{
  "schema_version": 1,
  "source_compilation_context": {
    "al": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/al.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "al",
    "label": "Alabama"
  },
  "records": [
    {
      "id": "alabama-supercomputer-center-huntsville-al",
      "state": "al",
      "kind": "facility",
      "name": "Alabama Supercomputer Center",
      "group": "operating",
      "status": "Operating",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Madison"
      ],
      "city": "Huntsville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Nearly24000squarefeet is not white-space area; no MW stated. Institution explicitly places facility in Cummings Research Park and recounts installation history. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Agency description of the existing Alabama Supercomputer Center; not an independent physical inspection. Operating status is supported by the current agency description, reviewed October 15, 2026; the source does not provide a publication date. No parcel or coordinate was newly confirmed. Historical 1987 and 2023 events do not supply the current-status review date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://asc.edu/alabama-supercomputer-center",
          "host": "asc.edu",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=686+Discovery+Drive%2C+Huntsville%2C+AL+35806&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Calculated Census street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.67742378303402%2C34.732317073601536%2C-86.66977199075598%2C34.73860525182647&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Aerial setting only, acquisition date unknown"
        },
        {
          "url": "https://www.asc.edu/sites/default/files/2023-02/The_Hub_Volume_1_JULY_2020.pdf",
          "host": "www.asc.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Historical official Huntsville Data Center address corroborates Northwest direction only"
        }
      ],
      "loc": {
        "lng": -86.673597886895,
        "lat": 34.735461162714,
        "precision": "address",
        "basis": "Published Alabama Supercomputer Authority facility address 686 Discovery Drive, Huntsville, AL 35806 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "city": "Huntsville",
            "campus": "Cummings Research Park",
            "area_sqft_approx": 24000,
            "area_basis": "whole facility including SOC,NOC,offices,data center",
            "building_completed": "1987-10",
            "latest_supercomputer_installation": "2023-10"
          },
          "notes": [
            "Nearly24000squarefeet is not white-space area; no MW stated.",
            "Institution explicitly places facility in Cummings Research Park and recounts installation history.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://asc.edu/alabama-supercomputer-center",
              "host": "asc.edu",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Agency description of the existing Alabama Supercomputer Center; not an independent physical inspection",
          "fields": {
            "current_status": "operating",
            "status_basis": "The Alabama Supercomputer Authority describes this existing facility as its operations hub, including active security, network and recovery operations and its data center.",
            "operator_published_address": "686 Discovery Drive, Huntsville, AL 35806"
          },
          "notes": [
            "Operating status is supported by the current agency description, reviewed October 15, 2026; the source does not provide a publication date. No parcel or coordinate was newly confirmed. Historical 1987 and 2023 events do not supply the current-status review date."
          ],
          "sources": [
            {
              "url": "https://asc.edu/alabama-supercomputer-center",
              "host": "asc.edu",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "d042aee935d18781fc5bfd7f2098970bf3fc4f835473743a51fab4fac5223fbf",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 19, October 23, 2026",
          "scope": "Current official facility street reference only. Native protected facts and canonical address remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -86.673597886895,
                "lat": 34.735461162714,
                "precision": "address",
                "basis": "Published Alabama Supercomputer Authority facility address 686 Discovery Drive, Huntsville, AL 35806 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "686 Discovery Drive, Huntsville, AL 35806",
              "county_fips": [
                "01089"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named official numeric facility section binds the service address to this existing research record. Corporate offices, related facility cards and embedded map coordinates are excluded.",
            "The unique Census calculated street range agrees with the retained state and county. Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. The reference does not locate a surveyed roof, parcel, full campus, legal owner, floor or suite.",
            "All canonical address, status, physical dates, quantity, role, identity and jurisdiction wrappers remain exact. The retained Census method source keeps its actual October 22 date; new captures are dated October 23.",
            "The current named Supercomputer Data Center section gives 686 Discovery Drive. An official historical July 2020 newsletter page 4 separately names the Huntsville Data Center at 686 Discovery Dr NW. That actually viewed page corroborates the added Northwest direction only. Historical office addresses, current Montgomery business office, bandwidth, site counts and all source figures remain excluded. The current publication is not relabeled as having printed Northwest."
          ],
          "sources": [
            {
              "url": "https://asc.edu/alabama-supercomputer-center",
              "host": "asc.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Official named Supercomputer Data Center numeric facility address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=686+Discovery+Drive%2C+Huntsville%2C+AL+35806&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Calculated Census street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.67742378303402%2C34.732317073601536%2C-86.66977199075598%2C34.73860525182647&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Aerial setting only, acquisition date unknown"
            },
            {
              "url": "https://www.asc.edu/sites/default/files/2023-02/The_Hub_Volume_1_JULY_2020.pdf",
              "host": "www.asc.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Historical official Huntsville Data Center address corroborates Northwest direction only"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Huntsville · Madison · Source context reviewed"
    },
    {
      "id": "dc-blox-birmingham-al",
      "state": "al",
      "kind": "facility",
      "name": "DC BLOX Birmingham Data Center Campus",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jefferson"
      ],
      "city": "Birmingham",
      "address": "",
      "who": "DC BLOX",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Pageheader294karea/49MWcommittedplanned/4centersdiffersfromlegacy200k/60MWexpansionlabels. Initialphaseandnewbuildableshellkeptseparate; no canonicalcurrentcampusMWorallphasesoperatingclaim. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Operator description of existing Birmingham colocation service and a separately described expansion. An operating phase is supported by this source; the display label is Operating phase. This does not certify full campus completion, current metered load or precise coordinates. Existing facilities and expansion retain their separate scope. The record remains uncertified as a whole. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dcblox.com/data-centers/birmingham/",
          "host": "dcblox.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=433+6th+Street+South%2C+Birmingham%2C+AL+35233&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Calculated Census street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.82605693347945%2C33.49830972067953%2C-86.81851599241854%2C33.504597898904464&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Aerial setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -86.822286462949,
        "lat": 33.501453809792,
        "precision": "address",
        "basis": "Published DC BLOX facility address 433 6th Street South, Birmingham, Alabama 35233 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "published_address": "433 6th Street South, Birmingham, AL35233",
            "initial_facility_area_sqft": 31000,
            "initial_critical_load_mw_max": 5,
            "expansion_buildable_area_sqft": 263000
          },
          "notes": [
            "Pageheader294karea/49MWcommittedplanned/4centersdiffersfromlegacy200k/60MWexpansionlabels. Initialphaseandnewbuildableshellkeptseparate; no canonicalcurrentcampusMWorallphasesoperatingclaim.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/birmingham/",
              "host": "dcblox.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Operator description of existing Birmingham colocation service and a separately described expansion",
          "fields": {
            "operator_published_address": "433 6th Street South, Birmingham, Alabama 35233",
            "service_scope": "The existing colocation facility offers services; the campus also includes operational and development scope. Expansion plans and committed/planned capacity do not establish operation of every building.",
            "current_status": "partly operating",
            "status_basis": "The operator describes current services in the existing colocation facility; campus development is a separate scope.",
            "status_scope": "Operating phase only; full campus buildout remains unresolved."
          },
          "notes": [
            "An operating phase is supported by this source; the display label is Operating phase. This does not certify full campus completion, current metered load or precise coordinates. Existing facilities and expansion retain their separate scope. The record remains uncertified as a whole."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/birmingham/",
              "host": "dcblox.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "ed45a19a054c6e1d034b2e989e1a0efed63814530af2af349f42e5864aa53d28",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "K3 company role review October22,2026",
          "scope": "Company identity and operator relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
          "fields": {
            "company_association": {
              "name": "DC BLOX",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Company identity and operator relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Company identity and operator relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
            "A source read is not a construction, opening, transaction-closing or operating date."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/birmingham/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed company identity source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 16, October 23, 2026",
          "scope": "Current official facility street reference only. Native protected facts and canonical address remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -86.822286462949,
                "lat": 33.501453809792,
                "precision": "address",
                "basis": "Published DC BLOX facility address 433 6th Street South, Birmingham, Alabama 35233 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "433 6th Street South, Birmingham, Alabama 35233",
              "county_fips": [
                "01073"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named official numeric facility section binds the service address to this existing research record. Corporate offices, related facility cards and embedded map coordinates are excluded.",
            "The unique Census calculated street range agrees with the retained state and county. Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. The reference does not locate a surveyed roof, parcel, full campus, legal owner, floor or suite.",
            "All canonical address, status, physical dates, quantity, role, identity and jurisdiction wrappers remain exact. The retained Census method source keeps its actual October 22 date; new captures are dated October 23."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/birmingham/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Official named Birmingham numeric facility address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=433+6th+Street+South%2C+Birmingham%2C+AL+35233&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Calculated Census street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.82605693347945%2C33.49830972067953%2C-86.81851599241854%2C33.504597898904464&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Aerial setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Birmingham · Jefferson · Source context reviewed",
      "status_scope": "An operating phase is supported; full campus completion is not established."
    },
    {
      "id": "dc-blox-huntsville-al",
      "state": "al",
      "kind": "facility",
      "name": "DC BLOX Huntsville Data Center",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Madison"
      ],
      "city": "Huntsville",
      "address": "",
      "who": "DC BLOX",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Header38karea/9MWcommittedplanned/2centersandlegacyexpansionfiguresdifferentversions/scopes. Notall9MWoperationalandnot13.5MWplus9. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Operator description of Huntsville colocation services; mixed operational and development campus scope. An operating phase is supported by this source; the display label is Operating phase. This does not certify full campus completion, current metered load or precise coordinates. Existing facilities and expansion retain their separate scope. The record remains uncertified as a whole. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dcblox.com/data-centers/huntsville/",
          "host": "dcblox.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=333+Diamond+Drive+NW%2C+Huntsville%2C+AL+35806&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Calculated Census street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.69596274327331%2C34.70631307992353%2C-86.68831335731669%2C34.71260125814847&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Aerial setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -86.692138050295,
        "lat": 34.709457169036,
        "precision": "address",
        "basis": "Published DC BLOX facility address 333 Diamond Drive NW, Huntsville, Alabama 35806 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "published_address": "333 Diamond Drive NW, Huntsville, AL35806",
            "initial_area_sqft": 9000,
            "potential_expanded_area_sqft": 52400,
            "potential_expanded_critical_load_mw_max": 13.5
          },
          "notes": [
            "Header38karea/9MWcommittedplanned/2centersandlegacyexpansionfiguresdifferentversions/scopes. Notall9MWoperationalandnot13.5MWplus9.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/huntsville/",
              "host": "dcblox.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Operator description of Huntsville colocation services; mixed operational and development campus scope",
          "fields": {
            "operator_published_address": "333 Diamond Drive NW, Huntsville, Alabama 35806",
            "service_scope": "The operator describes current colocation, network and storage services, while the campus headline combines operational and in-development facilities and committed/planned capacity.",
            "current_status": "partly operating",
            "status_basis": "The operator describes current colocation services and separately includes facilities in development.",
            "status_scope": "Operating phase only; full campus buildout remains unresolved."
