
          "m09-m09-hill-june4"
        ],
        "status": [
          "m09-m09-hill-may12",
          "m09-m09-hill-may29",
          "m09-m09-hill-june4"
        ]
      },
      "id": "restriction:hill-tx-recorded-moratorium-and-rescission",
      "instrument_id": "May 12 action 2026 5154 and June 4 recorded rescission 2026 5202 with conflicting prior reference 2026 2154",
      "instrument_url": "https://www.co.hill.tx.us/upload/page/7613/docs/CCMinutes/2026/CC%20Minutes%20June%204%202026.pdf",
      "instrument_verified": false,
      "jurisdiction": "Hill County",
      "limits": "The May 12 action is numbered 2026 5154, while the June 4 rescission references prior Order 2026 2154 and its separate action is numbered 2026 5202. The June 4 signed minutes also carry a May 26 approval footer that precedes the meeting. These source discrepancies remain explicit. The complete executed orders, exact legal commencement, final checklist text, current eligibility and an independently resolved instrument crosswalk were not verified. No termination day or calculated expiry is certified, and no specific computing campus stage follows from these County actions.",
      "next_scheduled_on": null,
      "reported_rescission_on": "2026-06-04",
      "reported_term_years": 1,
      "scope": "Original May 12, 2026 minutes record adoption of a one year data center construction moratorium by three affirmative and two negative votes. May 29 minutes record a tabled waiver and no action from the tabled executive session. Original June 4 minutes record a unanimous rescission action and adoption of a revised data center development review checklist.",
      "sets_site_status": false,
      "source_ids": [
        "m09-m09-hill-may12",
        "m09-m09-hill-may29",
        "m09-m09-hill-june4"
      ],
      "source_read_scope": {
        "checklist_adoption_not_full_text_certification": true,
        "chronologically_inconsistent_approval_footer_retained": true,
        "full_executed_orders_not_read": true,
        "june4_visual_pages": [
          1,
          2
        ],
        "may12_selected_text_pages": [
          1
        ],
        "may29_visual_pages": [
          1
        ],
        "prior_order_number_conflict_retained": true
      },
      "state": "tx",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:hood-tx-proposed-pause-library-record",
      "instrument_id": "Proposed County order cataloged January 29, 2026",
      "instrument_url": "https://lrl.texas.gov/currentissues/clips/resultsLinkclip.cfm?clipID=439730&headline=Hood+County%E2%80%99s+proposed+moratorium+on+data+centers+squashed+by+Texas+senator",
      "instrument_verified": false,
      "jurisdiction": "Hood County",
      "limits": "The linked proposed County order copy is on a private publisher host and was not adopted under the official source requirement. The archived letter does not name Hood County in its body and is attributed legislative advocacy, not an Attorney General decision, court judgment or completed Hood County vote. No adopted order, rejection result, actual legal start, expiry or property specific permission was independently verified.",
      "next_scheduled_on": null,
      "scope": "The Texas Legislative Reference Library catalogs a January 29, 2026 Hood County proposed industrial development moratorium order. Its description covers applications and site permits rather than proving a final enacted instrument. The official archive also retains a February 10 letter from state legislators challenging County moratorium authority in general.",
      "sets_site_status": false,
      "source_ids": [
        "m09-m09-hood-library",
        "m09-m09-hood-letter"
      ],
      "source_read_scope": {
        "general_letter_not_named_county_disposition": true,
        "legislative_letter_visual_pages": [
          1
        ],
        "library_catalog_selected_document_descriptions_read": true,
        "private_host_order_not_adopted": true
      },
      "state": "tx",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-09-09",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m09-m09-trumbull"
        ],
        "status": [
          "m09-m09-trumbull"
        ]
      },
      "id": "restriction:trumbull-ct-reported-two-year-pause",
      "instrument_id": "Town Council moratorium reported in October 1 First Selectman address",
      "instrument_url": "https://www.trumbull-ct.gov/m/NewsFlash/Archive/Item/3193?arcId=4954",
      "instrument_verified": false,
      "jurisdiction": "Town of Trumbull",
      "limits": "This is an official reported adoption account rather than the complete ordinance or certified Council vote. Exact commencement, publication, instrument number, exceptions and expiry were not verified. The reported two year term is not calculated from adoption, and the existing facility renovation discussed in the address does not become a Townwide new facility permission.",
      "next_scheduled_on": null,
      "reported_term_years": 2,
      "scope": "The original October 1, 2026 First Selectman address reports that the Town Council adopted a two year moratorium on establishment and development of new data centers on September 9. It expressly says existing data centers are unaffected.",
      "sets_site_status": false,
      "source_ids": [
        "m09-m09-trumbull"
      ],
      "source_read_scope": {
        "complete_ordinance_not_read": true,
        "existing_facility_exclusion_retained": true,
        "no_calculated_expiry": true,
        "selected_section": "The Trumbull Data Center and reported September 9 moratorium"
      },
      "state": "ct",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:eastbridgewater-ma-proposed-zoning-ban",
      "instrument_id": "Proposed zoning amendment in September 4 Planning Board notice",
      "instrument_url": "https://www.eastbridgewaterma.gov/m/newsflash/Archive/Item/198?arcId=254",
      "instrument_verified": false,
      "jurisdiction": "Town of East Bridgewater",
      "limits": "The past hearing and later article archive are not completed adoption or a repeal. The linked draft returned an ordinary self redirect and its substantive body was not reviewed. No final Town Meeting action, state approval, actual publication requirement, legal effect or existing facility exception was verified, and no future subject vote is exported from a generic Town Meeting date.",
      "next_scheduled_on": null,
      "scope": "The original archived September 4, 2026 Planning Board notice proposes an amendment prohibiting data centers as defined by the proposed text in all Town zoning districts and schedules a September 21 hearing. The archive states the article was displayed through October 6.",
      "sets_site_status": false,
      "source_ids": [
        "m09-m09-eastbridgewater-archive"
      ],
      "source_read_scope": {
        "archive_end_not_legal_termination": true,
        "archived_hearing_notice_main_body_read": true,
        "draft_redirect_body_not_read": true,
        "past_hearing_not_outcome": true
      },
      "state": "ma",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "ban",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-01-05",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "extended_on": "2026-06-15",
      "field_sources": {
        "adopted_on": [
          "m10-c54-lordstown-ordinance1"
        ],
        "extended_on": [
          "m10-c54-lordstown-ordinance29"
        ],
        "previous_expires_on": [
          "m10-c54-lordstown-opinion"
        ],
        "status": [
          "m10-c54-lordstown-ordinance1",
          "m10-c54-lordstown-ordinance29",
          "m10-c54-lordstown-opinion"
        ]
      },
      "id": "restriction:lordstown-oh-signed-extension",
      "instrument_id": "Ordinances 1 2026 and 29 2026",
      "instrument_url": "https://www.lordstown.com/wp-content/uploads/29-2026-1.pdf",
      "instrument_verified": true,
      "jurisdiction": "Village of Lordstown",
      "limits": "The extension preamble describes an additional period from passage, while its operative Section 7 refers to legal effect; both use not more than 180 days. Emergency declarations do not supply an independently verified exact calendar commencement in this review. The Court identifies the previous July 4 expiry and its information summary describes continuation through the remainder of 2026, but no exact new expiry is calculated. Exceptions include municipal or emergency infrastructure, incidental small server rooms no more than 500 square feet that are not the primary use, and specified manufacturing activities. No permanent ban, individual eligibility or computing operation follows from this summary.",
      "next_scheduled_on": null,
      "previous_expires_on": "2026-07-04",
      "reported_extension_term_days": 180,
      "scope": "Signed Ordinance 1 2026 records January 5 passage of a temporary data center permit and application processing moratorium. Signed Ordinance 29 2026 records June 15 passage of an extension. The instruments cover the Village corporate limits and suspend specified review duties. The October 20 original Supreme Court opinion applies the moratorium when denying a mandamus request to compel one developer site plan review.",
      "sets_site_status": false,
      "source_ids": [
        "m10-c54-lordstown-ordinance1",
        "m10-c54-lordstown-ordinance29",
        "m10-c54-lordstown-opinion",
        "m10-c54-lordstown-court"
      ],
      "source_read_scope": {
        "case_holding_not_all_possible_development_rights": true,
        "conditional_commencement_clauses_not_combined": true,
        "exceptions_retained": true,
        "extension_visual_pages": [
          1,
          2,
          3
        ],
        "no_calculated_expiry": true,
        "opinion_selected_text_pages": [
          1,
          2,
          7,
          19
        ],
        "original_visual_pages": [
          1,
          2,
          3
        ],
        "signature_dates_read": true
      },
      "state": "oh",
      "status": "extended",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-08-12",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m10-m10-garrettsville"
        ],
        "status": [
          "m10-m10-garrettsville"
        ]
      },
      "id": "restriction:garrettsville-oh-reported-ordinance202616",
      "instrument_id": "Ordinance 2026 16, original passed legislation notice",
      "instrument_url": "https://www.garrettsville.org/article/3073323",
      "instrument_verified": false,
      "jurisdiction": "Village of Garrettsville",
      "limits": "The complete ordinance is not included in the notice and its stated physical viewing locations were not visited. Adoption and an emergency title do not independently establish exact legal commencement, exceptions, actual publication or expiry. No term end is calculated and no original instrument was requested by mail or contact.",
      "next_scheduled_on": null,
      "reported_term_months": 12,
      "scope": "The original August 13, 2026 Village passed legislation notice says Council approved Ordinance 2026 16 on August 12. Its title describes a twelve month moratorium on acceptance of zoning applications for data centers and declares an emergency.",
      "sets_site_status": false,
      "source_ids": [
        "m10-m10-garrettsville"
      ],
      "source_read_scope": {
        "complete_instrument_not_read": true,
        "offline_locations_not_visited": true,
        "original_notice_main_body_read": true
      },
      "state": "oh",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-01",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m10-m10-grovecity"
        ],
        "status": [
          "m10-m10-grovecity"
        ]
      },
      "id": "restriction:grovecity-oh-reported-june1-pause",
      "instrument_id": "June 1 moratorium approval reported on official Community Consent Amendment page",
      "instrument_url": "https://www.grovecityohio.gov/750/7541/Issue-28-Community-Consent-Amendment-Inf",
      "instrument_verified": false,
      "jurisdiction": "City of Grove City",
      "limits": "The proposed charter amendment is separate from the existing reported moratorium and is not an adopted blanket data center ban. The underlying moratorium ordinance, exact legal commencement, publication, exceptions and expiry were not verified. The reported one year duration is not calculated from the approval day. City arguments about possible amendment effects are attributed positions rather than independent predictions or completed voter action.",
      "next_scheduled_on": null,
      "reported_term_years": 1,
      "scope": "The current original City Community Consent Amendment information page reports Council approval of a one year data center development moratorium June 1, 2026 and a later task force. It separately describes a proposed November 3 charter amendment vote covering development thresholds and certain changes to existing properties.",
      "sets_site_status": false,
      "source_ids": [
        "m10-m10-grovecity"
      ],
      "source_read_scope": {
        "full_moratorium_law_not_read": true,
        "selected_sections": [
          "Data Centers moratorium and task force",
          "Community Consent Amendment description and election date"
        ],
        "separate_proposed_charter_vote_not_moratorium_enactment": true
      },
      "state": "oh",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:tiffin-oh-resolution202642-past-second-reading",
      "instrument_id": "Resolution 2026 42 on April 6 agenda second reading",
      "instrument_url": "https://www.tiffinohio.gov/sites/default/files/docs/2026.04.06%20Tiffin%20City%20Council%20Agenda.pdf",
      "instrument_verified": false,
      "jurisdiction": "City of Tiffin",
      "limits": "The selected agenda is a proposal record and does not establish completed passage or that the matter remains pending today. A secondary report of later approval is not substituted for original minutes or an executed resolution. Exact adoption, legal effect, exceptions and expiry remain unverified. The separate nearby Ordinance 2026 18 concerns codified ordinance replacement pages and is not this data center resolution.",
      "next_scheduled_on": null,
      "proposed_term_months": 12,
      "scope": "The original April 6, 2026 Council agenda lists Resolution 2026 42 for second reading. Its proposed title describes a twelve month moratorium on data center establishment, conversions, development, construction and changes of use, with an emergency declaration.",
      "sets_site_status": false,
      "source_ids": [
        "m10-m10-tiffin-agenda"
      ],
      "source_read_scope": {
        "agenda_selected_text_pages": [
          1,
          2
        ],
        "later_original_outcome_not_verified": true,
        "neighboring_ordinance_number_not_substituted": true,
        "second_reading_not_completed_action": true
      },
      "state": "oh",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-05-06",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m10-m10-ontario-may6"
        ],
        "status": [
          "m10-m10-ontario-may6",
          "m10-m10-ontario-oct21"
        ]
      },
      "id": "restriction:ontario-oh-adoption-and-proposed-extension",
      "instrument_id": "Recorded Ordinance 26 13 adoption and proposed Ordinance 26 27 second reading",
      "instrument_url": "https://ontarioohio.org/wp-content/uploads/2026/05/05-06-2026-Council.pdf",
      "instrument_verified": false,
      "jurisdiction": "City of Ontario Ohio",
      "limits": "The later agenda does not certify extension adoption or present legal effect. The complete enacted ordinance and exact commencement, publication, definitions, exceptions and expiry were not verified, so no six month end is calculated from May 6. This is Ontario Ohio, not the Canadian province. A government speaker statement about separate Ohio legislation is not adopted as a verified statewide enacted law.",
      "next_scheduled_on": null,
      "proposed_extension_term_months": 6,
      "reported_term_months": 6,
      "scope": "Original May 6, 2026 Council minutes record seven affirmative votes with no negative vote adopting Ordinance 26 13, a six month moratorium on local licensing, zoning, occupancy and other permits for data centers supporting artificial intelligence. The October 21 agenda separately lists proposed Ordinance 26 27 for second reading to extend it another six months.",
      "sets_site_status": false,
      "source_ids": [
        "m10-m10-ontario-may6",
        "m10-m10-ontario-oct21",
        "m10-m10-ontario"
      ],
      "source_read_scope": {
        "agenda_selected_text_pages": [
          1,
          2
        ],
        "full_enacted_instrument_not_read": true,
        "later_second_reading_not_adoption": true,
        "minutes_selected_text_pages": [
          1,
          4
        ],
        "recorded_original_vote": "seven to zero",
        "unrelated_state_bill_statement_not_certified": true
      },
      "state": "oh",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-03-05",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m10-m10-scioto-march5"
        ],
        "status": [
          "m10-m10-scioto-march5"
        ]
      },
      "id": "restriction:scioto-pickaway-oh-resolution26054",
      "instrument_id": "Resolution 26 054, adoption recorded in Trustee minutes",
      "instrument_url": "https://sciototwppickawayoh.gov/wp-content/uploads/2026/10/Regular-Meeting-of-the-Scioto-Township-Trustees-3-5-2026.pdf",
      "instrument_verified": false,
      "jurisdiction": "Scioto Township unincorporated areas, Pickaway County",
      "limits": "The complete resolution, legal commencement, publication, definitions, exceptions and expiry were not verified. Neither the failed shorter amendment nor an assumed March 5 start is used to calculate an end. The website upload month is not an actual original publication day. This is Scioto Township in Pickaway County, separate from the same named Delaware County Township and neighboring Commercial Point.",
      "next_scheduled_on": null,
      "reported_term_days": 365,
      "scope": "Original March 5, 2026 Trustee minutes record Resolution 26 054 adopting a 365 day data center moratorium for the unincorporated Township by three affirmative votes. A proposed amendment reducing the term to six months failed by two negative votes and one affirmative vote before the original duration passed.",
      "sets_site_status": false,
      "source_ids": [
        "m10-m10-scioto-march5",
        "m10-m10-scioto"
      ],
      "source_read_scope": {
        "exact_county_identity_retained": true,
        "failed_six_month_amendment_not_final_term": true,
        "full_resolution_not_read": true,
        "minutes_selected_text_pages": [
          1,
          3
        ],
        "recorded_final_vote": "three to zero"
      },
      "state": "oh",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2025-09-22",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m11-m11-hawkins-minutes"
        ],
        "status": [
          "m11-m11-hawkins-minutes"
        ]
      },
      "id": "restriction:hawkins-tn-recorded-september2025-ban",
      "instrument_id": "Out of Order Resolution 2025 09 02, adoption recorded in minutes",
      "instrument_url": "https://www.hawkinscountyclerk.com/wp-content/uploads/2025/09/September-25-Minutes.pdf",
      "instrument_verified": false,
      "jurisdiction": "Hawkins County",
      "limits": "The full separately executed resolution, definitions, exceptions, exact territorial extent, legal commencement and later changes were not verified. The minutes approval vote fields remain blank in the posted copy. A normal order resolution bearing the same numeric suffix concerns a different appointment; its vote is not substituted for this out of order prohibition. The later adjournment vote is also separate. No exact expiry, current court outcome or physical facility closure is inferred.",
      "next_scheduled_on": null,
      "scope": "The original regular meeting minutes dated September 22, 2025 record adoption of Out of Order Resolution 2025 09 02 by ten affirmative votes, two negative votes and two absent members. The recorded title prohibits operation of cryptocurrency mining and data centers under the County Powers Act. The meeting first suspended rules to admit the additional resolutions.",
      "sets_site_status": false,
      "source_ids": [
        "m11-m11-hawkins-minutes"
      ],
      "source_read_scope": {
        "full_executed_resolution_not_read": true,
        "later_private_tracker_date_not_adopted": true,
        "minutes_approval_fields_blank": true,
        "minutes_visual_pages": [
          1,
          2,
          3,
          4
        ],
        "normal_order_same_number_not_substituted": true,
        "recorded_vote": "ten affirmative, two negative, two absent"
      },
      "state": "tn",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "ban",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-03-23",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m11-m11-washington-minutes-march23"
        ],
        "proposed_expires_on": [
          "m11-m11-washington-large"
        ],
        "status": [
          "m11-m11-washington-minutes-march23"
        ]
      },
      "id": "restriction:washington-tn-recorded-resolution260302",
      "instrument_id": "Resolution 26 03 02, passage recorded in signed Commission minutes",
      "instrument_url": "https://www.washingtoncountytn.org/AgendaCenter/ViewFile/Minutes/_03232026-988",
      "instrument_verified": false,
      "jurisdiction": "Washington County",
      "limits": "The agenda copy has blank vote, signature and approval fields. Its commencement clauses refer to passage and conditional Mayor approval or Clerk certification. The recorded vote verifies adoption, while exact legal commencement, the fully executed final instrument and a currently verified legal expiry remain unknown. The committee copy also describes a one year pause and a June 30, 2027 endpoint; these different formulations are retained rather than combined into a calculated term. General proposed findings about power, water and noise are attributed legislative text, without site specific measured findings. Resident names and household contacts are excluded.",
      "next_scheduled_on": null,
      "proposed_expires_on": "2027-06-30",
      "scope": "The original March 23, 2026 Commission minutes record passage of Resolution 26 03 02 by thirteen affirmative votes and two negative votes. The Clerk signs the posted minutes. The separately posted agenda packet contains proposed data center moratorium text through June 30, 2027, including applications, specified permitting and utility extensions, and an exception for standard commercial or industrial internal data processing.",
      "sets_site_status": false,
      "source_ids": [
        "m11-m11-washington-minutes-march23",
        "m11-m11-washington-large"
      ],
      "source_read_scope": {
        "agenda_execution_fields_blank": true,
        "agenda_full_packet_not_claimed_read": true,
        "agenda_selected_physical_text_pages": [
          38,
          49,
          50,
          51
        ],
        "clerk_signature_read": true,
        "committee_term_formulations_retained": true,
        "conditional_legal_commencement_unverified": true,
        "minutes_meeting_date_read": true,
        "minutes_visual_pages": [
          3,
          4,
          10
        ],
        "private_resident_contacts_excluded": true,
        "proposed_end_not_certified_current_expiry": true,
        "recorded_vote": "thirteen affirmative, two negative"
      },
      "state": "tn",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {},
      "id": "restriction:sullivan-tn-posted-resolution20251107-versions",
      "instrument_id": "Resolution 2025 11 07, multiple posted sponsor versions",
      "instrument_url": "https://sullivancountytn.gov/wp-content/uploads/December-2025-Monthly-Meeting.pdf",
      "instrument_verified": false,
      "jurisdiction": "Sullivan County",
      "limits": "Other posted versions describe prohibition pending appropriate rules and a request for further amendment. They are alternative texts rather than verified final legislation. Adoption, Clerk, Chair and Mayor execution fields are blank in the selected amended copy. The December 18 meeting agenda, a November 20 introduction line and a December 11 work session submission line do not certify completed adoption. Duplicate Section 6 numbering is retained as a document feature. No four month start or end is calculated, no final ban is certified and general proposed findings are not measured site impacts.",
      "next_scheduled_on": null,
      "proposed_term_months": 4,
      "scope": "The original December 2025 monthly meeting packet lists Resolution 2025 11 07 as old business and includes multiple sponsor versions. The version labeled as amended by sponsor proposes a four month data mining and cryptocurrency mining moratorium from passage, limits specified applications and development permissions, allows a later extension vote and excludes standard commercial or industrial internal data processing.",
      "sets_site_status": false,
      "source_ids": [
        "m11-m11-sullivan-packet"
      ],
      "source_read_scope": {
        "agenda_not_completed_vote": true,
        "alternative_versions_not_merged": true,
        "amended_execution_fields_blank": true,
        "duplicate_section_number_retained": true,
        "full_packet_not_claimed_read": true,
        "mayor_delivery_acceptance_veto_fields_blank": true,
        "selected_physical_text_pages": [
          1,
          4,
          9,
          10,
          11,
          12,
          14,
          15,
          16
        ]
      },
      "state": "tn",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-08-07",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-08-07",
      "expires_on": "2026-11-17",
      "extended_on": "2026-10-21",
      "extension_instrument_verified": false,
      "field_sources": {
        "adopted_on": [
          "m12-m12-putnam-resolution-observed"
        ],
        "effective_on": [
          "m12-m12-putnam-resolution-observed"
        ],
        "expires_on": [
          "m12-m12-putnam"
        ],
        "extended_on": [
          "m12-m12-putnam"
        ],
        "previous_expires_on": [
          "m12-m12-putnam-resolution-observed"
        ],
        "status": [
          "m12-m12-putnam"
        ]
      },
      "id": "restriction:putnam-ga-original-and-reported-october-extension",
      "instrument_id": "Signed Resolution 2026.8.7 and County reported October 21 extension",
      "instrument_url": "https://putnamcountyga.us/DocumentCenter/View/1226/2026-08-07-Resolution-for-Moratorium-on-Data-Centers-BESS-Solar-Farms-signed?bidId=",
      "instrument_verified": false,
      "jurisdiction": "Putnam County unincorporated areas",
      "limits": "The complete October extension instrument and its exact ending clock were not independently read. The original November 6 late night expiry clock is not transferred to November 17. The notice retains its August 12 initial post date, which is not the publication day of the later October update. The separately posted Chapter 53 document is explicitly proposed and its selected introduction is not certified as enacted law. The public comment invitation has no verified exact deadline in this review, and no form or message was submitted. No individual eligibility, physical computing closure or blanket permission is inferred. The August 20 comment notice also repeats the original November 6 end; the later explicit October 21 update supplies the reported extension field without converting the older invitation into a new deadline.",
      "next_scheduled_on": null,
      "original_instrument_verified": true,
      "previous_expires_on": "2026-11-06",
      "scope": "Signed Resolution 2026.8.7 adopts a land development permit moratorium for data centers, battery energy storage systems and solar energy systems, with an August 7, 2026 commencement clause and an original November 6, 2026 end. The current original County notice reports that the October 21, 2026 Board meeting extended the moratorium through November 17, 2026. The original resolution identifies unincorporated County regulation and covers specified land development, building, rezoning and conditional use applications.",
      "sets_site_status": false,
      "source_ids": [
        "m12-m12-putnam",
        "m12-m12-putnam-resolution-observed",
        "m12-m12-putnam-draft-observed",
        "m12-m12-putnam-comments"
      ],
      "source_read_scope": {
        "comment_notice_main_body_read": true,
        "current_county_notice_update_main_body_read": true,
        "draft_not_enacted_rule": true,
        "draft_selected_text_page": 1,
        "exact_extension_expiry_clock_unknown": true,
        "initial_post_date_not_later_update_publication_day": true,
        "no_comment_form_submitted": true,
        "older_comment_notice_end_not_substituted_for_updated_term": true,
        "original_resolution_visual_pages": [
          1,
          2
        ],
        "original_signature_and_attestation_read": true,
        "reported_october_extension_not_full_instrument": true,
        "unincorporated_scope_retained": true
      },
      "state": "ga",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-01-13",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-01-13",
      "expires_on": "2026-09-08",
      "extended_on": "2026-05-12",
      "extension_instrument_verified": false,
      "field_sources": {
        "adopted_on": [
          "m12-m12-rockdale-resolution"
        ],
        "effective_on": [
          "m12-m12-rockdale-resolution"
        ],
        "expires_on": [
          "m12-m12-rockdale-faq"
        ],
        "extended_on": [
          "m12-m12-rockdale-faq"
        ],
        "status": [
          "m12-m12-rockdale-resolution",
          "m12-m12-rockdale-faq"
        ]
      },
      "id": "restriction:rockdale-ga-signed-original-and-reported-may-extension",
      "instrument_id": "Signed Resolution R 2026 01 and County reported May 12 extension",
      "instrument_url": "https://www.rockdalecountyga.gov/wp-content/uploads/2026/01/R-2026-01.pdf",
      "instrument_verified": false,
      "jurisdiction": "Rockdale County",
      "limits": "The full May extension instrument, later Board actions and present legal disposition after the reported September 8 endpoint were not independently verified. No original 180 day end is calculated, no expiry or repeal is inferred merely because time passed and no permanent ban is certified. The signed original is verified separately from the incomplete current instrument chain. Legislative findings about possible environmental and infrastructure effects are attributed County findings rather than measured injury at every computing facility. The FAQ technical and health assurances, planned campus counts and staffing are not exported as measured performance or physical status.",
      "next_scheduled_on": null,
      "original_instrument_verified": true,
      "reported_term_days": 180,
      "scope": "The complete signed Resolution R 2026 01 records January 13, 2026 adoption and immediate legal effect for a 180 day moratorium on specified applications and approvals for siting, construction or expansion of new data centers and battery energy storage systems. It includes standalone and accessory uses. The County fact sheet updated May 12 reports a May 12 extension through September 8, 2026. The original exempts qualifying maintenance, repair and interior improvements without increased area, capacity, demand or water use, and applications with final nonappealable approval before its effective day.",
      "sets_site_status": false,
      "source_ids": [
        "m12-m12-rockdale-resolution",
        "m12-m12-rockdale-faq"
      ],
      "source_read_scope": {
        "current_post_september_legal_disposition_unknown": true,
        "faq_selected_text_page": 3,
        "faq_technical_assurances_not_independent_measured_findings": true,
        "faq_updated_on": "2026-05-12",
        "immediate_commencement_clause_read": true,
        "later_extension_full_instrument_not_read": true,
        "maintenance_and_prior_final_approval_exceptions_retained": true,
        "no_original_term_end_calculated": true,
        "original_resolution_visual_pages": [
          1,
          2,
          3,
          4,
          5
        ],
        "signature_and_attestation_read": true
      },
      "state": "ga",
      "status": "adopted_current_status_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "published_end_reached_current_disposition_unverified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-15",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": "2026-06-15",
      "expires_on": "2026-12-15",
      "field_sources": {
        "adopted_on": [
          "m13-c57-cumberland-moratorium"
        ],
        "effective_on": [
          "m13-c57-cumberland-moratorium"
        ],
        "expires_on": [
          "m13-c57-cumberland-moratorium"
        ],
        "status": [
          "m13-c57-cumberland-moratorium",
          "m13-c57-cumberland-data-observed"
        ]
      },
      "id": "restriction:cumberland-nc-signed-june-pause",
      "instrument_id": "Signed County data center moratorium adopted June 15, 2026",
      "instrument_url": "https://www.cumberlandcountync.gov/docs/default-source/planning-documents/data-center-moratorium-6-15-2026.pdf",
      "instrument_verified": true,
      "jurisdiction": "Cumberland County zoning jurisdiction",
      "limits": "The order is not a shutdown order for all existing computing, a permanent ban, or automatic City of Fayetteville regulation. Legislative recitals about existing groundwater contamination do not establish data center causation. The current County information hub describes permanent ordinance development and an October 20 Joint Planning Board discussion, with only a November consideration month. Those draft standards are not certified as enacted, and a month does not supply an exact future hearing day. No named development eligibility, present operator response or physical stage is established.",
      "next_scheduled_on": null,
      "scope": "The complete signed County order records June 15, 2026 adoption and effect upon adoption. Section 4 extends the data center moratorium through December 15, 2026 unless rescinded sooner. It directs County planning staff concerning site plan review and zoning and building permits within the County zoning jurisdiction. Its definition includes specified computing uses and excludes incidental subordinate internal data processing supporting a principal onsite use when processing is not the primary offsite service.",
      "sets_site_status": false,
      "source_ids": [
        "m13-c57-cumberland-moratorium",
        "m13-c57-cumberland-data-observed"
      ],
      "source_read_scope": {
        "complete_signed_order_visual_pages": [
          1,
          2,
          3,
          4
        ],
        "county_zoning_jurisdiction_not_all_municipalities": true,
        "draft_permanent_standards_not_adopted": true,
        "exact_end_clause_read": true,
        "incidental_internal_processing_exception_read": true,
        "november_month_not_exact_hearing_day": true,
        "preexisting_groundwater_contamination_not_data_center_causation": true,
        "signature_and_attestation_read": true
      },
      "state": "nc",
      "status": "in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "next_scheduled_on": [
          "m13-h14-davidson-moratorium-observed"
        ],
        "proposed_term_months": [
          "m13-h14-davidson-moratorium-observed"
        ],
        "status": [
          "m13-h14-davidson-moratorium-observed"
        ]
      },
      "id": "restriction:davidson-nc-october-moratorium-proposal",
      "instrument_id": "October 14, 2026 notice of proposed moratorium hearing",
      "instrument_url": "https://www.co.davidson.nc.us/DocumentCenter/View/14500/Data-Center-Moratorium-102626",
      "instrument_verified": false,
      "jurisdiction": "Davidson County",
      "limits": "The complete final moratorium instrument, adoption, commencement, exemption text and expiry were not independently verified. Four months is a proposed duration, without a calculated endpoint. The one hour limit concerns public comment and excludes Board and staff deliberation, so it does not establish a meeting end at 7 PM. Newspaper run dates printed as instructions are not independently verified publication dates. The notices do not establish physical construction, computing closure or operation.",
      "next_scheduled_on": "2026-10-26",
      "proposed_term_months": 4,
      "scope": "The original County notice dated October 14, 2026 advertises an October 26, 2026 hearing at 6 PM on a proposed four month moratorium. A separate original notice advertises data center zoning standards at the same Board meeting. These are two advertised topics, not proof of two different Board meetings, a held hearing, an adopted pause or enacted standards.",
      "sets_site_status": false,
      "source_ids": [
        "m13-h14-davidson-moratorium-observed",
        "m13-h14-davidson-rezoning-notice"
      ],
      "source_read_scope": {
        "future_hearing_not_occurrence_or_adoption": true,
        "newspaper_instructions_not_actual_publication": true,
        "ordinary_observed_redirect_actual200_read": true,
        "original_moratorium_notice_complete_text_page": 1,
        "original_zoning_notice_selected_item": 2,
        "public_comment_cap_not_total_meeting_end": true,
        "same_meeting_two_subject_notices": true
      },
      "state": "nc",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "status": [
          "m14-minneapolis-data"
        ]
      },
      "id": "restriction:minneapolis-mn-city-reported-temporary-pause",
      "instrument_id": "City reported temporary data center ordinance with precise terms unverified",
      "instrument_url": null,
      "instrument_verified": false,
      "jurisdiction": "City of Minneapolis",
      "limits": "The complete executed temporary ordinance, exact adoption and commencement days, present full exception text, amendment chain and precise end were not independently read in this bounded review. Most of the City is not all projects or every institution. The described definition for incidental internal servers belongs to the proposed standards discussion and is not certified as a final exception in the current pause. November 5 committee and November 12 Council meetings are schedules for consideration, not accomplished final adoption or legal expiry. A contact office address is not certified as a meeting venue. The City discussion of State building code authority is attributed context rather than an independent complete statewide legal interpretation.",
      "next_scheduled_on": null,
      "scope": "The current original City planning page reports that Council approved a temporary ordinance earlier in 2026 and that it pauses new data center proposals in most of the City while permanent standards are developed. The City amendment index separately lists the Data Centers Amendment under review. This supports a City reported temporary pause with incomplete precise instrument terms, not an independently verified blanket permanent prohibition.",
      "sets_site_status": false,
      "source_ids": [
        "m14-minneapolis-amendments",
        "m14-minneapolis-data"
      ],
      "source_read_scope": {
        "current_original_city_planning_page_complete_main_body_read": true,
        "full_executed_temporary_instrument_not_read": true,
        "most_city_not_all_projects": true,
        "no_site_eligibility_or_physical_closure_inferred": true,
        "november5_and12_schedules_not_completed_votes": true,
        "original_amendment_index_lists_data_centers_under_review": true,
        "proposed_internal_processing_definition_not_current_exception": true
      },
      "state": "mn",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "next_scheduled_on": [
          "m14-pokagon"
        ],
        "proposed_term_months": [
          "m14-pokagon"
        ],
        "status": [
          "m14-pokagon"
        ]
      },
      "id": "restriction:pokagon-mi-october-data-center-pause-proposal",
      "instrument_id": "Original notice of proposed October 27 Planning Commission proceeding",
      "instrument_url": "https://pokagontownshipmi.gov/mc-events/planning-commission-public-hearing/",
      "instrument_verified": false,
      "jurisdiction": "Pokagon Township, Cass County",
      "limits": "The complete final instrument, executed adoption, commencement, exact expiry, exemptions and later Township Board action were not independently verified. A proposed duration is not a calculated end date. Battery storage and solar subjects do not expand the computing rule or prove that every data center has those hazards. The notice does not establish physical construction, shutdown or operation.",
      "next_scheduled_on": "2026-10-27",
      "proposed_term_months": 6,
      "scope": "The original Township notice schedules an October 27, 2026 Planning Commission hearing and proposed action on zoning text and a six month pause on review or consideration of data center applications. It also advertises distinct battery storage and solar matters. The data center proposal remains prospective in this review.",
      "sets_site_status": false,
      "source_ids": [
        "m14-pokagon"
      ],
      "source_read_scope": {
        "exact_legal_term_not_calculated": true,
        "original_notice_main_body_read": true,
        "planning_hearing_and_proposed_action_not_accomplished_adoption": true,
        "separate_battery_and_solar_topics_not_computing_scope": true
      },
      "state": "mi",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-08-03",
      "applies_to_all_projects": false,
      "approved_on": "2026-08-05",
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m15-c60-rockford-moratorium-original"
        ],
        "approved_on": [
          "m15-c60-rockford-moratorium-original"
        ],
        "publication_on": [
          "m15-c60-rockford-moratorium-original"
        ],
        "status": [
          "m15-c60-rockford-moratorium-original",
          "m15-c60-rockford-policy"
        ],
        "term_months": [
          "m15-c60-rockford-moratorium-original"
        ]
      },
      "id": "restriction:rockford-il-executed-2026-pause",
      "instrument_id": "Ordinance 2026-145-O",
      "instrument_url": "https://www.rockfordil.gov/DocumentCenter/View/7462/2026-145-O-Approval-of-a-Moratorium-on-data-centers-and-directing-city-to-conduct-a-comprehensive-evaluation-of-best-practices?bidId=",
      "instrument_verified": true,
      "jurisdiction": "City of Rockford",
      "limits": "This is a bounded original executed instrument and current City account, without a blanket shutdown of existing computing, a permanent ban or certification of every named property entitlement. The policy page says enacted August 5 while the executed document distinguishes August 3 passage from August 5 approval and publication. The separate 180 day staff reporting requirement is not a moratorium expiration day. October 15 referral procedure and proposed permanent standards do not prove final text adoption, termination of the temporary order or an exact upcoming hearing.",
      "next_scheduled_on": null,
      "publication_on": "2026-08-05",
      "scope": "The complete executed City ordinance records August 3, 2026 passage and August 5 approval and certified pamphlet publication. Section 8 states six months from the effective date. Section 15 makes effect conditional on passage, approval and pamphlet publication; no separate exact effective day or calendar endpoint is printed and neither is calculated here. Section 9 excepts specified existing remodeling entitlements, routine maintenance without increased capacity, public emergency facilities, applicable law and existing industrial I2 properties under annexation agreements. Section 10 protects specified prior approvals and completed applications. Section 11 permits conditional processing while withholding final approval under its stated conditions. Section 12 establishes a hardship process. The current original City policy page reports the temporary pause and explicitly says it did not halt the potential Monarch development because of preexisting annexation rights.",
      "sets_site_status": false,
      "source_ids": [
        "m15-c60-rockford-moratorium-original",
        "m15-c60-rockford-policy",
        "m15-c60-rockford-referral-original"
      ],
      "source_read_scope": {
        "annexation_exception_and_prior_applications_read": true,
        "complete_executed_scan_physical_pages": [
          1,
          2,
          3,
          4,
          5,
          6,
          7
        ],
        "conditional_processing_and_hardship_appeal_read": true,
        "current_city_policy_body_read": true,
        "october15_referral_memo_read_and_viewed": true,
        "passage_distinct_from_approval_and_publication": true,
        "permanent_draft_not_final_adoption": true,
        "separate_180_day_reporting_not_pause_end": true,
        "signature_attestation_seal_and_publication_certificate_read": true,
        "six_month_term_not_calculated_endpoint": true
      },
      "state": "il",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-23",
      "term_months": 6,
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-25",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": "2029-07-01",
      "field_sources": {
        "adopted_on": [
          "m16-j1816-eastfishkill-june25-minutes"
        ],
        "expires_on": [
          "m16-j1816-eastfishkill-june25-minutes"
        ],
        "status": [
          "m16-j1816-eastfishkill-june25-minutes"
        ]
      },
      "id": "restriction:east-fishkill-ny-local-law3-2026",
      "instrument_id": "Local Law 3 of 2026",
      "instrument_url": "https://eastfishkillny.gov/wp-content/uploads/2026/08/TB-June-25-2026-Minutes.pdf",
      "instrument_verified": false,
      "jurisdiction": "Town of East Fishkill",
      "limits": "This verifies the full adopted minutes text and vote, not a separately executed instrument or State filing receipt. The explicit July 1, 2029 endpoint is retained without calculating an anniversary from June 25. The pending State bill recital is not proof of enacted State law and does not replace Executive Order 62. Ancillary use and the twenty MW threshold remain conjunctive. Exact Treetop eligibility, permanent zoning standards and physical computing stage remain unverified.",
      "next_scheduled_on": null,
      "scope": "The adopted text and five to zero vote appear in the original June 25, 2026 Council minutes on physical pages thirty and thirty one. Section 2b imposes a three year data center moratorium subject to the exception for use ancillary to an existing or permitted use and under twenty MW, or the separate Economic Development Special Permit route. Section 3 expressly states July 1, 2029 as the data center endpoint. Section 2a separately addresses undeveloped industrial land through December 31, 2026 with its stated exceptions. Section 5 conditions commencement on adoption with the New York Secretary of State; the separate State filing and effective day are unread.",
      "sets_site_status": false,
      "source_ids": [
        "m16-j1816-eastfishkill-june25-minutes"
      ],
      "source_read_scope": {
        "adopted_text_and_vote_physical_pages_read_and_viewed": [
          30,
          31
        ],
        "ancillary_and_under20mw_conjunction_retained": true,
        "explicit_endpoint_not_calculated": true,
        "industrial_pause_endpoint_separate": true,
        "preceding_discussion_page_read_and_viewed": 29,
        "state_filing_not_read": true
      },
      "state": "ny",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "term_months": [
          "m16-j1816-massena-draft-original"
        ]
      },
      "id": "restriction:massena-ny-proposed-september2026-pause",
      "instrument_id": "Draft September 2026 local law with blank number",
      "instrument_url": "https://massena.us/m/newsflash/Archive/Item/114?arcId=182",
      "instrument_verified": false,
      "jurisdiction": "Town of Massena",
      "limits": "A scheduled past hearing is not passage. The corrected PDF target self redirects to the same URL and was not read. The archive window is not a legal expiration or repeal. Exact final vote, corrected instrument, filing, current force and endpoint remain unverified. No six month calendar endpoint or closure of existing computing is inferred.",
      "next_scheduled_on": null,
      "scope": "The original Town archived draft was posted September 8, 2026 with a September 14 numbering correction and remains labeled draft with a blank law number. It proposes a six month pause from filing with the Secretary of State for specified land use and building approvals for data centers and accessory generators and substations. Stated exceptions concern incidental ancillary use under one MW, specified telecommunications facilities and utility equipment solely controlling its own network. A Town Board hardship route is included. The earlier August 28 notice scheduled a September 16 hearing.",
      "sets_site_status": false,
      "source_ids": [
        "m16-j1816-massena-draft-original",
        "m16-c61-massena-pause-original-archive"
      ],
      "source_read_scope": {
        "archive_end_not_legal_expiration": true,
        "complete_archived_draft_html_read": true,
        "corrected_pdf_self_redirect_hold": true,
        "exceptions_and_hardship_read": true,
        "past_hearing_not_adoption": true
      },
      "state": "ny",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "term_months": 6,
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-04-20",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m17-c62-ravenna-april20-minutes"
        ],
        "status": [
          "m17-c62-ravenna-april20-minutes"
        ],
        "term_months": [
          "m17-c62-ravenna-april20-minutes"
        ]
      },
      "id": "restriction:ravenna-oh-ordinance2026-067",
      "instrument_id": "Ordinance 2026 067",
      "instrument_url": "https://www.ravennaoh.gov/wp-content/uploads/2026/05/4-20-26-Special.pdf",
      "instrument_verified": false,
      "jurisdiction": "City of Ravenna",
      "limits": "The exact executed ordinance body, exceptions, commencement and expiration day were not independently read. A one year description is not converted into an April 2027 endpoint. The institutional discussion does not identify the exact Harner proposal, certify eligibility or date computing closure. Later extension, repeal or final rules remain unverified.",
      "next_scheduled_on": null,
      "scope": "The original April 20, 2026 Council minutes record unanimous adoption of Ordinance 2026 067 establishing a one year temporary pause on approval of new data centers for study and appropriate regulations. The separate waiver and emergency motions also passed. The selected minutes discuss an unnamed existing mining facility and the officials account of review authority separately.",
      "sets_site_status": false,
      "source_ids": [
        "m17-c62-ravenna-april20-minutes"
      ],
      "source_read_scope": {
        "adoption_waiver_and_emergency_motions_distinct": true,
        "executed_instrument_and_exact_effect_not_read": true,
        "one_year_term_not_calculated_endpoint": true,
        "original_physical_page2_read_and_viewed": true,
        "unnamed_existing_mining_not_transferred_to_harner": true
      },
      "state": "oh",
      "status": "action_recorded_instrument_unverified",
      "status_as_of": "2026-10-23",
      "term_months": 12,
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-04-22",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m17-c62-monroe-april22-finalminutes"
        ],
        "status": [
          "m17-c62-monroe-april22-finalminutes",
          "m17-c62-monroe-ordinance25-linked",
          "m17-c62-monroe-ordinance20-linked"
        ]
      },
      "id": "restriction:monroe-gloucester-nj-ordinance25-2026",
      "instrument_id": "Ordinance O:25-2026 with separate Hexa plan Ordinance O:20-2026",
      "instrument_url": "https://monroetownshipnj.org/wp-content/uploads/2026/04/O-25-2026.pdf",
      "instrument_verified": false,
      "jurisdiction": "Monroe Township Gloucester County",
      "limits": "Both posted copies have blank signature, vote certification and mayor approval fields. The minutes establish Council adoption but not a separately executed copy or exact publication and effective day. O25 requires twenty days after publication following final adoption; the date is not calculated. Current index titles conflict with actual PDF computing subjects and are not silently substituted. Exact current litigation outcome, legal force and property eligibility remain unverified. This is Gloucester County Monroe Township, not the same named Middlesex County municipality.",
      "next_scheduled_on": null,
      "scope": "The original April 22, 2026 Council minutes record six aye second reading approval of O25 and O20 and the Mayor confirms the computing prohibition and removal from the Hexa plan. The full posted O25 text addresses defined primary computing uses across Township districts and redevelopment areas, with an accessory server room exclusion limited to the lesser of two percent of principal structure floor area or two thousand square feet. Its prior approval and enforcement clauses retain their stated limits. O20 separately removes computing uses from the Hexa plan without deleting the retained warehouse use.",
      "sets_site_status": false,
      "source_ids": [
        "m17-c62-monroe-april22-finalminutes",
        "m17-c62-monroe-ordinance25-linked",
        "m17-c62-monroe-ordinance20-linked",
        "m17-c62-monroe-ordinances-index"
      ],
      "source_read_scope": {
        "blank_execution_not_final_signed_instrument": true,
        "complete_posted_o20_and_o25_text_bodies_read": true,
        "conditional_publication_effect_not_calculated": true,
        "index_title_and_document_subject_conflicts_retained": true,
        "original_council_pages4and6_read_and_viewed": true,
        "posted_o20_pages1_4_5_read_and_viewed": true,
        "posted_o25_pages2_3_5_6_read_and_viewed": true,
        "separate_hexa_plan_and_general_definition_scope": true,
        "server_room_lesser_of_two_limits_retained": true
      },
      "state": "nj",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "ban",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-03-02",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m18-c63-fulton-march2-minutes"
        ],
        "next_scheduled_on": [
          "m18-c63-fulton-oct26-agenda"
        ],
        "recommended_term_months": [
          "m18-c63-fulton-feb10-minutes"
        ],
        "status": [
          "m18-c63-fulton-march2-minutes"
        ]
      },
      "id": "restriction:fulton-in-ordinance03022026",
      "instrument_id": "Ordinance 03022026",
      "instrument_url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_03022026-368",
      "instrument_verified": false,
      "jurisdiction": "Fulton County",
      "limits": "The complete executed ordinance, exemptions, exact commencement, publication, endpoint and current legal force were not independently read. Twelve months describes the earlier recommendation and is not a calculated legal expiration day. Recorder stamps are filing dates rather than enactment. General policy actions do not establish exact Decennial property selection, application eligibility or computing closure.",
      "next_scheduled_on": "2026-10-26",
      "recommended_term_months": 12,
      "scope": "All twelve original February 10 Area Plan Commission minute scans were viewed. They record a six to one recommendation for a twelve month computing pause and a separate seven to zero committee recommendation. February 16 Commissioner minutes expressly say there was no ordinance vote that evening. Original March 2 Commissioner minute page one records adoption of Ordinance 03022026 by two votes to one, separately from three unanimous reading motions. The October 26 agenda schedules further ordinance language discussion.",
      "sets_site_status": false,
      "source_ids": [
        "m18-c63-fulton-feb10-minutes",
        "m18-c63-fulton-feb16-minutes",
        "m18-c63-fulton-march2-minutes",
        "m18-c63-fulton-oct26-agenda"
      ],
      "source_read_scope": {
        "all12_february10_scanned_pages_actually_viewed": true,
        "executed_instrument_exemptions_and_endpoint_unread": true,
        "february16_and_march2_original_page1_text_read_and_viewed": true,
        "recommendation_and_adoption_separated": true,
        "recording_stamp_not_enactment": true
      },
      "state": "in",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expiration_time_local": "12:00",
      "expiration_time_zone": null,
      "expires_on": "2028-01-01",
      "extended_on": "2026-07-14",
      "field_sources": {
        "expiration_time_local": [
          "m18-c63-merrillville-july14-council"
        ],
        "expires_on": [
          "m18-c63-merrillville-july14-council"
        ],
        "extended_on": [
          "m18-c63-merrillville-july14-council"
        ],
        "original_pause_start_on": [
          "m18-c63-merrillville-datacenters"
        ],
        "previous_expires_on": [
          "m18-c63-merrillville-datacenters"
        ],
        "status": [
          "m18-c63-merrillville-july14-council"
        ]
      },
      "id": "restriction:merrillville-in-extension20260714",
      "instrument_id": "July 14, 2026 Council recorded extension motion",
      "instrument_url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
      "instrument_verified": false,
      "jurisdiction": "Town of Merrillville",
      "limits": "The selected original signed minute pages record the extension action rather than a separately read complete executed rule. Exact original adoption and legal commencement, exceptions, current legal force, time zone and individual property eligibility remain unverified. The final date is not described as a calculated six month extension. No general pause is transferred to physical closure or automatic denial of Karis, Province or Wylie.",
      "next_scheduled_on": null,
      "original_pause_start_on": "2026-06-01",
      "previous_expires_on": "2027-05-31",
      "scope": "Original signed July 14 Council minute pages sixteen and seventeen record the final motion extending the data center moratorium until January 1, 2028 at twelve PM, with seven ayes and zero nays. Twelve PM is noon. An earlier December 31 suggestion is not the final motion. The separate older Town narrative reports a June 1, 2026 through May 31, 2027 pause and is retained as the earlier reported term.",
      "sets_site_status": false,
      "source_ids": [
        "m18-c63-merrillville-july14-council",
        "m18-c63-merrillville-datacenters"
      ],
      "source_read_scope": {
        "final_7to0_motion_not_earlier_suggestion": true,
        "final_motion_on_pages16_17_read_and_viewed": true,
        "older_town_narrative_term_retained": true,
        "original_signed_july14_pages1_4_and9_18_actually_viewed": true,
        "pages5_8_not_claimed_read": true,
        "separate_executed_rule_and_current_legal_force_unverified": true,
        "twelve_pm_is_noon": true,
        "unrelated_embedded_financial_instrument_not_claimed_fully_read": true
      },
      "state": "in",
      "status": "extended",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-23",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "next_scheduled_on": [
          "m20-c65gov-e5d4aeb5f8eb"
        ],
        "status": [
          "m20-c65gov-e5d4aeb5f8eb"
        ],
        "threshold_definition": [
          "m20-c65gov-e5d4aeb5f8eb"
        ]
      },
      "id": "restriction:emporia-ks:proposed-high-impact-computing-question2-2026",
      "instrument_id": "Proposed ballot Question 2; linked Resolution 3799 unread",
      "instrument_url": null,
      "instrument_verified": false,
      "jurisdiction": "City of Emporia",
      "limits": "The City expressly subjects the question to applicable laws and court orders and says summaries do not replace governing instruments. The linked full Resolution 3799, proposed ordinance and court records were not independently read after source transport holds. A Yes vote is not assumed, and even a later Yes result would not independently establish exact lawful commencement. Existing facility exceptions, current legal force and specific property eligibility remain unknown. The separate battery question is not this computing proposal.",
      "next_scheduled_on": "2026-11-03",
      "scope": "The complete original City ballot page describes a proposed Question 2 ordinance prohibiting construction, installation, operation and maintenance of high impact data centers across all City zoning districts. The definition requires the primary server infrastructure use and either peak electrical load strictly exceeding ten megawatts or daily water draw strictly exceeding one hundred thousand gallons. It includes server farms, colocation, AI training and cryptocurrency computing. This is a proposed general restriction rather than an enacted ban, an accomplished site denial or physical closure.",
      "sets_site_status": false,
      "source_ids": [
        "m20-c65gov-e5d4aeb5f8eb"
      ],
      "source_read_scope": {
        "city_summary_not_controlling_instrument": true,
        "complete_original_city_ballot_body_read": true,
        "full_resolution_ordinance_and_court_records_unread": true,
        "proposed_not_in_effect": true,
        "question3_type_tier_wording_not_computing_definition": true,
        "strict_thresholds_not_equal_or_combined_and": true,
        "subject_to_laws_and_court_orders": true
      },
      "state": "ks",
      "status": "proposed",
      "status_as_of": "2026-10-23",
      "termination_on": null,
      "threshold_definition": {
        "daily_water_draw_gallons": {
          "comparison": "strictly_greater_than",
          "value": 100000
        },
        "operator": "or",
        "peak_electrical_load_mw": {
          "comparison": "strictly_greater_than",
          "value": 10
        },
        "primary_purpose": "housing operation and maintenance of computer servers and related infrastructure"
      },
      "type": "ban",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-16",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-24",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m21-c66gov-860893e94940"
        ],
        "mghpcc_amendment_limit_mw": [
          "m21-c66gov-860893e94940"
        ],
        "status": [
          "m21-c66gov-860893e94940"
        ]
      },
      "id": "restriction:holyoke-ma-council-computing-zoning-order20260616",
      "instrument_id": "Council zoning order item 17 as amended",
      "instrument_url": "https://storage.googleapis.com/proudcity/holyokema/2026/04/item-3-june-16-2026-city-council-meeting-minutes-b22fb633.pdf",
      "instrument_verified": false,
      "jurisdiction": "City of Holyoke",
      "limits": "The complete executed ordinance, exact enacted definition, mayoral signature, publication, legal commencement and later amendments were not independently read. The original code request remained held by transport limits. The minutes describe an existing MGHPCC exception and ancillary use discussion, without certifying every legal exception or exact property eligibility. The separately referred study committee June 30, 2027 sunset is not a ban expiration. The failed committee moratorium vote is not the final Council ban vote. A meeting wrapper April 29 file date conflicts with the June 16 minute heading and is not repaired into a publication day. No privately reported later signature date is adopted.",
      "mghpcc_amendment_limit_mw": 12,
      "next_scheduled_on": null,
      "scope": "Selected original June 16, 2026 Council minute passages on physical pages ten through fourteen record item 17 to define computing as a use not allowable in City zoning districts. The final motion adds up to 12 MW to the MGHPCC permitted use language, followed by readings, enrollment and adoption by nine votes to four. This establishes a Council adopted ban account with an explicit existing institutional exception, rather than independently verified complete current legal force or physical facility closure.",
      "sets_site_status": false,
      "source_ids": [
        "m21-c66gov-860893e94940",
        "m21-c66gov-f70408c4fb0b"
      ],
      "source_read_scope": {
        "failed_committee_moratorium_not_final_council_vote": true,
        "final9to4_adoption_after_readings_and_enrollment": true,
        "final_mghpcc12mw_amendment_read": true,
        "full_minutes_or_executed_ordinance_review_not_claimed": true,
        "no_general_physical_closure_or_exact_project_denial": true,
        "private_resident_details_excluded": true,
        "selected_original_minute_passages_read_on_physical_pages": [
          1,
          2,
          3,
          10,
          11,
          12,
          13,
          14
        ],
        "study_committee_sunset_not_ban_expiry": true,
        "wrapper_april29_and_june16_heading_conflict_retained": true
      },
      "state": "ma",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-24",
      "termination_on": null,
      "type": "ban",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-06-01",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-24",
      "effective_on": null,
      "expires_on": "2027-08-31",
      "field_sources": {
        "adopted_on": [
          "m22-c67gov-14f6e4faf1fd"
        ],
        "expires_on": [
          "m22-c67gov-14f6e4faf1fd"
        ],
        "status": [
          "m22-c67gov-14f6e4faf1fd"
        ]
      },
      "id": "restriction:reno-nv-city-reported-final-application-pause20260601",
      "instrument_id": null,
      "instrument_url": "https://reno.gov/business-development/development-services/initiatives-and-updates.php",
      "instrument_verified": false,
      "jurisdiction": "City of Reno",
      "limits": "The full executed resolution, instrument number, exact legal commencement, detailed exceptions, extensions and any later replacement instrument were not independently read. The reported endpoint is conditional on earlier adequate regulations rather than an unconditional guaranteed expiry. The same City page separately describes live entertainment rules ending December 31, 2027; that unrelated date is not a computing moratorium term. The application pause does not establish that existing Keystone construction or every regional facility is prohibited or physically closed.",
      "next_scheduled_on": null,
      "scope": "The original current City development page says Council approved a final data center moratorium resolution on June 1, 2026 and reports it in effect through August 31, 2027 or until adequate regulations are adopted. The City says it is not accepting new data center conditional use applications during that period. This is a City reported application pause, separate from exact current conditions of an existing project and physical computing stage.",
      "sets_site_status": false,
      "source_ids": [
        "m22-c67gov-14f6e4faf1fd"
      ],
      "source_read_scope": {
        "city_reported_existing_effect_not_inferred_from_draft": true,
        "complete_original_data_center_text_amendment_and_moratorium_section_read": true,
        "conditional_earlier_regulations_retained": true,
        "full_executed_resolution_unread": true,
        "live_entertainment_term_not_computing_term": true,
        "no_exact_property_eligibility_or_physical_status_change": true
      },
      "state": "nv",
      "status": "officially_reported_in_effect",
      "status_as_of": "2026-10-24",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-24",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "status": [
          "m23-92aa0e919cc5"
        ]
      },
      "id": "restriction:little-rock-ar-official-proposal-202610",
      "instrument_id": null,
      "instrument_url": "https://littlerock.gov/wp-content/uploads/meeting-agenda/AGENDA%20-%20WEB%20-%2010-20-2026/Agenda-October-20-2026.htm",
      "instrument_verified": false,
      "jurisdiction": "City of Little Rock",
      "limits": "The original agenda is a proposed action rather than the completed vote or signed ordinance. No legal commencement, six month endpoint, actual emergency adoption or general physical closure is inferred.",
      "next_scheduled_on": null,
      "scope": "The original October 20, 2026 City Board agenda lists a proposed six month hyperscale computing permitting and approval moratorium as item 24. It lists requested municipal impact studies, public disclosure and an administrative relief procedure. The agenda does not independently establish the completed vote, actual emergency adoption, signed instrument, exact legal commencement or a later future hearing. The past 6 p.m. meeting start is not an upcoming computing hearing or an item specific time.",
      "sets_site_status": false,
      "source_ids": [
        "m23-92aa0e919cc5"
      ],
      "source_read_scope": {
        "completed_adoption_not_independently_verified": true,
        "draft_recital_or_agenda_not_enactment": true,
        "full_attached_four_page_draft_text_read": false,
        "no_site_status_changes": true,
        "original_relevant_government_body_read": true,
        "proposed_endpoint_not_actual_expiry": true
      },
      "state": "ar",
      "status": "proposed",
      "status_as_of": "2026-10-24",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-24",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "status": [
          "m23-adebbfe3e3f6",
          "m23-4a03a3782dc4"
        ]
      },
      "id": "restriction:guilford-nc-official-proposal-202610",
      "instrument_id": null,
      "instrument_url": "https://guilford.legistar.com/View.ashx?M=F&ID=16056326&GUID=85C38749-8CEF-4304-9843-AF54A4992C58",
      "instrument_verified": false,
      "jurisdiction": "Guilford County",
      "limits": "The attached text is retained as an unverified draft rather than a certified adopted instrument. The apparent adoption recital and conditional April 12, 2027 endpoint are not accomplished legal dates. Incidental subordinate server rooms and statutory exemptions remain explicit. No private November 5 report is used as an official schedule.",
      "next_scheduled_on": null,
      "scope": "The original County file 2026 439 full text identifies an October 15, 2026 public hearing and a proposed 180 day development approval pause. The displayed status is Held and its action history has zero records. The attached four page text recites an October 15 adoption and proposed April 12, 2027 endpoint, but no signed certification or independently displayed completed adoption action was read. This draft recital is not an accomplished adoption. The proposed scope includes the County planning jurisdiction, incidental subordinate server rooms and statutory project exemptions. Neither a private November 5 vote account nor the proposed endpoint becomes an official upcoming hearing.",
      "sets_site_status": false,
      "source_ids": [
        "m23-adebbfe3e3f6",
        "m23-4a03a3782dc4"
      ],
      "source_read_scope": {
        "completed_adoption_not_independently_verified": true,
        "draft_recital_or_agenda_not_enactment": true,
        "full_attached_four_page_draft_text_read": true,
        "no_site_status_changes": true,
        "original_relevant_government_body_read": true,
        "proposed_endpoint_not_actual_expiry": true
      },
      "state": "nc",
      "status": "proposed",
      "status_as_of": "2026-10-24",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-24",
      "draft_adoption_recital_on": "2026-06-08",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "draft_adoption_recital_on": [
          "m24-ec5ad38e206d"
        ],
        "instrument_id": [
          "m24-ec5ad38e206d"
        ],
        "reported_adoption_on": [
          "m24-8b25be42c999"
        ],
        "reported_term_days": [
          "m24-8b25be42c999",
          "m24-ec5ad38e206d"
        ],
        "status": [
          "m24-8b25be42c999",
          "m24-ec5ad38e206d"
        ]
      },
      "id": "restriction:iron-ut-conflicting-adoption-pause2026",
      "instrument_id": "2026-13",
      "instrument_url": "https://ironcountyut.gov/files/planning/data-center-solar-moratorium.pdf",
      "instrument_verified": false,
      "jurisdiction": "Iron County",
      "limits": "The complete three page text requires passage and publication for legal commencement. No exact effective day, final executed instrument, complete subsequent law or calculated expiration is independently verified. The text exempts applications determined complete before commencement and suspends submitted applications not yet complete. It covers the stated land use and associated approval categories, rather than proving that all computing projects are prohibited or physically closed. The separate past Antelope meeting notice does not establish a new Red Butte hearing.",
      "next_scheduled_on": null,
      "reported_adoption_on": "2026-05-26",
      "reported_term_days": 180,
      "scope": "The original County project webpage reports a May 26, 2026 ordinance adopting a 180 day pause for new computing, computing power plant and solar applications and says the incomplete Red Butte application is on hold. The linked ordinance 2026 13 instead bears a June 8 adoption recital with visibly blank chair signature, clerk attestation and all three voting fields. The original current agency account and unexecuted linked text are retained separately rather than silently harmonized.",
      "sets_site_status": false,
      "source_ids": [
        "m24-8b25be42c999",
        "m24-ec5ad38e206d"
      ],
      "source_read_scope": {
        "complete_application_exception_and_incomplete_suspension_retained": true,
        "complete_original_county_project_body_read": true,
        "complete_original_three_page_ordinance_text_read": true,
        "may26_webpage_june8_unsigned_recital_conflict_retained": true,
        "no_calculated_180_day_endpoint": true,
        "no_site_status_change": true,
        "original_physical_page3_pixels_actually_viewed": true,
        "passage_and_publication_not_independently_completed": true
      },
      "state": "ut",
      "status": "adopted_current_status_unverified",
      "status_as_of": "2026-10-24",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-07-21",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-24",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "adopted_on": [
          "m25-f1aefb7f3aca"
        ],
        "related_opposition_resolution": [
          "m25-f1aefb7f3aca"
        ],
        "reported_term_months": [
          "m25-f1aefb7f3aca"
        ],
        "status": [
          "m25-f1aefb7f3aca"
        ]
      },
      "id": "restriction:sierra-nm-recorded-eighteen-month-study20260721",
      "instrument_id": null,
      "instrument_url": "https://www.sierraco.org/wp-content/uploads/2026-07-21-minutes.pdf",
      "instrument_verified": false,
      "jurisdiction": "Sierra County",
      "limits": "All seven original scanned pages were actually viewed, including the commissioner signatures and clerk attestation. The later pages repeat printed Page 2, so physical pages 2, 6 and 7 identify the relevant passages. The full separate resolution or moratorium ordinance, detailed application scope, legal commencement, publication, exceptions, extensions and current legal force were not independently verified. No expiration is calculated. The related opposition resolution number is not silently assigned as a separate moratorium instrument number. County authority over particular State land and exact company eligibility remain unverified. A past October 20 suggested study agenda is not a new future hearing or accomplished study.",
      "next_scheduled_on": null,
      "related_opposition_resolution": "2026-51",
      "reported_term_months": 18,
      "scope": "The original signed County minutes dated July 21, 2026 record approval of opposition resolution 2026 51 with all three commissioner districts voting yes. They also state that an eighteen month moratorium was instituted to study possible large computing development effects, including water resources. This is a recorded study action, separate from a complete independent moratorium instrument and from the physical stage of any specific facility.",
      "sets_site_status": false,
      "source_ids": [
        "m25-f1aefb7f3aca",
        "m25-304ec1f7ed09"
      ],
      "source_read_scope": {
        "all_original_seven_scanned_minute_pages_actually_viewed": true,
        "full_separate_moratorium_instrument_unread": true,
        "no_calculated_expiry_or_physical_site_closure": true,
        "opposition_resolution_number_not_separate_pause_instrument_id": true,
        "physical_page6_three_district_yes_vote_and_reported_18_month_study_read": true,
        "physical_page7_signatures_and_attestation_actually_viewed": true
      },
      "state": "nm",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-24",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-24",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "status": [
          "m28-8fbd52af8f8a"
        ]
      },
      "id": "restriction:jackson-ms-agenda-pause-proposal20260505",
      "instrument_id": null,
      "instrument_url": "https://jacksonms.gov/wp-content/uploads/2026/05/combinepdf-20.pdf",
      "instrument_verified": false,
      "jurisdiction": "Jackson",
      "limits": "Selected original physical pages 1 and 3 of the seven page agenda were read. The Adoption of Ordinance heading does not independently establish enactment. Full ordinance text, actual vote, signatures, exceptions, legal commencement, extensions, present force and any exact term or expiry were not independently verified. No private report supplies a missing legal date. The general City item is not an exact Saxum site permission or physical closure.",
      "next_scheduled_on": null,
      "scope": "The original revised City Council agenda dated May 5, 2026 lists item 13 for proposed consideration of a temporary moratorium and regulatory framework on computing development and expansion. This establishes the historical proposal listing, not an accomplished vote or current legal force.",
      "sets_site_status": false,
      "source_ids": [
        "m28-8fbd52af8f8a"
      ],
      "source_read_scope": {
        "adoption_heading_not_completed_vote": true,
        "full_ordinance_vote_and_effective_day_unverified": true,
        "no_term_or_expiry_invented": true,
        "original_seven_page_agenda_selected_physical_pages1_3_read": true,
        "public_records_request_log_not_government_decision": true
      },
      "state": "ms",
      "status": "proposed",
      "status_as_of": "2026-10-24",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": null,
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-24",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "status": [
          "m29-4e08c143d021"
        ]
      },
      "id": "restriction:piedmont-ok-industrial-tech-draft-mining-exclusion20261024",
      "instrument_id": "2026-003",
      "instrument_url": "https://piedmont-ok.gov/DocumentCenter/View/950/Ordinance-2026-003",
      "instrument_verified": false,
      "jurisdiction": "Piedmont",
      "limits": "All six original page text sections were read and physical page 6 was actually viewed. The Passed and Approved day and both Mayor and City Clerk signature fields are blank. The ordinance number and portal label do not establish adoption, legal commencement or a citywide computing ban. The separate October 22 Cloverleaf document exceeded the bounded capture limit and was not read or obtained through another copy. This district proposal does not set individual site status, permission or physical closure.",
      "next_scheduled_on": null,
      "scope": "The original posted Industrial Technology district ordinance copy proposes to exclude cryptocurrency mining and mineral mining in that district while requiring special use review for other computing facilities. This is the scope of an unsigned draft copy, without independently verified enactment or current force.",
      "sets_site_status": false,
      "source_ids": [
        "m29-4e08c143d021"
      ],
      "source_read_scope": {
        "adoption_day_and_both_signature_fields_blank": true,
        "cryptocurrency_district_exclusion_not_general_citywide_computing_ban": true,
        "full_legal_enactment_and_present_force_unverified": true,
        "original_physical_page6_actually_viewed": true,
        "original_six_page_text_read": true,
        "oversized_project_document_not_read_or_replaced": true
      },
      "state": "ok",
      "status": "proposed",
      "status_as_of": "2026-10-24",
      "termination_on": null,
      "type": "ban",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "adopted_on": "2026-08-20",
      "applies_to_all_projects": false,
      "approved_on": null,
      "checked_on": "2026-10-24",
      "effective_on": null,
      "expires_on": null,
      "field_sources": {
        "status": [
          "m30-975ac93ee27a",
          "m30-08a1e6eca40d",
          "m30-1cdca68d707c",
          "m30-29fbff8dd973"
        ]
      },
      "id": "restriction:new-orleans-la-council-izd-adoption20260820",
      "instrument_id": "30,736 M.C.S. (Calendar 35,512)",
      "instrument_url": "https://cityofno.legistar.com/View.ashx?M=F&ID=15757037&GUID=D0B9C76E-A211-4103-99B9-2A1D5E478F88",
      "instrument_verified": false,
      "jurisdiction": "New Orleans",
      "limits": "Selected physical pages 1 and 6 of the original forty seven page final minutes were read. All four original ordinance page text sections and the appended certified earlier motion on scanned physical page 5 were read; physical pages 1, 4 and 5 were actually viewed. The ordinance copy has blank adoption, Mayor, return and roll call fields. Its first page recital and the earlier motion footer reference June 24, while the certified motion header states June 18. Those earlier dates remain distinct from the final August 20 Council adoption and are not harmonized. Mayor approval, exact commencement, legal term, extensions and current force were not independently verified. The denied original January motion was not read or replaced by an alternate copy, and no one year expiry is inferred from private reporting. The general rule does not independently establish an exact MS Solar project disposition, provider violation or physical closure.",
      "next_scheduled_on": null,
      "scope": "The original final Council minutes dated August 20, 2026 record adoption of Calendar 35512 for a citywide computing interim zoning district. The linked ordinance text restricts computing permits and occupational licenses, excludes accessory server and telecommunications rooms under 2000 square feet, and provides an appeal process. Council adoption is distinct from verified legal commencement or current force.",
      "sets_site_status": false,
      "source_ids": [
        "m30-975ac93ee27a",
        "m30-08a1e6eca40d",
        "m30-1cdca68d707c",
        "m30-29fbff8dd973"
      ],
      "source_read_scope": {
        "accessory_room_exception_and_appeal_not_all_projects": true,
        "adoption_and_mayor_fields_blank_in_linked_copy": true,
        "aug20_council_adoption_not_mayor_approval_or_legal_commencement": true,
        "certified_earlier_motion_header_june18_and_june24_recital_footer_conflict_retained": true,
        "denied_january_original_not_read_or_replaced": true,
        "no_private_report_term_or_expiry_adopted": true,
        "original_final_meeting_register_exact_item13_read": true,
        "original_final_minutes_selected_physical_pages1_6_text_read": true,
        "original_ordinance_physical_pages1_through4_text_read": true,
        "original_physical_pages1_4_and_scanned5_actually_viewed": true
      },
      "state": "la",
      "status": "adopted_effective_day_unverified",
      "status_as_of": "2026-10-24",
      "termination_on": null,
      "type": "moratorium",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:cleveland-oh-extension-1246-2026",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "type": "moratorium",
      "status": "extended",
      "checked_on": "2026-10-24",
      "status_as_of": "2026-10-24",
      "adopted_on": "2026-10-19",
      "approved_on": null,
      "effective_on": "2026-10-19",
      "extension_begins_on": "2026-10-20",
      "expires_on": "2027-01-29",
      "termination_on": null,
      "termination_condition": "Earlier effectiveness of new or amended codified ordinance sections regulating or prohibiting data centers.",
      "conditional_termination_before_end": true,
      "next_scheduled_on": null,
      "original_pause_start_on": "2026-07-20",
      "instrument_id": "1246-2026",
      "instrument_url": "https://cityofcleveland.legistar.com/View.ashx?G=2EB18EF1-2C21-4D1D-85C9-B38100AB8FFD&GUID=F6D4CD55-6D4D-4B9A-B1D6-BFE3FA37CD18&ID=16059141&M=F",
      "instrument_verified": true,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment",
        "m54-cleveland-city_page"
      ],
      "field_sources": {
        "status": [
          "m54-cleveland-ledger",
          "m54-cleveland-ordinance_attachment"
        ],
        "adopted_on": [
          "m54-cleveland-ledger"
        ],
        "effective_on": [
          "m54-cleveland-ledger"
        ],
        "extension_begins_on": [
          "m54-cleveland-ordinance_attachment"
        ],
        "expires_on": [
          "m54-cleveland-ordinance_attachment"
        ],
        "original_pause_start_on": [
          "m54-cleveland-ordinance_attachment"
        ],
        "scope": [
          "m54-cleveland-ordinance_attachment"
        ],
        "limits": [
          "m54-cleveland-ledger",
          "m54-cleveland-ordinance_attachment",
          "m54-cleveland-city_page"
        ]
      },
      "scope": "Section 1 extends the pause on review and issuance of use, building, zoning, occupancy and other permits, including Public Utilities licenses, for expansion of existing standalone data centers or establishment of a data center as the principal use in a standalone facility. The extension period begins October 20, 2026 and ends at the earlier code change trigger or January 29, 2027.",
      "limits": "The Council ledger reports passage and ordinance effectiveness on October 19, while the text starts the extension period October 20. The attached report has unfilled approval blocks; no separate mayoral approval day is inferred. The City explanatory page still gives the prior October 20 end. No complete later code review or current parcel eligibility finding is asserted, and January 29 is a conditional upper limit.",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:richmond-ca-urgency13-26-certified-review-20261024",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "type": "moratorium",
      "status": "in_effect",
      "checked_on": "2026-10-24",
      "status_as_of": "2026-10-24",
      "adopted_on": "2026-09-15",
      "approved_on": null,
      "effective_on": "2026-09-15",
      "expires_on": "2026-10-30",
      "termination_on": null,
      "next_scheduled_on": null,
      "original_pause_start_on": "2026-09-15",
      "instrument_id": "Urgency Ordinance 13-26 N.S.",
      "instrument_url": "https://www.ci.richmond.ca.us/ArchiveCenter/ViewFile/Item/17892",
      "instrument_verified": true,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m55-richmond-ordinance",
        "m55-richmond-city",
        "m55-richmond-report",
        "m55-richmond-notice"
      ],
      "field_sources": {
        "status": [
          "m55-richmond-ordinance",
          "m55-richmond-city"
        ],
        "adopted_on": [
          "m55-richmond-ordinance"
        ],
        "effective_on": [
          "m55-richmond-ordinance"
        ],
        "expires_on": [
          "m55-richmond-city",
          "m55-richmond-report"
        ],
        "original_pause_start_on": [
          "m55-richmond-ordinance"
        ],
        "scope": [
          "m55-richmond-ordinance"
        ],
        "limits": [
          "m55-richmond-ordinance",
          "m55-richmond-report",
          "m55-richmond-notice"
        ]
      },
      "scope": "Sections 5 and 6 cover establishment, construction, conversion and expansion of data centers throughout Richmond and prohibit new listed permits and land use entitlements during the term. An incidental server room on the same lot as a lawful primary use is exempt when it is not independent commercial, wholesale or third party computing. Existing lawfully operating data centers may continue under authorization held as of the effective date, subject to existing law.",
      "limits": "This is the certified original 45 day ordinance only. Its original term ends October 30, 2026 unless lawfully extended. The staff report recommends an extension and the notice schedules an October 20 hearing, but neither records the hearing outcome. No 22 month and 15 day extension, permanent ban, later legal endpoint, specific parcel permission or physical site status is inferred.",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:hayward-ca-ord26-09-action-review-20261024",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "type": "moratorium",
      "status": "officially_reported_in_effect",
      "checked_on": "2026-10-24",
      "status_as_of": "2026-10-24",
      "adopted_on": "2026-10-20",
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "original_pause_start_on": "2026-10-20",
      "action_recorded_on": "2026-10-20",
      "instrument_id": "Ordinance 26-09, identified in the Council action record",
      "instrument_url": "https://hayward.legistar.com/HistoryDetail.aspx?ID=37917674&GUID=563D35B1-345F-4E02-B0A2-0E73D6DDE972",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m56-hayward_action",
        "m56-hayward_draft",
        "m56-ledger",
        "m56-city-news"
      ],
      "field_sources": {
        "status": [
          "m56-city-news",
          "m56-hayward_action",
          "m56-ledger"
        ],
        "adopted_on": [
