{
  "schema_version": 1,
  "source_compilation_context": {
    "ga": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/ga.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "ga",
    "label": "Georgia"
  },
  "records": [
    {
      "id": "prime-storage-powers-ferry-place-marietta-ga",
      "state": "ga",
      "kind": "facility",
      "name": "1155 Powers Ferry Place Data Center (Prime Storage conversion)",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cobb"
      ],
      "city": "Marietta",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 90,000-square-foot storage property is not all confirmed DC floor area. Prime Storage/Prime Group Holdings is not Prime Data Centers. The existing 1130 Powers Ferry site and other Marietta proposals are separate. Opponents' corruption/health allegations are attributed, not findings; no later vote or moratorium adoption is assumed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://atlpresscollective.com/2026/07/08/powers-ferry-road-marietta-data-center/",
          "host": "atlpresscollective.com",
          "date": "2026-07-08",
          "published": "2026-07-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.mariettaga.gov/AgendaCenter/ViewFile/Agenda/_07012026-2982?packet=true",
          "host": "www.mariettaga.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 33.91783,
        "lng": -84.57459,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Atlanta Community Press Collective reports a four-three planning recommendation for Prime Storage's requested conversion of part of its Powers Ferry facility, with council action still pending.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The 90,000-square-foot storage property is not all confirmed DC floor area. Prime Storage/Prime Group Holdings is not Prime Data Centers. The existing 1130 Powers Ferry site and other Marietta proposals are separate. Opponents' corruption/health allegations are attributed, not findings; no later vote or moratorium adoption is assumed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://atlpresscollective.com/2026/07/08/powers-ferry-road-marietta-data-center/",
              "host": "atlpresscollective.com",
              "date": "2026-07-08",
              "published": "2026-07-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 56",
          "scope": "The original July 1, 2026 Planning Commission agenda lists Prime Storage Powers Ferry Place Marietta LLC request Z2026 12 for an additional data infrastructure facility use at 1155 Powers Ferry Place. This supports a named formal listed proposal at the scheduled agenda scope. The agenda alone does not establish that the hearing occurred, any recommendation or Council vote, issued building permits, physical conversion or current computing operation. The existing storage use is separate from computing service, and Prime Storage is not treated as Prime Data Centers.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_conversion_application",
              "scope": "The original July 1, 2026 Planning Commission agenda lists Prime Storage Powers Ferry Place Marietta LLC request Z2026 12 for an additional data infrastructure facility use at 1155 Powers Ferry Place. This supports a named formal listed proposal at the scheduled agenda scope. The agenda alone does not establish that the hearing occurred, any recommendation or Council vote, issued building permits, physical conversion or current computing operation. The existing storage use is separate from computing service, and Prime Storage is not treated as Prime Data Centers."
            },
            "source_read_scope": {
              "selected_physical_text_page": 3,
              "agenda_date_and_requested_additional_use_read": true,
              "agenda_not_completed_vote": true,
              "storage_conversion_not_compute_opening": true,
              "distinct_provider_brands_not_joined": true
            }
          },
          "notes": [
            "The original July 1, 2026 Planning Commission agenda lists Prime Storage Powers Ferry Place Marietta LLC request Z2026 12 for an additional data infrastructure facility use at 1155 Powers Ferry Place. This supports a named formal listed proposal at the scheduled agenda scope. The agenda alone does not establish that the hearing occurred, any recommendation or Council vote, issued building permits, physical conversion or current computing operation. The existing storage use is separate from computing service, and Prime Storage is not treated as Prime Data Centers.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.mariettaga.gov/AgendaCenter/ViewFile/Agenda/_07012026-2982?packet=true",
              "host": "www.mariettaga.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Marietta · Cobb · Source context reviewed",
      "status_scope": "The original July 1, 2026 Planning Commission agenda lists Prime Storage Powers Ferry Place Marietta LLC request Z2026 12 for an additional data infrastructure facility use at 1155 Powers Ferry Place. This supports a named formal listed proposal at the scheduled agenda scope. The agenda alone does not establish that the hearing occurred, any recommendation or Council vote, issued building permits, physical conversion or current computing operation. The existing storage use is separate from computing service, and Prime Storage is not treated as Prime Data Centers.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13067"
      }
    },
    {
      "id": "aligned-atl-01-lithia-springs-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Aligned Data Centers ATL-01",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Lithia Springs",
      "address": "",
      "who": "Aligned Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Generator3MW and UPS2MW lineup ratings are not whole-facility capacity. Operator lists facility address and services. Design standards are not certification. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://aligneddc.com/atlanta-data-centers/",
          "host": "aligneddc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1551+N+River+Rd.%2C+Lithia+Springs%2C+GA+30122&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Calculated Census street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-84.62021890693923%2C33.72241446976153%2C-84.61265833362476%2C33.728702647986466&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Aerial setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -84.616438620282,
        "lat": 33.725558558874,
        "precision": "address",
        "basis": "Published Aligned facility address 1551 N River Rd., Lithia Springs, GA 30122 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "street": "1551 N River Rd.",
            "city": "Lithia Springs"
          },
          "notes": [
            "Generator3MW and UPS2MW lineup ratings are not whole-facility capacity.",
            "Operator lists facility address and services. Design standards are not certification.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/atlanta-data-centers/",
              "host": "aligneddc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 10",
          "scope": "The current Aligned page lists ATL01 as a named data center with continuous access and service features. Operator listed service describes this current commercial offering. It does not certify all capacity, tenant occupancy, an opening day or the performance of every other facility listed on the regional page.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_service",
              "scope": "The current Aligned page lists ATL01 as a named data center with continuous access and service features. Operator listed service describes this current commercial offering. It does not certify all capacity, tenant occupancy, an opening day or the performance of every other facility listed on the regional page."
            }
          },
          "notes": [
            "The current Aligned page lists ATL01 as a named data center with continuous access and service features. Operator listed service describes this current commercial offering. It does not certify all capacity, tenant occupancy, an opening day or the performance of every other facility listed on the regional page.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/atlanta-data-centers/",
              "host": "aligneddc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 17, October 23, 2026",
          "scope": "Current official facility street reference only. Native protected facts and canonical address remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -84.616438620282,
                "lat": 33.725558558874,
                "precision": "address",
                "basis": "Published Aligned facility address 1551 N River Rd., Lithia Springs, GA 30122 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1551 N River Rd., Lithia Springs, GA 30122",
              "county_fips": [
                "13097"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named official numeric facility section binds the service address to this existing research record. Corporate offices, related facility cards and embedded map coordinates are excluded.",
            "The unique Census calculated street range agrees with the retained state and county. Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. The reference does not locate a surveyed roof, parcel, full campus, legal owner, floor or suite.",
            "All canonical address, status, physical dates, quantity, role, identity and jurisdiction wrappers remain exact. The retained Census method source keeps its actual October 22 date; new captures are dated October 23.",
            "The old unreviewed inventory point is 8648.3 metres from the current calculated street reference. The current official ATL 01 section explicitly gives 1551 North River Road, Lithia Springs, Georgia 30122. A unique Census street range agrees with the retained Douglas County context. Actually viewed official imagery places the calculated reference on a service street beside large industrial building forms and open construction land. Acquisition date is unknown and may predate construction. No earlier reviewed precise point, legal parcel, complete campus, current operation or property title is overridden."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/atlanta-data-centers/",
              "host": "aligneddc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Official named ATL-01 numeric facility address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1551+N+River+Rd.%2C+Lithia+Springs%2C+GA+30122&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Calculated Census street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-84.62021890693923%2C33.72241446976153%2C-84.61265833362476%2C33.728702647986466&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Aerial setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 13, October 23, 2026",
          "scope": "Aligned Data Centers explicitly lists this named code or campus in its own location portfolio. Operator is the attributed provider brand relationship, not an independently established legal entity, property owner or commissioning finding for every phase. Listed availability, design standards and service guarantees do not prove delivered power or current operation. No status, location, physical date, technical quantity or environmental outcome is promoted. Atlanta is the marketed region; the named ATL-01 section states Lithia Springs. No jurisdiction or street reference change is inferred.",
          "fields": {
            "company_association": {
              "name": "Aligned Data Centers",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Aligned Data Centers explicitly lists this named code or campus in its own location portfolio. Operator is the attributed provider brand relationship, not an independently established legal entity, property owner or commissioning finding for every phase. Listed availability, design standards and service guarantees do not prove delivered power or current operation. No status, location, physical date, technical quantity or environmental outcome is promoted. Atlanta is the marketed region; the named ATL-01 section states Lithia Springs. No jurisdiction or street reference change is inferred."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Aligned Data Centers explicitly lists this named code or campus in its own location portfolio. Operator is the attributed provider brand relationship, not an independently established legal entity, property owner or commissioning finding for every phase. Listed availability, design standards and service guarantees do not prove delivered power or current operation. No status, location, physical date, technical quantity or environmental outcome is promoted. Atlanta is the marketed region; the named ATL-01 section states Lithia Springs. No jurisdiction or street reference change is inferred.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://aligneddc.com/atlanta-data-centers/",
              "host": "aligneddc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact named code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Lithia Springs · Douglas · Source context reviewed",
      "status_scope": "The current Aligned page lists ATL01 as a named data center with continuous access and service features. Operator listed service describes this current commercial offering. It does not certify all capacity, tenant occupancy, an opening day or the performance of every other facility listed on the regional page."
    },
    {
      "id": "atlas-stiles-road-cartersville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Atlas Development Stiles Road Data Center (Euharlee Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Cartersville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Petition is advocacy evidence, not originalapplication/officialhearingrecord or finaldenial. Victorybanner/2225 supporters does not independently establish government action, localresident count or courtfinding. Predicted health/noise/water/power effects are concerns, not measuredsite impacts. No signing, formsubmission or contactmade. NoMW, currentstatus, tenant orRFSverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.change.org/p/say-no-to-the-data-center-on-euharlee-rd",
          "host": "change.org",
          "date": "2025-11-17",
          "published": "2025-11-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.24873,
        "lng": -84.85247,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "Change.org opposition petition names AtlasDevelopment’s proposed 260,000 square-foot use at 208/329 StilesRoad, with aDecember 15,2025 Bartowconditional-permit hearing described.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Petition is advocacy evidence, not originalapplication/officialhearingrecord or finaldenial. Victorybanner/2225 supporters does not independently establish government action, localresident count or courtfinding. Predicted health/noise/water/power effects are concerns, not measuredsite impacts. No signing, formsubmission or contactmade. NoMW, currentstatus, tenant orRFSverified.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.change.org/p/say-no-to-the-data-center-on-euharlee-rd",
              "host": "change.org",
              "date": "2025-11-17",
              "published": "2025-11-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cartersville · Bartow · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    },
    {
      "id": "aws-butts-county-ga",
      "state": "ga",
      "kind": "facility",
      "name": "AWS Butts County Data Center Campus",
      "group": "proposed",
      "status": "Project listed for development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Butts"
      ],
      "city": "Jackson",
      "address": "",
      "who": "Amazon",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AWS combined Georgia investment statement. Do not assign full two-county investment or all550jobs to Butts County alone. Amazon statewide workforce, solar household-equivalents and GDP are other scopes. Announcement is planned investment, not actual expenditure or per-campus IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-01-07",
          "Amazon published its Georgia infrastructure investment announcement January 7, 2025 and explicitly named Butts County. This is the source announcement day, not a physical construction or opening date."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure",
          "host": "aboutamazon.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.28715,
        "lng": -83.95669,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "AWS combined Georgia investment statement",
          "fields": {
            "investment_scope": "Butts and Douglas counties, Georgia, combined",
            "planned_investment_usd": 11000000000,
            "expected_direct_jobs_min_inclusive": 550
          },
          "notes": [
            "Do not assign full two-county investment or all550jobs to Butts County alone. Amazon statewide workforce, solar household-equivalents and GDP are other scopes. Announcement is planned investment, not actual expenditure or per-campus IT MW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure",
              "host": "aboutamazon.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 04, October 22, 2026",
          "scope": "Amazon identifies AWS as developing data center infrastructure in Butts County. Developer is the provider brand role for the existing county research context. The announcement does not independently identify a parcel, a specific building, a legal ownership entity or current construction or operation. No announced investment or employment figure is promoted.",
          "fields": {
            "company_association": {
              "name": "Amazon",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Amazon identifies AWS as developing data center infrastructure in Butts County. Developer is the provider brand role for the existing county research context. The announcement does not independently identify a parcel, a specific building, a legal ownership entity or current construction or operation. No announced investment or employment figure is promoted."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Amazon identifies AWS as developing data center infrastructure in Butts County. Developer is the provider brand role for the existing county research context. The announcement does not independently identify a parcel, a specific building, a legal ownership entity or current construction or operation. No announced investment or employment figure is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure",
              "host": "www.aboutamazon.com",
              "published": "2025-01-07",
              "date": "2025-01-07",
              "checked": "2026-10-22",
              "label": "First party named community development or operation statement"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 37",
          "scope": "Amazon original January 7, 2025 announcement explicitly names Butts County among the selected Georgia locations for new AWS data centers. Project listed for development is limited to that named investment plan. Its statewide investment and job forecasts and existing Amazon logistics facilities do not establish current construction, commissioned computing, delivered jobs or an exact campus opening. No statewide quantity is assigned to this component.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_butts_county_development_announcement",
              "scope": "Amazon original January 7, 2025 announcement explicitly names Butts County among the selected Georgia locations for new AWS data centers. Project listed for development is limited to that named investment plan. Its statewide investment and job forecasts and existing Amazon logistics facilities do not establish current construction, commissioned computing, delivered jobs or an exact campus opening. No statewide quantity is assigned to this component."