          },
          "notes": [
            "An operating phase is supported by this source; the display label is Operating phase. This does not certify full campus completion, current metered load or precise coordinates. Existing facilities and expansion retain their separate scope. The record remains uncertified as a whole."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/huntsville/",
              "host": "dcblox.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "8b1289e51d22eb0048262416c01f5a440ff9c53b140404c4d87f0ec1e2f5783e",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "K3 company role review October22,2026",
          "scope": "Company identity and operator relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
          "fields": {
            "company_association": {
              "name": "DC BLOX",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Company identity and operator relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Company identity and operator relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
            "A source read is not a construction, opening, transaction-closing or operating date."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/huntsville/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed company identity source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 16, October 23, 2026",
          "scope": "Current official facility street reference only. Native protected facts and canonical address remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -86.692138050295,
                "lat": 34.709457169036,
                "precision": "address",
                "basis": "Published DC BLOX facility address 333 Diamond Drive NW, Huntsville, Alabama 35806 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "333 Diamond Drive NW, Huntsville, Alabama 35806",
              "county_fips": [
                "01089"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named official numeric facility section binds the service address to this existing research record. Corporate offices, related facility cards and embedded map coordinates are excluded.",
            "The unique Census calculated street range agrees with the retained state and county. Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. The reference does not locate a surveyed roof, parcel, full campus, legal owner, floor or suite.",
            "All canonical address, status, physical dates, quantity, role, identity and jurisdiction wrappers remain exact. The retained Census method source keeps its actual October 22 date; new captures are dated October 23."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/huntsville/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Official named Huntsville numeric facility address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=333+Diamond+Drive+NW%2C+Huntsville%2C+AL+35806&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Calculated Census street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.69596274327331%2C34.70631307992353%2C-86.68831335731669%2C34.71260125814847&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Aerial setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Huntsville · Madison · Source context reviewed",
      "status_scope": "An operating phase is supported; full campus completion is not established."
    },
    {
      "id": "google-jackson-county-stevenson-al",
      "state": "al",
      "kind": "facility",
      "name": "Google Jackson County Campus",
      "group": "operating",
      "status": "Operating",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jackson"
      ],
      "city": "Stevenson",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "Calendar-year 2025 operator-reported location totals. Withdrawal, discharge and consumption are separate quantities; methodology permits estimates and does not establish today’s use.",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.. Stevenson/Bridgeport/JacksonCounty aliases need parcelboundarycomparison; no independentcoordinatecorrection. USD1.5billionannouncedexpansion notspent or additivefirstphasewithoutscopecheck. TVAgridconnected not dedicatedrenewablehourly supply; countypermitstatement needsoriginaljurisdictionlaw. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Current Google location page and dated expansion announcement; existing operations versus expansion. The June 15, 2026 announcement says operating since2019; the location timeline instead labels opening2018. Exact opening date remains unresolved. Existing operation does not certify completion of every expansion building. No current MW or precise parcel adopted. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [
        [
          "2026-06-15",
          "Google announced an expansion investment for its existing Jackson County campus; this was an announcement, not completion of the expansion."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/",
          "host": "web.archive.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.google/locations/alabama/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/alabama-investment-june-2026/",
          "host": "blog.google",
          "date": "2026-06-15",
          "published": "2026-06-15",
          "checked": "2026-10-15",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/alabama/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "host": "sustainability.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google 2026 Environmental Report"
        }
      ],
      "loc": {
        "lat": 34.77963,
        "lng": -85.99951,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.",
          "fields": {
            "reported_context": "Local reporting describes Google at48809AlabamaHighway277Bridgeport, two buildings270000squarefeet on600acres,2019opening/initialUSD600million and later announcedUSD1.5billionthirdbuilding. Named localdevelopmentofficial describes approximately250workers.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Stevenson/Bridgeport/JacksonCounty aliases need parcelboundarycomparison; no independentcoordinatecorrection. USD1.5billionannouncedexpansion notspent or additivefirstphasewithoutscopecheck. TVAgridconnected not dedicatedrenewablehourly supply; countypermitstatement needsoriginaljurisdictionlaw.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/",
              "host": "web.archive.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Current Google location page and dated expansion announcement; existing operations versus expansion",
          "fields": {
            "current_status": "operating",
            "status_basis": "Google describes the Jackson County data center as running digital services. Its June announcement separately describes an expansion."
          },
          "notes": [
            "The June 15, 2026 announcement says operating since2019; the location timeline instead labels opening2018. Exact opening date remains unresolved. Existing operation does not certify completion of every expansion building. No current MW or precise parcel adopted."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/alabama/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/alabama-investment-june-2026/",
              "host": "blog.google",
              "date": "2026-06-15",
              "published": "2026-06-15",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "b5f9e9284cb1f43b2a4ef6dab52c2343da9fab20e90f0d8b2688b9da66c9d72d",
          "events": [
            {
              "date": "2026-06-15",
              "kind": "announcement",
              "text": "Google announced an expansion investment for its existing Jackson County campus; this was an announcement, not completion of the expansion.",
              "sources": [
                {
                  "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/alabama-investment-june-2026/",
                  "host": "blog.google",
                  "date": "2026-06-15",
                  "published": "2026-06-15",
                  "checked": "2026-10-15",
                  "date_kind": "publication",
                  "label": "Reviewed source"
                }
              ]
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "Jackson County, Alabama is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "annual_water_reporting": {
              "source_location": "Jackson County, AL",
              "report_year": 2026,
              "reporting_year": 2025,
              "source_page": 97,
              "unit": "Million gallons",
              "withdrawal": 191.0,
              "discharge": 17.4,
              "consumption": 173.6
            },
            "water_method_scope": "Annual calendar-year 2025 figures for the reported location, not instantaneous use, a daily rate, an approved limit or one building. Google uses metered or invoiced values when available and can estimate missing data; the table does not identify each row’s metering completeness. Consumption is calculated as withdrawal minus discharge; values are rounded. Seawater and brackish water over 1,000 mg/L total dissolved solids are excluded. Unless otherwise specified, withdrawals are potable; Douglas County includes reclaimed wastewater. No litres or daily averages are calculated.",
            "water_location_association": "Jackson County, AL is associated with this regional campus research context only; no allocation to separate expansion/street-address records or individual buildings.",
            "existing_status_scope": "Existing source-supported Operating label is retained; this follow-up adds annual water context without replacing its prior status evidence."
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/alabama/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
              "host": "sustainability.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google 2026 Environmental Report"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 35, October 23, 2026",
          "scope": "Google identifies its own Jackson County, Alabama data center community in the body of its regional location page, separately from the global location menu. The operator per source relationship records its named provider brand, not independent proof that every building or expansion is operating. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown.",
          "fields": {
            "company_association": {
              "name": "Google",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Google identifies its own Jackson County, Alabama data center community in the body of its regional location page, separately from the global location menu. The operator per source relationship records its named provider brand, not independent proof that every building or expansion is operating. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Google identifies its own Jackson County, Alabama data center community in the body of its regional location page, separately from the global location menu. The operator per source relationship records its named provider brand, not independent proof that every building or expansion is operating. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/alabama/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Stevenson · Jackson · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-06-15",
          "kind": "announcement",
          "text": "Google announced an expansion investment for its existing Jackson County campus; this was an announcement, not completion of the expansion.",
          "sources": [
            {
              "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/alabama-investment-june-2026/",
              "host": "blog.google",
              "date": "2026-06-15",
              "published": "2026-06-15",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ]
        }
      ],
      "typed_water_facts": [
        {
          "measure": "withdrawal",
          "value": 191.0,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Jackson County, AL, calendar year 2025 withdrawal; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "discharge",
          "value": 17.4,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Jackson County, AL, calendar year 2025 discharge; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "consumption",
          "value": 173.6,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Jackson County, AL, calendar year 2025 consumption; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01071"
      }
    },
    {
      "id": "meta-huntsville-al",
      "state": "al",
      "kind": "facility",
      "name": "Meta Huntsville Data Center Campus",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Madison"
      ],
      "city": "Huntsville",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Undated fact sheet; file path is not a publication date. First page visually reviewed. Regional investment not allocated per building. Renewable project MW excluded from site power; matching and water-positive goals are not continuous physical renewable supply or measured water use. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Operator fact sheet, page 1 text and visual layout reviewed; page 2 not reviewed in this pass. An operating phase is supported by this source; the display label is Operating phase. This does not certify full campus completion, current metered load or precise coordinates. The sheet’s energy-project total is not Huntsville IT load. PDF page 1 only was reviewed; publication date unknown. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/asset/huntsville-data-center-info-sheet/",
          "host": "datacenters.atmeta.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Huntsville-Data-Center.pdf",
          "host": "datacenters.atmeta.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.76301,
        "lng": -86.55036,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "groundbreaking_year": 2018,
            "investment_usd_min": 1500000000,
            "investment_scope": "Huntsville, Alabama",
            "operator_reported_operational_jobs_min": 300,
            "peak_construction_workers": 1200,
            "local_school_nonprofit_funding_usd_min": 4500000,
            "jobs_qualification": "once completed"
          },
          "notes": [
            "Undated fact sheet; file path is not a publication date. First page visually reviewed. Regional investment not allocated per building. Renewable project MW excluded from site power; matching and water-positive goals are not continuous physical renewable supply or measured water use.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/huntsville-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Operator fact sheet, page 1 text and visual layout reviewed; page 2 not reviewed in this pass",
          "fields": {
            "operating_phase_context": "The sheet refers to operational data-center buildings but labels jobs as supported once completed.",
            "current_status": "partly operating",
            "status_basis": "The operator fact sheet describes operational buildings without establishing completion of every planned building.",
            "status_scope": "Operating phase only; full campus buildout remains unresolved."
          },
          "notes": [
            "An operating phase is supported by this source; the display label is Operating phase. This does not certify full campus completion, current metered load or precise coordinates. The sheet’s energy-project total is not Huntsville IT load. PDF page 1 only was reviewed; publication date unknown."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Huntsville-Data-Center.pdf",
              "host": "datacenters.atmeta.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "6d739560b7fe43defb00cbf32c2f67dd407a96d04134f3358add8a06d097e099",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 05, October 23, 2026",
          "scope": "Meta presents its named Huntsville data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Meta presents its named Huntsville data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Meta presents its named Huntsville data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/huntsville-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus fact sheet, visually reviewed PDF page 1"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Huntsville · Madison · Source context reviewed",
      "status_scope": "An operating phase is supported; full campus completion is not established.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01089"
      }
    },
    {
      "id": "rsa-dexter-avenue-montgomery-al",
      "state": "al",
      "kind": "facility",
      "name": "RSA Dexter Avenue Datacenter",
      "group": "operating",
      "status": "Operating",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Montgomery"
      ],
      "city": "Montgomery",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. RSA Dexter Avenue colocation facility and internal specification conflicts. Six internal spaces not six distinct physical buildings. Area nearly42000versus44000sqft and UPS2times1.6MWversus2MWtotal conflict; canonical area/ITcapacity held. Backup generators not usable ITMW. Footer201SUnion isRSAoffice not independently site street. Operator compliance statement not underlying audit review. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Owner description of an existing colocation facility and current management services. The owner page includes old market commentary and conflicting area figures. No current capacity, floor area or certification audit adopted. The generic RSA footer address is not the datacenter address. Publication date unknown; no parcel confirmation. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.rsa-al.gov/real-estate/office-building-portfolio/rsa-datacenter/",
          "host": "rsa-al.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.rsa-al.gov/uploads/files/Datacenter_Fact_Sheet_v2.pdf",
          "host": "www.rsa-al.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Official named RSA Dexter Avenue Datacenter numeric facility address section"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=445+Dexter+Avenue%2C+Montgomery%2C+AL+36104&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Calculated Census street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.30691087658825%2C32.374527868293534%2C-86.29946516293974%2C32.38081604651847&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Aerial setting only, acquisition date unknown"
        },
        {
          "url": "https://dam.nttdata.com/api/public/content/672980-NTT-DATA-Technology-Center-Info-Sheet.pdf",
          "host": "dam.nttdata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Operator sheet corroborates the named RSA Dexter Avenue facility only"
        }
      ],
      "loc": {
        "lng": -86.303188019764,
        "lat": 32.377671957406,
        "precision": "address",
        "basis": "Published Retirement Systems of Alabama facility address 445 Dexter Avenue, Montgomery, Alabama 36104 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "RSA Dexter Avenue colocation facility and internal specification conflicts",
          "fields": {
            "operator_reported_opening_date": "2012-10-04",
            "operator_reported_manager": "NTTData",
            "advertised_internal_colocation_spaces": 6,
            "advertised_racks_min_exclusive": 300,
            "backup_generators": 2,
            "backup_generator_rating_mw_each": 2.5
          },
          "notes": [
            "Six internal spaces not six distinct physical buildings. Area nearly42000versus44000sqft and UPS2times1.6MWversus2MWtotal conflict; canonical area/ITcapacity held. Backup generators not usable ITMW. Footer201SUnion isRSAoffice not independently site street. Operator compliance statement not underlying audit review.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.rsa-al.gov/real-estate/office-building-portfolio/rsa-datacenter/",
              "host": "rsa-al.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Owner description of an existing colocation facility and current management services",
          "fields": {
            "current_status": "operating",
            "status_basis": "RSA describes current hosted customers, continuous facility management and tenant services at the Dexter Avenue Datacenter."