          "m56-ledger",
          "m56-hayward_action"
        ],
        "action_recorded_on": [
          "m56-ledger",
          "m56-hayward_action"
        ],
        "original_pause_start_on": [
          "m56-city-news",
          "m56-ledger"
        ],
        "scope": [
          "m56-city-news",
          "m56-hayward_action"
        ],
        "limits": [
          "m56-hayward_action",
          "m56-hayward_draft",
          "m56-ledger"
        ]
      },
      "scope": "The City reports an immediate temporary moratorium on consideration and approval of new data centers. The October 20 Council action passed seven to zero, identifies Ordinance 26-09 and records adoption including a modification. The attached ordinance is a draft with a blank ordinance number and adoption block.",
      "limits": "The exact modification and final operative instrument remain unverified. The draft describes an initial 45 day term, expansion controls and exceptions for renewals or previously completed and approved applications; these draft provisions are not assigned as final law. No exact expiration day is calculated. The City statement about up to two years is a ceiling, not the adopted duration. No particular facility status or entitlement is changed.",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:jersey-city-nj-industrial-principal-use-26-057",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "type": "ban",
      "status": "adopted_effective_day_unverified",
      "checked_on": "2026-10-24",
      "status_as_of": "2026-10-24",
      "adopted_on": "2026-08-19",
      "approved_on": "2026-08-20",
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": "Ordinance 26-057",
      "instrument_url": "https://cityofjerseycity.civicweb.net/document/456803/Data%20Center%20Amendment.pdf?handle=F3A84F034B03438F873B901B05EF950F",
      "instrument_verified": true,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m57-agenda",
        "m57-ordinance"
      ],
      "field_sources": {
        "status": [
          "m57-ordinance"
        ],
        "adopted_on": [
          "m57-ordinance"
        ],
        "approved_on": [
          "m57-ordinance"
        ],
        "scope": [
          "m57-ordinance"
        ],
        "limits": [
          "m57-ordinance"
        ]
      },
      "scope": "The adopted ordinance removes cyber hotels and data centers as principal permitted uses in the Industrial District, excludes them from warehousing and removes the associated parking standard. The signed Council record reports August 19 final adoption by nine votes to zero, with Mayor approval August 20.",
      "limits": "This is a district and principal use restriction, without a determination that every colocated facility is prohibited. Exact legal effectiveness and completed publication remain unverified. The supporting planning resolution contains conflicting year headings and vote counts; those conflicts are not used to change the separately recorded final Council action. No current code reconciliation, later repeal review or site status change was performed.",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:dade-city-fl-revised-2026-22-proposal",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "type": "moratorium",
      "status": "proposed",
      "checked_on": "2026-10-24",
      "status_as_of": "2026-10-24",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-10-27",
      "instrument_id": "Revised Ordinance 2026-22, proposed",
      "instrument_url": "https://dadecityfl.civicweb.net/document/204890/City%20Commission%20-%2027%20Oct%202026.pdf?handle=A90CCF17D6834C5386DE0DD747B37512",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "field_sources": {
        "status": [
          "m58-dade-revised-packet"
        ],
        "next_scheduled_on": [
          "m58-dade-revised-packet"
        ],
        "scope": [
          "m58-dade-revised-packet"
        ],
        "limits": [
          "m58-dade-revised-packet"
        ]
      },
      "scope": "The revised proposal would pause listed development applications for data centers, large scale data centers and other large load customers within Dade City for twelve months. It includes an agreement route for qualifying smaller facilities after a public necessity determination and a vested rights determination process. The current packet schedules a repeated first reading on October 27 because the title changed.",
      "limits": "The revised ordinance has an unfilled adoption block and does not establish final adoption or effectiveness. Its disclosure date is not an actual moratorium start. The anticipated November 10 second reading awaits a new notice; older materials still list the earlier reading sequence. Definitions include generic data centers as well as separate large load categories, so the 50 MW threshold is not assigned to every covered use. No site eligibility or operation is determined.",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:fort-worth-tx-proposed-data-center-moratorium",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "type": "moratorium",
      "status": "proposed",
      "checked_on": "2026-10-24",
      "status_as_of": "2026-10-24",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-11-10",
      "instrument_id": "Proposed data center development moratorium; final ordinance not verified",
      "instrument_url": "https://www.fortworthtexas.gov/departments/city-manager/datacenters",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "field_sources": {
        "status": [
          "m59-fw-overview",
          "m59-fw-update"
        ],
        "next_scheduled_on": [
          "m59-fw-overview",
          "m59-fw-update"
        ],
        "scope": [
          "m59-fw-overview",
          "m59-fw-update"
        ],
        "limits": [
          "m59-fw-overview",
          "m59-fw-update"
        ]
      },
      "scope": "The city reports initiating a process for a proposed 90 day pause on new data center development applications. Its first required public hearing is scheduled during the November 10 Council meeting. The overview describes exceptions for vested and approved projects and submitted zoning applications; exact final ordinance scope remains unverified.",
      "limits": "The August 11 action initiated the process rather than establishing an effective moratorium. The city describes additional notices, hearings, readings and a supermajority adoption vote, tentatively February 16, 2027. No effective day or expiry is calculated. The state statute and final ordinance were not reviewed, and no site eligibility, construction or operation is determined.",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:linden-nj-ordinance-7053",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "type": "ban",
      "status": "action_recorded_instrument_unverified",
      "checked_on": "2026-10-25",
      "status_as_of": "2026-10-25",
      "adopted_on": "2026-10-20",
      "approved_on": "2026-10-21",
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": "Ordinance 70 53; official summary only",
      "instrument_url": "https://docs.google.com/document/d/1UjzNAlGWUR3a7PIuRdqn7z0yd6f-VahZ/edit",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m60-linden-summary"
      ],
      "field_sources": {
        "status": [
          "m60-linden-summary"
        ],
        "adopted_on": [
          "m60-linden-summary"
        ],
        "approved_on": [
          "m60-linden-summary"
        ],
        "scope": [
          "m60-linden-summary"
        ],
        "limits": [
          "m60-linden-summary"
        ]
      },
      "scope": "The City published summary states final adoption October 20 and approval October 21 of Ordinance 70 53, amending definitions and prohibited uses to prohibit data centers in all City zoning districts.",
      "limits": "Only the official statement and summary linked by the City notice is qualified. Full operative ordinance, exceptions and exact effective date remain unknown. Recorded adoption and approval do not establish current legal effect, individual site applicability, project cancellation or computing operation.",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:huntingburg-in-data-center-bess-proposal",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "type": "moratorium",
      "status": "proposed",
      "checked_on": "2026-10-25",
      "status_as_of": "2026-10-25",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-10-26",
      "instrument_id": null,
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m61-notice"
      ],
      "field_sources": {
        "status": [
          "m61-notice"
        ],
        "next_scheduled_on": [
          "m61-notice"
        ],
        "scope": [
          "m61-notice"
        ],
        "limits": [
          "m61-notice"
        ]
      },
      "scope": "The Advisory Plan Commission notice proposes a six month moratorium on consideration of approval of data centers and battery energy storage systems, alongside definitions, districts, special use exceptions and development standards. Hearings are scheduled October 26 and November 23, 2026.",
      "limits": "The notice schedules consideration of amendments and does not establish adoption or a current approval pause. Full proposed ordinance text, exceptions, legal commencement and expiry remain unknown. No individual project or computing operation status is determined.",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:richland-kalamazoo-mi-ordinance313-proposal",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "type": "moratorium",
      "status": "proposed",
      "checked_on": "2026-10-25",
      "status_as_of": "2026-10-25",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-10-28",
      "instrument_id": "Proposed Ordinance 313",
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "field_sources": {
        "status": [
          "m62-notice",
          "m62-agenda"
        ],
        "instrument_id": [
          "m62-notice",
          "m62-agenda"
        ],
        "next_scheduled_on": [
          "m62-notice",
          "m62-agenda"
        ],
        "scope": [
          "m62-notice",
          "m62-agenda"
        ],
        "limits": [
          "m62-notice",
          "m62-agenda"
        ]
      },
      "scope": "The Planning Commission schedules an October 28 hearing on proposed Ordinance 313. Section 300.2005 concerns a twelve month data center moratorium, while Section 300.2006 separately concerns a nine month battery energy storage moratorium.",
      "limits": "This item records proposed Ordinance 313 only. Its adoption, legal commencement, expiry, complete exceptions and relationship to prior Ordinance 311 remain unverified. The notice does not establish that earlier measures are absent or that the proposed amendment is already effective. No individual project status is determined.",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:hubbard-oh-city-ballot-ban-proposal",
      "jurisdiction": "City of Hubbard",
      "state": "oh",
      "type": "ban",
      "status": "proposed",
      "checked_on": "2026-10-25",
      "status_as_of": "2026-10-25",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-11-03",
      "instrument_id": null,
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m63-election"
      ],
      "field_sources": {
        "status": [
          "m63-election"
        ],
        "next_scheduled_on": [
          "m63-election"
        ],
        "scope": [
          "m63-election"
        ],
        "limits": [
          "m63-election"
        ]
      },
      "scope": "The Trumbull County Board of Elections notice lists a proposed Hubbard City ordinance to approve or reject a ban on data centers within City limits at the November 3, 2026 general election.",
      "limits": "This is the County ballot question summary rather than full proposed ordinance text. Definitions, exceptions, legal commencement and later amendments remain unknown. No enacted ban, election result, Township rule or individual project cancellation is inferred.",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:lafayette-co-ordinance21-2026",
      "jurisdiction": "City of Lafayette, Colorado",
      "state": "co",
      "type": "moratorium",
      "status": "action_recorded_instrument_unverified",
      "checked_on": "2026-10-26",
      "status_as_of": "2026-10-26",
      "adopted_on": null,
      "approved_on": "2026-10-20",
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": "Ordinance 21, Series 2026",
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m64-lafayette-recap"
      ],
      "field_sources": {
        "status": [
          "m64-lafayette-recap"
        ],
        "approved_on": [
          "m64-lafayette-recap"
        ],
        "action_recorded_on": [
          "m64-lafayette-recap"
        ],
        "scope": [
          "m64-lafayette-recap"
        ],
        "limits": [
          "m64-lafayette-recap"
        ]
      },
      "scope": "Official City meeting recap records October20 second reading approval for Ordinance21,Series2026, described as an eighteen month moratorium on acceptance, processing and approval of land use applications or building permits for development or construction of data centers and related land uses.",
      "limits": "The consent agenda containing this item was approved six to zero. This is an official action summary, not the signed ordinance or complete legal text. Effective date, exact termination, definitions, exceptions, later amendments and present legal effect remain unverified. No individual project cancellation or operating status is set.",
      "action_recorded_on": "2026-10-20",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:martin-fl-proposed-data-center-moratorium-2026",
      "jurisdiction": "Unincorporated Martin County, Florida",
      "state": "fl",
      "type": "moratorium",
      "status": "proposed",
      "checked_on": "2026-10-26",
      "status_as_of": "2026-10-26",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-10-27",
      "instrument_id": null,
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m65-martin-agenda"
      ],
      "field_sources": {
        "status": [
          "m65-martin-agenda"
        ],
        "next_scheduled_on": [
          "m65-martin-agenda"
        ],
        "scope": [
          "m65-martin-agenda"
        ],
        "limits": [
          "m65-martin-agenda"
        ]
      },
      "scope": "County agenda proposes a pause on submission and acceptance of new applications for large scale data centers in unincorporated Martin County. The described definition uses a single location with anticipated monthly peak load of at least 50 megawatts, with colocated customers included and different locations not aggregated.",
      "limits": "The agenda recommends adoption at the second hearing, not an accomplished vote. Already complete applications would continue under prior regulations according to the proposal. A prior procedural vote changes hearing timing only. The linked ordinance attachment returned HTTP 410, so full text, exceptions, term, adoption and legal effective day remain unverified. No project status is set.",
      "action_recorded_on": null,
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:avon-mn-data-centers-2026",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "type": "moratorium",
      "status": "action_recorded_instrument_unverified",
      "checked_on": "2026-10-26",
      "status_as_of": "2026-10-26",
      "adopted_on": null,
      "approved_on": "2026-08-12",
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": "Resolution 08-12-26-1 adopting an interim ordinance",
      "instrument_url": "https://www.avontownshipmn.gov/images/docs/resolutions/Resolution_08-12-26-1_Data_Center_Moratorium_RN_rev_Clean_1.pdf",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m66-avon",
        "m66-avon-minutes",
        "m66-avon-resolution-text"
      ],
      "field_sources": {
        "status": [
          "m66-avon",
          "m66-avon-minutes",
          "m66-avon-resolution-text"
        ],
        "approved_on": [
          "m66-avon",
          "m66-avon-minutes",
          "m66-avon-resolution-text"
        ],
        "action_recorded_on": [
          "m66-avon",
          "m66-avon-minutes",
          "m66-avon-resolution-text"
        ],
        "instrument_id": [
          "m66-avon",
          "m66-avon-minutes",
          "m66-avon-resolution-text"
        ],
        "instrument_url": [
          "m66-avon",
          "m66-avon-minutes",
          "m66-avon-resolution-text"
        ],
        "scope": [
          "m66-avon",
          "m66-avon-minutes",
          "m66-avon-resolution-text"
        ],
        "limits": [
          "m66-avon",
          "m66-avon-minutes",
          "m66-avon-resolution-text"
        ]
      },
      "scope": "August12 minutes record adoption action for Resolution08-12-26-1. The unsigned hosted text would restrict data center construction, installation, replacement and enlargement across the Township, with exclusions for accessory server rooms, ordinary business IT and separately regulated telecommunications facilities, and an exemption for centers existing before adoption.",
      "limits": "Officially hosted text leaves adoption and signature blanks. It states one year with possible earlier Board termination and effectiveness upon adoption, but the executed instrument and later amendments remain unverified. No exact legal expiry or current effect certified. Supporting infrastructure is covered only when principally serving the defined computing use.",
      "action_recorded_on": "2026-08-12",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:south-bristol-ny-data-centers-2026",
      "jurisdiction": "Town of South Bristol, New York",
      "state": "ny",
      "type": "ban",
      "status": "proposed",
      "checked_on": "2026-10-26",
      "status_as_of": "2026-10-26",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": null,
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m66-south-bristol"
      ],
      "field_sources": {
        "status": [
          "m66-south-bristol"
        ],
        "scope": [
          "m66-south-bristol"
        ],
        "limits": [
          "m66-south-bristol"
        ]
      },
      "scope": "Draft local law would prohibit data centers, artificial intelligence computing facilities and their supporting uses under the Town zoning code.",
      "limits": "Five page filing form leaves law number and adoption certifications blank. Health care internal computing has a qualified definition exclusion. Supporting infrastructure prohibition is tied to the covered facilities, not every substation or battery. Filing with the Secretary of State is the draft effective condition; no actual filing, adoption or present effect established.",
      "action_recorded_on": null,
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:brownsville-tx-2026-1826-proposal",
      "jurisdiction": "City of Brownsville and its Extraterritorial Jurisdiction, Texas",
      "state": "tx",
      "type": "moratorium",
      "status": "proposed",
      "checked_on": "2026-10-26",
      "status_as_of": "2026-10-26",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-11-04",
      "instrument_id": "Proposed Ordinance 2026-1826",
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m67-brownsville-recap"
      ],
      "field_sources": {
        "status": [
          "m67-brownsville-recap"
        ],
        "action_recorded_on": [
          "m67-brownsville-recap"
        ],
        "next_scheduled_on": [
          "m67-brownsville-recap"
        ],
        "instrument_id": [
          "m67-brownsville-recap"
        ],
        "scope": [
          "m67-brownsville-recap"
        ],
        "limits": [
          "m67-brownsville-recap"
        ]
      },
      "scope": "City recap records first reading approval following the third public hearing for a proposed ninety day pause on acceptance, processing and approval of data center applications in the City and its extraterritorial jurisdiction.",
      "limits": "The recap explicitly says this action did not put the pause into effect. Final reading is scheduled November4 and would require three fourths approval. November5 commencement and February3,2027 termination are conditional and are not stored as effective dates. A possible additional ninety days is not an adopted extension.",
      "action_recorded_on": "2026-10-07",
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:charlotte-nc-extension-20261026",
      "jurisdiction": "City of Charlotte and its Extraterritorial Jurisdiction",
      "state": "nc",
      "type": "moratorium",
      "status": "extended",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": "2026-10-26",
      "approved_on": null,
      "effective_on": "2026-10-26",
      "expires_on": "2027-10-18",
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": "October 26, 2026 moratorium extension ordinance",
      "instrument_url": "https://charlottenc.legistar.com/View.ashx?M=F&ID=16081715&GUID=8E3E0480-6BC0-4EF5-B1D2-625D53840636",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m68-history",
        "m68-ordinance"
      ],
      "scope": "Council action history records approval of the extension ordinance October 26. The ordinance becomes effective upon adoption, while the extended application pause commences November 6, 2026 and ends no later than October 18, 2027, or upon approval of specified new rules or policies, whichever occurs first. Covered actions are acceptance, processing and approval of new telecommunications and data storage applications within Charlotte and its extraterritorial jurisdiction.",
      "limits": "The posted attachment has an October 26 adoption clause but no executed signature block. The item header still says Agenda Ready; the separate action history records Approve and Pass. Internal support facilities meeting the stated conditions and projects exempt under state law are excluded. No individual exemption, physical shutdown, project cancellation or site stage is determined.",
      "term_description": "Extended pause commences November 6, 2026; ordinance effectiveness and pause commencement are distinct.",
      "field_sources": {
        "adopted_on": [
          "m68-history",
          "m68-ordinance"
        ],
        "effective_on": [
          "m68-ordinance"
        ],
        "expires_on": [
          "m68-ordinance"
        ],
        "status": [
          "m68-history"
        ],
        "scope": [
          "m68-ordinance"
        ],
        "limits": [
          "m68-history",
          "m68-ordinance"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "before_published_end",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:tyre-ny-20261028-proposal",
      "jurisdiction": "Town of Tyre, New York",
      "state": "ny",
      "type": "moratorium",
      "status": "proposed",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-10-28",
      "instrument_id": "Proposed local law establishing a moratorium on data centers and artificial intelligence computing facilities",
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m69-tyre-notice"
      ],
      "term_description": "One year proposed term; legal commencement and exact end remain unknown.",
      "scope": "Town notice proposes a one year restriction covering computing facility development review, approvals and specified construction or alteration activity within Town of Tyre. Town Board hearing is scheduled October28 at18:30.",
      "limits": "This is a hearing notice summarizing a proposed law, not a signed or adopted instrument. No individual project eligibility, accomplished hearing or current restriction is established.",
      "field_sources": {
        "status": [
          "m69-tyre-notice"
        ],
        "next_scheduled_on": [
          "m69-tyre-notice"
        ],
        "scope": [
          "m69-tyre-notice"
        ],
        "limits": [
          "m69-tyre-notice"
        ],
        "term_description": [
          "m69-tyre-notice"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:denton-tx-20261028-proposal",
      "jurisdiction": "City of Denton, Texas",
      "state": "tx",
      "type": "moratorium",
      "status": "proposed",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-12-01",
      "instrument_id": "Proposed data center moratorium, file ID 26-1606",
      "instrument_url": "https://denton-tx.legistar.com/View.ashx?M=F&ID=16082343&GUID=B0C44716-AA81-4B99-A088-CF78BBCF1103&G=A1619B3C-1B45-4681-B45C-0B3DA512F5D1",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "denton-staff",
        "denton-draft"
      ],
      "term_description": "Initial ninety day term proposed, with an earlier end upon adoption of all needed regulations. Legal commencement and expiry remain unknown.",
      "scope": "Draft would pause data center commercial development within City municipal boundaries, City CCNs and the Denton Municipal Electric Certificated Service Area, with a stated Chapter 245 exception. Staff schedules December 1 Council consideration of enactment.",
      "limits": "The retained instrument is an unsigned proposal with blank adoption and vote fields. Draft work plan target dates are not accomplished legal dates. Separate development code amendments do not establish moratorium enactment. Exact mapped coverage, individual project eligibility and present operation remain unverified.",
      "field_sources": {
        "status": [
          "denton-staff",
          "denton-draft"
        ],
        "next_scheduled_on": [
          "denton-staff",
          "denton-draft"
        ],
        "term_description": [
          "denton-staff",
          "denton-draft"
        ],
        "scope": [
          "denton-staff",
          "denton-draft"
        ],
        "limits": [
          "denton-staff",
          "denton-draft"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:deer-park-tx-20261028-proposal",
      "jurisdiction": "City of Deer Park, Texas",
      "state": "tx",
      "type": "ban",
      "status": "proposed",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-11-02",
      "instrument_id": "Proposed data center zoning amendments attached to DIS26 054",
      "instrument_url": "https://legistar1.granicus.com/cityofdeerpark/attachments/055b0136-6202-4d92-bd78-3d2ce4ec7241.pdf",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "term_description": "Proposed zoning restrictions have no verified commencement, expiry or adopted term.",
      "scope": "Draft permits data centers only in the M1 Industrial Park district with a Specific Use Permit and prohibits them in other zoning districts. It would cover principal and supporting facilities, restrict cooling water sources, require data center funded substations and prevent separate accessory classifications from avoiding the use permit.",
      "limits": "This is a partial zoning prohibition with an M1 permitting exception, not a City wide ban. Draft text is not law in effect. A separate unsigned ordinance proposes calling a December1 joint hearing; blank adoption, vote and signature fields do not establish that call. Individual property eligibility and existing project rights remain unverified.",
      "field_sources": {
        "status": [
          "m72-15792",
          "m72-15795",
          "m72-15797",
          "m72-meeting"
        ],
        "term_description": [
          "m72-15792",
          "m72-15795",
          "m72-15797",
          "m72-meeting"
        ],
        "scope": [
          "m72-15792",
          "m72-15795",
          "m72-15797",
          "m72-meeting"
        ],
        "limits": [
          "m72-15792",
          "m72-15795",
          "m72-15797",
          "m72-meeting"
        ],
        "next_scheduled_on": [
          "m72-meeting"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:boulder-co-dc260003-proposed-use-limits",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "type": "ban",
      "status": "proposed",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": "DC26 0003 proposed text options A and B",
      "instrument_url": "https://assets.bouldercounty.gov/wp-content/uploads/2026/09/cpp-dc-26-0003-attachment-a-option-1-data-center.pdf",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "term_description": "Proposed code restrictions have no verified adoption, commencement or expiry.",
      "scope": "Both County options would exclude data centers above the stated75kW IT energy load boundary. Option1 expressly permits the smaller defined use in LI and GI through Limited Impact Special Review. Option2 defines the larger use in Article18 and excludes it from General Industrial.",
      "limits": "These are alternative draft approaches, not two adopted laws or a blanket prohibition on every computing use. Incidental server infrastructure is expressly excluded by Option1. The existing temporary moratorium is a separate measure. No October21 recommendation, final Board action or site specific eligibility is verified.",
      "field_sources": {
        "status": [
          "m73-source-0",
          "m73-source-1",
          "m73-source-2"
        ],
        "term_description": [
          "m73-source-0",
          "m73-source-1",
          "m73-source-2"
        ],
        "scope": [
          "m73-source-0",
          "m73-source-1",
          "m73-source-2"
        ],
        "limits": [
          "m73-source-0",
          "m73-source-1",
          "m73-source-2"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:larimer-co-proposed-hyperscale-limits-20261028",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "type": "ban",
      "status": "proposed",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-11-24",
      "instrument_id": "Draft Article17 and use classifications in proposed Larimer Land Use Code amendments",
      "instrument_url": "https://publicinput.com/Customer/File/Full/87e4204c-1731-4758-b9cc-a6eac75d3fad",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "term_description": "Proposed code restrictions have no verified adoption, commencement or expiry.",
      "scope": "The proposed use tables mark hyperscale data centers prohibited and provide review paths for smaller facilities. Draft definitions aggregate peak demand across property phases and operators and put hyperscale at30MW or above.",
      "limits": "The portal summary describes a30MW cap and a category above30MW, creating a boundary discrepancy with the draft definition. Exact treatment at30MW remains unresolved. Neither draft language nor the summary is adopted law. Existing facility modifications have specific provisions; no blanket shutdown or present resource performance is established.",
      "field_sources": {
        "status": [
          "m73-source-3",
          "m73-source-4"
        ],
        "term_description": [
          "m73-source-3",
          "m73-source-4"
        ],
        "scope": [
          "m73-source-3",
          "m73-source-4"
        ],
        "limits": [
          "m73-source-3",
          "m73-source-4"
        ],
        "next_scheduled_on": [
          "m73-source-4"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:forest-grove-or:computing-moratorium-20261012",
      "jurisdiction": "City of Forest Grove, Oregon",
      "state": "or",
      "type": "moratorium",
      "status": "adopted_effective_day_unverified",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": "2026-10-12",
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": null,
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m74-forest-grove-official"
      ],
      "term_description": "City reports120calendar days. Exact commencement and expiry unverified.",
      "scope": "New data centers and existing center expansions of20percent or more within City boundaries.",
      "limits": "Prior land use approvals excluded. Original instrument not read. No site shutdown, present eligibility or future meeting day inferred.",
      "field_sources": {
        "adopted_on": [
          "m74-forest-grove-official"
        ],
        "status": [
          "m74-forest-grove-official"
        ],
        "term_description": [
          "m74-forest-grove-official"
        ],
        "scope": [
          "m74-forest-grove-official"
        ],
        "limits": [
          "m74-forest-grove-official"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:mexico-mo:proposed-computing-zoning-20261020",
      "jurisdiction": "City of Mexico, Missouri",
      "state": "mo",
      "type": "ban",
      "status": "proposed",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": "2026-11-09",
      "instrument_id": "Unnumbered draft data center ordinance",
      "instrument_url": "https://mexicomissouri.net/DocumentCenter/View/6638",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m76-mexico-notice",
        "m76-mexico-draft"
      ],
      "term_description": "Proposed zoning limits; no legal commencement qualified.",
      "scope": "Additional Use route in I1 and I2; other districts excluded. Qualifying subordinate processing of1MWorless exempt.",
      "limits": "Accessory exception also requires exclusive support of a permitted principal use. Not a blanket ban or adopted rule. Blank numbers and future hearing recital remain draft.",
      "field_sources": {
        "status": [
          "m76-mexico-notice",
          "m76-mexico-draft"
        ],
        "next_scheduled_on": [
          "m76-mexico-notice",
          "m76-mexico-draft"
        ],
        "term_description": [
          "m76-mexico-notice",
          "m76-mexico-draft"
        ],
        "scope": [
          "m76-mexico-notice",
          "m76-mexico-draft"
        ],
        "limits": [
          "m76-mexico-notice",
          "m76-mexico-draft"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:forest-park-ga:reported-2026-computing-moratorium",
      "jurisdiction": "City of Forest Park, Georgia",
      "state": "ga",
      "type": "moratorium",
      "status": "adopted_current_status_unverified",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": null,
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m77-forest-park-city-newsletter"
      ],
      "term_description": "Official September newsletter reports90days. Exact enactment, commencement and expiry unverified.",
      "scope": "City account describes a halt on applications for data center construction inside city limits while zoning rules are reviewed.",
      "limits": "Signed instrument, exceptions and current legal effect unverified. Relative earlier this month wording is not converted to a day. Secondary August31date not used to repair the source. November hearing leads remain unqualified. No individual project halt or operation inferred.",
      "field_sources": {
        "status": [
          "m77-forest-park-city-newsletter"
        ],
        "term_description": [
          "m77-forest-park-city-newsletter"
        ],
        "scope": [
          "m77-forest-park-city-newsletter"
        ],
        "limits": [
          "m77-forest-park-city-newsletter"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:downe-nj:ordinance2026-04",
      "jurisdiction": "Downe Township, Cumberland County, New Jersey",
      "state": "nj",
      "type": "ban",
      "status": "adopted_current_status_unverified",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": "Ordinance2026 04",
      "instrument_url": "https://downetwpnj.org/ordinance-2026-04-data-center-ban-ordinance/",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "term_description": "Township final passage notice reports adoption. Exact legal commencement and current force unverified.",
      "scope": "Official title designates data centers nonpermitted in all Township zones. Do not infer closure of an existing facility.",
      "limits": "Final passage notice reports October19 2026 adoption after July13 introduction. Scanned packet page4 inconsistently labels July13 adoption and August17 hearing; page5 has blank final adoption fields. Dates conflict, so no exact adoption or effect day is selected. Current exceptions and operative text completeness unverified.",
      "field_sources": {
        "status": [
          "m78-downe-0",
          "m78-downe-1",
          "m78-downe-2"
        ],
        "term_description": [
          "m78-downe-0",
          "m78-downe-1",
          "m78-downe-2"
        ],
        "scope": [
          "m78-downe-0",
          "m78-downe-1",
          "m78-downe-2"
        ],
        "limits": [
          "m78-downe-0",
          "m78-downe-1",
          "m78-downe-2"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:raritan-township-nj:reported-data-center-ban-20260918",
      "jurisdiction": "Raritan Township, New Jersey",
      "state": "nj",
      "type": "ban",
      "status": "adopted_current_status_unverified",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": null,
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m79-source-0"
      ],
      "term_description": "Township September18 account reports unanimous adoption; exact legal dates and current force unverified.",
      "scope": "Prohibits principal data centers in all zoning districts. Accessory server rooms solely supporting the principal use remain permitted inside its building, limited to10percent of gross floor area or2000squarefeet, whichever is less.",
      "limits": "Original enacted instrument and current exceptions not independently verified. Publication day is not adopted_on. Warehouse, flex and research classifications are not alternative authorization. No existing operating closure inferred.",
      "field_sources": {
        "status": [
          "m79-source-0"
        ],
        "term_description": [
          "m79-source-0"
        ],
        "scope": [
          "m79-source-0"
        ],
        "limits": [
          "m79-source-0"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:vermillion-sd:proposed-modular-computing-ban-1565",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "type": "ban",
      "status": "proposed",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": null,
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": "Proposed Ordinance 1565",
      "instrument_url": "https://www.vermillion.us/DocumentCenter/View/3260",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m80-source-0",
        "m80-source-1"
      ],
      "term_description": "Draft restriction with no established adoption or effective date.",
      "scope": "Proposed prohibition on computing facilities assembled from individual modules no larger than 15 by 60 feet, including modules joined to form larger buildings. This is a construction form restriction, not a citywide prohibition on all data centers.",
      "limits": "Six related proposals include district approval routes. Council action date was unset in the October 5 notice; draft legal dates are placeholders. Current adoption and force remain unverified. No individual project outcome inferred.",
      "field_sources": {
        "status": [
          "m80-source-0",
          "m80-source-1"
        ],
        "instrument_id": [
          "m80-source-0",
          "m80-source-1"
        ],
        "instrument_url": [
          "m80-source-0",
          "m80-source-1"
        ],
        "term_description": [
          "m80-source-0",
          "m80-source-1"
        ],
        "scope": [
          "m80-source-0",
          "m80-source-1"
        ],
        "limits": [
          "m80-source-0",
          "m80-source-1"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:lake-elsinore-ca:extension-2026-1540",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "type": "moratorium",
      "status": "adopted_current_status_unverified",
      "checked_on": "2026-10-28",
      "status_as_of": "2026-10-28",
      "adopted_on": "2026-10-06",
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": "Urgency Ordinance 2026-1540",
      "instrument_url": "https://www.lake-elsinore.org/DocumentCenter/View/5797/Urgency-Ordinance-2026-1540-Extending-Moratorium-on-Data-Centers-October-6-2026",
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m81-clerk-summary"
      ],
      "term_description": "Clerk reports adoption of an additional ten months and fifteen days on October 6 2026; exact commencement and terminal dates not independently verified.",
      "scope": "Extension of the temporary pause on accepting and processing new data center entitlement applications while development standards are prepared.",
      "limits": "Clerk summary verifies reported adoption, not the complete enacted terms or current force. Existing facility operation, exceptions and exact legal term require the full instrument. No expiry calculated.",
      "field_sources": {
        "status": [
          "m81-clerk-summary"
        ],
        "adopted_on": [
          "m81-clerk-summary"
        ],
        "instrument_id": [
          "m81-clerk-summary"
        ],
        "instrument_url": [
          "m81-clerk-summary"
        ],
        "term_description": [
          "m81-clerk-summary"
        ],
        "scope": [
          "m81-clerk-summary"
        ],
        "limits": [
          "m81-clerk-summary"
        ]
      },
      "current_status": "not_reverified_for_export_date",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:pierce-county-wa:reported-20260825-moratorium",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "type": "moratorium",
      "status": "adopted_current_status_unverified",
      "checked_on": "2026-10-29",
      "status_as_of": "2026-10-29",
      "adopted_on": "2026-08-25",
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": null,
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m84-source-0",
        "m84-source-1"
      ],
      "term_description": "County account reports August 25 passage for up to one year, conditional on executive signature. Exact legal term and current force remain unverified.",
      "scope": "Reported pause on filing, processing or approving permits for new and expanded data centers above 10 MW in unincorporated county areas.",
      "limits": "News labels ordinance 2026 577 but links to legislative O2026 557. Linked record displays August 27 effective date; this is not assigned across the unresolved identifier conflict. October 20 scheduled hearing is not a completed outcome. Full executed terms and exceptions unreviewed.",
      "field_sources": {
        "status": [
          "m84-source-0",
          "m84-source-1"
        ],
        "adopted_on": [
          "m84-source-0",
          "m84-source-1"
        ],
        "term_description": [
          "m84-source-0",
          "m84-source-1"
        ],
        "scope": [
          "m84-source-0",
          "m84-source-1"
        ],
        "limits": [
          "m84-source-0",
          "m84-source-1"
        ]
      },
      "current_status": "adopted_current_status_unverified",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    },
    {
      "id": "restriction:dubuque-ia:reported-hyperscale-moratorium-20260921",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "type": "moratorium",
      "status": "adopted_current_status_unverified",
      "checked_on": "2026-10-29",
      "status_as_of": "2026-10-29",
      "adopted_on": "2026-09-21",
      "approved_on": null,
      "effective_on": null,
      "expires_on": null,
      "termination_on": null,
      "next_scheduled_on": null,
      "instrument_id": null,
      "instrument_url": null,
      "instrument_verified": false,
      "applies_to_all_projects": false,
      "sets_site_status": false,
      "source_ids": [
        "m85-dubuque-news"
      ],
      "term_description": "City reports adoption September 21 of a six month moratorium. Exact commencement, expiry and current force remain unverified.",
      "scope": "Hyperscale category covers facilities meeting any one criterion: area at least100000squarefeet, electricity demand above75MW, at least5000servers, or cooling or operational water use above50gallonsperminute.",
      "limits": "Full approved ordinance link returned web403; complete operative clauses and exceptions unreviewed. Criteria are alternatives, not cumulative. No calendar expiry computed or site operation outcome inferred.",
      "field_sources": {
        "status": [
          "m85-dubuque-news"
        ],
        "adopted_on": [
          "m85-dubuque-news"
        ],
        "term_description": [
          "m85-dubuque-news"
        ],
        "scope": [
          "m85-dubuque-news"
        ],
        "limits": [
          "m85-dubuque-news"
        ]
      },
      "current_status": "adopted_current_status_unverified",
      "term_timing": "no_exact_end_verified",
      "timing_note": "Timing compares the export day with the stated term only. It does not infer extension, repeal, present legal effect or site eligibility."
    }
  ],
  "review_scope": "partial_official_instrument_review",
  "reviews": [
    {
      "checked_on": "2026-10-23",
      "id": "restriction:frederick-md-20260914",
      "jurisdiction": "Frederick County",
      "result": "selected_official_content",
      "scope": "The signed exception concerns property with an approved APFO Letter of Understanding before June 17, 2025. The County page says existing construction is not stopped. No individual exemption, project cancellation, completed state report or blanket countywide physical shutdown is established. The order may be superseded or terminated earlier.",
      "source_ids": [
        "m01-frederick-order",
        "m01-frederick-account"
      ],
      "state": "md"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction:rowan-nc-20260504",
      "jurisdiction": "Rowan County zoning jurisdiction",
      "result": "selected_official_content",
      "scope": "The April 20 date is the legislative hearing, not adoption or commencement. Earlier termination by majority resolution is permitted. A complete later amendment and termination search is not verified, and no exact Long Ferry exemption is decided. A passed planning deadline is not completed rulemaking.",
      "source_ids": [
        "m01-rowan-law",
        "m01-rowan-index"
      ],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction:lovejoy-ga-20260921",
      "jurisdiction": "City of Lovejoy city limits",
      "result": "selected_official_content",
      "scope": "The downloadable ordinance has blank adoption and signature fields and is not certified as the signed final instrument. The linked draft and FAQ conflict on an unrelated housing density. The City account is the basis for the reported dates and prohibition. No Clayton County wide rule, forever guarantee, physical shutdown or residential project approval is inferred.",
      "source_ids": [
        "m01-lovejoy-account",
        "m01-lovejoy-linked-draft"
      ],
      "state": "ga"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction:nashville-tn-bl2026-1448",
      "jurisdiction": "Metropolitan Nashville and Davidson County",
      "result": "selected_official_content",
      "scope": "The current Version 2 text report does not consolidate the adopted amendment. Both the substitute and amendment were reviewed together with history. The effective clause requires publication of notice; the actual newspaper publication day was not verified. No July 21 effective day, automatic expiration after zoning adoption or particular site determination is asserted.",
      "source_ids": [
        "m01-nashville-history",
        "m01-nashville-substitute",
        "m01-nashville-amendment",
        "m01-nashville-current-text"
      ],
      "state": "tn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction:dorr-mi-20260226",
      "jurisdiction": "Dorr Township",
      "result": "selected_official_content",
      "scope": "The signed final ordinance, legal effective day, exact expiry and later amendment history were not verified. The meeting day and twelve month description are not substituted for legal commencement or an exact end day. No Microsoft project cancellation or physical stage change is established.",
      "source_ids": [
        "m01-dorr-minutes"
      ],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction:pittsfield-mi-current",
      "jurisdiction": "Pittsfield Charter Township",
      "result": "selected_official_content",
      "scope": "Exact original adoption, legal effective day, exact expiry and signed moratorium text are not supplied by the selected notice. The future zoning hearing is not an enacted extension, repeal or automatic end of the moratorium.",
      "source_ids": [
        "m01-pittsfield"
      ],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction:loudoun-va-pause-proposal",
      "jurisdiction": "Loudoun County legislative applications",
      "result": "selected_official_content",
      "scope": "This is a deferred proposal, not an enacted moratorium or approval ban. No legal effective day, expiry or future vote outcome is known from the selected notice. Existing administrative permissions and individual applications are not adjudicated.",
      "source_ids": [
        "m01-loudoun"
      ],
      "state": "va"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:okc",
      "jurisdiction": "Oklahoma City",
      "result": "source_access_limited",
      "scope": "The official source host robots response returned 403 before the body was captured. Cached search accounts and future hearing dates are not adopted as current law. No absence of restrictions is established.",
      "source_ids": [],
      "state": "ok"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:charlotte",
      "jurisdiction": "City of Charlotte",
      "result": "source_access_limited",
      "scope": "The official source host robots response returned 403 before the body was captured. Cached search accounts and future hearing dates are not adopted as current law. No absence of restrictions is established.",
      "source_ids": [],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:brownsville",
      "jurisdiction": "City of Brownsville",
      "result": "source_access_limited",
      "scope": "The official source host robots response returned 403 before the body was captured. Cached search accounts and future hearing dates are not adopted as current law. No absence of restrictions is established.",
      "source_ids": [],
      "state": "tx"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:denton",
      "jurisdiction": "City of Denton",
      "result": "source_access_limited",
      "scope": "The official source host robots response returned 403 before the body was captured. Cached search accounts and future hearing dates are not adopted as current law. No absence of restrictions is established.",
      "source_ids": [],
      "state": "tx"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:san-diego-ca-proposed-20261022",
      "jurisdiction": "City of San Diego",
      "result": "selected_official_content",
      "scope": "The administrative order takes effect October 22 at 11:59 PM, but that clock is not the legal start of a data center moratorium. The proposed ordinance has no verified adoption, effective day or expiry. The 180 day recommendation deadline is not a restriction term. No Council vote outcome, meeting clock or venue is inferred.",
      "source_ids": [
        "m02-san-diego",
        "m02-san-diego-order"
      ],
      "state": "ca"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:boulder-co-dc260003",
      "jurisdiction": "Boulder County unincorporated areas",
      "result": "selected_official_content",
      "scope": "The selected page supplies no signed moratorium instrument or exact expiry day. The County explicitly excludes incorporated cities such as Boulder and Longmont from this code update. A stated interest in prohibiting uses is not an adopted permanent ban. No project exemption or later extension is decided.",
      "source_ids": [
        "m02-boulder"
      ],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:manatee-fl-ordinance2642",
      "jurisdiction": "Manatee County unincorporated areas",
      "result": "selected_official_content",
      "scope": "The County states a twelve month term or earlier repeal, with an extension possible. The selected account does not supply the signed ordinance, its exact legal effective day or an exact expiry. The July 28 direction and September 17 recommendation are distinct from October 8 adoption. This is not a permanent prohibition or a determination of a pending property application.",
      "source_ids": [
        "m02-manatee"
      ],
      "state": "fl"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:monterey-park-ca-ordinance2278",
      "jurisdiction": "City of Monterey Park",
      "result": "selected_official_content",
      "scope": "The uploaded 2278 copy has blank signature lines. Its thirty day clause is retained without converting it into a verified exact effective day or a present legal conclusion. The separate urgency Ordinance 2276 declares April 20 adoption and immediate effect; the separate 2279 ties effectiveness to Measure NDC. No election result, final execution, retroactive enforcement, later litigation or individual permit outcome is verified. The June 21, 2023 retroactivity clause is not represented as the 2026 adoption day.",
      "source_ids": [
        "m02-monterey-park",
        "m02-mp-2276",
        "m02-mp-2278",
        "m02-mp-2279"
      ],
      "state": "ca"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:seattle-wa-ordinance127447",
      "jurisdiction": "City of Seattle",
      "result": "selected_official_content",
      "scope": "The definition uses capacity over 20 MVA with the other listed criteria, not a 20 MW electricity demand threshold. A facility operating on the effective day can qualify for an expansion exception of no more than an additional 20 MVA under section 2. Six months refers to possible renewal periods, not the original 365 day term. Later amendments, early termination and current eligibility have not been fully reviewed. No exact calculated expiry or outcome of the required later hearing is promoted.",
      "source_ids": [
        "m02-seattle",
        "m02-seattle-bill",
        "m02-seattle-0"
      ],
      "state": "wa"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:marengo-mi-ordinance20261",
      "jurisdiction": "Marengo Township, Calhoun County",
      "result": "selected_official_content",
      "scope": "The certification text reports publication March 6, but the attestation and signature lines are blank and the following notice form also has blank dates. Publication and an executed certification have not been independently verified. The exact legal effective day, exact expiry and later Township amendments remain unknown. The waiver process concerns a future extension and is not an automatic exemption.",
      "source_ids": [
        "m02-marengo"
      ],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:newark-nj-file261273",
      "jurisdiction": "City of Newark",
      "result": "selected_official_content",
      "scope": "A pass result for returning the proposal is not passage or enactment of the moratorium. No adopted restriction, legal start, expiry or next scheduled hearing is verified. The historical proposal disposition remains explicit; a pending replacement ordinance is not inferred.",
      "source_ids": [
        "m02-newark"
      ],
      "state": "nj"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:new-york-eo62",
      "jurisdiction": "New York State DEC discretionary permissions",
      "result": "selected_official_content",
      "scope": "The order expressly excludes local government permissions from this hold. Manufacturing, research, education and medical care exclusions retain their statutory scope. The news account describes up to one year, but the operative hold has a report trigger and no fixed calendar expiry. The separate twelve month water report deadline is not the moratorium end. Completion of the environmental review, later orders, court action, present legal effect and individual project eligibility have not been verified. No exact separate effective day is supplied.",
      "source_ids": [
        "m02-new-york",
        "m02-new-york-order"
      ],
      "state": "ny"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:saugatuck",
      "jurisdiction": "Saugatuck Township",
      "result": "source_access_limited",
      "scope": "The official February 11 Board packet response was 200 but exceeded the local twelve MB capture limit. No response body or ordinance was retained from that request. No proposed draft, enactment or present restriction is adopted.",
      "source_ids": [],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:port-huron",
      "jurisdiction": "Port Huron Township",
      "result": "source_access_limited",
      "scope": "The exact indexed official ordinance news URL returned 404. No ordinance body, adoption, effective day, expiry or absence of restrictions is established.",
      "source_ids": [],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:harpersville-al-20260803",
      "jurisdiction": "Town of Harpersville corporate limits and police jurisdiction as permitted by law",
      "result": "selected_official_content",
      "scope": "The ordinance extends to corporate limits or police jurisdiction only to the extent permitted by law. It is not a Shelby County wide ban or a finding about an individual property. Earlier termination or later extension is possible. All four scanned pages were actually viewed, including signatures and posting attestation; the October 26 informational session is not a vote outcome.",
      "source_ids": [
        "m03-harpersville",
        "m03-harpersville-law"
      ],
      "state": "al"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:washington-md-20260630",
      "jurisdiction": "Washington County Maryland unincorporated areas",
      "result": "selected_official_content",
      "scope": "The account explicitly distinguishes Hagerstown and other incorporated municipalities, with a separate statutory annexation qualification. It does not establish a rule for every municipality. The underlying signed instrument, exact expiry and individual project eligibility are unverified. Staff noise, setback and other study topics on the page are proposals, not adopted standards.",
      "source_ids": [
        "m03-washington-md"
      ],
      "state": "md"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:cincinnati-oh-idc89",
      "jurisdiction": "City of Cincinnati specified IDC 89 zoning districts",
      "result": "selected_official_content",
      "scope": "This is an interim review control, not a blanket refusal to accept all applications or a City wide data center ban. The March 6 report recommends extension and contains review criteria; it is not the final adopted extension instrument. The original ordinance download had a transport hold. Exact extension effectiveness, later changes and individual applications are unverified. Proposed review criteria are not certified as final code.",
      "source_ids": [
        "m03-cincinnati",
        "m03-cincinnati-law-240"
      ],
      "state": "oh"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:snohomish-wa-ordinance26026",
      "jurisdiction": "Snohomish County unincorporated areas",
      "result": "selected_official_content",
      "scope": "The definition includes a total planned electrical load of at least two megawatts and other criteria. This is not a City of Snohomish rule. The docket final action on August 19 does not replace the original June 24 start. County Executive lines on the selected ordinance are blank; the enactment notice is the separate basis for immediate effect. No exact calculated expiry, completed renewal, later code replacement or individual permission is certified.",
      "source_ids": [
        "m03-snohomish",
        "m03-snohomish-0",
        "m03-snohomish-3"
      ],
      "state": "wa"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:skagit-wa-reported-moratorium",
      "jurisdiction": "Skagit County outside incorporated cities and towns",
      "result": "selected_official_content",
      "scope": "The linked instrument host robots request did not establish access, so its legal text was not adopted. The June 1 article date is not treated as the exact adoption or effective day. Exact commencement, expiry, signed final text, later amendment and individual exceptions remain unknown. The July 14 scheduled hearing is not assumed to have occurred or changed the rule.",
      "source_ids": [
        "m03-skagit"
      ],
      "state": "wa"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:spokane-wa-ordinancec36887",
      "jurisdiction": "City of Spokane",
      "result": "selected_official_content",
      "scope": "City of Spokane is distinct from Spokane County. The complete final ordinance and the exact mixed activity clause were not reviewed in the advertised large agenda packet. No exact mayoral approval, legal effective day, calculated expiry, later extension or site eligibility is certified. The scheduled July 22 hearing is not an accomplished decision.",
      "source_ids": [
        "m03-spokane-law-account",
        "m03-spokane-meeting"
      ],
      "state": "wa"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:denver-co-bill260431",
      "jurisdiction": "City and County of Denver",
      "result": "selected_official_content",
      "scope": "The selected signed copy has blank publication notice lines and supplies no separate exact legal effective day. Its term is one year from effectiveness, or earlier once both the municipal code and zoning code data center amendments are effective; the later of those two amendment days controls that alternative. No exact expiry, completed code amendments or individual site outcome is inferred. The ordinance number field is blank and is not filled from the bill number.",
      "source_ids": [
        "m03-denver",
        "m03-denver-7"
      ],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:lexington-ky-resolution4382026",
      "jurisdiction": "Lexington Fayette Urban County",
      "result": "selected_official_content",
      "scope": "Section 5 preserves an exception for applications already filed, if any. No exact individual exemption, existing facility shutdown, later zoning proposal outcome or full court review is inferred. October 6 committee action is distinct from the October 8 enacted extension. The engagement download wrappers and normal headless downloads failed to deliver a PDF; the independent official legislative docket and its signed three page resolution supplied the verified instrument.",
      "source_ids": [
        "m03-lexington",
        "m03-lexington-law-history",
        "m03-lexington-signed"
      ],
      "state": "ky"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:pima-az-resolution202656",
      "jurisdiction": "Pima County development jurisdiction",
      "result": "selected_official_content",
      "scope": "The prepared resolution has blank Board Chair and Clerk signature lines, while an attorney form approval is signed. It is not certified as the final executed text. The staff recommendation and requested meeting day do not independently establish enactment; the docket approval is the separate basis for the recorded adoption. Exact legal commencement, expiry, later litigation and the eligibility of Project Blue, Project Gravel or any other site remain unverified.",
      "source_ids": [
        "m03-pima",
        "m03-pima-1"
      ],
      "state": "az"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:montgomery-md",
      "jurisdiction": "Montgomery County Maryland",
      "result": "source_access_limited",
      "scope": "The normal public reader reported a nonretryable robots block for the official host. No further request, alternate identity, cached legal body or inferred absence of restrictions is adopted.",
      "source_ids": [],
      "state": "md"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:oakland-ca-ordinance13899",
      "jurisdiction": "City of Oakland",
      "result": "selected_official_content",
      "scope": "The October 13 filing stamp is not the adoption date. The instrument holds specified approvals, not every application acceptance or processing step. Its narrow exception covers incidental and subordinate server rooms for an existing principal use using existing water, electrical and HVAC supply; unrelated server operation is excluded. This is City authority, not all Alameda County. No calculated expiry, later extension, Behring project stage or individual exemption is certified.",
      "source_ids": [
        "m04-c45-oakland-instrument",
        "m04-c45-oakland-history"
      ],
      "state": "ca"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:clackamas-or-20261022",
      "jurisdiction": "Clackamas County unincorporated areas",
      "result": "selected_official_content",
      "scope": "The earlier October 1 notice only announced hearings and is retained separately. The County account supplies adoption and immediate effect, while the signed instrument and detailed application scope remain unverified. No fixed calculated expiry, municipal ban, individual project impact or outcome of later code work is inferred.",
      "source_ids": [
        "m04-m04-clackamas-adopt",
        "m04-m04-clackamas"
      ],
      "state": "or"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:st-joseph-mo-reported-pause",
      "jurisdiction": "City of St Joseph Missouri",
      "result": "selected_official_content",
      "scope": "July 21 is retained as the City account date of approval, without certifying the exact enacted instrument or legal effective day. The underlying emergency ordinance, exact expiry, later amendment and individual exceptions were not verified. Proposed consultant contracts and proposed future standards are not final zoning. This Missouri City is distinct from St Joseph Minnesota, St Joseph Tennessee and similarly named counties.",
      "source_ids": [
        "m04-m04-stjoseph-faq",
        "m04-m04-stjoseph-press"
      ],
      "state": "mo"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:lysander-ny-local-law42026",
      "jurisdiction": "Town of Lysander",
      "result": "selected_official_content",
      "scope": "The posted law text has no completed enactment or Secretary of State filing proof. Exact adoption, filing, legal commencement and original expiry remain unknown. The unapproved minutes proposed May 9, 2027 as an extension endpoint; the hearing motion does not enact that extension. Board hardship relief is described separately from suspended Zoning Board jurisdiction. The ordinary old host redirects to the current Town government host were recorded before capture, with no denied request or alternate identity.",
      "source_ids": [
        "m04-m04-lysander-law",
        "m04-h3-lysander"
      ],
      "state": "ny"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:mamakating-ny-proposed-pause",
      "jurisdiction": "Town of Mamakating",
      "result": "selected_official_content",
      "scope": "The agenda does not prove adoption of the rescheduling resolution, confirmation of the new hearing, enactment of a moratorium, term or effective date. No November 17 next scheduled field, completed vote or application hold is inferred. A separate budget hearing and its meeting details do not supply the moratorium outcome.",
      "source_ids": [
        "m04-m04-mamakating"
      ],
      "state": "ny"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:lower-macungie-pa-04",
      "jurisdiction": "Lower Macungie Township",
      "result": "selected_official_content",
      "scope": "The May 21 official minutes record approval of Ordinance 2026 02 by five affirmative votes. The packet describes conditional use treatment in three specified districts and exclusion in other zones. This is zoning regulation, not evidence of a Township wide moratorium or ban. Only the relevant ordinance and minutes portions were read; no statement that no later restriction exists is made.",
      "source_ids": [
        "m04-m04-lowermac-law",
        "m04-m04-lowermac-minutes"
      ],
      "state": "pa"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:salem-04",
      "jurisdiction": "City of Salem",
      "result": "source_access_limited",
      "scope": "The official City host robots request and the ordinary public reader returned HTTP 403. Requests stopped. Cached search text about a proposed hearing supplies no adopted moratorium or current legal term.",
      "source_ids": [],
      "state": "or"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:gorham-04",
      "jurisdiction": "Town of Gorham Maine",
      "result": "source_access_limited",
      "scope": "The original Town Council page returned HTTP 403. No further same host request was made. The earlier agenda about an unrelated mobile home emergency ordinance is not adopted as a data center law.",
      "source_ids": [],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:lewiston-me-04",
      "jurisdiction": "City of Lewiston Maine",
      "result": "source_access_limited",
      "scope": "The selected official City search results concerned mobile home lot rent and shelter moratoriums, not a verified data center restriction. A law from Town of Lewiston New York cannot be transferred to this Maine City. No complete absence of local rules is certified.",
      "source_ids": [],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:columbia-sc-04",
      "jurisdiction": "City of Columbia South Carolina",
      "result": "source_access_limited",
      "scope": "The selected official material did not establish a City data center moratorium. A South Carolina state legislative proposal and a City of Columbia Missouri instrument are separate jurisdictions and do not create a Columbia South Carolina law. Required exact City source verification remains held.",
      "source_ids": [],
      "state": "sc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:wiscasset-me-proposed-x19",
      "jurisdiction": "Town of Wiscasset",
      "result": "selected_official_content",
      "scope": "The text is a proposal despite its final filename. Proposed retroactive application to proceedings filed on or after November 3 is not a completed legal start. It excludes electronic equipment incidental to a business with another primary activity. Warrant Article 4 and sample ballot Question 2 refer to the same measure. No voter result, effective day, exact expiry or individual project effect is certified.",
      "source_ids": [
        "m05-h06-wiscasset",
        "m05-h06-wiscasset-ballot",
        "m05-h06-wiscasset-law"
      ],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:wells-me-proposed-retroactive-pause",
      "jurisdiction": "Town of Wells",
      "result": "selected_official_content",
      "scope": "The proposed 180 day term is measured from its June 16 Date of Applicability. June 16 is proposed retroactivity, not an adoption or verified effective date. Section 8 conditions immediate effect on Town Meeting enactment. The Board and Planning Board recommendations are not a voter result. Aggregate Data Center Area includes specified associated impervious surfaces, so the threshold is not simply building floor area. No exact end, existing blanket ban or project finding is inferred.",
      "source_ids": [
        "m05-h06-wells",
        "m05-h06-wells-ballot",
        "m05-h06-wells-warrant"
      ],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:peru-me-proposed-2026-pause",
      "jurisdiction": "Town of Peru",
      "result": "selected_official_content",
      "scope": "The signatures and attestation on the proposed text do not establish voter enactment. The selected subject notice identifies a month only, and no exact data center ballot copy was verified. A separate general referendum information flyer does not resolve that subject crosswalk. No exact next vote day, start, end or current legal hold is inferred.",
      "source_ids": [
        "m05-h06-peru-notice",
        "m05-h06-peru-law"
      ],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:north-berwick-me-proposed-ban",
      "jurisdiction": "Town of North Berwick",
      "result": "selected_official_content",
      "scope": "The actual sample ballot says Tuesday November 3, 2026 despite a November 4 label in the download URL. The proposed definition excludes accessory server rooms or information technology infrastructure below the stated aggregate area threshold. This is a proposed zoning prohibition, not an enacted ban or temporary moratorium. No result or legal effective day is certified.",
      "source_ids": [
        "m05-m05-northberwick-election",
        "m05-m05-northberwick-ballot",
        "m05-m05-northberwick-info"
      ],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:scarborough-me-reported-pause",
      "jurisdiction": "Town of Scarborough",
      "result": "selected_official_content",
      "scope": "The columns explicitly state that the author views need not reflect official Council policy. This is an attributed account, not a verified enacted instrument. Exact Council vote day, legal start, retroactive applicability, expiry, extension and exceptions remain unknown. A secondary June 3 date or reported April retroactivity is not imported.",
      "source_ids": [
        "m05-m05-scarborough-current",
        "m05-m05-scarborough-report"
      ],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:gray-me-2026-pause",
      "jurisdiction": "Town of Gray",
      "result": "selected_official_content",
      "scope": "The July 14 retroactive Date of Applicability is not the August 18 enactment date or a separately verified legal effective date. The aggregate Data Center Area threshold is 50000 square feet and includes associated impervious surfaces. The ordinance includes conditional nullification language limited by statute. No calculated expiry, later extension, final permit nullification or individual project eligibility is inferred.",
      "source_ids": [
        "m05-m05-gray",
        "m05-m05-gray-law-final"
      ],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:brunswick-me-2026-pause",
      "jurisdiction": "Town of Brunswick",
      "result": "selected_official_content",
      "scope": "The earlier memorandum recommends approval and is not itself the vote. The minutes state that adopted text will be attached to the permanent record, but the final executed attachment was not verified in this pass. The proposal says immediate effect upon adoption. Exact final legal commencement, subsequent amendment, current disposition and expiry remain unverified, with no calculated date or new site status.",
      "source_ids": [
        "m05-m05-brunswick-minutes",
        "m05-m05-brunswick-report"
      ],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:bangor-me-ordinance26270",
      "jurisdiction": "City of Bangor",
      "result": "selected_official_content",
      "scope": "The September 14 date on the packet ordinance is its introduction, not the final passage date. A minutes file linked under October 14 delivers September 28 minutes; the actual document heading and identical September 28 route control. The packet proposes immediate effect, but the final executed instrument and exact legal commencement were not separately verified. No calculated expiry, automatic current effect, approval outcome for any facility or universal absence of exceptions is certified.",
      "source_ids": [
        "m05-m05-bangor-minutes",
        "m05-m05-bangor-prior-minutes",
        "m05-m05-bangor-extension-packet"
      ],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:sanford-me-05",
      "jurisdiction": "City of Sanford",
      "result": "source_access_limited",
      "scope": "The selected original municipal meeting route has an unavailable robots response in this capture. Requests stopped before a meeting body was retrieved. Reported approvals, extensions and exact terms are not adopted from secondary pointers. No current legal status or absence of local restrictions is certified.",
      "source_ids": [],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:saco-me-05",
      "jurisdiction": "City of Saco",
      "result": "source_access_limited",
      "scope": "The selected original municipal meeting route has an unavailable robots response in this capture. Requests stopped before a meeting body was retrieved. Reported approvals, extensions and exact terms are not adopted from secondary pointers. No current legal status or absence of local restrictions is certified.",
      "source_ids": [],
      "state": "me"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:broomfield-co-ordinance2313",
      "jurisdiction": "City and County of Broomfield",
      "result": "selected_official_content",
      "scope": "The current official ordinance index lists Ordinance 2313 under July 7, 2026 as adopted on second and final reading, and identifies a temporary data center moratorium. This is an official adoption entry, distinct from the June 2 first reading entry. The linked final instrument redirects to itself and no eligible final text was obtained. Exact commencement, term, expiry, exceptions, later amendment and present legal effect remain unverified. No reported eighteen month term or assumed effective date is imported. No individual project finding is made.",
      "source_ids": [
        "m06-m06-broomfield-index"
      ],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:monument-co-ordinance182026",
      "jurisdiction": "Town of Monument",
      "result": "selected_official_content",
      "scope": "The original scanned July 20, 2026 Council minutes record a six to zero vote approving Ordinance 18 2026. The described pause covers acceptance or processing of specified permit and land development applications where a data center is a proposed principal or accessory use, and the minutes describe a six month term. This read establishes the recorded adoption and discussion, not the separately posted executed ordinance terms. Exact legal commencement, expiry, exceptions, later amendment and present legal effect remain unverified. Accessory use is part of the stated subject rather than an assumed general exception. The source check is not the adoption day.",
      "source_ids": [
        "m06-m06-monument-minutes"
      ],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:buena-vista-co-ordinance202613",
      "jurisdiction": "Town of Buena Vista",
      "result": "selected_official_content",
      "scope": "The June 23 agenda packet includes the June 9 Board minutes, which record a carried motion adopting Emergency Ordinance 2026 13 with six named affirmative votes. The earlier June 9 packet contains a proposed ordinance covering principal use data centers and excluding accessory equipment that solely supports another use on the same lot. The proposed text says immediate effect and December 9 termination, but has an unsigned adoption block and an emergency section discussing short term rentals rather than data centers. The final executed text and approval of these packet minutes were not separately verified. Proposed commencement, term and exceptions do not become certified final legal terms; no current application eligibility is inferred.",
      "source_ids": [
        "m06-m06-buenavista-later-large",
        "m06-m06-buenavista-large"
      ],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:woodland-park-co-proposed-ordinance1525",
      "jurisdiction": "City of Woodland Park",
      "result": "selected_official_content",
      "scope": "The original posted notice and attached first reading text describe proposed Ordinance 1525, with a July 16, 2026 hearing and a twelve month pause on data center applications and siting. The proposal excludes continued existing operation while subjecting expansions to the pause, and would prohibit the use by right in all districts. The attachment records only June 18 first reading and retains blank final adoption and termination fields. Its stated seven days after publication rule depends on later final passage and publication that were not verified in this pass. The past hearing is not proof of passage. No current enacted term, effective day or expiry is certified.",
      "source_ids": [
        "m06-m06-woodlandpark"
      ],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:jefferson-co-reported-20260519",
      "jurisdiction": "Jefferson County",
      "result": "selected_official_content",
      "scope": "The County May 19, 2026 account reports a Board vote issuing a ten month pause on new development or rezoning applications for data centers. It describes an exception for land already specifically zoned for data centers through a Planned Development when the data center is at least 1500 feet from a dwelling. The selected source is the official County account rather than the executed resolution. Exact legal start and end, later changes and present legal effect remain unverified. The exception is conditional and no parcel qualification is certified. Applicability outside County review authority or inside any particular municipality is not independently established.",
      "source_ids": [
        "m06-m06-jefferson"
      ],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:grand-junction-co-proposed-2026-pause",
      "jurisdiction": "City of Grand Junction",
      "result": "selected_official_content",
      "scope": "The official October 8 account reports an October 7 first reading and an October 21 hearing for a proposed pause. The linked proposed instrument would hold applications for data centers with projected electrical demand of at least one megawatt and end at the earlier of new specified code rules or 365 days from legal effect. The proposed threshold aggregates full development phases and specified facilities on the same or contiguous parcels under common ownership or control. Accessory computing solely supporting another lawful principal use is excluded. The proposed instrument retains a blank ordinance number. The selected source is prospective first reading material, and the October 21 outcome was not established. Its conditional thirty day effect after final passage and publication is not an exact verified start. No current enactment, expiry or effect on an individual project is inferred. The proposed text preserves applications accepted as complete before effect and existing lawful operations, while specified expansions remain covered. These are proposed exceptions, not individual qualifications.",
      "source_ids": [
        "m06-h08-grandjunction",
        "m06-h08-grandjunction-proposal-final"
      ],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:milliken-co-06",
      "jurisdiction": "Town of Milliken",
      "result": "selected_official_content",
      "scope": "The official Town meeting index was captured and used for navigation. Its embedded public portal script host has an unavailable robots response, and no exact original Ordinance 2026 839 text or adoption record was verified in this bounded pass. The index does not establish current legal status, terms or absence of a restriction. No restriction item is exported.",
      "source_ids": [
        "m06-m06-milliken-agendas"
      ],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:larimer-co-06",
      "jurisdiction": "Larimer County",
      "result": "source_access_limited",
      "scope": "The original County host robots request returned HTTP 403. Requests stopped. Search reader statements about a January resolution, its term and exceptions are not eligible original captures and are not adopted.",
      "source_ids": [],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:littleton-co-06",
      "jurisdiction": "City of Littleton",
      "result": "source_access_limited",
      "scope": "The original City host robots request returned HTTP 403. Requests stopped. Secondary first reading, hearing and proposed term statements do not establish an exact official instrument, future schedule or present legal effect.",
      "source_ids": [],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:mesa-co-06",
      "jurisdiction": "Mesa County",
      "result": "source_access_limited",
      "scope": "The web research tool reported robots blocking for the original County host. No further County request was made. Another City proposal discussion of Mesa is not the County executed instrument, and no current term, exception or individual project effect is certified.",
      "source_ids": [],
      "state": "co"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:calvert-md-ordinance4226",
      "jurisdiction": "Calvert County",
      "result": "selected_official_content",
      "scope": "The executed Ordinance 42 26 is dated August 18, 2026 with five affirmative votes and no negative votes. The current County page expressly reports legal effect on August 28. The law holds new application acceptance and pending or new site plan approvals for data centers and bars specified dependent County permits for a new data center. Its term is six months after effect or earlier termination by Board resolution. The signed instrument separately shows recordation on August 19, which is not the reported August 28 start. Its commencement clause also requires recordation and summary publication and at least ten days after adoption. No exact expiry is calculated, later extension or early termination is inferred, or individual application eligibility is certified. The law does not establish physical shutdown of an existing facility.",
      "source_ids": [
        "m07-c50-calvert-law",
        "m07-c50-calvert"
      ],
      "state": "md"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:worcester-md-resolution2618",
      "jurisdiction": "Worcester County",
      "result": "selected_official_content",
      "scope": "The executed Resolution 26 18 is passed July 21, 2026. The current County original account reports a temporary moratorium on permit applications and issuance for data centers and cable landing stations, along with related Board of Zoning Appeals proceedings, for twelve months or until rescinded. It states that pending and future applications are covered. The signed resolution and current account establish the recorded action and reported hold. A separate exact legal commencement clause and exact expiry day were not established, and no end is calculated. The resolution defines a cable landing station separately and excludes data storage, processing and computation from that definition. No municipal applicability outside County authority, final merits decision, site permission or physical facility stage is certified.",
      "source_ids": [
        "m07-m07-worcester-law",
        "m07-c50-worcester"
      ],
      "state": "md"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:mount-morris-ny-local-law22026",
      "jurisdiction": "Town of Mount Morris",
      "result": "selected_official_content",
      "scope": "The original filed Local Law 2 of 2026 certifies adoption on January 15, while its State Records stamp expressly shows January 27, 2026 filing. Section 8 makes the law effective upon filing with the Secretary of State. Section 4 imposes a twelve month pause on accepting applications for establishment, location, operation or construction of commercial data centers. The current County index expressly reports January 27, 2027 expiry. The January 15 adoption is separate from January 27 legal effect. The published expiry is taken from the County account rather than calculated. The law provides a written hardship variance process with a public hearing, so no universal project prohibition or automatic variance is inferred. A later amendment, individual eligibility or physical closure is not established.",
      "source_ids": [
        "m07-m07-mountmorris-law",
        "m07-m07-livingston"
      ],
      "state": "ny"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:york-ny-reported-local-law32026",
      "jurisdiction": "Town of York",
      "result": "selected_official_content",
      "scope": "The current County moratoria index lists the Town of York with a July 24, 2027 expiry. Its linked five page copy is headed Proposed Local Law 3 of 2026 and describes a twelve month pause, continuation limits for existing facilities, minor server room and emergency repair exceptions, and a hardship use variance route. The County listed expiry is an official report, while the linked copy remains explicitly proposed. Final adoption, State filing, exact commencement and the enacted form of those draft exceptions were not independently verified. The proposed copy says effect on Secretary of State filing, but no filing day is invented from the reported end. No automatic project eligibility or physical status is inferred.",
      "source_ids": [
        "m07-m07-livingston",
        "m07-m07-york-law"
      ],
      "state": "ny"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:plattsburgh-ny-proposed-local-lawp22026",
      "jurisdiction": "City of Plattsburgh",
      "result": "selected_official_content",
      "scope": "The original City hearing page states that Local Law P 2 of 2026 was introduced August 20 and schedules a September 3 hearing. Its proposed text would hold specified land use approvals for covered high energy computing uses for twelve months after State filing. Continued lawful operation and routine work without material demand or processing increases are treated separately from new, enlarged, converted or materially intensified uses. The selected original is an introduction and hearing notice, not an executed State filing or confirmed final vote. The City agenda index links meeting materials, but this bounded review did not substantively verify a final outcome from them. A past scheduled hearing is not passage. Proposed definitions, exceptions and term remain unverified as final law, and no exact start, expiry or project effect is certified.",
      "source_ids": [
        "m07-m07-plattsburgh",
        "m07-m07-plattsburgh-agendas"
      ],
      "state": "ny"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:frankfort-town-ny-proposed-local-law32026",
      "jurisdiction": "Town of Frankfort",
      "result": "selected_official_content",
      "scope": "The original Town September 24, 2026 agenda schedules a hearing on proposed Local Law 3, a moratorium on commercial cryptocurrency mining and data processing centers. The October 22 agenda proposes approval of the September 24 minutes, but does not itself supply the hearing outcome or an enacted moratorium text. The Town is distinct from the Village of Frankfort and their identically numbered local laws are not joined. Neither the elapsed hearing date nor a later agenda for approving minutes proves adoption, legal effect, term, expiry or an application outcome. Other energy sectors and later tax or parking laws are not attributed to this moratorium proposal without exact original text.",