            }
          },
          "notes": [
            "Amazon original January 7, 2025 announcement explicitly names Butts County among the selected Georgia locations for new AWS data centers. Project listed for development is limited to that named investment plan. Its statewide investment and job forecasts and existing Amazon logistics facilities do not establish current construction, commissioned computing, delivered jobs or an exact campus opening. No statewide quantity is assigned to this component.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure",
              "host": "www.aboutamazon.com",
              "published": "2025-01-07",
              "date": "2025-01-07",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Jackson · Butts · Source context reviewed",
      "status_scope": "Amazon original January 7, 2025 announcement explicitly names Butts County among the selected Georgia locations for new AWS data centers. Project listed for development is limited to that named investment plan. Its statewide investment and job forecasts and existing Amazon logistics facilities do not establish current construction, commissioned computing, delivered jobs or an exact campus opening. No statewide quantity is assigned to this component.",
      "event_evidence": [
        {
          "date": "2025-01-07",
          "text": "Amazon published its Georgia infrastructure investment announcement January 7, 2025 and explicitly named Butts County. This is the source announcement day, not a physical construction or opening date.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure",
              "host": "www.aboutamazon.com",
              "published": "2025-01-07",
              "date": "2025-01-07",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13035"
      }
    },
    {
      "id": "mmm-acquisitions-bells-ferry-marietta-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Bells Ferry Road Data Center (MMM Acquisitions)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cobb"
      ],
      "city": "Marietta",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The four-acre substation is within the campus, not extra site area. Staff raised unresolved variance concerns; plan approval is not a construction permit or commissioning. The readable article does not establish MMM Acquisitions as operator, confirmed power demand or actual tax receipts. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wsbtv.com/news/local/cobb-county/marietta-city-council-approves-plan-31-acre-data-center/UIDXM4QEJ5EMDGAQMPLRENRRF4/",
          "host": "wsbtv.com",
          "date": "2025-06-17",
          "published": "2025-06-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.95307,
        "lng": -84.58914,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WSB-TV reports council plan approval for a 31-acre Bells Ferry Road data-center proposal with two buildings, a substation and a stormwater pond.",
            "independently_verified_current_operating_status": null,
            "operator_or_site_identity_needs_crosswalk": true
          },
          "notes": [
            "The four-acre substation is within the campus, not extra site area. Staff raised unresolved variance concerns; plan approval is not a construction permit or commissioning. The readable article does not establish MMM Acquisitions as operator, confirmed power demand or actual tax receipts.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wsbtv.com/news/local/cobb-county/marietta-city-council-approves-plan-31-acre-data-center/UIDXM4QEJ5EMDGAQMPLRENRRF4/",
              "host": "wsbtv.com",
              "date": "2025-06-17",
              "published": "2025-06-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Marietta · Cobb · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13067"
      }
    },
    {
      "id": "bridgeport-data-center-campus-coweta-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Bridgeport Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Coweta"
      ],
      "city": "Moreland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No power estimate in DRI; 500000 gallons daily supply and 100000 wastewater are separate, not 600000 consumption. Three to five billion USD is estimated buildout value. Project Peach approval year conflicts with another report; no preferred year adopted. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/article_55ee204a-0e00-43e4-9ad1-78c92b679d06.html",
          "host": "times-herald.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.35356,
        "lng": -84.76379,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "Coweta roundup describes Bridgeport DRI and previously approved rezoning, with buildout value and water/sewage forecasts.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "No power estimate in DRI; 500000 gallons daily supply and 100000 wastewater are separate, not 600000 consumption. Three to five billion USD is estimated buildout value. Project Peach approval year conflicts with another report; no preferred year adopted.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/article_55ee204a-0e00-43e4-9ad1-78c92b679d06.html",
              "host": "times-herald.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Moreland · Coweta · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13077"
      }
    },
    {
      "id": "4am-development-burkhalter-road-statesboro-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Burkhalter Road Data Center (4AM Development)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bulloch"
      ],
      "city": "Statesboro",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Statesboro rezoning vote, remaining special-use hurdle and forecast scopes. Rezoning not final special-use/buildingpermit; no selectedoperatorasofreport.1.2B10yearmodelnotactualspending orlandpurchase.300gpdrestrooms and30to100gpdmakeup differ from10000galloninitialfill and1000gpdpeak. Noise50dBroughsummarynotadoptedprecisepermitlimit. No numeric criticalITMW or currentoperation. Public opposition attendance not countyopinionpoll. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.statesboroherald.com/local/statesboro-mayor-and-council-approve-rezoning-for-burkhalter-data-center-by-3-2-vote/",
          "host": "statesboroherald.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.39701,
        "lng": -81.74277,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Statesboro rezoning vote, remaining special-use hurdle and forecast scopes",
          "fields": {
            "applicant": "4AM Development LLC",
            "location": "BurkhalterRoad, Statesboro, Georgia",
            "reported_rezoning_approval_date": "2026-08-18",
            "reported_vote": "3-2includingmayortiebreaker",
            "proposed_site_acres_approx": 27,
            "proposed_stories": 2,
            "proposed_area_sqft_approx": 230000,
            "reported_status": "rezoning approved; separate special-use permit still required",
            "developer_funded_model10year_investment_usd": 1200000000,
            "developer_model_fulltime_jobs_approx": 12
          },
          "notes": [
            "Rezoning not final special-use/buildingpermit; no selectedoperatorasofreport.1.2B10yearmodelnotactualspending orlandpurchase.300gpdrestrooms and30to100gpdmakeup differ from10000galloninitialfill and1000gpdpeak. Noise50dBroughsummarynotadoptedprecisepermitlimit. No numeric criticalITMW or currentoperation. Public opposition attendance not countyopinionpoll.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.statesboroherald.com/local/statesboro-mayor-and-council-approve-rezoning-for-burkhalter-data-center-by-3-2-vote/",
              "host": "statesboroherald.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Statesboro · Bulloch · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13031"
      }
    },
    {
      "id": "cleanspark-college-park-ga",
      "state": "ga",
      "kind": "facility",
      "name": "CleanSpark College Park Bitcoin Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "College Park",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Historical transaction agreement, supply expansion and mining draw are different scopes; April2021 completion forecast is not actual completion. No current site capacity adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
          "host": "s21.q4cdn.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-agrees-to-acquire-bitcoin-miner-atl-data-center-301190492.html",
          "host": "prnewswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312525297510/clsk-20250930.htm",
          "host": "www.sec.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "CleanSpark reviewed source"
        },
        {
          "url": "https://d18rn0p25nwr6d.cloudfront.net/CIK-0000827876/4257c34e-6b9d-421e-a7b9-99edd4c85280.html",
          "host": "d18rn0p25nwr6d.cloudfront.net",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Original fiscal 2023 filing names the College Park computing property and its numeric street"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2380+Godby+Road%2C+College+Park%2C+GA+30349&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete unique literal 2380 Godby Road street range inside Fulton County"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.47260430779521%2C33.611284021427544%2C-84.4607385006948%2C33.62116544435245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -84.466671,
        "lat": 33.616225,
        "precision": "address",
        "basis": "Original CleanSpark filed property evidence identifies the College Park computing property at 2380 Godby Road, College Park, GA 30349. One complete unique literal Census street range gives a calculated reference inside Fulton County. Historical acquisition and fiscal filing dates do not establish current computing operation. Existing status group unknown remains unchanged. This is a street reference only, without a surveyed roof, legal title or complete campus. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-primary-review-round17-2026-10-14.json",
          "scope": "Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.",
          "fields": {
            "annual_report_property_use": "Company-owned immersion bitcoin mining property in CollegePark.",
            "annual_report_period": "2025-09-30",
            "historical_announcement_date": "2020-12-10",
            "historical_atl_purchase_agreement_up_to_usd_stock": 19400000,
            "historical_power": "20MW facility supply with planned50MW expansion; then9.6MW mining capacity use described separately."
          },
          "notes": [
            "Historical transaction agreement, supply expansion and mining draw are different scopes; April2021 completion forecast is not actual completion. No current site capacity adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
              "host": "s21.q4cdn.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-agrees-to-acquire-bitcoin-miner-atl-data-center-301190492.html",
              "host": "prnewswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_property_context": {
              "issuer": "CleanSpark",
              "reporting_period": "2025-09-30",
              "source_name": "College Park, Georgia",
              "scope": "Named immersion-mining property in Item 2; no new address or present-day operating certification."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312525297510/clsk-20250930.htm",
              "host": "www.sec.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "CleanSpark reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 61, 2026-10-24",
          "scope": "Explicit filed computing street and current calculated Census street range only. Existing status group unknown remains unchanged. No current computing operation, roof, legal title, complete campus, technical figure or physical milestone is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -84.466671,
                "lat": 33.616225,
                "precision": "address",
                "basis": "Original CleanSpark filed property evidence identifies the College Park computing property at 2380 Godby Road, College Park, GA 30349. One complete unique literal Census street range gives a calculated reference inside Fulton County. Historical acquisition and fiscal filing dates do not establish current computing operation. Existing status group unknown remains unchanged. This is a street reference only, without a surveyed roof, legal title or complete campus. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "2380 Godby Road, College Park, GA 30349",
              "county_fips": [
                "13121"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Explicit filed computing street and current calculated Census street range only. Existing status group unknown remains unchanged. No current computing operation, roof, legal title, complete campus, technical figure or physical milestone is certified.",
            "The inherited general area coordinate was not a reviewed computing street destination. The original fiscal 2023 filed property section expressly identifies 2380 Godby Road as the College Park computing property, independently distinct from Norcross, Washington, Carlsbad, Henderson and Woods Cross properties. The original fiscal 2025 annual report retains the College Park property context without publishing a replacement street. One complete unique literal Census response is inside retained Fulton County and is 4519.5 metres from the inherited point. This corrects the reference only. No physical relocation, current operation, roof, entire campus, title or source event date is inferred.",
            "The calculated street reference sits on the east to west road through the image center. Industrial and commercial roofs, paved service areas and trees appear nearby, with residential forms to the east and a large highway to the north. No roof, neighboring home, legal parcel or entire campus is selected. Acquisition date is unknown."
          ],
          "sources": [
            {
              "url": "https://d18rn0p25nwr6d.cloudfront.net/CIK-0000827876/4257c34e-6b9d-421e-a7b9-99edd4c85280.html",
              "host": "d18rn0p25nwr6d.cloudfront.net",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original fiscal 2023 filing names the College Park computing property and its numeric street"
            },
            {
              "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
              "host": "s21.q4cdn.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original fiscal 2025 annual report retains the College Park property context without a new street"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2380+Godby+Road%2C+College+Park%2C+GA+30349&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete unique literal 2380 Godby Road street range inside Fulton County"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.47260430779521%2C33.611284021427544%2C-84.4607385006948%2C33.62116544435245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated street reference, not a roof or complete campus",
      "summary": "College Park · Fulton · Source context reviewed"
    },
    {
      "id": "cleanspark-dalton-ga",
      "state": "ga",
      "kind": "facility",
      "name": "CleanSpark Dalton Bitcoin Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Whitfield"
      ],
      "city": "Dalton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Dalton4 energization mentioned as last week in Sept11,2024 release; exact day unknown and distinct from Dalton3. Do not sum subproject figures into current city operating load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.. MonthlyMWh are energy, not MW or criticalIT. No source records available forAbutmentRoad. Caption1850Abutment conflicts with listing850; do not resolve streetnumber silently. USD9.3millionpurchase plusUSD7millionlaterproject not automaticallycurrentcampuscapex; threeoperationsnotthreeidenticalAIbuildings.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
          "host": "s21.q4cdn.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html",
          "host": "prnewswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/",
          "host": "web.archive.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.8049,
        "lng": -84.96743,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-primary-review-round17-2026-10-14.json",
          "scope": "Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.",
          "fields": {
            "dalton3_agreement_date": "2024-02-02",
            "dalton3_acquisition_period": "2024-02",
            "dalton3_reported_purchase_price_including_costs_usd": 3569000,
            "parcel_scope": "Approximately2acres Dalton3 subproject, WhitfieldCounty, not all Dalton campuses."