          },
          "notes": [
            "The owner page includes old market commentary and conflicting area figures. No current capacity, floor area or certification audit adopted. The generic RSA footer address is not the datacenter address. Publication date unknown; no parcel confirmation."
          ],
          "sources": [
            {
              "url": "https://www.rsa-al.gov/real-estate/office-building-portfolio/rsa-datacenter/",
              "host": "rsa-al.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "953e7808ed175e953a47d8c37134aa475ab596b0576cb6e141632a8da6be8ca0",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 19, October 23, 2026",
          "scope": "Current official facility street reference only. Native protected facts and canonical address remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -86.303188019764,
                "lat": 32.377671957406,
                "precision": "address",
                "basis": "Published Retirement Systems of Alabama facility address 445 Dexter Avenue, Montgomery, Alabama 36104 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "445 Dexter Avenue, Montgomery, Alabama 36104",
              "county_fips": [
                "01101"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named official numeric facility section binds the service address to this existing research record. Corporate offices, related facility cards and embedded map coordinates are excluded.",
            "The unique Census calculated street range agrees with the retained state and county. Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. The reference does not locate a surveyed roof, parcel, full campus, legal owner, floor or suite.",
            "All canonical address, status, physical dates, quantity, role, identity and jurisdiction wrappers remain exact. The retained Census method source keeps its actual October 22 date; new captures are dated October 23.",
            "The current agency page links the captured folded datacenter brochure. Its actually viewed facility contact panel explicitly prints 445 Dexter Avenue, Montgomery, Alabama 36104. The NTT operator sheet names the same Dexter Avenue data center. The brochure date is not established; quantities, historic operation claims, pictured systems and the Montgomery office of a different agency are excluded."
          ],
          "sources": [
            {
              "url": "https://www.rsa-al.gov/uploads/files/Datacenter_Fact_Sheet_v2.pdf",
              "host": "www.rsa-al.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Official named RSA Dexter Avenue Datacenter numeric facility address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=445+Dexter+Avenue%2C+Montgomery%2C+AL+36104&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Calculated Census street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.30691087658825%2C32.374527868293534%2C-86.29946516293974%2C32.38081604651847&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Aerial setting only, acquisition date unknown"
            },
            {
              "url": "https://www.rsa-al.gov/real-estate/office-building-portfolio/rsa-datacenter/",
              "host": "www.rsa-al.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current agency datacenter page links this exact brochure"
            },
            {
              "url": "https://dam.nttdata.com/api/public/content/672980-NTT-DATA-Technology-Center-Info-Sheet.pdf",
              "host": "dam.nttdata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Operator sheet corroborates the named RSA Dexter Avenue facility only"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Montgomery · Montgomery · Source context reviewed"
    },
    {
      "id": "simple-helix-huntsville-al",
      "state": "al",
      "kind": "facility",
      "name": "Simple Helix Data Center",
      "group": "operating",
      "status": "Operating",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Madison"
      ],
      "city": "Huntsville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. 1.1MWwholefacility not perhall. Historical opening not independent2026operating verification. TierIIIis issuer label, not reviewed current certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Operator description of its existing Huntsville data center services. Operator service claim supports existing operation, not an independent physical inspection. Listed electrical capacities are not measured IT load; a contact address alone does not validate inherited map coordinates. Publication date unknown. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://prnewswire.com/news-releases/simple-helix-announces-opening-of-new-tier-iii-data-center-in-huntsville-alabama-300488165.html",
          "host": "prnewswire.com",
          "date": "2017-07-14",
          "published": "2017-07-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://simplehelix.com/facility/",
          "host": "simplehelix.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.78045,
        "lng": -86.56939,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-release-review-round6-2026-10-14.json",
          "scope": "named issuer release",
          "fields": {
            "opening_announcement": "2017-07-14",
            "advertised_capacity_mw": 1.1,
            "data_halls": 2,
            "power_basis": "facility capacity, not explicitly critical IT"
          },
          "notes": [
            "1.1MWwholefacility not perhall. Historical opening not independent2026operating verification. TierIIIis issuer label, not reviewed current certification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://prnewswire.com/news-releases/simple-helix-announces-opening-of-new-tier-iii-data-center-in-huntsville-alabama-300488165.html",
              "host": "prnewswire.com",
              "date": "2017-07-14",
              "published": "2017-07-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Operator description of its existing Huntsville data center services",
          "fields": {
            "current_status": "operating",
            "status_basis": "The operator describes hosted client equipment, staffed support and monitoring at its Huntsville data center.",
            "operator_published_contact_address": "165 West Park Loop NW, Huntsville, AL 35806"
          },
          "notes": [
            "Operator service claim supports existing operation, not an independent physical inspection. Listed electrical capacities are not measured IT load; a contact address alone does not validate inherited map coordinates. Publication date unknown."
          ],
          "sources": [
            {
              "url": "https://simplehelix.com/facility/",
              "host": "simplehelix.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "e35c6ac0012aac6575a650560209cb32d4309a6ce8547085d0f4d9e946d2c199",
          "events": [],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Huntsville · Madison · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01089"
      }
    },
    {
      "id": "applied-digital-delta-forge-2-brookwood-al",
      "state": "al",
      "kind": "facility",
      "name": "Applied Digital Delta Forge 2 (Brookwood AI Factory Campus)",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Tuscaloosa"
      ],
      "city": "Brookwood",
      "address": "",
      "who": "Applied Digital",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Source says county commission and city votes still ahead. Do not label every approval final; combined developer/tenant investment, tax abatements and community payments are distinct. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer announcement republished by telecom newswire, with planned quantities.. Commitments are not payments or expenditures. Building/site/campus area and corporate portfolio totals must not be combined. Tenant remains unnamed. Company report of lease, not original confidential instrument.. Revenue is not capex. June forecast is historical; September announcement uses broader 2028 window. Option revenue conditional, not guaranteed. No tenant identity reconstructed. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Reporter account of operator presentation, not observed water use or signed permit.. Initial fill is not daily consumption; annual ongoing use is not daily. October 7 issuer construction-stage statement is later but does not prove all approvals completed. Proposed conservation and no-rate-impact claims not independently verified. Public index and short banner used for discovery, not independent site verification.. Linked issuer June 8 and October 7 releases are separately reviewed. Bare insight page/banner alone is not a full project status record. Issuer Form10Q Business Update, printed page 42; named-campus construction statement. Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/",
          "host": "tuscaloosathread.com",
          "date": "2026-09-24",
          "published": "2026-09-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://newswire.telecomramblings.com/2026/09/applied-digital-announces-brookwood-tuscaloosa-county-alabama-as-home-of-3-2-billion-ai-factory-campus-investment/",
          "host": "newswire.telecomramblings.com",
          "date": "2026-09-24",
          "published": "2026-09-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2",
          "host": "ir.applieddigital.com",
          "date": "2026-06-08",
          "published": "2026-06-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
          "host": "ir.applieddigital.com",
          "date": "2026-10-07",
          "published": "2026-10-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://tuscaloosathread.com/applied-digital-brookwood-town-hall/",
          "host": "tuscaloosathread.com",
          "date": "2026-10-02",
          "published": "2026-10-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases",
          "host": "ir.applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.applieddigital.com/insights/july-site-update",
          "host": "applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
          "host": "ir.applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
          "host": "ir.applieddigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Applied Digital reviewed source"
        }
      ],
      "loc": {
        "lat": 33.28943,
        "lng": -87.52539,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Reported TCEDA incentive vote for Brookwood Delta Forge 2, including projected abatements and community benefit commitments.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Source says county commission and city votes still ahead. Do not label every approval final; combined developer/tenant investment, tax abatements and community payments are distinct.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://tuscaloosathread.com/3-billion-dollar-data-center-brookwood/",
              "host": "tuscaloosathread.com",
              "date": "2026-09-24",
              "published": "2026-09-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Issuer announcement republished by telecom newswire, with planned quantities.",
          "fields": {
            "announcement_date": "2026-09-24",
            "location": "Brookwood, Tuscaloosa County, Alabama",
            "planned_combined_developer_tenant_investment_usd_more_than": 3200000000,
            "leased_critical_it_load_mw": 210,
            "anticipated_operations_year": 2028,
            "community_benefit_commitment_usd": 270000000,
            "community_benefit_term_years": 20
          },
          "notes": [
            "Commitments are not payments or expenditures. Building/site/campus area and corporate portfolio totals must not be combined. Tenant remains unnamed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://newswire.telecomramblings.com/2026/09/applied-digital-announces-brookwood-tuscaloosa-county-alabama-as-home-of-3-2-billion-ai-factory-campus-investment/",
              "host": "newswire.telecomramblings.com",
              "date": "2026-09-24",
              "published": "2026-09-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Company report of lease, not original confidential instrument.",
          "fields": {
            "announcement_date": "2026-06-08",
            "company_reported_signed_critical_it_load_mw": 210,
            "base_lease_years": 15,
            "expected_base_lease_revenue_usd_approx": 5200000000,
            "all_options_total_lease_years": 30,
            "all_options_lease_revenue_usd_approx": 12700000000,
            "initial_operations_forecast": "2028-Q1"
          },
          "notes": [
            "Revenue is not capex. June forecast is historical; September announcement uses broader 2028 window. Option revenue conditional, not guaranteed. No tenant identity reconstructed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/154/applied-digital-signs-210-mw-lease-at-delta-forge-2",
              "host": "ir.applieddigital.com",
              "date": "2026-06-08",
              "published": "2026-06-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Issuer reports; readiness is not metered grid demand.",
          "fields": {
            "announcement_date": "2026-10-07",
            "fiscal_quarter_ended": "2026-08-31",
            "polaris_forge_1_reported_ready_for_service_date": "2026-10-01",
            "polaris_forge_1_reported_operational_critical_it_mw": 250,
            "other_named_ai_campuses_reported_stage": "Various construction stages",
            "jamestown_crypto_facility_mw_as_of_quarter_end": 106,
            "separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end": 180,
            "north_dakota_ai_delivered_total_end_2026_forecast_mw": 300,
            "potential_base_electron_generation_mw": 1200
          },
          "notes": [
            "Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
              "host": "ir.applieddigital.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Reporter account of operator presentation, not observed water use or signed permit.",
          "fields": {
            "report_date": "2026-10-02",
            "developer_initial_water_fill_gallons_approx": 1400000,
            "fill_components_gallons": {
              "fire_tank": 500000,
              "cooling_loop": 900000
            },
            "developer_ongoing_annual_water_gallons_approx": 750000,
            "reported_permit_stage": "Packages submitted to city, under review."