      "source_ids": [
        "m07-m07-frankfort-september-agenda",
        "m07-m07-frankfort-october-agenda",
        "m07-m07-frankfort-meetings"
      ],
      "state": "ny"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:avon-ny-07",
      "jurisdiction": "Town of Avon",
      "result": "selected_official_content",
      "scope": "The current County moratoria list labels this Town Pending Review. It does not establish whether that refers to a local proposal, County document review or an enacted law awaiting review. No exact original Town instrument, passage, legal start, expiry or current permission was verified in this bounded pass. No restriction item or absence finding is exported.",
      "source_ids": [
        "m07-m07-livingston"
      ],
      "state": "ny"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:leicester-ny-07",
      "jurisdiction": "Town of Leicester",
      "result": "selected_official_content",
      "scope": "The current County moratoria list labels this Town Pending Review. It does not establish whether that refers to a local proposal, County document review or an enacted law awaiting review. No exact original Town instrument, passage, legal start, expiry or current permission was verified in this bounded pass. No restriction item or absence finding is exported.",
      "source_ids": [
        "m07-m07-livingston"
      ],
      "state": "ny"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:newfield-ny-07",
      "jurisdiction": "Town of Newfield",
      "result": "source_access_limited",
      "scope": "The selected original Town laws host robots request returned HTTP 403. Requests stopped. A research dashboard and an elected official personal commentary are pointers only and do not supply an eligible original Town instrument, current legal term or exact State filing day.",
      "source_ids": [],
      "state": "ny"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:potsdam-ny-07",
      "jurisdiction": "Town of Potsdam",
      "result": "source_access_limited",
      "scope": "The original Town robots HTTP 403 hold is retained from the earlier calendar review without another request. Secondary data center moratorium dates and a separate battery storage hearing do not establish exact current data center law, commencement or expiry.",
      "source_ids": [],
      "state": "ny"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:pavilion-mi-proposed-pause",
      "jurisdiction": "Pavilion Charter Township",
      "result": "selected_official_content",
      "scope": "The current official notice index links a scanned Ordinance 184 copy proposing a one year pause on acceptance and processing of data center applications, or until replacement rules take effect. It includes a past August 10, 2026 consideration notice, but its adoption line remains blank. The separate temporary moratorium authority draft also has blank ordinance and adoption fields. The two posted copies have different conditional commencement clauses: publication after adoption in Ordinance 184 and eight days after publication in the separate zoning amendment. Neither a final adoption, actual publication, legal start or exact expiry is certified. The separate clauses are not combined into one legal clock. A past notice is not proof of passage and no specific proposal physical stage is inferred.",
      "source_ids": [
        "m08-c51-pavilion-pause",
        "m08-c51-pavilion-authority",
        "m08-c51-pavilion"
      ],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:parma-mi-moratorium20263",
      "jurisdiction": "Parma Township",
      "result": "selected_official_content",
      "scope": "The original official Notice of Adoption records February 18, 2026 adoption of Moratorium 2026 3 and describes a one year pause on data center permitting, consideration, approval, location, construction, review and installation. The notice lists a Waiver section and an Effective Date section in the underlying instrument. The one page notice states Publication Date February 27, 2026. It does not provide the underlying commencement or waiver text, so that stated publication day does not automatically become legal effect or a calculated expiry. The website article path date is not substituted for the notice body date. The complete instrument and current individual eligibility remain unverified.",
      "source_ids": [
        "m08-m08-parma-law",
        "m08-m08-parma"
      ],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:solon-kent-mi-resolution2610",
      "jurisdiction": "Township of Solon",
      "result": "selected_official_content",
      "scope": "The signed original Resolution 26 10 records a July 13, 2026 Board meeting and five affirmative votes with no negative vote. It extends the Township application review moratorium for data centers and digital mining uses until the expressly written February 9, 2027 date. The document identifies the original pause as imposed February 9, 2026 and previously set to end August 10, 2026. The extension incorporates the prior resolution terms, which were not independently read in full in this bounded pass. No exact separate commencement clause for the extension or individual project exception is invented. The explicit February 9 end is retained instead of a February 10 date in secondary pointers. Subsequent amendments, early termination and current property eligibility are unverified.",
      "source_ids": [
        "m08-c52-solon-extension"
      ],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:howell-livingston-mi-ordinance298",
      "jurisdiction": "Howell Township, Livingston County",
      "result": "selected_official_content",
      "scope": "The current Township ordinance index links Ordinance 298, a scanned data center moratorium extension copy. Its text records May 11, 2026 adoption and seven affirmative votes, extends the pause for six months after legal effect or earlier replacement rules and allows a conditional Board waiver on application. Its certification records website posting on May 13. The copy has blank supervisor and Clerk attestations and leaves newspaper publication and County filing dates blank. Its commencement is immediately after required publication, so website posting alone is not a verified exact legal start. No expiry is calculated, and a secondary report of a later October extension is not adopted without a later original. The earlier November 20, 2025 pause is historical context and no exact project waiver or current property eligibility is certified.",
      "source_ids": [
        "m08-m08-howell-law",
        "m08-m08-howell"
      ],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:frenchtown-monroe-mi-ordinance30019",
      "jurisdiction": "Frenchtown Charter Township",
      "result": "selected_official_content",
      "scope": "The original April 28, 2026 Board minutes record approval and adoption of Zoning Ordinance 300 19 by seven to zero after its second reading. The subject is a temporary moratorium for technology, data center and other high resource demand uses. The earlier March 17 public notice describes a separate proposed ordinance hearing and a March 10 resolution. The final adopted ordinance body, its exact commencement, term, exceptions and end were not established in this bounded pass. The earlier hearing notice and first reading are not substituted for final adoption or actual publication. No elapsed term calculation, current application eligibility or named campus physical closure is inferred from the action record.",
      "source_ids": [
        "m08-m08-frenchtown-minutes",
        "m08-m08-frenchtown"
      ],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:flint-mi-resolution260191-agenda",
      "jurisdiction": "City of Flint",
      "result": "selected_official_content",
      "scope": "The official June 8, 2026 final meeting agenda includes proposed Resolution 260191. Its summary describes a twelve month moratorium on data center applications, site plans, construction and renovations, with termination or extension conditions tied to Council action and replacement regulations. Final describes the agenda revision, not adoption of every listed resolution. No original completed action, executed resolution or later term was verified. The past meeting date is not a vote result, and the proposed twelve month duration does not establish a start, expiry, present legal effect or a specific facility closure.",
      "source_ids": [
        "m08-m08-flint"
      ],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:grandblanc-mi-08",
      "jurisdiction": "Grand Blanc Charter Township",
      "result": "selected_official_content",
      "scope": "The official Clerk agenda page links an embedded public meeting portal. Its underlying subject specific action and instrument bodies were not substantively reviewed in this bounded pass. No access denial is claimed. Secondary one year moratorium reporting does not establish an exact original legal start or end. No restriction item is exported from navigation alone.",
      "source_ids": [
        "m08-h09-grandblanc-agendas"
      ],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:blair-mi-08",
      "jurisdiction": "Blair Township, Grand Traverse County",
      "result": "source_access_limited",
      "scope": "The selected current official Township host had an unavailable robots response, so no body was requested. A separately published legal notice and private coverage remain pointers. No exact original Township instrument was captured or adopted in this bounded review.",
      "source_ids": [],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:niles-mi-08",
      "jurisdiction": "Niles Charter Township",
      "result": "source_access_limited",
      "scope": "The selected official Township host had an unavailable robots response and no page body was requested. Secondary October approval reporting is not an eligible original instrument or legal clock. No current start or expiry is inferred.",
      "source_ids": [],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:kalamazoo-mi-08",
      "jurisdiction": "City of Kalamazoo",
      "result": "source_access_limited",
      "scope": "The selected official City host had an unavailable robots response and no page body was requested. Public media meeting summaries and video descriptions are pointers only, without a substantively reviewed original law, completed action or exact legal clock.",
      "source_ids": [],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:hill-tx-recorded-moratorium-and-rescission",
      "jurisdiction": "Hill County",
      "result": "selected_official_content",
      "scope": "Original May 12, 2026 minutes record adoption of a one year data center construction moratorium by three affirmative and two negative votes. May 29 minutes record a tabled waiver and no action from the tabled executive session. Original June 4 minutes record a unanimous rescission action and adoption of a revised data center development review checklist. The May 12 action is numbered 2026 5154, while the June 4 rescission references prior Order 2026 2154 and its separate action is numbered 2026 5202. The June 4 signed minutes also carry a May 26 approval footer that precedes the meeting. These source discrepancies remain explicit. The complete executed orders, exact legal commencement, final checklist text, current eligibility and an independently resolved instrument crosswalk were not verified. No termination day or calculated expiry is certified, and no specific computing campus stage follows from these County actions.",
      "source_ids": [
        "m09-m09-hill-may12",
        "m09-m09-hill-may29",
        "m09-m09-hill-june4"
      ],
      "state": "tx"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:hood-tx-proposed-pause-library-record",
      "jurisdiction": "Hood County",
      "result": "selected_official_content",
      "scope": "The Texas Legislative Reference Library catalogs a January 29, 2026 Hood County proposed industrial development moratorium order. Its description covers applications and site permits rather than proving a final enacted instrument. The official archive also retains a February 10 letter from state legislators challenging County moratorium authority in general. The linked proposed County order copy is on a private publisher host and was not adopted under the official source requirement. The archived letter does not name Hood County in its body and is attributed legislative advocacy, not an Attorney General decision, court judgment or completed Hood County vote. No adopted order, rejection result, actual legal start, expiry or property specific permission was independently verified.",
      "source_ids": [
        "m09-m09-hood-library",
        "m09-m09-hood-letter"
      ],
      "state": "tx"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:trumbull-ct-reported-two-year-pause",
      "jurisdiction": "Town of Trumbull",
      "result": "selected_official_content",
      "scope": "The original October 1, 2026 First Selectman address reports that the Town Council adopted a two year moratorium on establishment and development of new data centers on September 9. It expressly says existing data centers are unaffected. This is an official reported adoption account rather than the complete ordinance or certified Council vote. Exact commencement, publication, instrument number, exceptions and expiry were not verified. The reported two year term is not calculated from adoption, and the existing facility renovation discussed in the address does not become a Townwide new facility permission.",
      "source_ids": [
        "m09-m09-trumbull"
      ],
      "state": "ct"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:eastbridgewater-ma-proposed-zoning-ban",
      "jurisdiction": "Town of East Bridgewater",
      "result": "selected_official_content",
      "scope": "The original archived September 4, 2026 Planning Board notice proposes an amendment prohibiting data centers as defined by the proposed text in all Town zoning districts and schedules a September 21 hearing. The archive states the article was displayed through October 6. The past hearing and later article archive are not completed adoption or a repeal. The linked draft returned an ordinary self redirect and its substantive body was not reviewed. No final Town Meeting action, state approval, actual publication requirement, legal effect or existing facility exception was verified, and no future subject vote is exported from a generic Town Meeting date.",
      "source_ids": [
        "m09-m09-eastbridgewater-archive"
      ],
      "state": "ma"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:wareham-09",
      "jurisdiction": "Town of Wareham",
      "result": "selected_official_content",
      "scope": "Original Town Meeting alert and document index establish a general October 26 meeting and a warrant link. The separately retained scanned warrant has not been substantively visually certified as a data center restriction instrument in this bounded pass. Navigation OCR without a term match is not proof that no restriction exists. No data center vote, adopted ban or legal clock is exported.",
      "source_ids": [
        "m09-h10-wareham-meeting",
        "m09-h10-wareham-documents"
      ],
      "state": "ma"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:southplainfield-09",
      "jurisdiction": "Borough of South Plainfield",
      "result": "selected_official_content",
      "scope": "The selected original Borough home page supplies navigation but no substantively reviewed exact data center restriction instrument or completed action. Private reporting and a general government calendar do not establish enactment, no restriction, a legal start or an expiry.",
      "source_ids": [
        "m09-h10-southplainfield"
      ],
      "state": "nj"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:brownsville-09",
      "jurisdiction": "City of Brownsville",
      "result": "source_access_limited",
      "scope": "The selected official host returned HTTP 403 for robots and no notice body was requested. A search pointer to an October 7 proposed ninety day pause report is not adopted as an original completed vote, current legal effect or an upcoming hearing.",
      "source_ids": [],
      "state": "tx"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:fortworth-09",
      "jurisdiction": "City of Fort Worth",
      "result": "source_access_limited",
      "scope": "The selected official host returned HTTP 403 for robots and no data center page body was requested. Search pointers to process initiation, a future report and hearings do not supply an adopted moratorium or verified scheduled calendar entry without an eligible original body.",
      "source_ids": [],
      "state": "tx"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:jerseycity-09",
      "jurisdiction": "City of Jersey City",
      "result": "source_access_limited",
      "scope": "The selected official host robots response redirected to a plain HTTP path and no eligible notice body was requested in this bounded pass. Introduction and a past planned final vote found as search pointers do not establish a completed final ban or legal commencement. No alternate host route was used.",
      "source_ids": [],
      "state": "nj"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:massachusetts-09",
      "jurisdiction": "Commonwealth of Massachusetts",
      "result": "source_access_limited",
      "scope": "The selected official executive order host returned HTTP 403 for robots and no order body was requested. A search pointer to conditional permitting requirements is not classified as a blanket statewide moratorium, adopted restriction item or individual project prohibition.",
      "source_ids": [],
      "state": "ma"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:lordstown-oh-signed-extension",
      "jurisdiction": "Village of Lordstown",
      "result": "selected_official_content",
      "scope": "Signed Ordinance 1 2026 records January 5 passage of a temporary data center permit and application processing moratorium. Signed Ordinance 29 2026 records June 15 passage of an extension. The instruments cover the Village corporate limits and suspend specified review duties. The October 20 original Supreme Court opinion applies the moratorium when denying a mandamus request to compel one developer site plan review. The extension preamble describes an additional period from passage, while its operative Section 7 refers to legal effect; both use not more than 180 days. Emergency declarations do not supply an independently verified exact calendar commencement in this review. The Court identifies the previous July 4 expiry and its information summary describes continuation through the remainder of 2026, but no exact new expiry is calculated. Exceptions include municipal or emergency infrastructure, incidental small server rooms no more than 500 square feet that are not the primary use, and specified manufacturing activities. No permanent ban, individual eligibility or computing operation follows from this summary.",
      "source_ids": [
        "m10-c54-lordstown-ordinance1",
        "m10-c54-lordstown-ordinance29",
        "m10-c54-lordstown-opinion",
        "m10-c54-lordstown-court"
      ],
      "state": "oh"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:garrettsville-oh-reported-ordinance202616",
      "jurisdiction": "Village of Garrettsville",
      "result": "selected_official_content",
      "scope": "The original August 13, 2026 Village passed legislation notice says Council approved Ordinance 2026 16 on August 12. Its title describes a twelve month moratorium on acceptance of zoning applications for data centers and declares an emergency. The complete ordinance is not included in the notice and its stated physical viewing locations were not visited. Adoption and an emergency title do not independently establish exact legal commencement, exceptions, actual publication or expiry. No term end is calculated and no original instrument was requested by mail or contact.",
      "source_ids": [
        "m10-m10-garrettsville"
      ],
      "state": "oh"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:grovecity-oh-reported-june1-pause",
      "jurisdiction": "City of Grove City",
      "result": "selected_official_content",
      "scope": "The current original City Community Consent Amendment information page reports Council approval of a one year data center development moratorium June 1, 2026 and a later task force. It separately describes a proposed November 3 charter amendment vote covering development thresholds and certain changes to existing properties. The proposed charter amendment is separate from the existing reported moratorium and is not an adopted blanket data center ban. The underlying moratorium ordinance, exact legal commencement, publication, exceptions and expiry were not verified. The reported one year duration is not calculated from the approval day. City arguments about possible amendment effects are attributed positions rather than independent predictions or completed voter action.",
      "source_ids": [
        "m10-m10-grovecity"
      ],
      "state": "oh"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:tiffin-oh-resolution202642-past-second-reading",
      "jurisdiction": "City of Tiffin",
      "result": "selected_official_content",
      "scope": "The original April 6, 2026 Council agenda lists Resolution 2026 42 for second reading. Its proposed title describes a twelve month moratorium on data center establishment, conversions, development, construction and changes of use, with an emergency declaration. The selected agenda is a proposal record and does not establish completed passage or that the matter remains pending today. A secondary report of later approval is not substituted for original minutes or an executed resolution. Exact adoption, legal effect, exceptions and expiry remain unverified. The separate nearby Ordinance 2026 18 concerns codified ordinance replacement pages and is not this data center resolution.",
      "source_ids": [
        "m10-m10-tiffin-agenda"
      ],
      "state": "oh"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:ontario-oh-adoption-and-proposed-extension",
      "jurisdiction": "City of Ontario Ohio",
      "result": "selected_official_content",
      "scope": "Original May 6, 2026 Council minutes record seven affirmative votes with no negative vote adopting Ordinance 26 13, a six month moratorium on local licensing, zoning, occupancy and other permits for data centers supporting artificial intelligence. The October 21 agenda separately lists proposed Ordinance 26 27 for second reading to extend it another six months. The later agenda does not certify extension adoption or present legal effect. The complete enacted ordinance and exact commencement, publication, definitions, exceptions and expiry were not verified, so no six month end is calculated from May 6. This is Ontario Ohio, not the Canadian province. A government speaker statement about separate Ohio legislation is not adopted as a verified statewide enacted law.",
      "source_ids": [
        "m10-m10-ontario-may6",
        "m10-m10-ontario-oct21",
        "m10-m10-ontario"
      ],
      "state": "oh"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:scioto-pickaway-oh-resolution26054",
      "jurisdiction": "Scioto Township unincorporated areas, Pickaway County",
      "result": "selected_official_content",
      "scope": "Original March 5, 2026 Trustee minutes record Resolution 26 054 adopting a 365 day data center moratorium for the unincorporated Township by three affirmative votes. A proposed amendment reducing the term to six months failed by two negative votes and one affirmative vote before the original duration passed. The complete resolution, legal commencement, publication, definitions, exceptions and expiry were not verified. Neither the failed shorter amendment nor an assumed March 5 start is used to calculate an end. The website upload month is not an actual original publication day. This is Scioto Township in Pickaway County, separate from the same named Delaware County Township and neighboring Commercial Point.",
      "source_ids": [
        "m10-m10-scioto-march5",
        "m10-m10-scioto"
      ],
      "state": "oh"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:jackson-franklin-oh-10",
      "jurisdiction": "Jackson Township Franklin County",
      "result": "selected_official_content",
      "scope": "The old official Trustee page linked the current Township government host. Its ordinary observed redirect was followed through normal HTTPS to the current Board meetings index. The selected visible 2026 index did not supply an independently reviewed exact Resolution 2026 049 body or May 12 completed action. No final moratorium, start or expiry is exported from the index or a private tracker. Same named Ohio Townships and a New Jersey utilities resolution are not joined. No public record request or other contact was made.",
      "source_ids": [
        "m10-m10-jackson-board"
      ],
      "state": "oh"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:vermilion-oh-10",
      "jurisdiction": "City of Vermilion",
      "result": "source_access_limited",
      "scope": "The selected official City host had an unavailable robots response and no ordinance body was requested. A search reader describing Ordinance 2026 17 and a March 2027 end is a pointer only. It is not adopted as a verified complete instrument, legal start or exact expiry.",
      "source_ids": [],
      "state": "oh"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:deerfield-oh-10",
      "jurisdiction": "Deerfield Township",
      "result": "source_access_limited",
      "scope": "The selected official meeting document path was disallowed by robots and its body was not requested. A search pointer to first reading text is not substituted for an eligible final instrument, completed vote, effective day or current term.",
      "source_ids": [],
      "state": "oh"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:commercialpoint-oh-10",
      "jurisdiction": "Village of Commercial Point",
      "result": "source_access_limited",
      "scope": "The selected official Village host had an unavailable robots response and no ordinance index body was requested. Search pointers to an eighteen month pause and a separate new use prohibition do not establish either complete final instrument, the interaction between them, legal commencement or exceptions. No alternate route was used.",
      "source_ids": [],
      "state": "oh"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:hawkins-tn-recorded-september2025-ban-11",
      "jurisdiction": "Hawkins County",
      "result": "selected_official_content",
      "scope": "The original regular meeting minutes dated September 22, 2025 record adoption of Out of Order Resolution 2025 09 02 by ten affirmative votes, two negative votes and two absent members. The recorded title prohibits operation of cryptocurrency mining and data centers under the County Powers Act. The meeting first suspended rules to admit the additional resolutions. The full separately executed resolution, definitions, exceptions, exact territorial extent, legal commencement and later changes were not verified. The minutes approval vote fields remain blank in the posted copy. A normal order resolution bearing the same numeric suffix concerns a different appointment; its vote is not substituted for this out of order prohibition. The later adjournment vote is also separate. No exact expiry, current court outcome or physical facility closure is inferred.",
      "source_ids": [
        "m11-m11-hawkins-minutes"
      ],
      "state": "tn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:washington-tn-recorded-resolution260302-11",
      "jurisdiction": "Washington County",
      "result": "selected_official_content",
      "scope": "The original March 23, 2026 Commission minutes record passage of Resolution 26 03 02 by thirteen affirmative votes and two negative votes. The Clerk signs the posted minutes. The separately posted agenda packet contains proposed data center moratorium text through June 30, 2027, including applications, specified permitting and utility extensions, and an exception for standard commercial or industrial internal data processing. The agenda copy has blank vote, signature and approval fields. Its commencement clauses refer to passage and conditional Mayor approval or Clerk certification. The recorded vote verifies adoption, while exact legal commencement, the fully executed final instrument and a currently verified legal expiry remain unknown. The committee copy also describes a one year pause and a June 30, 2027 endpoint; these different formulations are retained rather than combined into a calculated term. General proposed findings about power, water and noise are attributed legislative text, without site specific measured findings. Resident names and household contacts are excluded.",
      "source_ids": [
        "m11-m11-washington-minutes-march23",
        "m11-m11-washington-large"
      ],
      "state": "tn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:sullivan-tn-posted-resolution20251107-versions-11",
      "jurisdiction": "Sullivan County",
      "result": "selected_official_content",
      "scope": "The original December 2025 monthly meeting packet lists Resolution 2025 11 07 as old business and includes multiple sponsor versions. The version labeled as amended by sponsor proposes a four month data mining and cryptocurrency mining moratorium from passage, limits specified applications and development permissions, allows a later extension vote and excludes standard commercial or industrial internal data processing. Other posted versions describe prohibition pending appropriate rules and a request for further amendment. They are alternative texts rather than verified final legislation. Adoption, Clerk, Chair and Mayor execution fields are blank in the selected amended copy. The December 18 meeting agenda, a November 20 introduction line and a December 11 work session submission line do not certify completed adoption. Duplicate Section 6 numbering is retained as a document feature. No four month start or end is calculated, no final ban is certified and general proposed findings are not measured site impacts.",
      "source_ids": [
        "m11-m11-sullivan-packet"
      ],
      "state": "tn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:campbell-tn-11",
      "jurisdiction": "Campbell County",
      "result": "selected_official_content",
      "scope": "The original County agendas and minutes index provides meeting navigation and linked folders. The selected index is not an executed data center rule, final vote or verified legal term. No linked shared folder body was read, no access keyed folder URL is exported and no resident contact is included. No rule absence is inferred from this navigation review.",
      "source_ids": [
        "m11-m11-campbell"
      ],
      "state": "tn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:white-tn-11",
      "jurisdiction": "White County",
      "result": "source_access_limited",
      "scope": "The selected official Commission and agenda hosts had unavailable robots responses. No meeting body or final instrument was requested. A private account of a July 2026 ban remains a pointer only, without certified vote, commencement or exceptions.",
      "source_ids": [],
      "state": "tn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:loudon-tn-11",
      "jurisdiction": "Loudon County",
      "result": "source_access_limited",
      "scope": "The selected official meeting documents host had an unavailable robots response. The County is in Tennessee and is separate from the City of Loudon and Loudoun County Virginia. No City action or Virginia rule is transferred to this County.",
      "source_ids": [],
      "state": "tn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:scott-tn-11",
      "jurisdiction": "Scott County",
      "result": "source_access_limited",
      "scope": "The selected official County host had an unavailable robots response. No final rule body or completed vote was read. Same named counties in Minnesota and Iowa are not joined to this Tennessee jurisdiction.",
      "source_ids": [],
      "state": "tn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:carter-tn-11",
      "jurisdiction": "Carter County",
      "result": "source_access_limited",
      "scope": "The selected official Tennessee County host had an unavailable robots response. No final data center instrument, completed vote or legal clock was read. A same named Montana County is not substituted.",
      "source_ids": [],
      "state": "tn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:greene-tn-11",
      "jurisdiction": "Greene County",
      "result": "source_access_limited",
      "scope": "The official County host returned an ordinary redirect. The observed destination disallowed the selected request through robots, so its body was not requested and no alternate route was used. Current enactment and legal effect remain unverified.",
      "source_ids": [],
      "state": "tn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:hamblen-tn-11",
      "jurisdiction": "Hamblen County",
      "result": "source_access_limited",
      "scope": "The selected official County host had an unavailable robots response. No underlying meeting body, executed instrument, completed vote or current term was read. No rule absence is inferred.",
      "source_ids": [],
      "state": "tn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:putnam-ga-original-and-reported-october-extension-12",
      "jurisdiction": "Putnam County unincorporated areas",
      "result": "selected_official_content",
      "scope": "Signed Resolution 2026.8.7 adopts a land development permit moratorium for data centers, battery energy storage systems and solar energy systems, with an August 7, 2026 commencement clause and an original November 6, 2026 end. The current original County notice reports that the October 21, 2026 Board meeting extended the moratorium through November 17, 2026. The original resolution identifies unincorporated County regulation and covers specified land development, building, rezoning and conditional use applications. The complete October extension instrument and its exact ending clock were not independently read. The original November 6 late night expiry clock is not transferred to November 17. The notice retains its August 12 initial post date, which is not the publication day of the later October update. The separately posted Chapter 53 document is explicitly proposed and its selected introduction is not certified as enacted law. The public comment invitation has no verified exact deadline in this review, and no form or message was submitted. No individual eligibility, physical computing closure or blanket permission is inferred. The August 20 comment notice also repeats the original November 6 end; the later explicit October 21 update supplies the reported extension field without converting the older invitation into a new deadline.",
      "source_ids": [
        "m12-m12-putnam",
        "m12-m12-putnam-resolution-observed",
        "m12-m12-putnam-draft-observed",
        "m12-m12-putnam-comments"
      ],
      "state": "ga"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:rockdale-ga-signed-original-and-reported-may-extension-12",
      "jurisdiction": "Rockdale County",
      "result": "selected_official_content",
      "scope": "The complete signed Resolution R 2026 01 records January 13, 2026 adoption and immediate legal effect for a 180 day moratorium on specified applications and approvals for siting, construction or expansion of new data centers and battery energy storage systems. It includes standalone and accessory uses. The County fact sheet updated May 12 reports a May 12 extension through September 8, 2026. The original exempts qualifying maintenance, repair and interior improvements without increased area, capacity, demand or water use, and applications with final nonappealable approval before its effective day. The full May extension instrument, later Board actions and present legal disposition after the reported September 8 endpoint were not independently verified. No original 180 day end is calculated, no expiry or repeal is inferred merely because time passed and no permanent ban is certified. The signed original is verified separately from the incomplete current instrument chain. Legislative findings about possible environmental and infrastructure effects are attributed County findings rather than measured injury at every computing facility. The FAQ technical and health assurances, planned campus counts and staffing are not exported as measured performance or physical status.",
      "source_ids": [
        "m12-m12-rockdale-resolution",
        "m12-m12-rockdale-faq"
      ],
      "state": "ga"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:coweta-ga-12",
      "jurisdiction": "Coweta County",
      "result": "selected_official_content",
      "scope": "The selected current original County home page provides agendas, planning and general meeting navigation, without an independently reviewed exact data center moratorium body, adoption or end. Private accounts of a 2025 pause and search excerpts of proposed data center definitions do not certify current enacted standards or a current legal term. A new definition is not automatically a moratorium.",
      "source_ids": [
        "m12-h13-coweta"
      ],
      "state": "ga"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:morgan-ga-12",
      "jurisdiction": "Morgan County",
      "result": "selected_official_content",
      "scope": "The selected original County home body provides general government and calendar navigation, without a substantively verified exact County data center instrument in this bounded review. A separate City of Madison agenda or proposed rule is not transferred to Countywide authority. No rule absence or legal expiry is inferred.",
      "source_ids": [
        "m12-m12-morgan"
      ],
      "state": "ga"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:carroll-ga-12",
      "jurisdiction": "Carroll County",
      "result": "selected_official_content",
      "scope": "The selected original Georgia County home provides general Board and planning event navigation, without a substantively verified exact data center moratorium body or final extension. A private tracker describes two 100 day periods, but neither a commencement nor expiry is calculated from those accounts. Other same named counties and City of Temple decisions remain separate.",
      "source_ids": [
        "m12-m12-carroll"
      ],
      "state": "ga"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:walton-ga-12",
      "jurisdiction": "Walton County",
      "result": "selected_official_content",
      "scope": "The selected original Georgia County Board page describes duties, meeting procedure and agenda navigation. It does not independently establish a data center moratorium or prohibition. Accounts about Walton County Florida are a different jurisdiction and are not transferred to Georgia. No rule absence is inferred.",
      "source_ids": [
        "m12-m12-walton"
      ],
      "state": "ga"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:fayette-ga-12",
      "jurisdiction": "Fayette County",
      "result": "source_access_limited",
      "scope": "The selected original County agenda packet returned HTTP 200 beyond the initial twelve megabyte bound and its body was not retained or adopted. A search excerpt reporting one official belief about a City of Fayetteville moratorium does not establish a County rule, a verified City instrument or current legal effect. The separate annexation debate is not final data center legislation.",
      "source_ids": [],
      "state": "ga"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:newton-ga-12",
      "jurisdiction": "Newton County",
      "result": "source_access_limited",
      "scope": "The selected original County resolution and minutes paths had unavailable robots responses. No instrument or meeting body was requested. Search pointers describing earlier February, March and April actions and an October 7 endpoint do not establish complete terms, a later extension or present legal disposition. No alternate access route was used.",
      "source_ids": [],
      "state": "ga"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:jasper-ga-12",
      "jurisdiction": "Jasper County",
      "result": "source_access_limited",
      "scope": "The selected Georgia County home redirected to a reCAPTCHA challenge. The challenge was not followed or bypassed and no substantive rule body was read. South Carolina Jasper County accounts and the City of Jasper in Pickens County Georgia are different jurisdictions and are not joined to this County.",
      "source_ids": [],
      "state": "ga"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:bartow-ga-12",
      "jurisdiction": "Bartow County",
      "result": "source_access_limited",
      "scope": "The selected original County host had an unavailable robots response and no body was requested. A City of Euharlee data center zoning text amendment is a different municipal matter and is not proof of a County moratorium, an adopted Countywide prohibition or individual facility closure.",
      "source_ids": [],
      "state": "ga"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:cumberland-nc-signed-june-pause-nc-13",
      "jurisdiction": "Cumberland County zoning jurisdiction",
      "result": "selected_official_content",
      "scope": "The complete signed County order records June 15, 2026 adoption and effect upon adoption. Section 4 extends the data center moratorium through December 15, 2026 unless rescinded sooner. It directs County planning staff concerning site plan review and zoning and building permits within the County zoning jurisdiction. Its definition includes specified computing uses and excludes incidental subordinate internal data processing supporting a principal onsite use when processing is not the primary offsite service. The order is not a shutdown order for all existing computing, a permanent ban, or automatic City of Fayetteville regulation. Legislative recitals about existing groundwater contamination do not establish data center causation. The current County information hub describes permanent ordinance development and an October 20 Joint Planning Board discussion, with only a November consideration month. Those draft standards are not certified as enacted, and a month does not supply an exact future hearing day. No named development eligibility, present operator response or physical stage is established.",
      "source_ids": [
        "m13-c57-cumberland-moratorium",
        "m13-c57-cumberland-data-observed"
      ],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:davidson-nc-october-moratorium-proposal-nc-13",
      "jurisdiction": "Davidson County",
      "result": "selected_official_content",
      "scope": "The original County notice dated October 14, 2026 advertises an October 26, 2026 hearing at 6 PM on a proposed four month moratorium. A separate original notice advertises data center zoning standards at the same Board meeting. These are two advertised topics, not proof of two different Board meetings, a held hearing, an adopted pause or enacted standards. The complete final moratorium instrument, adoption, commencement, exemption text and expiry were not independently verified. Four months is a proposed duration, without a calculated endpoint. The one hour limit concerns public comment and excludes Board and staff deliberation, so it does not establish a meeting end at 7 PM. Newspaper run dates printed as instructions are not independently verified publication dates. The notices do not establish physical construction, computing closure or operation.",
      "source_ids": [
        "m13-h14-davidson-moratorium-observed",
        "m13-h14-davidson-rezoning-notice"
      ],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:halifax-nc-13",
      "jurisdiction": "Halifax County",
      "result": "selected_official_content",
      "scope": "The selected original County home and agenda index provide official Board navigation. No complete data center moratorium, current adopted standards or exact final legal disposition was substantively verified. A private expected development closing does not establish an adopted rule or a completed land transfer. No minutes library login or notification subscription was used.",
      "source_ids": [
        "m13-c57-halifax-home",
        "m13-c57-halifax-agendas"
      ],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:rockingham-nc-13",
      "jurisdiction": "City of Rockingham in Richmond County",
      "result": "selected_official_content",
      "scope": "The selected original City agenda index lists meeting records and project studies. The posted Terra Nexus noise model concerns a proposal, not an adopted City noise rule or computing operation. Scanned meeting packets were retained but not visually qualified as final legal action in this review. City of Rockingham in Richmond County is distinct from Rockingham County.",
      "source_ids": [
        "m13-c57-rockingham-agendas"
      ],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:iredell-nc-13",
      "jurisdiction": "Iredell County",
      "result": "selected_official_content",
      "scope": "The selected original County home body supplies Board meeting recaps, planning and general government navigation. It does not substantively verify an exact County data center pause instrument or present legal term. A separate Town of Mooresville or City of Statesville rule is not automatically Countywide regulation. No rule absence is inferred from this bounded home page review.",
      "source_ids": [
        "m13-m13-iredell"
      ],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:stokes-nc-13",
      "jurisdiction": "Stokes County",
      "result": "source_access_limited",
      "scope": "The selected original County host had an unavailable robots response and no body was requested. Private accounts of several rezoning votes, court proceedings and later applications do not supply a complete current County moratorium instrument or establish computing closure.",
      "source_ids": [],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:chatham-nc-13",
      "jurisdiction": "Chatham County",
      "result": "source_access_limited",
      "scope": "The selected original County host had an unavailable robots response and no body was requested. Private policy accounts and an individual project approval are not substituted for exact original County rule terms or current legal effect.",
      "source_ids": [],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:charlotte-nc-13",
      "jurisdiction": "City of Charlotte",
      "result": "source_access_limited",
      "scope": "The selected original City moratorium FAQ path had an unavailable robots response and no body was requested. A reported temporary pause remains a pointer without a complete original instrument or verified current ending term. City authority is not transferred to all of Mecklenburg County.",
      "source_ids": [],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:mooresville-nc-13",
      "jurisdiction": "Town of Mooresville",
      "result": "source_access_limited",
      "scope": "The selected original Town host had an unavailable robots response and no body was requested. An account of a withdrawn project or terminated land deal is not proof of an adopted Townwide moratorium, Countywide law or physical computing closure.",
      "source_ids": [],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:raleigh-nc-13",
      "jurisdiction": "City of Raleigh",
      "result": "source_access_limited",
      "scope": "The selected original City document host had an unavailable robots response and no annexation packet body was requested. An annexation case and project coverage do not establish a general data center moratorium, final law or present computing stage.",
      "source_ids": [],
      "state": "nc"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:minneapolis-mn-city-reported-temporary-pause-14",
      "jurisdiction": "City of Minneapolis",
      "result": "selected_official_content",
      "scope": "The current original City planning page reports that Council approved a temporary ordinance earlier in 2026 and that it pauses new data center proposals in most of the City while permanent standards are developed. The City amendment index separately lists the Data Centers Amendment under review. This supports a City reported temporary pause with incomplete precise instrument terms, not an independently verified blanket permanent prohibition. The complete executed temporary ordinance, exact adoption and commencement days, present full exception text, amendment chain and precise end were not independently read in this bounded review. Most of the City is not all projects or every institution. The described definition for incidental internal servers belongs to the proposed standards discussion and is not certified as a final exception in the current pause. November 5 committee and November 12 Council meetings are schedules for consideration, not accomplished final adoption or legal expiry. A contact office address is not certified as a meeting venue. The City discussion of State building code authority is attributed context rather than an independent complete statewide legal interpretation.",
      "source_ids": [
        "m14-minneapolis-amendments",
        "m14-minneapolis-data"
      ],
      "state": "mn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:pokagon-mi-october-data-center-pause-proposal-14",
      "jurisdiction": "Pokagon Township, Cass County",
      "result": "selected_official_content",
      "scope": "The original Township notice schedules an October 27, 2026 Planning Commission hearing and proposed action on zoning text and a six month pause on review or consideration of data center applications. It also advertises distinct battery storage and solar matters. The data center proposal remains prospective in this review. The complete final instrument, executed adoption, commencement, exact expiry, exemptions and later Township Board action were not independently verified. A proposed duration is not a calculated end date. Battery storage and solar subjects do not expand the computing rule or prove that every data center has those hazards. The notice does not establish physical construction, shutdown or operation.",
      "source_ids": [
        "m14-pokagon"
      ],
      "state": "mi"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:elk-river-mn-14",
      "jurisdiction": "City of Elk River",
      "result": "selected_official_content",
      "scope": "The original City ordinance index lists 26 17 Data Center Moratorium. The complete instrument and current legal term were not substantively read, so the index title alone is not promoted into an in effect prohibition, exact adoption day, expiry, exception or computing closure. Its public WebLink viewer reference was inaccessible through the bounded reader. No alternate copy was used to claim the held body. The separate selected project hearing notice returned HTTP 404 and is not proof of cancellation.",
      "source_ids": [
        "m14-elk-river"
      ],
      "state": "mn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:lakeville-mn-14",
      "jurisdiction": "City of Lakeville",
      "result": "selected_official_content",
      "scope": "The current original City home body provides government navigation, ordinary calendar listings and a headline about a Court action. The headline and general events do not independently verify a complete data center moratorium, present legal scope or a final computing stage. The underlying Court opinion was not read in this policy pass. No rule absence, Citywide ban or project permission is inferred.",
      "source_ids": [
        "m14-lakeville"
      ],
      "state": "mn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:faribault-mn-14",
      "jurisdiction": "City of Faribault",
      "result": "selected_official_content",
      "scope": "The original City Archer account describes a proposed development, environmental review and supplemental review due March 31, 2027. A project review deadline, a City account of appellate return and the absence of a formal application are not independently verified Citywide data center moratorium terms or a blanket ban. No full new general prohibition was read in this bounded source.",
      "source_ids": [
        "m14-faribault"
      ],
      "state": "mn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:farmington-mn-14",
      "jurisdiction": "City of Farmington",
      "result": "selected_official_content",
      "scope": "The original City Technology Park chronology describes planning approvals, plat additions, development contracts and plaintiffs filing dismissals that await final Court directions. Those accounts do not establish a current general data center moratorium, final judgment, computing permission or physical shutdown. The source is project and litigation context, without a full new Citywide prohibition instrument.",
      "source_ids": [
        "m14-farmington"
      ],
      "state": "mn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:chaska-mn-14",
      "jurisdiction": "City of Chaska",
      "result": "selected_official_content",
      "scope": "The original City CloudHQ account describes preliminary approval, no final application and an outstanding power study. Lack of a final application or completed study is not itself an adopted moratorium, general land use prohibition or physical computing closure. No complete Citywide pause instrument or exact legal end was read in the selected project page.",
      "source_ids": [
        "m14-chaska"
      ],
      "state": "mn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:monticello-mn-14",
      "jurisdiction": "City of Monticello",
      "result": "selected_official_content",
      "scope": "The original City project account describes complete land use applications, a Planning Commission recommendation, unscheduled Council consideration and a December 8 decision deadline. Those case steps and the separate environmental review do not establish a current Citywide computing moratorium or a blanket ban. A legal decision deadline is not a scheduled hearing or inferred end of a general prohibition.",
      "source_ids": [
        "m14-monticello"
      ],
      "state": "mn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:harmony-mn-14",
      "jurisdiction": "City of Harmony",
      "result": "selected_official_content",
      "scope": "The original one page special meeting agenda schedules a public hearing on a proposed data center ordinance. It does not supply the full proposed substantive text or independently establish that the proposal is a moratorium, a permanent ban or an adopted final rule. The scheduled October 28 meeting and exact agenda clock remain separate calendar data, without a legal term inferred from a general ordinance title.",
      "source_ids": [
        "m14-harmony-agenda"
      ],
      "state": "mn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:eagan-mn-14",
      "jurisdiction": "City of Eagan",
      "result": "source_access_limited",
      "scope": "The selected original City rule and explanatory article paths had unavailable robots responses and no body was requested. Search excerpts describing a February action, an ending day and size or proximity criteria remain pointers rather than adopted raw instrument evidence in this pass. No alternate host or copy was used. The held policy account does not establish that every existing Eagan project is prohibited, closed or eligible.",
      "source_ids": [],
      "state": "mn"
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:rockford-15",
      "jurisdiction": {
        "county": null,
        "municipality": "Rockford",
        "state": "il"
      },
      "result": "selected_official_content",
      "scope": "The executed ordinance records passage August 3, 2026 and approval and certified publication August 5. The current City policy page describes a temporary pause and explicitly distinguishes the Monarch annexation rights. Six months from effectiveness is retained as written, without a calculated end. The separate 180 day staff report requirement is not the pause endpoint. Proposed permanent rules are not certified as enacted.",
      "source_ids": [
        "m15-c60-rockford-policy",
        "m15-c60-rockford-moratorium-original",
        "m15-c60-rockford-referral-original"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:coal-city-15",
      "jurisdiction": {
        "county": null,
        "municipality": "Coal City",
        "state": "il"
      },
      "result": "selected_official_content",
      "scope": "The original Village project account describes PUD committee review followed by a future conditional use process under its development code. This bounded account is not an executed general moratorium, permanent ban or proof that none exists. Aligned issuer assurances are not local law.",
      "source_ids": [
        "m15-h17-coalcity"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:grayslake-15",
      "jurisdiction": {
        "county": null,
        "municipality": "Grayslake",
        "state": "il"
      },
      "result": "selected_official_content",
      "scope": "The actual August 18 original Village FAQ describes previously approved zoning and future administrative building review, without a verified accomplished computing opening. Selected future standards and expected effects are institutional accounts, not independently read executed legal text or measured performance. County authority over unincorporated land is not automatically applied to the incorporated Grayslake project.",
      "source_ids": [
        "m15-h17-grayslake-faq"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:lake-county-15",
      "jurisdiction": {
        "county": "Lake County",
        "municipality": null,
        "state": "il"
      },
      "result": "source_access_limited",
      "scope": "The original County information path returned HTTP 403. Search descriptions of an eight month restriction in unincorporated territory are not adopted as a verified executed instrument, exact effect or end. The incorporated Grayslake project is not assigned a County restriction from an unread source.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:south-elgin-15",
      "jurisdiction": {
        "county": null,
        "municipality": "South Elgin",
        "state": "il"
      },
      "result": "source_access_limited",
      "scope": "The selected original Village source had an unavailable robots response and no body was requested. Private descriptions of an October vote and twelve month term are not substituted for an original executed ordinance or current legal status. South Elgin is not the separate City of Elgin.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:sangamon-15",
      "jurisdiction": {
        "county": "Sangamon County",
        "municipality": null,
        "state": "il"
      },
      "result": "selected_official_content",
      "scope": "The selected original County project question and answer section says, as an older November 10, 2025 County account, that the State Attorney office was researching authority for a temporary moratorium. That legal research is not an accomplished restriction or present comprehensive legal opinion. Other developer assurances reproduced on the County site retain their developer attribution.",
      "source_ids": [
        "m15-h17-sangamon"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:naperville-15",
      "jurisdiction": {
        "county": null,
        "municipality": "Naperville",
        "state": "il"
      },
      "result": "selected_official_content",
      "scope": "The exact final Council minutes record denial of the Karis conditional use ordinance and associated variances and agreement. This project specific action is not a general municipal moratorium or permanent ban, physical computing closure, or proof of concern resolution. Private resident identities and unrelated speaker details are not exported.",
      "source_ids": [
        "m15-c60-naperville-council-minutes"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:pekin-15",
      "jurisdiction": {
        "county": null,
        "municipality": "Pekin",
        "state": "il"
      },
      "result": "selected_official_content",
      "scope": "The original representative mitigation letter requests a response plan, studies and a blank review checklist. Those planning requests are not an executed City ordinance, general moratorium or verified termination of the inherited exact project. The selected body does not independently complete the Lutticken Farm developer crosswalk.",
      "source_ids": [
        "m15-c60-pekin-mitigation"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:joliet-15",
      "jurisdiction": {
        "county": null,
        "municipality": "Joliet",
        "state": "il"
      },
      "result": "source_access_limited",
      "scope": "The selected original City project and annexation sources had unavailable robots responses. Original company future delivery and specifications are not a general City restriction, final permit or commissioned service. No ordinance or current legal eligibility is verified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:rochelle-15",
      "jurisdiction": {
        "county": null,
        "municipality": "Rochelle",
        "state": "il"
      },
      "result": "source_access_limited",
      "scope": "The older original City question and answer account describes proposed development agreement conditions for an unnamed facility, without independently verifying the final executed terms or the exact inherited Steward Drive crosswalk. The later meeting source is held by robots. No project denial, general ban, current rule absence or computing closure is inferred.",
      "source_ids": [
        "m15-c60-rochelle-qa"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:massena-16",
      "jurisdiction": {
        "county": null,
        "municipality": "Massena",
        "state": "ny"
      },
      "result": "source_access_limited",
      "scope": "The original September 8 draft was marked corrected September 14 but still has a blank local law number. It proposes six months from State filing, specified ancillary use under one MW, telecommunications and utility control exceptions, and hardship relief. The corrected PDF self redirects and remains held. The archive end is not repeal, the past hearing is not passage, and exact current force and endpoint remain unverified.",
      "source_ids": [
        "m16-j1816-massena-draft-original",
        "m16-c61-massena-pause-original-archive",
        "m16-j1816-massena-nov4-council-notice"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:lysander-16",
      "jurisdiction": {
        "county": null,
        "municipality": "Lysander",
        "state": "ny"
      },
      "result": "selected_official_content",
      "scope": "Existing Local Law 4 context and the earlier unapproved minutes retain their separate State filing hold. The November 5 extension hearing is not accomplished adoption or proof of the proposed endpoint. The current information page adds no separately verified executed restriction and does not change the prior context.",
      "source_ids": [
        "m16-j1816-lysander-datainfo",
        "m16-c61-lysander-home"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:alabama-16",
      "jurisdiction": {
        "county": null,
        "municipality": "Alabama",
        "state": "ny"
      },
      "result": "selected_official_content",
      "scope": "Selected original draft STREAM findings are proposed project materials. Blank execution and copied findings for Edwards Vacuum do not establish final computing permission or a general ban. No comprehensive local legal status or exact property eligibility is certified.",
      "source_ids": [
        "m16-c61-alabama-draftfindings"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:portland-16",
      "jurisdiction": {
        "county": null,
        "municipality": "Portland",
        "state": "ny"
      },
      "result": "selected_official_content",
      "scope": "Resolution 25 records March 11, 2026 general concept support subject to plans and environmental and regulatory review. This is not a final campus permit or a general municipal moratorium. The later budget and unrelated notice pages establish neither a computing ban nor its absence.",
      "source_ids": [
        "m16-c61-portland-march-minutes-original",
        "m16-c61-portland-oct2-minutes-original",
        "m16-c61-portland-oct6-notice1-original",
        "m16-c61-portland-oct6-notice2-original",
        "m16-c61-portland-clerk"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:east-fishkill-16",
      "jurisdiction": {
        "county": null,
        "municipality": "East Fishkill",
        "state": "ny"
      },
      "result": "selected_official_content",
      "scope": "The complete adopted Local Law 3 text on physical pages thirty and thirty one records a three year conditional data center pause and an explicit July 1, 2029 endpoint. Its separate industrial land pause ends December 31, 2026. The State commencement and filing condition is not independently verified. An ancillary use must also be under twenty MW unless the separate Economic Development Special Permit route applies.",
      "source_ids": [
        "m16-j1816-eastfishkill-june25-minutes"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:tonawanda-16",
      "jurisdiction": {
        "county": null,
        "municipality": "Tonawanda",
        "state": "ny"
      },
      "result": "source_access_limited",
      "scope": "The original Town source returned HTTP 403. A 2021 State cleanup account is not a current Town ordinance or proof of a computing moratorium. No general rule absence, final permit or City to Town transfer of authority is inferred.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:warwick-16",
      "jurisdiction": {
        "county": null,
        "municipality": "Warwick",
        "state": "ny"
      },
      "result": "source_access_limited",
      "scope": "The original Town source had a transport hold and no current local instrument was read. An asset purchase is not a municipal restriction or current legal entitlement. No rule absence, exact computing closure or new operating use is inferred.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:albany-16",
      "jurisdiction": {
        "county": null,
        "municipality": "Albany",
        "state": "ny"
      },
      "result": "selected_official_content",
      "scope": "The selected original Planning Board records concern housing conversions. They do not independently establish a data center moratorium, permit or absence of local restrictions. A market directory or mixed use concept cannot complete an exact property legal crosswalk.",
      "source_ids": [
        "m16-j1816-albany-planning",
        "m16-j1816-albany-nov10-agenda"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:plattsburgh-16",
      "jurisdiction": {
        "county": null,
        "municipality": "Plattsburgh",
        "state": "ny"
      },
      "result": "selected_official_content",
      "scope": "The complete current City P2 notice repeats the proposed twelve month term from State filing and lawful continuation and routine work limits. It does not establish final passage, filing or an exact end. The existing proposed context remains unchanged without a duplicate episode. Listed Council folders are not read executed instruments.",
      "source_ids": [
        "m16-j1816-m07-m07-plattsburgh",
        "m16-j1816-m07-m07-plattsburgh-agendas"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:north-greenbush-16",
      "jurisdiction": {
        "county": null,
        "municipality": "North Greenbush",
        "state": "ny"
      },
      "result": "selected_official_content",
      "scope": "The bounded original Planning Board account and both scanned October agenda pages concern library, residential and traffic matters. North Greenbush is a separate municipality from East Greenbush. A neighboring restriction cannot be transferred to this Town and the selected agenda does not prove a general ban or absence.",
      "source_ids": [
        "m16-j1816-northgreenbush-planning",
        "m16-j1816-northgreenbush-oct26-agenda"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:new-york-large-loads-16",
      "jurisdiction": {
        "county": null,
        "municipality": null,
        "state": "ny"
      },
      "result": "source_access_limited",
      "scope": "The original public case shell establishes a large load interconnection proceeding, not an executed new moratorium or completed environmental review. Existing Executive Order 62 remains a separate earlier context without duplication or a current force upgrade. Its final environmental report trigger is not replaced by a press description of one year.",
      "source_ids": [
        "m16-j1816-dps-case-master"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:west-chester-oh-17",
      "jurisdiction": {
        "county": "Butler County",
        "municipality": "West Chester Township",
        "state": "oh"
      },
      "result": "source_access_limited",
      "scope": "The original Township robots response returned HTTP 403 and no alternate Township source was requested. Current local restrictions, exemptions and exact property eligibility remain unverified. Provider service marketing is not a municipal instrument.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:coshocton-oh-17",
      "jurisdiction": {
        "county": "Coshocton County",
        "municipality": "Coshocton",
        "state": "oh"
      },
      "result": "selected_official_content",
      "scope": "The selected original County minute page concerns a lagoon closure plan and separate Conesville infrastructure work. It does not establish a general municipal computing ban, final legal eligibility or physical computing closure. County and City authority are not merged.",
      "source_ids": [
        "m17-c62-coshocton-lagoons"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:trenton-oh-17",
      "jurisdiction": {
        "county": "Butler County",
        "municipality": "Trenton",
        "state": "oh"
      },
      "result": "selected_official_content",
      "scope": "The original staff review distinguishes site design from separate engineering review and a limited fence permit. Its code and design compliance accounts are not independently verified measured performance, an adopted general pause or final whole campus permission. Public requests for a moratorium do not constitute enactment.",
      "source_ids": [
        "m17-c62-trenton-march30-agenda",
        "m17-c62-trenton-forum",
        "m17-c62-trenton-council-april2"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:preble-oh-17",
      "jurisdiction": {
        "county": "Preble County",
        "municipality": null,
        "state": "oh"
      },
      "result": "selected_official_content",
      "scope": "The selected original preliminary discussion describes a Jefferson Township property and does not independently bind the inherited Monroe Township proposal. A preliminary discussion, intermediate recommendation and private withdrawal account are not a general County restriction or a read final site disposition.",
      "source_ids": [
        "m17-c62-preble-may15-minutes",
        "m17-c62-preble-agenda-index"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:athens-township-oh-17",
      "jurisdiction": {
        "county": "Athens County",
        "municipality": "Athens Township",
        "state": "oh"
      },
      "result": "selected_official_content",
      "scope": "The selected original Township bodies describe administration, recurring meetings and road work. They do not independently supply the reported executed computing pause. City of Athens jurisdiction, private accounts and similarly named municipalities are not substituted for the exact Township instrument or property eligibility.",
      "source_ids": [
        "m17-c62-athens-township-home",
        "m17-c62-athens-township-meetings",
        "m17-c62-athens-township-projects"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:dover-athens-oh-17",
      "jurisdiction": {
        "county": "Athens County",
        "municipality": "Dover Township",
        "state": "oh"
      },
      "result": "source_access_limited",
      "scope": "No exact current official Dover Township Athens County instrument was read in this bounded discovery. A Pennsylvania zoning proposal and the separate Tuscarawas County Ohio zoning code do not govern this subject. A private claim about zoning authority or possible voting is not certified law.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:ravenna-oh-17",
      "jurisdiction": {
        "county": "Portage County",
        "municipality": "Ravenna",
        "state": "oh"
      },
      "result": "selected_official_content",
      "scope": "The original April 20 Council minute page records Ordinance 2026 067 adoption and a one year pause on approval of new data centers. The executed instrument, exact effective trigger and endpoint were not read. The minutes discuss an unnamed existing mining use separately, so no automatic shutdown or exact Harner application disposition is inferred.",
      "source_ids": [
        "m17-c62-ravenna-april20-minutes"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:lordstown-oh-17",
      "jurisdiction": {
        "county": "Trumbull County",
        "municipality": "Lordstown",
        "state": "oh"
      },
      "result": "selected_official_content",
      "scope": "The complete original October 20 slip opinion denies Bristolville mandamus relief because its preliminary site review did not establish a right to a permit under prior law. It records the June 15 extension for 180 days without an exact new endpoint printed here. The existing earlier Lordstown pause context remains unduplicated. Neither this case nor Foxconn manufacturing statements establish Stargate eligibility or closure.",
      "source_ids": [
        "m17-c62-lordstown-april6-council",
        "m17-c62-lordstown-original-opinion"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:new-brunswick-nj-17",
      "jurisdiction": {
        "county": "Middlesex County",
        "municipality": "New Brunswick",
        "state": "nj"
      },
      "result": "source_access_limited",
      "scope": "The original City body remains held after the unavailable robots response. Private accounts of removing a computing component from a redevelopment plan do not independently establish a City wide ban, current physical closure or read exact final instrument.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:monroe-gloucester-nj-17",
      "jurisdiction": {
        "county": "Gloucester County",
        "municipality": "Monroe Township",
        "state": "nj"
      },
      "result": "selected_official_content",
      "scope": "The original April 22 Council minutes and Mayor report record approval of Ordinances O20 and O25. The actual PDF bodies concern computing despite unrelated titles on the current ordinance index. Both copies retain blank execution fields and conditional effect tied to publication. The May 12 application was deemed incomplete rather than denied on its merits. Current court disposition and exact legal force remain unverified.",
      "source_ids": [
        "m17-c62-monroe-may12-finalminutes",
        "m17-c62-monroe-april22-finalminutes",
        "m17-c62-monroe-ordinance20-linked",
        "m17-c62-monroe-ordinance25-linked",
        "m17-c62-monroe-planning-index",
        "m17-c62-monroe-ordinances-index"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:montvale-nj-17",
      "jurisdiction": {
        "county": "Bergen County",
        "municipality": "Montvale",
        "state": "nj"
      },
      "result": "selected_official_content",
      "scope": "The complete original Borough notice describes a conditional affordable housing settlement amendment with a KPMG site computing alternative and future judicial fairness review. It does not independently enact a general data center ban, complete facility zoning or establish commissioned service. Court scheduling is not approval of the proposed settlement.",
      "source_ids": [
        "m17-c62-montvale-observed-notice"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:merom-in-18",
      "jurisdiction": {
        "county": "Sullivan County",
        "municipality": "Merom",
        "state": "in"
      },
      "result": "source_access_limited",
      "scope": "No exact current local executed computing restriction was read. An unread issuer announcement, power supply contract or separate county project does not establish local law, property eligibility or absence of rules.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:indianapolis-in-18",
      "jurisdiction": {
        "county": "Marion County",
        "municipality": "Indianapolis",
        "state": "in"
      },
      "result": "source_access_limited",
      "scope": "A provider proposal and private reports of policy revision are not an independently read City instrument. The exact current local pause, definition, exemptions and individual application eligibility remain unverified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:bristol-in-18",
      "jurisdiction": {
        "county": "Elkhart County",
        "municipality": "Bristol",
        "state": "in"
      },
      "result": "selected_official_content",
      "scope": "The original work session describes proposed DPUD improvements and discussion, without independently supplying a complete adopted instrument. Mixed use rezoning and the older Province computing identity remain separate. Project portal assurances do not enact municipal law.",
      "source_ids": [
        "m18-c63-bristol-worksession"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:fulton-in-18",
      "jurisdiction": {
        "county": "Fulton County",
        "municipality": null,
        "state": "in"
      },
      "result": "selected_official_content",
      "scope": "All twelve February 10 scanned minute pages show a six to one recommendation for a twelve month pause and a separate seven to zero committee recommendation. February 16 says no ordinance vote that evening. Original March 2 recorded minute page one records adoption of ordinance03022026by two votes to one. Exact instrument exceptions, legal commencement, publication and endpoint remain unread; the recorder stamp is not enactment.",
      "source_ids": [
        "m18-c63-fulton-feb10-minutes",
        "m18-c63-fulton-feb16-minutes",
        "m18-c63-fulton-march2-minutes",
        "m18-c63-fulton-oct26-agenda",
        "m18-c63-fulton-apc-oct26"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:jefferson-in-18",
      "jurisdiction": {
        "county": "Jefferson County",
        "municipality": null,
        "state": "in"
      },
      "result": "selected_official_content",
      "scope": "The selected County home and buffer notice do not independently establish an executed computing pause, exact site eligibility or physical computing service. County planning, military property history and general buffer procedures are distinct.",
      "source_ids": [
        "m18-c63-jefferson-home"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:greensburg-in-18",
      "jurisdiction": {
        "county": "Decatur County",
        "municipality": "Greensburg",
        "state": "in"
      },
      "result": "selected_official_content",
      "scope": "All four original signed minute scans were actually viewed. A tax abatement and revitalization area action is not a computing ban or final facility permission. The exact underlying resolution, Jumping Bison subject and separate County restriction remain unverified. City and County authority are not merged.",
      "source_ids": [
        "m18-c63-greensburg-dec10-2024",
        "m18-c63-greensburg-council-index"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:merrillville-in-18",
      "jurisdiction": {
        "county": "Lake County",
        "municipality": "Merrillville",
        "state": "in"
      },
      "result": "selected_official_content",
      "scope": "Original signed July 14 Council minute pages sixteen and seventeen record a seven to zero extension until January 1, 2028 at twelve PM. The earlier December 31 suggestion and older Town narrative June 2026 through May 2027 term are not silently substituted for that final motion. Exact current legal force, original exceptions and individual property eligibility remain unverified.",
      "source_ids": [
        "m18-c63-merrillville-datacenters",
        "m18-c63-merrillville-july14-council",
        "m18-c63-merrillville-meetings"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:frankfort-in-18",
      "jurisdiction": {
        "county": "Clinton County",
        "municipality": "Frankfort",
        "state": "in"
      },
      "result": "source_access_limited",
      "scope": "The exact original packets remained unread during a bounded transport hold. An indexed special exception and zoning request do not independently establish a general City pause, final legal eligibility or commissioned computing.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:washington-in-18",
      "jurisdiction": {
        "county": "Daviess County",
        "municipality": "Washington",
        "state": "in"
      },
      "result": "selected_official_content",
      "scope": "The original City home describes municipal notices without an independently read computing instrument or final Outrigger disposition. Private cancellation reports, proposed service letters and tax exemption subjects are not a City wide computing prohibition or an accomplished closure.",
      "source_ids": [
        "m18-c63-washington-home"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:eagle-creek-in-18",
      "jurisdiction": {
        "county": "Lake County",
        "municipality": "Eagle Creek Township",
        "state": "in"
      },
      "result": "source_access_limited",
      "scope": "The original County discussion does not supply an executed Eagle Creek Township computing restriction, exact jurisdictional authority or property eligibility. The County fiscal audit is unrelated to computing effects. No exact Township instrument was located and read in this bounded review.",
      "source_ids": [
        "m18-c63-lake-april14-minutes"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:chesterton-in-18",
      "jurisdiction": {
        "county": "Porter County",
        "municipality": "Chesterton",
        "state": "in"
      },
      "result": "selected_official_content",
      "scope": "Withdrawal of the named PUD and annexation petitions is not a general municipal computing ban, final current use of the property or physical computing closure. The selected minute record does not independently establish an executed current computing rule or later application disposition.",
      "source_ids": [
        "m18-c63-chesterton-june10-2024"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:charlestown-in-18",
      "jurisdiction": {
        "county": "Clark County",
        "municipality": "Charlestown",
        "state": "in"
      },
      "result": "selected_official_content",
      "scope": "The selected original hosted proposal materials contain design assurances, forecasts and conflicting three and five MW scenarios. These are not municipal legal limits, measured performance, final permission or an enacted pause. An unnamed tenant is not assigned a provider role.",
      "source_ids": [
        "m18-c63-charlestown-planning",
        "m18-c63-charlestown-forum",
        "m18-c63-charlestown-impacts"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:plainfield-in-18",
      "jurisdiction": {
        "county": "Hendricks County",
        "municipality": "Plainfield",
        "state": "in"
      },
      "result": "source_access_limited",
      "scope": "The original Town FAQ remains unread after the unavailable robots response. Provider specifications, in service utility text and planned Indy phases are not a municipal instrument, exact property eligibility or computing service.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:pittsboro-in-18",
      "jurisdiction": {
        "county": "Hendricks County",
        "municipality": "Pittsboro",
        "state": "in"
      },
      "result": "selected_official_content",
      "scope": "Original September 22 minute text and October 27 agenda describe general landscaping amendment proceedings and possible recommendation choices. These are not a read final computing specific ban or final facility permission. Private resident names and addresses are excluded, and general industrial concerns are not assigned to an exact Vantage property.",
      "source_ids": [
        "m18-c63-pittsboro-oct27-agenda1168-observed",
        "m18-c63-pittsboro-agendas",
        "m18-c63-pittsboro-sept22-minutes-observed"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:wolcott-in-18",
      "jurisdiction": {
        "county": "White County",
        "municipality": "Wolcott",
        "state": "in"
      },
      "result": "source_access_limited",
      "scope": "No exact original current Town or County computing restriction was located and read in this bounded review. Project design, no incentive claims, noise limits and tax savings forecasts do not independently enact law or certify property eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:beacon-westline-dove-creek-san-angelo-tx-19",
      "jurisdiction": {
        "county": "Tom Green County",
        "municipality": null,
        "state": "tx"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:soluna-project-ellen-rio-hondo-tx-19",
      "jurisdiction": {
        "county": "Cameron County",
        "municipality": "Rio Hondo",
        "state": "tx"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:soluna-project-fei-childress-tx-19",
      "jurisdiction": {
        "county": "Childress County",
        "municipality": "Childress",
        "state": "tx"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:soluna-project-grace-silverton-tx-19",
      "jurisdiction": {
        "county": "Briscoe County",
        "municipality": "Silverton",
        "state": "tx"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:stargate-abilene-tx-19",
      "jurisdiction": {
        "county": "Taylor County",
        "municipality": "Abilene",
        "state": "tx"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:switch-the-rock-round-rock-tx-19",
      "jurisdiction": {
        "county": "Williamson County",
        "municipality": "Round Rock",
        "state": "tx"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:tesla-cortex-2-giga-texas-austin-tx-19",
      "jurisdiction": {
        "county": "Travis County",
        "municipality": null,
        "state": "tx"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:tract-caldwell-valley-uhland-tx-19",
      "jurisdiction": {
        "county": "Caldwell County",
        "municipality": "Uhland",
        "state": "tx"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:diversified-longhorn-pad-a-horton-township-elk-pa-19",
      "jurisdiction": {
        "county": "Elk County",
        "municipality": "Horton Township",
        "state": "pa"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:ecp-york-2-energy-center-data-center-peach-bottom-york-pa-19",
      "jurisdiction": {
        "county": "York County",
        "municipality": "Peach Bottom Township",
        "state": "pa"
      },
      "result": "selected_official_content",
      "scope": "The complete original Township page labels its May 21, 2026 data center ordinance a draft, says it was submitted for County review and expressly says no final action has been taken. This is a municipal policy account rather than an exact York 2 computing project disposition. A working gas power plant is not commissioned computing, and a draft ordinance does not establish approval, current construction or a legal prohibition. The linked complete draft remains unread. This bounded instrument review does not certify comprehensive current law, a general computing ban, exact legal effect or site eligibility.",
      "source_ids": [
        "m19-c64gov-38c373c44e1b"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:flexential-allentown-data-center-abe01-pa-19",
      "jurisdiction": {
        "county": "Lehigh County",
        "municipality": "Allentown",
        "state": "pa"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:flexential-philadelphia-collegeville-phl01-pa-19",
      "jurisdiction": {
        "county": "Montgomery County",
        "municipality": "Collegeville",
        "state": "pa"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:iron-city-wells-karthaus-township-clearfield-pa-19",
      "jurisdiction": {
        "county": "Clearfield County",
        "municipality": "Karthaus Township",
        "state": "pa"
      },
      "result": "selected_official_content",
      "scope": "Selected original May 28, 2025 County agenda pages five and six identify Iron City Wells and a new DEP air authorization for Iron City number one Power Generator and Compute Center in Karthaus Township. This supports a listed computing proposal. The separately listed Beccaria number two and Woodward number three projects are not merged. The agenda is a prospective meeting record and does not establish an accomplished County vote, current permit disposition, commissioned computing or actual generator operation. The original later Pennsylvania Bulletin remains held by robots restrictions. This bounded instrument review does not certify comprehensive current law, a general computing ban, exact legal effect or site eligibility.",
      "source_ids": [
        "m19-c64gov-80e564125a9f"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:mudiita-ransom-township-lackawanna-pa-19",