          },
          "notes": [
            "Dalton4 energization mentioned as last week in Sept11,2024 release; exact day unknown and distinct from Dalton3. Do not sum subproject figures into current city operating load.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
              "host": "s21.q4cdn.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html",
              "host": "prnewswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.",
          "fields": {
            "reported_context": "Local reporting separates CleanSpark AbutmentRoad and EnterpriseDrive operations. Two purchasedJune2023forUSD9.3million; third announced2024USD7million. DaltonUtilities records reportedly averaged16770MWh/month at1022Enterprise and10290at952Enterprise over prior12months.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "MonthlyMWh are energy, not MW or criticalIT. No source records available forAbutmentRoad. Caption1850Abutment conflicts with listing850; do not resolve streetnumber silently. USD9.3millionpurchase plusUSD7millionlaterproject not automaticallycurrentcampuscapex; threeoperationsnotthreeidenticalAIbuildings.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/",
              "host": "web.archive.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Dalton · Whitfield · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13313"
      }
    },
    {
      "id": "cleanspark-lafayette-ga",
      "state": "ga",
      "kind": "facility",
      "name": "CleanSpark LaFayette Bitcoin Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Walker"
      ],
      "city": "LaFayette",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Agreement day not independently specified closing day. Acquisition accounting is not new-campus construction spending, IT load or public incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
          "host": "s21.q4cdn.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.73543,
        "lng": -85.30055,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-primary-review-round17-2026-10-14.json",
          "scope": "Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.",
          "fields": {
            "asset_purchase_agreement_date": "2025-05-13",
            "seller": "MGT Capital Investments",
            "reported_completed_asset_acquisition_usd": 1413000,
            "cash_consideration_usd": 1350000,
            "transaction_cost_usd": 63000
          },
          "notes": [
            "Agreement day not independently specified closing day. Acquisition accounting is not new-campus construction spending, IT load or public incentive.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
              "host": "s21.q4cdn.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "LaFayette · Walker · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13295"
      }
    },
    {
      "id": "cleanspark-norcross-ga",
      "state": "ga",
      "kind": "facility",
      "name": "CleanSpark Norcross Bitcoin Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Gwinnett"
      ],
      "city": "Norcross",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Miner collateral location and subsidiary listing do not independently establish current operating status, street address, commissioning or whole-site load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
          "host": "s21.q4cdn.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://d18rn0p25nwr6d.cloudfront.net/CIK-0000827876/4257c34e-6b9d-421e-a7b9-99edd4c85280.html",
          "host": "d18rn0p25nwr6d.cloudfront.net",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Original fiscal2023filed Item2 computing property paragraph, historical source"
        },
        {
          "url": "https://gis3.gwinnettcounty.com/mapvis/rest/services/GISDataBrowser/GC_Parcel/MapServer/0/query?where=ADDRNUM%3D%275295%27+AND+UPPER%28FULLNAME%29+LIKE+%27%25BROOK%25HOLLOW%25%27&outFields=OBJECTID%2CFULLADDR%2CPIN%2CCOMMONPIN%2CFULLNAME%2CMUNICIPALITY%2CSTATE%2CZIP5%2CPOINTTYPE%2CSTATUS%2CDATA_SOURCE&returnGeometry=true&outSR=4326&f=json&resultRecordCount=20",
          "host": "gis3.gwinnettcounty.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete unique official address identity, point coordinates excluded"
        },
        {
          "url": "https://gis3.gwinnettcounty.com/mapvis/rest/services/GISDataBrowser/GC_Parcel/MapServer/6/query?where=PIN%3D%276213+007%27&outFields=OBJECTID%2CPIN%2CLOCADDR%2CLOCCITY%2CLOCSTATE%2CLOCZIP%2CDEEDEDACREAGE%2CCALCULATEDACREAGE&returnGeometry=true&outSR=4326&f=json&resultRecordCount=10",
          "host": "gis3.gwinnettcounty.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete exact parcel6213 007 polygon and literal county situs"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5295+Brook+Hollow+Parkway%2C+Norcross%2C+Georgia+30071&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Two exact complete literal request versions return502, identical response bytes retained without adopted coordinates"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.19155450864277%2C33.92271928853755%2C-84.17964549135722%2C33.932600711462456&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -84.1856,
        "lat": 33.92766,
        "precision": "approximate",
        "basis": "Approximate calculated center of Gwinnett County reference parcel 6213 007, linked to the filed computing property at 5295 Brook Hollow Parkway in Norcross, Georgia. This reference describes one source parcel and does not select a roof, certify legal title or establish the complete campus. The retained status remains unknown. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-primary-review-round17-2026-10-14.json",
          "scope": "Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.",
          "fields": {
            "historical_named_site_evidence": "Annual report financing note locates pledged miners at CollegePark and Norcross.",
            "site_it_mw": null
          },
          "notes": [
            "Miner collateral location and subsidiary listing do not independently establish current operating status, street address, commissioning or whole-site load.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
              "host": "s21.q4cdn.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 63, 2026-10-24",
          "scope": "Original issuer computing property identity and approximate center of one complete official county source parcel only. Unknown status and every other fact remain unchanged. No surveyed roof, legal title, tenant, source role, technical quantity or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -84.1856,
                "lat": 33.92766,
                "precision": "approximate",
                "basis": "Approximate calculated center of Gwinnett County reference parcel 6213 007, linked to the filed computing property at 5295 Brook Hollow Parkway in Norcross, Georgia. This reference describes one source parcel and does not select a roof, certify legal title or establish the complete campus. The retained status remains unknown. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": {
                "identifier": "6213 007",
                "identifier_field": "PIN",
                "objectid": 739113,
                "agency": "Gwinnett County Georgia GIS",
                "reference_method": "calculated_polygon_centroid",
                "not_survey_quality": true,
                "legal_title_verified": false,
                "independent_building_identity": false,
                "full_campus_verified": false,
                "operator_ownership_verified": false,
                "geometry_acquisition_date": null
              },
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "Original issuer computing property identity and approximate center of one complete official county source parcel only. Unknown status and every other fact remain unchanged. No surveyed roof, legal title, tenant, source role, technical quantity or complete campus is certified.",
            "The inherited general area coordinate was not a reviewed computing property destination. The original issuer computing property paragraph and exact official county address and complete parcel joins support this bounded approximate reference inside retained Gwinnett County. The measured correction is 2981.9 metres. Both exact complete literal Census transport failures remain retained. The county building address point is not adopted. All predecessor coordinates and source versions remain in history. This is a reference correction without physical relocation, a new computing event, selected roof, legal title, current operation or complete campus certification.",
            "Mixed wooded and commercial setting with several separate buildings, parking areas, access roads and a divided highway to the southeast. The source image is contextual only. No exact roof, current computing operation or complete campus boundary is established; image acquisition date is unknown."
          ],
          "sources": [
            {
              "url": "https://d18rn0p25nwr6d.cloudfront.net/CIK-0000827876/4257c34e-6b9d-421e-a7b9-99edd4c85280.html",
              "host": "d18rn0p25nwr6d.cloudfront.net",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original fiscal2023filed Item2 computing property paragraph, historical source"
            },
            {
              "url": "https://gis3.gwinnettcounty.com/mapvis/rest/services/GISDataBrowser/GC_Parcel/MapServer/0/query?where=ADDRNUM%3D%275295%27+AND+UPPER%28FULLNAME%29+LIKE+%27%25BROOK%25HOLLOW%25%27&outFields=OBJECTID%2CFULLADDR%2CPIN%2CCOMMONPIN%2CFULLNAME%2CMUNICIPALITY%2CSTATE%2CZIP5%2CPOINTTYPE%2CSTATUS%2CDATA_SOURCE&returnGeometry=true&outSR=4326&f=json&resultRecordCount=20",
              "host": "gis3.gwinnettcounty.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete unique official address identity, point coordinates excluded"
            },
            {
              "url": "https://gis3.gwinnettcounty.com/mapvis/rest/services/GISDataBrowser/GC_Parcel/MapServer/6/query?where=PIN%3D%276213+007%27&outFields=OBJECTID%2CPIN%2CLOCADDR%2CLOCCITY%2CLOCSTATE%2CLOCZIP%2CDEEDEDACREAGE%2CCALCULATEDACREAGE&returnGeometry=true&outSR=4326&f=json&resultRecordCount=10",
              "host": "gis3.gwinnettcounty.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete exact parcel6213 007 polygon and literal county situs"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5295+Brook+Hollow+Parkway%2C+Norcross%2C+Georgia+30071&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Two exact complete literal request versions return502, identical response bytes retained without adopted coordinates"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.19155450864277%2C33.92271928853755%2C-84.17964549135722%2C33.932600711462456&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate source parcel reference, not a roof or complete campus",
      "summary": "Norcross · Gwinnett · Source context reviewed"
    },
    {
      "id": "cleanspark-sandersville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "CleanSpark Sandersville Bitcoin Mining Facility",
      "group": "operating",
      "status": "Operator-reported mining operation",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Washington"
      ],
      "city": "Sandersville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Lease revenues are not capex, subsidies or an awarded tax incentive. Actual executed lease and ready-for-service day not inspected. Existing bitcoin campus and proposed tenant infrastructure are different phases; no new current AI load inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html",
          "host": "prnewswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-reports-third-fiscal-quarter-2026-results-302845377.html",
          "host": "prnewswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html",
          "host": "prnewswire.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm",
          "host": "www.sec.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        }
      ],
      "loc": {
        "lat": 32.96963,
        "lng": -82.7959,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-primary-review-round17-2026-10-14.json",
          "scope": "Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.",
          "fields": {
            "lease_announcement": "2026-07-14",
            "initial_lease_years": 20,
            "optional_extensions_years": [
              5,
              5
            ],
            "expected_initial_term_revenue_usd": 6600000000,
            "expected_revenue_if_both_extensions_usd": 11600000000,
            "initial_operations_launch_year": 2022,
            "tenant": "Confidential global technology company, name unverified",
            "september_finance_update": "October9 issuer release reports Sandersville fully funded following notes financing.",
            "landlord_cost_scope": "Estimated10M to12M per criticalIT MW, not a disclosed total site cost."
          },
          "notes": [
            "Lease revenues are not capex, subsidies or an awarded tax incentive. Actual executed lease and ready-for-service day not inspected. Existing bitcoin campus and proposed tenant infrastructure are different phases; no new current AI load inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html",
              "host": "prnewswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-reports-third-fiscal-quarter-2026-results-302845377.html",
              "host": "prnewswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html",
              "host": "prnewswire.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "next-status-2026-10-19",
          "scope": "In its quarterly filing for June 30, 2026, CleanSpark reports continued bitcoin mining at its existing Sandersville site while describing a separate future AI campus on adjacent land.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_mining_operation",
              "scope": "In its quarterly filing for June 30, 2026, CleanSpark reports continued bitcoin mining at its existing Sandersville site while describing a separate future AI campus on adjacent land."
            }
          },
          "notes": [
            "The quarterly filing distinguishes the existing mining site from the new AI development. A future lease commencement and planned diversion of power are not current AI operation, closure or a completed conversion. The filing's time scope remains explicit; no physical event date or technical quantity is adopted."
          ],
          "sources": [
            {
              "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526338382/clsk-20260630.htm",
              "host": "www.sec.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Sandersville · Washington · Source context reviewed",
      "status_scope": "In its quarterly filing for June 30, 2026, CleanSpark reports continued bitcoin mining at its existing Sandersville site while describing a separate future AI campus on adjacent land.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13303"
      }
    },
    {
      "id": "cleanspark-twin-city-ga",
      "state": "ga",
      "kind": "facility",
      "name": "CleanSpark Twin City Bitcoin Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Emanuel"
      ],
      "city": "Twin City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Table net5.49M differs from gross5.9M by assumed0.41M lease liability; do not add these accounting views. Agreement day not independently established closing day. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
          "host": "s21.q4cdn.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.58991,
        "lng": -82.3016,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-primary-review-round17-2026-10-14.json",
          "scope": "Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.",
          "fields": {
            "asset_purchase_agreement_date": "2025-01-21",
            "seller": "Apex Data Centers",
            "reported_combined_purchase_price_usd": 5900000,
            "cash_consideration_usd": 5400000,
            "transaction_cost_usd": 90000,
            "assumed_lease_liability_usd": 410000
          },
          "notes": [
            "Table net5.49M differs from gross5.9M by assumed0.41M lease liability; do not add these accounting views. Agreement day not independently established closing day.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf",
              "host": "s21.q4cdn.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Twin City · Emanuel · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13107"
      }
    },
    {
      "id": "atlas-coosa-project-gracie-floyd-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Coosa Data Center (Project Gracie)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Floyd"
      ],
      "city": "Rome",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Atlas Gracie versus Sassy proposal identity. Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.26318,
        "lng": -85.21399,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Atlas Gracie versus Sassy proposal identity",
          "fields": {
            "developer": "Atlas Development",
            "separate_proposals": [
              {
                "name": "Project Gracie",
                "locality": "Coosa, FloydCounty, Georgia",
                "proposed_acres": 200,
                "proposed_area_sqft": 2400000,
                "proposed_buildings": 7,
                "target_completion_month": "2032-12",
                "reported_planning_recommendation": "4-3 in favor; CountyBoard decision still required"
              },
              {
                "name": "Project Sassy",
                "locality": "Rome, Georgia",
                "proposed_initial_acres": 178,
                "sought_additional_acres": 15
              }
            ]
          },
          "notes": [
            "Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Rome · Floyd · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13115"
      }
    },
    {
      "id": "coresite-at1-atlanta-ga-ga",
      "state": "ga",
      "kind": "facility",
      "name": "CoreSite AT1 - Atlanta, GA",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Colocation",
      "counties": [
        "Fulton"
      ],
      "city": "Atlanta",
      "address": "55 Marietta St. NW, Atlanta, GA 30303",
      "who": "CoreSite",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.coresite.com/data-center/at1-atlanta-ga",
          "host": "coresite.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.coresite.com/data-center-locations/atlanta",
          "host": "www.coresite.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "CoreSite official location and specifications"
        },
        {
          "url": "https://www.coresite.com/data-centers/locations",
          "host": "www.coresite.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "CoreSite official location and specifications"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=55+Marietta+St.+NW%2C+Atlanta%2C+GA+30303&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        }
      ],
      "loc": {
        "lat": 33.755476855094,
        "lng": -84.391095443797,
        "precision": "address",
        "basis": "Published CoreSite facility address matched to one Census street range within the existing record county. Calculated street reference, not a surveyed parcel, roof, suite or property ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "operator_site_code": "AT1",
            "published_address": "55 Marietta St NW, Atlanta, GA30303",
            "operator_labeled_area_sqft_lower_bound": 62000,
            "area_qualifier": "plus"
          },
          "notes": [
            "Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.coresite.com/data-center/at1-atlanta-ga",
              "host": "coresite.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-CoreSite-Locations-20261016",
          "scope": "Scoped CoreSite facility-code service/address review; original locations, jurisdiction, physical identity, dates and legacy figures remain unverified or separately sourced.",
          "fields": {
            "operator_facility_code": "AT1",
            "record_association_scope": "Existing CoreSite AT1 - Atlanta, GA is associated by its unique CoreSite facility code, state and published locality with the primary operator page. A code/service context is not a separately verified physical building, campus boundary, legal owner or parcel. The inherited point and jurisdiction remain unchanged.",
            "published_location_address": {
              "text": "55 Marietta St. NW, Atlanta, GA 30303",
              "scope": "Postal facility address exactly as published. No missing postal code is supplied, no suite/building allocation is inferred and no point or jurisdiction is moved."
            },
            "current_status_basis": "Current CoreSite AT1 page offers named colocation and interconnection services at this location. This supports an operator-listed service component, not physical inspection, live availability, every expansion being complete or measured uptime.",
            "published_technical_specs": {
              "POWER AVAILABILITY": "AC and DC",
              "UPS/PDU/RPP": "N, 2N redundancy"
            },
            "technical_scope": "Operator-published electrical/redundancy and staffing/service specifications with no published technical as-of date. AC/DC describes supply type, not MW; formulas are not installed capacity or energy use. A service-level agreement is not independently observed uptime. Future DE3 design specifications do not establish operation."
          },
          "notes": [
            "Partial field review only. Existing name/ID, point, precision, city/counties, opening field, legacy MW/investment/jobs and prior source history are preserved.",
            "Operator brand is not a legal ownership finding. Certification and SLA marketing are not independent inspections or achieved uptime."
          ],
          "sources": [
            {
              "url": "https://www.coresite.com/data-center/at1-atlanta-ga",
              "host": "www.coresite.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "CoreSite official location and specifications"
            },
            {
              "url": "https://www.coresite.com/data-center-locations/atlanta",
              "host": "www.coresite.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "CoreSite official location and specifications"
            },
            {
              "url": "https://www.coresite.com/data-centers/locations",
              "host": "www.coresite.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "CoreSite official location and specifications"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 1, October 22, 2026",
          "scope": "Published operator street reference only. No status, date, quantity, legal jurisdiction, title, surveyed parcel, whole campus or distinct building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 33.755476855094,
                "lng": -84.391095443797,
                "precision": "address",
                "basis": "Published CoreSite facility address matched to one Census street range within the existing record county. Calculated street reference, not a surveyed parcel, roof, suite or property ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "55 Marietta St. NW, Atlanta, GA 30303",
              "county_fips": [
                "13121"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The visible facility heading and street address identify this existing operator record. Corporate headquarters and embedded template coordinates are not adopted.",
            "Census calculates coordinates along address ranges. The county response and retained Census county display geometry agree. No aerial appearance, present operating stage, legal title or physical site census is certified."