          },
          "notes": [
            "Initial fill is not daily consumption; annual ongoing use is not daily. October 7 issuer construction-stage statement is later but does not prove all approvals completed. Proposed conservation and no-rate-impact claims not independently verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://tuscaloosathread.com/applied-digital-brookwood-town-hall/",
              "host": "tuscaloosathread.com",
              "date": "2026-10-02",
              "published": "2026-10-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Public index and short banner used for discovery, not independent site verification.",
          "fields": {},
          "notes": [
            "Linked issuer June 8 and October 7 releases are separately reviewed. Bare insight page/banner alone is not a full project status record.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases",
              "host": "ir.applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.applieddigital.com/insights/july-site-update",
              "host": "applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Issuer Form10Q Business Update, printed page 42; named-campus construction statement",
          "fields": {
            "current_status": "under construction",
            "status_basis": "Delta Forge 2 is explicitly described as under construction.",
            "status_as_of": "2026-10-07",
            "report_period_ended": "2026-08-31"
          },
          "notes": [
            "Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_property_context": {
              "issuer": "Applied Digital",
              "reporting_period": "2026-05-31",
              "source_name": "Delta Forge 2",
              "scope": "Named annual-filing campus/location context only. Mixed operating and future phases stay separate; no current-stage or inherited town/state certification."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Applied Digital reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 30, October 23, 2026",
          "scope": "Applied Digital identifies the same uniquely named Delta Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review.",
          "fields": {
            "company_association": {
              "name": "Applied Digital",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Applied Digital identifies the same uniquely named Delta Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Applied Digital identifies the same uniquely named Delta Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Brookwood · Tuscaloosa · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01125"
      }
    },
    {
      "id": "edged-gateway-prichard-al",
      "state": "al",
      "kind": "facility",
      "name": "Edged Prichard Data Center (Project Gateway)",
      "group": "proposed",
      "status": "Proposed",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Mobile"
      ],
      "city": "Prichard",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Edged Gateway Prichard proposed building and forecast. 93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Project website identifies an Edged US proposal and explicit approval conditions. The website says details remain conditional on permitting, infrastructure, customers and regulatory approvals. Design power and water/noise promises are not operational measurements or permit findings. No capacity or parcel adopted; publication date unknown. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://projectgatewayal.com/",
          "host": "projectgatewayal.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 30.80728,
        "lng": -88.22571,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Edged Gateway Prichard proposed building and forecast",
          "fields": {
            "developer": "Edged US",
            "project": "Project Gateway",
            "locality": "Prichard, Alabama",
            "developer_described_stage": "proposed/evaluated campus",
            "proposed_building_power_mw": 8,
            "power_basis": "building capacity, not explicit critical IT",
            "proposed_building_sqft": 57000,
            "planned_investment_usd": 93000000,
            "expected_permanent_jobs_min_inclusive": 20
          },
          "notes": [
            "93Mproposednotactualspent.72percentoverheadenergysaving/23Mgallonavoidedwatercomparisonhypotheticalbaselinesnotmeasuredactual.54dBnotstatedmeasurementpointorindependentcompliance,notquietguarantee. June11communitymeetingbannerhasnoyear/timeorvenueintheexcerpt;notnewcurrenthearingcalendar. No petition/formsubmitted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://projectgatewayal.com/",
              "host": "projectgatewayal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Project website identifies an Edged US proposal and explicit approval conditions",
          "fields": {
            "current_status": "proposed",
            "status_basis": "The project website calls Gateway a proposed Prichard development being evaluated by Edged US."
          },
          "notes": [
            "The website says details remain conditional on permitting, infrastructure, customers and regulatory approvals. Design power and water/noise promises are not operational measurements or permit findings. No capacity or parcel adopted; publication date unknown."
          ],
          "sources": [
            {
              "url": "https://projectgatewayal.com/",
              "host": "projectgatewayal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "329e73d0bd598b89c4bff6047e3e5919a39b768498596db88a484026a7a90271",
          "events": [],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Prichard · Mobile · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01097"
      }
    },
    {
      "id": "nebius-bhm01-birmingham-al",
      "state": "al",
      "kind": "facility",
      "name": "Nebius Birmingham AI Factory (BHM01)",
      "group": "proposed",
      "status": "Proposed",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jefferson"
      ],
      "city": "Birmingham",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nebius Birmingham land, targets and fiscal scopes. SamepageFAQsayhundredsjobsversusheadline1000plus;countnotindependentlycertified.30yearincentiveoperatorclaimnotexecutedIDBagreementoractualforegone-taxsum.85.7Mcombinednotcityaloneoractualcollectedtax. TargetsQ12026permits/hearingsandQ22026constructionnotobservedoutcomes;do notcalendarpasttargetsasfutureevents. Q42026servicefutureasofOct14. No criticalITMWorfinalwaterdemand. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Operator planning statement; anticipated timeline is not an accomplished construction milestone. The anticipated Q2construction and Q4commissioning entries are forecasts subject to change, not observed starts or energization. No achieved permits, water-use measurement, tax payments, current capacity or point precision adopted. Publication date unknown. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://nebius.com/birminghamal",
          "host": "nebius.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=201+Milan+Parkway%2C+Birmingham%2C+Alabama&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete literal Census street response and county context"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.891120081958%2C33.424168288537544%2C-86.879279918042%2C33.43404971146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting with unknown image acquisition date"
        }
      ],
      "loc": {
        "lng": -86.8852,
        "lat": 33.429109,
        "precision": "address",
        "basis": "The named operator Birmingham project body identifies the former bank property at 201 Milan Parkway, Birmingham, Alabama. One complete literal Census street range supplies a calculated reference in Jefferson County. It selects no existing roof, individual proposed hall or complete campus. Existing status group proposed remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Nebius Birmingham land, targets and fiscal scopes",
          "fields": {
            "developer": "Nebius",
            "address": "201 Milan Parkway, Birmingham, Alabama",
            "former_use": "Regions Bank back office",
            "operator_reported_land_acquisition_month": "2025-09",
            "land_acres": 75,
            "historic_initial_commissioning_target_quarter": "2026-Q4",
            "fullbuildout_target_through_year": 2028,
            "operator_reported_tax_incentive_term_years": 30,
            "estimated_average_annual_tax_usd": 85700000,
            "tax_forecast_scope": "Birmingham City, Jefferson County and Alabama combined",
            "expected_construction_jobs_min_exclusive": 1000,
            "estimated_construction_duration_months_approx": 30
          },
          "notes": [
            "SamepageFAQsayhundredsjobsversusheadline1000plus;countnotindependentlycertified.30yearincentiveoperatorclaimnotexecutedIDBagreementoractualforegone-taxsum.85.7Mcombinednotcityaloneoractualcollectedtax. TargetsQ12026permits/hearingsandQ22026constructionnotobservedoutcomes;do notcalendarpasttargetsasfutureevents. Q42026servicefutureasofOct14. No criticalITMWorfinalwaterdemand.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://nebius.com/birminghamal",
              "host": "nebius.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Operator planning statement; anticipated timeline is not an accomplished construction milestone",
          "fields": {
            "current_status": "proposed",
            "status_basis": "Nebius explicitly describes the AI factory as being in the planning stages.",
            "operator_published_project_address": "201 Milan Parkway, Birmingham, Alabama"
          },
          "notes": [
            "The anticipated Q2construction and Q4commissioning entries are forecasts subject to change, not observed starts or energization. No achieved permits, water-use measurement, tax payments, current capacity or point precision adopted. Publication date unknown."
          ],
          "sources": [
            {
              "url": "https://nebius.com/birminghamal",
              "host": "nebius.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "407a6d3890e58bf706b6c3ddb59df1e3161d58e78966b8bd8400aed593ad17fb",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 55, October 23, 2026",
          "scope": "Explicit source bound reference only. Existing status group proposed remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -86.8852,
                "lat": 33.429109,
                "precision": "address",
                "basis": "The named operator Birmingham project body identifies the former bank property at 201 Milan Parkway, Birmingham, Alabama. One complete literal Census street range supplies a calculated reference in Jefferson County. It selects no existing roof, individual proposed hall or complete campus. Existing status group proposed remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "201 Milan Parkway, Birmingham, Alabama",
              "county_fips": [
                "01073"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The operator explicitly connects the potential Birmingham AI factory with the former Regions Bank property and 201 Milan Parkway. The source labels its timeline anticipated and future dates subject to change. Listed permit, construction and commissioning periods remain forecasts and create no new physical milestones. The September 2025 land account is retained only as source context, without adopting acreage, title or legal ownership.",
            "Explicit source bound reference only. Existing status group proposed remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
            "A curved road and several institutional or commercial buildings with parking lie among broad wooded ground. The literal property street reference selects no individual existing roof, proposed data hall, substation or full campus.",
            "The inherited general area coordinate and county display were not reviewed physical facility destinations. The exact independent official sources now support only the bounded reference described in the basis. Earlier coordinates and complete source history remain intact. This is a reference correction, without a claim of physical relocation or a new physical milestone."
          ],
          "sources": [
            {
              "url": "https://nebius.com/birminghamal",
              "host": "nebius.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Named computing facility or project street in original source body"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=201+Milan+Parkway%2C+Birmingham%2C+Alabama&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete literal Census street response and county context"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-86.891120081958%2C33.424168288537544%2C-86.879279918042%2C33.43404971146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting with unknown image acquisition date"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated official source street reference, not a surveyed roof or parcel",
      "summary": "Birmingham · Jefferson · Source context reviewed"
    },
    {
      "id": "cloverleaf-red-clay-lowndes-al",
      "state": "al",
      "kind": "facility",
      "name": "Project Red Clay",
      "group": "proposed",
      "status": "Proposed",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lowndes"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Red Clay developer project and fiscal scopes. Developer economic projections, not actual tax collections. Do not add2.8Btotal to1.6Bschoolsubset or multiply annual average into guarantee. Up-to10Mcommitment not funds disbursed. No signed CBA or regulator order read. Developer intends to find eventual operator after approvals; no named tenant inferred. Closed-loop not zero site water. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Developer description of Project Red Clay as a proposal. Projected tax revenue, job counts and developer utility commitments are forecasts and claims. This page does not prove issued permits, an executed utility agreement, construction or operation. No precise parcel or realized totals adopted; publication date unknown. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://redclaydatacenter.com/",
          "host": "redclaydatacenter.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.1549,
        "lng": -86.64989,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Red Clay developer project and fiscal scopes",
          "fields": {
            "project_name": "Project Red Clay",
            "locality": "Lowndes County, Alabama",
            "expected_construction_jobs_min_exclusive": 1000,
            "expected_construction_duration_years_max": 5,
            "expected_initial_fulltime_jobs": 225,
            "expected_full_scale_fulltime_jobs_min_exclusive": 300,
            "developer_estimated_average_annual_local_tax_usd": 124000000,
            "developer_estimated_local_funding_through_2050_usd_min_exclusive": 2800000000,
            "developer_estimated_school_funding_through_2050_usd_min_exclusive": 1600000000,
            "developer_community_benefits_commitment_usd_max": 10000000,
            "named_cba_partner": "Central Alabama Community Foundation"
          },
          "notes": [
            "Developer economic projections, not actual tax collections. Do not add2.8Btotal to1.6Bschoolsubset or multiply annual average into guarantee. Up-to10Mcommitment not funds disbursed. No signed CBA or regulator order read. Developer intends to find eventual operator after approvals; no named tenant inferred. Closed-loop not zero site water.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://redclaydatacenter.com/",
              "host": "redclaydatacenter.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Developer description of Project Red Clay as a proposal",
          "fields": {
            "current_status": "proposed",
            "status_basis": "Cloverleaf explicitly identifies Project Red Clay as a proposed data center in Lowndes County."
          },
          "notes": [
            "Projected tax revenue, job counts and developer utility commitments are forecasts and claims. This page does not prove issued permits, an executed utility agreement, construction or operation. No precise parcel or realized totals adopted; publication date unknown."