      "jurisdiction": {
        "county": "Lackawanna County",
        "municipality": "Ransom Township",
        "state": "pa"
      },
      "result": "selected_official_content",
      "scope": "The complete original Township data center document index names Scranton Materials zoning and exhibit submissions. The index does not independently establish the exact inherited Mudiita property or legal identity, present computing stage or a current final outcome. Private accounts of a land purchase and lack of plans are not adopted. A separate Scranton Materials application, Township wide policy and Mudiita proposal are not merged. This bounded instrument review does not certify comprehensive current law, a general computing ban, exact legal effect or site eligibility.",
      "source_ids": [
        "m19-c64gov-2fdf30b0beff"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:muncy-data-center-lycoming-county-pa-19",
      "jurisdiction": {
        "county": "Lycoming County",
        "municipality": "Muncy Township",
        "state": "pa"
      },
      "result": "selected_official_content",
      "scope": "The complete retained original Township notice schedules a November 4, 2026 hearing at seven PM on proposed Data Center Ordinance 2026 01 and lists earlier resolutions and review meetings. This retains municipal policy context without independently deciding the exact inherited Muncy computing application. A private deemed approval account is not a read final official disposition. The new request remained held by unavailable robots, so the retained capture keeps its original October 23 retrieval time and is not recertified. The future hearing is not an accomplished vote or permit. This bounded instrument review does not certify comprehensive current law, a general computing ban, exact legal effect or site eligibility.",
      "source_ids": [
        "m19-c64gov-4a4f959e11be"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:nova-energy-cryptomine-frenchcreek-venango-county-pa-19",
      "jurisdiction": {
        "county": "Venango County",
        "municipality": "Frenchcreek Township",
        "state": "pa"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:pa-data-center-partners-granville-township-mifflin-pa-19",
      "jurisdiction": {
        "county": "Mifflin County",
        "municipality": "Granville Township",
        "state": "pa"
      },
      "result": "selected_official_content",
      "scope": "The complete original Township project index and five page applicant narrative identify the Granville computing proposal and its conditional use submission. This supports a listed proposal. The original signed July 16, 2026 letter returns the submission as incomplete for a missing traffic study certification and requests refiling; this is not a merits denial or physical closure. Original ordinance page one and signed attestation page twenty one establish the separate September 28 ordinance adoption, without a claim that all legal provisions were read. The official October 26 appeal notice remains prospective. Applicant compliance assertions and infrastructure forecasts are not independently verified performance or final permission. Developer and Developers wording variants in the official index and notice are retained without changing roles. This bounded instrument review does not certify comprehensive current law, a general computing ban, exact legal effect or site eligibility.",
      "source_ids": [
        "m19-c64gov-6d9478cd513f",
        "m19-c64gov-4baf3a092e1a",
        "m19-c64gov-e6204f4112b0",
        "m19-c64gov-5778bede95eb",
        "m19-c64gov-0d3fd93ccc2b"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:prospect-rd-misty-hollow-forward-township-butler-pa-19",
      "jurisdiction": {
        "county": "Butler County",
        "municipality": "Forward Township",
        "state": "pa"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:slate-belt-holdings-upper-mount-bethel-northampton-pa-19",
      "jurisdiction": {
        "county": "Northampton County",
        "municipality": "Upper Mount Bethel Township",
        "state": "pa"
      },
      "result": "selected_official_content",
      "scope": "The complete original six page posted memorandum names Slate Belt Holdings and a proposed data center campus. This supports a listed proposal. Its date and signature fields remain blank, and community payments, rule changes, litigation resolution, cooling commitments and later approvals remain conditional. Selected original draft ordinance pages one through three and thirty one retain a blank adoption day and execution fields. The independent October 8 RPL East letter concerns a separate property and is not assigned to this Slate Belt campus. The original July filing packet returned HTTP 404. No current final ordinance, executed agreement, construction, service or measured benefit is established by these bodies. This bounded instrument review does not certify comprehensive current law, a general computing ban, exact legal effect or site eligibility.",
      "source_ids": [
        "m19-c64gov-1e33513dcde2",
        "m19-c64gov-f662cc6c579b",
        "m19-c64gov-cb15812b0df1",
        "m19-c64gov-b6f9605d0261"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:stonebridge-powder-mills-lawrence-county-pa-19",
      "jurisdiction": {
        "county": "Lawrence County",
        "municipality": "Mahoning Township",
        "state": "pa"
      },
      "result": "selected_official_content",
      "scope": "The complete original Township author page contains a past September 15, 2026 notice for an SS Penn appeal concerning its preliminary plan and a June 4 zoning letter for Powder Mill Works property. The selected notice does not identify a final decision or independently describe a computing use. The exact Stonebridge relationship and current computing stage remain unverified. A preliminary plan, promised past vote, parcel ownership account and similarly named properties are not final facility permission, accomplished hearing outcome or physical operation. This bounded instrument review does not certify comprehensive current law, a general computing ban, exact legal effect or site eligibility.",
      "source_ids": [
        "m19-c64gov-ffa3a465f21f"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:suncap-stowe-township-allegheny-county-pa-19",
      "jurisdiction": {
        "county": "Allegheny County",
        "municipality": "Stowe Township",
        "state": "pa"
      },
      "result": "selected_official_content",
      "scope": "All three original signed August 11, 2026 Council minute scans were viewed. The Solicitor describes a social media rumor about an anticipated data center discussion, and officials distinguish the actual meeting subject. Residents mention SunCap, potential protection of future generations and transparency around the ordinance, while officials describe separate approval requirements. This does not independently establish a submitted SunCap computing application, final project cancellation, physical closure or current service. Current general meeting dates are not computing hearings. Private resident names, addresses, unrelated complaints and municipal financial details are excluded. The missing older October PDF is not treated as a source body. This bounded instrument review does not certify comprehensive current law, a general computing ban, exact legal effect or site eligibility.",
      "source_ids": [
        "m19-c64gov-9164b3d7898f",
        "m19-c64gov-b1600f6d7948",
        "m19-c64gov-e1bb38b7a250"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:tron-usa-ai-campus-titus-station-cumru-berks-pa-19",
      "jurisdiction": {
        "county": "Berks County",
        "municipality": "Cumru Township",
        "state": "pa"
      },
      "result": "source_access_limited",
      "scope": "No exact original local computing instrument was located and read in this bounded review. The selected source access or discovery holds remain explicit. A provider service account, older technical sheet, private report, forecast or recurring meeting pattern does not establish a current local prohibition, exact legal force or property eligibility. No absence of local rules is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:beacon-calvert-al-20",
      "jurisdiction": {
        "county": "Mobile County",
        "municipality": null,
        "state": "al"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:1547-alohanap-kapolei-hi-20",
      "jurisdiction": {
        "county": "Honolulu County",
        "municipality": null,
        "state": "hi"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:cogent-pearl-city-waihona-hi-20",
      "jurisdiction": {
        "county": "Honolulu County",
        "municipality": null,
        "state": "hi"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:google-uh-west-oahu-cable-landing-station-kapolei-hi-20",
      "jurisdiction": {
        "county": "Honolulu County",
        "municipality": null,
        "state": "hi"
      },
      "result": "selected_official_content",
      "scope": "All six original DLNR memorandum text pages were read. The April 24, 2026 document recommends a submerged cable easement and identifies Humuhumu Services and Starfish Infrastructure with a University West Oahu telecommunications facility. Recommendation and blank approval fields do not establish an accomplished Board decision, current construction or computing service. A separate conservation application and earlier environmental accounts are not read final decisions. Google parent identity, cable landing and physical computing are not merged. This instrument review does not certify complete current law, property eligibility or an accomplished blanket prohibition.",
      "source_ids": [
        "m20-c65gov-0a1061497a11"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:hawaiiantel-endeavor-honolulu-hi-20",
      "jurisdiction": {
        "county": "Honolulu County",
        "municipality": null,
        "state": "hi"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:hawaiiantel-kawaihae-hi-20",
      "jurisdiction": {
        "county": "Hawaii County",
        "municipality": null,
        "state": "hi"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:hawaiki-cable-kapolei-hi-20",
      "jurisdiction": {
        "county": "Honolulu County",
        "municipality": null,
        "state": "hi"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:servpac-mtp-building-1-mililani-hi-20",
      "jurisdiction": {
        "county": "Honolulu County",
        "municipality": null,
        "state": "hi"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:servpac-mtp2-mililani-hi-20",
      "jurisdiction": {
        "county": "Honolulu County",
        "municipality": null,
        "state": "hi"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:uh-cancer-center-medai-core-honolulu-hi-20",
      "jurisdiction": {
        "county": "Honolulu County",
        "municipality": null,
        "state": "hi"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:uh-information-technology-center-honolulu-hi-20",
      "jurisdiction": {
        "county": "Honolulu County",
        "municipality": null,
        "state": "hi"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:uh-mhpcc-kihei-hi-20",
      "jurisdiction": {
        "county": "Maui County",
        "municipality": null,
        "state": "hi"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:tract-altoona-ia-20",
      "jurisdiction": {
        "county": "Polk County",
        "municipality": "Altoona",
        "state": "ia"
      },
      "result": "selected_official_content",
      "scope": "The complete original City of Altoona economic development account dated October 1, 2025 identifies the planned Tract campus and describes annexation, rezoning and a development agreement. This supports a listed proposal. Entitled land, projected capacity, jobs and tax benefits do not independently establish actual construction, current computing service, executed power delivery or an opening day. The denied or unavailable Tract company body was not copied from another host. This instrument review does not certify complete current law, property eligibility or an accomplished blanket prohibition.",
      "source_ids": [
        "m20-c65gov-32d54875524b"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:tract-norwalk-ia-20",
      "jurisdiction": {
        "county": null,
        "municipality": "Norwalk",
        "state": "ia"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:wahawk-power-waterloo-ia-20",
      "jurisdiction": {
        "county": "Black Hawk County",
        "municipality": "Waterloo",
        "state": "ia"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:beale-gardner-johnson-county-ks-20",
      "jurisdiction": {
        "county": "Johnson County",
        "municipality": "Gardner",
        "state": "ks"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:beale-project-pilot-de-soto-ks-20",
      "jurisdiction": {
        "county": "Johnson County",
        "municipality": "De Soto",
        "state": "ks"
      },
      "result": "selected_official_content",
      "scope": "The complete original City project page explicitly reports grading and early site preparation underway and conditional Phase 1 site plan approval. This supports site preparation reported, without certifying completed computing buildings, commissioned service or a first construction day. Older pending approval and 2027 delivery language remains separate from the updated account. The complete October 2 City notice reports Council approval of a second supplement on October 1. Forecast water demand, funding commitments and benefits are not actual usage, payments or measured effects. All ten original presentation text pages were read; its older plans and public proprietary footer do not establish current full permissions or a named tenant. This instrument review does not certify complete current law, property eligibility or an accomplished blanket prohibition.",
      "source_ids": [
        "m20-c65gov-40f2be8e17b4",
        "m20-c65gov-f3efa7ffe798",
        "m20-c65gov-b2cc7434c6aa"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:cloverleaf-bluestem-tonganoxie-ks-20",
      "jurisdiction": {
        "county": "Leavenworth County",
        "municipality": "Tonganoxie",
        "state": "ks"
      },
      "result": "selected_official_content",
      "scope": "The complete original project portal describes a conceptual data center proposal and states no formal requests have been filed, without a verified publication day. This supports a listed proposal without establishing current entitlement, construction or service. The complete original City notice describes a privately hosted Cloverleaf June 9, 2026 open house and expressly excludes a City presentation, agenda, decisions and City organized public comment. That prospective past notice does not establish an accomplished City vote, a new upcoming hearing or measured benefits. This instrument review does not certify complete current law, property eligibility or an accomplished blanket prohibition. The June 9 privately hosted open house notice expressly excludes City agenda and decisions; the notice is not proof the event occurred.",
      "source_ids": [
        "m20-c65gov-3c4b86883ca0"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:evolution-technology-bourbon-county-ks-20",
      "jurisdiction": {
        "county": "Bourbon County",
        "municipality": null,
        "state": "ks"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:kanza-park-flint-hills-emporia-ks-20",
      "jurisdiction": {
        "county": "Lyon County",
        "municipality": "Emporia",
        "state": "ks"
      },
      "result": "selected_official_content",
      "scope": "The complete original City overlay account identifies Kanza Park Place planned digital infrastructure and July 22, 2026 zoning actions, and expressly says no data center has been approved for construction. This supports a listed proposal without treating zoning as construction or service. The October 16 notice schedules a past October 21 guideline study session but does not establish its outcome. The separate November 3 City ballot proposes a general high impact computing ban subject to laws and court orders, rather than enacted law or an accomplished project denial. Full controlling resolution and court instruments remain unread after source transport holds. This instrument review does not certify complete current law, property eligibility or an accomplished blanket prohibition. The November 3 general City Question 2 is separately retained as a prospective ballot vote, subject to applicable laws and court orders. No exact polling clock, polling place or legal commencement is independently read.",
      "source_ids": [
        "m20-c65gov-4722ce5dadb3",
        "m20-c65gov-780984cb02c5",
        "m20-c65gov-a882bdcba2f1",
        "m20-c65gov-e5d4aeb5f8eb"
      ]
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:powertransitions-project-yardbird-ks-20",
      "jurisdiction": {
        "county": "Wyandotte County",
        "municipality": "Kansas City",
        "state": "ks"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-23",
      "id": "restriction-review:red-wolf-dcd-properties-project-red-wolf-ks-20",
      "jurisdiction": {
        "county": "Wyandotte County",
        "municipality": "Kansas City",
        "state": "ks"
      },
      "result": "source_access_limited",
      "scope": "The bounded review did not locate and read an exact current local computing restriction instrument. Selected access and discovery holds remain explicit. Provider services, research programs, future maintenance, broker marketing and private reports do not establish a general ban, pause, current legal force or absence of rules. No comprehensive current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:365datacenters-marlborough-ma-21",
      "jurisdiction": {
        "county": "Middlesex County",
        "municipality": "Marlborough",
        "state": "ma"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:aws-grafton-ma-21",
      "jurisdiction": {
        "county": "Worcester County",
        "municipality": "Grafton",
        "state": "ma"
      },
      "result": "selected_official_content",
      "scope": "The original August 10, 2026 Town planning materials list draft computing bylaws and proposed amendments, without an exact Amazon property decision. The selected October 26, 2026 main agenda lists an Amazon drone delivery discussion follow up, not a computing project hearing. Town policy drafts, another company land use, a recurring meeting and property acquisition reporting do not establish current exact computing construction, service, a local computing ban or an accomplished vote. Linked complete draft bylaw instruments remain unread. This instrument review does not establish comprehensive current law, exact property eligibility, executed full legal language or physical computing stage. The October 26 Amazon discussion is drone delivery, not computing. The August draft computing bylaw materials do not establish later enactment.",
      "source_ids": [
        "m21-c66gov-c6e6e3385459",
        "m21-c66gov-7528f0d30c94"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:aws-westborough-ma-21",
      "jurisdiction": {
        "county": "Worcester County",
        "municipality": "Westborough",
        "state": "ma"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:chestnut-river-holyoke-ma-21",
      "jurisdiction": {
        "county": "Hampden County",
        "municipality": "Holyoke",
        "state": "ma"
      },
      "result": "selected_official_content",
      "scope": "Selected original June 16, 2026 Council minute text records public discussion mentioning Chestnut River and a computing proposal, while officials distinguish press discussion from a filed application. The same minutes record a separate general computing ban vote by nine to four and a specific MGHPCC amendment. This retains reported proposal and municipal policy context without independently resolving exact present Chestnut River property eligibility, construction, operation or physical closure. Private resident identities, addresses, medical accounts and unsupported technical allegations are excluded. The original code route remains a transport hold, and a privately reported later mayoral signature was not independently read. The meeting page displays an April 29 file date that conflicts with the June 16 minute heading; no publication day is repaired or inferred. This instrument review does not establish comprehensive current law, exact property eligibility, executed full legal language or physical computing stage. The final nine to four Council vote and the MGHPCC amendment are separate from the failed committee moratorium and the referred study committee. The April 29 wrapper date and June 16 minute heading conflict remains explicit.",
      "source_ids": [
        "m21-c66gov-f70408c4fb0b",
        "m21-c66gov-860893e94940"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:expedient-boston-medford-ma-21",
      "jurisdiction": {
        "county": "Middlesex County",
        "municipality": "Medford",
        "state": "ma"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:lumen-boston-cambridge-ma-21",
      "jurisdiction": {
        "county": "Middlesex County",
        "municipality": "Cambridge",
        "state": "ma"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:markley-boston-summer-street-ma-21",
      "jurisdiction": {
        "county": "Suffolk County",
        "municipality": "Boston",
        "state": "ma"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:markley-lowell-ma-21",
      "jurisdiction": {
        "county": "Middlesex County",
        "municipality": "Lowell",
        "state": "ma"
      },
      "result": "selected_official_content",
      "scope": "The complete original current provider facility and home bodies name Lowell colocation and disaster recovery service. This supports existing service with expansion separate. All six original September 16, 2024 City staff memorandum text pages were read; they request clarification of proposed equipment, screening progress and hazardous substance practices and retain applicant statements about emissions and stormwater. Those are attributed permit review accounts rather than measured harm or proof that all expansion work is complete. The distinct later State appeal recommendation remains unread after a robots transport hold. This instrument review does not establish comprehensive current law, exact property eligibility, executed full legal language or physical computing stage.",
      "source_ids": [
        "m21-c66gov-53fa44da3741"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:mghpcc-holyoke-ma-21",
      "jurisdiction": {
        "county": "Hampden County",
        "municipality": "Holyoke",
        "state": "ma"
      },
      "result": "selected_official_content",
      "scope": "The complete original institutional overview explicitly describes computing and storage resources serving researchers and ongoing virtual experiments at the Holyoke facility. The complete directions body identifies the named institution and equipment access. This supports institution reported computing service without exporting a new address, measured computation count, energy result or opening day. A distinct proposed commercial facility and the municipal policy debate are not existing MGHPCC closure. This instrument review does not establish comprehensive current law, exact property eligibility, executed full legal language or physical computing stage. The final nine to four Council vote and the MGHPCC amendment are separate from the failed committee moratorium and the referred study committee. The April 29 wrapper date and June 16 minute heading conflict remains explicit.",
      "source_ids": [
        "m21-c66gov-f70408c4fb0b",
        "m21-c66gov-860893e94940"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:servistar-westfield-ma-21",
      "jurisdiction": {
        "county": "Hampden County",
        "municipality": "Westfield",
        "state": "ma"
      },
      "result": "selected_official_content",
      "scope": "The original City archive and selected one page October 13, 2026 agenda identify Servistar Realties requesting extension of the computing permit originally granted October 19, 2021. This supports a proposal documented in the City agenda without independently establishing an accomplished extension vote, current permit force, actual construction or computing service. The private later denial account is not substituted for unread official minutes. The much larger original older application exceeded the bounded capture limit and was not read. No general pause or permit deadline becomes physical shutdown. This instrument review does not establish comprehensive current law, exact property eligibility, executed full legal language or physical computing stage.",
      "source_ids": [
        "m21-c66gov-60aa93a746d9",
        "m21-c66gov-dd8f8ad41e83"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:centra-portland-me-21",
      "jurisdiction": {
        "county": "Cumberland County",
        "municipality": "Portland",
        "state": "me"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:liquidcool-loring-afb-me-21",
      "jurisdiction": {
        "county": "Aroostook County",
        "municipality": "Limestone",
        "state": "me"
      },
      "result": "selected_official_content",
      "scope": "All five original State hosted testimony text pages were read. The document bears March 11, 2026 and a resubmission heading for LD713 with earlier LD307 wording. It identifies Loring LiquidCool, raises potential utility rate and environmental concerns and suggests Loring as a policy case study. These are attributed residents statements, not an agency technical finding, actual enacted exemption, commissioned computing or an exact current physical stage. The attachment repeats third party project and engineering accounts that are not independently adopted. Private author identity and address are excluded. This instrument review does not establish comprehensive current law, exact property eligibility, executed full legal language or physical computing stage.",
      "source_ids": [
        "m21-c66gov-540f49f8472b"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:millcompute-bates-mill-lewiston-me-21",
      "jurisdiction": {
        "county": "Androscoggin County",
        "municipality": "Lewiston",
        "state": "me"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:nautilus-millinocket-me-21",
      "jurisdiction": {
        "county": "Penobscot County",
        "municipality": "Millinocket",
        "state": "me"
      },
      "result": "selected_official_content",
      "scope": "The complete original EPA June 9, 2025 account concerns cleanup funding and redevelopment of the former paper mill. It does not independently name the exact Nautilus computing proposal or establish commissioned computing. Grant selection is not money spent or building completion, and past paper mill contamination and closure are not a finding about a computing operation. The exact current Nautilus computing stage and opening day remain held. This instrument review does not establish comprehensive current law, exact property eligibility, executed full legal language or physical computing stage.",
      "source_ids": [
        "m21-c66gov-7c2231084b8d"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:new-england-energy-sanford-woods-dc-me-21",
      "jurisdiction": {
        "county": "York County",
        "municipality": "Sanford",
        "state": "me"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:sentinel-jay-me-21",
      "jurisdiction": {
        "county": "Franklin County",
        "municipality": "Jay",
        "state": "me"
      },
      "result": "selected_official_content",
      "scope": "The complete original September 16, 2026 Town warrant post describes November 3 ballot questions for mobile home rent stabilization and new commercial ground mounted solar facilities. Those questions are not computing restrictions or a Sentinel computing hearing. A generic Town election, the prior mill closure and private accounts of Sentinel withdrawal do not independently resolve the exact current computing stage, legal outcome or physical closure. This instrument review does not establish comprehensive current law, exact property eligibility, executed full legal language or physical computing stage. The November 3 solar and mobile home questions do not become a computing ban or computing ballot date.",
      "source_ids": [
        "m21-c66gov-74032eedbe49"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:wiscasset-proposed-me-21",
      "jurisdiction": {
        "county": "Lincoln County",
        "municipality": "Wiscasset",
        "state": "me"
      },
      "result": "selected_official_content",
      "scope": "Complete original election notice and proposed pause text, plus the complete one page warrant text and scan, retain the November 3, 2026 prospective Article4 vote from eight AM to eight PM at Wiscasset Community Center. The signed warrant date and a separate handwritten certification date do not establish ordinance adoption. The pause would take effect upon adoption, with a six month term and stated exceptions, but no adoption or expiry is calculated. This is general municipal policy rather than independently verified current Old Ferry Road computing permission, construction, cancellation or commissioned service. The already retained calendar vote and proposed restriction are not duplicated. This instrument review does not establish comprehensive current law, exact property eligibility, executed full legal language or physical computing stage. The existing November 3 computing pause vote remains retained once. The signed warrant, proposed conditional effect and term are not an accomplished adoption or a calculated endpoint.",
      "source_ids": [
        "m21-c66gov-ff3443f9fe8d",
        "m21-c66gov-85433cb8de2d",
        "m21-c66gov-5d00e36cd5f8"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:dartmouth-college-data-center-lebanon-nh-21",
      "jurisdiction": {
        "county": "Grafton County",
        "municipality": "Lebanon",
        "state": "nh"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:firstlight-keene-nh-21",
      "jurisdiction": {
        "county": "Cheshire County",
        "municipality": "Keene",
        "state": "nh"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:firstlight-lebanon-nh-21",
      "jurisdiction": {
        "county": "Grafton County",
        "municipality": "Lebanon",
        "state": "nh"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:locke-road-micro-data-center-concord-nh-21",
      "jurisdiction": {
        "county": "Merrimack County",
        "municipality": "Concord",
        "state": "nh"
      },
      "result": "selected_official_content",
      "scope": "The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day. This instrument review does not establish comprehensive current law, exact property eligibility, executed full legal language or physical computing stage. The privately reported November 18 follow up remains unverified in the selected official records and is not added.",
      "source_ids": [
        "m21-c66gov-8445e76fee44",
        "m21-c66gov-03ee4f6e207c"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:granite-shore-merrimack-station-bow-nh-21",
      "jurisdiction": {
        "county": "Merrimack County",
        "municipality": "Bow",
        "state": "nh"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Selected access and discovery limits remain explicit. Provider service, an inherited place name, a resource title or a private account does not establish a current general computing prohibition, exact legal effect or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:amazon-data-services-reno-storey-county-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Sparks",
        "state": "nv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:apple-reno-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Sparks",
        "state": "nv"
      },
      "result": "selected_official_content",
      "scope": "Selected original July 2024 GOED packet pages publish an Apple letter describing existing Reno data center operations and a separate expansion request. The account identifies Washoe County, while broader Nevada summaries use regional county groupings. The letter establishes an attributed historical service account without certifying the current completion of the expansion or independently crosswalking every regional building. The forecast expansion month and an incentive application are not commissioned capacity. The original 2026 environmental report exceeded the bounded capture limit and was not read. No exact first opening day or present physical stage is adopted. This bounded review does not certify complete current law, exact property eligibility, all exceptions or executed full legal instruments.",
      "source_ids": [
        "m22-c67gov-8abf8f47fe54"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:blusky-ai-wells-elko-county-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Wells",
        "state": "nv"
      },
      "result": "selected_official_content",
      "scope": "The complete seven page May 12, 2026 revised Legislative Counsel Bureau background memorandum lists BluSky AI in Elko County with a letter of intent. Its roster is explicitly compiled from private mapping and selected external accounts, is current as of March 2026 and is not certified complete. The original issuer letter and exact Wells site application were not independently read. A government hosted derivative roster and letter of intent do not establish current exact computing construction, final permission or service. General statewide research and utility projections are not site findings. This bounded review does not certify complete current law, exact property eligibility, all exceptions or executed full legal instruments.",
      "source_ids": [
        "m22-c67gov-bde09ed7b0ec"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:centra-rno2-keystone-reno-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Reno",
        "state": "nv"
      },
      "result": "selected_official_content",
      "scope": "The complete original City FAQ updated July 28, 2026 explicitly describes construction and footing inspections at the Keystone project, including concrete pours and later compaction documentation. This supports the City documented construction stage without certifying current commissioning, computing load or completion. The City reports January 15, 2025 conditional use approval and distinguishes later building review from that entitlement. Its responses to resident questions about notice, noise, cooling, generators and utilities remain attributed City accounts. Existing Keystone concern documentation is retained without creating a duplicate episode or declaring a violation. This bounded review does not certify complete current law, exact property eligibility, all exceptions or executed full legal instruments. The separate current City development page reports a final June 1, 2026 moratorium on new data center conditional use applications through August 31, 2027 or earlier adequate regulations. Existing Keystone construction is not physical closure and the term is not a future hearing day.",
      "source_ids": [
        "m22-c67gov-c61f59a3ebcd",
        "m22-c67gov-14f6e4faf1fd"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:colovore-reno-1-storey-county-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "McCarran",
        "state": "nv"
      },
      "result": "selected_official_content",
      "scope": "The original NDEP permit identifies Colovore Reno 1 at 100 Italy Drive in McCarran. The current provider roster describes RNO01 Sparks and RNO02 Reno as under construction, while its Reno market page describes RNO01 halls as sold out and RNO02 as preleasing. This pass does not independently crosswalk the Sparks marketing component to the inherited McCarran permit premises. Sold capacity, preleasing and an air quality operating permit do not establish commissioned computing. Neither a private opening account nor a marketing city name is substituted for exact current service evidence. This bounded review does not certify complete current law, exact property eligibility, all exceptions or executed full legal instruments.",
      "source_ids": [
        "m22-c67gov-2dfb5c2efbb9"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:fleet-data-centers-storey-county-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "McCarran",
        "state": "nv"
      },
      "result": "selected_official_content",
      "scope": "Selected original Storey County packet pages describe the NVPRU applicants proposed data center campus at 2300 Peru Drive and a height request. The staff report records a February 6, 2025 Planning Commission recommendation and a proposed Board motion, rather than an independently read final Board vote. This pass does not establish the exact crosswalk between those older parcels and all components of the inherited combined Fleet South Valley and Peru Ridge record. Private groundbreaking accounts and proposed private generation do not independently establish current exact computing construction or service. No applicant or ownership role is changed. This bounded review does not certify complete current law, exact property eligibility, all exceptions or executed full legal instruments.",
      "source_ids": [
        "m22-c67gov-177cf1a46a1d"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:flexential-las-vegas-downtown-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Las Vegas",
        "state": "nv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:flexential-las-vegas-north-las04-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "North Las Vegas",
        "state": "nv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:isp-net-las-vegas-fremont-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Las Vegas",
        "state": "nv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:monarch-data-center-yerington-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Yerington",
        "state": "nv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:oppidan-paradise-post-road-clark-county-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Paradise",
        "state": "nv"
      },
      "result": "selected_official_content",
      "scope": "The original County legislation page identifies a proposed warehouse data center on Post Road in Paradise, file WS25 0066, with Passed status and March 4, 2025 final action. The page names the applicant as Post Road Capital Real Estate Fund and its action detail is unavailable in the displayed history. The complete original attached staff review describes the Post Road design and preliminary conditions. It does not independently identify Oppidan as the current operating company. The exact corporate crosswalk, accomplished conditions and present physical stage remain held. A passed design review does not establish commissioned service or a current operating project. No ownership role is changed. This bounded review does not certify complete current law, exact property eligibility, all exceptions or executed full legal instruments.",
      "source_ids": [
        "m22-c67gov-512700bc7d68",
        "m22-c67gov-f7d65af9879e"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:sarcobatus-solar-scottys-junction-nye-county-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Scotty's Junction",
        "state": "nv"
      },
      "result": "selected_official_content",
      "scope": "Selected original County agenda and draft agreement pages describe Sarcobatus solar development and a request to schedule a hearing on a proposed development agreement. Adoption blanks and a proposed July 27, 2026 effective clause do not independently establish execution or legal commencement. The selected pages do not independently identify the exact distributed computing deployment, and solar approval does not establish computing construction or service. No draft hearing recommendation becomes an accomplished event or a future calendar entry. This bounded review does not certify complete current law, exact property eligibility, all exceptions or executed full legal instruments.",
      "source_ids": [
        "m22-c67gov-2d30a167a31d"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:switch-apex-industrial-park-north-las-vegas-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "North Las Vegas",
        "state": "nv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:switch-edge-1-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Las Vegas",
        "state": "nv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:switch-las-19-enterprise-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Enterprise",
        "state": "nv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:switch-las-vegas-10-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Las Vegas",
        "state": "nv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:switch-tahoe-reno-1-the-citadel-campus-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "McCarran",
        "state": "nv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:townsite-solar-2-boulder-city-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Boulder City",
        "state": "nv"
      },
      "result": "selected_official_content",
      "scope": "The original City parcel page marks its proposal withdrawn on July 6, 2026, while the BLM project page separately records the federal parcel proposal and a June 26, 2026 decision. The City main account records an appeal decision. The earlier independently reviewed federal appeal and stay concern remains retained, without a duplicate episode. These different parcels and procedural events do not independently establish computing closure, an open building, a final merits judgment or the current resolution of the stay. The selected withdrawal release link returned a redirect hold and was not followed through an alternate copy. The federal project page update date is not physical commencement. This bounded review does not certify complete current law, exact property eligibility, all exceptions or executed full legal instruments.",
      "source_ids": [
        "m22-c67gov-7617a96749d1",
        "m22-c67gov-7d4971831099",
        "m22-c67gov-b5f08b866f4d"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:vantage-nv1-storey-county-nv-22",
      "jurisdiction": {
        "county": null,
        "municipality": "McCarran",
        "state": "nv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:hanton-city-smithfield-ri-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Smithfield",
        "state": "ri"
      },
      "result": "selected_official_content",
      "scope": "Selected original Smithfield zoning packet pages describe a general proposed principal use definition and a proposed not permitted classification, with a May 5, 2026 hearing notice. They do not identify the exact Hanton City project. The staff memorandum bears March 16 while recounting a March 19 review; the conflict is retained without repairing publication or vote dates. A scheduled historical hearing and draft general policy do not establish an accomplished enactment, current project denial or physical closure. Accessory computing distinctions and conditional legal commencement are not replaced by a blanket site status. This bounded review does not certify complete current law, exact property eligibility, all exceptions or executed full legal instruments. The additional original May 5 agenda repeats the proposed general computing amendment with an April 29 posting day. It remains an agenda rather than a completed vote or complete executed ordinance; no current ban or exact project denial is certified.",
      "source_ids": [
        "m22-c67gov-f25e04692fa7",
        "m22-c67gov-4fcf80bb45cf"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:firstlight-williston-vt-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Williston",
        "state": "vt"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:powertransitions-vermont-yankee-vernon-vt-22",
      "jurisdiction": {
        "county": null,
        "municipality": "Vernon",
        "state": "vt"
      },
      "result": "selected_official_content",
      "scope": "The complete original Town redevelopment page describes nuclear decommissioning and historical reuse planning, including a plan not yet accepted as of October 1, 2021. It does not independently identify or approve a current PowerTransitions computing proposal. The Town nuclear shutdown date is not data center closure, and the projected nuclear cleanup completion is not computing construction or commissioning. Private discussions of possible reuse remain pointers until exact current original computing documentation is read. This bounded review does not certify complete current law, exact property eligibility, all exceptions or executed full legal instruments.",
      "source_ids": [
        "m22-c67gov-e5f98ad1a579"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:st-albans-data-center-vt-22",
      "jurisdiction": {
        "county": null,
        "municipality": "St. Albans",
        "state": "vt"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:tech-vault-south-burlington-vt-22",
      "jurisdiction": {
        "county": null,
        "municipality": "South Burlington",
        "state": "vt"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:uvm-vacc-south-burlington-vt-22",
      "jurisdiction": {
        "county": null,
        "municipality": "South Burlington",
        "state": "vt"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing restriction instrument was located and read in this bounded review. Provider service, a building code, private reporting, a passed forecast or an unavailable source does not establish current general computing legal force, exact property eligibility or absence of rules. No complete current law review is claimed.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:little-rock-23",
      "jurisdiction": {
        "county": "Pulaski County",
        "municipality": "Little Rock",
        "state": "ar"
      },
      "result": "selected_official_content",
      "scope": "The original October 20, 2026 City Board agenda lists a proposed six month hyperscale computing permitting and approval moratorium as item 24. It lists requested municipal impact studies, public disclosure and an administrative relief procedure. The agenda does not independently establish the completed vote, actual emergency adoption, signed instrument, exact legal commencement or a later future hearing. The past 6 p.m. meeting start is not an upcoming computing hearing or an item specific time. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": [
        "m23-92aa0e919cc5"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:guilford-23",
      "jurisdiction": {
        "county": "Guilford County",
        "municipality": null,
        "state": "nc"
      },
      "result": "selected_official_content",
      "scope": "The original County file 2026 439 full text identifies an October 15, 2026 public hearing and a proposed 180 day development approval pause. The displayed status is Held and its action history has zero records. The attached four page text recites an October 15 adoption and proposed April 12, 2027 endpoint, but no signed certification or independently displayed completed adoption action was read. This draft recital is not an accomplished adoption. The proposed scope includes the County planning jurisdiction, incidental subordinate server rooms and statutory project exemptions. Neither a private November 5 vote account nor the proposed endpoint becomes an official upcoming hearing. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": [
        "m23-adebbfe3e3f6",
        "m23-4a03a3782dc4"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:charlotte-23",
      "jurisdiction": {
        "county": "Mecklenburg County",
        "municipality": "Charlotte",
        "state": "nc"
      },
      "result": "source_access_limited",
      "scope": "The original City host was unavailable at robots. No FAQ, meeting notice or legislative agenda body was independently captured and read. Search indexed accounts of a future October 26 extension vote and a November 5 endpoint remain held rather than adopted as exact scheduled action or current legal force. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:prince-william-23",
      "jurisdiction": {
        "county": "Prince William County",
        "municipality": null,
        "state": "va"
      },
      "result": "source_access_limited",
      "scope": "The original County host was unavailable at robots. Indexed overlay district and filing deadline accounts were not adopted. An eligibility filing deadline is not a public hearing, and a district revision is not a blanket County computing ban. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:maricopa-23",
      "jurisdiction": {
        "county": "Maricopa County",
        "municipality": null,
        "state": "az"
      },
      "result": "source_access_limited",
      "scope": "Bounded original discovery did not locate and read an exact current computing agenda or executed restriction instrument. General filing schedules and recurring hearings are not specific computing events or actual adoption. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:santa-clara-city-23",
      "jurisdiction": {
        "county": "Santa Clara County",
        "municipality": "Santa Clara",
        "state": "ca"
      },
      "result": "source_access_limited",
      "scope": "The original City utility host was unavailable at robots. An indexed historical State proceeding is not a new City computing hearing, and a generic Planning Commission calendar is not an exact computing agenda. City and County jurisdictions remain distinct. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:cleveland-23",
      "jurisdiction": {
        "county": "Cleveland County",
        "municipality": null,
        "state": "nc"
      },
      "result": "source_access_limited",
      "scope": "Bounded original discovery did not locate and read an exact current County computing notice or executed restriction instrument. No private schedule, countywide ban or absence of rules is inferred. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:gaston-23",
      "jurisdiction": {
        "county": "Gaston County",
        "municipality": null,
        "state": "nc"
      },
      "result": "source_access_limited",
      "scope": "Bounded original discovery did not locate and read an exact current computing hearing or executed restriction instrument. An older government internal information technology relocation procurement is not a hyperscale project hearing or general computing ban. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:rockingham-23",
      "jurisdiction": {
        "county": "Rockingham County",
        "municipality": null,
        "state": "nc"
      },
      "result": "source_access_limited",
      "scope": "Bounded original discovery did not locate and read an exact current County computing notice or executed restriction instrument. General meetings, private claims and other similarly named jurisdictions are not substituted. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:stafford-23",
      "jurisdiction": {
        "county": "Stafford County",
        "municipality": null,
        "state": "va"
      },
      "result": "source_access_limited",
      "scope": "Bounded original discovery did not locate and read an exact current computing agenda or executed pause. Historical development standards and older project hearings do not establish a new 2026 hearing, current ban or physical site outcome. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:louisa-23",
      "jurisdiction": {
        "county": "Louisa County",
        "municipality": null,
        "state": "va"
      },
      "result": "source_access_limited",
      "scope": "Bounded original discovery did not locate and read an exact current computing hearing or executed restriction instrument. A generic application filing deadline is not a project hearing or accomplished enactment. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:aurora-23",
      "jurisdiction": {
        "county": null,
        "municipality": "Aurora",
        "state": "co"
      },
      "result": "source_access_limited",
      "scope": "Bounded original discovery did not locate and read an exact current computing vote or executed restriction instrument. General bond questions, traffic closures and other municipal business do not become computing events. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:butte-silver-bow-23",
      "jurisdiction": {
        "county": "Silver Bow County",
        "municipality": null,
        "state": "mt"
      },
      "result": "selected_official_content",
      "scope": "The complete original local government computing impact committee body says no committee meetings are currently scheduled and reports a six month Sabey extension granted on February 11, 2026. The extension is not a computing moratorium, verified initiative qualification, court outcome or future hearing. A private ballot account is not adopted. No current site operation, executed sale or exact extension expiration is inferred. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": [
        "m23-873e844b77ca"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:missoula-23",
      "jurisdiction": {
        "county": "Missoula County",
        "municipality": null,
        "state": "mt"
      },
      "result": "selected_official_content",
      "scope": "The original County Bonner project update publishes the property owner signature withdrawal and says the proposed project will not move forward. Its earlier application history remains incomplete and the expected hearing is postponed until further notice. A regular first Wednesday land use board pattern does not establish a new specific project hearing. The selected body describes special exception review and possible later zoning compliance requirements; an individual proposal withdrawal, public opposition and those review standards are not a County computing ban or measured harm. This bounded review does not certify complete current law, all exceptions, exact project eligibility or absence of later legal changes.",
      "source_ids": [
        "m23-682bf9fd0d78"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:ncar-wyoming-supercomputing-center-cheyenne-wy-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Cheyenne",
        "state": "wy"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:prometheus-hyperscale-evanston-wy-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Evanston",
        "state": "wy"
      },
      "result": "selected_official_content",
      "scope": "The selected original State program report explicitly describes a prospective Evanston computing campus separately from a planned Casper operation. This supports an agency listed proposal at the named city scope. Earlier tax exemption certification and a planned buildout do not establish actual construction, commissioned capacity or current computing operation. Private later permit accounts, carbon claims and the exact industrial park corporate crosswalk are not independently verified here. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m24-b5ea0c3b5ba2",
        "m24-b799946d8cfc"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:ptolemy-data-systems-sheridan-wy-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Sheridan",
        "state": "wy"
      },
      "result": "selected_official_content",
      "scope": "The complete six page original City hosted company capability document describes historical Sheridan colocation and a facility built in 2012. Its exact publication day is not independently printed in the selected body. The current original provider pages describe managed information technology and cloud support but do not independently establish current computing service at that exact older premise. A changed corporate office and current business activity do not establish relocation, physical closure or the present facility stage. No current compliance, hardware capacity, operating security specification or first opening day is adopted. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m24-f5abfceab66a"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:related-digital-cheyenne-wy-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Cheyenne",
        "state": "wy"
      },
      "result": "selected_official_content",
      "scope": "The selected original State program report explicitly describes the named Cheyenne Related Digital campus as currently under construction. This supports agency reported construction at that report scope. Its late 2026 completion expectation, prospective anchor tenant and earlier tax certification are not accomplished computing service, measured installed capacity or a completed phase. The selected account does not independently establish a first opening or verify all present project components. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m24-b5ea0c3b5ba2",
        "m24-b799946d8cfc"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:site-layer-4-goshen-hole-platte-county-wy-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Wheatland",
        "state": "wy"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:tallgrass-project-jade-cheyenne-wy-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Cheyenne",
        "state": "wy"
      },
      "result": "selected_official_content",
      "scope": "The complete original County file 26 422 explicitly records approval of postponing review of the Tembo HUB 1 office support conditional use request on August 13, 2026. Passed refers to that postponement, not approval of the computing campus or office permit itself. The separate September 10 agenda lists the office request as file 26 466, while file 26 465 is a dog boarding zone change. Its minutes remain draft and action results unavailable. Neither a prior private file number account nor a past office agenda establishes current computing construction or operation. The main County notice host was unavailable at robots. No developer, operator, project name or facility identity is changed. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m24-10e6758f5f58",
        "m24-fddccc48a20d"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:truss-energy-carpenter-wy-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Carpenter",
        "state": "wy"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:atlas-power-williston-nd-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Williston",
        "state": "nd"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:bitzero-nekoma-nd-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Nekoma",
        "state": "nd"
      },
      "result": "selected_official_content",
      "scope": "The complete original Governor release dated July 25, 2022 describes a binding acquisition and redevelopment agreement for the Nekoma pyramid and reports a July 18 Board decision accepting the bid. These are historical transaction and proposal accounts rather than independently verified present computing service, completed redevelopment or physical construction. The military installation operational and shutdown history is not a computing opening or closure. Planned heat reuse, jobs, investment and zero carbon descriptions are not measured present outcomes. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m24-2c5e697205da"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:core-scientific-grand-forks-nd-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Grand Forks",
        "state": "nd"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:enerfore-pleasant-valley-tioga-nd-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Tioga",
        "state": "nd"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:brightnight-red-butte-newcastle-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Newcastle",
        "state": "ut"
      },
      "result": "selected_official_content",
      "scope": "The complete original County project page identifies the Red Butte application as submitted May 4, 2026, deemed incomplete May 22 and on hold subject to a computing application moratorium. This supports an agency listed proposal on hold rather than computing construction or operation. The webpage reports May 26 adoption, while the complete linked three page ordinance 2026 13 has a June 8 adoption recital and blank signature, attestation and vote fields. Its effective clause requires passage and publication. These conflicts remain unresolved; no legal commencement, calculated expiration or exact property exception is certified. The separate Antelope June 4 meeting notice is not this project hearing or proof that the meeting occurred. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m24-8b25be42c999",
        "m24-ec5ad38e206d"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:flexential-cottonwood-heights-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Cottonwood Heights",
        "state": "ut"
      },
      "result": "selected_official_content",
      "scope": "The selected original public notice document is a February 20, 2024 Canyon Centre redevelopment analysis. Its title and selected first two pages do not independently identify this exact Flexential facility or current computing service. Extracted keyword checks are not a complete visual review of every image. The unavailable original provider host remains held without an alternate copy. A general redevelopment analysis is not a computing permission or operating account. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m24-20259af08bd1"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:flexential-salt-lake-city-lindon-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Lindon",
        "state": "ut"
      },
      "result": "selected_official_content",
      "scope": "The selected original 225 page Lindon packet is for March 16, 2026 and its first two pages list general Council business, financial audit, commercial colors and wireless tower rules. This selected content does not independently identify the exact inherited computing facility or present service. The complete packet and all visual pages were not reviewed, and a negative keyword result is not a complete government review. The original provider access hold remains retained. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m24-84f7bb5bcde6"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:regence-salt-lake-city-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Cottonwood Heights",
        "state": "ut"
      },
      "result": "selected_official_content",
      "scope": "The inherited original public notice pointer is a Canyon Centre redevelopment analysis, rather than an independently identified Regence Salt Lake computing operation account. The selected first two pages and extracted text do not establish the exact facility identity, current service or closure. No city boundary, ownership, location or facility component is changed to repair that missing crosswalk. Exact current physical stage remains held. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m24-20259af08bd1"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:stratos-box-elder-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Lucin",
        "state": "ut"
      },
      "result": "selected_official_content",
      "scope": "The complete original County Stratos fact sheet describes a future phased project and responds to supportive and critical public submissions. This supports an agency described proposal rather than proof of construction or computing operation. Future jobs, tax receipts, water suitability, closed cooling, onsite power and rate assurances remain attributed County claims without independent measurements or an executed site approval. The count of submissions is not a count of unique residents or a verified representative opinion. No developer role, capacity or exact first opening is changed. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m24-bac6ca23e8fa"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:summit-ridge-santaquin-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Santaquin",
        "state": "ut"
      },
      "result": "selected_official_content",
      "scope": "The complete original one page City notice schedules a computing question and answer open house on January 29, 2026 at 6 p.m. It does not independently identify the exact inherited Summit Ridge proposal or prove that the historical meeting occurred. The other original property notice returned a same URL redirect loop and was not read. A generic City computing meeting and proposed property disposition do not establish an exact project vote, current construction, service or a new future hearing. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m24-a1b8e67d844b"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:flexential-salt-lake-city-downtown-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Salt Lake City",
        "state": "ut"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:flexential-salt-lake-city-fair-park-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Salt Lake City",
        "state": "ut"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:flexential-salt-lake-city-millcreek-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Salt Lake City",
        "state": "ut"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:flexential-salt-lake-city-south-valley-slc09-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "West Jordan",
        "state": "ut"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:lumen-ogden-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Ogden",
        "state": "ut"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:lumen-salt-lake-city-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Salt Lake City",
        "state": "ut"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:oracle-salt-lake-city-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "Salt Lake City",
        "state": "ut"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:oracle-west-jordan-ut-24",
      "jurisdiction": {
        "county": null,
        "municipality": "West Jordan",
        "state": "ut"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:connect-data-centers-albuquerque-nm-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Albuquerque",
        "state": "nm"
      },
      "result": "selected_official_content",
      "scope": "The complete original six page City decision describes administrative site plan approval on July 31, 2024 for the Daytona Road computing proposal. Conditions include infrastructure approval, recorded platting and later final signoff. The appended digital signing audit is dated August 1 and labels the decision July 24, while the operative body says July 31. Those dates are not silently harmonized. This establishes a historical planning action rather than present construction, accomplished conditions or computing service. Exact current stage and operating company crosswalk remain held. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m25-b0e7c0fedbb0"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:green-data-socorro-county-nm-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Socorro",
        "state": "nm"
      },
      "result": "selected_official_content",
      "scope": "Selected original Regents minutes dated March 6, 2026 describe a Green Data Center opportunity and direct further evaluation, information gathering and due diligence about impacts, feasibility, infrastructure and water. The minutes were approved on April 17. Authority to continue evaluation is not approval to construct, an executed land lease or computing service. This bounded body does not independently crosswalk all private developer, land area and campus accounts. The County transparency page was read, but its public document folder is disallowed by robots and no County moratorium instrument was obtained. Exact current physical stage remains held. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m25-450ef17bd4f6"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:green-data-spaceport-america-sierra-county-nm-25",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "nm"
      },
      "result": "selected_official_content",
      "scope": "All seven original scanned minute pages were actually viewed. The July 21, 2026 minutes record public concerns about a possible AI facility near the Spaceport and, separately, approval of opposition resolution 2026 51 and institution of an eighteen month study moratorium. The signed minutes do not independently name the exact Green Data company or establish this inherited project physical construction, legal eligibility or closure. The complete moratorium instrument, exact commencement, exceptions and current legal force remain unverified. The later October 20 agenda lists a suggested computing study, which is a past proposed discussion rather than proof that it occurred or a new future hearing. No moratorium expiration is calculated. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m25-f1aefb7f3aca",
        "m25-304ec1f7ed09"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:sandia-725e-hpc-data-center-albuquerque-nm-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Albuquerque",
        "state": "nm"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:stargate-project-jupiter-dona-ana-nm-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Santa Teresa",
        "state": "nm"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:teraplex-gallup-tradeport-mckinley-county-nm-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Gallup",
        "state": "nm"
      },
      "result": "selected_official_content",
      "scope": "Selected original City agenda pages explicitly identify the Teraplex and Gutami potential Tradeport project and a proposed effluent option amendment. This supports a City documented proposal. The agenda describes effectiveness as contingent on Council approval and a required payment, and land acquisition, exercising an effluent option and construction as later conditions. It is not an independently read accomplished Council vote, executed amendment, delivered water or operating computing facility. A presentation only item is not project approval, and an option quantity is not actual consumption. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m25-ce4f724490b8"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:csre-properties-blockchain-rapid-city-sd-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Rapid City",
        "state": "sd"
      },
      "result": "selected_official_content",
      "scope": "The complete original docket index and public application identify the CSRE electric service request and show a pending proceeding. A requested approval by June 1, 2026 is not an accomplished order. The later public cover letter is dated August 18 while the index records filing on August 19; those dates remain separate. Service contract terms and future billing provisions do not independently establish computing construction, actual delivery or operation at the inherited facility. Confidential exhibits were not requested, and no redacted term or current legal outcome is reconstructed. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m25-d32cbd6281b1",
        "m25-0943abae98d0",
        "m25-572ddbfff7ba"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:leola-data-center-mcpherson-county-sd-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Leola",
        "state": "sd"
      },
      "result": "selected_official_content",
      "scope": "Selected original application pages describe a preliminary Leola computing proposal and a November 7, 2024 supplement. The application form and its title do not independently establish final Board action, actual construction or computing operation. The current original utility docket still displays Pending and lists later September and October 2026 filings without an independently read final service approval. Intervenor decisions are not computing commissioning. No confidential material, exact current physical stage, approved capacity or calculated permit expiration is inferred. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m25-b2a1cb513443",
        "m25-276cbea8911f"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:midco-sioux-falls-sd-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Sioux Falls",
        "state": "sd"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:zenith-tooele-valley-burmester-ut-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Burmester",
        "state": "ut"
      },
      "result": "selected_official_content",
      "scope": "The selected original March 26, 2024 petition page requests creation of a public infrastructure district to finance infrastructure and names the petitioners. It does not independently identify this exact computing facility as built, under construction or commissioned. The remaining scan and legal exhibits were not fully reviewed. A district petition, ownership recital or general infrastructure financing is not computing permission or operation. Exact corporate and physical crosswalks remain held. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m25-d73b56124ae6"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:tract-eagle-mountain-ut-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Eagle Mountain",
        "state": "ut"
      },
      "result": "selected_official_content",
      "scope": "Selected original redevelopment packet pages describe a future computing complex and separate QTS participation agreement business. They do not independently establish the exact Tract company project crosswalk or current physical construction. A redevelopment plan, tax participation amendment and a different named campus are not this record commissioned computing. The complete 132 page packet was not reviewed. No developer, tenant, ownership, capacity or location is changed. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m25-85e1eac20c98"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:volition-spanish-fork-ut-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Spanish Fork",
        "state": "ut"
      },
      "result": "selected_official_content",
      "scope": "Selected original City minutes dated April 21, 2026 explicitly describe the Volition Spanish Fork proposal in a work session where no formal actions are taken. This supports a City documented proposal. Future ordinance updates, environmental documentation, pipeline planning, projected revenues, prospective customer names and provider forecasts for first capacity do not establish accomplished entitlement, construction or computing service. The current original provider page gives general designs without independently commissioning this exact city site. Claimed grid reliability, water use, emissions and generation capacity are not measured or certified. This selected original content does not independently establish a new future computing hearing. Past schedules and incomplete action histories do not become completed votes. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": [
        "m25-ac4330c4e2f2"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:atterix-raton-digital-hub-nm-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Raton",
        "state": "nm"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:nova-innova-data-center-albuquerque-nm-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Albuquerque",
        "state": "nm"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:roswell-information-park-chaves-county-nm-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Roswell",
        "state": "nm"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:westblock-shiprock-nm-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Shiprock",
        "state": "nm"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:zenith-volts-roswell-chaves-county-data-center-nm-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Roswell",
        "state": "nm"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:applied-digital-deuel-county-sd-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Toronto",
        "state": "sd"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:big-watt-digital-onida-sd-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Onida",
        "state": "sd"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:sequitor-edge-rapid-city-sd-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Rapid City",
        "state": "sd"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:simple-mining-madison-sd-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Madison",
        "state": "sd"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:gemini-data-center-sioux-falls-sd-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Sioux Falls",
        "state": "sd"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:valar-atomics-project-beehive-price-ut-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Price",
        "state": "ut"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:unisys-salt-lake-city-ut-25",
      "jurisdiction": {
        "county": null,
        "municipality": "Salt Lake City",
        "state": "ut"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. General provider service, development standards, broad cloud regions, private reporting and unavailable records do not establish an exact future hearing, present legal force or absence of rules. No complete current law, exact site eligibility or general physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:1623-farnam-omaha-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Omaha",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:archgreen-grand-island-hall-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Grand Island",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:binary-net-vault-lincoln-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Lincoln",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:clop-omaha-papillion-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Papillion",
        "state": "ne"
      },
      "result": "selected_official_content",
      "scope": "The complete original State public notice identifies a proposed CLOP computing facility in Papillion and a proposed air construction permit. This supports an agency listed proposal at the notice scope. The comment window is October 6 through November 7, 2025. The notice does not independently establish issuance of the final permit, completed construction or computing service. Its generator and emissions estimates are prospective permit descriptions, not installed equipment or measured pollution. A possible hearing upon petition is not a granted hearing or a new future event. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m26-16272babeeda"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:scott-data-center-omaha-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Omaha",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:sequitor-edge-kearney-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Kearney",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:starwood-project-horizon-kearney-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Kearney",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:bginusa-york-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "York",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:mara-kearney-buffalo-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Kearney",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:jigowatt-stanton-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Stanton",
        "state": "ne"
      },
      "result": "selected_official_content",
      "scope": "Selected original August 2023 public utility minutes explicitly describe the Jigowatt proposed cloud computing project and adopt routing and public involvement authority for a transmission line. The meeting resumed August 10 and the resolution vote belongs to that day. This is transmission planning authority, not an accomplished computing facility approval, installed line, delivered energy or present mining service. The November 2025 service target is a forecast rather than an actual completion date. The remaining minute business was not fully reviewed. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m26-a3f632afbe0c"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:crusoe-monolith-hallam-lancaster-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Hallam",
        "state": "ne"
      },
      "result": "selected_official_content",
      "scope": "Selected original Village minutes and the complete October 5 agenda explicitly identify the proposed Monolith and Crusoe computing project at the existing Olive Creek property. This supports an agency listed proposal. August 19 minutes record a pause for further information; September 16 minutes record a four member recommendation to the Board; September 14 Board minutes table a separate resident proposal to limit facilities. These are distinct actions. The October 5 agenda is planned consideration, without an independently read completed October decision. Neither recommendation nor an agenda establishes current construction or service. Private resident names and addresses are omitted from research prose, and projected noise, water and financial benefits remain attributed claims. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m26-35ac137ce13b",
        "m26-b828d083c182",
        "m26-c4877feaf7a1",
        "m26-337c01569c6d"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:fortitude-grand-island-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Grand Island",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:fortitude-prosser-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Prosser",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:nebraska-colocation-centers-lincoln-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Lincoln",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:archgreen-doniphan-hall-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Doniphan",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:basic-mining-superior-nuckolls-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Superior",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:fortitude-aurora-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Aurora",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:foundry-minden-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Minden",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:google-nebraska-ai-campus-proposed-26",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:sagebrush-hallam-hyperscale-campus-lancaster-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "Hallam",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:travelers-data-center-sarpy-ne-26",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "ne"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The proposed Hallam numerical limit, planning recommendation and project review pause are not silently converted into a general enacted ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:armory-innovation-district-st-louis-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "St. Louis",
        "state": "mo"
      },
      "result": "selected_official_content",
      "scope": "The complete original City release reports unanimous conditional use approval on April 21, 2026. This supports agency reported approval, without construction or computing operation. The original three page conditions summary describes requirements and the separate three page community benefit summary expressly describes a future agreement. A condition or summary is not proof of a recorded executed agreement, delivered benefits or measured compliance. Board Bill 74 remains introduced and assigned to committee in its current original index; its repeal description is not accomplished TIF termination. Separate office jobs, future operating targets and inconsistent contribution estimates are not silently harmonized or exported. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m27-ca8ee1c07ab0",
        "m27-51a7a2cecab9",
        "m27-5f1f839d47e7",
        "m27-1fd9589d03ae"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:edged-kansas-city-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Kansas City",
        "state": "mo"
      },
      "result": "selected_official_content",
      "scope": "The complete original State release explicitly reports an opened Kansas City computing facility and a prior day ceremony. The complete current original provider page names the same Arlington Avenue facility and describes present access, interconnection and remote hands service. Together these support agency and provider reported service. The ceremony and older space availability quarter are not exact first computing commissioning. Advertised critical capacity, cooling savings, design efficiency, SLA and tier descriptions are not independently measured current operation or certification. The tax program statement alone is not the basis for operation. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m27-cd0a3975b92f"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:crg-festus-data-center-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Festus",
        "state": "mo"
      },
      "result": "selected_official_content",
      "scope": "The complete original City notice identifies its development agreement with CRG for a computing project and requests qualified assistance with public communication, permit review and coordination. This supports an agency listed proposal. The procurement does not independently establish completed construction permission, actual construction, commissioned computing or resolution of public concerns. The observed same host canonical redirect was followed without bypassing a denial. General October 26 City meetings do not independently establish computing consideration. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m27-eb0e1c593bbb"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:next-revolution-emerson-campus-ferguson-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Ferguson",
        "state": "mo"
      },
      "result": "selected_official_content",
      "scope": "Selected original Council minutes and project questions distinguish an existing former Emerson computing facility from proposed redevelopment and additional uses. A Council member explicitly says the tour did not enter the computing building and the upcoming decision concerns tax abatement. The selected agency hosted responses identify SSL Investments as the project developer and describe future tenant driven phases, but do not independently establish the inherited Next Revolution corporate crosswalk or the exact present new computing stage. Existing campus service is not automatically operation of every proposed redevelopment component. No later April vote, executed incentive agreement, new building or operator role is inferred. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m27-c74983cae9a7",
        "m27-f0060a386eb5"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:google-hunt-midwest-kc-northland-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Kansas City",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:lambda-kansas-city-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Kansas City",
        "state": "mo"
      },
      "result": "selected_official_content",
      "scope": "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m27-49aec6afd4a9"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:lumon-solutions-marshfield-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Marshfield",
        "state": "mo"
      },
      "result": "selected_official_content",
      "scope": "The complete original County update explicitly describes construction on Rifle Range Road. Its linked original Conservation report names Lumon Solutions Marshfield LLC, resolving the earlier missing company crosswalk at the County project scope. Together these support agency reported construction, without computing operation. The six page report text says it is not a site clearance or completed species consultation; no known recorded species is not proof of no species. The groundwater email gives a forecast based on supplied design information and cites monitoring data only through 2017, not current measured drawdown or actual water use. The unrelated McDonald County visit is not this facility performance evidence. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m27-5ecd49664ddb",
        "m27-de1e6b08580a",
        "m27-86a633d287b3"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:metrobloks-liberty-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Liberty",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:nebius-independence-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Independence",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:patmos-kansas-city-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Kansas City",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:crg-project-cumulus-st-charles-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "St. Charles",
        "state": "mo"
      },
      "result": "selected_official_content",
      "scope": "Selected original City Council minutes explicitly identify the CRG Cumulus application and state it was withdrawn by the applicant with no Council action required. A Council member separately criticizes the applicant withdrawal and communication. This establishes a historical proposal outcome in the August 19, 2025 record rather than denial by Council, a general ban or physical closure of an operating computing facility. The original agenda packet containing the applicant letter exceeded the bounded capture limit, so its indexed letter text and alternate distributed copy were not adopted. Exact present revised proposal stage and the letter day remain held. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m27-bd7b01a8a376"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:shenandoah-project-kestrel-kc-northland-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Kansas City",