          ],
          "sources": [
            {
              "url": "https://www.coresite.com/data-center/at1-atlanta-ga",
              "host": "www.coresite.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "CoreSite facility page and visible street address"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=55+Marietta+St.+NW%2C+Atlanta%2C+GA+30303&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check39, October23,2026",
          "scope": "CoreSite identifies the same named AT1 facility and service street in the main body of its first party facility page and advertises its own colocation or interconnection services there. The operator per source relationship records the CoreSite provider brand. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Connectivity to another facility, hosted cloud on ramps and a carrier hotel name do not identify the owner or operator of every space in a building, a tenant or a parent legal entity. Advertised space, power, performance and service commitments are not newly verified quantities. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown.",
          "fields": {
            "company_association": {
              "name": "CoreSite",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "CoreSite identifies the same named AT1 facility and service street in the main body of its first party facility page and advertises its own colocation or interconnection services there. The operator per source relationship records the CoreSite provider brand. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Connectivity to another facility, hosted cloud on ramps and a carrier hotel name do not identify the owner or operator of every space in a building, a tenant or a parent legal entity. Advertised space, power, performance and service commitments are not newly verified quantities. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."
            },
            "provider_role": "operator"
          },
          "notes": [
            "CoreSite identifies the same named AT1 facility and service street in the main body of its first party facility page and advertises its own colocation or interconnection services there. The operator per source relationship records the CoreSite provider brand. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Connectivity to another facility, hosted cloud on ramps and a carrier hotel name do not identify the owner or operator of every space in a building, a tenant or a parent legal entity. Advertised space, power, performance and service commitments are not newly verified quantities. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."
          ],
          "sources": [
            {
              "url": "https://www.coresite.com/data-center/at1-atlanta-ga",
              "host": "www.coresite.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Atlanta · Fulton · Source context reviewed",
      "status_scope": "Current CoreSite AT1 page offers named colocation and interconnection services at this location. This supports an operator-listed service component, not physical inspection, live availability, every expansion being complete or measured uptime."
    },
    {
      "id": "coresite-at2-marietta-data-center-ga",
      "state": "ga",
      "kind": "facility",
      "name": "CoreSite AT2 - Marietta Data Center",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Colocation",
      "counties": [
        "Cobb"
      ],
      "city": "Marietta",
      "address": "1130 Powers Ferry Place, Marietta, GA 30067",
      "who": "CoreSite",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.coresite.com/data-center/at2-atlanta-ga",
          "host": "coresite.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.coresite.com/data-center-locations/atlanta",
          "host": "www.coresite.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "CoreSite official location and specifications"
        },
        {
          "url": "https://www.coresite.com/data-centers/locations",
          "host": "www.coresite.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "CoreSite official location and specifications"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1130+Powers+Ferry+Place%2C+Marietta%2C+GA+30067&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        }
      ],
      "loc": {
        "lat": 33.924022533306,
        "lng": -84.482377414438,
        "precision": "address",
        "basis": "Published CoreSite facility address matched to one Census street range within the existing record county. Calculated street reference, not a surveyed parcel, roof, suite or property ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "operator_site_code": "AT2",
            "published_address": "1130 Powers Ferry Place, Marietta, GA30067",
            "operator_labeled_area_sqft_lower_bound": 67000,
            "area_qualifier": "plus"
          },
          "notes": [
            "Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.coresite.com/data-center/at2-atlanta-ga",
              "host": "coresite.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-CoreSite-Locations-20261016",
          "scope": "Scoped CoreSite facility-code service/address review; original locations, jurisdiction, physical identity, dates and legacy figures remain unverified or separately sourced.",
          "fields": {
            "operator_facility_code": "AT2",
            "record_association_scope": "Existing CoreSite AT2 - Marietta Data Center is associated by its unique CoreSite facility code, state and published locality with the primary operator page. A code/service context is not a separately verified physical building, campus boundary, legal owner or parcel. The inherited point and jurisdiction remain unchanged.",
            "published_location_address": {
              "text": "1130 Powers Ferry Place, Marietta, GA 30067",
              "scope": "Postal facility address exactly as published. No missing postal code is supplied, no suite/building allocation is inferred and no point or jurisdiction is moved."
            },
            "current_status_basis": "Current CoreSite AT2 page offers named colocation and interconnection services at this location. This supports an operator-listed service component, not physical inspection, live availability, every expansion being complete or measured uptime.",
            "published_technical_specs": {
              "POWER AVAILABILITY": "AC",
              "UPS/PDU/RPP": "N+1, 2N redundancy",
              "OPERATIONS": "24x7x365 remote hands"
            },
            "technical_scope": "Operator-published electrical/redundancy and staffing/service specifications with no published technical as-of date. AC/DC describes supply type, not MW; formulas are not installed capacity or energy use. A service-level agreement is not independently observed uptime. Future DE3 design specifications do not establish operation."
          },
          "notes": [
            "Partial field review only. Existing name/ID, point, precision, city/counties, opening field, legacy MW/investment/jobs and prior source history are preserved.",
            "Operator brand is not a legal ownership finding. Certification and SLA marketing are not independent inspections or achieved uptime."
          ],
          "sources": [
            {
              "url": "https://www.coresite.com/data-center/at2-atlanta-ga",
              "host": "www.coresite.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "CoreSite official location and specifications"
            },
            {
              "url": "https://www.coresite.com/data-center-locations/atlanta",
              "host": "www.coresite.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "CoreSite official location and specifications"
            },
            {
              "url": "https://www.coresite.com/data-centers/locations",
              "host": "www.coresite.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "CoreSite official location and specifications"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 1, October 22, 2026",
          "scope": "Published operator street reference only. No status, date, quantity, legal jurisdiction, title, surveyed parcel, whole campus or distinct building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 33.924022533306,
                "lng": -84.482377414438,
                "precision": "address",
                "basis": "Published CoreSite facility address matched to one Census street range within the existing record county. Calculated street reference, not a surveyed parcel, roof, suite or property ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1130 Powers Ferry Place, Marietta, GA 30067",
              "county_fips": [
                "13067"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The visible facility heading and street address identify this existing operator record. Corporate headquarters and embedded template coordinates are not adopted.",
            "Census calculates coordinates along address ranges. The county response and retained Census county display geometry agree. No aerial appearance, present operating stage, legal title or physical site census is certified."
          ],
          "sources": [
            {
              "url": "https://www.coresite.com/data-center/at2-atlanta-ga",
              "host": "www.coresite.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "CoreSite facility page and visible street address"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1130+Powers+Ferry+Place%2C+Marietta%2C+GA+30067&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check39, October23,2026",
          "scope": "CoreSite identifies the same named AT2 facility and service street in the main body of its first party facility page and advertises its own colocation or interconnection services there. The operator per source relationship records the CoreSite provider brand. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Connectivity to another facility, hosted cloud on ramps and a carrier hotel name do not identify the owner or operator of every space in a building, a tenant or a parent legal entity. Advertised space, power, performance and service commitments are not newly verified quantities. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown. The original title and service street name Marietta, while the URL uses Atlanta. The metro name does not move the facility into Atlanta municipality.",
          "fields": {
            "company_association": {
              "name": "CoreSite",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "CoreSite identifies the same named AT2 facility and service street in the main body of its first party facility page and advertises its own colocation or interconnection services there. The operator per source relationship records the CoreSite provider brand. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Connectivity to another facility, hosted cloud on ramps and a carrier hotel name do not identify the owner or operator of every space in a building, a tenant or a parent legal entity. Advertised space, power, performance and service commitments are not newly verified quantities. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown. The original title and service street name Marietta, while the URL uses Atlanta. The metro name does not move the facility into Atlanta municipality."
            },
            "provider_role": "operator"
          },
          "notes": [
            "CoreSite identifies the same named AT2 facility and service street in the main body of its first party facility page and advertises its own colocation or interconnection services there. The operator per source relationship records the CoreSite provider brand. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Connectivity to another facility, hosted cloud on ramps and a carrier hotel name do not identify the owner or operator of every space in a building, a tenant or a parent legal entity. Advertised space, power, performance and service commitments are not newly verified quantities. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown. The original title and service street name Marietta, while the URL uses Atlanta. The metro name does not move the facility into Atlanta municipality."
          ],
          "sources": [
            {
              "url": "https://www.coresite.com/data-center/at2-atlanta-ga",
              "host": "www.coresite.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Marietta · Cobb · Source context reviewed",
      "status_scope": "Current CoreSite AT2 page offers named colocation and interconnection services at this location. This supports an operator-listed service component, not physical inspection, live availability, every expansion being complete or measured uptime."
    },
    {
      "id": "coreweave-dalton-ii-old-tilton-road-whitfield-ga",
      "state": "ga",
      "kind": "facility",
      "name": "CoreWeave Dalton II / Core Scientific Old Tilton Road Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Whitfield"
      ],
      "city": "Dalton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Old Tilton Road cadastral identity, separate ownership and tenant roles. Reference point is not independently verified building entrance. Zero-price JDA transfer is not free construction or full incentive value. Prior purchase includes other parcel 13-060-04-000; 3.6M is not this parcel-only capex. No displayed commercial structure does not prove vacancy or closure. CoreWeave tenant identity, operating stage and IT MW remain unverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.. Neither expired forecast establishesOctoberoperation. ExistingDalton1+2at2205IndustrialSouth andDalton3atBoringDrive are distinct;50MW/142MWand1706/74712monthlyMWh not automatically thisfourthsite or its criticalIT. Main entranceEnterpriseDrive differs fromearlierOldTiltonreference.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gis.whitfieldcountyga.com/GIS/WCGIS/parceldetail.asp?txtrealkey=31339",
          "host": "gis.whitfieldcountyga.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/",
          "host": "web.archive.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://investors.corescientific.com/news-events/press-releases/detail/139/core-scientific-announces-second-quarter-2026-results",
          "host": "investors.corescientific.com",
          "published": "2026-07-28",
          "date": "2026-07-28",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 34.81699,
        "lng": -84.98062,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Old Tilton Road cadastral identity, separate ownership and tenant roles",
          "fields": {
            "agency": "Whitfield County Georgia parcel service",
            "parcel": "13-060-01-000",
            "realkey": 31339,
            "owner_as_listed": "Dalton Whitfield County Joint Development Authority",
            "situs": "0 Old Tilton Road",
            "acres": 167.56,
            "tax_bill_recipient": "Core Scientific Inc.",
            "county_reference_point_latitude": 34.69265485,
            "county_reference_point_longitude": -84.94183002,
            "listed_jda_transfer_date": "2025-12-16",
            "listed_prior_multiple_parcel_purchase_date": "2024-12-20",
            "listed_multiple_parcel_purchase_usd": 3600000
          },
          "notes": [
            "Reference point is not independently verified building entrance. Zero-price JDA transfer is not free construction or full incentive value. Prior purchase includes other parcel 13-060-04-000; 3.6M is not this parcel-only capex. No displayed commercial structure does not prove vacancy or closure. CoreWeave tenant identity, operating stage and IT MW remain unverified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gis.whitfieldcountyga.com/GIS/WCGIS/parceldetail.asp?txtrealkey=31339",
              "host": "gis.whitfieldcountyga.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.",
          "fields": {
            "reported_context": "Local reporting describes fourth CoreScientific/CoreWeave development, approximately250000squarefeet and145MWundefined capacity, under construction, countyrezoningMarch2025. OriginalJuly2026completionestimate followed official belief operationbySeptember.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Neither expired forecast establishesOctoberoperation. ExistingDalton1+2at2205IndustrialSouth andDalton3atBoringDrive are distinct;50MW/142MWand1706/74712monthlyMWh not automatically thisfourthsite or its criticalIT. Main entranceEnterpriseDrive differs fromearlierOldTiltonreference.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/",
              "host": "web.archive.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 37",
          "scope": "The original second quarter 2026 company release reports portfolio conversion and high density colocation progress and lists two Georgia facilities. The reviewed body does not provide an accepted exact Old Tilton Road component crosswalk. Portfolio totals, a billing commencement or another Dalton component are not transferred into current commissioned computing at this inherited exact record.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "company_portfolio_conversion_without_exact_old_tilton_component_crosswalk",
              "scope": "The original second quarter 2026 company release reports portfolio conversion and high density colocation progress and lists two Georgia facilities. The reviewed body does not provide an accepted exact Old Tilton Road component crosswalk. Portfolio totals, a billing commencement or another Dalton component are not transferred into current commissioned computing at this inherited exact record."