          ],
          "sources": [
            {
              "url": "https://redclaydatacenter.com/",
              "host": "redclaydatacenter.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "98f75848b24fae537b835075321c018015c7c6dbd2e6edf0f2b83693a7f8f785",
          "events": [],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lowndes · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01085"
      }
    },
    {
      "id": "beacon-calvert-al",
      "state": "al",
      "kind": "facility",
      "name": "Calvert Infrastructure Hub",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Mobile"
      ],
      "city": "Calvert",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Developer claims about utilities, buffers, water and jobs are forecasts. Water supply and sewer quantities are separate, not additive consumption; no commissioned capacity established. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://utv44.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact",
          "host": "utv44.com",
          "date": "2026-07-03",
          "published": "2026-07-03",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 30.79013,
        "lng": -88.20699,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "UTV44 reports Beacon Calvert proposal, first-building 2027 target and pending studies, design and permitting.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Developer claims about utilities, buffers, water and jobs are forecasts. Water supply and sewer quantities are separate, not additive consumption; no commissioned capacity established.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://utv44.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact",
              "host": "utv44.com",
              "date": "2026-07-03",
              "published": "2026-07-03",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Calvert · Mobile · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01097"
      }
    },
    {
      "id": "construction-partners-dothan-al",
      "state": "al",
      "kind": "facility",
      "name": "Construction Partners Corporate Headquarters and Data Processing Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Houston"
      ],
      "city": "Dothan",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Dothan combined headquarters and data-processing proposal. Mixed headquarters and data-processing budget is not exclusively data-center capex. New-position capacity is a forecast, not current hires. Company founding in 2001 and corporate value of 3.5B do not date or price this facility. Construction expected to begin soon; no exact opening, parcel or IT MW established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-03-19",
          "The March 19, 2026 publication date of the State account announces plans for the new Dothan headquarters and data processing center. Construction is forecast, not reported to have started, and no opening is established."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.madeinalabama.com/2026/03/construction-partners-to-invest-20-million-in-new-dothan-headquarters/",
          "host": "madeinalabama.com",
          "date": "2026-03-19",
          "published": "2026-03-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 31.15304,
        "lng": -85.30248,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Dothan combined headquarters and data-processing proposal",
          "fields": {
            "agency": "Alabama Department of Commerce",
            "announcement_date": "2026-03-19",
            "company": "Construction Partners Inc.",
            "city": "Dothan",
            "project": "new corporate headquarters and data processing center",
            "planned_combined_investment_usd": 20000000,
            "capacity_for_new_professional_positions_min_exclusive": 60,
            "existing_area_employees_approx": 50
          },
          "notes": [
            "Mixed headquarters and data-processing budget is not exclusively data-center capex. New-position capacity is a forecast, not current hires. Company founding in 2001 and corporate value of 3.5B do not date or price this facility. Construction expected to begin soon; no exact opening, parcel or IT MW established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.madeinalabama.com/2026/03/construction-partners-to-invest-20-million-in-new-dothan-headquarters/",
              "host": "madeinalabama.com",
              "date": "2026-03-19",
              "published": "2026-03-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 43",
          "scope": "The original March 19, 2026 State account announces a new Construction Partners headquarters and data processing center in Dothan, with construction expected to begin soon. That forecast is not an actual start or a current completed computing facility. Existing company employees and the existing headquarters are not proof of operation in the planned new center. Delivered investment, jobs, exact completion and current physical stage remain unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "headquarters_data_center_announcement_and_start_forecast_only",
              "scope": "The original March 19, 2026 State account announces a new Construction Partners headquarters and data processing center in Dothan, with construction expected to begin soon. That forecast is not an actual start or a current completed computing facility. Existing company employees and the existing headquarters are not proof of operation in the planned new center. Delivered investment, jobs, exact completion and current physical stage remain unverified."
            }
          },
          "notes": [
            "The original March 19, 2026 State account announces a new Construction Partners headquarters and data processing center in Dothan, with construction expected to begin soon. That forecast is not an actual start or a current completed computing facility. Existing company employees and the existing headquarters are not proof of operation in the planned new center. Delivered investment, jobs, exact completion and current physical stage remain unverified.",
            "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."
          ],
          "sources": [
            {
              "url": "https://www.madeinalabama.com/2026/03/construction-partners-to-invest-20-million-in-new-dothan-headquarters/",
              "host": "www.madeinalabama.com",
              "published": "2026-03-19",
              "date": "2026-03-19",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Dothan · Houston · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-03-19",
          "text": "The March 19, 2026 publication date of the State account announces plans for the new Dothan headquarters and data processing center. Construction is forecast, not reported to have started, and no opening is established.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.madeinalabama.com/2026/03/construction-partners-to-invest-20-million-in-new-dothan-headquarters/",
              "host": "www.madeinalabama.com",
              "published": "2026-03-19",
              "date": "2026-03-19",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01069"
      }
    },
    {
      "id": "core-scientific-auburn-al",
      "state": "al",
      "kind": "facility",
      "name": "Core Scientific Auburn Data Center (AUBix)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lee"
      ],
      "city": "Auburn",
      "address": "",
      "who": "Core Scientific",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. AIenabledoperatorofferingnotindependentall50MWenergized/currentNVIDIAcertificatereview. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Current operator listing for Auburn 1; no explicit whole-record current operating milestone established. The page lists the location and operator features but does not explicitly establish a present operating milestone. Operator capacity labels are not independently verified energized load. Current status and inherited point precision remain unresolved. Publication date is not established.",
      "date": "",
      "events": [
        [
          "2025-02-19",
          "The February 19, 2025 publication date of the original company release announces entry into the existing Auburn AUBix facility and a planned launch. This is not the exact physical opening, completion of every expansion or an independently verified delivered capacity."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://corescientific.com/high-density-data-centers/auburn-al/",
          "host": "corescientific.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm",
          "host": "www.sec.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Core Scientific reviewed source"
        },
        {
          "url": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-013305/core-20251231.htm",
          "host": "investors.corescientific.com",
          "published": "2026-03-02",
          "date": "2026-03-02",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://investors.corescientific.com/news-events/press-releases/detail/107/core-scientific-announces-expansion-into-auburn-alabama-with-new-high-performance-computing-facility",
          "host": "investors.corescientific.com",
          "published": "2025-02-19",
          "date": "2025-02-19",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://corescientific.com/high-density-data-centers/",
          "host": "corescientific.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://gis.auburnalabama.org/public/rest/services/Tools/PublicSearch/MapServer/0/query?where=AddressNumber+%3D+1571+AND+UPPER%28StreetName%29+%3D+%27SAMFORD%27&outFields=OBJECTID%2CFacilityID%2CAddressNumber%2CStreetName%2CFullStreet%2CFullAddress%2CMailingCity%2CState%2CZip%2CAddressAuthority%2CAddressClassification%2CAddressPointType%2CCreatedDate&returnGeometry=true&outSR=4326&f=json",
          "host": "gis.auburnalabama.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Independent City Address Authority point for the exact operator street"
        },
        {
          "url": "https://gis.auburnalabama.org/public/rest/services/PublicService/Parcels/MapServer/0/query?geometry=-85.51275405445307%2C32.60119153688463&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=OBJECTID%2CPARCEL%2CPIN%2CSTRNUM%2CSTRNAM%2CACRES_COUNTY%2CACRES&returnGeometry=true&outSR=4326&f=json",
          "host": "gis.auburnalabama.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete spatial intersection joins the City address authority to one parcel"
        },
        {
          "url": "https://gis.auburnalabama.org/public/rest/services/PublicService/Parcels/MapServer/0/query?where=PIN+%3D+%2760478%27+AND+UPPER%28STRNAM%29+%3D+%271571+W+SAMFORD+AVE%27&outFields=OBJECTID%2CPARCEL%2CPIN%2CSTRNUM%2CSTRNAM%2CACRES_COUNTY%2CACRES&returnGeometry=true&outSR=4326&f=json",
          "host": "gis.auburnalabama.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete exact full situs and PIN parcel query"
        },
        {
          "url": "https://gis.auburnalabama.org/public/rest/services/PublicService/Parcels/MapServer/0?f=pjson",
          "host": "gis.auburnalabama.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "City geometry and Lee County parcel attribute definitions"
        },
        {
          "url": "https://api2.auburnalabama.org/ePacket/2726/file/7556",
          "host": "api2.auburnalabama.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "January 20, 2026 agenda separates data center 1571 and substation 1501"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1571+W+Samford+Ave%2C+Auburn%2C+AL+36832&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete literal Census street response and county context"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-85.51924474605134%2C32.59610928853755%2C-85.50751525394865%2C32.605990711462454&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting with unknown image acquisition date"
        }
      ],
      "loc": {
        "lng": -85.51338,
        "lat": 32.60105,
        "precision": "approximate",
        "basis": "Approximate calculated center of the complete official City of Auburn parcel 0807260000025005, PIN 60478, independently matched through the City Address Authority to the operator facility street 1571 W Samford Avenue. The original literal Census query has zero matches and is retained. The center is a bounded source parcel reference, without a surveyed roof, legal title, operating computing or full campus claim. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "published_address": "1571 W Samford Ave, Auburn, AL36832",
            "advertised_total_power_capacity_mw": 50,
            "campus_acres": 6,
            "total_area_sqft": 39202,
            "power_basis": "totalpowercapacity, not explicitlycriticalIT"
          },
          "notes": [
            "AIenabledoperatorofferingnotindependentall50MWenergized/currentNVIDIAcertificatereview.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://corescientific.com/high-density-data-centers/auburn-al/",
              "host": "corescientific.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Current operator listing for Auburn 1; no explicit whole-record current operating milestone established",
          "fields": {
            "operator_published_address": "1571 W Samford Ave, Auburn, AL 36832",
            "listed_facility_name": "Auburn 1"
          },
          "notes": [
            "The page lists the location and operator features but does not explicitly establish a present operating milestone. Operator capacity labels are not independently verified energized load. Current status and inherited point precision remain unresolved. Publication date is not established."
          ],
          "sources": [
            {
              "url": "https://corescientific.com/high-density-data-centers/auburn-al/",
              "host": "corescientific.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "d08b2bf78a94f86f17ffc6c8f0d04cbd1b434a606a468eb7537b5e13f8c8b393",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_utility_context": {
              "issuer": "Core Scientific",
              "reporting_period": "2025-12-31",
              "source_rows": [
                {
                  "location": "Auburn, Alabama",
                  "utility": "Alabama Power Company",
                  "gross_utility_capacity_mw": 50
                }
              ],
              "scope": "Annual gross utility-capacity context only; not critical IT, current load, an opened phase or an unambiguous physical-site boundary. No typed MW fact or summed campus total added."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm",
              "host": "www.sec.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Core Scientific reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 43",
          "scope": "The current original company page names Auburn 1 and lists facility specifications. The issuer March 2, 2026 annual report lists Auburn in its December 31, 2025 utility capacity table, and the February 19, 2025 original release describes taking over the existing AUBix facility with a future launch. A utility allocation, owned or leased portfolio total, acquisition process and marketed specifications do not separately establish actual customer computing at every Auburn component today. Current physical stage remains unclear; no capacity, completed expansion, title or employee outcome is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_marketing_and_annual_capacity_table_not_exact_current_compute_stage",
              "scope": "The current original company page names Auburn 1 and lists facility specifications. The issuer March 2, 2026 annual report lists Auburn in its December 31, 2025 utility capacity table, and the February 19, 2025 original release describes taking over the existing AUBix facility with a future launch. A utility allocation, owned or leased portfolio total, acquisition process and marketed specifications do not separately establish actual customer computing at every Auburn component today. Current physical stage remains unclear; no capacity, completed expansion, title or employee outcome is promoted."