        "state": "mo"
      },
      "result": "selected_official_content",
      "scope": "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m27-b8e29dc456cf"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:aws-green-new-florence-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "New Florence",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:crusoe-callaway-county-kingdom-city-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Kingdom City",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:crusoe-warrenton-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Warrenton",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:diamond-farms-gateway-digital-villa-ridge-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Villa Ridge",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:foristell-i70-annexation-data-center-site-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Foristell",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:hematite-bitcoin-mining-jefferson-county-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Hematite",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:geronimo-jasper-county-powered-data-park-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:beltline-meramec-valley-technology-park-pacific-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:white-cloud-acres-barnard-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Barnard",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:wildwood-ranch-joplin-mo-27",
      "jurisdiction": {
        "county": null,
        "municipality": "Joplin",
        "state": "mo"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Saint Charles application withdrawal, City permit conditions and introduced tax bill are not silently converted into a general enacted computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:aws-clinton-hinds-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Clinton",
        "state": "ms"
      },
      "result": "selected_official_content",
      "scope": "The complete original City release says AWS is repurposing the former Delphi plant, and the original issuer update expressly describes that transformation. Together these support agency and company reported conversion construction at the statement scope. Celebrating investment is not a computing opening. Projected jobs, tax receipts, water commitments, electricity rates and statewide savings remain attributed prospective or aggregate accounts, not independently measured results for this building. No installed capacity, opening day, operator role or local legal outcome is inferred. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m28-04de66a62702"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:aws-costas-ridgeland-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Ridgeland",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:aws-project-atlas-madison-county-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Canton",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:aws-project-steamboat-warren-county-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Vicksburg",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:cspire-starkville-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Starkville",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:greenidge-columbus-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Columbus",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:compass-lauderdale-meridian-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Meridian",
        "state": "ms"
      },
      "result": "selected_official_content",
      "scope": "The complete original Governor release identifies the proposed Meridian Compass campus and an eight year future building program. This supports an agency listed proposal. Incentive certification, site preparation assistance and a planned utility supply do not independently establish computing operation, completed buildings or current physical construction. Future tenant equipment is not all developer construction investment, and projected direct and indirect jobs are not actual operating employment. No installed power or exact opening is inferred. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m28-71072363b032"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:erdc-dsrc-vicksburg-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Vicksburg",
        "state": "ms"
      },
      "result": "selected_official_content",
      "scope": "Selected original public agency guide introduction describes ERDC DSRC as an operating and maintained research computing center at the Information Technology Laboratory. This supports institution reported computing service at the named center scope. It does not independently certify every system, capacity, current uptime or exact first opening. Only public introductory context was used; restricted pages, account systems and actual computing access were not requested. The denied original dedication article was not replaced with a copied article body. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m28-ec5478ca72c6"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:xai-macrohardrr-southaven-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Southaven",
        "state": "ms"
      },
      "result": "selected_official_content",
      "scope": "The complete original Governor release explicitly names MACROHARDRR and says a purchased building is being retrofitted for computing. This supports agency reported construction at the January 8 statement scope. The anticipated February 2026 operating start is not independently established as accomplished. A nearby power plant and an existing Tennessee computing site are separate components. Investment, incentives, future computing power and job projections are not current installed load or operation, and other Southaven records are not merged. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m28-88caaa01bb0c"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:msu-hpc2-portera-starkville-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Starkville",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:navy-dsrc-stennis-space-center-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Stennis Space Center",
        "state": "ms"
      },
      "result": "selected_official_content",
      "scope": "Selected original public agency guide introduction explicitly identifies the Navy DSRC at Stennis and describes maintained research computing service. This supports institution reported computing service at the named center scope. The introduction does not independently certify every system, current uptime, restricted workloads or exact commissioning. The unavailable original Navy dedication article was not substituted with its indexed text or another copy. Only public guide context was read, with no restricted pages, account applications or computing access requested. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m28-ff0a742de240"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:saxum-forest-avenue-jackson-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Jackson",
        "state": "ms"
      },
      "result": "selected_official_content",
      "scope": "Selected original May 5, 2026 Council agenda pages list proposed consideration of a general computing moratorium and regulatory framework. An agenda adoption heading is not an accomplished vote, signed ordinance, exact legal effect or present force. The selected agenda does not independently crosswalk the specific Forest Avenue Saxum proposal or establish its physical stage. A separate City weekly file is a public records request log, not planning minutes; a request for Saxum documents is not an official approval. No private request details or later claimed ban outcome is republished. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m28-8fbd52af8f8a"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:xai-southaven-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Southaven",
        "state": "ms"
      },
      "result": "selected_official_content",
      "scope": "The original Governor release names MACROHARDRR and distinguishes a nearby power plant and existing Tennessee site. It does not independently identify the exact broader legacy Southaven record as a separate physical building or prove it is the same named project. This alias and component crosswalk remains held. No duplicated computing capacity, second opening or physical operation is inferred from one named building rehabilitation account. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m28-88caaa01bb0c"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:xai-tulane-road-southaven-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Southaven",
        "state": "ms"
      },
      "result": "selected_official_content",
      "scope": "The complete original Mayor account reports a contract for relocating the training center and a future land exchange involving MZX Tech. It does not independently establish completed title transfer, a final computing permit, current construction or computing operation at the inherited Tulane project. Public safety facility funding and planned new training buildings are not the computing campus. The August 18 publication day does not date the contract execution or closing. No corporate role, parcel boundary or capacity is changed. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": [
        "m28-106ad0c6e2ec"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:clarksdale-hyperscale-data-center-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Clarksdale",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:cleanspark-clinton-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Clinton",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:cleanspark-meridian-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Meridian",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:cleanspark-vicksburg-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Vicksburg",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:cleanspark-wiggins-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Wiggins",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:gawk-enerpower-amory-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Amory",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:prado-ai-jackson-metro-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Ridgeland",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:starkville-industrial-park-road-crypto-mine-ms-28",
      "jurisdiction": {
        "county": null,
        "municipality": "Starkville",
        "state": "ms"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Jackson agenda adoption heading, tax certification, research computing service and land exchange are not silently converted into an enacted local computing ban. No complete current law, exact site eligibility or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:oklahoma-ai-ventures-black-bear-noble-county-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Perry",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:cerebras-oklahoma-city-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Oklahoma City",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:cloudburst-oklahoma-city-campus-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Oklahoma City",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:beltline-piedmont-kingfisher-county-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Piedmont",
        "state": "ok"
      },
      "result": "selected_official_content",
      "scope": "The complete original City transparency portal separately lists the named computing project and its revised planned unit development documents. This supports an agency listed proposal without an independently read completed approval vote, construction or computing service. The posted six page Industrial Technology ordinance copy requires special use review for computing and excludes cryptocurrency mining in that district, but its adoption day and signatures are blank. Physical page 6 was actually viewed. This unsigned copy does not independently establish enactment or present legal force. The October 22 Cloverleaf document exceeded the bounded capture limit and was not read or obtained through an alternate copy. Portal update labels do not certify completed votes, permit eligibility or physical stage. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": [
        "m29-93cb56c59de9",
        "m29-4e08c143d021"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:cloverleaf-project-open-sky-piedmont-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Piedmont",
        "state": "ok"
      },
      "result": "selected_official_content",
      "scope": "The complete original City transparency portal separately lists the named computing project and its revised planned unit development documents. This supports an agency listed proposal without an independently read completed approval vote, construction or computing service. The posted six page Industrial Technology ordinance copy requires special use review for computing and excludes cryptocurrency mining in that district, but its adoption day and signatures are blank. Physical page 6 was actually viewed. This unsigned copy does not independently establish enactment or present legal force. The October 22 Cloverleaf document exceeded the bounded capture limit and was not read or obtained through an alternate copy. Portal update labels do not certify completed votes, permit eligibility or physical stage. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": [
        "m29-93cb56c59de9",
        "m29-4e08c143d021"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:cogent-oklahoma-city-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Oklahoma City",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:noec-core-data-center-vinita-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Vinita",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:core-scientific-muskogee-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Muskogee",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:fluidstack-okmulgee-county-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Okmulgee",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:lambda-midamerica-industrial-park-chouteau-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Chouteau",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:beltline-luther-horizon-technology-park-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Luther",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:midcon-recovery-solutions-oklahoma-city-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Oklahoma City",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:northern-data-pryor-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Pryor",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:beale-project-atlas-coweta-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Coweta",
        "state": "ok"
      },
      "result": "selected_official_content",
      "scope": "Selected original December 2025 City Manager newsletter physical page 3 explicitly identifies the Beale Project Atlas proposal. The complete original March 20, 2026 City notice supplies procedures for a scheduled April 6 public hearing. Together these support an agency listed proposal at the statement scope. A historical schedule and public comment procedures do not establish that the hearing occurred, a vote outcome, permission, current construction or computing operation. The original project page returned 404 and was not supplied by an alternate copy. Future community revenue and environmental assurances are not accomplished benefits or measured harm. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": [
        "m29-d5e05f1afc2e",
        "m29-1379750e89f7"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:iren-project-emerald-kiowa-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Kiowa",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:beale-project-mustang-claremore-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Claremore",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:google-spring-sand-springs-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Sand Springs",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:rack59-oklahoma-city-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Oklahoma City",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:aligned-data-centers-amber-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Amber",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:beltline-oklahoma-city-frisco-road-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Oklahoma City",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:boomtown-lawton-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Lawton",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:host-digital-northeast-oklahoma-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Tulsa",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:polaris-technologies-muskogee-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Muskogee",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:potentia-oklahoma-campus-02-inola-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Inola",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:plainsmen-project-thunderbird-enid-ok-29",
      "jurisdiction": {
        "county": null,
        "municipality": "Enid",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The Piedmont unsigned draft, private development standards and past hearing procedures do not independently establish an enacted general computing ban. No exact site permission or physical closure is certified.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:aws-benton-bossier-parish-la-30",
      "jurisdiction": {
        "county": null,
        "municipality": "Benton",
        "state": "la"
      },
      "result": "selected_official_content",
      "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Bossier parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The New Orleans Council adoption is separate from legal commencement and individual property application. Parish campus construction, current provider service and general City action do not establish exact site eligibility or physical closure.",
      "source_ids": [
        "m30-033c7120ad94"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:aws-blanchard-caddo-parish-la-30",
      "jurisdiction": {
        "county": null,
        "municipality": "Blanchard",
        "state": "la"
      },
      "result": "selected_official_content",
      "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The New Orleans Council adoption is separate from legal commencement and individual property application. Parish campus construction, current provider service and general City action do not establish exact site eligibility or physical closure.",
      "source_ids": [
        "m30-033c7120ad94"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:stack-bossier-parish-la-30",
      "jurisdiction": {
        "county": null,
        "municipality": "Benton",
        "state": "la"
      },
      "result": "selected_official_content",
      "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Bossier parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The New Orleans Council adoption is separate from legal commencement and individual property application. Parish campus construction, current provider service and general City action do not establish exact site eligibility or physical closure.",
      "source_ids": [
        "m30-033c7120ad94"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:stack-caddo-parish-la-30",
      "jurisdiction": {
        "county": null,
        "municipality": "Blanchard",
        "state": "la"
      },
      "result": "selected_official_content",
      "scope": "The complete original State and developer February 23 announcements identify the coordinated Amazon and STACK campus development in Caddo and Bossier Parishes. The complete original June 10 developer release explicitly reports construction already underway at both planned parish campuses. This supports company reported construction at the Caddo parish campus scope, without computing commissioning or independent completion of every phase. The earlier imminent start forecast alone is not the basis for construction. Existing separate Amazon and STACK company records are not counted as four newly discovered physical campuses, merged or assigned new corporate roles. The selected sources do not independently refine the exact municipal or parcel placement. Community funding, future jobs, utility payments and full investment remain attributed accounts rather than measured delivered benefits or installed computing capacity. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The New Orleans Council adoption is separate from legal commencement and individual property application. Parish campus construction, current provider service and general City action do not establish exact site eligibility or physical closure.",
      "source_ids": [
        "m30-033c7120ad94"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:fogo-data-centers-new-orleans-la-30",
      "jurisdiction": {
        "county": null,
        "municipality": "New Orleans",
        "state": "la"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The New Orleans Council adoption is separate from legal commencement and individual property application. Parish campus construction, current provider service and general City action do not establish exact site eligibility or physical closure.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:tulsaconnect-downtown-dc5-tulsa-ok-30",
      "jurisdiction": {
        "county": null,
        "municipality": "Tulsa",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The New Orleans Council adoption is separate from legal commencement and individual property application. Parish campus construction, current provider service and general City action do not establish exact site eligibility or physical closure.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:tulsaconnect-east-dc3-tulsa-ok-30",
      "jurisdiction": {
        "county": null,
        "municipality": "Tulsa",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The New Orleans Council adoption is separate from legal commencement and individual property application. Parish campus construction, current provider service and general City action do not establish exact site eligibility or physical closure.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:ms-solar-grid-data-new-orleans-east-la-30",
      "jurisdiction": {
        "county": null,
        "municipality": "New Orleans",
        "state": "la"
      },
      "result": "selected_official_content",
      "scope": "Selected original City registers and final Council minute pages 1 and 6 record adoption of Calendar 35512 on August 20, 2026, creating the citywide computing interim zoning district. The linked ordinance text describes permit and occupational license restrictions, an accessory room exception and an appeal process, but its adoption and Mayor fields are blank. The packet also contains a certified earlier motion whose June 18 header conflicts with the June 24 recital and file footer; these dates are not harmonized. The exact legal commencement, term, extensions and current force remain unverified. These general City records do not independently name the inherited MS Solar project, establish its exact permit disposition or physical stage. A citywide rule is not a physical closure or individual project denial. The denied original January motion was not read or replaced with an alternate copy. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. The New Orleans Council adoption is separate from legal commencement and individual property application. Parish campus construction, current provider service and general City action do not establish exact site eligibility or physical closure.",
      "source_ids": [
        "m30-975ac93ee27a",
        "m30-08a1e6eca40d",
        "m30-1cdca68d707c",
        "m30-29fbff8dd973"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:walker-buddy-ellis-road-data-center-livingston-la-30",
      "jurisdiction": {
        "county": null,
        "municipality": "Walker",
        "state": "la"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The New Orleans Council adoption is separate from legal commencement and individual property application. Parish campus construction, current provider service and general City action do not establish exact site eligibility or physical closure.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:smarttec-site-01-mead-ok-30",
      "jurisdiction": {
        "county": null,
        "municipality": "Mead",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The New Orleans Council adoption is separate from legal commencement and individual property application. Parish campus construction, current provider service and general City action do not establish exact site eligibility or physical closure.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:windstream-wholesale-oklahoma-city-ok-30",
      "jurisdiction": {
        "county": null,
        "municipality": "Oklahoma City",
        "state": "ok"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. The New Orleans Council adoption is separate from legal commencement and individual property application. Parish campus construction, current provider service and general City action do not establish exact site eligibility or physical closure.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:alpha-technologies-huntington-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Huntington",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:alpha-technologies-south-charleston-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "South Charleston",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:citynet-bridgeport-harrison-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Bridgeport",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:citynet-charleston-kanawha-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Charleston",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:continent-8-west-virginia-dc1-south-charleston-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "South Charleston",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:continent-8-west-virginia-dc2-petersburg-grant-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Petersburg",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:penzance-bedington-berkeley-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "wv"
      },
      "result": "selected_official_content",
      "scope": "The complete original Governor February 26, 2026 release names Penzance Bedington Campus and describes a future computing development and approved High Impact Intelligence Center designation. This supports an agency listed proposal. Certification, projected load, reviewed engineering plans and future utility milestones are not computing construction or operation. The prospective investment, jobs, revenue allocations, reclaimed water opportunity and private funding assertions are attributed plans rather than independently measured delivered results. No legal site eligibility, installed capacity or corporate role is changed. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": [
        "m31-cd64850b7598"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:adams-fork-harless-datacenter-logan-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Holden",
        "state": "wv"
      },
      "result": "selected_official_content",
      "scope": "Selected original agency event content schedules an August 18, 2025 virtual meeting for two distinct off grid power generation permit applications associated with Adams Fork and Harless campus names. This is a historical schedule, without proof the meeting occurred, final permit disposition or computing construction or operation. The notice describes both locations as Mingo County while the inherited Harless record retains a Logan county context; that source conflict is retained without a jurisdiction or location change. An energy permit and a campus name do not independently establish a commissioned computing component or exact physical project crosswalk. The separately attempted original joint notice returned 404 and supplied no missing legal date. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": [
        "m31-bdd7e6765f3b"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:adams-fork-wharncliffe-datacenter-mingo-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Wharncliffe",
        "state": "wv"
      },
      "result": "selected_official_content",
      "scope": "Selected original agency event content schedules an August 18, 2025 virtual meeting for two distinct off grid power generation permit applications associated with Adams Fork and Harless campus names. This is a historical schedule, without proof the meeting occurred, final permit disposition or computing construction or operation. The notice describes both locations as Mingo County while the inherited Harless record retains a Logan county context; that source conflict is retained without a jurisdiction or location change. An energy permit and a campus name do not independently establish a commissioned computing component or exact physical project crosswalk. The separately attempted original joint notice returned 404 and supplied no missing legal date. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": [
        "m31-bdd7e6765f3b"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:irs-enterprise-computing-center-kearneysville-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Kearneysville",
        "state": "wv"
      },
      "result": "selected_official_content",
      "scope": "The complete original Energy Department September 24, 2024 page identifies the IRS Martinsburg facility at Kearneysville and proposes federal support for energy conservation measures. It does not independently establish present computing service, completed energy work, installed load or a new building opening. The inherited IRS Publication 4801 link now resolves to June 2026 tax return statistical estimates; selected cover pages confirm that it is not computing facility evidence. Exact current physical computing disposition remains held. No technical site drawing, aerial image, restricted system or account was requested. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": [
        "m31-dfadd8526f5d"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:netl-computational-science-engineering-center-morgantown-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Morgantown",
        "state": "wv"
      },
      "result": "selected_official_content",
      "scope": "The complete original NETL May 22, 2025 release explicitly reports construction underway on the Morgantown Computational Science and Engineering Center. This is a dated historical construction account. The selected later official discovery did not establish exact present completion, computing commissioning or continued construction as of the current check. Existing Joule and wafer scale computing work are separate from the new consolidated building opening. Prospective processing performance and energy savings are not measured results for an operating new center. Current physical stage remains held. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": [
        "m31-21edf96ba38f"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:noaa-environmental-security-computing-center-fairmont-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Fairmont",
        "state": "wv"
      },
      "result": "selected_official_content",
      "scope": "Selected original current public Hera guide overview explicitly describes available computing resources and test and development systems through NESCC. This supports institution reported computing service at the named center scope. Only public overview context was used; hardware inventory, theoretical performance, current uptime, specific workloads and exact first commissioning remain uncertified. The unavailable original Rhea announcement was not read from indexed text or obtained through another copy. This independently published current guide is separate from that announcement, and no Rhea installation or new modular building completion is inferred. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": [
        "m31-2a1fb4c2f194"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:starwood-tamarack-west-columbia-mason-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "West Columbia",
        "state": "wv"
      },
      "result": "selected_official_content",
      "scope": "The complete original Project Tamarack page explicitly describes a planned computing development in West Columbia, and the complete original Governor release describes a Starwood project designation in Mason County. This supports a company listed proposal without computing construction or operation. The project page distinguishes the former Clements State Tree Nursery as a separate property outside its ownership and control; no neighboring site is merged. Certification, ratepayer pledges, proposed cooling, sound studies, potential tax receipts and future employment are attributed plans rather than measured outcomes or verified legal compliance. The Governor statement day is not an independently established exact Tamarack certificate execution or groundbreaking day. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": [
        "m31-6ab511dcb126"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:dedispec-berkeley-springs-morgan-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Berkeley Springs",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:blockchain-power-bens-run-tyler-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Bens Run",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:blockchain-power-blacksville-monongalia-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Blacksville",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:blockchain-power-hazelton-preston-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Hazelton",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:blockchain-power-miracle-run-monongalia-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Miracle Run",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:blockchain-power-tunnelton-preston-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Tunnelton",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:blockware-sunpark-boone-lincoln-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:fbi-cjis-division-clarksburg-harrison-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Clarksburg",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:grant-town-power-plant-crypto-mine-marion-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Grant Town",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:hog-lick-aggregates-white-hall-marion-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "White Hall",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:fundamental-data-ridgeline-datacenter-tucker-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:shady-spring-data-center-campus-raleigh-county-wv-31",
      "jurisdiction": {
        "county": null,
        "municipality": "Shady Spring",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. An energy permit schedule and State project designation do not establish a local computing moratorium, final computing permission or physical closure. The agency Mingo county description and inherited Harless Logan context remain distinct without a jurisdiction change.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:cielo-gaffney-cherokee-county-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Gaffney",
        "state": "sc"
      },
      "result": "selected_official_content",
      "scope": "The complete original Governor June 24, 2025 release names the planned Cielo Gaffney development on Ford Road. This supports an agency listed proposal. Its first operating forecast for the end of 2028, planned facilities, investment and jobs are prospective rather than commissioned computing, physical construction or delivered benefits. No exact future opening day or installed capacity is inferred. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": [
        "m32-8347dc587482"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:google-ridgeville-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Ridgeville",
        "state": "sc"
      },
      "result": "selected_official_content",
      "scope": "The complete original Governor September 26, 2024 release identifies two separate planned Dorchester campuses at Pine Hill in Ridgeville and Winding Woods in St. George. The complete original Google October 13, 2025 update reports continued construction of two Dorchester sites. Selected current Google state page text instead describes three facilities, names Summerville and St. George, and contains a generic 2024 Dorchester opening milestone. These source and naming conflicts do not independently establish exact current Ridgeville operation or continued physical construction. The original historical statements are retained without resolving the current stage by elapsed forecasts, a generic opening label or regional branding. No campus identity, role or location is changed. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": [
        "m32-48d1e54b7d0e"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:greenidge-spartanburg-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Spartanburg",
        "state": "sc"
      },
      "result": "selected_official_content",
      "scope": "The complete original January 25, 2022 Commerce release announces plans for the Greenidge Spartanburg development at Jones Road and forecasts a first phase during the second half of 2022. This historical plan does not establish present operation, cancellation, legal project transfer or physical closure. The original later issuer sale account was unavailable under its robots check and was not read or replaced with a copy or indexed extract. Exact current disposition remains held. The observed original agency redirect was followed to its current canonical page. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": [
        "m32-15f250ee0037"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:northmark-valara-spartanburg-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Spartanburg",
        "state": "sc"
      },
      "result": "selected_official_content",
      "scope": "Selected physical pages 1 through 4 of the original sixteen page Valara application identify the named High Performance Compute Center and planned onsite generation. The record describes a computing project and already permitted generator installation, without proving that equipment was installed, computing construction began or the center operates. This supports an agency listed proposal. The April 23, 2026 signed digital record copy is not independently verified as first submission or web publication day. The exact NorthMark legal role and the inherited project crosswalk are not changed. Neither generation permitting nor an application narrative establishes installed computing capacity. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": [
        "m32-6876d44c2e91"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:volt-edge-project-alpaca-union-county-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Union",
        "state": "sc"
      },
      "result": "selected_official_content",
      "scope": "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": [
        "m32-3b6d9de293bc",
        "m32-48d5f2027765",
        "m32-f7182da59d58"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:project-altair-newberry-county-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Prosperity",
        "state": "sc"
      },
      "result": "selected_official_content",
      "scope": "The complete original County account describes Project Altair as a proposed computing development associated with a land option at Mid Carolina Commerce Park II. It explicitly reports that Council held a public hearing April 15, 2026 and that a third reading was delayed for utility feasibility and due diligence. A separate community information session had no confirmed date in the account. This supports an agency listed proposal. The selected account does not establish a completed land sale, final project approval, physical construction, present cancellation or operation. The publication day is unverified and is not invented from the hearing day. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": [
        "m32-9d25d4107140"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:project-boulder-colleton-county-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "sc"
      },
      "result": "selected_official_content",
      "scope": "All three physical pages of the original December 1, 2025 Council minutes were actually viewed. They record executive session economic development discussion that names Project Boulder and explicitly state that no action was taken during executive session. The minutes were approved January 5, 2026. The selected minutes do not independently identify a computing component, exact operator, later physical stage, project approval or current local restriction. The codename alone does not establish an exact computing project crosswalk. Current disposition remains held. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": [
        "m32-886aa29b75c4"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:srs-ai-data-center-savannah-river-site-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "sc"
      },
      "result": "selected_official_content",
      "scope": "The complete original NNSA July 20, 2026 release selects Amentum for negotiations concerning a phased AI computing and onsite energy lease at Savannah River Site. It explicitly says that selection is not a final lease award and retains future permitting, safety, security and federal review conditions. This supports an agency listed proposal. Selection is not executed leasing, computing construction, installed generation or computing operation. No new legal company role, exact parcel, technical quantity or delivered benefit is adopted. This selected original content does not independently establish a new future computing hearing. A generic next Board meeting is not verified computing consideration, and past agendas do not become completed votes. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": [
        "m32-c284a946e6b7"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:va-capital-region-readiness-center-martinsburg-wv-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Martinsburg",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:genesis-digital-assets-anderson-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Anderson",
        "state": "sc"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:genesis-digital-assets-union-lockhart-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Lockhart",
        "state": "sc"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:lighthouse-data-centers-spartanburg-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Spartanburg",
        "state": "sc"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:pollard-mccormick-county-data-center-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "McCormick",
        "state": "sc"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:clarendon-county-ram-bay-data-center-manning-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Manning",
        "state": "sc"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:stream-data-centers-project-liberty-marion-county-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Marion",
        "state": "sc"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:tigerdc-project-spero-spartanburg-county-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "sc"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:eagle-rock-rhodes-technology-park-colleton-county-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "",
        "state": "sc"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:terra-nexus-camden-kershaw-county-sc-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Camden",
        "state": "sc"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:silicon-foundation-warwood-wheeling-ohio-county-wv-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Wheeling",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:ryan-stuart-summit-point-jefferson-county-wv-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Summit Point",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:uscg-operations-systems-center-kearneysville-wv-32",
      "jurisdiction": {
        "county": null,
        "municipality": "Kearneysville",
        "state": "wv"
      },
      "result": "source_access_limited",
      "scope": "No exact current original local computing notice or restriction instrument was located and read for this record in the bounded review. Provider service, general corporate news, unavailable records and private reporting do not establish an exact future hearing, present legal force or absence of local rules. Project proposals, fiscal hearing schedules, preliminary leases and historical executive sessions do not establish an adopted computing ban or final present legal site eligibility.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:new-york-large-load-notices-32",
      "jurisdiction": {
        "county": null,
        "municipality": null,
        "state": "ny"
      },
      "result": "selected_official_content",
      "scope": "Original October 19 notice physical page 1 and October 20 update physical pages 1 and 3 were read as text and actually viewed. The signed extension sets November 4, 2026 for Draft Scope comments, without an exact clock. The update cover schedules an October 28, 2026 technical conference from 10 AM to 4 PM and virtual registration by October 26 at 4:30 PM. No explicit time zone is supplied. The cover identifies Case 26 E 0045 while its attached agenda identifies 26 E 0429 and contains an inconsistent internal session end time. Those conflicts remain explicit. The attached agenda venue is not independently assigned to the cover case. Original public agency captures and retrieval receipts were reused with exact byte hashes; no new C3 network request, denied body substitution or meeting credential republication occurred. Neither schedule is a completed hearing, substantive order or physical computing disposition. This review adds no verified new local moratorium or ban.",
      "source_ids": [
        "m32-e0d2d651e088",
        "m32-b5bef5534b81"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:loudoun-current-documentation-and-deferred-pause-32",
      "jurisdiction": {
        "county": "Loudoun",
        "municipality": null,
        "state": "va"
      },
      "result": "selected_official_content",
      "scope": "The original October 23 County account reports additional documentation for high energy use facility legislative applications, including utility correspondence, infrastructure information, proximity, sound and environmental assessments. It excludes by right administrative applications. The original State statutory page was unavailable under its robots check, so the complete statutory text, exact legal commencement and individual project compliance remain unverified. The original October 20 account defers consideration of a proposed legislative pause to November 17; neither the September consideration vote nor deferral enacts a moratorium. The original October 22 account reports October 20 authorization for further Amazon and GWU negotiations, explicitly preliminary agreements and an AWS stated intent to withdraw an application. Intent is not a completed withdrawal, executed conveyance or computing operation. Existing November 17 calendar coverage is not duplicated. This review adds no verified new local moratorium or ban.",
      "source_ids": [
        "m32-1e701797ed68",
        "m32-e0c5075a5409",
        "m32-8b5ac09dae26"
      ]
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:prince-william-original-overlay-current-review-32",
      "jurisdiction": {
        "county": "Prince William",
        "municipality": null,
        "state": "va"
      },
      "result": "source_access_limited",
      "scope": "The original County overlay review page was unavailable under its robots check. No alternate query, host, copied body or indexed text was adopted. Current local computing schedule and legal disposition remain unverified in this bounded review. This review adds no verified new local moratorium or ban.",
      "source_ids": []
    },
    {
      "checked_on": "2026-10-24",
      "id": "restriction-review:maricopa-current-computing-notice-review-32",
      "jurisdiction": {
        "county": "Maricopa",
        "municipality": null,
        "state": "az"
      },
      "result": "source_access_limited",
      "scope": "Bounded official discovery located no newly read exact upcoming computing notice or complete adopted restriction instrument. Historical zoning and planning recommendation search leads were not adopted as future schedules, final Board action or current legal force, and alternate County mirror bodies were not used. This review adds no verified new local moratorium or ban.",
      "source_ids": []
    },
    {
      "id": "m54-review-01",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ],
      "scope": "instrument identity",
      "notes": "The full attached ordinance is numbered 1246 of 2026."
    },
    {
      "id": "m54-review-02",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ],
      "scope": "recorded adoption",
      "notes": "The official ledger records Council passage on October 19, 2026."
    },
    {
      "id": "m54-review-03",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ],
      "scope": "recorded effectiveness",
      "notes": "The official ledger separately gives October 19, 2026 as the ordinance effective date."
    },
    {
      "id": "m54-review-04",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ],
      "scope": "extension commencement",
      "notes": "Section 1 begins the extension period on October 20, 2026, a different day from the ledger effective date."
    },
    {
      "id": "m54-review-05",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ],
      "scope": "conditional endpoint",
      "notes": "Section 1 ends the extension at the earlier new code trigger or January 29, 2027."
    },
    {
      "id": "m54-review-06",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ],
      "scope": "principal use scope",
      "notes": "Section 1 covers principal use in a standalone facility and expansion of an existing standalone data center."
    },
    {
      "id": "m54-review-07",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ],
      "scope": "permit scope",
      "notes": "The text lists use, building and zoning permits, occupancy certificates and other permits including Public Utilities licenses."
    },
    {
      "id": "m54-review-08",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ],
      "scope": "earlier ordinance",
      "notes": "The recitals identify Ordinance 556 of 2026, passed July 15 and effective July 20, as the original pause."
    },
    {
      "id": "m54-review-09",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ],
      "scope": "draft date boundary",
      "notes": "The October 12 drafting notation is not used as the adoption or effective date."
    },
    {
      "id": "m54-review-10",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ],
      "scope": "approval block boundary",
      "notes": "The attachment report has unfilled approval fields. The ledger supplies the recorded passage and effectiveness, without an invented mayor signature day."
    },
    {
      "id": "m54-review-11",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-city_page"
      ],
      "scope": "older page discrepancy",
      "notes": "The City explanatory page retains the earlier October 20 scheduled end and does not describe this extension."
    },
    {
      "id": "m54-review-12",
      "jurisdiction": "City of Cleveland",
      "state": "oh",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ],
      "scope": "current legal scope",
      "notes": "The extension record does not certify complete current code, parcel permission or operating status of any data center."
    },
    {
      "id": "m55-review-01",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-ordinance"
      ],
      "source_pages": [
        5
      ],
      "scope": "certified enactment",
      "notes": "The Clerk certifies adoption at the September 15, 2026 Council meeting. All seven listed members voted yes, with no noes, abstentions or absences."
    },
    {
      "id": "m55-review-02",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-ordinance"
      ],
      "source_pages": [
        4,
        5
      ],
      "scope": "immediate effect",
      "notes": "Section 10 makes the urgency ordinance effective immediately upon its certified adoption."
    },
    {
      "id": "m55-review-03",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-ordinance"
      ],
      "source_pages": [
        3
      ],
      "scope": "original term",
      "notes": "Section 7 gives a 45 day term from adoption unless lawfully extended."
    },
    {
      "id": "m55-review-04",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-report"
      ],
      "source_pages": [
        1,
        2
      ],
      "scope": "published end",
      "notes": "The report expressly identifies October 30, 2026 as the initial term end."
    },
    {
      "id": "m55-review-05",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-ordinance"
      ],
      "source_pages": [
        3
      ],
      "scope": "covered activities",
      "notes": "Section 6 includes establishment, construction, conversion and expansion in every City zoning district."
    },
    {
      "id": "m55-review-06",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-ordinance"
      ],
      "source_pages": [
        3
      ],
      "scope": "definition scope",
      "notes": "Section 5 defines commercial computing uses and associated support equipment without an added numerical power threshold."
    },
    {
      "id": "m55-review-07",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-ordinance"
      ],
      "source_pages": [
        3
      ],
      "scope": "subordinate room exception",
      "notes": "The room exception is limited to an incidental lawful primary use on the same lot and excludes independent commercial, wholesale or third party computing."
    },
    {
      "id": "m55-review-08",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-ordinance"
      ],
      "source_pages": [
        3
      ],
      "scope": "existing operations exception",
      "notes": "Lawful existing operations with existing authorization as of the effective date may continue under existing standards; this is not approval for expansion."
    },
    {
      "id": "m55-review-09",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-ordinance"
      ],
      "source_pages": [
        3
      ],
      "scope": "permit scope",
      "notes": "Section 6 lists use, building, occupancy, subdivision, zoning, grading and other permits or entitlements."
    },
    {
      "id": "m55-review-10",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-report"
      ],
      "source_pages": [
        2,
        3
      ],
      "scope": "proposed extension",
      "notes": "Staff recommends a 22 month and 15 day extension and invites comment; a recommendation is not a recorded Council outcome."
    },
    {
      "id": "m55-review-11",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-notice"
      ],
      "source_pages": [
        1
      ],
      "scope": "notice date separation",
      "notes": "The notice is dated September 28 and expressly marked published October 10. Its hearing was scheduled October 20, not recorded as accomplished."
    },
    {
      "id": "m55-review-12",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-report"
      ],
      "source_pages": [
        2
      ],
      "scope": "regional claims boundary",
      "notes": "The report discusses other Bay Area jurisdictions. Those comparisons are not admitted as primary proof of those cities legal actions."
    },
    {
      "id": "m55-review-13",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-report"
      ],
      "source_pages": [
        1,
        2,
        3
      ],
      "scope": "metadata boundary",
      "notes": "The PDF metadata title mentions tobacco, while all three body pages concern the data center moratorium. Body content controls this review."
    },
    {
      "id": "m55-review-14",
      "jurisdiction": "City of Richmond",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m55-richmond-ordinance"
      ],
      "source_pages": [
        1,
        2,
        3,
        4,
        5
      ],
      "scope": "physical status boundary",
      "notes": "The ordinance does not establish operation, construction or eligibility of any particular Atlas record."
    },
    {
      "id": "m56-review-01",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-ledger"
      ],
      "scope": "action date",
      "notes": "The parent action history identifies October 20, 2026."
    },
    {
      "id": "m56-review-02",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-hayward_action"
      ],
      "scope": "actual action",
      "notes": "The action detail records a motion to adopt the urgency ordinance and a passing result."
    },
    {
      "id": "m56-review-03",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-hayward_action"
      ],
      "scope": "vote count",
      "notes": "The record lists seven ayes and no opposing votes."
    },
    {
      "id": "m56-review-04",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-hayward_action"
      ],
      "scope": "ordinance identifier",
      "notes": "The action text identifies ORD 26-09, distinct from legislative file LB 26-015."
    },
    {
      "id": "m56-review-05",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-hayward_action",
        "m56-ledger"
      ],
      "scope": "modification",
      "notes": "The action label says adoption including a modification, but its text does not describe the modification."
    },
    {
      "id": "m56-review-06",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-hayward_draft"
      ],
      "scope": "draft provenance",
      "notes": "Attachment II has a blank ordinance number and unfilled adoption and approval fields."
    },
    {
      "id": "m56-review-07",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-hayward_draft"
      ],
      "scope": "draft duration",
      "notes": "The draft describes a 45 day initial term. Its exact application in the modified final instrument is not established."
    },
    {
      "id": "m56-review-08",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-hayward_draft"
      ],
      "scope": "draft exceptions",
      "notes": "The draft discusses renewals of valid existing business licenses and building permits, and previously complete and approved applications. These are draft terms here."
    },
    {
      "id": "m56-review-09",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-city-news"
      ],
      "scope": "official report",
      "notes": "The City October 21 article reports an immediate moratorium and unanimous Council action."
    },
    {
      "id": "m56-review-10",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-city-news"
      ],
      "scope": "state law ceiling",
      "notes": "The City describes a possible two year maximum, which is not treated as an adopted term or an exact expiration day."
    },
    {
      "id": "m56-review-11",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-ledger",
        "m56-hayward_action"
      ],
      "scope": "header discrepancy",
      "notes": "The parent status remains Agenda Ready while the action history and detail record passage. The action record is retained separately from that header."
    },
    {
      "id": "m56-review-12",
      "jurisdiction": "City of Hayward",
      "state": "ca",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m56-city-news"
      ],
      "scope": "site scope",
      "notes": "The City article separately describes three operating facilities and one construction project. The moratorium itself is not used to change any site stage."
    },
    {
      "id": "m57-review-01",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "identity",
      "notes": "The original instrument identifies Ord. 26-057, removing cyber hotel and data center principal uses from the Industrial District."
    },
    {
      "id": "m57-review-02",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "introduction",
      "notes": "The signed record lists July 15, 2026 introduction and nine affirmative votes."
    },
    {
      "id": "m57-review-03",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "final vote",
      "notes": "The signed record lists August 19, 2026 final adoption and a nine to zero vote."
    },
    {
      "id": "m57-review-04",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "mayor",
      "notes": "The visually reviewed third page includes the Mayor signature and August 20, 2026 approval."
    },
    {
      "id": "m57-review-05",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "certification",
      "notes": "The third page includes the City Clerk certification signature and the Council President signature."
    },
    {
      "id": "m57-review-06",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "effective day",
      "notes": "The ordinance takes effect at the time and in the manner provided by law. An exact effective date and required publication completion remain unverified."
    },
    {
      "id": "m57-review-07",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "scope",
      "notes": "The removal concerns principal permitted uses in the Industrial District; it is not described as a prohibition on every data processing activity citywide."
    },
    {
      "id": "m57-review-08",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "definition",
      "notes": "The visually reviewed seventh page adds text excluding data centers and cyber hotels from warehousing."
    },
    {
      "id": "m57-review-09",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "deletion",
      "notes": "The seventh page visibly strikes the cyber hotel principal use entry. Text extraction alone would not establish that deletion."
    },
    {
      "id": "m57-review-10",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "parking",
      "notes": "The eighth page visibly strikes the cyber hotel parking standard."
    },
    {
      "id": "m57-review-11",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "existing context",
      "notes": "The planning memo discusses existing colocated downtown facilities. It cites a private directory for its inventory; that list is not adopted as independently verified operation evidence."
    },
    {
      "id": "m57-review-12",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "jurisdiction",
      "notes": "The instrument and agenda identify Jersey City in New Jersey."
    },
    {
      "id": "m57-review-13",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "recommendation date conflict",
      "notes": "The planning resolution attachment headings say June 30, 2025 while its body and final memorialization field say June 30, 2026. No exact planning decision day is normalized from that conflict."
    },
    {
      "id": "m57-review-14",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "recommendation vote conflict",
      "notes": "The planning attachment says six to zero but shows nine affirmative marks. That inconsistency is retained and does not replace the separately recorded final Council vote."
    },
    {
      "id": "m57-review-15",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "current limits",
      "notes": "This review establishes the adopted and approved instrument as captured. No subsequent amendment, repeal or complete current code reconciliation was reviewed."
    },
    {
      "id": "m57-review-16",
      "jurisdiction": "City of Jersey City",
      "state": "nj",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m57-ordinance"
      ],
      "scope": "site status",
      "notes": "No individual facility stage or eligibility is changed by this zoning review."
    },
    {
      "id": "m58-review-01",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "instrument",
      "notes": "The revised text is numbered Ordinance 2026-22."
    },
    {
      "id": "m58-review-02",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "process state",
      "notes": "The October 27 memo recommends a new first reading because the title changed after the October 13 first reading vote."
    },
    {
      "id": "m58-review-03",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "adoption block",
      "notes": "The revised text leaves the adoption day, second reading and approval signatures unfilled. No final adoption is established."
    },
    {
      "id": "m58-review-04",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "territory",
      "notes": "The proposed moratorium covers incorporated Dade City. The memo separately describes surrounding unincorporated Pasco County."
    },
    {
      "id": "m58-review-05",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "covered processes",
      "notes": "The proposal covers submission and acceptance of listed development, land use and permit applications."
    },
    {
      "id": "m58-review-06",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "proposed term",
      "notes": "The draft specifies twelve months, with effectiveness upon passage and adoption. No exact start or expiry is calculated without final adoption."
    },
    {
      "id": "m58-review-07",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "extension",
      "notes": "A further six months would require another ordinance adoption. Extension is not automatic."
    },
    {
      "id": "m58-review-08",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "smaller facility exception",
      "notes": "Section 3 permits a development agreement route after a public necessity determination for a data center that is not a large scale facility or large load customer, subject to specific conditions."
    },
    {
      "id": "m58-review-09",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "definition scope",
      "notes": "The generic data center definition includes a facility within a larger structure. The proposal is not summarized as covering only facilities over 50 MW."
    },
    {
      "id": "m58-review-10",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "large load threshold",
      "notes": "The proposed large load and large scale definitions use at least 50 MW anticipated monthly peak demand, measured over a 15 minute interval at one location."
    },
    {
      "id": "m58-review-11",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "aggregation",
      "notes": "The draft excludes aggregation across separate locations but includes qualifying colocated entities at a single location."
    },
    {
      "id": "m58-review-12",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "disclosure date",
      "notes": "Section 6 names October 27 for proposed applicant disclosure. That draft date is not used as an accomplished legal effective day."
    },
    {
      "id": "m58-review-13",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "vested rights",
      "notes": "Section 9 provides a vested rights determination application and an appeal to the Commission within 45 days. No individual project is declared vested."
    },
    {
      "id": "m58-review-14",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "study concerns",
      "notes": "The memo and draft discuss possible utility, water, wastewater, noise and lighting impacts. These are attributed study reasons, not measurements at a named facility."
    },
    {
      "id": "m58-review-15",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "later hearing",
      "notes": "The memo anticipates November 10 second reading with a new notice to be published. The older impact estimate retains October 27 second reading; it is not used to override the revised memo."
    },
    {
      "id": "m58-review-16",
      "jurisdiction": "City of Dade City",
      "state": "fl",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m58-dade-revised-packet"
      ],
      "scope": "read scope",
      "notes": "Agenda and memo pages 1 through 4 and 15 through 16 plus all seven revised ordinance pages 17 through 23 were read. Unrelated packet materials are not legal proof."
    },
    {
      "id": "m59-review-01",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 1",
      "notes": "City jurisdiction identified."
    },
    {
      "id": "m59-review-02",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 2",
      "notes": "The city describes a proposed moratorium on new data center development applications."
    },
    {
      "id": "m59-review-03",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 3",
      "notes": "The August 11 resolution initiates a process, not an effective pause."
    },
    {
      "id": "m59-review-04",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 4",
      "notes": "The overview describes a proposed initial 90 day term."
    },
    {
      "id": "m59-review-05",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 5",
      "notes": "No adopted moratorium date is verified."
    },
    {
      "id": "m59-review-06",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 6",
      "notes": "No effective day or expiry is calculated."
    },
    {
      "id": "m59-review-07",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 7",
      "notes": "The dated city update schedules the first hearing November 10."
    },
    {
      "id": "m59-review-08",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 8",
      "notes": "The overview describes further notices, hearings and readings."
    },
    {
      "id": "m59-review-09",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 9",
      "notes": "The overview describes a supermajority adoption requirement, not a completed vote."
    },
    {
      "id": "m59-review-10",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 10",
      "notes": "February 16, 2027 adoption remains tentative."
    },
    {
      "id": "m59-review-11",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 11",
      "notes": "The overview describes vested, approved and submitted zoning application exclusions; no individual eligibility is decided."
    },
    {
      "id": "m59-review-12",
      "jurisdiction": "City of Fort Worth",
      "state": "tx",
      "checked_on": "2026-10-24",
      "result": "selected_official_content",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "scope": "Proposal qualification 12",
      "notes": "The underlying final ordinance and Texas statute were not read; this is official proposal context only."
    },
    {
      "id": "m60-review-01",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "source",
      "notes": "The City notice links the exact original ordinance summary."
    },
    {
      "id": "m60-review-02",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "format",
      "notes": "The retained original is a DOCX summary, not the complete ordinance."
    },
    {
      "id": "m60-review-03",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "identity",
      "notes": "The summary names Ordinance 70 53."
    },
    {
      "id": "m60-review-04",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "adoption",
      "notes": "Final adoption is reported October 20, 2026."
    },
    {
      "id": "m60-review-05",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "approval",
      "notes": "Approval is reported separately on October 21, 2026."
    },
    {
      "id": "m60-review-06",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "definitions",
      "notes": "The summary identifies amendments to chapter 31 2 definitions."
    },
    {
      "id": "m60-review-07",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "uses",
      "notes": "The summary identifies chapter 31 20.25 prohibited uses."
    },
    {
      "id": "m60-review-08",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "territory",
      "notes": "The summary describes all City zoning districts."
    },
    {
      "id": "m60-review-09",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "effect",
      "notes": "No exact effective date is supplied."
    },
    {
      "id": "m60-review-10",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "exceptions",
      "notes": "Complete operative provisions and exceptions remain unqualified."
    },
    {
      "id": "m60-review-11",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "status",
      "notes": "An official action is recorded but the full instrument is not verified."
    },
    {
      "id": "m60-review-12",
      "jurisdiction": "City of Linden",
      "state": "nj",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m60-linden-summary"
      ],
      "scope": "site boundary",
      "notes": "No individual property determination or physical operation status is inferred."
    },
    {
      "id": "m61-review-01",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "issuer",
      "notes": "City Advisory Plan Commission notice."
    },
    {
      "id": "m61-review-02",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "date",
      "notes": "Notice dated October 12, 2026."
    },
    {
      "id": "m61-review-03",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "instrument scope",
      "notes": "Amendments to Chapter 153 of the Unified Development Ordinance are proposed."
    },
    {
      "id": "m61-review-04",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "uses",
      "notes": "Both data centers and battery energy storage systems are covered."
    },
    {
      "id": "m61-review-05",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "pause scope",
      "notes": "Proposed moratorium concerns consideration of approvals."
    },
    {
      "id": "m61-review-06",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "term",
      "notes": "Six months is a proposed duration without a verified commencement or expiry."
    },
    {
      "id": "m61-review-07",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "first hearing",
      "notes": "October 26 hearing is scheduled, not accomplished."
    },
    {
      "id": "m61-review-08",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "second hearing",
      "notes": "November 23 second hearing is separately scheduled."
    },
    {
      "id": "m61-review-09",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "other provisions",
      "notes": "Definitions, permitted districts, special use exceptions and standards are also proposed."
    },
    {
      "id": "m61-review-10",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "legal state",
      "notes": "No adopted ordinance or active moratorium is established."
    },
    {
      "id": "m61-review-11",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "full text",
      "notes": "Notice says proposed amendments may be examined in the Planning Commission office; full text is unqualified."
    },
    {
      "id": "m61-review-12",
      "jurisdiction": "City of Huntingburg",
      "state": "in",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m61-notice"
      ],
      "scope": "site limits",
      "notes": "No individual project eligibility, cancellation or operating status is inferred."
    },
    {
      "id": "m62-review-01",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "jurisdiction",
      "notes": "Richland Township in Kalamazoo County, Michigan."
    },
    {
      "id": "m62-review-02",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "issuer",
      "notes": "Planning Commission hearing notice and Agenda A are official originals."
    },
    {
      "id": "m62-review-03",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "proposal identity",
      "notes": "Agenda A identifies Ordinance 313."
    },
    {
      "id": "m62-review-04",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "section",
      "notes": "Data center provision is Section 300.2005."
    },
    {
      "id": "m62-review-05",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "data center term",
      "notes": "Proposed data center term is twelve months."
    },
    {
      "id": "m62-review-06",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "battery section",
      "notes": "Battery storage provision is Section 300.2006."
    },
    {
      "id": "m62-review-07",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "battery term",
      "notes": "Battery storage proposal is nine months, distinct from the data center term."
    },
    {
      "id": "m62-review-08",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "hearing",
      "notes": "Consideration is scheduled for October 28, 2026."
    },
    {
      "id": "m62-review-09",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "prior measures",
      "notes": "Earlier Ordinance 311 is not qualified by these selected originals; no replacement or absence is inferred."
    },
    {
      "id": "m62-review-10",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "legal timing",
      "notes": "No legal commencement or expiry is derived from the proposed duration."
    },
    {
      "id": "m62-review-11",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "full instrument",
      "notes": "Selected originals are a notice and agenda rather than full operative amendment text."
    },
    {
      "id": "m62-review-12",
      "jurisdiction": "Richland Township, Kalamazoo County",
      "state": "mi",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m62-notice",
        "m62-agenda"
      ],
      "scope": "site scope",
      "notes": "No individual development approval, cancellation or operation is established."
    },
    {
      "id": "m63-review-01",
      "jurisdiction": "City of Hubbard",
      "state": "oh",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m63-election"
      ],
      "scope": "issuer",
      "notes": "County Board of Elections official notice."
    },
    {
      "id": "m63-review-02",
      "jurisdiction": "City of Hubbard",
      "state": "oh",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m63-election"
      ],
      "scope": "election",
      "notes": "November 3, 2026 general election identified on page 1."
    },
    {
      "id": "m63-review-03",
      "jurisdiction": "City of Hubbard",
      "state": "oh",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m63-election"
      ],
      "scope": "question",
      "notes": "Page 6 lists proposed Hubbard City ordinance on data center ban."
    },
    {
      "id": "m63-review-04",
      "jurisdiction": "City of Hubbard",
      "state": "oh",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m63-election"
      ],
      "scope": "electorate",
      "notes": "Hubbard City precincts are listed."
    },
    {
      "id": "m63-review-05",
      "jurisdiction": "City of Hubbard",
      "state": "oh",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m63-election"
      ],
      "scope": "territory",
      "notes": "Within City limits, separate from Hubbard Township."
    },
    {
      "id": "m63-review-06",
      "jurisdiction": "City of Hubbard",
      "state": "oh",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m63-election"
      ],
      "scope": "status",
      "notes": "Approval or rejection is scheduled rather than known."
    },
    {
      "id": "m63-review-07",
      "jurisdiction": "City of Hubbard",
      "state": "oh",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m63-election"
      ],
      "scope": "definition",
      "notes": "Full ordinance definition is outside this notice summary."
    },
    {
      "id": "m63-review-08",
      "jurisdiction": "City of Hubbard",
      "state": "oh",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m63-election"
      ],
      "scope": "exceptions",
      "notes": "No full exception scope is qualified."
    },
    {
      "id": "m63-review-09",
      "jurisdiction": "City of Hubbard",
      "state": "oh",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m63-election"
      ],
      "scope": "timing",
      "notes": "No actual adoption, legal effective day or duration is supplied."
    },
    {
      "id": "m63-review-10",
      "jurisdiction": "City of Hubbard",
      "state": "oh",
      "checked_on": "2026-10-25",
      "result": "selected_official_content",
      "source_ids": [
        "m63-election"
      ],
      "scope": "site limits",
      "notes": "No individual project denial, cancellation or computing operation is established."
    },
    {
      "id": "m64-review-01",
      "jurisdiction": "City of Lafayette, Colorado",
      "state": "co",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m64-lafayette-recap"
      ],
      "scope": "issuer",
      "notes": "OfficialCityofLafayetteColorado recap."
    },
    {
      "id": "m64-review-02",
      "jurisdiction": "City of Lafayette, Colorado",
      "state": "co",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m64-lafayette-recap"
      ],
      "scope": "meeting",
      "notes": "MeetingdateOctober20,2026; not inferred publicationday."
    },
    {
      "id": "m64-review-03",
      "jurisdiction": "City of Lafayette, Colorado",
      "state": "co",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m64-lafayette-recap"
      ],
      "scope": "action",
      "notes": "Second reading approval appears in consent agenda."
    },
    {
      "id": "m64-review-04",
      "jurisdiction": "City of Lafayette, Colorado",
      "state": "co",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m64-lafayette-recap"
      ],
      "scope": "vote",
      "notes": "Consent agenda approved6to0; no invented separate rollcall."
    },
    {
      "id": "m64-review-05",
      "jurisdiction": "City of Lafayette, Colorado",
      "state": "co",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m64-lafayette-recap"
      ],
      "scope": "instrument",
      "notes": "Ordinance21Series2026 identified."
    },
    {
      "id": "m64-review-06",
      "jurisdiction": "City of Lafayette, Colorado",
      "state": "co",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m64-lafayette-recap"
      ],
      "scope": "term",
      "notes": "Nominal duration18months, no computedenddate."
    },
    {
      "id": "m64-review-07",
      "jurisdiction": "City of Lafayette, Colorado",
      "state": "co",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m64-lafayette-recap"
      ],
      "scope": "covered actions",
      "notes": "Acceptance,processing andapproval identified."
    },
    {
      "id": "m64-review-08",
      "jurisdiction": "City of Lafayette, Colorado",
      "state": "co",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m64-lafayette-recap"
      ],
      "scope": "applications",
      "notes": "Landuseapplications andbuildingpermits identified."
    },
    {
      "id": "m64-review-09",
      "jurisdiction": "City of Lafayette, Colorado",
      "state": "co",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m64-lafayette-recap"
      ],
      "scope": "development scope",
      "notes": "Development orconstruction ofdata centers andrelateduses; fulldefinitionsunknown."
    },
    {
      "id": "m64-review-10",
      "jurisdiction": "City of Lafayette, Colorado",
      "state": "co",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m64-lafayette-recap"
      ],
      "scope": "legal limit",
      "notes": "No signedinstrument/effective date verified; actiononly status retained."
    },
    {
      "id": "m65-review-01",
      "jurisdiction": "Unincorporated Martin County, Florida",
      "state": "fl",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m65-martin-agenda"
      ],
      "scope": "proposal qualification 1",
      "notes": "County agenda is official."
    },
    {
      "id": "m65-review-02",
      "jurisdiction": "Unincorporated Martin County, Florida",
      "state": "fl",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m65-martin-agenda"
      ],
      "scope": "proposal qualification 2",
      "notes": "File 27-0109 is Agenda Ready."
    },
    {
      "id": "m65-review-03",
      "jurisdiction": "Unincorporated Martin County, Florida",
      "state": "fl",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m65-martin-agenda"
      ],
      "scope": "proposal qualification 3",
      "notes": "Second hearing is October 27, 2026."
    },
    {
      "id": "m65-review-04",
      "jurisdiction": "Unincorporated Martin County, Florida",
      "state": "fl",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m65-martin-agenda"
      ],
      "scope": "proposal qualification 4",
      "notes": "Scope is unincorporated county territory."
    },
    {
      "id": "m65-review-05",
      "jurisdiction": "Unincorporated Martin County, Florida",
      "state": "fl",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m65-martin-agenda"
      ],
      "scope": "proposal qualification 5",
      "notes": "Submission and acceptance are proposed covered actions."
    },
    {
      "id": "m65-review-06",
      "jurisdiction": "Unincorporated Martin County, Florida",
      "state": "fl",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m65-martin-agenda"
      ],
      "scope": "proposal qualification 6",
      "notes": "The definition concerns a single location, not aggregate facilities."
    },
    {
      "id": "m65-review-07",
      "jurisdiction": "Unincorporated Martin County, Florida",
      "state": "fl",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m65-martin-agenda"
      ],
      "scope": "proposal qualification 7",
      "notes": "Colocated customers are included in the described load definition."
    },
    {
      "id": "m65-review-08",
      "jurisdiction": "Unincorporated Martin County, Florida",
      "state": "fl",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m65-martin-agenda"
      ],
      "scope": "proposal qualification 8",
      "notes": "Previously complete applications are described as continuing under prior rules."
    },
    {
      "id": "m65-review-09",
      "jurisdiction": "Unincorporated Martin County, Florida",
      "state": "fl",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m65-martin-agenda"
      ],
      "scope": "proposal qualification 9",
      "notes": "The October 13 vote concerns hearing timing and is not moratorium adoption."
    },
    {
      "id": "m65-review-10",
      "jurisdiction": "Unincorporated Martin County, Florida",
      "state": "fl",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m65-martin-agenda"
      ],
      "scope": "proposal qualification 10",
      "notes": "Ordinance attachment returned HTTP 410; no adopted term or effective day inferred."
    },
    {
      "id": "m66-avon-review-1",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon",
        "m66-avon-minutes"
      ],
      "scope": "instrument qualification 1",
      "notes": "August12 official minutes page1 reviewed."
    },
    {
      "id": "m66-avon-review-2",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon",
        "m66-avon-minutes"
      ],
      "scope": "instrument qualification 2",
      "notes": "September2 minutes approve August minutes."
    },
    {
      "id": "m66-avon-review-3",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon",
        "m66-avon-minutes"
      ],
      "scope": "instrument qualification 3",
      "notes": "Carried motion adopts Resolution08-12-26-1."
    },
    {
      "id": "m66-avon-review-4",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon",
        "m66-avon-minutes"
      ],
      "scope": "instrument qualification 4",
      "notes": "Hearing considered nominal one year pause."
    },
    {
      "id": "m66-avon-review-5",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon",
        "m66-avon-minutes"
      ],
      "scope": "instrument qualification 5",
      "notes": "Vote wording is both in favor, no numeric rollcall inferred."
    },
    {
      "id": "m66-avon-review-6",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon",
        "m66-avon-minutes"
      ],
      "scope": "instrument qualification 6",
      "notes": "Full instrument remains unverified."
    },
    {
      "id": "m66-avon-review-7",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon",
        "m66-avon-minutes"
      ],
      "scope": "instrument qualification 7",
      "notes": "Legal effective day unknown."
    },
    {
      "id": "m66-avon-review-8",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon",
        "m66-avon-minutes"
      ],
      "scope": "instrument qualification 8",
      "notes": "No expiry computed from nominal term."
    },
    {
      "id": "m66-avon-review-9",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon",
        "m66-avon-minutes"
      ],
      "scope": "instrument qualification 9",
      "notes": "Later legal followup not resolved."
    },
    {
      "id": "m66-avon-review-10",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon",
        "m66-avon-minutes"
      ],
      "scope": "instrument qualification 10",
      "notes": "Joint planning meeting unrelated; no data center schedule inferred."
    },
    {
      "id": "m66-south-bristol-review-1",
      "jurisdiction": "Town of South Bristol, New York",
      "state": "ny",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-south-bristol"
      ],
      "scope": "instrument qualification 1",
      "notes": "Official Town hosted draft."
    },
    {
      "id": "m66-south-bristol-review-2",
      "jurisdiction": "Town of South Bristol, New York",
      "state": "ny",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-south-bristol"
      ],
      "scope": "instrument qualification 2",
      "notes": "Five page document text fully read."
    },
    {
      "id": "m66-south-bristol-review-3",
      "jurisdiction": "Town of South Bristol, New York",
      "state": "ny",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-south-bristol"
      ],
      "scope": "instrument qualification 3",
      "notes": "Law number blank."