            }
          },
          "notes": [
            "The original second quarter 2026 company release reports portfolio conversion and high density colocation progress and lists two Georgia facilities. The reviewed body does not provide an accepted exact Old Tilton Road component crosswalk. Portfolio totals, a billing commencement or another Dalton component are not transferred into current commissioned computing at this inherited exact record.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://investors.corescientific.com/news-events/press-releases/detail/139/core-scientific-announces-second-quarter-2026-results",
              "host": "investors.corescientific.com",
              "published": "2026-07-28",
              "date": "2026-07-28",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Dalton · Whitfield · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13313"
      }
    },
    {
      "id": "databank-indo-cartersville-ga",
      "state": "ga",
      "kind": "project",
      "name": "DataBank Project Indo",
      "group": "approved",
      "status": "Zoning approved",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Cartersville",
      "address": "218 Industrial Park Road, Cartersville, GA",
      "who": "DataBank",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "Approximate 200 MW +/- critical IT planning envelope described by city staff for Project Indo. Not approved utility supply, a measured load or commissioned capacity; no specific technical as-of day is stated.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Technology rezoning and state review pending at report date.2027start/2028to2032delivery forecasts,2.4-billion buildoutVALUE/23-milliontax estimates not realized. No exact application year/date assumed. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-09-03",
          "Cartersville City Council approved Project Indo Z26-05 rezoning and concurrent variances in separate 6-0 votes, with three conditions and ordinance reference 44-26. Zoning approval does not establish final permits, power availability, construction or operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html",
          "host": "daily-tribune.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf",
          "host": "mccmeetings.blob.core.usgovcloudapi.net",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Signed September 3, 2026 council minutes, pages 1-2 and 7"
        },
        {
          "url": "https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-d9b8411c278c413ebdec3c97807edca0.pdf",
          "host": "mccmeetingspublic.blob.core.usgovcloudapi.net",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Z26-05 city case file, zoning synopsis pages 1-3"
        },
        {
          "url": "https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-47a78684740141a2bd666b0110ac1ed2.pdf",
          "host": "mccmeetings.blob.core.usgovcloudapi.net",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "September 17 council minutes, page 1 ratifies September 3 minutes"
        },
        {
          "url": "https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-621d8771b7934c63b3825634b1abf945.pdf",
          "host": "mccmeetingspublic.blob.core.usgovcloudapi.net",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "September 3 second-reading staff summary; recommendation, not vote"
        }
      ],
      "loc": {
        "lat": 34.21354,
        "lng": -84.83793,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "Daily Tribune reports DataBank DRI/rezoning application for69-acre218IndustrialParkRoad in Cartersville.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Technology rezoning and state review pending at report date.2027start/2028to2032delivery forecasts,2.4-billion buildoutVALUE/23-milliontax estimates not realized. No exact application year/date assumed.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html",
              "host": "daily-tribune.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Primary-Campus-Holds-20261016",
          "scope": "Targeted primary campus/project stage and identity-scope review. No physical-site census, point/precision upgrade, actual delivery, metered use or legal title finding.",
          "fields": {
            "city_case_reference": "Z26-05; ordinance reference 44-26",
            "zoning_decision": {
              "adopted_on": "2026-09-03",
              "zoning_vote": "6-0",
              "variance_vote": "6-0",
              "from": "H-I (Heavy Industrial)",
              "to": "T (Technology)",
              "conditions": [
                "Conditioned on the submitted concept site plan, elevations and project descriptions, including a closed-loop water cooling system.",
                "Principal use limited to data processing, storage, hosting and related services, with associated Technology-district and customary accessory uses.",
                "No certificate of occupancy for a data center until a letter establishes electric power is available; individual buildings and subdivisions may be treated separately."
              ],
              "effective_on": null
            },
            "variance_scope": "Approved concurrent requests reduce off-street parking from 1,313 to 286 spaces and allow the front facade nearest Industrial Park Road to face away from that road. These are site-specific zoning permissions, not building or occupancy permits.",
            "published_project_location": {
              "address": "218 Industrial Park Road, Cartersville, Georgia",
              "parcel_reference": "C059-0001-001",
              "reported_acres_approx": 68.77
            },
            "proposed_technical_scope": "City staff describes an approximately 200 MW +/- critical IT data-center proposal and two data-center warehouses. This is a planning envelope, not commissioned, contracted or metered capacity. No new two-building physical census is asserted.",
            "utility_and_delivery_limits": "The case file says MEAG Power was studying power supply needs and transmission routing, with sewer flow and industrial pretreatment information still needed. It forecasts development in 2027 and staged facility delivery from 2028 through 2032, contingent on approval. No actual start, utility allocation, occupancy, opening or consumption is established.",
            "water_condition_scope": "Closed-loop water cooling is a zoning condition. It is not proof of installed equipment, zero water use, a withdrawal permit or measured consumption.",
            "approval_document_scope": "Signed September 3 council minutes record both final motions. September 17 minutes separately approve those minutes. The September 3 agenda and staff recommendation alone are not used as proof the vote passed. No automatic September 3 effective date is inferred.",
            "current_status_basis": "City Council approved Z26-05 rezoning and concurrent variances on September 3, 2026, both 6-0, with three conditions and ordinance reference 44-26. Approval is limited to zoning; final building, air, power-availability, occupancy, construction and operation are not established."
          },
          "notes": [
            "Field-specific review only. Original name, approximate location and wrapper, city/county context, opening field, legacy MW, financial and ownership limits remain.",
            "Campus/component and regulatory proposal units are not interchangeable with separate physical sites or complete operational capacity."
          ],
          "sources": [
            {
              "url": "https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf",
              "host": "mccmeetings.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Signed September 3, 2026 council minutes, pages 1-2 and 7"
            },
            {
              "url": "https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-d9b8411c278c413ebdec3c97807edca0.pdf",
              "host": "mccmeetingspublic.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Z26-05 city case file, zoning synopsis pages 1-3"
            },
            {
              "url": "https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-47a78684740141a2bd666b0110ac1ed2.pdf",
              "host": "mccmeetings.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "September 17 council minutes, page 1 ratifies September 3 minutes"
            },
            {
              "url": "https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-621d8771b7934c63b3825634b1abf945.pdf",
              "host": "mccmeetingspublic.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "September 3 second-reading staff summary; recommendation, not vote"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cartersville · Bartow · Source context reviewed",
      "search_extra": "DataBank Project Indo Z26-05 44-26 218 Industrial Park Road C059-0001-001",
      "status_scope": "City Council approved Z26-05 rezoning and concurrent variances on September 3, 2026, both 6-0, with three conditions and ordinance reference 44-26. Approval is limited to zoning; final building, air, power-availability, occupancy, construction and operation are not established.",
      "event_evidence": [
        {
          "date": "2026-09-03",
          "text": "Cartersville City Council approved Project Indo Z26-05 rezoning and concurrent variances in separate 6-0 votes, with three conditions and ordinance reference 44-26. Zoning approval does not establish final permits, power availability, construction or operation.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://mccmeetings.blob.core.usgovcloudapi.net/cviillega-pubu/MEET-Minutes-884cd68bdb9d4ff0b5641ff5da96deaf.pdf",
              "host": "mccmeetings.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Signed September 3, 2026 council minutes, pages 1-2 and 7"
            }
          ]
        }
      ],
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 200,
          "unit": "MW",
          "as_of": null,
          "as_of_basis": "not_published",
          "observed_on": "2026-10-16",
          "basis": "forecast",
          "scope": "Approximate 200 MW +/- critical IT planning envelope described by city staff for Project Indo. Not approved utility supply, a measured load or commissioned capacity; no specific technical as-of day is stated.",
          "sources": [
            "https://mccmeetingspublic.blob.core.usgovcloudapi.net/cviillega-meet-884cd68bdb9d4ff0b5641ff5da96deaf/ITEM-Attachment-001-d9b8411c278c413ebdec3c97807edca0.pdf"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    },
    {
      "id": "dcblox-atlanta-east-conyers-ga",
      "state": "ga",
      "kind": "facility",
      "name": "DC BLOX Atlanta East Hyperscale Data Center Campus",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Rockdale"
      ],
      "city": "Conyers",
      "address": "",
      "who": "DC BLOX",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. OriginalDecember12,2023body versus September8,2026updated header. Utility total216MWis not criticalIT. Historical delivery target is not a completed opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Page title still coming soon. Completed-and-planned total154is not all energized. Prior216MWutility commitment uses a different basis. Do not add154to216or copy total to each building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dcblox.com/dc-blox-to-build-hyperscale-ready-data-center-campus-rockdale-county-ga/",
          "host": "dcblox.com",
          "date": "2023-12-12",
          "published": "2023-12-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/",
          "host": "dcblox.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.dcblox.com/data-centers/atlanta-data-centers/",
          "host": "www.dcblox.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
          "host": "www.dcblox.com",
          "published": "2024-11-14",
          "date": "2024-11-14",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.6544,
        "lng": -84.02696,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "acquired_acres": 72,
            "full_build_design_area_sqft": 750000,
            "utility_committed_total_power_mw": 216,
            "additional_tenant_area_sqft": 160000,
            "historical_expected_delivery": "2025-Q4"
          },
          "notes": [
            "OriginalDecember12,2023body versus September8,2026updated header. Utility total216MWis not criticalIT. Historical delivery target is not a completed opening.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-to-build-hyperscale-ready-data-center-campus-rockdale-county-ga/",
              "host": "dcblox.com",
              "date": "2023-12-12",
              "published": "2023-12-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "published_address": "1726 Farmer Road, Conyers, GA30012",
            "campus_buildings": 4,
            "campus_area_sqft": 747787,
            "critical_capacity_completed_and_planned_mw": 154,
            "building_power_blocks_mw": [
              10,
              48,
              48,
              48
            ],
            "site_preparations_started_by": "2024-09"
          },
          "notes": [
            "Page title still coming soon. Completed-and-planned total154is not all energized. Prior216MWutility commitment uses a different basis. Do not add154to216or copy total to each building.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/",
              "host": "dcblox.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "status-continuation-2026-10-19",
          "scope": "DC BLOX describes its Atlanta East campus in Conyers as in development and reports that campus construction has begun.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_construction",
              "scope": "DC BLOX describes its Atlanta East campus in Conyers as in development and reports that campus construction has begun."
            }
          },
          "notes": [
            "The page also mixes operational and development categories. Its construction account supports this qualified stage only, not completed buildings or commissioning. The month-only site-preparation reference is not an exact event date."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check68, October24,2026",
          "scope": "The current Atlanta market page and dated edge announcement identify DC BLOX development of Atlanta East in Conyers. Shared regional totals and current page availability wording do not establish completion or commissioning of every component. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification.",
          "fields": {
            "company_association": {
              "name": "DC BLOX",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The current Atlanta market page and dated edge announcement identify DC BLOX development of Atlanta East in Conyers. Shared regional totals and current page availability wording do not establish completion or commissioning of every component. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The current Atlanta market page and dated edge announcement identify DC BLOX development of Atlanta East in Conyers. Shared regional totals and current page availability wording do not establish completion or commissioning of every component. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/atlanta-data-centers/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "www.dcblox.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Conyers · Rockdale · Source context reviewed",
      "status_scope": "DC BLOX describes its Atlanta East campus in Conyers as in development and reports that campus construction has begun.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13247"
      }
    },
    {
      "id": "dc-blox-atlanta-west-ga",
      "state": "ga",
      "kind": "facility",
      "name": "DC BLOX Atlanta West (ATL1)",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Lithia Springs",
      "address": "",
      "who": "DC BLOX",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. August11,2025original release body takes precedence over September16,2026updated header. Financing is not spent campus capex. Company-wide470criticalMWfooter and previous265Mloan excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/",
          "host": "dcblox.com",
          "date": "2025-08-11",
          "published": "2025-08-11",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.dcblox.com/data-centers/atlanta-data-centers/douglas-county-ga-hyperscale-data-center-campus/",
          "host": "www.dcblox.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        },
        {
          "url": "https://www.dcblox.com/dc-blox-acquires-55-acres-construction-180mw-data-center-douglasville-ga/",
          "host": "www.dcblox.com",
          "published": "2023-10-31",
          "date": "2023-10-31",
          "checked": "2026-10-19",
          "label": "Original source for the qualified stage"
        }
      ],
      "loc": {
        "lat": 33.70219,
        "lng": -84.76811,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "construction_green_loan_usd": 1150000000,
            "initial_planned_capacity_mw": 120,
            "additional_planned_capacity_mw": 80,
            "additional_capacity_earliest_target": "2027",
            "power_basis": "release capacity; critical IT versus gross not specified"
          },
          "notes": [
            "August11,2025original release body takes precedence over September16,2026updated header. Financing is not spent campus capex. Company-wide470criticalMWfooter and previous265Mloan excluded.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/",
              "host": "dcblox.com",
              "date": "2025-08-11",
              "published": "2025-08-11",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "status-continuation-2026-10-19",
          "scope": "DC BLOX offers the Atlanta West campus for hyperscale development while retaining prospective and mixed-stage descriptions.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_development",
              "scope": "DC BLOX offers the Atlanta West campus for hyperscale development while retaining prospective and mixed-stage descriptions."
            }
          },
          "notes": [
            "An earlier release reports construction commencement, but neither a past move-in forecast nor the mixed-stage headline establishes which buildings are operating. Current completion remains unestablished."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/atlanta-data-centers/douglas-county-ga-hyperscale-data-center-campus/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            },
            {
              "url": "https://www.dcblox.com/dc-blox-acquires-55-acres-construction-180mw-data-center-douglasville-ga/",
              "host": "www.dcblox.com",
              "published": "2023-10-31",
              "date": "2023-10-31",
              "checked": "2026-10-19",
              "label": "Original source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check68, October24,2026",
          "scope": "The October 31, 2023 announcement identifies DC BLOX development of the Douglasville campus. The later displayed September 16, 2026 update and current leasing profile do not establish a new completion day. Acreage and power figures vary across versions and measures, so none is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification.",
          "fields": {
            "company_association": {
              "name": "DC BLOX",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The October 31, 2023 announcement identifies DC BLOX development of the Douglasville campus. The later displayed September 16, 2026 update and current leasing profile do not establish a new completion day. Acreage and power figures vary across versions and measures, so none is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The October 31, 2023 announcement identifies DC BLOX development of the Douglasville campus. The later displayed September 16, 2026 update and current leasing profile do not establish a new completion day. Acreage and power figures vary across versions and measures, so none is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-acquires-55-acres-construction-180mw-data-center-douglasville-ga/",
              "host": "www.dcblox.com",
              "published": "2023-10-31",
              "date": "2023-10-31",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.dcblox.com/data-centers/atlanta-data-centers/douglas-county-ga-hyperscale-data-center-campus/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lithia Springs · Douglas · Source context reviewed",
      "status_scope": "DC BLOX offers the Atlanta West campus for hyperscale development while retaining prospective and mixed-stage descriptions.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "digital-realty-atl11-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Digital Realty ATL11",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cobb"
      ],
      "city": "Austell",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Requested ATL11 URL returned the Atlanta regional page, which lists ATL13 and ATL14. No current ATL11 facility/address/status is supported; redirect is not closure proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl11",
          "host": "digitalrealty.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.digitalrealty.com/data-centers/americas/atlanta",
          "host": "www.digitalrealty.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.94165,
        "lng": -84.57668,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {},
          "notes": [
            "Requested ATL11 URL returned the Atlanta regional page, which lists ATL13 and ATL14. No current ATL11 facility/address/status is supported; redirect is not closure proof.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl11",
              "host": "digitalrealty.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The old ATL11 URL now redirects to Digital Realty’s Atlanta metro directory, which identifies ATL13 and ATL14. A metro redirect does not match ATL11, and omission does not establish closure or a successor identity."