            },
            "source_read_scope": {
              "annual_report_sections": [
                "Business Operations and Segments",
                "Power Providers utility capacity table"
              ],
              "annual_table_as_of": "2025-12-31",
              "whole_annual_report_audited": false,
              "current_named_auburn_page_read": true
            }
          },
          "notes": [
            "The current original company page names Auburn 1 and lists facility specifications. The issuer March 2, 2026 annual report lists Auburn in its December 31, 2025 utility capacity table, and the February 19, 2025 original release describes taking over the existing AUBix facility with a future launch. A utility allocation, owned or leased portfolio total, acquisition process and marketed specifications do not separately establish actual customer computing at every Auburn component today. Current physical stage remains unclear; no capacity, completed expansion, title or employee outcome is promoted.",
            "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."
          ],
          "sources": [
            {
              "url": "https://corescientific.com/high-density-data-centers/auburn-al/",
              "host": "corescientific.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-013305/core-20251231.htm",
              "host": "investors.corescientific.com",
              "published": "2026-03-02",
              "date": "2026-03-02",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://investors.corescientific.com/news-events/press-releases/detail/107/core-scientific-announces-expansion-into-auburn-alabama-with-new-high-performance-computing-facility",
              "host": "investors.corescientific.com",
              "published": "2025-02-19",
              "date": "2025-02-19",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 31, October 23, 2026",
          "scope": "Core Scientific identifies the same named Auburn 1 data center on its current first party location page and lists the facility in its own location portfolio. Operator per source records the advertised provider brand relationship; service marketing does not independently certify current computing, commissioning, performance or whole campus operation. Legal title, sole control, tenant identity and a distinct corporate entity are not established. Existing status, location, address, county, quantities, dates, certification and component identity remain exact. The source publication date is unknown.",
          "fields": {
            "company_association": {
              "name": "Core Scientific",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Core Scientific identifies the same named Auburn 1 data center on its current first party location page and lists the facility in its own location portfolio. Operator per source records the advertised provider brand relationship; service marketing does not independently certify current computing, commissioning, performance or whole campus operation. Legal title, sole control, tenant identity and a distinct corporate entity are not established. Existing status, location, address, county, quantities, dates, certification and component identity remain exact. The source publication date is unknown."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Core Scientific identifies the same named Auburn 1 data center on its current first party location page and lists the facility in its own location portfolio. Operator per source records the advertised provider brand relationship; service marketing does not independently certify current computing, commissioning, performance or whole campus operation. Legal title, sole control, tenant identity and a distinct corporate entity are not established. Existing status, location, address, county, quantities, dates, certification and component identity remain exact. The source publication date is unknown."
          ],
          "sources": [
            {
              "url": "https://corescientific.com/high-density-data-centers/auburn-al/",
              "host": "corescientific.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://corescientific.com/high-density-data-centers/",
              "host": "corescientific.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 55, October 23, 2026",
          "scope": "Explicit source bound reference only. Existing status group unknown remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -85.51338,
                "lat": 32.60105,
                "precision": "approximate",
                "basis": "Approximate calculated center of the complete official City of Auburn parcel 0807260000025005, PIN 60478, independently matched through the City Address Authority to the operator facility street 1571 W Samford Avenue. The original literal Census query has zero matches and is retained. The center is a bounded source parcel reference, without a surveyed roof, legal title, operating computing or full campus claim. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": {
                "identifier": "0807260000025005",
                "identifier_field": "PARCEL",
                "objectid": 1193849,
                "agency": "City of Auburn GIS, with Lee County parcel attributes",
                "reference_method": "calculated_polygon_centroid",
                "not_survey_quality": true,
                "legal_title_verified": false,
                "independent_building_identity": false,
                "full_campus_verified": false,
                "operator_ownership_verified": false,
                "geometry_acquisition_date": null
              },
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "The operator names 1571 W Samford Avenue. The literal Census query returns zero. An independent exact City Address Authority query returns one City address at that complete street. Its spatial parcel join and an independent complete situs and PIN query return the same single parcel. The parcel STRNUM is null and STRNAM contains the complete street, so the original split situs query also returns zero. The January 20, 2026 City agenda separately names Project Apollo data center expansion at 1571 and a substation at 1501; the substation is excluded. Source layer dates and address creation metadata are not facility milestones.",
            "Explicit source bound reference only. Existing status group unknown remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
            "A large industrial or institutional roof and paved areas lie among other buildings, roads, wooded ground and a diagonal transportation corridor. The selected official parcel center is an approximate source area reference only. No visible roof, current workload, expansion completion or legal title is certified.",
            "The inherited general area coordinate and county display were not reviewed physical facility destinations. The exact independent official sources now support only the bounded reference described in the basis. Earlier coordinates and complete source history remain intact. This is a reference correction, without a claim of physical relocation or a new physical milestone."
          ],
          "sources": [
            {
              "url": "https://corescientific.com/high-density-data-centers/auburn-al/",
              "host": "corescientific.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Named Auburn facility street"
            },
            {
              "url": "https://investors.corescientific.com/news-events/press-releases/detail/107/core-scientific-announces-expansion-into-auburn-alabama-with-new-high-performance-computing-facility",
              "host": "investors.corescientific.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Original Auburn facility announcement"
            },
            {
              "url": "https://gis.auburnalabama.org/public/rest/services/Tools/PublicSearch/MapServer/0/query?where=AddressNumber+%3D+1571+AND+UPPER%28StreetName%29+%3D+%27SAMFORD%27&outFields=OBJECTID%2CFacilityID%2CAddressNumber%2CStreetName%2CFullStreet%2CFullAddress%2CMailingCity%2CState%2CZip%2CAddressAuthority%2CAddressClassification%2CAddressPointType%2CCreatedDate&returnGeometry=true&outSR=4326&f=json",
              "host": "gis.auburnalabama.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Independent City Address Authority point for the exact operator street"
            },
            {
              "url": "https://gis.auburnalabama.org/public/rest/services/PublicService/Parcels/MapServer/0/query?geometry=-85.51275405445307%2C32.60119153688463&geometryType=esriGeometryPoint&inSR=4326&spatialRel=esriSpatialRelIntersects&outFields=OBJECTID%2CPARCEL%2CPIN%2CSTRNUM%2CSTRNAM%2CACRES_COUNTY%2CACRES&returnGeometry=true&outSR=4326&f=json",
              "host": "gis.auburnalabama.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete spatial intersection joins the City address authority to one parcel"
            },
            {
              "url": "https://gis.auburnalabama.org/public/rest/services/PublicService/Parcels/MapServer/0/query?where=PIN+%3D+%2760478%27+AND+UPPER%28STRNAM%29+%3D+%271571+W+SAMFORD+AVE%27&outFields=OBJECTID%2CPARCEL%2CPIN%2CSTRNUM%2CSTRNAM%2CACRES_COUNTY%2CACRES&returnGeometry=true&outSR=4326&f=json",
              "host": "gis.auburnalabama.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete exact full situs and PIN parcel query"
            },
            {
              "url": "https://gis.auburnalabama.org/public/rest/services/PublicService/Parcels/MapServer/0?f=pjson",
              "host": "gis.auburnalabama.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "City geometry and Lee County parcel attribute definitions"
            },
            {
              "url": "https://api2.auburnalabama.org/ePacket/2726/file/7556",
              "host": "api2.auburnalabama.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "January 20, 2026 agenda separates data center 1571 and substation 1501"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1571+W+Samford+Ave%2C+Auburn%2C+AL+36832&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete literal Census street response and county context"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-85.51924474605134%2C32.59610928853755%2C-85.50751525394865%2C32.605990711462454&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting with unknown image acquisition date"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate source parcel reference, not a roof or complete campus",
      "summary": "Auburn · Lee · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-02-19",
          "text": "The February 19, 2025 publication date of the original company release announces entry into the existing Auburn AUBix facility and a planned launch. This is not the exact physical opening, completion of every expansion or an independently verified delivered capacity.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://investors.corescientific.com/news-events/press-releases/detail/107/core-scientific-announces-expansion-into-auburn-alabama-with-new-high-performance-computing-facility",
              "host": "investors.corescientific.com",
              "published": "2025-02-19",
              "date": "2025-02-19",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ]
    },
    {
      "id": "dc-blox-montgomery-al",
      "state": "al",
      "kind": "facility",
      "name": "DC BLOX Montgomery Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Montgomery"
      ],
      "city": "Montgomery",
      "address": "",
      "who": "DC BLOX",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. regional map mismatch. Regional12campuses/470MWcommittedplannednotMontgomerysite. DoesnotresolveexactMontgomeryaddressorcapacity; separateNovember14,2024releaseprovidesnameddevelopmentcontext. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-11-14",
          "DC BLOX announced plans for a Montgomery hyperscale edge facility. This is the release date, not a construction start, opening or delivery date."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dcblox.com/data-center-map/",
          "host": "dcblox.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
          "host": "www.dcblox.com",
          "published": "2024-11-14",
          "date": "2024-11-14",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        },
        {
          "url": "https://www.dcblox.com/wp-content/uploads/2026/03/DC-BLOX-Going-Vertical.pdf",
          "host": "www.dcblox.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        }
      ],
      "loc": {
        "lat": 32.22077,
        "lng": -86.20776,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "regional map mismatch",
          "fields": {},
          "notes": [
            "Regional12campuses/470MWcommittedplannednotMontgomerysite. DoesnotresolveexactMontgomeryaddressorcapacity; separateNovember14,2024releaseprovidesnameddevelopmentcontext.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-center-map/",
              "host": "dcblox.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The current operator map combines operating and development campuses and does not independently establish Montgomery’s stage. The November 2024 announcement describes initial 5 MW and possible expansion, not delivered capacity. The March-path brochure lists Montgomery among locations without a facility completion date. No opening, cancellation or metered load is inferred."
            }
          },
          "notes": [
            "The current operator map combines operating and development campuses and does not independently establish Montgomery’s stage. The November 2024 announcement describes initial 5 MW and possible expansion, not delivered capacity. The March-path brochure lists Montgomery among locations without a facility completion date. No opening, cancellation or metered load is inferred."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "www.dcblox.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.dcblox.com/wp-content/uploads/2026/03/DC-BLOX-Going-Vertical.pdf",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.dcblox.com/data-center-map/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 1",
          "scope": "DC BLOX announced the Montgomery development on November 14, 2024. The current regional map combines operating and development campuses. Neither source establishes present construction or delivered service for this record. Planned capacity and regional totals remain separate.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "DC BLOX announced the Montgomery development on November 14, 2024. The current regional map combines operating and development campuses. Neither source establishes present construction or delivered service for this record. Planned capacity and regional totals remain separate."