    },
    {
      "id": "m66-south-bristol-review-4",
      "jurisdiction": "Town of South Bristol, New York",
      "state": "ny",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-south-bristol"
      ],
      "scope": "instrument qualification 4",
      "notes": "Adoption certifications blank."
    },
    {
      "id": "m66-south-bristol-review-5",
      "jurisdiction": "Town of South Bristol, New York",
      "state": "ny",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-south-bristol"
      ],
      "scope": "instrument qualification 5",
      "notes": "Data center definition and AI definition distinct."
    },
    {
      "id": "m66-south-bristol-review-6",
      "jurisdiction": "Town of South Bristol, New York",
      "state": "ny",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-south-bristol"
      ],
      "scope": "instrument qualification 6",
      "notes": "Health care internal use exclusion is qualified."
    },
    {
      "id": "m66-south-bristol-review-7",
      "jurisdiction": "Town of South Bristol, New York",
      "state": "ny",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-south-bristol"
      ],
      "scope": "instrument qualification 7",
      "notes": "Supporting uses tied to covered facilities."
    },
    {
      "id": "m66-south-bristol-review-8",
      "jurisdiction": "Town of South Bristol, New York",
      "state": "ny",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-south-bristol"
      ],
      "scope": "instrument qualification 8",
      "notes": "Draft effect depends on filing."
    },
    {
      "id": "m66-south-bristol-review-9",
      "jurisdiction": "Town of South Bristol, New York",
      "state": "ny",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-south-bristol"
      ],
      "scope": "instrument qualification 9",
      "notes": "No actual filing proof reviewed."
    },
    {
      "id": "m66-south-bristol-review-10",
      "jurisdiction": "Town of South Bristol, New York",
      "state": "ny",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-south-bristol"
      ],
      "scope": "instrument qualification 10",
      "notes": "Past hearing scheduling does not establish adoption."
    },
    {
      "id": "m66-avon-text-1",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon-resolution-text"
      ],
      "scope": "full text qualification 1",
      "notes": "All three hosted resolution pages read; adoption and signature blanks retained."
    },
    {
      "id": "m66-avon-text-2",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon-resolution-text"
      ],
      "scope": "full text qualification 2",
      "notes": "Definition excludes accessory server rooms and ordinary business IT."
    },
    {
      "id": "m66-avon-text-3",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon-resolution-text"
      ],
      "scope": "full text qualification 3",
      "notes": "Preexisting data centers are exempt in the hosted text."
    },
    {
      "id": "m66-avon-text-4",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon-resolution-text"
      ],
      "scope": "full text qualification 4",
      "notes": "Restriction covers construction installation replacement and enlargement."
    },
    {
      "id": "m66-avon-text-5",
      "jurisdiction": "Avon Township, Minnesota",
      "state": "mn",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m66-avon-resolution-text"
      ],
      "scope": "full text qualification 5",
      "notes": "One year and earlier termination clauses do not independently prove exact legal expiry."
    },
    {
      "id": "m67-review-1",
      "jurisdiction": "City of Brownsville and its Extraterritorial Jurisdiction, Texas",
      "state": "tx",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m67-brownsville-recap"
      ],
      "scope": "proposal qualification 1",
      "notes": "Official City recap published October7."
    },
    {
      "id": "m67-review-2",
      "jurisdiction": "City of Brownsville and its Extraterritorial Jurisdiction, Texas",
      "state": "tx",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m67-brownsville-recap"
      ],
      "scope": "proposal qualification 2",
      "notes": "Ordinance2026 1826 received first reading approval."
    },
    {
      "id": "m67-review-3",
      "jurisdiction": "City of Brownsville and its Extraterritorial Jurisdiction, Texas",
      "state": "tx",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m67-brownsville-recap"
      ],
      "scope": "proposal qualification 3",
      "notes": "Third public hearing is not final ordinance adoption."
    },
    {
      "id": "m67-review-4",
      "jurisdiction": "City of Brownsville and its Extraterritorial Jurisdiction, Texas",
      "state": "tx",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m67-brownsville-recap"
      ],
      "scope": "proposal qualification 4",
      "notes": "Covered area is City and extraterritorial jurisdiction."
    },
    {
      "id": "m67-review-5",
      "jurisdiction": "City of Brownsville and its Extraterritorial Jurisdiction, Texas",
      "state": "tx",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m67-brownsville-recap"
      ],
      "scope": "proposal qualification 5",
      "notes": "Proposed actions are application acceptance processing and approval."
    },
    {
      "id": "m67-review-6",
      "jurisdiction": "City of Brownsville and its Extraterritorial Jurisdiction, Texas",
      "state": "tx",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m67-brownsville-recap"
      ],
      "scope": "proposal qualification 6",
      "notes": "Second and final reading scheduled November4."
    },
    {
      "id": "m67-review-7",
      "jurisdiction": "City of Brownsville and its Extraterritorial Jurisdiction, Texas",
      "state": "tx",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m67-brownsville-recap"
      ],
      "scope": "proposal qualification 7",
      "notes": "Three fourths approval is described as required."
    },
    {
      "id": "m67-review-8",
      "jurisdiction": "City of Brownsville and its Extraterritorial Jurisdiction, Texas",
      "state": "tx",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m67-brownsville-recap"
      ],
      "scope": "proposal qualification 8",
      "notes": "November5 and February3 are conditional dates."
    },
    {
      "id": "m67-review-9",
      "jurisdiction": "City of Brownsville and its Extraterritorial Jurisdiction, Texas",
      "state": "tx",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m67-brownsville-recap"
      ],
      "scope": "proposal qualification 9",
      "notes": "A possible further90days is not an accomplished extension."
    },
    {
      "id": "m67-review-10",
      "jurisdiction": "City of Brownsville and its Extraterritorial Jurisdiction, Texas",
      "state": "tx",
      "checked_on": "2026-10-26",
      "result": "selected_official_content",
      "source_ids": [
        "m67-brownsville-recap"
      ],
      "scope": "proposal qualification 10",
      "notes": "No current legal effect or site status inferred."
    },
    {
      "id": "m68-review-1",
      "jurisdiction": "City of Charlotte and its Extraterritorial Jurisdiction",
      "state": "nc",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m68-history",
        "m68-ordinance"
      ],
      "scope": "Extension instrument field review",
      "notes": "Action history records Approve and Pass on October 26."
    },
    {
      "id": "m68-review-2",
      "jurisdiction": "City of Charlotte and its Extraterritorial Jurisdiction",
      "state": "nc",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m68-history",
        "m68-ordinance"
      ],
      "scope": "Extension instrument field review",
      "notes": "Header remains Agenda Ready and is not silently reconciled."
    },
    {
      "id": "m68-review-3",
      "jurisdiction": "City of Charlotte and its Extraterritorial Jurisdiction",
      "state": "nc",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m68-history",
        "m68-ordinance"
      ],
      "scope": "Extension instrument field review",
      "notes": "Attachment adoption clause states October 26."
    },
    {
      "id": "m68-review-4",
      "jurisdiction": "City of Charlotte and its Extraterritorial Jurisdiction",
      "state": "nc",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m68-history",
        "m68-ordinance"
      ],
      "scope": "Extension instrument field review",
      "notes": "Section 6 makes ordinance effective upon adoption."
    },
    {
      "id": "m68-review-5",
      "jurisdiction": "City of Charlotte and its Extraterritorial Jurisdiction",
      "state": "nc",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m68-history",
        "m68-ordinance"
      ],
      "scope": "Extension instrument field review",
      "notes": "Extended pause commences November 6, distinct from ordinance effectiveness."
    },
    {
      "id": "m68-review-6",
      "jurisdiction": "City of Charlotte and its Extraterritorial Jurisdiction",
      "state": "nc",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m68-history",
        "m68-ordinance"
      ],
      "scope": "Extension instrument field review",
      "notes": "Published outer end is October 18, 2027."
    },
    {
      "id": "m68-review-7",
      "jurisdiction": "City of Charlotte and its Extraterritorial Jurisdiction",
      "state": "nc",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m68-history",
        "m68-ordinance"
      ],
      "scope": "Extension instrument field review",
      "notes": "Earlier end upon specified new rules or policies is retained."
    },
    {
      "id": "m68-review-8",
      "jurisdiction": "City of Charlotte and its Extraterritorial Jurisdiction",
      "state": "nc",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m68-history",
        "m68-ordinance"
      ],
      "scope": "Extension instrument field review",
      "notes": "City and extraterritorial jurisdiction are included."
    },
    {
      "id": "m68-review-9",
      "jurisdiction": "City of Charlotte and its Extraterritorial Jurisdiction",
      "state": "nc",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m68-history",
        "m68-ordinance"
      ],
      "scope": "Extension instrument field review",
      "notes": "Internal support facilities and statutory project exceptions remain scoped."
    },
    {
      "id": "m68-review-10",
      "jurisdiction": "City of Charlotte and its Extraterritorial Jurisdiction",
      "state": "nc",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m68-history",
        "m68-ordinance"
      ],
      "scope": "Extension instrument field review",
      "notes": "No signed execution block or individual project eligibility is verified."
    },
    {
      "id": "m69-review-1",
      "jurisdiction": "Town of Tyre, New York",
      "state": "ny",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m69-tyre-notice"
      ],
      "scope": "Proposed restriction notice fields",
      "notes": "Official Town Clerk notice published October2 2026."
    },
    {
      "id": "m69-review-2",
      "jurisdiction": "Town of Tyre, New York",
      "state": "ny",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m69-tyre-notice"
      ],
      "scope": "Proposed restriction notice fields",
      "notes": "Town Board hearing day October28 2026."
    },
    {
      "id": "m69-review-3",
      "jurisdiction": "Town of Tyre, New York",
      "state": "ny",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m69-tyre-notice"
      ],
      "scope": "Proposed restriction notice fields",
      "notes": "Hearing starts18:30 local clock, not a guessed item clock."
    },
    {
      "id": "m69-review-4",
      "jurisdiction": "Town of Tyre, New York",
      "state": "ny",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m69-tyre-notice"
      ],
      "scope": "Proposed restriction notice fields",
      "notes": "Tyre Town Hall and1082 Gravel Road are explicitly stated."
    },
    {
      "id": "m69-review-5",
      "jurisdiction": "Town of Tyre, New York",
      "state": "ny",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m69-tyre-notice"
      ],
      "scope": "Proposed restriction notice fields",
      "notes": "Seneca Falls is the notice postal address, not a different governing authority."
    },
    {
      "id": "m69-review-6",
      "jurisdiction": "Town of Tyre, New York",
      "state": "ny",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m69-tyre-notice"
      ],
      "scope": "Proposed restriction notice fields",
      "notes": "Proposed one year computing moratorium, not enacted prohibition."
    },
    {
      "id": "m69-review-7",
      "jurisdiction": "Town of Tyre, New York",
      "state": "ny",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m69-tyre-notice"
      ],
      "scope": "Proposed restriction notice fields",
      "notes": "No legal commencement or exact expiration established."
    },
    {
      "id": "m69-review-8",
      "jurisdiction": "Town of Tyre, New York",
      "state": "ny",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m69-tyre-notice"
      ],
      "scope": "Proposed restriction notice fields",
      "notes": "Public speakers may be heard and proposed law inspected at Town Hall."
    },
    {
      "id": "m69-review-9",
      "jurisdiction": "Town of Tyre, New York",
      "state": "ny",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m69-tyre-notice"
      ],
      "scope": "Proposed restriction notice fields",
      "notes": "No source time zone or closing time supplied."
    },
    {
      "id": "m69-review-10",
      "jurisdiction": "Town of Tyre, New York",
      "state": "ny",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m69-tyre-notice"
      ],
      "scope": "Proposed restriction notice fields",
      "notes": "Direct capture403 held; accessible complete official web view recorded with distinct provenance."
    },
    {
      "id": "m70-review-1",
      "jurisdiction": "City of San Diego",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m70-blog23",
        "m70-blog26"
      ],
      "scope": "Selected moratorium schedule update and item S510 section",
      "notes": "October 23 update moves expected moratorium discussion to Tuesday morning."
    },
    {
      "id": "m70-review-2",
      "jurisdiction": "City of San Diego",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m70-blog23",
        "m70-blog26"
      ],
      "scope": "Selected moratorium schedule update and item S510 section",
      "notes": "October 26 dated Council office preview identifies the October 27 Council meeting."
    },
    {
      "id": "m70-review-3",
      "jurisdiction": "City of San Diego",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m70-blog23",
        "m70-blog26"
      ],
      "scope": "Selected moratorium schedule update and item S510 section",
      "notes": "Moratorium appears as item S510 in the October 27 preview."
    },
    {
      "id": "m70-review-4",
      "jurisdiction": "City of San Diego",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m70-blog23",
        "m70-blog26"
      ],
      "scope": "Selected moratorium schedule update and item S510 section",
      "notes": "Selected item belongs to the 10 a.m. session. Session start is not an exact item opening clock."
    },
    {
      "id": "m70-review-5",
      "jurisdiction": "City of San Diego",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m70-blog23",
        "m70-blog26"
      ],
      "scope": "Selected moratorium schedule update and item S510 section",
      "notes": "The item proposes an urgency ordinance under Government Code section 65858."
    },
    {
      "id": "m70-review-6",
      "jurisdiction": "City of San Diego",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m70-blog23",
        "m70-blog26"
      ],
      "scope": "Selected moratorium schedule update and item S510 section",
      "notes": "Source describes a required four fifths adoption vote, not an accomplished vote."
    },
    {
      "id": "m70-review-7",
      "jurisdiction": "City of San Diego",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m70-blog23",
        "m70-blog26"
      ],
      "scope": "Selected moratorium schedule update and item S510 section",
      "notes": "Proposed initial term is 45 days from passage; no passage day verified."
    },
    {
      "id": "m70-review-8",
      "jurisdiction": "City of San Diego",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m70-blog23",
        "m70-blog26"
      ],
      "scope": "Selected moratorium schedule update and item S510 section",
      "notes": "Potential further term requires another noticed hearing and vote; no extension inferred."
    },
    {
      "id": "m70-review-9",
      "jurisdiction": "City of San Diego",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m70-blog23",
        "m70-blog26"
      ],
      "scope": "Selected moratorium schedule update and item S510 section",
      "notes": "The later preview resolves the prior October 26 versus October 27 scheduling uncertainty."
    },
    {
      "id": "m70-review-10",
      "jurisdiction": "City of San Diego",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m70-blog23",
        "m70-blog26"
      ],
      "scope": "Selected moratorium schedule update and item S510 section",
      "notes": "No adopted ordinance, accomplished hearing, effective date or individual project decision established."
    },
    {
      "id": "m71-review-1",
      "jurisdiction": "City of Denton",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "denton-staff",
        "denton-draft"
      ],
      "scope": "Complete second hearing staff report and draft sections 2, 6, 9 and blank adoption block",
      "notes": "Draft section 2 proposes an initial ninety day pause."
    },
    {
      "id": "m71-review-2",
      "jurisdiction": "City of Denton",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "denton-staff",
        "denton-draft"
      ],
      "scope": "Complete second hearing staff report and draft sections 2, 6, 9 and blank adoption block",
      "notes": "Draft scope includes municipal boundaries, City CCNs and the DME Certificated Service Area."
    },
    {
      "id": "m71-review-3",
      "jurisdiction": "City of Denton",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "denton-staff",
        "denton-draft"
      ],
      "scope": "Complete second hearing staff report and draft sections 2, 6, 9 and blank adoption block",
      "notes": "Draft recitals exclude applications or permits subject to Chapter 245."
    },
    {
      "id": "m71-review-4",
      "jurisdiction": "City of Denton",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "denton-staff",
        "denton-draft"
      ],
      "scope": "Complete second hearing staff report and draft sections 2, 6, 9 and blank adoption block",
      "notes": "Section 6 provides an earlier end if all needed ordinances and regulations are adopted."
    },
    {
      "id": "m71-review-5",
      "jurisdiction": "City of Denton",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "denton-staff",
        "denton-draft"
      ],
      "scope": "Complete second hearing staff report and draft sections 2, 6, 9 and blank adoption block",
      "notes": "Any extension requires further official Council action under the stated process."
    },
    {
      "id": "m71-review-6",
      "jurisdiction": "City of Denton",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "denton-staff",
        "denton-draft"
      ],
      "scope": "Complete second hearing staff report and draft sections 2, 6, 9 and blank adoption block",
      "notes": "Section 9 conditions effectiveness on passage, approval and required publication."
    },
    {
      "id": "m71-review-7",
      "jurisdiction": "City of Denton",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "denton-staff",
        "denton-draft"
      ],
      "scope": "Complete second hearing staff report and draft sections 2, 6, 9 and blank adoption block",
      "notes": "The draft vote and adoption day fields are blank."
    },
    {
      "id": "m71-review-8",
      "jurisdiction": "City of Denton",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "denton-staff",
        "denton-draft"
      ],
      "scope": "Complete second hearing staff report and draft sections 2, 6, 9 and blank adoption block",
      "notes": "December 1 is the future consideration day in the staff report, not verified commencement."
    },
    {
      "id": "m71-review-9",
      "jurisdiction": "City of Denton",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "denton-staff",
        "denton-draft"
      ],
      "scope": "Complete second hearing staff report and draft sections 2, 6, 9 and blank adoption block",
      "notes": "The staff account of October 13 development code adoption concerns a separate regulatory action."
    },
    {
      "id": "m71-review-10",
      "jurisdiction": "City of Denton",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "denton-staff",
        "denton-draft"
      ],
      "scope": "Complete second hearing staff report and draft sections 2, 6, 9 and blank adoption block",
      "notes": "Draft utility capacity statements and contractual load limits do not establish observed facility operation or exact restriction geometry."
    },
    {
      "id": "m72-review-1",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Two seven page zoning drafts have identical extracted text."
    },
    {
      "id": "m72-review-2",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "The two draft attachments remain separate source captures."
    },
    {
      "id": "m72-review-3",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "The proposal defines data centers by primary use."
    },
    {
      "id": "m72-review-4",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Servers in an office alone do not determine classification."
    },
    {
      "id": "m72-review-5",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Administrative space does not convert a campus to office use."
    },
    {
      "id": "m72-review-6",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "The written zoning paragraph limits the use to M1."
    },
    {
      "id": "m72-review-7",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "M1 requires a Specific Use Permit."
    },
    {
      "id": "m72-review-8",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Other districts would prohibit the use."
    },
    {
      "id": "m72-review-9",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "This is not a blanket municipal prohibition."
    },
    {
      "id": "m72-review-10",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "The use permit covers new establishment."
    },
    {
      "id": "m72-review-11",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Expansion and substantial modification also require the permit."
    },
    {
      "id": "m72-review-12",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Support facilities on the campus are included."
    },
    {
      "id": "m72-review-13",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Substations and generation equipment are included."
    },
    {
      "id": "m72-review-14",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Fuel storage and cooling equipment are included."
    },
    {
      "id": "m72-review-15",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Battery storage and utility infrastructure are included."
    },
    {
      "id": "m72-review-16",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Separate accessory classifications cannot evade the use permit."
    },
    {
      "id": "m72-review-17",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Other building permits do not replace the use permit."
    },
    {
      "id": "m72-review-18",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Draft water conditions distinguish domestic and cooling uses."
    },
    {
      "id": "m72-review-19",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Cooling with potable, surface or groundwater would be prohibited."
    },
    {
      "id": "m72-review-20",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Substations would be funded and maintained by the data center."
    },
    {
      "id": "m72-review-21",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Plans must identify principal and supporting improvements."
    },
    {
      "id": "m72-review-22",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Fire and life safety requirements refer to adopted codes."
    },
    {
      "id": "m72-review-23",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Hearing call attachment is a separate two page ordinance."
    },
    {
      "id": "m72-review-24",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "Hearing call adoption, votes and signatures remain blank."
    },
    {
      "id": "m72-review-25",
      "jurisdiction": "City of Deer Park",
      "state": "tx",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m72-15792",
        "m72-15795",
        "m72-15797",
        "m72-meeting"
      ],
      "scope": "Seven page zoning draft and two page unsigned hearing call, with exact scheduled agenda",
      "notes": "November2 meeting is confirmed; December1 hearing remains proposed."
    },
    {
      "id": "m73-review-1",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Two alternative texts are attached to one docket."
    },
    {
      "id": "m73-review-2",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Option1 defines the use at or below75kW IT energy load."
    },
    {
      "id": "m73-review-3",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Option1 excludes larger data centers."
    },
    {
      "id": "m73-review-4",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Option1 uses Limited Impact Special Review in LI and GI."
    },
    {
      "id": "m73-review-5",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Option1 lists no parking requirement."
    },
    {
      "id": "m73-review-6",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Option1 lists no loading requirement."
    },
    {
      "id": "m73-review-7",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Option1 excludes incidental or subordinate server infrastructure."
    },
    {
      "id": "m73-review-8",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Option2 defines the data center use above75kW."
    },
    {
      "id": "m73-review-9",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Option2 excludes the defined use from General Industrial."
    },
    {
      "id": "m73-review-10",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Only unincorporated County areas are covered."
    },
    {
      "id": "m73-review-11",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "October21 was a scheduled recommendation hearing, not an outcome in this review."
    },
    {
      "id": "m73-review-12",
      "jurisdiction": "Unincorporated Boulder County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-0",
        "m73-source-1",
        "m73-source-2"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Existing temporary moratorium remains separate from permanent code proposals."
    },
    {
      "id": "m73-review-13",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "The draft is27pages; selected provisions only are reviewed."
    },
    {
      "id": "m73-review-14",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Article17 applicability concerns unincorporated County areas."
    },
    {
      "id": "m73-review-15",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "New small facilities require Administrative Special Review."
    },
    {
      "id": "m73-review-16",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "New large facilities require Special Review."
    },
    {
      "id": "m73-review-17",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Substantial modifications have a separate applicability provision."
    },
    {
      "id": "m73-review-18",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Use tables mark hyperscale prohibited."
    },
    {
      "id": "m73-review-19",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Draft definitions aggregate property demand across phases and operators."
    },
    {
      "id": "m73-review-20",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Draft micro or edge category is below1MW."
    },
    {
      "id": "m73-review-21",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Draft small category is at least1MW and below10MW."
    },
    {
      "id": "m73-review-22",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Draft large category is at least10MW and below30MW."
    },
    {
      "id": "m73-review-23",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Draft hyperscale category is at least30MW."
    },
    {
      "id": "m73-review-24",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "Portal summary uses a different exact30MW boundary; discrepancy remains unresolved."
    },
    {
      "id": "m73-review-25",
      "jurisdiction": "Unincorporated Larimer County, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m73-source-3",
        "m73-source-4"
      ],
      "scope": "Selected proposed use definition, applicability, review and prohibition provisions with official page scope",
      "notes": "November24 feedback close is not adoption or a final vote."
    },
    {
      "id": "m74-review-1",
      "jurisdiction": "City of Forest Grove, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m74-forest-grove-official"
      ],
      "scope": "Selected City report field",
      "notes": "City authority confirmed."
    },
    {
      "id": "m74-review-2",
      "jurisdiction": "City of Forest Grove, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m74-forest-grove-official"
      ],
      "scope": "Selected City report field",
      "notes": "Publication is October13 2026."
    },
    {
      "id": "m74-review-3",
      "jurisdiction": "City of Forest Grove, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m74-forest-grove-official"
      ],
      "scope": "Selected City report field",
      "notes": "Adoption reported October12."
    },
    {
      "id": "m74-review-4",
      "jurisdiction": "City of Forest Grove, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m74-forest-grove-official"
      ],
      "scope": "Selected City report field",
      "notes": "Public hearing preceded vote."
    },
    {
      "id": "m74-review-5",
      "jurisdiction": "City of Forest Grove, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m74-forest-grove-official"
      ],
      "scope": "Selected City report field",
      "notes": "New development covered."
    },
    {
      "id": "m74-review-6",
      "jurisdiction": "City of Forest Grove, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m74-forest-grove-official"
      ],
      "scope": "Selected City report field",
      "notes": "Expansion threshold is20percent or more."
    },
    {
      "id": "m74-review-7",
      "jurisdiction": "City of Forest Grove, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m74-forest-grove-official"
      ],
      "scope": "Selected City report field",
      "notes": "Prior land use approvals excluded."
    },
    {
      "id": "m74-review-8",
      "jurisdiction": "City of Forest Grove, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m74-forest-grove-official"
      ],
      "scope": "Selected City report field",
      "notes": "Reported term120calendar days."
    },
    {
      "id": "m74-review-9",
      "jurisdiction": "City of Forest Grove, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m74-forest-grove-official"
      ],
      "scope": "Selected City report field",
      "notes": "Exact legal commencement unknown."
    },
    {
      "id": "m74-review-10",
      "jurisdiction": "City of Forest Grove, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m74-forest-grove-official"
      ],
      "scope": "Selected City report field",
      "notes": "Future work sessions not yet dated."
    },
    {
      "id": "m75-review-1",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Draft minutes record unanimous adoption."
    },
    {
      "id": "m75-review-2",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Minutes remain labeled draft."
    },
    {
      "id": "m75-review-3",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Packet has680pages."
    },
    {
      "id": "m75-review-4",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Selected pages2through8 read."
    },
    {
      "id": "m75-review-5",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Packet resolution number blank."
    },
    {
      "id": "m75-review-6",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Signature lines blank."
    },
    {
      "id": "m75-review-7",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Primary uses covered."
    },
    {
      "id": "m75-review-8",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Unincorporated territory only."
    },
    {
      "id": "m75-review-9",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "New development included."
    },
    {
      "id": "m75-review-10",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Existing facility expansion included."
    },
    {
      "id": "m75-review-11",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "New applications cannot be accepted."
    },
    {
      "id": "m75-review-12",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Processing and approval also restricted."
    },
    {
      "id": "m75-review-13",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Telecommunications carriage exception explicit."
    },
    {
      "id": "m75-review-14",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Cloud and colocation included."
    },
    {
      "id": "m75-review-15",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Internal commercial computing included."
    },
    {
      "id": "m75-review-16",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Digital asset mining included."
    },
    {
      "id": "m75-review-17",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "AI training and inference included."
    },
    {
      "id": "m75-review-18",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "One site can have multiple primary uses."
    },
    {
      "id": "m75-review-19",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Common ownership defines site grouping."
    },
    {
      "id": "m75-review-20",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Packet gives120day duration."
    },
    {
      "id": "m75-review-21",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Extension or repeal may occur earlier."
    },
    {
      "id": "m75-review-22",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "County counsel takes no adoption position."
    },
    {
      "id": "m75-review-23",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Further hearing required for extension."
    },
    {
      "id": "m75-review-24",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Potential six month extension conditional."
    },
    {
      "id": "m75-review-25",
      "jurisdiction": "Unincorporated Clackamas County, Oregon",
      "state": "or",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m75-clackamas-0",
        "m75-clackamas-1"
      ],
      "scope": "Selected packet pages2through8 and draft minute passage",
      "notes": "Code amendments require later process."
    },
    {
      "id": "m76-review-1",
      "jurisdiction": "City of Mexico, Missouri",
      "state": "mo",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m76-mexico-notice",
        "m76-mexico-draft"
      ],
      "scope": "Selected draft and notice field",
      "notes": "Draft title."
    },
    {
      "id": "m76-review-2",
      "jurisdiction": "City of Mexico, Missouri",
      "state": "mo",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m76-mexico-notice",
        "m76-mexico-draft"
      ],
      "scope": "Selected draft and notice field",
      "notes": "Blank bill number."
    },
    {
      "id": "m76-review-3",
      "jurisdiction": "City of Mexico, Missouri",
      "state": "mo",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m76-mexico-notice",
        "m76-mexico-draft"
      ],
      "scope": "Selected draft and notice field",
      "notes": "Blank ordinance number."
    },
    {
      "id": "m76-review-4",
      "jurisdiction": "City of Mexico, Missouri",
      "state": "mo",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m76-mexico-notice",
        "m76-mexico-draft"
      ],
      "scope": "Selected draft and notice field",
      "notes": "I1route."
    },
    {
      "id": "m76-review-5",
      "jurisdiction": "City of Mexico, Missouri",
      "state": "mo",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m76-mexico-notice",
        "m76-mexico-draft"
      ],
      "scope": "Selected draft and notice field",
      "notes": "I2route."
    },
    {
      "id": "m76-review-6",
      "jurisdiction": "City of Mexico, Missouri",
      "state": "mo",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m76-mexico-notice",
        "m76-mexico-draft"
      ],
      "scope": "Selected draft and notice field",
      "notes": "Other zones excluded."
    },
    {
      "id": "m76-review-7",
      "jurisdiction": "City of Mexico, Missouri",
      "state": "mo",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m76-mexico-notice",
        "m76-mexico-draft"
      ],
      "scope": "Selected draft and notice field",
      "notes": "Accessory exception conditional."
    },
    {
      "id": "m76-review-8",
      "jurisdiction": "City of Mexico, Missouri",
      "state": "mo",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m76-mexico-notice",
        "m76-mexico-draft"
      ],
      "scope": "Selected draft and notice field",
      "notes": "1MWceiling."
    },
    {
      "id": "m76-review-9",
      "jurisdiction": "City of Mexico, Missouri",
      "state": "mo",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m76-mexico-notice",
        "m76-mexico-draft"
      ],
      "scope": "Selected draft and notice field",
      "notes": "Future recital not outcome."
    },
    {
      "id": "m76-review-10",
      "jurisdiction": "City of Mexico, Missouri",
      "state": "mo",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m76-mexico-notice",
        "m76-mexico-draft"
      ],
      "scope": "Selected draft and notice field",
      "notes": "AdditionalUse approval not construction authorization."
    },
    {
      "id": "m77-review-1",
      "jurisdiction": "City of Forest Park, Georgia",
      "state": "ga",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m77-forest-park-city-newsletter"
      ],
      "scope": "Selected official newsletter field",
      "notes": "Official City newsletter account verified."
    },
    {
      "id": "m77-review-2",
      "jurisdiction": "City of Forest Park, Georgia",
      "state": "ga",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m77-forest-park-city-newsletter"
      ],
      "scope": "Selected official newsletter field",
      "notes": "Council approval reported."
    },
    {
      "id": "m77-review-3",
      "jurisdiction": "City of Forest Park, Georgia",
      "state": "ga",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m77-forest-park-city-newsletter"
      ],
      "scope": "Selected official newsletter field",
      "notes": "Source issueSeptember2026."
    },
    {
      "id": "m77-review-4",
      "jurisdiction": "City of Forest Park, Georgia",
      "state": "ga",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m77-forest-park-city-newsletter"
      ],
      "scope": "Selected official newsletter field",
      "notes": "Term90days."
    },
    {
      "id": "m77-review-5",
      "jurisdiction": "City of Forest Park, Georgia",
      "state": "ga",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m77-forest-park-city-newsletter"
      ],
      "scope": "Selected official newsletter field",
      "notes": "City limits scope."
    },
    {
      "id": "m77-review-6",
      "jurisdiction": "City of Forest Park, Georgia",
      "state": "ga",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m77-forest-park-city-newsletter"
      ],
      "scope": "Selected official newsletter field",
      "notes": "Construction applications described."
    },
    {
      "id": "m77-review-7",
      "jurisdiction": "City of Forest Park, Georgia",
      "state": "ga",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m77-forest-park-city-newsletter"
      ],
      "scope": "Selected official newsletter field",
      "notes": "Zoning review purpose."
    },
    {
      "id": "m77-review-8",
      "jurisdiction": "City of Forest Park, Georgia",
      "state": "ga",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m77-forest-park-city-newsletter"
      ],
      "scope": "Selected official newsletter field",
      "notes": "Exact approval day unknown."
    },
    {
      "id": "m77-review-9",
      "jurisdiction": "City of Forest Park, Georgia",
      "state": "ga",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m77-forest-park-city-newsletter"
      ],
      "scope": "Selected official newsletter field",
      "notes": "Instrument exceptions unknown."
    },
    {
      "id": "m77-review-10",
      "jurisdiction": "City of Forest Park, Georgia",
      "state": "ga",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m77-forest-park-city-newsletter"
      ],
      "scope": "Selected official newsletter field",
      "notes": "Current legal effect unverified."
    },
    {
      "id": "m78-review-1",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Whole official register captured."
    },
    {
      "id": "m78-review-2",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Two legal notice tables."
    },
    {
      "id": "m78-review-3",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Fifteen literal data rows."
    },
    {
      "id": "m78-review-4",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Irregular cells preserved."
    },
    {
      "id": "m78-review-5",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Introduction record distinct."
    },
    {
      "id": "m78-review-6",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Final passage record distinct."
    },
    {
      "id": "m78-review-7",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Ordinance number2026 04."
    },
    {
      "id": "m78-review-8",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "All zones title."
    },
    {
      "id": "m78-review-9",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Township scope."
    },
    {
      "id": "m78-review-10",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Cumberland County identified."
    },
    {
      "id": "m78-review-11",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Five scanned pages read visually."
    },
    {
      "id": "m78-review-12",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Clerk attestation visible."
    },
    {
      "id": "m78-review-13",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Mayor signature line blank."
    },
    {
      "id": "m78-review-14",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "July13 adoption label onpage4."
    },
    {
      "id": "m78-review-15",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "August17 hearing text onpage4."
    },
    {
      "id": "m78-review-16",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "July13 first reading onpage5."
    },
    {
      "id": "m78-review-17",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "First reading rollcall distinct."
    },
    {
      "id": "m78-review-18",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Final rollcall blank."
    },
    {
      "id": "m78-review-19",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Final date fields blank."
    },
    {
      "id": "m78-review-20",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Final notice saysOctober19adoption."
    },
    {
      "id": "m78-review-21",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Final notice saysJuly13introduction."
    },
    {
      "id": "m78-review-22",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "Effective clause requires passage andpublication."
    },
    {
      "id": "m78-review-23",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "No publication day qualified."
    },
    {
      "id": "m78-review-24",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "No expiry invented."
    },
    {
      "id": "m78-review-25",
      "jurisdiction": "Downe Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m78-downe-0",
        "m78-downe-1",
        "m78-downe-2"
      ],
      "scope": "Selected register, scanned ordinance and final notice field",
      "notes": "No present operation inference."
    },
    {
      "id": "m79-review-1",
      "jurisdiction": "Raritan Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-0"
      ],
      "scope": "Selected official account or definition field",
      "notes": "PublicationSeptember18."
    },
    {
      "id": "m79-review-2",
      "jurisdiction": "Raritan Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-0"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Unanimous adoption reported."
    },
    {
      "id": "m79-review-3",
      "jurisdiction": "Raritan Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-0"
      ],
      "scope": "Selected official account or definition field",
      "notes": "All districts scope."
    },
    {
      "id": "m79-review-4",
      "jurisdiction": "Raritan Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-0"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Accessory exception retained."
    },
    {
      "id": "m79-review-5",
      "jurisdiction": "Raritan Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-0"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Inside principal building."
    },
    {
      "id": "m79-review-6",
      "jurisdiction": "Raritan Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-0"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Sole property use support."
    },
    {
      "id": "m79-review-7",
      "jurisdiction": "Raritan Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-0"
      ],
      "scope": "Selected official account or definition field",
      "notes": "10percent floorarea cap."
    },
    {
      "id": "m79-review-8",
      "jurisdiction": "Raritan Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-0"
      ],
      "scope": "Selected official account or definition field",
      "notes": "2000squarefeet alternative;whicheverless."
    },
    {
      "id": "m79-review-9",
      "jurisdiction": "Raritan Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-0"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Exact adoption unknown."
    },
    {
      "id": "m79-review-10",
      "jurisdiction": "Raritan Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-0"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Current effect unverified."
    },
    {
      "id": "m79-review-11",
      "jurisdiction": "Bethlehem Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-1"
      ],
      "scope": "Selected official account or definition field",
      "notes": "PublicationSeptember18."
    },
    {
      "id": "m79-review-12",
      "jurisdiction": "Bethlehem Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-1"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Ordinance506 2026identified."
    },
    {
      "id": "m79-review-13",
      "jurisdiction": "Bethlehem Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-1"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Hunterdon County identified."
    },
    {
      "id": "m79-review-14",
      "jurisdiction": "Bethlehem Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-1"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Independent primary use defined."
    },
    {
      "id": "m79-review-15",
      "jurisdiction": "Bethlehem Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-1"
      ],
      "scope": "Selected official account or definition field",
      "notes": "AI and cloud included."
    },
    {
      "id": "m79-review-16",
      "jurisdiction": "Bethlehem Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-1"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Mining included."
    },
    {
      "id": "m79-review-17",
      "jurisdiction": "Bethlehem Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-1"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Business equipment exception visible."
    },
    {
      "id": "m79-review-18",
      "jurisdiction": "Bethlehem Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-1"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Less than10percent or1000squarefeet;whicheverless."
    },
    {
      "id": "m79-review-19",
      "jurisdiction": "Bethlehem Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-1"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Only selected definition excerpt read."
    },
    {
      "id": "m79-review-20",
      "jurisdiction": "Bethlehem Township, New Jersey",
      "state": "nj",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m79-source-1"
      ],
      "scope": "Selected official account or definition field",
      "notes": "Adoption not qualified from excerpt."
    },
    {
      "id": "m80-review-1",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-0"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Notice posted October 5 2026."
    },
    {
      "id": "m80-review-2",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-0"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Six ordinances available for comment."
    },
    {
      "id": "m80-review-3",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-0"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Planning review completed."
    },
    {
      "id": "m80-review-4",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-0"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Council action date not set."
    },
    {
      "id": "m80-review-5",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-1"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "1565 proposed definitions."
    },
    {
      "id": "m80-review-6",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-1"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Data center demand from 2 through 10 MW."
    },
    {
      "id": "m80-review-7",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-1"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Medium above 10 through 50 MW."
    },
    {
      "id": "m80-review-8",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-1"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Hyperscale above 50 MW."
    },
    {
      "id": "m80-review-9",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-1"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Modules 15 by 60 feet or smaller prohibited, including connecting modules."
    },
    {
      "id": "m80-review-10",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-1"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Reading and effective dates are placeholders."
    },
    {
      "id": "m80-review-11",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-2"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "1566 proposes section 155.085."
    },
    {
      "id": "m80-review-12",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-2"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Cooling systems must recirculate liquid."
    },
    {
      "id": "m80-review-13",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-2"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Evaporative continual water addition prohibited."
    },
    {
      "id": "m80-review-14",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-3"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "1567 GB district conditional use."
    },
    {
      "id": "m80-review-15",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-3"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Combining parcels constrained by demand category."
    },
    {
      "id": "m80-review-16",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-3"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Existing building conversion has separate screening conditions."
    },
    {
      "id": "m80-review-17",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-4"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "1568 LI conditional use."
    },
    {
      "id": "m80-review-18",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-4"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "New conditional hearing for combined uses."
    },
    {
      "id": "m80-review-19",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-4"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Signature and legal dates blank."
    },
    {
      "id": "m80-review-20",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-5"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "1569 GI data center permitted use."
    },
    {
      "id": "m80-review-21",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-5"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Medium category conditional."
    },
    {
      "id": "m80-review-22",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-5"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Draft inconsistently refers to Large and Medium; not repaired."
    },
    {
      "id": "m80-review-23",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-6"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "1570 HI basic category permitted."
    },
    {
      "id": "m80-review-24",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-6"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Medium and hyperscale categories conditional."
    },
    {
      "id": "m80-review-25",
      "jurisdiction": "City of Vermillion, South Dakota",
      "state": "sd",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m80-source-6"
      ],
      "scope": "Selected proposed ordinance or notice field",
      "notes": "Hyperscale lot combination requires conditional hearing."
    },
    {
      "id": "m81-review-1",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "City of Lake Elsinore, California."
    },
    {
      "id": "m81-review-2",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "Official clerk adoption notice, not complete instrument."
    },
    {
      "id": "m81-review-3",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "Special Council meeting October 6 2026."
    },
    {
      "id": "m81-review-4",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "Ordinance 2026 1540 adopted."
    },
    {
      "id": "m81-review-5",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "Extends prior 2026 1539."
    },
    {
      "id": "m81-review-6",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "Additional ten months and fifteen days."
    },
    {
      "id": "m81-review-7",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "New entitlement applications scope."
    },
    {
      "id": "m81-review-8",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "Acceptance paused."
    },
    {
      "id": "m81-review-9",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "Processing paused."
    },
    {
      "id": "m81-review-10",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "Development standards preparation purpose."
    },
    {
      "id": "m81-review-11",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "Five affirmative named officials."
    },
    {
      "id": "m81-review-12",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "No negative votes reported."
    },
    {
      "id": "m81-review-13",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "No absent or abstaining votes reported."
    },
    {
      "id": "m81-review-14",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "No explicit commencement or terminal day."
    },
    {
      "id": "m81-review-15",
      "jurisdiction": "City of Lake Elsinore, California",
      "state": "ca",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m81-clerk-summary"
      ],
      "scope": "Selected clerk adoption summary field",
      "notes": "No existing facility shutdown established."
    },
    {
      "id": "m82-review-1",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Bill121214."
    },
    {
      "id": "m82-review-2",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Ordinance127447."
    },
    {
      "id": "m82-review-3",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Passed status."
    },
    {
      "id": "m82-review-4",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Council June9 adoption."
    },
    {
      "id": "m82-review-5",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Mayor June11 signature."
    },
    {
      "id": "m82-review-6",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Clerk June11 attestation."
    },
    {
      "id": "m82-review-7",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "All zones."
    },
    {
      "id": "m82-review-8",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Principal uses."
    },
    {
      "id": "m82-review-9",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Accessory uses."
    },
    {
      "id": "m82-review-10",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "New facilities."
    },
    {
      "id": "m82-review-11",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Expansions."
    },
    {
      "id": "m82-review-12",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Changes of use."
    },
    {
      "id": "m82-review-13",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Filing paused."
    },
    {
      "id": "m82-review-14",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Acceptance paused."
    },
    {
      "id": "m82-review-15",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Processing paused."
    },
    {
      "id": "m82-review-16",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Approval paused."
    },
    {
      "id": "m82-review-17",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Definition exceeds20MVA, not MW."
    },
    {
      "id": "m82-review-18",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Operating facility exception."
    },
    {
      "id": "m82-review-19",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Exception additional capacity at most20MVA."
    },
    {
      "id": "m82-review-20",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Below threshold existing facilities can qualify for exception."
    },
    {
      "id": "m82-review-21",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "365day stated duration."
    },
    {
      "id": "m82-review-22",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Renewal requires further action."
    },
    {
      "id": "m82-review-23",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Earlier termination possible."
    },
    {
      "id": "m82-review-24",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Signed original fetch410, unreviewed."
    },
    {
      "id": "m82-review-25",
      "jurisdiction": "City of Seattle, Washington",
      "state": "wa",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m82-seattle-legislation"
      ],
      "scope": "Selected legislative field",
      "notes": "Current force unverified."
    },
    {
      "id": "m83-review-1",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "Passed status."
    },
    {
      "id": "m83-review-2",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "File26 0431."
    },
    {
      "id": "m83-review-3",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "Created March24 2026, not adoption."
    },
    {
      "id": "m83-review-4",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "Committee March31 filing approval."
    },
    {
      "id": "m83-review-5",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "April13 publication order, not final adoption."
    },
    {
      "id": "m83-review-6",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "May18 final Council passage."
    },
    {
      "id": "m83-review-7",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "May18 Council President signature."
    },
    {
      "id": "m83-review-8",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "May20 mayoral signature."
    },
    {
      "id": "m83-review-9",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "Primary use scope."
    },
    {
      "id": "m83-review-10",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "Certain permits and site development plans."
    },
    {
      "id": "m83-review-11",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "Acceptance and processing scope."
    },
    {
      "id": "m83-review-12",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "Signed attachment web410."
    },
    {
      "id": "m83-review-13",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "Draft attachment web410."
    },
    {
      "id": "m83-review-14",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "Exact effective and expiry dates held."
    },
    {
      "id": "m83-review-15",
      "jurisdiction": "City and County of Denver, Colorado",
      "state": "co",
      "checked_on": "2026-10-28",
      "result": "selected_official_content",
      "source_ids": [
        "m83-denver-detail"
      ],
      "scope": "Selected legislative chronology or scope field",
      "notes": "Current force not established by historical passage."
    },
    {
      "id": "m84-review-1",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "News August26, updated September3."
    },
    {
      "id": "m84-review-2",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "August25 passage reported."
    },
    {
      "id": "m84-review-3",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Six votes to one."
    },
    {
      "id": "m84-review-4",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Above10MW scope."
    },
    {
      "id": "m84-review-5",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Unincorporated county only."
    },
    {
      "id": "m84-review-6",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "New development."
    },
    {
      "id": "m84-review-7",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Expansion."
    },
    {
      "id": "m84-review-8",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Filing restricted."
    },
    {
      "id": "m84-review-9",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Processing restricted."
    },
    {
      "id": "m84-review-10",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Approval restricted."
    },
    {
      "id": "m84-review-11",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Up to one year stated."
    },
    {
      "id": "m84-review-12",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Executive signature condition."
    },
    {
      "id": "m84-review-13",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "October20hearing scheduled, no outcome."
    },
    {
      "id": "m84-review-14",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "News calls instrument577."
    },
    {
      "id": "m84-review-15",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-0"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "News links legislative557."
    },
    {
      "id": "m84-review-16",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-1"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Legislative title557."
    },
    {
      "id": "m84-review-17",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-1"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Legislative statusPassed."
    },
    {
      "id": "m84-review-18",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-1"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "August25finalvote."
    },
    {
      "id": "m84-review-19",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-1"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Six aye one nay."
    },
    {
      "id": "m84-review-20",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-1"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "August27effective displayed."
    },
    {
      "id": "m84-review-21",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-1"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Same subject as news."
    },
    {
      "id": "m84-review-22",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-1"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Number conflict not silently repaired."
    },
    {
      "id": "m84-review-23",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-1"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Current force not proven."
    },
    {
      "id": "m84-review-24",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-1"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "Full signed text unreviewed."
    },
    {
      "id": "m84-review-25",
      "jurisdiction": "Unincorporated Pierce County, Washington",
      "state": "wa",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m84-source-1"
      ],
      "scope": "Selected official account or linked chronology field",
      "notes": "No expiry calculated."
    },
    {
      "id": "m85-review-1",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "September22 publication."
    },
    {
      "id": "m85-review-2",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "September21 adoption reported."
    },
    {
      "id": "m85-review-3",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "Six month term."
    },
    {
      "id": "m85-review-4",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "Hyperscale only scope."
    },
    {
      "id": "m85-review-5",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "Any one threshold sufficient."
    },
    {
      "id": "m85-review-6",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "Area at least100000squarefeet."
    },
    {
      "id": "m85-review-7",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "Demand strictly above75MW."
    },
    {
      "id": "m85-review-8",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "At least5000servers."
    },
    {
      "id": "m85-review-9",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "Water strictly above50gallonsperminute."
    },
    {
      "id": "m85-review-10",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "Cooling or operational water basis."
    },
    {
      "id": "m85-review-11",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "Long term regulation directed, not adopted."
    },
    {
      "id": "m85-review-12",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "No future action date stated."
    },
    {
      "id": "m85-review-13",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "Current force unverified."
    },
    {
      "id": "m85-review-14",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "Full ordinance link403."
    },
    {
      "id": "m85-review-15",
      "jurisdiction": "City of Dubuque, Iowa",
      "state": "ia",
      "checked_on": "2026-10-29",
      "result": "selected_official_content",
      "source_ids": [
        "m85-dubuque-news"
      ],
      "scope": "Selected adoption account or threshold field",
      "notes": "No computed expiration."