            }
          },
          "notes": [
            "The old ATL11 URL now redirects to Digital Realty’s Atlanta metro directory, which identifies ATL13 and ATL14. A metro redirect does not match ATL11, and omission does not establish closure or a successor identity."
          ],
          "sources": [
            {
              "url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl11",
              "host": "www.digitalrealty.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 10",
          "scope": "The old ATL11 URL redirects to the Atlanta market. The current market page lists ATL13 and ATL14. No original source in this review explicitly crosswalks ATL11 to either current code. A redirect is not closure or proof that a different code is the same physical facility. Current stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_market_code_crosswalk_held",
              "scope": "The old ATL11 URL redirects to the Atlanta market. The current market page lists ATL13 and ATL14. No original source in this review explicitly crosswalks ATL11 to either current code. A redirect is not closure or proof that a different code is the same physical facility. Current stage remains unclear."
            },
            "identity_scope": {
              "inherited_code": "ATL11",
              "codes_on_current_market_page": [
                "ATL13",
                "ATL14"
              ],
              "crosswalk_verified": false
            }
          },
          "notes": [
            "The old ATL11 URL redirects to the Atlanta market. The current market page lists ATL13 and ATL14. No original source in this review explicitly crosswalks ATL11 to either current code. A redirect is not closure or proof that a different code is the same physical facility. Current stage remains unclear.",
            "No campus total, service offer or approval is converted into an observed operating capacity, exact site point or verified opening day."
          ],
          "sources": [
            {
              "url": "https://www.digitalrealty.com/data-centers/americas/atlanta",
              "host": "www.digitalrealty.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Austell · Cobb · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13067"
      }
    },
    {
      "id": "digital-realty-atlanta-atl13-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Digital Realty Atlanta ATL13",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Atlanta",
      "address": "56 Marietta Street Atlanta, GA 30303",
      "who": "Digital Realty",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl13",
          "host": "digitalrealty.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=56+Marietta+Street+Atlanta%2C+GA+30303&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Published-address street-range query for Digital Realty ATL13"
        }
      ],
      "loc": {
        "lat": 33.755401458914,
        "lng": -84.391199235025,
        "precision": "address",
        "basis": "Published Digital Realty ATL13 address independently matched by the U.S. Census street-range geocoder and corroborated by the current operator map coordinate. A calculated street location, not a surveyed parcel, roof, suite or whole-building ownership claim"
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "operator_facility_code": "ATL13",
            "published_address": "56 Marietta Street Atlanta, GA 30303",
            "advertised_building_sqft": 84000
          },
          "notes": [
            "Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl13",
              "host": "digitalrealty.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Digital Realty U.S. property review October 16",
          "scope": "Explicit current provider-code, service-component and published-address review. No physical-site census, ownership, current metered demand, full-campus delivery or coordinate certification.",
          "fields": {
            "operator_location_codes": [
              "ATL13"
            ],
            "current_service_scope": "Digital Realty currently markets colocation and connectivity services under ATL13. This supports an operating service component in the existing research context, not complete campus delivery, full-building operation, legal ownership, present vacancy or a commissioned IT-load figure.",
            "identity_scope": "The provider-qualified code and published locality match this existing ID. Codes used by CoreSite, Equinix, NTT or other providers are not interchangeable. Shared street addresses or carrier hotels do not certify separate physical sites or establish whole-building ownership.",
            "technical_scope": "The current listing is a commercial service/specification source. No current critical IT MW, utility-service authorization, annual energy, measured water series or construction/opening day is normalized from generic power, cooling, density, certification or renewable-energy claims.",
            "location_scope": "The published address is source context only. Inherited coordinates, precision, city/county jurisdiction and parcel identity are unchanged; the point has not been matched to the street address.",
            "published_address_ATL13": "56 Marietta Street Atlanta, GA 30303"
          },
          "notes": [
            "Operating phase refers to a currently marketed service component at the named code/address, not a site inspection or complete campus.",
            "The current property pages are undated. Review date is not a publication day, physical opening day or technical-capacity as-of date. Existing addresses were blank; no inherited point is upgraded by assumption."
          ],
          "sources": [
            {
              "url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl13",
              "host": "www.digitalrealty.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Current Digital Realty ATL13 property page"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Digital Realty address and location review October 16",
          "scope": "Explicit provider-qualified address and location review. Street-range points and partial county reference areas are different methods; neither certifies a roof, owner, complete campus or distinct physical site.",
          "fields": {
            "published_coordinate_context": {
              "code": "ATL13",
              "operator_point": [
                -84.3915303,
                33.7554561
              ],
              "scope": "Publisher map metadata, not a surveyed roof, parcel boundary, title, technical-capacity or opening assertion."
            },
            "census_address_context": {
              "query_address": "56 Marietta Street Atlanta, GA 30303",
              "match_count": 1,
              "match": {
                "matchedAddress": "56 MARIETTA ST, ATLANTA, GA, 30303",
                "coordinates": {
                  "x": -84.391199235025,
                  "y": 33.755401458914
                },
                "addressComponents": {
                  "zip": "30303",
                  "streetName": "MARIETTA",
                  "preType": "",
                  "city": "ATLANTA",
                  "preDirection": "",
                  "suffixDirection": "",
                  "fromAddress": "56",
                  "state": "GA",
                  "suffixType": "ST",
                  "toAddress": "98",
                  "suffixQualifier": "",
                  "preQualifier": ""
                },
                "tigerLine": {
                  "side": "L",
                  "tigerLineId": "17344117"
                }
              },
              "benchmark": "Public_AR_Current",
              "vintage": "Current_Current",
              "scope": "Calculated address-range point, not a building center, parcel, suite or actual operation verification."
            },
            "coordinate_comparison": {
              "operator_to_census_m": 31.2,
              "operator_to_inherited_m": 8.3,
              "scope": "Derived distance comparison only; proximity alone does not resolve provider or physical-site identity."
            },
            "location_decision": {
              "decision": "admit_published_address_point",
              "reason": "The current single-address ATL13 listing and literal 56 Marietta Street match identify the same Atlanta service context; published operator and calculated street-range points differ 31.2 m.",
              "scope": "Address-level display only. Existing service-component and unresolved physical-site-count identity limits remain; no campus, roof or ownership certification."
            }
          },
          "notes": [
            "Current marketed-service stage, operator code, published address, all technical quantities and dated events remain unchanged.",
            "Publication dates are unknown. Retrieval dates, Census Current_Current naming, county tax year, edit timestamps and physical milestones are separate scopes."
          ],
          "sources": [
            {
              "url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl13",
              "host": "www.digitalrealty.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Current Digital Realty ATL13 property page"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=56+Marietta+Street+Atlanta%2C+GA+30303&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Published-address street-range query for Digital Realty ATL13"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check49, October24,2026",
          "scope": "Digital Realty identifies the named ATL13 facility and its published service street in the main body of its own location page and advertises its own colocation space and facility services. Operator per source records the Digital Realty provider brand for that component only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised area, density, redundancy, renewable percentages, certifications, resilience and market superlatives are not independently verified measurements, legal title or environmental outcomes. Carrier and cloud connections do not identify every tenant or connected property owner. Metropolitan market labels do not replace the stated service municipality. The source publication date is unknown. The source expressly describes Digital Realty as the interconnection area operator. The relationship is limited to that service component and does not establish operation or ownership of every space in the shared building.",
          "fields": {
            "company_association": {
              "name": "Digital Realty",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Digital Realty identifies the named ATL13 facility and its published service street in the main body of its own location page and advertises its own colocation space and facility services. Operator per source records the Digital Realty provider brand for that component only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised area, density, redundancy, renewable percentages, certifications, resilience and market superlatives are not independently verified measurements, legal title or environmental outcomes. Carrier and cloud connections do not identify every tenant or connected property owner. Metropolitan market labels do not replace the stated service municipality. The source publication date is unknown. The source expressly describes Digital Realty as the interconnection area operator. The relationship is limited to that service component and does not establish operation or ownership of every space in the shared building."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Digital Realty identifies the named ATL13 facility and its published service street in the main body of its own location page and advertises its own colocation space and facility services. Operator per source records the Digital Realty provider brand for that component only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised area, density, redundancy, renewable percentages, certifications, resilience and market superlatives are not independently verified measurements, legal title or environmental outcomes. Carrier and cloud connections do not identify every tenant or connected property owner. Metropolitan market labels do not replace the stated service municipality. The source publication date is unknown. The source expressly describes Digital Realty as the interconnection area operator. The relationship is limited to that service component and does not establish operation or ownership of every space in the shared building."
          ],
          "sources": [
            {
              "url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl13",
              "host": "www.digitalrealty.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address matched to a Census street range",
      "summary": "Atlanta · Fulton · Source context reviewed",
      "status_scope": "Digital Realty currently markets colocation and connectivity services under ATL13. This supports an operating service component in the existing research context, not complete campus delivery, full-building operation, legal ownership, present vacancy or a commissioned IT-load figure."
    },
    {
      "id": "edged-atlanta-tilford-yard-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Edged Atlanta (ATL01)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Atlanta",
      "address": "",
      "who": "Edged",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. ReleaseAugust22says ceremonyyesterday.27MWfirstbuilding is within168MWcampus, not all168opened.1.69Beconomicinvestmentregional wording not audited construction spend.70Mfuture taxes not incentive amount. Cooling-water savings design comparison not measured actual consumption; portfolioPUEnotcampusmeasurement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html",
          "host": "prnewswire.com",
          "date": "2024-08-22",
          "published": "2024-08-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://edged.us/news/edged-us-tops-out-ultra---efficient-42-mw-data-center-optimized-for-ai-inference-at-scale-at-its-atlanta-campus",
          "host": "edged.us",
          "published": "2026-04-24",
          "date": "2026-04-24",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        },
        {
          "url": "https://edged.us/atlanta",
          "host": "edged.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party named campus and scoped operator relationship"
        }
      ],
      "loc": {
        "lat": 33.80394,
        "lng": -84.48247,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "issuer-release-review-round6-2026-10-14.json",
          "scope": "named issuer release",
          "fields": {
            "first_building_opening_event_date": "2024-08-21",
            "published_address": "1800 Thomas Street NW, Atlanta, GA",
            "first_building_capacity_mw": 27,
            "planned_campus_critical_capacity_mw": 168,
            "campus_buildings": 3,
            "operator_described_economic_investment_region_usd": 1690000000,
            "tax_revenue_forecast_usd_approx": 70000000,
            "tax_revenue_forecast_period_years": 10
          },
          "notes": [
            "ReleaseAugust22says ceremonyyesterday.27MWfirstbuilding is within168MWcampus, not all168opened.1.69Beconomicinvestmentregional wording not audited construction spend.70Mfuture taxes not incentive amount. Cooling-water savings design comparison not measured actual consumption; portfolioPUEnotcampusmeasurement.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html",
              "host": "prnewswire.com",
              "date": "2024-08-22",
              "published": "2024-08-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "Edged reported on April 24, 2026 that two Atlanta facilities were operational while the third remained under construction with an early 2027 target. Only the operating phase is supported; all-campus completion, energized totals and water savings are not certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operating_phase",
              "scope": "Edged reported on April 24, 2026 that two Atlanta facilities were operational while the third remained under construction with an early 2027 target. Only the operating phase is supported; all-campus completion, energized totals and water savings are not certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "Edged reported on April 24, 2026 that two Atlanta facilities were operational while the third remained under construction with an early 2027 target. Only the operating phase is supported; all-campus completion, energized totals and water savings are not certified."
          ],
          "sources": [
            {
              "url": "https://edged.us/news/edged-us-tops-out-ultra---efficient-42-mw-data-center-optimized-for-ai-inference-at-scale-at-its-atlanta-campus",
              "host": "edged.us",
              "published": "2026-04-24",
              "date": "2026-04-24",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check25, October23,2026",
          "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The retained campus identity is not split into the three advertised ATL01 components. Campus capacity and individual facility status remain outside this role review.",
          "fields": {
            "company_association": {
              "name": "Edged",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The retained campus identity is not split into the three advertised ATL01 components. Campus capacity and individual facility status remain outside this role review."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The retained campus identity is not split into the three advertised ATL01 components. Campus capacity and individual facility status remain outside this role review."
          ],
          "sources": [
            {
              "url": "https://edged.us/atlanta",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus and scoped operator relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Atlanta · Fulton · Source context reviewed",
      "status_scope": "Edged reported on April 24, 2026 that two Atlanta facilities were operational while the third remained under construction with an early 2027 target. Only the operating phase is supported; all-campus completion, energized totals and water savings are not certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "flexential-atlanta-alpharetta-data-center-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Flexential Atlanta - Alpharetta Data Center",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Alpharetta",
      "address": "",
      "who": "Flexential",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
          "host": "flexential.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.74193,
        "lng": -84.46313,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round14-2026-10-14.json",
          "scope": "Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.",
          "fields": {
            "operator_named_facility": "Flexential Atlanta - Alpharetta Data Center",
            "publisher_reported_footprint_sqft": 142475,
            "publisher_reported_critical_power_mw": 6,
            "power_basis": "operator critical load UPS capacity; Douglasville sections call it critical power",
            "current_measured_demand_mw": null,
            "commissioning_date": null,
            "exact_address_verified_by_this_document": false
          },
          "notes": [
            "Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "flexential.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check62, October24,2026",
          "scope": "Flexential identifies the named location in the original fleet guide, PDF pages 30 and 31. The Atlanta Alpharetta profile explicitly describes Flexential colocation and related services at this named location. Regional network access does not identify additional facilities, cloud operators or tenants. Only the previously empty provider brand is filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Operator per source describes the guide profile only, not a current operating verification. The publication day is unknown; file metadata is not a physical or publication date. No technical, environmental, tenant or ownership claim is adopted.",
          "fields": {
            "company_association": {
              "name": "Flexential",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Flexential identifies the named location in the original fleet guide, PDF pages 30 and 31. The Atlanta Alpharetta profile explicitly describes Flexential colocation and related services at this named location. Regional network access does not identify additional facilities, cloud operators or tenants. Only the previously empty provider brand is filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Operator per source describes the guide profile only, not a current operating verification. The publication day is unknown; file metadata is not a physical or publication date. No technical, environmental, tenant or ownership claim is adopted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Flexential identifies the named location in the original fleet guide, PDF pages 30 and 31. The Atlanta Alpharetta profile explicitly describes Flexential colocation and related services at this named location. Regional network access does not identify additional facilities, cloud operators or tenants. Only the previously empty provider brand is filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Operator per source describes the guide profile only, not a current operating verification. The publication day is unknown; file metadata is not a physical or publication date. No technical, environmental, tenant or ownership claim is adopted."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 80",
          "scope": "Selected original fleet guide physical page 30 names the Atlanta Alpharetta center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_guide_named_atlanta_alpharetta_service",
              "scope": "Selected original fleet guide physical page 30 names the Atlanta Alpharetta center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged."