            }
          },
          "notes": [
            "DC BLOX announced the Montgomery development on November 14, 2024. The current regional map combines operating and development campuses. Neither source establishes present construction or delivered service for this record. Planned capacity and regional totals remain separate."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "www.dcblox.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.dcblox.com/data-center-map/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check68, October24,2026",
          "scope": "The November 14, 2024 announcement identifies DC BLOX development at Montgomery. Initial tenant demand, future additional capacity and regional totals remain distinct marketing plans. The dated development association does not prove present construction or operation. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification.",
          "fields": {
            "company_association": {
              "name": "DC BLOX",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The November 14, 2024 announcement identifies DC BLOX development at Montgomery. Initial tenant demand, future additional capacity and regional totals remain distinct marketing plans. The dated development association does not prove present construction or operation. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The November 14, 2024 announcement identifies DC BLOX development at Montgomery. Initial tenant demand, future additional capacity and regional totals remain distinct marketing plans. The dated development association does not prove present construction or operation. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "www.dcblox.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Montgomery · Montgomery · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-11-14",
          "text": "DC BLOX announced plans for a Montgomery hyperscale edge facility. This is the release date, not a construction start, opening or delivery date.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "www.dcblox.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01101"
      }
    },
    {
      "id": "meta-montgomery-al",
      "state": "al",
      "kind": "facility",
      "name": "Meta Montgomery Data Center",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Montgomery"
      ],
      "city": "Montgomery",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Nearly1.3Marea and1.5B+investment cover expanded campus.3B+Alabama total includes Huntsville;227MWis supported Alabama renewable generation, not campusIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Dated expansion announcement; no fresh completion milestone. The2025 announcement describes two added buildings and future operation. It is not October 2026 status evidence. Investment and jobs remain campus forecasts, not realized spending or current employment. No status, load or parcel upgrade.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/",
          "host": "datacenters.atmeta.com",
          "date": "2025-09-23",
          "published": "2025-09-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/montgomery-data-center-info-sheet/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 32.23889,
        "lng": -86.22754,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "expansion_new_buildings": 2,
            "resulting_planned_campus_area_sqft_approx": 1300000,
            "planned_campus_investment_usd_min_exclusive": 1500000000,
            "peak_construction_jobs_min_exclusive": 1000,
            "forecast_operational_jobs_min_exclusive": 100
          },
          "notes": [
            "Nearly1.3Marea and1.5B+investment cover expanded campus.3B+Alabama total includes Huntsville;227MWis supported Alabama renewable generation, not campusIT.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/",
              "host": "datacenters.atmeta.com",
              "date": "2025-09-23",
              "published": "2025-09-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Dated expansion announcement; no fresh completion milestone",
          "fields": {
            "historical_expansion_announcement": "2025-09-23",
            "current_status_hold": "No subsequent operating or completed-construction milestone established in the reviewed source."
          },
          "notes": [
            "The2025 announcement describes two added buildings and future operation. It is not October 2026 status evidence. Investment and jobs remain campus forecasts, not realized spending or current employment. No status, load or parcel upgrade."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/",
              "host": "datacenters.atmeta.com",
              "date": "2025-09-23",
              "published": "2025-09-23",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "c26c0d2d243a1816028c030a16f973623b3aa0290c1e489358d05cd167a2c8a5",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed development",
              "basis": "The current named operator factsheet describes this campus in future terms and gives operational employment only once completed.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation."
          },
          "notes": [
            "This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/montgomery-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 04, October 22, 2026",
          "scope": "Meta announces the expansion of its Montgomery campus and says it designs and builds its infrastructure. Developer is attributed to the provider brand. The announcement is not a current operating certification, a parcel review or an attribution of the legal property owner. No building, area, employment, investment or utility figure is promoted.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Meta announces the expansion of its Montgomery campus and says it designs and builds its infrastructure. Developer is attributed to the provider brand. The announcement is not a current operating certification, a parcel review or an attribution of the legal property owner. No building, area, employment, investment or utility figure is promoted."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Meta announces the expansion of its Montgomery campus and says it designs and builds its infrastructure. Developer is attributed to the provider brand. The announcement is not a current operating certification, a parcel review or an attribution of the legal property owner. No building, area, employment, investment or utility figure is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/",
              "host": "datacenters.atmeta.com",
              "published": "2025-09-23",
              "date": "2025-09-23",
              "checked": "2026-10-22",
              "label": "First party named community development or operation statement"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Montgomery · Montgomery · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet describes this campus in future terms and gives operational employment only once completed. This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01101"
      }
    },
    {
      "id": "patmos-fairfield-al",
      "state": "al",
      "kind": "facility",
      "name": "Patmos Fairfield Colocation Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jefferson"
      ],
      "city": "Fairfield",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The report says the local temporary ban excluded Patmos; exclusion is not project approval. Utility assurances and quieter-than-Walmart or water-only-impact claims are attributed, not independent environmental findings. Colocation is not inherently small. No later approval, construction or metered capacity is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wbrc.com/2026/08/13/hundreds-pack-fairfield-town-hall-over-proposed-data-center-inside-former-walmart/",
          "host": "wbrc.com",
          "date": "2026-08-13",
          "published": "2026-08-13",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://go.patmos.tech/fairfield",
          "host": "go.patmos.tech",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.55446,
        "lng": -86.89645,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WBRC reports Patmos' former-Walmart Fairfield proposal, with city approval still needed and construction/phase openings forecast for 2026 to 2028.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The report says the local temporary ban excluded Patmos; exclusion is not project approval. Utility assurances and quieter-than-Walmart or water-only-impact claims are attributed, not independent environmental findings. Colocation is not inherently small. No later approval, construction or metered capacity is established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wbrc.com/2026/08/13/hundreds-pack-fairfield-town-hall-over-proposed-data-center-inside-former-walmart/",
              "host": "wbrc.com",
              "date": "2026-08-13",
              "published": "2026-08-13",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 43",
          "scope": "The original Patmos Fairfield page advertises an August 12, 2026 community townhall about its vision for a local technology campus. This is an original project communication, not proof that the event occurred, permits were issued, a fit out began or the Fairfield facility is currently operating. Generic current Patmos services and other cities are excluded from this exact facility stage.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "dated_original_townhall_invitation_not_current_facility_stage",
              "scope": "The original Patmos Fairfield page advertises an August 12, 2026 community townhall about its vision for a local technology campus. This is an original project communication, not proof that the event occurred, permits were issued, a fit out began or the Fairfield facility is currently operating. Generic current Patmos services and other cities are excluded from this exact facility stage."
            }
          },
          "notes": [
            "The original Patmos Fairfield page advertises an August 12, 2026 community townhall about its vision for a local technology campus. This is an original project communication, not proof that the event occurred, permits were issued, a fit out began or the Fairfield facility is currently operating. Generic current Patmos services and other cities are excluded from this exact facility stage.",
            "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."
          ],
          "sources": [
            {
              "url": "https://go.patmos.tech/fairfield",
              "host": "go.patmos.tech",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Fairfield · Jefferson · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01073"
      }
    },
    {
      "id": "youngwoo-project-brookwood-al",
      "state": "al",
      "kind": "facility",
      "name": "Project Brookwood Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Tuscaloosa"
      ],
      "city": "Brookwood",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Recommendation and future council hearing are not final approval.200 acresalreadyowned,374 acresundercontract and anotherowner’s 680 acres are overlapping/different land scopes, not automatically one summed campus. AppliedDigital’s 1300 acres/two-million-square-footproject is explicitly separate developer and property; never assign itsIT, lease or investment toYoungwoo. Petition names DataCenterCampus despite counsel saying future uses uncertain. No disclosedITMW, capex, tenant, current construction or observedSeptember 15 outcome. School-relocation suggestion is not adopted relocation plan or proven impact. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://tuscaloosathread.com/second-brookwood-data-center/",
          "host": "tuscaloosathread.com",
          "date": "2026-08-12",
          "published": "2026-08-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.24671,
        "lng": -87.52164,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "TuscaloosaThread reports planning commission unanimously recommended 374 acreannexation/rezoning for Youngwoo’sProjectBrookwoodLLC, with council final vote scheduledSeptember 15.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Recommendation and future council hearing are not final approval.200 acresalreadyowned,374 acresundercontract and anotherowner’s 680 acres are overlapping/different land scopes, not automatically one summed campus. AppliedDigital’s 1300 acres/two-million-square-footproject is explicitly separate developer and property; never assign itsIT, lease or investment toYoungwoo. Petition names DataCenterCampus despite counsel saying future uses uncertain. No disclosedITMW, capex, tenant, current construction or observedSeptember 15 outcome. School-relocation suggestion is not adopted relocation plan or proven impact.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://tuscaloosathread.com/second-brookwood-data-center/",
              "host": "tuscaloosathread.com",
              "date": "2026-08-12",
              "published": "2026-08-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Brookwood · Tuscaloosa · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01125"
      }
    },
    {
      "id": "qts-marvel-bessemer-al",
      "state": "al",
      "kind": "facility",
      "name": "QTS Bessemer (Project Marvel)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jefferson"
      ],
      "city": "Bessemer",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. This is2025reporting, not a2026vote. QTS is not identified in the readable body. The claimed100-acre site and other land/building descriptions are inconsistent and not reconciled. Opponents' water, power, incentives and environmental claims are not approved amounts, measured impacts or current IT demand. No later rezoning result adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://tuscaloosathread.com/bessemer-data-center-concerns/",
          "host": "tuscaloosathread.com",
          "date": "2025-10-14",
          "published": "2025-10-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://q.com/data-centers/bessemer/",
          "host": "q.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.57463,
        "lng": -86.91847,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Tuscaloosa Thread describes Project Marvel's October7 zoning-use action and a future November18 rezoning hearing, with local opposition and developer details incomplete.",
            "independently_verified_current_operating_status": null,
            "operator_or_exact_site_identity_needs_crosswalk": true
          },
          "notes": [
            "This is2025reporting, not a2026vote. QTS is not identified in the readable body. The claimed100-acre site and other land/building descriptions are inconsistent and not reconciled. Opponents' water, power, incentives and environmental claims are not approved amounts, measured impacts or current IT demand. No later rezoning result adopted.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://tuscaloosathread.com/bessemer-data-center-concerns/",
              "host": "tuscaloosathread.com",
              "date": "2025-10-14",
              "published": "2025-10-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 2",
          "scope": "The QTS Bessemer page reports equipment mobilization, clearing, earthwork and preparatory surveys. This is a primary city project lead. The page does not identify Project Marvel by name, and the inherited news source did not identify QTS. An exact application or site crosswalk is still required before transferring that construction statement to this record.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The QTS Bessemer page reports equipment mobilization, clearing, earthwork and preparatory surveys. This is a primary city project lead. The page does not identify Project Marvel by name, and the inherited news source did not identify QTS. An exact application or site crosswalk is still required before transferring that construction statement to this record."