    }
  ],
  "schema_version": 1,
  "sources": {
    "m01-dorr-minutes": {
      "archive_sha256": "b8c4cc808df06dada09abfbef8db644c7197cb0fb4aef7ca5de02b0260129d97",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Dorr Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.dorrtownshipmi.gov/wp-content/uploads/2026/08/2-26-2026.pdf"
    },
    "m01-frederick-account": {
      "archive_sha256": "97edc28f2ef20b8393ca32e3227df168d689c310c9a0a7f138a8683378828a03",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Frederick County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.frederickcountymd.gov/9310/Data-Centers"
    },
    "m01-frederick-order": {
      "archive_sha256": "5f8ee1daad37eccc9240395069ecbbbbe7f878cd5b996c908660691dfd6617b1",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Frederick County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.frederickcountymd.gov/ArchiveCenter/ViewFile/Item/17236"
    },
    "m01-loudoun": {
      "archive_sha256": "fdff158b455282c59d7044898f1c4fe0cc088c1db650b3447d7eb18c8ce8b2b4",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-20",
      "publisher": "Loudoun County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.loudoun.gov/m/newsflash/home/detail/10938"
    },
    "m01-lovejoy-account": {
      "archive_sha256": "98daa559da6e611a3539f7bd2745b84dfe2b892290dc9602049c409897617010",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Lovejoy",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cityoflovejoy.com/1147/Media-Release"
    },
    "m01-lovejoy-linked-draft": {
      "archive_sha256": "7e90dd26ba4aa53ce61cba2969f33cdfa03b1a4d811ca08204d1c145e2d8d493",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Lovejoy",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cityoflovejoy.com/DocumentCenter/View/3000/LJ-Zoning-re-repeal-SAP-and-data-centers-REVISED"
    },
    "m01-nashville-amendment": {
      "archive_sha256": "f41960ad5f01afe613dfe504dd06698244d5ee83744d5b3d155d010d0552c364",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Metro Nashville Legislative Information Center",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://nashville.legistar.com/View.ashx?M=F&ID=15702335&GUID=178F127E-72C9-42EA-9836-D935A7FBAAD4"
    },
    "m01-nashville-current-text": {
      "archive_sha256": "d337d05bafc25a6cf387e1d29bdfdceafb80d955df9a2508116ebc33a370c311",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Metro Nashville Legislative Information Center",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://nashville.legistar.com/ViewReport.ashx?M=R&N=Text&GID=787&ID=6857083&GUID=2B2D3C04-FAE6-43C3-BBB6-FCC098A948FC&Title=Legislation+Text"
    },
    "m01-nashville-history": {
      "archive_sha256": "53b9b06ed8d0415e48610fe2f7df70c67b820a6fc37ae5d41176dae6b5b362ee",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Metro Nashville Legislative Information Center",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://nashville.legistar.com/LegislationDetail.aspx?GUID=2A6E536A-95F6-46B9-993A-1F6E018DD389&ID=8063111&Options=ID%7CText%7C&Search=BL2026-1448"
    },
    "m01-nashville-substitute": {
      "archive_sha256": "28ae8b3b4380d75812a04f69b7ca285f304a7650c797d6d5b261c260bde3bbf4",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Metro Nashville Legislative Information Center",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://nashville.legistar.com/View.ashx?M=F&ID=15672358&GUID=8C3636B9-54C9-4716-AED3-BC45B46DFBF8"
    },
    "m01-pittsfield": {
      "archive_sha256": "cff9a2dc29d9c81129964a34b90d76cfe11460f204ab8e40e3e2d93f7e6b4f98",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Pittsfield Charter Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.pittsfield-mi.gov/datacenter"
    },
    "m01-rowan-index": {
      "archive_sha256": "fd074e014e7934d6b4ab34172203c1897f3dff907ecb79561cb0acbf182053de",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Rowan County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.rowancountync.gov/2073/Long-Ferry-Development"
    },
    "m01-rowan-law": {
      "archive_sha256": "03698a74d9c521c21e669e7b8fb3b1c6bf3e56b01b93205b91296e0de29dc218",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Rowan County Board of Commissioners",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.rowancountync.gov/DocumentCenter/View/57271/Ordinance-Imposing-One-Year-Moratorium-on-the-Development-of-Data-Centers-in-Rowan-County-PDF?bidId="
    },
    "m02-boulder": {
      "archive_sha256": "b0eb8875aa4e58aa74da1bab7839e7d59e80cd8550520325d74f1efff7ed9df4",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Boulder County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://bouldercounty.gov/property-and-land/land-use/planning/land-use-code-update/dc-26-0003/"
    },
    "m02-manatee": {
      "archive_sha256": "c08d45b2133b45907a58611ac88abcaf78baf9c11912bd2809e5821a1f680b8c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Manatee County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.mymanatee.org/connect/news-and-information/news-and-information/article-detail/board-of-county-commissioners/2026/10/09/manatee-county-commissioners-approve-12-month-data-center-moratorium"
    },
    "m02-marengo": {
      "archive_sha256": "400a417ef7b91d8fbe5c49a6584825f165590eb065b0494d2efd1b007582e172",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Marengo Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://marengomi.gov/wp-content/uploads/2026/02/2026-1-Data-Center-Moratorium.pdf"
    },
    "m02-monterey-park": {
      "archive_sha256": "78fe6962e6c7102ac3631e39b9d4a0a40cd0e1ed54f4cbf39a1b000f1cf31cda",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Monterey Park",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://montereypark.ca.gov/1710/Data-Center-Information"
    },
    "m02-mp-2276": {
      "archive_sha256": "b862387fd7962dd1ed0dd16dcee7b17c1787e398c2a0ef8dc6d288bf6ee77516",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Monterey Park",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://montereypark.ca.gov/DocumentCenter/View/19131/Ord-2276-Data-Center-Prohibition---Urgency"
    },
    "m02-mp-2278": {
      "archive_sha256": "fdeab6291cd6aef8c657ee439d962f9412d72aa290d2dd95b77c0cc496988a59",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Monterey Park",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://montereypark.ca.gov/DocumentCenter/View/19133/Ord-2278-Data-Center-Prohibition---Regular"
    },
    "m02-mp-2279": {
      "archive_sha256": "1f87f75a009457170ce5311fc9dd8656a9134ede3c6ea1eb9b833e4a05187156",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Monterey Park",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.montereypark.ca.gov/DocumentCenter/View/19132/Ord-2279-Data-Center-Prohibition---Regular---Implementing-NDC"
    },
    "m02-new-york": {
      "archive_sha256": "5b19d1a74d5d8a8608e2e7b5386ae1abc723a3a5ce47165a383f64a253bda593",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-07-14",
      "publisher": "New York Governor",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.governor.ny.gov/news/first-statewide-moratorium-new-hyperscale-data-centers-launched-governor-kathy-hochul"
    },
    "m02-new-york-order": {
      "archive_sha256": "7e72bf9a125c2c1ad458b07a95e41813c017e4e85d6a50647cbc0c1b6cb0a5af",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "New York Governor",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.governor.ny.gov/executive-order/no-62-establishing-temporary-moratorium-data-centers-new-york-while-state-develops"
    },
    "m02-newark": {
      "archive_sha256": "ca613053e55a0e765b3ef3b70015c79b7882527e4fe8095d996436e2b134d23a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Newark Municipal Council and City Clerk",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://newark.legistar.com/LegislationDetail.aspx?GUID=8BA72AD2-597E-4B54-AB88-8CE2B4E80645&ID=8199707&Options=&Search="
    },
    "m02-san-diego": {
      "archive_sha256": "ec3b75844de5c05859cf73b649a4a3f0d889444a44723c4728f18b959121da66",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-22",
      "publisher": "City of San Diego",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.sandiego.gov/mayor/mayor-gloria-signs-executive-order-directing-moratorium-data-centers-san-diego"
    },
    "m02-san-diego-order": {
      "archive_sha256": "c8b4bd8f7cb9f4359070216304862ecd9132fe21c2ec3f08f072d78a28e6acfb",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of San Diego",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.sandiego.gov/sites/default/files/2026-10/mtg-eo-data-center-2026-2.pdf"
    },
    "m02-seattle": {
      "archive_sha256": "0d36dd2257181aa8574f4802e84f4043cb748492123475186a93c0e189ffeedf",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-06-09",
      "publisher": "Seattle City Council",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://content.govdelivery.com/accounts/WASEATTLE/bulletins/41b4451"
    },
    "m02-seattle-0": {
      "archive_sha256": "67ba32830dc4e494921171e35e03cb8ffc5a0656d25894194df84b2b16cc18b3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Seattle City Clerk",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://seattle.legistar.com/View.ashx?M=F&ID=15591933&GUID=FF4AF581-2436-47CB-82BA-B0AC4D72590F"
    },
    "m02-seattle-bill": {
      "archive_sha256": "6c7c451c7919650c7f94fb9dd9cbab3ab6191c2f1029eb7f602b85f7bda0efc2",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Seattle City Clerk",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://seattle.legistar.com/LegislationDetail.aspx?GUID=86F14A6D-9247-4BB5-839E-0A26937BFD3C&ID=8032163&Options=&Search=&utm_medium=email&utm_source=govdelivery"
    },
    "m03-cincinnati": {
      "archive_sha256": "fdea99aed11b9bb7c134b0365dadb44ede4be6a520c4f8d8f1148966c5a45632",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Cincinnati",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://cincyweb.cincinnati-oh.gov/planning/projects/active/interim-development-control-overlay-89-data-centers-and-zoning-study/"
    },
    "m03-cincinnati-law-240": {
      "archive_sha256": "0a8ab4b3175a0aa2637c18a0f017edae25c6a9981635acba0954dca3813618d9",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Cincinnati",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://cincyweb.cincinnati-oh.gov/sites/planning/assets/Item-2---IDC-89---9mo-Extension.pdf"
    },
    "m03-denver": {
      "archive_sha256": "4961c5f81b197639afb335d71ad1326c03bc7d071e4c538d374d241bf59c66ed",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City and County of Denver",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://denver.legistar.com/LegislationDetail.aspx?GUID=0A6BACDC-1F9A-474F-863E-C3F51B5C4489&ID=7960021&Options=&Search="
    },
    "m03-denver-7": {
      "archive_sha256": "146043fe2a59d8d074d296c86235de9a86dcbba327a5607a652b3dc28aea2193",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City and County of Denver",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://denver.legistar.com/View.ashx?M=F&ID=15494229&GUID=886C2DC6-F50E-47BA-8549-6BE8C094251F"
    },
    "m03-harpersville": {
      "archive_sha256": "eb213386de5b1ba458280f040f8b9011bc49cce697ee5952a5e8383ad2876d04",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Harpersville",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.harpersvilleal.gov/298/Data-Center-Study"
    },
    "m03-harpersville-law": {
      "archive_sha256": "6d41e2b1d80f04e0b7506edf36fd7b75fbc88d05f4b0b4e78f1ac5b420b18942",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Harpersville",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.harpersvilleal.gov/DocumentCenter/View/861/ORD---2026-08-03-03---Data-Center-Moratoriumpdf"
    },
    "m03-lexington": {
      "archive_sha256": "e24c9f8707645d385ac620c9053bf7d888202b4f70196e7c9711f712cca100b6",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Lexington Fayette Urban County Government",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://engage.lexingtonky.gov/datacenters?tool=brainstormer"
    },
    "m03-lexington-law-history": {
      "archive_sha256": "385e5e14e755992d635334770ea2c498f83b662adc46384555a646495a9b3cb5",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Lexington Fayette Urban County Government",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://lexington.legistar.com/LegislationDetail.aspx?FullText=1&GUID=BDCDA141-E0C7-4673-80C5-72E32582561E&ID=8279969&Options=&Search="
    },
    "m03-lexington-signed": {
      "archive_sha256": "25dc4921d17788ffe0b27dc40dac10d46f0e5d6be2e40ffaec418fab1f45dfdd",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Lexington Fayette Urban County Government",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://lexington.legistar.com/View.ashx?M=F&ID=16055309&GUID=12C712EF-30F8-43EB-A046-AC1397EE9A18"
    },
    "m03-pima": {
      "archive_sha256": "f7aecf459a18bb1cf262e14d9389f5af1b78e2928b176d9fe9b8db160bc4c841",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Pima County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://pima.legistar.com/LegislationDetail.aspx?GUID=633B4F2B-1303-4119-9A5C-44A7BC8A056B&ID=8215310&Options=&Search="
    },
    "m03-pima-1": {
      "archive_sha256": "05d5c23d1977d2bd80ab6b6f65aee2866a99a0f03ede47bfdb0dde868f0412bf",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Pima County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://pima.legistar.com/View.ashx?M=F&ID=15860968&GUID=FCCDB6FB-FD3D-4B34-BE73-9A3AB907023A"
    },
    "m03-skagit": {
      "archive_sha256": "0bb5431260543a9e79eb5d90d2a5ec18424966cb85eb99a44b6d15518656c5c2",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-06-01",
      "publisher": "Skagit County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.skagitcountywa.gov/news/posts/skagit-county-commissioners-adopt-moratorium-on-new-data-centers/"
    },
    "m03-snohomish": {
      "archive_sha256": "54a3da6cf9a3d37ccf480d1faa262a9a3d8e612f6fb0679d75544c21c0cdb04b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Snohomish County Council",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://snohomish.legistar.com/LegislationDetail.aspx?GUID=06A18BDE-E669-46E1-8CA6-0887D96EFDC2&ID=8070603"
    },
    "m03-snohomish-0": {
      "archive_sha256": "a47b7a1035eacb600eda006943609c9ffee0049bdd1031012ffd1dbecab92dc9",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Snohomish County Council",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://snohomish.legistar.com/View.ashx?M=F&ID=15651712&GUID=DE8BC08D-EDAF-4845-A365-BFC421D79680"
    },
    "m03-snohomish-3": {
      "archive_sha256": "8038042f099121f5363452828d8a1dce21cf655a69583c0762c0811cc5d77788",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Snohomish County Council",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://snohomish.legistar.com/View.ashx?M=F&ID=15652264&GUID=E2045B59-AB34-4853-8E5A-93C168C9A2B0"
    },
    "m03-spokane-law-account": {
      "archive_sha256": "ee0464b421345d47818066e1094c105fca051031e403b7919ff9d5d5ff2d5074",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-06-23",
      "publisher": "City of Spokane",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://my.spokanecity.org/news/releases/2026/06/23/spokane-city-council-passes-one-year-moratorium-on-data-centers/"
    },
    "m03-spokane-meeting": {
      "archive_sha256": "1e35317e8d07926c99a6a7d205655ad9b3fc9bbdf00acc3025caf428ee68520e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Spokane",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://my.spokanecity.org/citycouncil/meetings/2026/06/22/legislative-meeting/"
    },
    "m03-washington-md": {
      "archive_sha256": "f1bd2f244e4ce82b2012ee9b49c7490f70092922bf34f8ceac20df1ed93ac667",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-09-30",
      "publisher": "Washington County Maryland",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.washco-md.net/news/washington-county-statement-on-temporary-moratorium-for-data-centers-in-washington-county/"
    },
    "m04-c45-oakland-history": {
      "archive_sha256": "f4dadf897dcacbe7bd4332373a5939cbd2e8f63d0253b7a7cb9e40cde83882d7",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Oakland",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://oakland.legistar.com/LegislationDetail.aspx?GUID=4775CA8D-0CB2-4BC8-BC13-DCCDA9352E08&ID=8203751&Options=&Search="
    },
    "m04-c45-oakland-instrument": {
      "archive_sha256": "2bea5f79e408184df1622cfec51224c1ba405f4c04e9f9a766ab87668b9e9a6b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Oakland",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://oakland.legistar.com/View.ashx?M=F&ID=16061258&GUID=FE63DAEB-29A2-4617-A8B8-63F0D607ABC5"
    },
    "m04-h3-lysander": {
      "archive_sha256": "f37f5464809a52ef1b93c7c5e8b92855464820e150ea80f3f371eef7634bfb7f",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Lysander",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://lysanderny.gov/sites/default/files/2026-10/10.1.2026_unapproved_meeting_minutes.pdf"
    },
    "m04-m04-clackamas": {
      "archive_sha256": "1302c29de2ec14f86f370f230aac052fdbd211419079ce68677b18cd4b03c052",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-01",
      "publisher": "Clackamas County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.clackamas.us/bcc/press-release-public-hearings-on-potential-data-center-moratorium"
    },
    "m04-m04-clackamas-adopt": {
      "archive_sha256": "8908b06c68e2d4912a8a978556bb554938ce670110f0656e345da1b6e2b423e5",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-22",
      "publisher": "Clackamas County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.clackamas.us/news/2026-10-22/clackamas-county-commissioners-unanimously-approve-temporary-data-center-moratorium"
    },
    "m04-m04-lowermac-law": {
      "archive_sha256": "1705c43e1dc0d5df1c8f666d64f981ba323771227151e68853d4d3c8a9163f46",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Lower Macungie Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.lowermac.com/AgendaCenter/ViewFile/Agenda/_05212026-596"
    },
    "m04-m04-lowermac-minutes": {
      "archive_sha256": "1b32b1dd577eaf17250c33db740b94f385434509b666e160f8370ad73aaeaa07",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Lower Macungie Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.lowermac.com/AgendaCenter/ViewFile/Minutes/_05212026-596"
    },
    "m04-m04-lysander-law": {
      "archive_sha256": "77b66c0d5dc7898f55dcdd1a64b752a5cbb01eb856c2a3f433405f31106b4cfe",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Lysander",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://lysanderny.gov/sites/default/files/2026-04/data_storage_moratorium_ll_no._4_docx.pdf"
    },
    "m04-m04-mamakating": {
      "archive_sha256": "9f180584a46c1ca29334a451cc38f3253bc531f9ed4d799eb9d9a2ff67045619",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Mamakating",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.mamakating.gov/AgendaCenter/ViewFile/Agenda/_10202026-1061"
    },
    "m04-m04-stjoseph-faq": {
      "archive_sha256": "28839e499c8521b53d82b35a4e13ff6d0681d1d26f60896e000e16c0613858a6",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of St Joseph Missouri",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.stjosephmo.gov/DocumentCenter/View/22254/Data-Center-Development-FAQ-PDF?bidId="
    },
    "m04-m04-stjoseph-press": {
      "archive_sha256": "bbae351ae87d1fb8825217d808cf9a3f4ce128018a955637ea9f0b3de69e2ad3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-09-24",
      "publisher": "City of St Joseph Missouri",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.stjosephmo.gov/DocumentCenter/View/22255/Data-Center-Consultant-Ordinances-September-24-2026-PDF?bidId="
    },
    "m05-h06-peru-law": {
      "archive_sha256": "623ff9149e67c5e2c022022b21573a1655f686f76ec683c5725d88c3bab68bd2",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Peru",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://townofperumaine.org/wp-content/uploads/2026/09/Temporary-Moratorium-of-the-Development-and-Permitting-of-Data-Centers.pdf"
    },
    "m05-h06-peru-notice": {
      "archive_sha256": "74f03c7d9f0080e112f5b10ebfd25dcfe03f286e5ec973755a0cda583e36c8d3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-09-15",
      "publisher": "Town of Peru",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://townofperumaine.org/temporary-moratorium-of-the-development-and-permitting-of-data-centers-to-be-on-the-november-2026-ballot/"
    },
    "m05-h06-wells": {
      "archive_sha256": "d6d57aea3987c3b4865a63245b0e4133c36649d3f04d54323b423b8c5560c7ec",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Wells",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://wellstown.org/440/Town-Meeting-Election-Info"
    },
    "m05-h06-wells-ballot": {
      "archive_sha256": "f3e1f6fa99058d12941fd6e299947b1bd841a3383dcd3e885640c856f7b88191",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Wells",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://wellstown.org/DocumentCenter/View/8526/November-3-2026-Election-Sample-Town-Ballot?bidId="
    },
    "m05-h06-wells-warrant": {
      "archive_sha256": "44a827d74c282cf6e81164b182f55256f4dd8fd1583c1de2a1a1ee125fd4ebd2",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Wells",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://wellstown.org/DocumentCenter/View/8514/November-3-2026-Special-Town-Meeting-Warrant?bidId="
    },
    "m05-h06-wiscasset": {
      "archive_sha256": "8c9767d2c5e7713dafe6a3d9baf2e168827cdcd07c9118f2e82a198dd49554fa",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Wiscasset",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.wiscasset.gov/m/newsflash?cat=1"
    },
    "m05-h06-wiscasset-ballot": {
      "archive_sha256": "334f65d86b044eb7be7e2f2f94c0be97d40065726066f34c1749a819b054a8ff",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Wiscasset",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.wiscasset.gov/DocumentCenter/View/1725/Sample-Ballot---Town-Referendum---November-3-2026"
    },
    "m05-h06-wiscasset-law": {
      "archive_sha256": "ae7898e0b234df661438d2290fd3146dd92c971baaec6b966a4a4f2a969b9583",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Wiscasset",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.wiscasset.gov/DocumentCenter/View/1743/Data-Center-Moratorium-Ordinance---Final"
    },
    "m05-m05-bangor-extension-packet": {
      "archive_sha256": "abee672c025eb3cbbf2f34779a6078d4554c593dcc707fc02f241993647cdb88",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Bangor",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.bangormaine.gov/AgendaCenter/ViewFile/Agenda/_09282026-931"
    },
    "m05-m05-bangor-minutes": {
      "archive_sha256": "c31e2450208e43da38825539973122358bf5f23810510fd31904d609a1792645",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Bangor",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.bangormaine.gov/AgendaCenter/ViewFile/Agenda/_04272026-764"
    },
    "m05-m05-bangor-prior-minutes": {
      "archive_sha256": "56a69794751c231ed14b983b2a4e90b7069904035abc9cfb0ec4b172df4177ef",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Bangor",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.bangormaine.gov/AgendaCenter/ViewFile/Minutes/_09282026-931"
    },
    "m05-m05-brunswick-minutes": {
      "archive_sha256": "4776fc5c11c77a82186c89a0c219aa49862e9a03635e1cd721ad82e009299654",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Brunswick",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.brunswickme.gov/AgendaCenter/ViewFile/Minutes/_06012026-3849"
    },
    "m05-m05-brunswick-report": {
      "archive_sha256": "01f0cf5501aaa75f6bd4646400c21c263672cf7e4bc8081d926c5c6f7b5c975d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Brunswick",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.brunswickme.gov/AgendaCenter/ViewFile/Item/3965?fileID=35643"
    },
    "m05-m05-gray": {
      "archive_sha256": "44fc61f1d380b6c427fe5069d16b4cdc2e332d4bcb426bc7b9e0c3aeeec2dfdf",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-08-20",
      "publisher": "Town of Gray",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://graymaine.org/m/newsflash/Home/Detail/168"
    },
    "m05-m05-gray-law-final": {
      "archive_sha256": "1bbf18960c7a68ed8747e3699b171849e37a74371a1e1f313d42c36bede8186d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Gray",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.graymaine.org/DocumentCenter/View/1435/Data-Center-Moratorium?bidId="
    },
    "m05-m05-northberwick-ballot": {
      "archive_sha256": "43c9c68cdc19e733994f9d1af69b99240ecdc2f9a92a99961e87f6d590373cc6",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of North Berwick",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.townofnorthberwick.org/DocumentCenter/View/1601/Town-Referdum-November-4-2026"
    },
    "m05-m05-northberwick-election": {
      "archive_sha256": "6baaf032c2a136b6230dba61318bde7d6ff05c8ccad025212126f0d99d0251a8",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of North Berwick",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.townofnorthberwick.org/355/Town-Meeting-Elections"
    },
    "m05-m05-northberwick-info": {
      "archive_sha256": "a3de6dc7853d48b00510a1ade88dcecfc2b5b6a2e01f51261e3c285f39d4c90d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of North Berwick",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.townofnorthberwick.org/DocumentCenter/View/1615/November-2026-Referendum"
    },
    "m05-m05-scarborough-current": {
      "archive_sha256": "f671ff89c956141fd2e47aa283453300ad134c3bbec2b908c80d00aebd257a43",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Scarborough Council member column",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.scarboroughmaine.org/stay-connected/town-news/default/~board/town-council-corner/post/your-voice-matters-1790889582481"
    },
    "m05-m05-scarborough-report": {
      "archive_sha256": "83f45ff1da93f8d07c37f98a46ed7f820fa4c44ac0f1d0a940c87366194a77c9",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Scarborough Council member column",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.scarboroughmaine.org/government/town-council/council-outlook/default/~board/town-council-corner/post/why-i-love-calling-scarborough-home-1784146459071"
    },
    "m06-h08-grandjunction": {
      "archive_sha256": "bf900eb56c6c49a95c60487be9f8936c673524884b26b492360bfba6733645d3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-08",
      "publisher": "City of Grand Junction",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.gjcity.org/m/NewsFlash/Archive/Item/2283?arcId=2753"
    },
    "m06-h08-grandjunction-proposal-final": {
      "archive_sha256": "24dfd6b973ff0728d0651dfd393e06a9ab225976df29e378b512142a1d98c6ab",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Grand Junction",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.gjcity.org/DocumentCenter/View/18539/Proposed-Ordinance-Data-Center-Temp-Moratorium?bidId="
    },
    "m06-m06-broomfield-index": {
      "archive_sha256": "da1821853cc799c0a0962cb76e4752eb480f3b5ac23a6212f43403bc353b01e8",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City and County of Broomfield",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.broomfield.org/4283/City-Council-Ordinances"
    },
    "m06-m06-buenavista-large": {
      "archive_sha256": "f3b0a283b3f523910efd700eb36f0cb48c1cea530ecb84867b53b0ad17f57f65",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Buena Vista",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://buenavistaco.gov/AgendaCenter/ViewFile/Agenda/_06092026-2153"
    },
    "m06-m06-buenavista-later-large": {
      "archive_sha256": "feb4059fd7e06ee1864185aee9beb631f7c4adb2543ce2ffe49b1c999184fc75",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Buena Vista",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.buenavistaco.gov/AgendaCenter/ViewFile/Agenda/_06232026-2161"
    },
    "m06-m06-jefferson": {
      "archive_sha256": "21d28d3a976451415ec2559f0175eee5aaa11bb0ec60a6b8d1ab2203874c3dd1",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-05-19",
      "publisher": "Jefferson County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.jeffco.us/m/NewsFlash/Home/Detail/2596"
    },
    "m06-m06-milliken-agendas": {
      "archive_sha256": "94ff42d75c55c83884140c36d76c89aa67e090429ebdf56778c170683da44fad",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Milliken",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.millikenco.gov/255/Agendas-Minutes"
    },
    "m06-m06-monument-minutes": {
      "archive_sha256": "9fd340d8918ccc3a02f4de4541b3f59b2ed7802559ed53e43895d94f533ac342",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Monument",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://monumentco.api.civicclerk.com/v1/Meetings/GetMeetingFileStream(fileId=4837,plainText=false)"
    },
    "m06-m06-woodlandpark": {
      "archive_sha256": "0a69910cd5d986d56073da8f54a5d1825e902c4e6423ba827e90b3f6812e6fa0",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Woodland Park",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://woodlandpark.gov/DocumentCenter/View/6979/Ordinance-1525-Series-2026-PN-Temp-Moratorium---on-Data-Centers"
    },
    "m07-c50-calvert": {
      "archive_sha256": "8b7f297b084f7f86715fe066121cbf9ee0801093044348c192374fb69795db6c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Calvert County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.calvertcountymd.gov/3880/Data-Centers"
    },
    "m07-c50-calvert-law": {
      "archive_sha256": "e8ef3633be6fce7af3bccbbdf1497965a5c48d714763c46433d38b4c3d641556",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Calvert County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.calvertcountymd.gov/DocumentCenter/View/57423/42-26"
    },
    "m07-c50-worcester": {
      "archive_sha256": "7e9ebb3158ad9b188bff31400ce5a71b0d43eeed18975b36ff98e1c2681f9172",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-07-30",
      "publisher": "Worcester County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://worcestermd.gov/news/worcester-county-enacts-moratorium-data-centers-and-cable-landing-stations-while-new"
    },
    "m07-m07-frankfort-meetings": {
      "archive_sha256": "cb9dc106c16cfc66a3c930801d413133df983aef2050f114aad424288bce084e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Frankfort",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.townoffrankfortny.gov/government/meetings-minutes-agendas/"
    },
    "m07-m07-frankfort-october-agenda": {
      "archive_sha256": "35c9b77ac306b7b71b329b886f95125c8006ca2684983f46c352f27d5c91e9fc",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Frankfort",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.townoffrankfortny.gov/download/document/381"
    },
    "m07-m07-frankfort-september-agenda": {
      "archive_sha256": "2b3153a67ce42d892206cc265d5f1be896c6a9b80857c10a5d95b1f9758f2418",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Frankfort",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.townoffrankfortny.gov/download/document/369"
    },
    "m07-m07-livingston": {
      "archive_sha256": "149ede6ee950ea20283c63705b389241c8f4b82656daf9efd392e43b8e1fab75",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Livingston County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.livingstoncountyny.gov/1874/Data-Centers"
    },
    "m07-m07-mountmorris-law": {
      "archive_sha256": "b1cd2d2b002f997cb199555f32ecc793bed0bfb5eff0d1fbfd294e82b549e721",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Livingston County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.livingstoncountyny.gov/DocumentCenter/View/24671/T-Mount-Morris-Moratorium-January-2026"
    },
    "m07-m07-plattsburgh": {
      "archive_sha256": "5f2aed5f1581b5ff19c01e4b164fa548f5460f008a002abec17be84a2e4ca20d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Plattsburgh",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://cityofplattsburgh-ny.gov/department/news/public-hearing-local-law-p-2-2026"
    },
    "m07-m07-plattsburgh-agendas": {
      "archive_sha256": "ac9b4fee86f8c68cd7dbe5c159e58e1ef9618341ba7d2eed2987d918fd8a93ee",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Plattsburgh",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://cityofplattsburgh-ny.gov/index.php/AgendaCenter"
    },
    "m07-m07-worcester-law": {
      "archive_sha256": "fd5c38a4a09caa1e67be83c8a3d89af9ce6ced16f353967260d673157ab3a2c4",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Worcester County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://worcestermd.gov/sites/default/files/2026-09/Resolution%2026-18%20Moratorium%20Cable%20Landings%20Data%20Centers.pdf"
    },
    "m07-m07-york-law": {
      "archive_sha256": "ab9d1b97553111e4c470c8b937c37af3b87165bb11184681faec5394ae725cfd",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Livingston County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.livingstoncountyny.gov/DocumentCenter/View/24673/LL3-of-2026-Data-Center-Moratorium-York"
    },
    "m08-c51-pavilion": {
      "archive_sha256": "a025cd61d6a2e4a457451e41755e721081f6be9b45ad5bce50dd1ce86426866d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Pavilion Charter Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.paviliontwpmi.gov/notices-postings"
    },
    "m08-c51-pavilion-authority": {
      "archive_sha256": "770584679f18d36b320e24a1068b6bfa171f73a3b2603c9be0f59aec60d7e6f8",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Pavilion Charter Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.paviliontwpmi.gov/_files/ugd/222eb1_5cc4c95223f646c48abaad26c0a52653.pdf"
    },
    "m08-c51-pavilion-pause": {
      "archive_sha256": "707f1cb6fb3d9a3c82fb03743cad7a30401ef662322b4b1cd00e76f41b6d61ee",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Pavilion Charter Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.paviliontwpmi.gov/_files/ugd/222eb1_a75a165163a748a19a693be3c6d6e4d7.pdf"
    },
    "m08-c52-solon-extension": {
      "archive_sha256": "6c761985820e7c1858364abed5f8434a3263724f8727334613b188dfe620f64c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Township of Solon",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.solontwp.org/wp-content/uploads/2026/07/26-10-Extend-Moratorium-on-Data-Centers.pdf"
    },
    "m08-h09-grandblanc-agendas": {
      "archive_sha256": "bdec62bbd58f0af9a10007f783ef2c573147d6c96d86876ad465af47c4a983b7",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Grand Blanc Charter Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.grandblanctwpmi.gov/177/Agendas-Minutes-Videos"
    },
    "m08-m08-flint": {
      "archive_sha256": "e06589dc099356fd5d328e9e1985aa1dd9f1ac84e6d5252832d8e35e8de3a9a8",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Flint",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cityofflint.com/wp-content/uploads/2026/06/AGENDA.FCC-Meeting-June-8-2026-FINAL.pdf"
    },
    "m08-m08-frenchtown": {
      "archive_sha256": "5413e5fd084588350dba6185c6cc84c576d533c83baee03067f0291da4788e8b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-03-17",
      "publisher": "Frenchtown Charter Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.frenchtownmi.gov/ArchiveCenter/ViewFile/Item/139"
    },
    "m08-m08-frenchtown-minutes": {
      "archive_sha256": "d83e93948f9a8a9b4b19f063f6636d04b7bc7979acb4354886332928689f9390",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Frenchtown Charter Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.frenchtownmi.gov/AgendaCenter/ViewFile/Minutes/_04282026-200"
    },
    "m08-m08-howell": {
      "archive_sha256": "8de021f3fbc6274d02bced71f673ba03c375992fd9d58c7ac54dab0b582b71d8",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Howell Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://howelltownshipmi.org/ordinances/"
    },
    "m08-m08-howell-law": {
      "archive_sha256": "8333e0b989ca019586c7737a2cea8ca9f6b9bf9efc2822eafffe2984c8bb5894",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Howell Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://howelltownshipmi.org/wp-content/uploads/2026/06/20260513155523130.pdf"
    },
    "m08-m08-parma": {
      "archive_sha256": "674984bc4efe675bdafd3a7600dd0664e6001367926824b592fdb8cf44f94e45",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Parma Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://parmatwp.gov/2026/02/23/notice-of-data-center-moratorium-adoption-2026-3/"
    },
    "m08-m08-parma-law": {
      "archive_sha256": "f45c45bb9b4e6c1092326ac7f676327e0ede3ccfa5c240a07c85eff185cdabdf",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Parma Township",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://parmatwp.gov/wp-content/uploads/2026/02/2026-3-Publication.pdf"
    },
    "m09-h10-southplainfield": {
      "archive_sha256": "d0ba390f3f0a615923f1f6bdcb2d5f192d344a19f3ddde917f6d21333c7e5b7e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Borough of South Plainfield",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.southplainfieldnj.com/"
    },
    "m09-h10-wareham-documents": {
      "archive_sha256": "94d5f47fdce7bc295b3ade08b2892b23c43a51b36633602923a1d64deb86f53c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Wareham",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.wareham.gov/351/Town-Meeting-Information"
    },
    "m09-h10-wareham-meeting": {
      "archive_sha256": "7eb206a1ee18c128ccc5800b90de60f7a717326cc326d5fb033942cfe84becf0",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Wareham",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.wareham.gov/AlertCenter.aspx?AID=Town-Meeting-Monday-October-26-2026-142"
    },
    "m09-m09-eastbridgewater-archive": {
      "archive_sha256": "8423dc86346a26b1fe61de7099af74c81b8fd3a9fdb61285b80381a2896789e3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-09-04",
      "publisher": "Town of East Bridgewater",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.eastbridgewaterma.gov/m/newsflash/Archive/Item/198?arcId=254"
    },
    "m09-m09-hill-june4": {
      "archive_sha256": "29caea74e92e7c13031c3eadc53df656b6fc6df3acc50241cc511f2a26e63562",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Hill County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.co.hill.tx.us/upload/page/7613/docs/CCMinutes/2026/CC%20Minutes%20June%204%202026.pdf"
    },
    "m09-m09-hill-may12": {
      "archive_sha256": "1fe235066143fdd03c114f27ee48f8641de341a6663a13bb82bbf9c8594d8b5b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Hill County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.co.hill.tx.us/upload/page/7613/docs/CCMinutes/2026/CC%20Minutes%20on%20May%2012%202026.pdf"
    },
    "m09-m09-hill-may29": {
      "archive_sha256": "b94a678e7f8bfa30b731940422d36085454b0e9d691dc69272face8fe262c90a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Hill County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.co.hill.tx.us/upload/page/7613/docs/CCMinutes/2026/CC%20Minutes%20May%2029%202026.pdf"
    },
    "m09-m09-hood-letter": {
      "archive_sha256": "ed97e141d829abd4e9435478fea17a3097a41382d94d480551ce80f422dfc53a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Texas Legislative Reference Library",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://lrl.texas.gov/scanned/archive/2026/58989.pdf"
    },
    "m09-m09-hood-library": {
      "archive_sha256": "14a1526e140d40707305b6e0d93e78f52259a544f4cd8ee9f746904926b88b6b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Texas Legislative Reference Library",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://lrl.texas.gov/currentissues/clips/resultsLinkclip.cfm?clipID=439730&headline=Hood+County%E2%80%99s+proposed+moratorium+on+data+centers+squashed+by+Texas+senator"
    },
    "m09-m09-trumbull": {
      "archive_sha256": "9b2f25e34cf71c557c09323c9375429e74211b183a0e1d12897c049281b221d9",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-01",
      "publisher": "Town of Trumbull",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.trumbull-ct.gov/m/NewsFlash/Archive/Item/3193?arcId=4954"
    },
    "m10-c54-lordstown-court": {
      "archive_sha256": "e5575f3f6b7dccaee1207bcba87c82502bbc9056cf3380640c9b6fcc605c5d30",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-20",
      "publisher": "Supreme Court of Ohio Office of Public Information",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://courtnewsohio.gov/cases/2026/SCO/1020/251497.asp"
    },
    "m10-c54-lordstown-opinion": {
      "archive_sha256": "bee1247b8ee4f8cef933ecda2bdadc3263a2287feec0522b19a16d198c119295",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-20",
      "publisher": "Supreme Court of Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.supremecourt.ohio.gov/rod/docs/pdf/0/2026/2026-Ohio-4073.pdf"
    },
    "m10-c54-lordstown-ordinance1": {
      "archive_sha256": "f2a6cd84739860313417452c135205329a42836c965109ad7526231cf9e91c6a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Village of Lordstown",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.lordstown.com/wp-content/uploads/1-2026.pdf"
    },
    "m10-c54-lordstown-ordinance29": {
      "archive_sha256": "343bad2d354cb2eb1c5a04edc6a29b70b7ef1eb95063bdd1aba2bd51c6790884",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Village of Lordstown",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.lordstown.com/wp-content/uploads/29-2026-1.pdf"
    },
    "m10-m10-garrettsville": {
      "archive_sha256": "e615c3ba8724426d9617a22e8a7947cd83188d8b40921ed88cde7c1481002dd1",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-08-13",
      "publisher": "Village of Garrettsville",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.garrettsville.org/article/3073323"
    },
    "m10-m10-grovecity": {
      "archive_sha256": "1d597b1d8821898b0d6ca1a7f111cfe2094ea8c259f02814aed7d2b86e0b794b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Grove City",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.grovecityohio.gov/750/7541/Issue-28-Community-Consent-Amendment-Inf"
    },
    "m10-m10-jackson-board": {
      "archive_sha256": "8306b5a1c7a58d7073614cdc63338542b149e9ac5d68ffba182bc5712a084427",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Jackson Township Franklin County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://jacksontwpfranklinoh.gov/government/board-meetings/"
    },
    "m10-m10-ontario": {
      "archive_sha256": "fc34bd4785cdf651ad09b13395350df14f98cfce914763c8df80a8d4817a2423",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Ontario Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://ontarioohio.org/city-council/"
    },
    "m10-m10-ontario-may6": {
      "archive_sha256": "c40af50c329f6aaa415fd1a1eebbe041399d93ec6929d56297fc873674d8524c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Ontario Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://ontarioohio.org/wp-content/uploads/2026/05/05-06-2026-Council.pdf"
    },
    "m10-m10-ontario-oct21": {
      "archive_sha256": "e6a45be9266ae6b7e9ba1f135cd4cbdfad10cf04c9e819c736b0d77fd6700a13",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Ontario Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://ontarioohio.org/wp-content/uploads/2026/10/10-21-2026-AGENDA.pdf"
    },
    "m10-m10-scioto": {
      "archive_sha256": "38c811842bd74ec5a3dd086ae78e68cf8e424ea3bd31b1c486811e41f77ad67e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Scioto Township Pickaway County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://sciototwppickawayoh.gov/trustee-meeting-minutes/"
    },
    "m10-m10-scioto-march5": {
      "archive_sha256": "ec610f81496a3adff5b7780c9c1b2f93afee30012c4bca5bf1045f6d3a34b2e7",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Scioto Township Pickaway County",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://sciototwppickawayoh.gov/wp-content/uploads/2026/10/Regular-Meeting-of-the-Scioto-Township-Trustees-3-5-2026.pdf"
    },
    "m10-m10-tiffin-agenda": {
      "archive_sha256": "0ad04245632e8c02e0c78aaadd5959a308fbfc33885e250c6ad3f4a57a90b126",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Tiffin",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.tiffinohio.gov/sites/default/files/docs/2026.04.06%20Tiffin%20City%20Council%20Agenda.pdf"
    },
    "m11-m11-campbell": {
      "archive_sha256": "e78314cc8f25f30056668a25a13e2cb36acda71cd3591e9ef2941fc15855930e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Campbell County Tennessee",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://campbellcountytn.gov/agendas-and-minutes/"
    },
    "m11-m11-hawkins-minutes": {
      "archive_sha256": "6c7bc1382006e8a8edc4eca554f290d6bca7a8e28ab2bedbdd3992ba93546546",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Hawkins County Clerk",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.hawkinscountyclerk.com/wp-content/uploads/2025/09/September-25-Minutes.pdf"
    },
    "m11-m11-sullivan-packet": {
      "archive_sha256": "b04ea61a8d268c22bb85f70ecc90dcca56387a030d25322243545092d8d1a430",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Sullivan County Tennessee",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://sullivancountytn.gov/wp-content/uploads/December-2025-Monthly-Meeting.pdf"
    },
    "m11-m11-washington-large": {
      "archive_sha256": "fafe81fa608a0dd2a7cabe37eee38b3dc2101044504869153512841f1cf43920",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Washington County Tennessee",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.washingtoncountytn.org/AgendaCenter/ViewFile/Agenda/_03232026-988"
    },
    "m11-m11-washington-minutes-march23": {
      "archive_sha256": "1de8df8e6675c0e02da00704e4e5e4d6c39c20f3fc421829a5361ac6c7a3ebf2",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Washington County Tennessee",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.washingtoncountytn.org/AgendaCenter/ViewFile/Minutes/_03232026-988"
    },
    "m12-h13-coweta": {
      "archive_sha256": "397948607836d94105fac383d6619c0297bb38523817f19d5e791dddfc6b1edc",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Coweta County Georgia",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.coweta.ga.us/"
    },
    "m12-m12-carroll": {
      "archive_sha256": "708aa244067798bdc3eb8b8f5a6ca690b4d979e7042e3df68ad240d3a4201e77",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Carroll County Georgia",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.carrollcountyga.gov/"
    },
    "m12-m12-morgan": {
      "archive_sha256": "b4fcab7dc4ad60bbfba069de308bdb05f88e337c0c2f9fc3bfae71231a332788",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Morgan County Georgia",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://morgancountyga.gov/"
    },
    "m12-m12-putnam": {
      "archive_sha256": "b98591b877c806e813a9fd1717f09a1b03b7cdee693076e4730eb0c242464368",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-08-12",
      "publisher": "Putnam County Georgia",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://putnamcountyga.us/m/newsflash/Home/Detail/20"
    },
    "m12-m12-putnam-comments": {
      "archive_sha256": "0c304250cc1c35f2b953e3406efaa76aafffe6dcd84e38b3e6d8d85095576929",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-08-20",
      "publisher": "Putnam County Georgia",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://putnamcountyga.us/m/newsflash/Home/Detail/22"
    },
    "m12-m12-putnam-draft-observed": {
      "archive_sha256": "bf88c357238d0abc3b6ced311cd42bb6d10966a0cb4a43dd4cb17270e6888aa5",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Putnam County Georgia",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://putnamcountyga.us/DocumentCenter/View/1230/260702-Sec-53---Technology-Uses-?bidId="
    },
    "m12-m12-putnam-resolution-observed": {
      "archive_sha256": "8822d3ea188c58637102dcf07c134e85179d64fa0bd6956aabcdd9a220b7f111",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Putnam County Georgia",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://putnamcountyga.us/DocumentCenter/View/1226/2026-08-07-Resolution-for-Moratorium-on-Data-Centers-BESS-Solar-Farms-signed?bidId="
    },
    "m12-m12-rockdale-faq": {
      "archive_sha256": "04dc858a2ecd4b1fb3ff4b693e75a48f9bc0e7b9692ca5791f6616e7bdacfac4",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Rockdale County Georgia",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.rockdalecountyga.gov/wp-content/uploads/2026/05/Rockdale-Data-Center-Fact-Sheet-5.12.26-Revised.docx.pdf"
    },
    "m12-m12-rockdale-resolution": {
      "archive_sha256": "997a10949859f597346b56ee1c782c1bc506ec779e76e62e72bab275de6e19b2",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Rockdale County Georgia",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.rockdalecountyga.gov/wp-content/uploads/2026/01/R-2026-01.pdf"
    },
    "m12-m12-walton": {
      "archive_sha256": "71f5a800c95f9691da75b7095f0886c07aae343936ca7a56a7ba146811aaa80a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Walton County Georgia",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.waltoncountyga.gov/322/Board-of-Commissioners"
    },
    "m13-c57-cumberland-data-observed": {
      "archive_sha256": "27a3aaae3cbc35da4fcb85bc1e8c65eb4172ff9a64eaefe364bc865981fd2a85",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Cumberland County North Carolina",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cumberlandcountync.gov/departments/planning-group/planning-and-inspections/datacenter"
    },
    "m13-c57-cumberland-moratorium": {
      "archive_sha256": "1cc95e58d90c504585c1631c5d4a37b97d6027baeb0f23f2ea7aada575221e1c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Cumberland County North Carolina",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cumberlandcountync.gov/docs/default-source/planning-documents/data-center-moratorium-6-15-2026.pdf"
    },
    "m13-c57-halifax-agendas": {
      "archive_sha256": "6a576d8352d2cb51a57228a49378bdd8948730a36aa025d9641086d02430dafe",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Halifax County North Carolina",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.halifaxnc.com/129/Agendas-Minutes"
    },
    "m13-c57-halifax-home": {
      "archive_sha256": "82ff2d800fbe3963f8b6fb872aa727e31c9511f47a834f5bb5e2f6c1b7ffe61e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Halifax County North Carolina",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.halifaxnc.com/"
    },
    "m13-c57-rockingham-agendas": {
      "archive_sha256": "94a67a43456fe79ed2d857c5094e7a6f41a4e850c97589d72bac036f76b605f3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Rockingham North Carolina",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://gorockingham.com/city-council-agendas"
    },
    "m13-h14-davidson-moratorium-observed": {
      "archive_sha256": "13e135377ebc17e85c4479378ff603c0424e0f81f6d2fc833cf9b583e2e72d73",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Davidson County North Carolina",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.co.davidson.nc.us/DocumentCenter/View/14500/Data-Center-Moratorium-102626"
    },
    "m13-h14-davidson-rezoning-notice": {
      "archive_sha256": "43d2c636f4272a9318976680aec507e0d88a30e5ebe45aaea40eac5c28096869",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Davidson County North Carolina",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.co.davidson.nc.us/DocumentCenter/View/14466/Rezoning-Matters-10-26-2026"
    },
    "m13-m13-iredell": {
      "archive_sha256": "3cbf7b187fcdfa98f246ef825b89ce7a0a4976b8b3c6e99467e8f92dc664a029",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Iredell County North Carolina",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.iredellcountync.gov/"
    },
    "m14-chaska": {
      "archive_sha256": "f3b32652ee9fecfa8f7b1609166ad1699f63c2057b35015b043dc789bae10447",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Chaska Minnesota",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.chaskamn.gov/841/Cloud-HQ"
    },
    "m14-elk-river": {
      "archive_sha256": "d06df196c67067407dade190ed9f1c5b0c763aeb21bfb4f79e80900f6c7a5c6e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Elk River Minnesota",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.elkrivermn.gov/1270/City-Ordinances"
    },
    "m14-faribault": {
      "archive_sha256": "181d7cea982a99e3e6119772e74ae070c0e9aea85f561b43e064317198f229c4",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Faribault Minnesota",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.faribaultmn.gov/815/Archer-Datacenters"
    },
    "m14-farmington": {
      "archive_sha256": "27a196b64cf6ac3de2e9644c57bcbe280dda99ef1da2455edc540530267de3cd",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Farmington Minnesota",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park"
    },
    "m14-harmony-agenda": {
      "archive_sha256": "325f3f6b8408c8abb458528fbbe9a6b4ad79c9e2fbfefe42e55f9a125a600d0d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Harmony Minnesota",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://harmonymn.gov/wp-content/uploads/2026/10/261028-PZ-Agenda.pdf"
    },
    "m14-lakeville": {
      "archive_sha256": "41b07421ae77687fbc23c6648666e18ebd4b468f864a52247d25294c2aad0512",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Lakeville Minnesota",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.lakevillemn.gov/"
    },
    "m14-minneapolis-amendments": {
      "archive_sha256": "5300a154b93d07651c1ef7be2cd85974986e19ef2010c3c1230591a69b01187d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Minneapolis",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.minneapolismn.gov/business-services/planning-zoning/amendments/proposed-adopted/"
    },
    "m14-minneapolis-data": {
      "archive_sha256": "ac16c5ac49dde557272e1ca79d24e5b9a08a6a7251adc013e6d4ec565738167b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Minneapolis",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.minneapolismn.gov/business-services/planning-zoning/amendments/proposed-adopted/data-centers/"
    },
    "m14-monticello": {
      "archive_sha256": "8e56cfd2fa6c13393b83ffc5e1ade0ae63812ae56436c603182bb9160cf86eaf",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Monticello Minnesota",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.monticellomn.gov/753/Monticello-Tech"
    },
    "m14-pokagon": {
      "archive_sha256": "2a741f1f5223c743bdd8bd734778eff86ab88e6e8e90b6975cc00d3e0c4dbd2c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Pokagon Township Michigan",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://pokagontownshipmi.gov/mc-events/planning-commission-public-hearing/"
    },
    "m15-c60-naperville-council-minutes": {
      "archive_sha256": "a2d07699071b16089056597fb84f3a205251e82fd07b5ff8e478490177b9cbcd",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Naperville Illinois",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://naperville.legistar.com/View.ashx?M=M&ID=1355597&GUID=3323A6F2-7A6B-4ACA-84C4-FF5AC63F6632"
    },
    "m15-c60-pekin-mitigation": {
      "archive_sha256": "79df2265f228b34ec541953ac0f35e19502d3ee0254828d939fddb3c0ebaf8c1",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Pekin Illinois hosted representative mitigation letter",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.ci.pekin.il.us/DocumentCenter/View/1031/Developer-Mitigation-Letter"
    },
    "m15-c60-rochelle-qa": {
      "archive_sha256": "d15407fda661b5f38d11510db2fd6d5a0a0fba83491be2385e0f634958b640c3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Rochelle Illinois",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cityofrochelle.net/data-center-qa/"
    },
    "m15-c60-rockford-moratorium-original": {
      "archive_sha256": "2f25baf0f776304d9e9b5397020df3f8b52476258ab47b6095c5e13c935e7345",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-08-05",
      "publisher": "City of Rockford Illinois",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.rockfordil.gov/DocumentCenter/View/7462/2026-145-O-Approval-of-a-Moratorium-on-data-centers-and-directing-city-to-conduct-a-comprehensive-evaluation-of-best-practices?bidId="
    },
    "m15-c60-rockford-policy": {
      "archive_sha256": "3411c0c393d6c967073f3d7c8334692f5676ac8101bb009c08f16ab05ae6919c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Rockford Illinois",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.rockfordil.gov/795/Data-Centers"
    },
    "m15-c60-rockford-referral-original": {
      "archive_sha256": "42f5399b2d21fb2ca7227eec8a2452a52ae6b7aec46eb953c85e59e77ca4fd6c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Rockford Illinois",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.rockfordil.gov/DocumentCenter/View/7463/Memo-Resolution-for-Text-Amendment-Data-Centers?bidId="
    },
    "m15-h17-coalcity": {
      "archive_sha256": "0bc3dcbb68ed4dbb8a44771ea9814c99b66ecf45ac6b837fddc627012593a655",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Village of Coal City Illinois",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://coalcity-il.gov/data-center/"
    },
    "m15-h17-grayslake-faq": {
      "archive_sha256": "4074230081116305bdf1b519a539e4d82fc311fa632e2a0e7821c8971679dd9d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Village of Grayslake Illinois",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.villageofgrayslake.com/DocumentCenter/View/15282/T5-FAQ-sheet"
    },
    "m15-h17-sangamon": {
      "archive_sha256": "e7b28261e083597eb5cb87231b8313e7f1648b991bfeb20d7ab8dd8144d0d5ed",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Sangamon County Illinois",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://sangamonil.gov/departments/a-c/county-board/proposed-cyrusone-data-center"
    },
    "m16-c61-alabama-draftfindings": {
      "archive_sha256": "349b1b9aa2b1eead9a10ab6a87e243a12ffe32c36260694c9ab4a88d898eea0b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Alabama New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://townofalabamany.gov/wp-content/uploads/2026/06/NMZ-5DRAFT-AlabamaPB-Findings-Form-STREAM-06082026.pdf"
    },
    "m16-c61-lysander-home": {
      "archive_sha256": "d8a8449a952da613e84db798edd06816811c4acdcd36611affb6b82e9a8bffaf",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Lysander New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://lysanderny.gov/"
    },
    "m16-c61-massena-pause-original-archive": {
      "archive_sha256": "c3555fc5e90fb68f3c3ba27fdced91768af17738a94d5639680bb73925debdc7",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-08-28",
      "publisher": "Town of Massena New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://massena.us/m/newsflash/Archive/Item/112?arcId=175"
    },
    "m16-c61-portland-clerk": {
      "archive_sha256": "92e5b3b08c349be5b5034e9739b5a676f3dc522c2c7c32d7bb877d33149cbd94",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Portland New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://townofportlandny.gov/clerk-1"
    },
    "m16-c61-portland-march-minutes-original": {
      "archive_sha256": "f3eee17b07f828018d38e9aec5964ad0fd072c6fa5329b80990d1d43faecb1a4",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Portland New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://static1.squarespace.com/static/648bc60c3305335b28132299/t/69e8c1f6d49cfe289dd24ce5/1776861686169/Meeting+Min+Mar.pdf"
    },
    "m16-c61-portland-oct2-minutes-original": {
      "archive_sha256": "2b86500a36f6d6b0878677fd1f331e43aec374d7ceb05c31a5a102e33982cf75",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Portland New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://static1.squarespace.com/static/648bc60c3305335b28132299/t/6ac68d9f71a3c7569f707b7f/1791397279477/Scan_0012.pdf"
    },
    "m16-c61-portland-oct6-notice1-original": {
      "archive_sha256": "13ce3a5c79d82dda8f4b526db03a9259a8797190dd320869de96babf6dd28616",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Portland New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://static1.squarespace.com/static/648bc60c3305335b28132299/t/6ac68832111b0a779107065e/1791395890185/Scan_0011.pdf"
    },
    "m16-c61-portland-oct6-notice2-original": {
      "archive_sha256": "87114c2ada3e198a4af5e4a67f198c56b6848fb43e15a09155f2d8c4f057e165",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Portland New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://static1.squarespace.com/static/648bc60c3305335b28132299/t/6ac68a33af8c875222f2ded0/1791396403043/Scan_0010.pdf"
    },
    "m16-j1816-albany-nov10-agenda": {
      "archive_sha256": "8f957c42bf657fa38899ae7237c63381339bb5a1834d4f71693d27349380f468",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Albany New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://albanyny.gov/AgendaCenter/ViewFile/Agenda/_11102026-2502"
    },
    "m16-j1816-albany-planning": {
      "archive_sha256": "5491d7d972b09858766583814191644d3512b36200c588b94c988f448ca9a15a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Albany New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://albanyny.gov/AgendaCenter/Planning-Board-4"
    },
    "m16-j1816-dps-case-master": {
      "archive_sha256": "bc5276d96ddea7b2492d1c757b47db489e7aec029f469fbda0a5a8bbbe067f1f",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "New York State Department of Public Service",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?CaseSearch=Search&MatterCaseNo=26-E-0045&_sp=71a44e44-0154-4449-9835-df73716285b6"
    },
    "m16-j1816-eastfishkill-june25-minutes": {
      "archive_sha256": "3428234f526ce15f75201f781dc0f8f1c142049fe8032f2ae3ec5ad9ca55ab2e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of East Fishkill New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://eastfishkillny.gov/wp-content/uploads/2026/08/TB-June-25-2026-Minutes.pdf"
    },
    "m16-j1816-lysander-datainfo": {
      "archive_sha256": "c986d9bc8235d99099e8cdb41e5e6649b65a44d8f1aac24ead91b1d516eb93c8",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Lysander New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://lysanderny.gov/notices/data-center-information"
    },
    "m16-j1816-m07-m07-plattsburgh": {
      "archive_sha256": "e519552410de6d26d0b95c92b508e78f16add9339a0d5d303be9bfa27c0ac0a6",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Plattsburgh New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://cityofplattsburgh-ny.gov/department/news/public-hearing-local-law-p-2-2026"
    },
    "m16-j1816-m07-m07-plattsburgh-agendas": {
      "archive_sha256": "4fcd6316f4656929b978dd00cc947c26d138e2a03796d4693d5872861e04ec94",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Plattsburgh New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://cityofplattsburgh-ny.gov/index.php/AgendaCenter"
    },
    "m16-j1816-massena-draft-original": {
      "archive_sha256": "844f68128c17c813bc2a0f944ae9807c6ffe16241c26d580485d167b2a83f340",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-09-08",
      "publisher": "Town of Massena New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://massena.us/m/newsflash/Archive/Item/114?arcId=182"
    },
    "m16-j1816-massena-nov4-council-notice": {
      "archive_sha256": "01b6c01b535925070d6b3173ba7450f5686c47b67f9857abc37db04fb81b4647",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-22",
      "publisher": "Town of Massena New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://massena.us/m/newsflash/Home/Detail/123"
    },
    "m16-j1816-northgreenbush-oct26-agenda": {
      "archive_sha256": "f281769af6d3577fc71f3960187fb9168c4fe1bd38180c6a10526f1cc63f91f2",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-08",
      "publisher": "Town of North Greenbush New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.northgreenbush.gov/sites/default/files/2026-10/pb_agenda_20261026.pdf"
    },
    "m16-j1816-northgreenbush-planning": {
      "archive_sha256": "e293d54da6122a58f4cd4e9ed12c42672cec0fc8c3180c6036b6582dd27d4a40",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of North Greenbush New York",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.northgreenbush.gov/boards-committees/planning-board"
    },
    "m17-c62-athens-township-home": {
      "archive_sha256": "f5210a0cede3304d9897c8d6bd792f8eedffb838b8793179755077df2b1ab95a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Athens Township Athens County Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://athenstwp.com/"
    },
    "m17-c62-athens-township-meetings": {
      "archive_sha256": "86e82efa493db55e4825763432bcbeebb74780d60f72a0b45a39b31dc32566db",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Athens Township Athens County Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://athenstwp.com/meetings/"
    },
    "m17-c62-athens-township-projects": {
      "archive_sha256": "988cc7c6b789598b8397c8b424b5d36269f48e36898c4ffa4a9f9d29b18e9ef0",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Athens Township Athens County Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://athenstwp.com/projects/"
    },
    "m17-c62-coshocton-lagoons": {
      "archive_sha256": "87fda017897611b9932f422eb7105828e75ba51b00039e494ae69aa9fb346711",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Coshocton County Ohio Regional Planning Commission",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.coshoctoncounty.net/rpc/wp-content/uploads/sites/22/2025/01/Minutes-from-full-board-attachments-11-18-24-Approved.pdf"
    },
    "m17-c62-lordstown-april6-council": {
      "archive_sha256": "37050e948b4d13da59ed8e6ba59f596d3a434118d2ffacfb6354d82b36acda0e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Village of Lordstown Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.lordstown.com/wp-content/uploads/April-6-2026-1.pdf"
    },
    "m17-c62-lordstown-original-opinion": {
      "archive_sha256": "bee1247b8ee4f8cef933ecda2bdadc3263a2287feec0522b19a16d198c119295",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Supreme Court of Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.supremecourt.ohio.gov/rod/docs/pdf/0/2026/2026-Ohio-4073.pdf"
    },
    "m17-c62-monroe-april22-finalminutes": {
      "archive_sha256": "68ecd7faed56e726fddab9d944cf982ff692722619e62655cc785673920eb946",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Monroe Township New Jersey Council",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://monroetownshipnj.org/wp-content/uploads/2026/07/04-22-26-Council-Meeting.pdf"
    },
    "m17-c62-monroe-may12-finalminutes": {
      "archive_sha256": "431970ed12b2b150be4a68a3999ae5df7119bf4bca5b347bd61a53b5167b0b2d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Monroe Township New Jersey Planning Board",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://monroetownshipnj.org/wp-content/uploads/2026/10/2026-05-12-PB-Special-Minutes.pdf"
    },
    "m17-c62-monroe-ordinance20-linked": {
      "archive_sha256": "88e01999e9b095afbf4787315ac02101fb32874ff4fd53f76524452c1fcef260",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Monroe Township New Jersey posted ordinance text",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://monroetownshipnj.org/wp-content/uploads/2026/04/O-20-2026-2.pdf"
    },
    "m17-c62-monroe-ordinance25-linked": {
      "archive_sha256": "97ca89b66bbeeb4e4fcaa7e4972796e4790f54174a48ca482df4a5681e54fbbc",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Monroe Township New Jersey posted ordinance text",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://monroetownshipnj.org/wp-content/uploads/2026/04/O-25-2026.pdf"
    },
    "m17-c62-monroe-ordinances-index": {
      "archive_sha256": "631da895107ea817be3a99ce6cacb2585e976999c3e77698f0deb74a77a0737e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Monroe Township New Jersey",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://monroetownshipnj.org/township-council/ordinances/"
    },
    "m17-c62-monroe-planning-index": {
      "archive_sha256": "57773cbe47c0c9c7fad72832f7af322387461512fe5af7515247f941562e454a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Monroe Township New Jersey",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://monroetownshipnj.org/5boards-and-commissions/planning-board/meeting-agendas/"
    },
    "m17-c62-montvale-observed-notice": {
      "archive_sha256": "89e22301759fc215e55b66c7fb1708c4419a339095e75b3493916ff38f6691f5",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-09-04",
      "publisher": "Borough of Montvale New Jersey",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.montvalenj.gov/news/the-borough-of-montvale-offices-and-the-recycling-center-will-be-closed-on-monday-october-12th-in-observance-of-columbus-day-curbside-pick-up-will-remain-on-a-normal-schedule/notice-of-fairness-hearing-november-18-2026/"
    },
    "m17-c62-preble-agenda-index": {
      "archive_sha256": "225da368067fd7461551836dbd283845c1681fe1da993aa46da201c0db9e902f",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Preble County Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.prebco.org/AgendaCenter"
    },
    "m17-c62-preble-may15-minutes": {
      "archive_sha256": "80285c821ee6716ee56c668cca5782621295f87982ec9a80970ce4c2eadf116a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Preble County Ohio Planning Commission",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.prebco.org/AgendaCenter/ViewFile/Minutes/_05152025-920"
    },
    "m17-c62-ravenna-april20-minutes": {
      "archive_sha256": "82a3a1ff7c4a158188353e1262bddeb3d056250e3f3fb792ae9236c3326ff8b6",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Ravenna Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.ravennaoh.gov/wp-content/uploads/2026/05/4-20-26-Special.pdf"
    },
    "m17-c62-trenton-council-april2": {
      "archive_sha256": "389696e575032e9f0d849c05559de48578da2fdab68307a9421b2a0efb8082da",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Trenton Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://ci.trenton.oh.us/AgendaCenter/ViewFile/Minutes/_04022026-551"
    },
    "m17-c62-trenton-forum": {
      "archive_sha256": "2200135d1cc891f193a1d9c93ae051d4fabfd1fae71a7312284fbc1ba42f0933",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Trenton Ohio hosted original developer and staff presentation",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://trentonoh.gov/DocumentCenter/View/2403/Prologis-and-Staff-Public-Forum-Agenda-?bidId="
    },
    "m17-c62-trenton-march30-agenda": {
      "archive_sha256": "b576d693b90194c5f9384c6641d9e6fbaa14ccabddc66758f4a681f71967c651",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Trenton Ohio",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.ci.trenton.oh.us/AgendaCenter/ViewFile/Agenda/_03302026-550"
    },
    "m18-c63-bristol-worksession": {
      "archive_sha256": "bcda69b15e31545dc0e464531ba229bd53cb765525ffc715fba174a4c4f782ea",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Bristol Indiana",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://mccmeetings.blob.core.usgovcloudapi.net/bristolin-pubu/MEET-Minutes-28f69c956a6a48a6b51fe224e8835ce8.pdf"
    },
    "m18-c63-charlestown-forum": {
      "archive_sha256": "ebb5eaf62496c8d0fc546da00a6fa002dddb33639e49710cba732de471fefd86",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Charlestown Indiana hosted project forum",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cityofcharlestown.com/DocumentCenter/View/2143/Data-Center---Community-Presentation---Slideshow"
    },
    "m18-c63-charlestown-impacts": {
      "archive_sha256": "00c30c1c9a6684532e59ea1a57968bc7eb4ef6f96380a0479c07342eef2d0647",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Charlestown Indiana hosted Wheatley Group economic scenario",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cityofcharlestown.com/AgendaCenter/ViewFile/Item/944?fileID=3292"
    },
    "m18-c63-charlestown-planning": {
      "archive_sha256": "b5137bba7b7e76f03b2d3daf5bb348dbd44f86b1b7cb3ac95127cea7f4ec55f2",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Charlestown Indiana",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cityofcharlestown.com/202/Advisory-Plan-Commission"
    },
    "m18-c63-chesterton-june10-2024": {
      "archive_sha256": "a130707300cbd31ab18e0650c258237499e843f6af61d7c83bfd646ccce2431b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Chesterton Indiana",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024"
    },
    "m18-c63-fulton-apc-oct26": {
      "archive_sha256": "4cb7553efe4323b1f20eba74338c4428defa082d4b3bda56fb1b2789d57abfa3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Fulton County Indiana official calendar",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.co.fulton.in.us/Calendar.aspx?EID=1049"
    },
    "m18-c63-fulton-feb10-minutes": {
      "archive_sha256": "acc31c281e77b7763b3f60aff51a3aebba79bde2bfe55112774c13ca11e2518e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Fulton County Indiana Area Plan Commission",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_02102026-349"
    },
    "m18-c63-fulton-feb16-minutes": {
      "archive_sha256": "30252cce79c1e77a53b445f40384a1de89eb5aa91451e6b4684e04564ac06d93",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Fulton County Indiana Commissioners",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_02162026-367"
    },
    "m18-c63-fulton-march2-minutes": {
      "archive_sha256": "9129eef954516dc2e8bd65cda1c59c5258719c81666cc28b02fd2fa8cfe6050b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Fulton County Indiana Commissioners",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_03022026-368"
    },
    "m18-c63-fulton-oct26-agenda": {
      "archive_sha256": "f08b6ad254085dfbb51ccd5d4fedfda11116125ab9c213b0a3fa886c51a68e5a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Fulton County Indiana Area Plan Commission",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Agenda/_10262026-415"
    },
    "m18-c63-greensburg-council-index": {
      "archive_sha256": "918e7794f44d29a0dcaaedd5205abbbe7724202a069dca139197f2a75e6c229a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Greensburg Indiana",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cityofgreensburg.com/government/agendas-and-minutes/city-council/"
    },
    "m18-c63-greensburg-dec10-2024": {
      "archive_sha256": "7f0a56e5a34c986fd230c9c03bb68419ce1a3bd503bf722aa4fe17599782e457",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Greensburg Indiana original signed Council minutes",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://assets.simpleviewinc.com/simpleview/image/upload/v1/clients/greensburgin/12_10_2024_CC_885b3948-f7ca-4967-a466-f8ececc4913b.pdf"
    },
    "m18-c63-jefferson-home": {
      "archive_sha256": "721eb521895ad6fc4ba468880cb29c52b541e96345cf3a1ca838ee1b6805002d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Jefferson County Indiana",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.jeffersoncounty.in.gov/"
    },
    "m18-c63-lake-april14-minutes": {
      "archive_sha256": "fc9aa45e3c48bb0507295fb32ce3989da301a0e560abede6f35a83157807b3e4",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Lake County Indiana Council",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://lakecountyin.gov/departments/council/meeting-minutes-c/2026/2026-04-14_meeting%20minutes.pdf"
    },
    "m18-c63-merrillville-datacenters": {
      "archive_sha256": "c43ee8e215878c5c4106b4217fd9f54724ed0fb88d590474de06ff2f615cc62f",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Merrillville Indiana",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/"
    },
    "m18-c63-merrillville-july14-council": {
      "archive_sha256": "2f5bf8dcee71c3b94a22e291fe18f5b9cda44905d0d63f7101a907ae88b8f7b2",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Merrillville Indiana original signed Council minutes",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf"
    },
    "m18-c63-merrillville-meetings": {
      "archive_sha256": "2ead87e69c4db5ce17d619df5e591405eb5884c1fe0e07942c56f61a68a240e3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Merrillville Indiana",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.merrillville.in.gov/our-government/meeting-calendar-minutes-and-video/"
    },
    "m18-c63-pittsboro-agendas": {
      "archive_sha256": "10ad0efb2527769f99562a43a378f9b71e3c73e9e87cbc4034a42528b8ec10e1",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Pittsboro Indiana",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.townofpittsboro.org/agendacenter"
    },
    "m18-c63-pittsboro-oct27-agenda1168-observed": {
      "archive_sha256": "ffc301c2deaf32cef5b2957e9c164d77d6d008da91773cd95f459102b07050ea",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Pittsboro Indiana",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.townofpittsboro.org/DocumentCenter/View/1168/2026-10-27-PC-Agenda_V3?bidId="
    },
    "m18-c63-pittsboro-sept22-minutes-observed": {
      "archive_sha256": "075c69e2395e182f432bf5f663ddd753b7c3fe872df81885e601dddd8c2be99a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Town of Pittsboro Indiana",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.townofpittsboro.org/DocumentCenter/View/1166/2026-09-22-PC-Minutes?bidId="
    },
    "m18-c63-washington-home": {
      "archive_sha256": "d52505911c01c63660c47574aea277d7224af16bee0d7fe4b59640c58e9294cd",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Washington Indiana",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.washingtonin.us/"
    },
    "m19-c64gov-0d3fd93ccc2b": {
      "archive_sha256": "b42693522be76dd241564b1cfdf3fcef619b25e6fc23e3c406e52205f7795069",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Granville Township original zoning appeal calendar notice",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://granvilletwp.org/events/event/zoning-hearing-board-appeal-lewistown-developers-llc/"
    },
    "m19-c64gov-1e33513dcde2": {
      "archive_sha256": "ff3466d31390b0a80522cdc6d42b4928a34458e85dc5aff7105d5246f119ca26",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Upper Mount Bethel Township original home and notices",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.umbt.org/"
    },
    "m19-c64gov-2fdf30b0beff": {
      "archive_sha256": "935ac7dd7b7f63014a73ac46c6cedf7f0477d533c909d0776d3dda266787fdba",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Ransom Township original data center document index",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://ransomtownshippa.gov/data-center-documents"
    },
    "m19-c64gov-38c373c44e1b": {
      "archive_sha256": "11b6f2fba0ef4f73d4e3c657fd68f5143297cd81b285c97da66f758feb50f889",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Peach Bottom Township original draft notice",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.peachbottomtownship.org/2000-2"
    },
    "m19-c64gov-4a4f959e11be": {
      "archive_sha256": "d31e152dc74a98b303f8884059f68aeb378dfffb28a927d1de2ba40a14dc2b24",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Muncy Township original retained ordinance review notice",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.muncytwp.org/data-center-ordinance-agenda/"
    },
    "m19-c64gov-4baf3a092e1a": {
      "archive_sha256": "82383d6f8031e9e9e315ae09bd37575164f7a2b553493cceb1ba4dd8f28d83f1",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Granville Township original signed completeness letter",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://granvilletwp.org/wp-content/uploads/2026/07/Giorgione.pdf"
    },
    "m19-c64gov-5778bede95eb": {
      "archive_sha256": "1dfedc67256fcc7570a27f5965eb075d50a683cd1c65c028cb17c4141c115fdc",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Granville Township original ordinance with signed attestation",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://granvilletwp.org/wp-content/uploads/2026/09/Ordinance-2026-3-Attested.pdf"
    },
    "m19-c64gov-6d9478cd513f": {
      "archive_sha256": "4dc7ba2c8727fa028b808a183a2c02c1e5ff723e89ce2ca85ba5381b786f7a6a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Granville Township original home and project document index",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://granvilletwp.org/"
    },
    "m19-c64gov-80e564125a9f": {
      "archive_sha256": "bbd31433e3af3a890f752eaa556e79328fa298ffec838e6a58ad90d25388d27c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Clearfield County Planning Commission original agenda",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://clearfieldcountypa.gov/AgendaCenter/ViewFile/Agenda/_05282025-332"
    },
    "m19-c64gov-9164b3d7898f": {
      "archive_sha256": "d6a66f60c41b4ef1d607dba32f820566c4c4a04abcafe745663cc8f4768e8510",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Stowe Township original signed August Council minutes",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://stowetwp.net/wp-content/uploads/2026/09/August-2026.pdf"
    },
    "m19-c64gov-b1600f6d7948": {
      "archive_sha256": "569d420e9e97fbb665b77c9258bd356254c4e5d823457b1e0cd7f7d138809fa1",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Stowe Township original home",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://stowetwp.net/"
    },
    "m19-c64gov-b6f9605d0261": {
      "archive_sha256": "fb76d313ff7c8555660f45ca59371cd79b155ef741ce28b36d00d781e00ef371",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Upper Mount Bethel Township hosted original RPL East submission letter",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.umbt.org/wp-content/uploads/RPL-Data-Center-Validity-Challenge-Submission-Letter.pdf"
    },
    "m19-c64gov-cb15812b0df1": {
      "archive_sha256": "d6b63aec6f70d64d7b84ef4d4097885c3da7675c690921be50a3708490d27757",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Upper Mount Bethel Township original posted draft zoning amendment",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.umbt.org/wp-content/uploads/UMBT-ZoningAmend-DataCntrs-DRAFT2.pdf"
    },
    "m19-c64gov-e1bb38b7a250": {
      "archive_sha256": "f7b4a7219d1da6bebbc2b796bcf08063ae83cac0b0705b807c8e29b987c38c17",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Stowe Township original meetings index",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://stowetwp.net/meetings/"
    },
    "m19-c64gov-e6204f4112b0": {
      "archive_sha256": "c807295feb122777436e854fce5d8ad97548d435224a83c343008eec1f884d4c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Granville Township hosted original applicant conditional use narrative",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://granvilletwp.org/wp-content/uploads/2026/07/Granville-Cond-Use-Narrative-v0.1.pdf"
    },
    "m19-c64gov-f662cc6c579b": {
      "archive_sha256": "cbf21b6764ed3967f5becdda785f07b4390f2ab2a522bf625bed736db6c47347",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Upper Mount Bethel Township original posted draft memorandum",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.umbt.org/wp-content/uploads/Memorandum-of-Understanding-4908-3404-7178-v1.pdf"
    },
    "m19-c64gov-ffa3a465f21f": {