            },
            "source_read_scope": {
              "original_owned_raw_guide_and_retrieval_receipt_reused": true,
              "no_new_request_for_denied_market_body": true,
              "original_named_provider_service_text_selected_physical_page": 30,
              "not_entire_102_page_guide_or_maps_read": true,
              "named_center_scope_not_every_inherited_component_code": true,
              "no_capacity_audit_legal_or_uptime_certification": true,
              "no_planned_expansion_or_advertised_inventory_as_completed_phase": true
            }
          },
          "notes": [
            "Selected original fleet guide physical page 30 names the Atlanta Alpharetta center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Alpharetta · Fulton · Source context reviewed",
      "status_scope": "Selected original fleet guide physical page 30 names the Atlanta Alpharetta center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "flexential-atlanta-douglasville-1-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Flexential Atlanta - Douglasville 1",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "Flexential",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Page 32 gives 204,700 square feet building and 150,000 data halls; these are different floor-area scopes. This PDF does not establish a commissioning date. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
          "host": "flexential.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1700+N.+River+Rd%2C+Douglasville%2C+GA+30122&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street method and limits"
        },
        {
          "url": "https://www.flexential.com/data-centers/ga/atlanta/douglasville-data-center",
          "host": "www.flexential.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.72871731191,
        "lng": -84.61789008925,
        "precision": "address",
        "basis": "Official Flexential fleet guide publishes 1700 N. River Rd, Douglasville, GA 30122 for Douglasville 1. It matches one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof or full campus. Existing status remains unknown; current operation and ownership are not certified."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round14-2026-10-14.json",
          "scope": "Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.",
          "fields": {
            "operator_named_facility": "Flexential Atlanta - Douglasville 1",
            "publisher_reported_footprint_sqft": 204700,
            "publisher_reported_critical_power_mw": 22.5,
            "power_basis": "operator critical load UPS capacity; Douglasville sections call it critical power",
            "current_measured_demand_mw": null,
            "commissioning_date": null,
            "exact_address_verified_by_this_document": false
          },
          "notes": [
            "Page 32 gives 204,700 square feet building and 150,000 data halls; these are different floor-area scopes. This PDF does not establish a commissioning date.",
            "Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "flexential.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 9, October 22, 2026",
          "scope": "Official operator street reference only. Existing status remains unknown. No canonical address, physical milestone, quantity, company role, legal jurisdiction, surveyed parcel, full campus or independent building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 33.72871731191,
                "lng": -84.61789008925,
                "precision": "address",
                "basis": "Official Flexential fleet guide publishes 1700 N. River Rd, Douglasville, GA 30122 for Douglasville 1. It matches one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof or full campus. Existing status remains unknown; current operation and ownership are not certified."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1700 N. River Rd, Douglasville, GA 30122",
              "county_fips": [
                "13097"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The official fleet guide names the Douglasville 1 facility and explicitly prints its numeric street address in the Location section. The preceding named facility page and its specification page belong to the same two page section. Its address page was visually reviewed.",
            "This is a location only review. The native unknown status and its evidence wrappers remain exact. The guide description, capacities, SLA, technical specifications and certifications do not establish commissioning or current operation and are not adopted. The existing blank canonical address is preserved.",
            "The source uses Douglasville as the facility locality. Census standardizes the same numeric North River Road address and postal code to Lithia Springs, inside the existing Douglas County context. No city, jurisdiction, ownership or title correction is inferred.",
            "The unique Census street match is used as a calculated address reference, not a building, full campus or parcel point. The public county map was inspected as a further lead; direct parcel queries failed and its other service requires a token. No parcel geometry, title or coordinate is adopted from that route."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Official fleet guide, Douglasville 1 service address on PDF page 33"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1700+N.+River+Rd%2C+Douglasville%2C+GA+30122&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 80",
          "scope": "Selected original fleet guide physical page 32 names the Atlanta Douglasville 1 center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_guide_named_atlanta_douglasville_1_service",
              "scope": "Selected original fleet guide physical page 32 names the Atlanta Douglasville 1 center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged."
            },
            "source_read_scope": {
              "original_owned_raw_guide_and_retrieval_receipt_reused": true,
              "no_new_request_for_denied_market_body": true,
              "original_named_provider_service_text_selected_physical_page": 32,
              "not_entire_102_page_guide_or_maps_read": true,
              "named_center_scope_not_every_inherited_component_code": true,
              "no_capacity_audit_legal_or_uptime_certification": true,
              "no_planned_expansion_or_advertised_inventory_as_completed_phase": true
            }
          },
          "notes": [
            "Selected original fleet guide physical page 32 names the Atlanta Douglasville 1 center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check66, October24,2026",
          "scope": "The named Douglasville 1 service profile identifies Flexential for the retained record. It remains separate from Douglasville 2. Capacity, standby generation and cooling advertising are not adopted as measured output or permit findings. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification.",
          "fields": {
            "company_association": {
              "name": "Flexential",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "The named Douglasville 1 service profile identifies Flexential for the retained record. It remains separate from Douglasville 2. Capacity, standby generation and cooling advertising are not adopted as measured output or permit findings. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification."
            },
            "provider_role": "operator"
          },
          "notes": [
            "The named Douglasville 1 service profile identifies Flexential for the retained record. It remains separate from Douglasville 2. Capacity, standby generation and cooling advertising are not adopted as measured output or permit findings. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/data-centers/ga/atlanta/douglasville-data-center",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, status remains unknown",
      "summary": "Douglasville · Douglas · Source context reviewed",
      "status_scope": "Selected original fleet guide physical page 32 names the Atlanta Douglasville 1 center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged."
    },
    {
      "id": "flexential-atlanta-douglasville-2-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Flexential Atlanta - Douglasville 2",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "Flexential",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
          "host": "flexential.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1750+N.+River+Rd%2C+Douglasville%2C+GA+30122&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street method and limits"
        },
        {
          "url": "https://www.flexential.com/data-centers/ga/atlanta/douglasville-2-data-center",
          "host": "www.flexential.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.flexential.com/resources/press-release/flexential-secures-strategic-real-estate-ownership-hillsboro-oregon",
          "host": "www.flexential.com",
          "published": "2026-05-28",
          "date": "2026-05-28",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.flexential.com/data-centers/portland-hillsboro-6-data-center",
          "host": "www.flexential.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.731693227468,
        "lng": -84.616202921678,
        "precision": "address",
        "basis": "Official Flexential fleet guide publishes 1750 N. River Rd, Douglasville, GA 30122 for Douglasville 2. It matches one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof or full campus. Existing status remains unknown; current operation and ownership are not certified."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round14-2026-10-14.json",
          "scope": "Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.",
          "fields": {
            "operator_named_facility": "Flexential Atlanta - Douglasville 2",
            "publisher_reported_footprint_sqft": 358000,
            "publisher_reported_critical_power_mw": 36,
            "power_basis": "operator critical load UPS capacity; Douglasville sections call it critical power",
            "current_measured_demand_mw": null,
            "commissioning_date": null,
            "exact_address_verified_by_this_document": false
          },
          "notes": [
            "Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "flexential.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 9, October 22, 2026",
          "scope": "Official operator street reference only. Existing status remains unknown. No canonical address, physical milestone, quantity, company role, legal jurisdiction, surveyed parcel, full campus or independent building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 33.731693227468,
                "lng": -84.616202921678,
                "precision": "address",
                "basis": "Official Flexential fleet guide publishes 1750 N. River Rd, Douglasville, GA 30122 for Douglasville 2. It matches one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof or full campus. Existing status remains unknown; current operation and ownership are not certified."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1750 N. River Rd, Douglasville, GA 30122",
              "county_fips": [
                "13097"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The official fleet guide names the Douglasville 2 facility and explicitly prints its numeric street address in the Location section. The preceding named facility page and its specification page belong to the same two page section. Its address page was visually reviewed.",
            "This is a location only review. The native unknown status and its evidence wrappers remain exact. The guide description, capacities, SLA, technical specifications and certifications do not establish commissioning or current operation and are not adopted. The existing blank canonical address is preserved.",
            "The source uses Douglasville as the facility locality. Census standardizes the same numeric North River Road address and postal code to Lithia Springs, inside the existing Douglas County context. No city, jurisdiction, ownership or title correction is inferred.",
            "The unique Census street match is used as a calculated address reference, not a building, full campus or parcel point. The public county map was inspected as a further lead; direct parcel queries failed and its other service requires a token. No parcel geometry, title or coordinate is adopted from that route."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Official fleet guide, Douglasville 2 service address on PDF page 35"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1750+N.+River+Rd%2C+Douglasville%2C+GA+30122&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 80",
          "scope": "Selected original fleet guide physical page 34 describes Douglasville 2 as a new build, advertises data halls, capacity, design and available services, and uses future oriented deployment language. These statements do not independently resolve exact current physical computing completion or commissioned service. The current original Atlanta market page returned 403 and no indexed market listing, alternate copy or new provider request was used to fill that gap. Original guide specifications, ownership and advertised inventory do not establish computing operation or an exact opening day. Current stage remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_douglasville2_new_build_advertising_exact_stage_held",
              "scope": "Selected original fleet guide physical page 34 describes Douglasville 2 as a new build, advertises data halls, capacity, design and available services, and uses future oriented deployment language. These statements do not independently resolve exact current physical computing completion or commissioned service. The current original Atlanta market page returned 403 and no indexed market listing, alternate copy or new provider request was used to fill that gap. Original guide specifications, ownership and advertised inventory do not establish computing operation or an exact opening day. Current stage remains held."
            },
            "source_read_scope": {
              "original_owned_guide_and_receipt_reused": true,
              "original_physical_page34_selected_complete_service_and_design_text_read": true,
              "new_build_advertising_not_commissioned_computing": true,
              "denied_current_market_body_not_replaced": true,
              "no_equipment_capacity_role_or_location_change": true
            }
          },
          "notes": [
            "Selected original fleet guide physical page 34 describes Douglasville 2 as a new build, advertises data halls, capacity, design and available services, and uses future oriented deployment language. These statements do not independently resolve exact current physical computing completion or commissioned service. The current original Atlanta market page returned 403 and no indexed market listing, alternate copy or new provider request was used to fill that gap. Original guide specifications, ownership and advertised inventory do not establish computing operation or an exact opening day. Current stage remains held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check66, October24,2026",
          "scope": "The named Douglasville 2 service profile identifies Flexential for the retained record. Its target PUE and advertised liquid ready capabilities do not establish a measured environmental outcome, a commissioning date or completion of a wider campus. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification.",
          "fields": {
            "company_association": {
              "name": "Flexential",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "The named Douglasville 2 service profile identifies Flexential for the retained record. Its target PUE and advertised liquid ready capabilities do not establish a measured environmental outcome, a commissioning date or completion of a wider campus. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification."
            },
            "provider_role": "operator"
          },
          "notes": [
            "The named Douglasville 2 service profile identifies Flexential for the retained record. Its target PUE and advertised liquid ready capabilities do not establish a measured environmental outcome, a commissioning date or completion of a wider campus. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and checked dates remain separate from physical milestones. Operator per source describes the named service profile rather than a current operating verification."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/data-centers/ga/atlanta/douglasville-2-data-center",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research followup 2",
          "scope": "The freshly read original dedicated Douglasville 2 profile advertises named capability, colocation and support using a broad service template. The May 2026 issuer account refers to an earlier property acquisition without independently dating physical commissioning. No acquisition, marketing capability, design target or neighboring operating facility is substituted for an exact current computing phase. The separately unavailable Atlanta market source was not requested again, and the existing legitimate dedicated original capture was reused without a new network request. No physical status, title, location or service quantity is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_douglasville2_dedicated_profile_capability_not_commissioning",
              "scope": "The freshly read original dedicated Douglasville 2 profile advertises named capability, colocation and support using a broad service template. The May 2026 issuer account refers to an earlier property acquisition without independently dating physical commissioning. No acquisition, marketing capability, design target or neighboring operating facility is substituted for an exact current computing phase. The separately unavailable Atlanta market source was not requested again, and the existing legitimate dedicated original capture was reused without a new network request. No physical status, title, location or service quantity is promoted."