            }
          },
          "notes": [
            "The QTS Bessemer page reports equipment mobilization, clearing, earthwork and preparatory surveys. This is a primary city project lead. The page does not identify Project Marvel by name, and the inherited news source did not identify QTS. An exact application or site crosswalk is still required before transferring that construction statement to this record."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/bessemer/",
              "host": "q.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Bessemer · Jefferson · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01073"
      }
    },
    {
      "id": "sovereign-gazelle-somerville-al",
      "state": "al",
      "kind": "facility",
      "name": "Sovereign Gazelle Bitcoin Mining Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Morgan"
      ],
      "city": "Somerville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. County attorney/chair and developer counsel positions are attributed legal opinions, not a court ruling or independently examined statewide law. Do not map as a verified legally effective construction ban or erase the reported resolution. Utility says no permit application was submitted; preliminary route discussion/locates are not route approval or executed service. 50 MW is proposed electrical supply, not critical IT/current draw. Fifteen-acre $300,000 land purchase by affiliate is separate from planned ten-acre footprint and project capex. Sovereign Gazelle April 2026 incorporation does not change affiliate August 2025 land acquisition chronology. No RFS or approved noise limit. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.hartselleenquirer.com/2026/08/17/morgan-county-says-cannot-stop-proposed-data-center/",
          "host": "hartselleenquirer.com",
          "date": "2026-08-17",
          "published": "2026-08-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.45356,
        "lng": -86.85303,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Hartselle Enquirer reports Sovereign Gazelle’s proposed 50 MW bitcoin site at 369 Union Road, with county officials describing an adopted 12-month unincorporated-area resolution as lacking an enforcement mechanism.",
            "independently_verified_current_operating_status": null,
            "reported_moratorium_months": 12,
            "legally_effective_moratorium_verified": false,
            "no_court_outcome_adopted": true
          },
          "notes": [
            "County attorney/chair and developer counsel positions are attributed legal opinions, not a court ruling or independently examined statewide law. Do not map as a verified legally effective construction ban or erase the reported resolution. Utility says no permit application was submitted; preliminary route discussion/locates are not route approval or executed service. 50 MW is proposed electrical supply, not critical IT/current draw. Fifteen-acre $300,000 land purchase by affiliate is separate from planned ten-acre footprint and project capex. Sovereign Gazelle April 2026 incorporation does not change affiliate August 2025 land acquisition chronology. No RFS or approved noise limit.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.hartselleenquirer.com/2026/08/17/morgan-county-says-cannot-stop-proposed-data-center/",
              "host": "hartselleenquirer.com",
              "date": "2026-08-17",
              "published": "2026-08-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Somerville · Morgan · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01103"
      }
    },
    {
      "id": "swift-willow-westover-al",
      "state": "al",
      "kind": "facility",
      "name": "Swift Willow Westover Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Shelby"
      ],
      "city": "Westover",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Possible withdrawal was not observed. MOU difficulties do not prove legal termination. Exact ordinance terms/expiry and later August 20 meeting outcome remain open. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wbrc.com/2026/08/19/westover-approves-6-month-moratorium-data-centers/",
          "host": "wbrc.com",
          "date": "2026-08-18",
          "published": "2026-08-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.26395,
        "lng": -86.6606,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "six-month-moratorium-reported",
            "reported_finding": "WBRC reports unanimous Westover six-month pause on August 18; developer might withdraw according to city attorney.",
            "report_display_date": "2026-08-18",
            "independently_verified_current_status": null
          },
          "notes": [
            "Possible withdrawal was not observed. MOU difficulties do not prove legal termination. Exact ordinance terms/expiry and later August 20 meeting outcome remain open.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wbrc.com/2026/08/19/westover-approves-6-month-moratorium-data-centers/",
              "host": "wbrc.com",
              "date": "2026-08-18",
              "published": "2026-08-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Westover · Shelby · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01117"
      }
    },
    {
      "id": "synergy-south-russellville-al",
      "state": "al",
      "kind": "facility",
      "name": "Synergy South Russellville Bitcoin Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Franklin"
      ],
      "city": "Russellville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Operator website says neither of its two North Alabama facilities exceeds 12 MW; that is an upper-bound statement, not exactly 12 MW, current load or critical IT at Russellville. Proposed 50 MW belongs to Somerville. Residents’50 to 95 dB comparisons and forecasts of amplified noise are not measured Russellville or future Somerville impacts. Police saying no complaints filed does not establish absence of environmental/health effects. VoltCore involvement is reported development history, not proof of current ownership. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.waff.com/2026/09/01/somerville-homeowners-compare-russellville-bitcoin-mining-site-their-proposed-local-facility/",
          "host": "waff.com",
          "date": "2026-09-01",
          "published": "2026-09-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://digitalpeaker.com/",
          "host": "digitalpeaker.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://digitalpeaker.com/services",
          "host": "digitalpeaker.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://digitalpeaker.com/site-a1",
          "host": "digitalpeaker.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://digitalpeaker.com/site-a2",
          "host": "digitalpeaker.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 34.44175,
        "lng": -87.84365,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "WAFF reports Synergy South operates a bitcoin facility on Jackson Avenue in Russellville, compared by opponents with a separate proposed Somerville mine.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Operator website says neither of its two North Alabama facilities exceeds 12 MW; that is an upper-bound statement, not exactly 12 MW, current load or critical IT at Russellville. Proposed 50 MW belongs to Somerville. Residents’50 to 95 dB comparisons and forecasts of amplified noise are not measured Russellville or future Somerville impacts. Police saying no complaints filed does not establish absence of environmental/health effects. VoltCore involvement is reported development history, not proof of current ownership.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.waff.com/2026/09/01/somerville-homeowners-compare-russellville-bitcoin-mining-site-their-proposed-local-facility/",
              "host": "waff.com",
              "date": "2026-09-01",
              "published": "2026-09-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 43",
          "scope": "The current Synergy South original pages describe operating North Alabama mining and hosting services at codes A1 and A2. Both code pages give only North Alabama as their location. They do not identify Russellville or the inherited exact facility address. No code is assigned to the Russellville record from a portfolio description, and no company capacity, expansion target, measured grid benefit or exact current facility operation is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "company_codes_lack_exact_russellville_crosswalk",
              "scope": "The current Synergy South original pages describe operating North Alabama mining and hosting services at codes A1 and A2. Both code pages give only North Alabama as their location. They do not identify Russellville or the inherited exact facility address. No code is assigned to the Russellville record from a portfolio description, and no company capacity, expansion target, measured grid benefit or exact current facility operation is promoted."
            }
          },
          "notes": [
            "The current Synergy South original pages describe operating North Alabama mining and hosting services at codes A1 and A2. Both code pages give only North Alabama as their location. They do not identify Russellville or the inherited exact facility address. No code is assigned to the Russellville record from a portfolio description, and no company capacity, expansion target, measured grid benefit or exact current facility operation is promoted.",
            "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."
          ],
          "sources": [
            {
              "url": "https://digitalpeaker.com/",
              "host": "digitalpeaker.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://digitalpeaker.com/services",
              "host": "digitalpeaker.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://digitalpeaker.com/site-a1",
              "host": "digitalpeaker.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://digitalpeaker.com/site-a2",
              "host": "digitalpeaker.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Russellville · Franklin · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01059"
      }
    },
    {
      "id": "tallassee-mill-data-center-al",
      "state": "al",
      "kind": "facility",
      "name": "Tallassee 1852 Mill Data Center Proposal",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Elmore"
      ],
      "city": "Tallassee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. No adopted moratorium or permanent legal prohibition established. Historic mill potential location is not operating data center; future Tallapoosa projects not this site. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wsfa.com/2026/05/18/tallassee-pulls-plug-data-center-plan-now/",
          "host": "wsfa.com",
          "date": "2026-05-18",
          "published": "2026-05-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.59699,
        "lng": -86.1485,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "mayoral-project-pause",
            "reported_finding": "WSFA reports Tallassee mayor and council not moving forward for now, citing need for information and public process.",
            "report_display_date": "2026-05-18",
            "independently_verified_current_status": null
          },
          "notes": [
            "No adopted moratorium or permanent legal prohibition established. Historic mill potential location is not operating data center; future Tallapoosa projects not this site.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wsfa.com/2026/05/18/tallassee-pulls-plug-data-center-plan-now/",
              "host": "wsfa.com",
              "date": "2026-05-18",
              "published": "2026-05-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Tallassee · Elmore · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01051"
      }
    },
    {
      "id": "university-of-alabama-hpc-tuscaloosa-al",
      "state": "al",
      "kind": "facility",
      "name": "University of Alabama High Performance Computing and Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Tuscaloosa"
      ],
      "city": "Tuscaloosa",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Alabama future facility with unresolved capacity units/boundary. Internal power scope/unit conflict:14.6MWmasterplan versus5/16mWplus and cabinet ratings; no single canonical criticalITMW adopted. Do not multiply83rated350kWcabinets into actual facility demand.96Mforecastnotactualspent. Adjacent22500GSFsubstation not additional data hall. Early2027future, not operating now. Tier2plus wording not independent certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. University future facility page; revised opening forecast and named project address. The current university page forecasts early2027, superseding the older August 2026 completion target. Existing campus computing services do not prove this new building is operating. Historical Stage1approval alone does not establish present construction or final permits; current status remains unresolved.",
      "date": "",
      "events": [
        [
          "2023-09-05",
          "The September 5, 2023 publication date of the University account announces the planned computing center and reports earlier Stage 1 approval. It does not establish the exact approval day, a construction start or an August 2026 actual completion."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://hpc.ua.edu/about/",
          "host": "hpc.ua.edu",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://news.ua.edu/2023/09/new-computing-center-expands-innovation-opportunities/",
          "host": "news.ua.edu",
          "date": "2023-09-05",
          "published": "2023-09-05",
          "checked": "2026-10-15",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.30991,
        "lng": -87.54775,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Alabama future facility with unresolved capacity units/boundary",
          "fields": {
            "institution": "University of Alabama",
            "facility": "High Performance Computing and Data Center",
            "address": "709 Johnny Stallings Drive, Tuscaloosa, Alabama",
            "planned_gross_sqft": 40000,
            "included_data_hall_sqft": 10000,
            "planned_project_investment_usd": 96000000,
            "opening_target": "early2027",
            "published_masterplanned_computing_mw": 14.6,
            "other_published_capacity_text": "5 mW+ available, scalable to16 mW+"
          },
          "notes": [
            "Internal power scope/unit conflict:14.6MWmasterplan versus5/16mWplus and cabinet ratings; no single canonical criticalITMW adopted. Do not multiply83rated350kWcabinets into actual facility demand.96Mforecastnotactualspent. Adjacent22500GSFsubstation not additional data hall. Early2027future, not operating now. Tier2plus wording not independent certification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://hpc.ua.edu/about/",
              "host": "hpc.ua.edu",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "University future facility page; revised opening forecast and named project address",
          "fields": {
            "operator_published_project_address": "709 Johnny Stallings Drive, Tuscaloosa, Alabama",
            "opening_forecast": "early 2027",
            "historical_stage_1_approval_publication_date": "2023-09-05"
          },
          "notes": [
            "The current university page forecasts early2027, superseding the older August 2026 completion target. Existing campus computing services do not prove this new building is operating. Historical Stage1approval alone does not establish present construction or final permits; current status remains unresolved."
          ],
          "sources": [
            {
              "url": "https://hpc.ua.edu/about/",
              "host": "hpc.ua.edu",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://news.ua.edu/2023/09/new-computing-center-expands-innovation-opportunities/",
              "host": "news.ua.edu",
              "date": "2023-09-05",
              "published": "2023-09-05",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "9fe9ef21b70ac3babecf11800d3aee21823459d9ad6a9c2bf2b46969eecb84ba",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 43",
          "scope": "The current original University project page forecasts opening in early 2027. Its September 5, 2023 account had forecast completion in August 2026 and reported earlier Stage 1 approval without an exact approval day. Neither a passed completion forecast nor the newer future opening forecast establishes actual construction progress, commissioning or an operating new facility. Other existing University computing resources are not merged into this planned center, and the forecast is not completed to an exact opening day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_future_opening_forecast_not_completed_physical_stage",
              "scope": "The current original University project page forecasts opening in early 2027. Its September 5, 2023 account had forecast completion in August 2026 and reported earlier Stage 1 approval without an exact approval day. Neither a passed completion forecast nor the newer future opening forecast establishes actual construction progress, commissioning or an operating new facility. Other existing University computing resources are not merged into this planned center, and the forecast is not completed to an exact opening day."
            }
          },
          "notes": [
            "The current original University project page forecasts opening in early 2027. Its September 5, 2023 account had forecast completion in August 2026 and reported earlier Stage 1 approval without an exact approval day. Neither a passed completion forecast nor the newer future opening forecast establishes actual construction progress, commissioning or an operating new facility. Other existing University computing resources are not merged into this planned center, and the forecast is not completed to an exact opening day.",
            "All existing identity, organization roles, location, jurisdiction, quantity and physical opening fields remain unchanged. Source checks and prospective dates are not physical opening days."
          ],
          "sources": [
            {
              "url": "https://hpc.ua.edu/about/",
              "host": "hpc.ua.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://news.ua.edu/2023/09/new-computing-center-expands-innovation-opportunities/",
              "host": "news.ua.edu",
              "published": "2023-09-05",
              "date": "2023-09-05",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Tuscaloosa · Tuscaloosa · Source context reviewed",
      "event_evidence": [
        {
          "date": "2023-09-05",
          "text": "The September 5, 2023 publication date of the University account announces the planned computing center and reports earlier Stage 1 approval. It does not establish the exact approval day, a construction start or an August 2026 actual completion.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://news.ua.edu/2023/09/new-computing-center-expands-innovation-opportunities/",
              "host": "news.ua.edu",
              "published": "2023-09-05",
              "date": "2023-09-05",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "01125"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