      "archive_sha256": "c0c8d4e6e3fc26327588de4a1d6be3e607c76c1d6653f3b6f40ddfd0b58776c4",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "Mahoning Township original notice and minute index",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://mahoningtownship.net/author/mahoningtownship1/"
    },
    "m20-c65gov-0a1061497a11": {
      "archive_sha256": "06abeccb56284178aac3e291dfb4b7eff8ee902c0095c67765e1fc950ef30e63",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-04-24",
      "publisher": "Hawaii DLNR original April 24 staff memorandum",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://dlnr.hawaii.gov/wp-content/uploads/2026/04/D-7.pdf"
    },
    "m20-c65gov-32d54875524b": {
      "archive_sha256": "9fdfe657d7c9e7c797b84d37d789ee82427641a7f9c42fe0825801c0c3835b7a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2025-10-01",
      "publisher": "City of Altoona original economic development announcement",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/"
    },
    "m20-c65gov-3c4b86883ca0": {
      "archive_sha256": "15f61f768e14d7b6b1bbad6bada1e4edf17896d49cc551c3228614d27ef92322",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Tonganoxie original June 9 public event notice",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.tonganoxie.org/sites/g/files/vyhlif7461/f/agendas/notice_of_public_meeting_tonganoxie_community_open_house_event_v2.pdf"
    },
    "m20-c65gov-40f2be8e17b4": {
      "archive_sha256": "32ef3b7b51b4c7a50f931f36fff5d080637f6f44fa2e0ac10df528a772c45116",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of De Soto original current Beale project account",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://desotoks.us/496/Beale-Data-Center"
    },
    "m20-c65gov-4722ce5dadb3": {
      "archive_sha256": "1c312550b7d790599cc339c5bbbb137ecbd2365d0f458d270b41ec777124d9ad",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Emporia original overlay and Kanza Park project account",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.emporiaks.gov/1592/Digital-Infrastructure-Overlay-District"
    },
    "m20-c65gov-780984cb02c5": {
      "archive_sha256": "dda603ea9685613d94adcca8a1dda73123ada1ded7786eb2e7f07e5b959aedf3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-16",
      "publisher": "City of Emporia original October 16 proposed guideline notice",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.emporiaks.gov/m/NewsFlash/Home/Detail/535"
    },
    "m20-c65gov-a882bdcba2f1": {
      "archive_sha256": "a1dfa4a0ce3e714f7e87d52d9024c158a076170619539deade735b97d4dcf22c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Emporia original proposed guideline resource",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.emporiaks.gov/1602/Proposed-Data-Center-Development-Guideli"
    },
    "m20-c65gov-b2cc7434c6aa": {
      "archive_sha256": "71bb0b591a2947681b1b7442ea5b3062d028d5adb3fdf20c586d5610967ccfdb",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of De Soto hosted original August 21, 2025 developer presentation",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.desotoks.us/DocumentCenter/View/3368/Data-Center-Project---Developer-Presentation-Slidedeck"
    },
    "m20-c65gov-e5d4aeb5f8eb": {
      "archive_sha256": "67f160ddc2d662cd474a03a0b18ab20df7a0aa2fd5e414a6d8fbccb457fce09a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": null,
      "publisher": "City of Emporia original November 3 ballot information",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.emporiaks.gov/1600/2026-City-of-Emporia-Ballot-Information"
    },
    "m20-c65gov-f3efa7ffe798": {
      "archive_sha256": "98e97d449c6e5acf75dc065b840b564678162b0eb95662efaac00d4118b04d3a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-23",
      "published_on": "2026-10-02",
      "publisher": "City of De Soto original second supplement announcement",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.desotoks.us/m/newsflash/home/detail/357"
    },
    "m21-c66gov-03ee4f6e207c": {
      "archive_sha256": "c1d74ee0e5733243bcbe13f2861bab530b737703fc804c47deef33227441700a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "City of Concord original meeting calendar",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://concordnh.legistar.com/Calendar.aspx"
    },
    "m21-c66gov-53fa44da3741": {
      "archive_sha256": "c46f02d8469568636a3755a3258e3cc39942cfa4523b810a6e4e8eda3b0826ef",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "City of Lowell original September 16, 2024 site plan memorandum",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://lowellma.gov/DocumentCenter/View/27797/Prince-Ave_2-and-1-Markley-Way-Comments"
    },
    "m21-c66gov-540f49f8472b": {
      "archive_sha256": "f68b42a5ca5d216f914ba9e53fc163672dabe1e2671b2d0b0da642efcd1b9636",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Maine Legislature hosted original residents testimony",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://legislature.maine.gov/legis/bills/getTestimonyDoc.asp?id=10061699"
    },
    "m21-c66gov-5d00e36cd5f8": {
      "archive_sha256": "ae7898e0b234df661438d2290fd3146dd92c971baaec6b966a4a4f2a969b9583",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Town of Wiscasset original proposed computing pause",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.wiscasset.gov/DocumentCenter/View/1743/Data-Center-Moratorium-Ordinance---Final"
    },
    "m21-c66gov-60aa93a746d9": {
      "archive_sha256": "796c9347bb06068591325ac0e969b5994881b7ab6826d8e481f993d238f08da4",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "City of Westfield original agenda archive",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cityofwestfield.org/AgendaCenter"
    },
    "m21-c66gov-74032eedbe49": {
      "archive_sha256": "c763a0623c12839ffd59c453eaaa65a007a5b5f664891d89e6896e94abaf1718",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Town of Jay original November 3 warrant notice",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.jay-maine.org/warrant-for-november-3-2026-special-town-meeting/"
    },
    "m21-c66gov-7528f0d30c94": {
      "archive_sha256": "77a8b02d92d4a7b115aabcb3fb0e9dd4fa4c0bb37c845e2987ec05e7291a1bbc",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Town of Grafton original October 26 planning materials",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.grafton-ma.gov/1493/October-26-2026-Planning-Board-Meeting-M"
    },
    "m21-c66gov-7c2231084b8d": {
      "archive_sha256": "dea3494cbe8b76dc6309e65f9daf243b85ff5670a2aa37aad24fd4701940ffdb",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2025-06-09",
      "publisher": "US EPA original June 9, 2025 Millinocket redevelopment account",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.epa.gov/newsreleases/investing-millinocket-epa-maine-officials-highlight-former-paper-mill-site"
    },
    "m21-c66gov-8445e76fee44": {
      "archive_sha256": "57226ab5bf9f6e0756331d593055f9097eefde9897bf457f1172a783c8d2f22e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "City of Concord original October 21 Planning Board agenda",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C"
    },
    "m21-c66gov-85433cb8de2d": {
      "archive_sha256": "6abba7ca33f28b5de0ebf4bc9550ba669a4681eb5e03e7376e1851c6b5f9a590",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Town of Wiscasset original signed September warrant",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.wiscasset.gov/DocumentCenter/View/1726/Special-Town-Meeting-Warrant---November-3-2026"
    },
    "m21-c66gov-860893e94940": {
      "archive_sha256": "127598997d765cfa73fcd39fef2bef79905666634c268fa87802a091ca950290",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "City of Holyoke original June 16 Council minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://storage.googleapis.com/proudcity/holyokema/2026/04/item-3-june-16-2026-city-council-meeting-minutes-b22fb633.pdf"
    },
    "m21-c66gov-c6e6e3385459": {
      "archive_sha256": "f2c528f3d2234f84001d8b6d2bffc703c7599e343e0b703a7bd1fda6b95936d5",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Town of Grafton original August 10 planning materials",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.grafton-ma.gov/1460/August-10-2026-Planning-Board-Meeting-Ma"
    },
    "m21-c66gov-dd8f8ad41e83": {
      "archive_sha256": "f389dbe98afd70c6b52a5aeeeaacb3bb744ddf9ea5b4c16e22b2d665c4ea8ff0",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "City of Westfield original October 13 special Planning Board notice",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.cityofwestfield.org/AgendaCenter/ViewFile/Agenda/_10132026-8701"
    },
    "m21-c66gov-f70408c4fb0b": {
      "archive_sha256": "4292e7b9ae680de6d32768c137552955bd0634fd31fe5672c08fe9b85181d8a0",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "City of Holyoke original June 16 Council meeting page",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.holyoke.org/meetings/holyoke-city-council-meeting-june-16-2026/"
    },
    "m21-c66gov-ff3443f9fe8d": {
      "archive_sha256": "03e1c1939b14ad8956a61937bda87d13bbf81193b4ff71c176fb60f5ad96dbe5",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Town of Wiscasset original current election notices",
      "retrieved_on": "2026-10-23",
      "source_type": "government_record",
      "url": "https://www.wiscasset.gov/m/NewsFlash"
    },
    "m22-c67gov-14f6e4faf1fd": {
      "archive_sha256": "00f58ab2de257e8c93e841bc107f7945d3680fd163c4276dfa6185aa9f369117",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "City of Reno",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://reno.gov/business-development/development-services/initiatives-and-updates.php"
    },
    "m22-c67gov-177cf1a46a1d": {
      "archive_sha256": "dada79821d6d85ee5b9dd61a18526ca7e5f60e13adbaa22214b9b19c0cf6431b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Storey County original February 18, 2025 agenda packet",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.storeycounty.org/AgendaCenter/ViewFile/Agenda/_02182025-1269"
    },
    "m22-c67gov-2d30a167a31d": {
      "archive_sha256": "5329d894ed66177076b376b7f525889d5ec5bda5031c9bf180576327f95b99c3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Nye County original Sarcobatus agenda materials",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.nyecountynv.gov/DocumentCenter/View/51153/Item19"
    },
    "m22-c67gov-2dfb5c2efbb9": {
      "archive_sha256": "42d4e554b8b1059c6b02ab38b86a53172090ba808a6764e6c4e27547b18f6117",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Nevada NDEP original Colovore Reno 1 air permit",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://ndep.nv.gov/uploads/documents/ap7374-5002-class-ii-aqop.pdf"
    },
    "m22-c67gov-4fcf80bb45cf": {
      "archive_sha256": "fba3328e8f71701b9fabfd48b251e33524cfc279c95eb6ac72e08ca0b9c4599e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Town of Smithfield original May 5 agenda",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://clerkshq.com/Content/Smithfield-ri/council/2026/may05_26ag.htm"
    },
    "m22-c67gov-512700bc7d68": {
      "archive_sha256": "74e84b29a5896b260c9ba3695b2d7bc72df005e9fc062f707bcec9aecd7ad1ce",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Clark County original Post Road legislation record",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://clark.legistar.com/LegislationDetail.aspx?GUID=3C5385FC-3056-45ED-9732-34D4F7F4C84A&ID=7149479&Options=&Search="
    },
    "m22-c67gov-7617a96749d1": {
      "archive_sha256": "faaa8bd540b31903a6adb623a8d4ca1490a7e3986f545507ebee93b35954aa93",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Boulder City original data center account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.bcnv.org/1170/Data-Centers"
    },
    "m22-c67gov-7d4971831099": {
      "archive_sha256": "7f68fceaac26340b987e2865b792c8b83c2b4d3bbd29347837fbd2c26570a663",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Boulder City original City parcel proposal account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.bcnv.org/1174/TS2-Data-Center-Proposal-Withdrawn-76202"
    },
    "m22-c67gov-8abf8f47fe54": {
      "archive_sha256": "01dfca3b70a1510570cd150bb410e7074b8d7cdc328bafa9f986512e757946ac",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Nevada GOED original Apple application packet",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf"
    },
    "m22-c67gov-b5f08b866f4d": {
      "archive_sha256": "a80de3ae2275a1170f12cf46c72a80443cafb277ed75e211eb5f6b44572b5bd6",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "BLM original Townsite project record",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://eplanning.blm.gov/Project-Home/?id=f4dd06fc-446f-f111-ab0d-001dd802f839"
    },
    "m22-c67gov-bde09ed7b0ec": {
      "archive_sha256": "0ef24a7da8e2084cc090fa448852a5672d62a43712c78a8ad28623497f27c759",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Nevada Legislative Counsel Bureau original revised background memorandum",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.leg.state.nv.us/App/InterimCommittee/REL/Document/33075"
    },
    "m22-c67gov-c61f59a3ebcd": {
      "archive_sha256": "ec132f0665129e55a76bcdcf2536a1033db3690f63507c200047cf09bcf2e153",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "City of Reno original Keystone FAQ",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.reno.gov/Documents/Business%20and%20Development/Development%20Services/Keystone%20Data%20Center%20Frequently%20Asked%20Questions.pdf?t=202606291145300"
    },
    "m22-c67gov-e5f98ad1a579": {
      "archive_sha256": "fbb2239305e45fa03945f2827d92f30f438e21c5d5cc30a4308eed83857314ab",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Town of Vernon original Vermont Yankee redevelopment account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://vernonvt.org/vermont-yankee-site-redevelopment/"
    },
    "m22-c67gov-f25e04692fa7": {
      "archive_sha256": "e315ece4b875afec25b80140e3710eeea7a5d2090d28c88d19d469f4dcc5c94e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Town of Smithfield original zoning packet",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://clerkshq.com/Content/Attachments/Smithfield-ri/260407_8e.pdf?clientSite=Smithfield-ri"
    },
    "m22-c67gov-f7d65af9879e": {
      "archive_sha256": "5c0d25fe6ae791dc1072dbeb56d9d4016e5c0ca0f38c047409146b09648bef9c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Clark County original Post Road staff review",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://clark.legistar.com/View.ashx?M=F&ID=13785153&GUID=01617D95-16FA-4FF6-A447-FEDF42D33EAC"
    },
    "m23-4a03a3782dc4": {
      "archive_sha256": "4a03a3782dc4a535f149d54c10a1465b01e266afcdf5e8dbd0a9df71af032fed",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Guilford County original attached draft moratorium",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://guilford.legistar.com/View.ashx?M=F&ID=16056326&GUID=85C38749-8CEF-4304-9843-AF54A4992C58"
    },
    "m23-682bf9fd0d78": {
      "archive_sha256": "682bf9fd0d7863e27e82c50c02aaf301e58132537e1317875440b3969fd970b8",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Missoula County original Bonner project account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://missoulacountyvoice.com/bonner-data-center"
    },
    "m23-873e844b77ca": {
      "archive_sha256": "873e844b77ca6eec799dbafb7ec3d86ce200d8a5bdf89b4a228db75886099eeb",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Butte Silver Bow original computing impact committee account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.bsbmt.gov/3468/Ad--Hoc-Data-Center-Impact-Committee"
    },
    "m23-92aa0e919cc5": {
      "archive_sha256": "92aa0e919cc56fe0de95963dbe8cb8c5183a7ca07997cee020c58215ad1d3d5d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "City of Little Rock original October 20 agenda",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://littlerock.gov/wp-content/uploads/meeting-agenda/AGENDA%20-%20WEB%20-%2010-20-2026/Agenda-October-20-2026.htm"
    },
    "m23-adebbfe3e3f6": {
      "archive_sha256": "adebbfe3e3f68d3165214ac87aa0327542dcc050a14e129500439c25459e0ab0",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Guilford County original hearing legislation account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://guilford.legistar.com/LegislationDetail.aspx?GUID=B62B5B04-4075-414F-A4A1-B10CA85FF96C&ID=8284364&Options=&Search=&FullText=1"
    },
    "m24-10e6758f5f58": {
      "archive_sha256": "10e6758f5f5821881c948c9f508310fef1ec9041d44fd2e072ab17d81c03e1ff",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Laramie County original Tembo office postponement record",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://laramiecounty.legistar.com/LegislationDetail.aspx?GUID=32BDBB37-BAF4-4FC8-A8E7-34812FE2FCE7&ID=8165034&Options=&Search="
    },
    "m24-20259af08bd1": {
      "archive_sha256": "20259af08bd10c0ef711fdebc0adf5c5931b597cc65d490b2d7c539c954eb050",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Utah public notice original Canyon Centre analysis",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.utah.gov/pmn/files/1088841.pdf"
    },
    "m24-2c5e697205da": {
      "archive_sha256": "2c5e697205da67973cbee47ee030189627884d2011fa09f1c93b482340aed7c5",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2022-07-25",
      "publisher": "North Dakota Governor original Nekoma acquisition announcement",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center"
    },
    "m24-84f7bb5bcde6": {
      "archive_sha256": "84f7bb5bcde6ebd682ccee5857567d590759f1e2bfd395c84f61a84fd498f846",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Lindon City original March 16 Council packet",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.utah.gov/pmn/files/1403855.pdf"
    },
    "m24-8b25be42c999": {
      "archive_sha256": "8b25be42c9991fa0ebe2eac60283ccfe4087bbeae73141eceeb2f78800067f73",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Iron County original current computing application account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://ironcountyut.gov/planning/data-center-projects"
    },
    "m24-a1b8e67d844b": {
      "archive_sha256": "a1b8e67d844ba6c4c429918ef46a9db011423fd64517beb2b403607b672af9ad",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Santaquin City original January computing open house notice",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.santaquin.gov/DocumentCenter/View/5659/Public-Notice---city-council-data-center-open-house-01-29-2026"
    },
    "m24-b5ea0c3b5ba2": {
      "archive_sha256": "b5ea0c3b5ba25be0b17311e2fbdf7ee14ad1e7f203e47bf8c6601d625065f5d0",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Wyoming Business Council original legislative program report",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://wyoleg.gov/InterimCommittee/2026/09-202606049-05WBCMaterialsPreparedforJointMinerals06052026.pdf"
    },
    "m24-b799946d8cfc": {
      "archive_sha256": "b799946d8cfcf6111e16d70e382d6512a5b28f8a75e0645f2e3c0fb4a0f2eb03",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Wyoming Business Council original legislative program report",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://wyoleg.gov/InterimCommittee/2026/02-2026062202-02_WBCMaterials.pdf"
    },
    "m24-bac6ca23e8fa": {
      "archive_sha256": "bac6ca23e8fae211e72d9e30ed7f8fce1e65704a223b841bc480a70ab019f440",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Box Elder County original Stratos feedback fact sheet",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.boxeldercountyut.gov/647/Stratos-Project-Fact-Sheet"
    },
    "m24-ec5ad38e206d": {
      "archive_sha256": "ec5ad38e206d8e932b4083bc9592e9726d0e5b49189a473e79be522fc477ea07",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Iron County original linked computing and solar ordinance text",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://ironcountyut.gov/files/planning/data-center-solar-moratorium.pdf"
    },
    "m24-f5abfceab66a": {
      "archive_sha256": "f5abfceab66af9b701772da06417a4bbdb80af696b2efd2d49d49d6b7cf06bea",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "City of Douglas original hosted Ptolemy capability document",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.cityofdouglas.org/AgendaCenter/ViewFile/Item/1542?fileID=1449"
    },
    "m24-fddccc48a20d": {
      "archive_sha256": "fddccc48a20d2f7e9dc8200fed50d1c347e7ec9cacc290f0e53cd7c156dcfb7a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Laramie County original September Planning Commission meeting record",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://laramiecounty.legistar.com/MeetingDetail.aspx?GUID=E265666F-7989-4C81-AD20-D6DF7140139F&ID=1435936&Options=&Search="
    },
    "m25-0943abae98d0": {
      "archive_sha256": "0943abae98d073ba9ca7f1d6b171726702062a453edeacd96685776f350abbd5",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "South Dakota PUC original public utility application",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://puc.sd.gov/commission/dockets/electric/2026/EL26-008/Application.pdf"
    },
    "m25-276cbea8911f": {
      "archive_sha256": "276cbea8911fca5a6780a12fa262b9e63cf91c083d6df5d08497b2239cb734b2",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "South Dakota PUC original Leola service agreement docket",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://puc.sd.gov/Dockets/Electric/2024/EL24-028.aspx"
    },
    "m25-304ec1f7ed09": {
      "archive_sha256": "304ec1f7ed09a2db8caf31b761e8e4436c484b9e3564bb53270db1e87ace041a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Sierra County original October 20 agenda",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.sierraco.org/wp-content/uploads/county-commission-agenda-2026-10-20.pdf"
    },
    "m25-450ef17bd4f6": {
      "archive_sha256": "450ef17bd4f651502069f699e9f73c8368baf5c35443b7c97752aa83253525e3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "New Mexico Tech Board of Regents original March minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.nmt.edu/leadership/docs/2026-03-06-nmt-bor-regular-mtg-minutes-final.pdf"
    },
    "m25-572ddbfff7ba": {
      "archive_sha256": "572ddbfff7ba084a1916a99c96fe426ea4fae6645fa247e170058ef4271dd8c2",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "South Dakota PUC original public amended exhibit letter",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://puc.sd.gov/commission/dockets/electric/2026/EL26-008/LTR081926.pdf"
    },
    "m25-85e1eac20c98": {
      "archive_sha256": "85e1eac20c98aa249db85bff1bc4065e54931aac45e54e29401cd3a1159cfdf0",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Eagle Mountain original redevelopment agency agenda packet",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.utah.gov/pmn/files/1158232.pdf"
    },
    "m25-ac4330c4e2f2": {
      "archive_sha256": "ac4330c4e2f264b26093c1ddef8003832b1360215b2cea5915bd025f8e2aa6a9",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Spanish Fork City original April 21 work session minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.utah.gov/pmn/files/1430163.pdf"
    },
    "m25-b0e7c0fedbb0": {
      "archive_sha256": "b0e7c0fedbb020e27af0397e95769245e8b66e287b131e3c2ae33cdbe0629df9",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Albuquerque original administrative site plan decision",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://documents.cabq.gov/planning/development-facilitation-team/PR-2020-004747%20-%20SI-2024-00451%20July%2031st%2C%202024%20Notice%20of%20Decision%20-%20signed.pdf"
    },
    "m25-b2a1cb513443": {
      "archive_sha256": "b2a1cb513443e1da7a613d16ed051b62e991940006e652dbe4abe9f35b73a31f",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "South Dakota PUC original hosted Leola conditional use application",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://puc.sd.gov/commission/dockets/electric/2024/EL24-027/CondUsePermit.pdf"
    },
    "m25-ce4f724490b8": {
      "archive_sha256": "ce4f724490b8f615e34f84506665f5b7944696fe6966182fde2aec5dc9ae7a73",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Gallup City original April 28 computing proposal and effluent agenda",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Agenda/_04282026-1450"
    },
    "m25-d32cbd6281b1": {
      "archive_sha256": "d32cbd6281b1534380ce54481294142133ed744f833be3cc0680543b1f7b2d12",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "South Dakota PUC original blockchain service docket",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://puc.sd.gov/Dockets/Electric/2026/EL26-008.aspx"
    },
    "m25-d73b56124ae6": {
      "archive_sha256": "d73b56124ae636c55fd322e920d60bfbdcc8b3fc801150a57af83b39e6e524d7",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Utah Inland Port Authority original infrastructure district petition",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://inlandportauthority.utah.gov/wp-content/uploads/Petition-for-TV-PID.pdf"
    },
    "m25-f1aefb7f3aca": {
      "archive_sha256": "f1aefb7f3acaa691c24f31d20ca729b8cded8e27051a8a88fca4b8b35b41756d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Sierra County original signed July 21 minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.sierraco.org/wp-content/uploads/2026-07-21-minutes.pdf"
    },
    "m26-16272babeeda": {
      "archive_sha256": "16272babeeda476c76b35a9c51581a0a0fe66ad438217e8682afbde895ca551b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Nebraska DWEE original CLOP proposed air permit notice",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://dwee.nebraska.gov/news-events/public-notices/clop-omaha-ne-llc"
    },
    "m26-337c01569c6d": {
      "archive_sha256": "337c01569c6d99fd96c44037ba080a4ca8cc0fd5913cb2adbaabf561b963dbb6",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Hallam original October 5 Board agenda",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/October-Agenda-2026-R.pdf"
    },
    "m26-35ac137ce13b": {
      "archive_sha256": "35ac137ce13be2ea26c25e475aff3836a72bcf7d2670603752663efed800fd8a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Hallam original August 19 Planning Commission minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/8-19-26-Planning-Commision-minutes.pdf"
    },
    "m26-a3f632afbe0c": {
      "archive_sha256": "a3f632afbe0c6b87f3e83311ad7832ac54cfe8143507045653cbaffe12aea68f",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Nebraska Public Power District original August 2023 minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://docs.nppd.com/Board/2023/2023AugustMinutes.pdf"
    },
    "m26-b828d083c182": {
      "archive_sha256": "b828d083c1828412ba03c62009d2585ebe5eb2c8affad1d0cab7914ca4da8df8",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Hallam original September 16 Planning Commission minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-16-2026-Planning-Commision-minutes.pdf"
    },
    "m26-c4877feaf7a1": {
      "archive_sha256": "c4877feaf7a18aa0c38a7c0308bf64994e57015c645078082c7ee645081e89d7",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Hallam original September 14 Board minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://villageofhallamnebraska.com/wp-content/uploads/2026/10/9-14-26-minutes.pdf"
    },
    "m27-1fd9589d03ae": {
      "archive_sha256": "1fd9589d03aeeeeacf5fbf073cd3ed62b4e3a4bd9eb743fab0dbc771e95fb8ff",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "St Louis City original Board Bill 74 history",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.stlouis-mo.gov/government/city-laws/board-bills/boardbill.cfm?BBId=17912&bbDetail=true"
    },
    "m27-49aec6afd4a9": {
      "archive_sha256": "49aec6afd4a944f89a8e3cdb948a7f143c990e985212e2697a1494b2e038d781",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2025-10-28",
      "publisher": "Missouri DED original Lambda conversion proposal announcement",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city"
    },
    "m27-51a7a2cecab9": {
      "archive_sha256": "51a7a2cecab95eaa9427d156622f0fb6615b9780bb9719e17e615f7ce61f31b3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "St Louis City original conditional use provisions summary",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.stlouis-mo.gov/government/departments/mayor/documents/upload/Conditional-Use-provisions.pdf"
    },
    "m27-5ecd49664ddb": {
      "archive_sha256": "5ecd49664ddba219a27cd620115f3562dde439645531def20ea17ae07af349a1",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-05-21",
      "publisher": "Webster County original May 21 construction update",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://webstercountymo.gov/commission-data-center-update-may-21/"
    },
    "m27-5f1f839d47e7": {
      "archive_sha256": "5f1f839d47e7c770ab4bd5a6af016f1a778feadc05ccd3777e5ee84852b6fdf1",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "St Louis City original future community benefit term summary",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.stlouis-mo.gov/government/departments/mayor/documents/upload/CBA-provisions.pdf"
    },
    "m27-86a633d287b3": {
      "archive_sha256": "86a633d287b333354c7227c7c38ebd8b178822dc3f1e2469932d96c5892e362a",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Missouri DNR original groundwater email hosted by Webster County",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-MO-DNR-email-re-impact-of-data-center-well.pdf"
    },
    "m27-b8e29dc456cf": {
      "archive_sha256": "b8e29dc456cfe3102e85608ef0ac0d17b8e49a00dde2e8fc852f8c9bb7a0cf68",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2025-08-26",
      "publisher": "Port KC original Northland Kestrel proposal announcement",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/"
    },
    "m27-bd7b01a8a376": {
      "archive_sha256": "bd7b01a8a376dacd775189d85e8547c6ae29326580ce73a9664903f3d641a8a5",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Saint Charles City original August 19 Council minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.stcharlescitymo.gov/AgendaCenter/ViewFile/Minutes/_08192025-1737"
    },
    "m27-c74983cae9a7": {
      "archive_sha256": "c74983cae9a734a65b83f13cc883204ef695c6fcd6bec305c05521d6f60aecae",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Ferguson City original April 21 outgoing Council minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.fergusoncity.com/DocumentCenter/View/8742/Council-Meeting-Minutes-4212026-outgoing"
    },
    "m27-ca8ee1c07ab0": {
      "archive_sha256": "ca8ee1c07ab016afffc794372444abb7a8ede3cc7604ab290a782100351e9bc3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-04-21",
      "publisher": "St Louis City original conditional approval announcement",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.stlouis-mo.gov/government/departments/mayor/news/data-center-permit-approved.cfm"
    },
    "m27-cd0a3975b92f": {
      "archive_sha256": "cd0a3975b92fa93ff4d861c75177ebc3d93cf3c545d813cc432b165d74604621",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2024-12-12",
      "publisher": "Missouri DED original Edged Kansas City opening account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million"
    },
    "m27-de1e6b08580a": {
      "archive_sha256": "de1e6b08580a8b7e890f1012e150aaec402620db3af98657830b262c8f38dc2c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Missouri Conservation original Lumon project review hosted by Webster County",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf"
    },
    "m27-eb0e1c593bbb": {
      "archive_sha256": "eb0e1c593bbb8007c159b029e973528396468983e591701fbd45b4be68b30a17",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-10-14",
      "publisher": "Festus City original computing project support procurement notice",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.festusmo.gov/m/newsflash/home/detail/235"
    },
    "m27-f0060a386eb5": {
      "archive_sha256": "f0060a386eb5840e6e03eecc7550afc73cf966ab7363576accfb37a3a4961658",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Ferguson City original Project Butterfly resident questions and responses",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.fergusoncity.com/DocumentCenter/View/8645/Project-Butterfly---Complete-Q-and-A-Responses?bidId="
    },
    "m28-04de66a62702": {
      "archive_sha256": "04de66a62702999d2d75ee11df08223fed9e30deded54f5fb0adf494e475465b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-06-09",
      "publisher": "Clinton City original AWS former Delphi conversion account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://clintonms.org/awsdatacenter/"
    },
    "m28-106ad0c6e2ec": {
      "archive_sha256": "106ad0c6e2ecba5964dbe5404753767fce6589ba35da38b7b97afb9f949a374c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-08-18",
      "publisher": "Southaven Mayor original training center relocation and land agreement account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.southaven.org/Blog.aspx?IID=239"
    },
    "m28-71072363b032": {
      "archive_sha256": "71072363b0321a9201e8a7d9d9934fe1440751e1e7431d8d4b80cb8e0bb3d2a3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2025-01-09",
      "publisher": "Mississippi Governor original Meridian Compass campus proposal",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/"
    },
    "m28-88caaa01bb0c": {
      "archive_sha256": "88caaa01bb0c5ac422398c2ea52f9f64e24ea8a4870b8c6fac4e0b0e3b29b056",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-01-08",
      "publisher": "Mississippi Governor original named MACROHARDRR rehabilitation account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/"
    },
    "m28-8fbd52af8f8a": {
      "archive_sha256": "8fbd52af8f8a215564815f97e080a9726c5e8f30c401596417b33a4b283072a9",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Jackson City original revised May 5 Council agenda",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://jacksonms.gov/wp-content/uploads/2026/05/combinepdf-20.pdf"
    },
    "m28-ec5478ca72c6": {
      "archive_sha256": "ec5478ca72c6641db3389b32e8670d6c4302955be96cbe85f2f2531f7f025919",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "HPC Centers original public ERDC introductory guide",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://centers.hpc.mil/users/docs/erdc/introGuide.html"
    },
    "m28-ff0a742de240": {
      "archive_sha256": "ff0a742de240ddd19de9626814fefed77afd4ec266d103aecc4e2b6aa11f3195",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "HPC Centers original public Navy introductory guide",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://centers.hpc.mil/users/docs/navy/introGuide.html"
    },
    "m29-1379750e89f7": {
      "archive_sha256": "1379750e89f73b0b992577f4e971786f36258c4d23166b3ac81d26131fb050b5",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-03-20",
      "publisher": "Coweta City original March 20 Project Atlas speaker procedures",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.cityofcoweta-ok.gov/m/newsflash/Archive/Item/569?arcId=816"
    },
    "m29-4e08c143d021": {
      "archive_sha256": "4e08c143d0215fd059f65e8aa6a59c54127f43763301318b65c450e357ecfa2c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Piedmont City original posted Ordinance 2026 003 copy",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://piedmont-ok.gov/DocumentCenter/View/950/Ordinance-2026-003"
    },
    "m29-93cb56c59de9": {
      "archive_sha256": "93cb56c59de994fe4d88b2aa3ae9548ca7453e015fc0fc6023eb68614035f69b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Piedmont City original computing project transparency portal",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://piedmont-ok.gov/323/Data-Center-Transparency-Portal"
    },
    "m29-d5e05f1afc2e": {
      "archive_sha256": "d5e05f1afc2ec16f23bc9dbcd5683655565e5a916fd14efd62a8e7986c7a5736",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Coweta City original December 2025 City Manager newsletter",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.cityofcoweta-ok.gov/ArchiveCenter/ViewFile/Item/1158"
    },
    "m30-033c7120ad94": {
      "archive_sha256": "033c7120ad94449d8d466e5e07e154ce5557528a7749ff7c0e43eb001492691b",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-02-23",
      "publisher": "Louisiana Economic Development original Amazon and STACK campus announcement",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.opportunitylouisiana.gov/news/amazon-selects-louisiana-for-12-billion-data-center-campuses-in-major-u-s-expansion"
    },
    "m30-08a1e6eca40d": {
      "archive_sha256": "08a1e6eca40d751db2965b3117a913fc2077f4ef4814c79f794d1a56239746e3",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "New Orleans City original August 20 final meeting register",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://cityofno.legistar.com/MeetingDetail.aspx?GUID=C3A948F3-6B57-475B-9323-5A30BFDBACDA&ID=1400127&Options=&Search="
    },
    "m30-1cdca68d707c": {
      "archive_sha256": "1cdca68d707cbf9d6c7089c6732bcecd7bc7b40b33c89bf7647ef35d7988c9b6",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "New Orleans City original linked five page ordinance and earlier motion packet",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://cityofno.legistar.com/View.ashx?M=F&ID=15757037&GUID=D0B9C76E-A211-4103-99B9-2A1D5E478F88"
    },
    "m30-29fbff8dd973": {
      "archive_sha256": "29fbff8dd973162602cfe88fb717e6a1bd59aceba58e6791a8dc1eb1f7d9434f",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "New Orleans City original August 20 final Council minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://cityofno.legistar.com/View.ashx?M=M&ID=1400127&GUID=C3A948F3-6B57-475B-9323-5A30BFDBACDA"
    },
    "m30-975ac93ee27a": {
      "archive_sha256": "975ac93ee27a38a4e762d6caaada47cdea50485d739a837992f2ba50989f014f",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "New Orleans City original ordinance register",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://cityofno.legistar.com/LegislationDetail.aspx?GUID=8D3010F2-EFCA-4270-8C6E-5583AF4F2105&ID=8167372&Options=&Search="
    },
    "m31-21edf96ba38f": {
      "archive_sha256": "21edf96ba38f2f76a776bad50d12ef5b04ba382dd168deaf018222f247927cec",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2025-05-22",
      "publisher": "NETL original named CSE construction account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://netl.doe.gov/node/14819"
    },
    "m31-2a1fb4c2f194": {
      "archive_sha256": "2a1fb4c2f19451d60a4a7568f7f96590733fe0e19efa0ef142667d94c46ccf7e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "NOAA original current public Hera system overview guide",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://docs.rdhpcs.noaa.gov/systems/hera_user_guide.html"
    },
    "m31-6ab511dcb126": {
      "archive_sha256": "6ab511dcb126f444ba0ffb15e964ddf555e77e23237e44c48a9fff56e038625e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-09-03",
      "publisher": "West Virginia Governor original Starwood Mason county designation announcement",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://governor.wv.gov/article/governor-morrisey-announces-more-81-billion-new-investment-west-virginia-business-summit"
    },
    "m31-bdd7e6765f3b": {
      "archive_sha256": "bdd7e6765f3b8339a29b73a7178adaeb9afa531cdf681e18215d7c803b5f370d",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "West Virginia DEP original Adams Fork and Harless energy permit meeting notice",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://dep.wv.gov/events/Pages/event.aspx?eventid=264"
    },
    "m31-cd64850b7598": {
      "archive_sha256": "cd64850b7598024a1398281992e9c0dd9cb7bbd2615a595f1a35e1a6eb691a83",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-02-26",
      "publisher": "West Virginia Governor original named Bedington campus account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact"
    },
    "m31-dfadd8526f5d": {
      "archive_sha256": "dfadd8526f5d1394880dda5e6f55f82f6dacb7c14ddbb51af6bb0201aa263b84",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2024-09-24",
      "publisher": "United States Energy Department original Martinsburg efficiency proposal account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.energy.gov/nepa/articles/cx-032001-internal-revenue-service-martinsburg-enterprise-computing-center-espc"
    },
    "m32-15f250ee0037": {
      "archive_sha256": "15f250ee0037fb0968d316815840f9f75665b0851652ecc1ec1c83f8ea62e6c8",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2022-01-25",
      "publisher": "South Carolina Commerce original Greenidge development announcement",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.sccommerce.com/newsroom/greenidge-generation-establishing-operations-spartanburg-county"
    },
    "m32-1e701797ed68": {
      "archive_sha256": "1e701797ed68e5efe692395b70ddc35c7e20231635515a6413311ff8cc867ef1",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-10-23",
      "publisher": "Loudoun County original current public account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.loudoun.gov/m/newsflash/Home/Detail/10948"
    },
    "m32-3b6d9de293bc": {
      "archive_sha256": "3b6d9de293bc251207ef307bc9048a69b7ef8aaa59ee26e1002b8935bb7da731",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Union County original current public notice index",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://gearupunionsc.com/public-notices/"
    },
    "m32-48d1e54b7d0e": {
      "archive_sha256": "48d1e54b7d0e2c71ecbfb5f80e3e3d4e4d84a974615ce30780becdb945f689be",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2024-09-26",
      "publisher": "South Carolina Governor original two Dorchester campus announcement",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion"
    },
    "m32-48d5f2027765": {
      "archive_sha256": "48d5f2027765ac171788a6ee0503e1c9e6cff08d4731ab09e7cf9072ab3d90e5",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Union County original hosted Project Alpaca presentation",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf"
    },
    "m32-6876d44c2e91": {
      "archive_sha256": "6876d44c2e9191ab3a10d553d297e0dc52fcc77309bbe139159ed43e2f2f629f",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "South Carolina Environmental Services original Valara permit application",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf"
    },
    "m32-8347dc587482": {
      "archive_sha256": "8347dc58748200a0f0113810a6ef53a89fd8ee7bea11207aff07d1ddb6ae5c2e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2025-06-24",
      "publisher": "South Carolina Governor original named Gaffney campus announcement",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development"
    },
    "m32-886aa29b75c4": {
      "archive_sha256": "886aa29b75c4e6ab81343082b618dbd6163203cfa7c0ec1f8d1ccc945224b3c6",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Colleton County original December 1 Council minutes",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.colletoncounty.org/sites/default/files/uploads/minutes/12-1-25-regular-meeting-minutes.pdf"
    },
    "m32-8b5ac09dae26": {
      "archive_sha256": "8b5ac09dae264e19d48be4fabfaeeeda73f004253243efe52146858a0790a408",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-10-20",
      "publisher": "Loudoun County original current public account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.loudoun.gov/m/newsflash/Home/Detail/10938"
    },
    "m32-9d25d4107140": {
      "archive_sha256": "9d25d4107140310e319d17e76af0f829d3295787399891497e4915565feb516e",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Newberry County original Project Altair public account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers"
    },
    "m32-b5bef5534b81": {
      "archive_sha256": "b5bef5534b818bc0e2d1fa40ecf3aa7f1ad2eaddd05a99d83a5960950f421c31",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-10-20",
      "publisher": "New York Department of Public Service original large load proceeding notice",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B30155BA1-0000-CA10-A034-1582CF7C7A62%7D"
    },
    "m32-c284a946e6b7": {
      "archive_sha256": "c284a946e6b7dcb1e9fa6f6ff896e5fe97d8368bac8200d084d13a8cb4c12bcf",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-07-20",
      "publisher": "United States NNSA original Amentum lease negotiation selection account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site"
    },
    "m32-e0c5075a5409": {
      "archive_sha256": "e0c5075a5409a03260e7a710016384768e97d88fac4e40aac0a42a3f23fe5f6c",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-10-22",
      "publisher": "Loudoun County original current public account",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://www.loudoun.gov/m/newsflash/Home/Detail/10944"
    },
    "m32-e0d2d651e088": {
      "archive_sha256": "e0d2d651e0880aa265a00d3f817172d72b07c56544ec261ef69cf3d321643120",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": "2026-10-19",
      "publisher": "New York Department of Public Service original large load proceeding notice",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://documents.dps.ny.gov/public/Common/ViewDoc.aspx?DocRefId=%7B90B154A1-0000-CF2B-A5BE-4FFE645CE7B6%7D"
    },
    "m32-f7182da59d58": {
      "archive_sha256": "f7182da59d587537a49f932f9878291c9ac27e4d41e78790068f088a4eecc15f",
      "capture_format": "raw_response_bytes",
      "checked_on": "2026-10-24",
      "published_on": null,
      "publisher": "Union County original linked Ordinance 413 hearing notice",
      "retrieved_on": "2026-10-24",
      "source_type": "government_record",
      "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Public-Hearing-Ordinance-413_Project-Alpaca.docx.pdf"
    },
    "m54-cleveland-ledger": {
      "url": "https://cityofcleveland.legistar.com/LegislationDetail.aspx?G=2EB18EF1-2C21-4D1D-85C9-B38100AB8FFD&GUID=C47C1DB1-3DB2-44D1-9049-644671B4CCF8&ID=8283864&Options=&Search=",
      "publisher": "Cleveland City Council",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "628a1c90e14b555da653fefc217bf8615aca4610eff3441e1bc6cd708fad8449",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/restrictions-current/raw/ledger.html"
    },
    "m54-cleveland-ordinance_attachment": {
      "url": "https://cityofcleveland.legistar.com/View.ashx?G=2EB18EF1-2C21-4D1D-85C9-B38100AB8FFD&GUID=F6D4CD55-6D4D-4B9A-B1D6-BFE3FA37CD18&ID=16059141&M=F",
      "publisher": "Cleveland City Council",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "5d90803f15004e477b2bc002cdfc7c40683833571a0a65a0360e91b71464f734",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/restrictions-current/raw/ordinance_attachment.pdf"
    },
    "m54-cleveland-city_page": {
      "url": "https://www.clevelandohio.gov/news/cleveland-city-council-approves-temporary-pause-new-standalone-data-centers",
      "publisher": "City of Cleveland",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "c9c9182f6d6a799b945197396d18c29ae6af4852b9fd03ab2f05668000e3492e",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/restrictions-current/raw/city_page.html"
    },
    "m55-richmond-city": {
      "url": "https://www.richmondca.gov/5002/Data-Center-Moratorium-and-Study",
      "publisher": "City of Richmond, California",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "6f14a5c6a5b05fc4a18df7d8140c36659a8415fe9b1a1f8719b69adf5599c9e8",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/restrictions-richmond/raw/city.html"
    },
    "m55-richmond-ordinance": {
      "url": "https://www.ci.richmond.ca.us/ArchiveCenter/ViewFile/Item/17892",
      "publisher": "City of Richmond, California",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "2d6af462b6cb17f5d474fa0e7fea91f4de4ea3f66cc67135eed68f07f5809ca9",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/restrictions-richmond/raw/ordinance.pdf"
    },
    "m55-richmond-report": {
      "url": "https://www.ci.richmond.ca.us/DocumentCenter/View/82040/10-Day-Report-on-the-45-Day-Data-Center-Moratorium",
      "publisher": "City of Richmond, California",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "bb855b52ab8163674021f3b0d7c68eb6ee10e2c629301545eb41724db1fbc4cf",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/restrictions-richmond/raw/report.pdf"
    },
    "m55-richmond-notice": {
      "url": "https://www.ci.richmond.ca.us/DocumentCenter/View/81982/Data-Center-45-day-Moratorium-Public-Hearing-Notice---102026_REV-FOR-10-20-26",
      "publisher": "City of Richmond, California",
      "source_type": "government_record",
      "published_on": "2026-10-10",
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "f4ffe87405f401ddf6390717b2e4ef2d557b6f05a90aae9315ae00afdf610e2e",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/restrictions-richmond/raw/notice.pdf"
    },
    "m56-hayward_action": {
      "url": "https://hayward.legistar.com/HistoryDetail.aspx?ID=37917674&GUID=563D35B1-345F-4E02-B0A2-0E73D6DDE972",
      "publisher": "City of Hayward City Council",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "ca82a4c1f4819c724bdd6bc29139e25f09a9e186f1939af76a4b93bda68bed85",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/official-followups/hayward_action.html"
    },
    "m56-hayward_draft": {
      "url": "https://hayward.legistar.com/View.ashx?M=F&ID=16071529&GUID=8E34E177-EBE9-481E-84FB-7FEEF9061D48",
      "publisher": "City of Hayward City Council",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "73653b85d062e20f159a8a1c51f2587ed738bfdf479f2dd414d42d1d1903fdbf",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/official-followups/hayward_draft.pdf"
    },
    "m56-ledger": {
      "url": "https://hayward.legistar.com/LegislationDetail.aspx?GUID=2D407310-FB5E-43DB-B1B9-4A9BD75D1B4F&ID=8291024&Options=&Search=",
      "publisher": "City of Hayward City Council",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "b8fe902414974174e50843d40538431422a711bcf9ce3d1330ff6c461a5b264a",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/official-followups/hayward-ledger.html"
    },
    "m56-city-news": {
      "url": "https://www.hayward-ca.gov/discover/news/oct26/hayward-city-council-enacts-immediate-moratorium-new-data-centers",
      "publisher": "City of Hayward",
      "source_type": "government_record",
      "published_on": "2026-10-21",
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "13c541c0c12546279e2ead3f766ad9c5222d2a4bca03ba93f022407467cdc3c0",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/news-03/raw/2026-10-21-hayward-moratorium.html"
    },
    "m57-agenda": {
      "url": "https://cityofjerseycity.civicweb.net/document/458964/",
      "publisher": "City of Jersey City",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "217b88ea6ee23fd5c4e2246addefb71f866d08bf95ef6c99d30c3ce327c0219e",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/official-followups/jersey-city/agenda.html"
    },
    "m57-ordinance": {
      "url": "https://cityofjerseycity.civicweb.net/document/456803/Data%20Center%20Amendment.pdf?handle=F3A84F034B03438F873B901B05EF950F",
      "publisher": "City of Jersey City",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "e0024d38be36a333047e4a6ee93b4630fff5b5def64e4afed56c4ff0f1c22df7",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/official-followups/jersey-city/ordinance.pdf"
    },
    "m58-dade-revised-packet": {
      "url": "https://dadecityfl.civicweb.net/document/204890/City%20Commission%20-%2027%20Oct%202026.pdf?handle=A90CCF17D6834C5386DE0DD747B37512",
      "publisher": "City of Dade City",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "5647349cee656a8cd6d8fab5cd9331851c2278486525fb4b3fe71ec5e86db917",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/hearings-current/dade-city/packet.pdf"
    },
    "m59-fw-overview": {
      "url": "https://www.fortworthtexas.gov/departments/city-manager/datacenters",
      "publisher": "City of Fort Worth",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "9cd1b832e9fa59ccaf5e0dae145d38a191d1d342ceed5757cd2b7ae961001439",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/hearings-current/fort-worth/overview.html"
    },
    "m59-fw-update": {
      "url": "https://www.fortworthtexas.gov/news/2026/9/dcic-schedule",
      "publisher": "City of Fort Worth",
      "source_type": "government_record",
      "published_on": "2026-09-29",
      "retrieved_on": "2026-10-24",
      "checked_on": "2026-10-24",
      "archive_sha256": "0c6f60e74cb803046128acc1b0b652de30a06227336616405a833544e26a151d",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/hearings-current/fort-worth/update.html"
    },
    "m60-linden-summary": {
      "url": "https://docs.google.com/document/d/1UjzNAlGWUR3a7PIuRdqn7z0yd6f-VahZ/edit",
      "publisher": "City of Linden",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-25",
      "checked_on": "2026-10-25",
      "archive_sha256": "34ebfdee562d921de96a6fe5ee45872d86ab0929cc5ce356daa8791d6525691e",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/official-followups/linden-ban/ordinance-summary.docx"
    },
    "m61-notice": {
      "url": "https://www.huntingburg-in.gov/egov/apps/document/center.egov?view=item&id=2561",
      "publisher": "City of Huntingburg",
      "source_type": "government_record",
      "published_on": "2026-10-12",
      "retrieved_on": "2026-10-25",
      "checked_on": "2026-10-25",
      "archive_sha256": "0c7f0d530af428b82fba94cef4d3c20a564083a30bfce77b75e9329854d013d3",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/official-followups/huntingburg-current/notice.pdf"
    },
    "m62-notice": {
      "url": "https://www.richlandtwp.net/October%2028%20Planning%20Commission%20Public%20Hearing.pdf?t=202609301649320",
      "publisher": "Richland Township, Kalamazoo County",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-25",
      "checked_on": "2026-10-25",
      "archive_sha256": "808089423a7ab1e81db4466eb878de4b03ef857258eacec69eab424f85292a64",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/official-followups/richland-current/notice.pdf"
    },
    "m62-agenda": {
      "url": "https://www.richlandtwp.net/PC%20Agenda%20A%2010-28-26.pdf?t=202610251636530",
      "publisher": "Richland Township, Kalamazoo County",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-25",
      "checked_on": "2026-10-25",
      "archive_sha256": "48eadac63c8525859b965e181915acb66ca1640212e97e11046cffdebecb0e8f",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/official-followups/richland-current/agenda-a.pdf"
    },
    "m63-election": {
      "url": "https://boe.co.trumbull.oh.gov/pdfs/46%20day%20notice.pdf",
      "publisher": "Trumbull County Board of Elections",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-25",
      "checked_on": "2026-10-25",
      "archive_sha256": "fe597e2ed33814547cb2ae40aa80fcf6097687f89f8bec9b2c60369ecfb2a32b",
      "capture_format": "raw_response_bytes",
      "path": "build/cache/research-2026-10-22/official-followups/hubbard-ballot/election-notice.pdf"
    },
    "m64-lafayette-recap": {
      "url": "https://www.lafayetteco.gov/CivicSend/ViewMessage/message/304072",
      "publisher": "City of Lafayette, Colorado",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-26",
      "checked_on": "2026-10-26",
      "archive_sha256": "084bb0a5068b69aabc7fa5e4fbbee10166e0739303b46ddbb82789ed26743a27",
      "capture_format": "official_web_view_reviewer_note",
      "path": "build/cache/research-2026-10-22/official-followups/lafayette-current/recap-web-review.txt"
    },
    "m65-martin-agenda": {
      "url": "https://martin.legistar.com/LegislationDetail.aspx?FullText=1&GUID=58084918-819B-4913-9D1F-0FD6FC8CE974&ID=8288761&Options=&Search=",
      "publisher": "Martin County Board of County Commissioners",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-26",
      "checked_on": "2026-10-26",
      "archive_sha256": "291cb866cc8a22e62e757cfb9ee4363bb11c225f585d434fa0c4b2e4f5d6c13a",
      "capture_format": "official_web_view_reviewer_note",
      "path": "build/cache/research-2026-10-22/official-followups/martin-current/proposal-web-review.txt"
    },
    "m66-avon": {
      "url": "https://www.avontownshipmn.gov/images/docs/legal/Avon_Twp_legal_Interim_Ordinance_2026.pdf",
      "publisher": "Avon Township, Minnesota",
      "source_type": "government_record",
      "published_on": "2026-09-23",
      "retrieved_on": "2026-10-26",
      "checked_on": "2026-10-26",
      "path": "build/cache/research-2026-10-22/official-followups/avon-current/restriction-web-review.txt",
      "archive_sha256": "72108ba60a5762c2bae3bb5a1f082c9e903123b9491085be623337c3fde7010d",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m66-south-bristol": {
      "url": "https://southbristolny.gov/wp-content/uploads/2026/09/Ag-Local-Law-Amending-Zoning-Re-Data-Centers.pdf",
      "publisher": "Town of South Bristol, New York",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-26",
      "checked_on": "2026-10-26",
      "path": "build/cache/research-2026-10-22/official-followups/south-bristol-current/restriction-web-review.txt",
      "archive_sha256": "106a9a1b1e05885a8dc0bebc58de4eb1e7f65ae4298c9e6afee59dae27a05715",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m66-avon-minutes": {
      "url": "https://www.avontownshipmn.gov/images/docs/supervisors_meeting/2026_August_Supervisors_Minutes.pdf",
      "publisher": "Avon Township Board of Supervisors",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-26",
      "checked_on": "2026-10-26",
      "path": "build/cache/research-2026-10-22/official-followups/avon-current/minutes-web-review.txt",
      "archive_sha256": "d3031da12cc3379ed3700255ff5347616122db527f3f7a55e454294daa979de5",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m66-avon-resolution-text": {
      "url": "https://www.avontownshipmn.gov/images/docs/resolutions/Resolution_08-12-26-1_Data_Center_Moratorium_RN_rev_Clean_1.pdf",
      "publisher": "Avon Township",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-26",
      "checked_on": "2026-10-26",
      "path": "build/cache/research-2026-10-22/official-followups/avon-current/resolution-text-web-review.txt",
      "archive_sha256": "8f6c6ecfa67dc6e3481b2191f59c6710fa96bcc4049db454ce4e96381b536d49",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m67-brownsville-recap": {
      "url": "https://www.brownsvilletx.gov/m/newsflash/Home/Detail/3513",
      "publisher": "City of Brownsville, Texas",
      "source_type": "government_record",
      "published_on": "2026-10-07",
      "retrieved_on": "2026-10-26",
      "checked_on": "2026-10-26",
      "path": "build/cache/research-2026-10-22/official-followups/brownsville-current/proposal-web-review.txt",
      "archive_sha256": "e63f710b50452a7a4f9c818a96be44eb483e1b289396f30d161bf6ec6302e154",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m68-history": {
      "url": "https://charlottenc.legistar.com/LegislationDetail.aspx?GUID=6D9578E8-E0FA-4043-9765-2DEDBD375AE6&ID=8293913&Options=&Search=",
      "publisher": "Charlotte City Council",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/charlotte-current/extension-item-20261028.html",
      "archive_sha256": "6ae57b0311eedc684432d85364829705a50d48c3f717c45c5eca6ba7a3f0f94a",
      "capture_format": "raw_response_bytes"
    },
    "m68-ordinance": {
      "url": "https://charlottenc.legistar.com/View.ashx?M=F&ID=16081715&GUID=8E3E0480-6BC0-4EF5-B1D2-625D53840636",
      "publisher": "Charlotte City Council",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/charlotte-current/extension-ordinance.pdf",
      "archive_sha256": "f626a71a172171d7856ee9938dc3142e2f9a31fe61270592fa61f09c50043f24",
      "capture_format": "raw_response_bytes"
    },
    "m69-tyre-notice": {
      "url": "https://tyreny.gov/public-notice-public-hearing-october-28-2026-630-pm/",
      "publisher": "Town of Tyre, Town Clerk",
      "source_type": "government_record",
      "published_on": "2026-10-02",
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/tyre-current/official-web-review.txt",
      "archive_sha256": "12384939a39108a1416d787017e7708e0fb1a43e0ea6e031c12643cb3d3da182",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m70-blog23": {
      "url": "https://www.sandiego.gov/blog/peoples-business-october-23-2026",
      "publisher": "City of San Diego, Office of Council President",
      "source_type": "government_record",
      "published_on": "2026-10-23",
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/san-diego-schedule-current/october-23.html",
      "archive_sha256": "ceee889044a6ef99af3e960d5a4f7619d7bf1038653b515c452c1b356671f241",
      "capture_format": "raw_response_bytes"
    },
    "m70-blog26": {
      "url": "https://www.sandiego.gov/blog/peoples-business-october-26-2026",
      "publisher": "City of San Diego, Office of Council President",
      "source_type": "government_record",
      "published_on": "2026-10-26",
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/san-diego-schedule-current/october-26.html",
      "archive_sha256": "10fcced98cbf442a7d29606f369437ebd2c3a65b35e33886cc63b9845b8ed30e",
      "capture_format": "raw_response_bytes"
    },
    "denton-staff": {
      "url": "https://denton-tx.legistar.com/View.ashx?M=F&ID=16082346&GUID=0B69C76E-D4F6-499D-BA3C-D5257F99C603&G=A1619B3C-1B45-4681-B45C-0B3DA512F5D1",
      "publisher": "City of Denton, Development Services",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/denton-current/ea3b98c8e4c195c22970.pdf",
      "archive_sha256": "94e951f2c693094ef2f7775bcb709798488c12bfce6d323e7572eac2e43bfd21",
      "capture_format": "raw_response_bytes"
    },
    "denton-draft": {
      "url": "https://denton-tx.legistar.com/View.ashx?M=F&ID=16082343&GUID=B0C44716-AA81-4B99-A088-CF78BBCF1103&G=A1619B3C-1B45-4681-B45C-0B3DA512F5D1",
      "publisher": "City of Denton, Development Services",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/denton-current/00ada0e245c5457d1215.pdf",
      "archive_sha256": "5330d0f365b02cb5e71e73af626768424b78b3ebcb462705374104eb4f959a47",
      "capture_format": "raw_response_bytes"
    },
    "m72-15792": {
      "url": "https://legistar1.granicus.com/cityofdeerpark/attachments/085a978f-a0a8-4c7a-b268-e1cd4fd6c8bc.pdf",
      "publisher": "City of Deer Park official legislative attachments",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/deer-park-current/15792-draft.pdf",
      "archive_sha256": "1c3ac93312bff642b443987d83a6eb48973736b10705598898365f4bb665390e",
      "capture_format": "raw_response_bytes"
    },
    "m72-15795": {
      "url": "https://legistar1.granicus.com/cityofdeerpark/attachments/055b0136-6202-4d92-bd78-3d2ce4ec7241.pdf",
      "publisher": "City of Deer Park official legislative attachments",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/deer-park-current/15795-draft.pdf",
      "archive_sha256": "1c3ac93312bff642b443987d83a6eb48973736b10705598898365f4bb665390e",
      "capture_format": "raw_response_bytes"
    },
    "m72-15797": {
      "url": "https://legistar1.granicus.com/cityofdeerpark/attachments/d8662404-e691-460f-83bf-53d8dd9041e8.pdf",
      "publisher": "City of Deer Park official legislative attachments",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/deer-park-current/15797-draft.pdf",
      "archive_sha256": "6164154f86240069a1b995dc69db418d361069535609ba8e032d5140b3b13dc8",
      "capture_format": "raw_response_bytes"
    },
    "m72-meeting": {
      "url": "https://legistar1.granicus.com/cityofdeerpark/meetings/2026/11/3362_A_Planning___Zoning_Commission_26-11-02_Other_Meeting_Agenda_.pdf",
      "publisher": "City of Deer Park Planning and Zoning Commission",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/deer-park-current/november2-agenda.pdf",
      "archive_sha256": "073826624444398c8a104e1541d589b74651cf34c812be3d452927f99f120081",
      "capture_format": "raw_response_bytes"
    },
    "m73-source-0": {
      "url": "https://bouldercounty.gov/property-and-land/land-use/planning/land-use-code-update/dc-26-0003/",
      "publisher": "Boulder County",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/colorado-draft-rules/boulder.html",
      "archive_sha256": "8d1f7c889b56e9c885ebc14271eda4ff6b7ae034308ae75adaf24d8a79fa023e",
      "capture_format": "raw_response_bytes"
    },
    "m73-source-1": {
      "url": "https://assets.bouldercounty.gov/wp-content/uploads/2026/09/cpp-dc-26-0003-attachment-a-option-1-data-center.pdf",
      "publisher": "Boulder County",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/colorado-draft-rules/boulder-option1.pdf",
      "archive_sha256": "5b2a921c235bea895c489da4c78be9040bcd95382466c23389f9258f455d90c7",
      "capture_format": "raw_response_bytes"
    },
    "m73-source-2": {
      "url": "https://assets.bouldercounty.gov/wp-content/uploads/2026/09/cpp-dc-26-0003-attachment-b-option-2-data-center.pdf",
      "publisher": "Boulder County",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/colorado-draft-rules/boulder-option2.pdf",
      "archive_sha256": "e57711fb829a51dda384d4b22db4de573456ed8cb1cb3070e6502c0b352fe9ea",
      "capture_format": "raw_response_bytes"
    },
    "m73-source-3": {
      "url": "https://publicinput.com/Customer/File/Full/87e4204c-1731-4758-b9cc-a6eac75d3fad",
      "publisher": "Larimer County official draft and engagement portal",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/colorado-draft-rules/larimer-draft.pdf",
      "archive_sha256": "737ad849cea1045dc21c4b47e23586958951ffb491c81c07e51bb5927cc237d9",
      "capture_format": "raw_response_bytes"
    },
    "m73-source-4": {
      "url": "https://engage.larimer.gov/x00418",
      "publisher": "Larimer County official draft and engagement portal",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/larimer-draft-current/feedback-current.html",
      "archive_sha256": "cc19fe6ff57de16e331bbb6fa1b2b1998f79e49dd3b20422e1ffd83ab2c461ec",
      "capture_format": "raw_response_bytes"
    },
    "m74-forest-grove-official": {
      "url": "https://www.forestgrove-or.gov/m/newsflash/Home/Detail/191",
      "publisher": "City of Forest Grove",
      "source_type": "government_record",
      "published_on": "2026-10-13",
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/forest-grove-current/official-web-review-note.txt",
      "archive_sha256": "a48d468c4ded6cef3ab0e09a698a9bd2f5bd20eede0b8719fd0a5c5f29a6b7fb",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m75-clackamas-0": {
      "url": "https://www.clackamas.us/meetings/bcc/business/2026-10-22",
      "publisher": "Clackamas County",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/clackamas-current/minutes.html",
      "archive_sha256": "3ffba018b577831412b12117c14782d297e4d68de9869cce167175d656967796",
      "capture_format": "raw_response_bytes"
    },
    "m75-clackamas-1": {
      "url": "https://docs.clackamas.us/documents/drupal/27fb3b55-c673-4440-a28a-7d9c3a9a5f52",
      "publisher": "Clackamas County",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/clackamas-current/packet.pdf",
      "archive_sha256": "614846126f35f12c267feb92dd8b3cd2cbb7378af046e897a2e62d6f977d4dda",
      "capture_format": "raw_response_bytes"
    },
    "m76-mexico-notice": {
      "url": "https://mexicomissouri.net/m/newsflash/home/detail/997",
      "publisher": "City of Mexico, Missouri",
      "source_type": "government_record",
      "published_on": "2026-10-20",
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/mexico-mo-current/notice-web-review.txt",
      "archive_sha256": "be35e7f95887bab8c968423549e8cba338695817a462b03bb8d5f7b1913052c2",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m76-mexico-draft": {
      "url": "https://mexicomissouri.net/DocumentCenter/View/6638",
      "publisher": "City of Mexico, Missouri",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/mexico-mo-current/draft-web-review.txt",
      "archive_sha256": "2dde149cefeeb9c8b8c235cd38f75f31d97f39142e213e1aaf6142fac5217551",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m77-forest-park-city-newsletter": {
      "url": "https://myemail.constantcontact.com/--City-Hall-Is-On-A-Roll----Forest-Park-Leaf-Report-Monthly-Newsletter--September-2026---.html?aid=SDSzx4BA7CA&soid=1138003873354",
      "publisher": "City of Forest Park, The Leaf Report September2026 newsletter",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/forest-park-current/newsletter.html",
      "archive_sha256": "763d25f2fcc3761ba4473be5fe4409f27d93c6f89509eb8d30bbec45a3734ff3",
      "capture_format": "raw_response_bytes"
    },
    "m78-downe-0": {
      "url": "https://downetwpnj.org/public-notices/",
      "publisher": "Township of Downe Municipal Clerk",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-lists-current/downe-notices/source.html",
      "archive_sha256": "e1d03e1031ce1798b0b14a897961aa6338d3eb891aae53e04ac0cc42dd54438d",
      "capture_format": "raw_response_bytes"
    },
    "m78-downe-1": {
      "url": "https://downetwpnj.org/ordinance-2026-04-data-center-ban-ordinance/",
      "publisher": "Township of Downe Municipal Clerk",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-lists-current/downe-notices/ordinance.pdf",
      "archive_sha256": "b387c99d162f5ec7838f65b296a5c443622929c085319b7dcd234f8db6011b8b",
      "capture_format": "raw_response_bytes"
    },
    "m78-downe-2": {
      "url": "https://downetwpnj.org/notice-of-final-passage-ordinance-2026-04/",
      "publisher": "Township of Downe Municipal Clerk",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-lists-current/downe-notices/passage.doc",
      "archive_sha256": "80df4ba0584673746b76bd100078d30833ed008ef9f1530069fac0d00861ced2",
      "capture_format": "raw_response_bytes"
    },
    "m79-source-0": {
      "url": "https://www.raritantwpnj.gov/government/news/789-raritan-township-adopts-ordinance-prohibiting-data-centers",
      "publisher": "Raritan Township",
      "source_type": "government_record",
      "published_on": "2026-09-18",
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/nj-ban-batch/web-review-0.txt",
      "archive_sha256": "40cc268b6d3925f669af0e198aebc866283eced2048a9f290d32f49c20a3b318",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m79-source-1": {
      "url": "https://bethlehemnj.org/ordinance-506-2026/",
      "publisher": "Bethlehem Township",
      "source_type": "government_record",
      "published_on": "2026-09-18",
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/nj-ban-batch/web-review-1.txt",
      "archive_sha256": "6cb58b527f3a2e5ed89d08e56f4cf9d10ad5b681fe4793966383d72423718e7f",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m80-source-0": {
      "url": "https://www.vermillion.us/m/newsflash/Home/Detail/846",
      "publisher": "City of Vermillion, South Dakota",
      "source_type": "government_record",
      "published_on": "2026-10-05",
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/vermillion-sd-current/web-review-0.txt",
      "archive_sha256": "60f37bde8a2f3062fe024547ebf7159698b370a2993608bed0d777d91d8c2e21",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m80-source-1": {
      "url": "https://www.vermillion.us/DocumentCenter/View/3260",
      "publisher": "City of Vermillion, South Dakota",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/vermillion-sd-current/web-review-1.txt",
      "archive_sha256": "60356da9bef392003c8244e2dd6d0ee974fd4b5a0ea72738e498fc56e511a37e",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m80-source-2": {
      "url": "https://www.vermillion.us/DocumentCenter/View/3261",
      "publisher": "City of Vermillion, South Dakota",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/vermillion-sd-current/web-review-2.txt",
      "archive_sha256": "6b6c21ae9900f02412f52593e7c81ee82affa5e4bede4cbb1678cdf26e271845",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m80-source-3": {
      "url": "https://www.vermillion.us/DocumentCenter/View/3262",
      "publisher": "City of Vermillion, South Dakota",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/vermillion-sd-current/web-review-3.txt",
      "archive_sha256": "30292f0152e1dc5689bac7dbe8f32bdbeedbdbc3fd204f5a0cb211979087cc9e",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m80-source-4": {
      "url": "https://www.vermillion.us/DocumentCenter/View/3263",
      "publisher": "City of Vermillion, South Dakota",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/vermillion-sd-current/web-review-4.txt",
      "archive_sha256": "2575682d9f03f7a08758be0c9fccb5af66437ee5e48c3e45fd6ebf00612a15c6",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m80-source-5": {
      "url": "https://www.vermillion.us/DocumentCenter/View/3264",
      "publisher": "City of Vermillion, South Dakota",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/vermillion-sd-current/web-review-5.txt",
      "archive_sha256": "a4fc005c9e955cb74db6661db4cfdaa4f747fd39ea383af632000822d4d52430",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m80-source-6": {
      "url": "https://www.vermillion.us/DocumentCenter/View/3265",
      "publisher": "City of Vermillion, South Dakota",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/vermillion-sd-current/web-review-6.txt",
      "archive_sha256": "f77f970a344314f059d15de4495922446ac972d8b0513f495f6d3e2b0c16321e",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m81-clerk-summary": {
      "url": "https://www.lake-elsinore.org/DocumentCenter/View/5797/Urgency-Ordinance-2026-1540-Extending-Moratorium-on-Data-Centers-October-6-2026",
      "publisher": "City of Lake Elsinore City Clerk",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/lake-elsinore-current/official-web-review.txt",
      "archive_sha256": "7d08c5a9fc11e7fa66f90dc3f9471b3d482dc0f1df498ff8d46b5b6fca398aa9",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m82-seattle-legislation": {
      "url": "https://seattle.legistar.com/LegislationDetail.aspx?FullText=1&GUID=86F14A6D-9247-4BB5-839E-0A26937BFD3C&ID=8032163&Options=ID%7CText%7C&Search=121214",
      "publisher": "Seattle Office of the City Clerk",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/seattle-current/legislation.html",
      "archive_sha256": "38a510a6159744b5b0b7e657a75e647b9efed2460b9ea8d590d7f7faeb733f37",
      "capture_format": "raw_response_bytes"
    },
    "m83-denver-detail": {
      "url": "https://denver.legistar.com/LegislationDetail.aspx?GUID=0A6BACDC-1F9A-474F-863E-C3F51B5C4489&ID=7960021&Options=&Search=",
      "publisher": "City and County of Denver City Council",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-28",
      "checked_on": "2026-10-28",
      "path": "build/cache/research-2026-10-22/official-followups/denver-current/detail.html",
      "archive_sha256": "75b3302cc177266ca59fa38a7bd860df6602acb14fc6db0a3fc6a1f6b8698d92",
      "capture_format": "raw_response_bytes"
    },
    "m84-source-0": {
      "url": "https://www.piercecountywa.gov/m/NewsFlash/Home/Detail/7241",
      "publisher": "Pierce County, Washington",
      "source_type": "government_record",
      "published_on": "2026-08-26",
      "retrieved_on": "2026-10-29",
      "checked_on": "2026-10-29",
      "path": "build/cache/research-2026-10-22/official-followups/pierce-wa-current/web-review-0.txt",
      "archive_sha256": "84759f3ca5faa9b84356a8affc7f2cca809dfca9269d4887a15aabd8a66361c2",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m84-source-1": {
      "url": "https://online.co.pierce.wa.us/cfapps/council/iview/proposal.cfm?proposal_num=O2026-557",
      "publisher": "Pierce County, Washington",
      "source_type": "government_record",
      "published_on": null,
      "retrieved_on": "2026-10-29",
      "checked_on": "2026-10-29",
      "path": "build/cache/research-2026-10-22/official-followups/pierce-wa-current/web-review-1.txt",
      "archive_sha256": "0092f911af55267e98e92875386b7a22d0a58c19fe45e6a4de87f2321933029f",
      "capture_format": "official_web_view_reviewer_note"
    },
    "m85-dubuque-news": {
      "url": "https://www.cityofdubuque.org/CivicSend/ViewMessage/message/301420",
      "publisher": "City of Dubuque",
      "source_type": "government_record",
      "published_on": "2026-09-22",
      "retrieved_on": "2026-10-29",
      "checked_on": "2026-10-29",
      "path": "build/cache/research-2026-10-22/official-followups/dubuque-current/web-review.txt",
      "archive_sha256": "279f3714a875bee653cc664c835d5768cc8891e3f60b3a2e473fc8d7b1d9ea46",
      "capture_format": "official_web_view_reviewer_note"
    }
  },
  "cohorts": [
    "Codex 3 moratorium cohort 1",
    "Codex 3 moratorium cohort 2",
    "Codex 3 moratorium cohort 3",
    "Codex 3 moratorium cohort 4",
    "Codex 3 moratorium cohort 5",
    "Codex 3 moratorium cohort 6",
    "Codex 3 moratorium cohort 7",
    "Codex 3 moratorium cohort 8",
    "Codex 3 moratorium cohort 9",
    "Codex 3 moratorium cohort 10",
    "Codex 3 moratorium cohort 11",
    "Codex 3 moratorium cohort 12",
    "Codex 3 moratorium cohort 13",
    "Codex 3 moratorium cohort 14",
    "Codex 3 moratoriums cohort 15",
    "Codex 3 moratoriums cohort 16",
    "Codex 3 moratoriums cohort 17",
    "Codex 3 moratoriums cohort 18",
    "Codex 3 moratoriums cohort 19",
    "Codex 3 moratoriums cohort 20",
    "Codex 3 moratoriums cohort 21",
    "Codex 3 moratoriums cohort 22",
    "Codex 3 restriction cohort 23",
    "Codex 3 restriction cohort 24",
    "Codex 3 restriction cohort 25",
    "Codex 3 restriction cohort 26",
    "Codex 3 restriction cohort 27",
    "Codex 3 restriction cohort 28",
    "Codex 3 restriction cohort 29",
    "Codex 3 restriction cohort 30",
    "Codex 3 restriction cohort 31",
    "Codex 3 restriction cohort 32",
    "Codex 3 restriction cohort 54",
    "Codex 3 restriction cohort 55",
    "Codex 3 restriction cohort 56",
    "Codex 3 restrictions cohort 57",
    "Codex 3 restrictions cohort 58",
    "Codex 3 restrictions cohort 59",
    "Codex 3 restrictions cohort 60",
    "Codex 3 restrictions cohort 61",
    "Codex 3 restrictions cohort 62",
    "Codex 3 restrictions cohort 63",
    "Codex 3 restrictions cohort 64",
    "Codex 3 restrictions cohort 65",
    "Codex 3 restrictions cohort 66",
    "Codex 3 restrictions cohort 67",
    "Codex 3 restrictions cohort 68",
    "Codex 3 restrictions cohort 69",
    "Codex 3 restrictions cohort 70",
    "Codex 3 restrictions cohort 71",
    "Codex 3 restrictions cohort 72",
    "Codex 3 restrictions cohort 73",
    "Codex 3 restriction cohort 74",
    "Codex 3 restriction cohort 75",
    "Codex 3 restriction cohort 76",
    "Codex 3 restriction cohort 77",
    "Codex 3 restriction cohort 78",
    "Codex 3 restriction cohort 79",
    "Codex 3 restriction cohort 80",
    "Codex 3 restriction cohort 81",
    "Codex 3 restriction cohort 82",
    "Codex 3 restriction cohort 83",
    "Codex 3 restriction cohort 84",
    "Codex 3 restriction cohort 85"
  ],
  "item_corrections": [
    {
      "id": "restriction:san-diego-ca-proposed-20261022",
      "set": {
        "next_scheduled_on": "2026-10-27",
        "scope": "The October 23 Council office update moves the expected moratorium discussion to Tuesday morning. The October 26 preview places proposed urgency ordinance item S510 in the October 27 morning Council session. This supersedes the earlier October 26 consideration reference and establishes no completed vote.",
        "limits": "The Council office preview describes a proposed 45 day urgency ordinance requiring a four fifths vote. No accomplished adoption, legal commencement, expiry or extension is verified. The 10 a.m. clock is the session start, not an exact item opening time."
      },
      "field_sources": {
        "next_scheduled_on": [
          "m70-blog23",
          "m70-blog26"
        ],
        "scope": [
          "m70-blog23",
          "m70-blog26"
        ],
        "limits": [
          "m70-blog23",
          "m70-blog26"
        ]
      },
      "reason": "Later Council office schedule update and item preview supersede the earlier planned day; no legal outcome inferred."
    },
    {
      "id": "restriction:clackamas-or-20261022",
      "set": {
        "scope": "County account and draft minutes report October22adoption. Packet text covers new applications for new or expanded data centers as primary uses in unincorporated areas, including colocation, cloud, AI and mining. It excludes telecommunications facilities principally carrying communications rather than hosting or processing end user data.",
        "limits": "The680page packet is not a signed instrument: resolution number and signatures are blank. Only pages2through8 reviewed. Existing immediate effect account retained; no calculated expiry or current eligibility. Possible extension requires a further hearing and findings; it is not automatic."
      },
      "field_sources": {
        "scope": [
          "m75-clackamas-0",
          "m75-clackamas-1"
        ],
        "limits": [
          "m75-clackamas-0",
          "m75-clackamas-1"
        ]
      },
      "reason": "Add selected packet scope and exceptions while retaining unsigned draft and minutes limits."
    }
  ],
  "superseded_items": [],
  "item_supersessions": [
    {
      "superseded_item_id": "restriction:cleveland-oh-standalone-data-center-pause-disposition-20261024",
      "replacement_item_id": "restriction:cleveland-oh-extension-1246-2026",
      "reason": "The official October 19 extension record resolves the earlier review that left disposition after October 20 unknown. The earlier review remains retained as history.",
      "source_ids": [
        "m54-cleveland-ledger",
        "m54-cleveland-ordinance_attachment"
      ]
    },
    {
      "superseded_item_id": "restriction:richmond-ca-45-day-data-center-pause-20260915",
      "replacement_item_id": "restriction:richmond-ca-urgency13-26-certified-review-20261024",
      "reason": "A complete certified original ordinance now supports the exact original term and exemptions. The prior City page review remains retained in history. No extension outcome is supplied.",
      "source_ids": [
        "m55-richmond-ordinance",
        "m55-richmond-report"
      ]
    },
    {
      "superseded_item_id": "restriction:hayward-ca-officially-reported-moratorium-20261020",
      "replacement_item_id": "restriction:hayward-ca-ord26-09-action-review-20261024",
      "reason": "The official action detail now identifies Ordinance 26-09 and its vote, while the attached text is expressly retained as a draft. Earlier uncertainty about the modified final text is preserved.",
      "source_ids": [
        "m56-hayward_action",
        "m56-hayward_draft"
      ]
    },
    {
      "superseded_item_id": "restriction:fort-worth-tx-proposed-data-center-moratorium-20261024",
      "replacement_item_id": "restriction:fort-worth-tx-proposed-data-center-moratorium",
      "source_ids": [
        "m59-fw-overview",
        "m59-fw-update"
      ],
      "reason": "The later review retains proposed status and adds the November 10 hearing without counting the earlier pending Fort Worth proposal a second time."
    }
  ],
  "as_of": "2026-10-29",
  "counts": {
    "reviewed_jurisdictions": 986,
    "restriction_contexts": 121,
    "verified_in_effect_at_source_check": 8,
    "officially_reported_in_effect_at_source_check": 15,
    "proposals": 41,
    "source_access_holds": 265
  }
}