            },
            "source_read_scope": {
              "complete_relevant_named_current_operator_profile_sections_read": true,
              "original_peer_capture_and_actual_retrieval_receipt_reused": true,
              "no_new_network_request": true,
              "shared_hillsboro6_marketing_template_not_proof_of_commissioning": true,
              "service_advertising_lease_and_ownership_not_operation": true,
              "no_role_location_identity_or_quantity_promotion": true
            }
          },
          "notes": [
            "The freshly read original dedicated Douglasville 2 profile advertises named capability, colocation and support using a broad service template. The May 2026 issuer account refers to an earlier property acquisition without independently dating physical commissioning. No acquisition, marketing capability, design target or neighboring operating facility is substituted for an exact current computing phase. The separately unavailable Atlanta market source was not requested again, and the existing legitimate dedicated original capture was reused without a new network request. No physical status, title, location or service quantity is promoted.",
            "Existing identities, roles, physical placement, jurisdiction assignments, technical quantities and exact first service days remain unchanged. A publication day does not date property closing or physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/data-centers/ga/atlanta/douglasville-2-data-center",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.flexential.com/resources/press-release/flexential-secures-strategic-real-estate-ownership-hillsboro-oregon",
              "host": "www.flexential.com",
              "published": "2026-05-28",
              "date": "2026-05-28",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.flexential.com/data-centers/portland-hillsboro-6-data-center",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, status remains unknown",
      "summary": "Douglasville · Douglas · Source context reviewed"
    },
    {
      "id": "flexential-atlanta-norcross-atl01-02-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Flexential Atlanta - Norcross (ATL01/02)",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Gwinnett"
      ],
      "city": "Norcross",
      "address": "",
      "who": "Flexential",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Source heading groups Norcross without numbered-building split. Apply only to the existing grouped ATL01/02 record, never duplicate per building. Narrative nearly 40,000 square feet plus proposed additional 40,000 differs from 32,740 quick facts. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
          "host": "flexential.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.flexential.com/system/files/file/2024-01/Flexential%20-%202023%20ISO%2027001%20Surveillance%20-%20Certificate_1831866-4.pdf",
          "host": "www.flexential.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Original issued certificate computing location table, historical street context only"
        },
        {
          "url": "https://www.flexential.com/system/files/file/2021-12/Flexential-2021-PCI-DSS-AOC-Cloud-Operations.pdf",
          "host": "www.flexential.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Original named computing facility list, historical location context only"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2775+Northwoods+Parkway%2C+Norcross%2C+Georgia+30071&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete unique literal published street range, raw version retained"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.20499343781223%2C33.950296288537544%2C-84.19308056218777%2C33.96017771146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -84.199037,
        "lat": 33.955237,
        "precision": "address",
        "basis": "Operator facility documents identify 2775 Northwoods Parkway, Norcross, Georgia 30071. One complete unique Census street range supports this calculated reference inside Gwinnett County. This reference does not select a roof, tenant floor, surveyed parcel or complete campus. Source dates do not establish current operation. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round14-2026-10-14.json",
          "scope": "Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.",
          "fields": {
            "operator_named_facility": "Flexential Atlanta - Norcross (ATL01/02)",
            "publisher_reported_footprint_sqft": 32740,
            "publisher_reported_critical_power_mw": 2.21,
            "power_basis": "operator critical load UPS capacity; Douglasville sections call it critical power",
            "current_measured_demand_mw": null,
            "commissioning_date": null,
            "exact_address_verified_by_this_document": false
          },
          "notes": [
            "Source heading groups Norcross without numbered-building split. Apply only to the existing grouped ATL01/02 record, never duplicate per building. Narrative nearly 40,000 square feet plus proposed additional 40,000 differs from 32,740 quick facts.",
            "Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "flexential.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 64, 2026-10-24",
          "scope": "Original operator published computing street identity and calculated street reference only. The explicit Las Vegas street set remains approximate. Existing status, other facts and all historical source limitations stay unchanged. No current certification, technical figure, ownership, roof, floor or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -84.199037,
                "lat": 33.955237,
                "precision": "address",
                "basis": "Operator facility documents identify 2775 Northwoods Parkway, Norcross, Georgia 30071. One complete unique Census street range supports this calculated reference inside Gwinnett County. This reference does not select a roof, tenant floor, surveyed parcel or complete campus. Source dates do not establish current operation. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "2775 Northwoods Parkway, Norcross, Georgia 30071",
              "county_fips": [
                "13135"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Original operator published computing street identity and calculated street reference only. The explicit Las Vegas street set remains approximate. Existing status, other facts and all historical source limitations stay unchanged. No current certification, technical figure, ownership, roof, floor or complete campus is certified.",
            "The inherited general area coordinate was not an independently reviewed computing street reference. The original operator published computing location documents and complete unique literal Census street evidence support this bounded reference inside the retained county. The measured correction is 72.8 metres. All original source wordings, dates, predecessor coordinates and versions remain retained. Existing status group unknown and every other fact stay unchanged. This is a reference correction without physical relocation, a new operation, selected roof, tenant floor, legal title or complete campus certification.",
            "Separate commercial roofs, tree belts, roads and nearby residential blocks are visible. A diagonal road crosses the setting. This does not identify a specific hall or a new neighboring development."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2024-01/Flexential%20-%202023%20ISO%2027001%20Surveillance%20-%20Certificate_1831866-4.pdf",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original issued certificate computing location table, historical street context only"
            },
            {
              "url": "https://www.flexential.com/system/files/file/2021-12/Flexential-2021-PCI-DSS-AOC-Cloud-Operations.pdf",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original named computing facility list, historical location context only"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2775+Northwoods+Parkway%2C+Norcross%2C+Georgia+30071&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete unique literal published street range, raw version retained"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.20499343781223%2C33.950296288537544%2C-84.19308056218777%2C33.96017771146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check63, October24,2026",
          "scope": "Flexential identifies the named location in the original fleet guide, PDF pages 36 and 37. The Atlanta Norcross profile identifies a retained named service location. Additional planned floor space remains a forecast rather than a delivered expansion, a separate building count or a measured operating capacity. Only the previously empty provider brand is filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Operator per source describes the guide profile only, not a current operating verification. The publication day is unknown; file metadata is not a physical or publication date. No technical, environmental, tenant or ownership claim is adopted.",
          "fields": {
            "company_association": {
              "name": "Flexential",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Flexential identifies the named location in the original fleet guide, PDF pages 36 and 37. The Atlanta Norcross profile identifies a retained named service location. Additional planned floor space remains a forecast rather than a delivered expansion, a separate building count or a measured operating capacity. Only the previously empty provider brand is filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Operator per source describes the guide profile only, not a current operating verification. The publication day is unknown; file metadata is not a physical or publication date. No technical, environmental, tenant or ownership claim is adopted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Flexential identifies the named location in the original fleet guide, PDF pages 36 and 37. The Atlanta Norcross profile identifies a retained named service location. Additional planned floor space remains a forecast rather than a delivered expansion, a separate building count or a measured operating capacity. Only the previously empty provider brand is filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Operator per source describes the guide profile only, not a current operating verification. The publication day is unknown; file metadata is not a physical or publication date. No technical, environmental, tenant or ownership claim is adopted."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 80",
          "scope": "Selected original fleet guide physical page 36 names the Atlanta Norcross center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_guide_named_atlanta_norcross_service",
              "scope": "Selected original fleet guide physical page 36 names the Atlanta Norcross center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged."
            },
            "source_read_scope": {
              "original_owned_raw_guide_and_retrieval_receipt_reused": true,
              "no_new_request_for_denied_market_body": true,
              "original_named_provider_service_text_selected_physical_page": 36,
              "not_entire_102_page_guide_or_maps_read": true,
              "named_center_scope_not_every_inherited_component_code": true,
              "no_capacity_audit_legal_or_uptime_certification": true,
              "no_planned_expansion_or_advertised_inventory_as_completed_phase": true
            }
          },
          "notes": [
            "Selected original fleet guide physical page 36 names the Atlanta Norcross center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396",
              "host": "www.flexential.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated street reference, not a roof or tenant floor",
      "summary": "Norcross · Gwinnett · Source context reviewed",
      "status_scope": "Selected original fleet guide physical page 36 names the Atlanta Norcross center or complex and describes provider computing services and customer support in the present tense. This supports operator listed colocation service at that named center or complex scope. The original guide was captured October 23, 2026 and is reused with its exact original receipt and hash. The current Atlanta market page returned 403 during this review, so its body and a later roster were not read, replaced or adopted from indexed text. The guide service account does not certify present uptime, legal eligibility, audits, installed capacity, exact first commissioning or every component implied by inherited center codes. Planned expansion and advertised availability are not independently completed phases. Provider branding, company roles, component identity and location remain unchanged."
    },
    {
      "id": "google-douglas-county-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Google Douglasville Data Center",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "Calendar-year 2025 operator-reported location totals. Withdrawal, discharge and consumption are separate quantities; methodology permits estimates and does not establish today’s use.",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Google 2026 quarterly performance table; named regional campus scope. Operator-reported period metrics, not an October operating inspection, current MW load or building-specific measurement. Regional values are not assigned to a separate expansion or street-address record. Blank TTM remains unknown. No status, location precision or whole-campus completion upgrade; publication date unknown.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.google/locations/georgia/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.google/efficiency/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/georgia/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "host": "sustainability.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google 2026 Environmental Report"
        }
      ],
      "loc": {
        "lat": 33.68578,
        "lng": -84.76667,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "Georgia statewide page, separate location milestones",
          "fields": {
            "douglas_county_opening_year": 2007,
            "announced_new_locations_year": 2026,
            "new_locations": [
              "LaGrange",
              "Columbia County"
            ],
            "regional_committed_investment_usd_min_exclusive": 3000000000,
            "investment_scope": "Georgia statewide"
          },
          "notes": [
            "2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/georgia/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Google 2026 quarterly performance table; named regional campus scope",
          "fields": {
            "operator_reported_pue_period": "2026-Q2",
            "operator_reported_campus_pue": [
              {
                "source_campus_label": "Douglas County, Georgia",
                "quarterly_pue": 1.1,
                "trailing_twelve_month_pue": 1.09
              }
            ]
          },
          "notes": [
            "Operator-reported period metrics, not an October operating inspection, current MW load or building-specific measurement. Regional values are not assigned to a separate expansion or street-address record. Blank TTM remains unknown. No status, location precision or whole-campus completion upgrade; publication date unknown."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/efficiency/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://datacenters.google/locations/georgia/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "398f42d55ca9e2ebecd3b24e2dede307ad2d9d3b653469d1efebd135488f9c17",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "Douglas County, Georgia is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "annual_water_reporting": {
              "source_location": "Douglas County, GA",
              "report_year": 2026,
              "reporting_year": 2025,
              "source_page": 97,
              "unit": "Million gallons",
              "withdrawal": 440.6,
              "discharge": 73.5,
              "consumption": 367.1
            },
            "water_method_scope": "Annual calendar-year 2025 figures for the reported location, not instantaneous use, a daily rate, an approved limit or one building. Google uses metered or invoiced values when available and can estimate missing data; the table does not identify each row’s metering completeness. Consumption is calculated as withdrawal minus discharge; values are rounded. Seawater and brackish water over 1,000 mg/L total dissolved solids are excluded. Unless otherwise specified, withdrawals are potable; Douglas County includes reclaimed wastewater. No litres or daily averages are calculated.",
            "water_location_association": "Douglas County, GA is associated with this regional campus research context only; no allocation to separate expansion/street-address records or individual buildings.",
            "current_status_basis": "An operating component is supported at Google’s named Douglas County, Georgia location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.",
            "annual_withdrawal_components": {
              "potable_million_gallons": 46.3,
              "reclaimed_wastewater_million_gallons": 394.3,
              "total_million_gallons": 440.6
            }
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/georgia/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
              "host": "sustainability.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google 2026 Environmental Report"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check57, October24,2026",
          "scope": "Google identifies the named Douglas County data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Georgia page distinguishes the existing Douglas County presence from new LaGrange and Columbia County plans. Its2003presence and2007opening wording are not converted to a new exact date or applied to the proposed projects.",
          "fields": {
            "company_association": {
              "name": "Google",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Google identifies the named Douglas County data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Georgia page distinguishes the existing Douglas County presence from new LaGrange and Columbia County plans. Its2003presence and2007opening wording are not converted to a new exact date or applied to the proposed projects."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Google identifies the named Douglas County data center community in the main body of its official data center location page. Operator per source records the Google provider brand for the retained campus only, without assigning a subsidiary, contractor, tenant, legal landowner or every building. These pages do not provide a new street or exact site. Any separately retained service street is identity context only and does not newly admit a location, parcel or roof. Existing who value and its complete source wrapper remain exact. Existing status, location, address, county, quantities, dates and component identity remain exact. Statewide investment, economic activity, training, philanthropy and volunteer totals are not individual campus costs, workforce figures or power demand. Sustainability, recycled water, energy and water project statements are not independent measurements or established environmental outcomes. The page publication date is unknown, distinct from year only milestones. The Georgia page distinguishes the existing Douglas County presence from new LaGrange and Columbia County plans. Its2003presence and2007opening wording are not converted to a new exact date or applied to the proposed projects."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/georgia/",
              "host": "datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Douglasville · Douglas · Source context reviewed",
      "status_scope": "An operating component is supported at Google’s named Douglas County, Georgia location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.",
      "typed_water_facts": [
        {
          "measure": "withdrawal",
          "value": 440.6,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Douglas County, GA, calendar year 2025 withdrawal; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded. Withdrawal combines 46.3 million gallons potable water and 394.3 million gallons reclaimed wastewater; the total is not all potable.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "discharge",
          "value": 73.5,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Douglas County, GA, calendar year 2025 discharge; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded. Withdrawal combines 46.3 million gallons potable water and 394.3 million gallons reclaimed wastewater; the total is not all potable.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "consumption",
          "value": 367.1,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Douglas County, GA, calendar year 2025 consumption; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded. Withdrawal combines 46.3 million gallons potable water and 394.3 million gallons reclaimed wastewater; the total is not all potable.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "google-columbia-county-ga",
      "state": "ga",
      "kind": "project",
      "name": "Google Evans Data Center",
      "group": "proposed",
      "status": "Development listed",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Columbia"
      ],
      "city": "Evans",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.google/locations/georgia/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/georgia/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        }
      ],
      "loc": {
        "lat": 33.55592,
        "lng": -82.27695,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "Georgia statewide page, separate location milestones",
          "fields": {
            "douglas_county_opening_year": 2007,
            "announced_new_locations_year": 2026,
            "new_locations": [
              "LaGrange",
              "Columbia County"
            ],
            "regional_committed_investment_usd_min_exclusive": 3000000000,
            "investment_scope": "Georgia statewide"
          },
          "notes": [
            "2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/georgia/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "Columbia County, Georgia is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "current_development_scope": "Google names Columbia County and dates the development announcement to 2026.",
            "current_status_basis": "Google’s current location page names Columbia County, Georgia as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/georgia/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Evans · Columbia · Source context reviewed",
      "status_scope": "Google’s current location page names Columbia County, Georgia as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13073"
      }
    },
    {
      "id": "google-lagrange-ga",
      "state": "ga",
      "kind": "project",
      "name": "Google LaGrange Data Center",
      "group": "proposed",
      "status": "Development listed",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Troup"
      ],
      "city": "LaGrange",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.google/locations/georgia/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/georgia/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        }
      ],
      "loc": {
        "lat": 33.03319,
        "lng": -85.02857,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "Georgia statewide page, separate location milestones",
          "fields": {
            "douglas_county_opening_year": 2007,
            "announced_new_locations_year": 2026,
            "new_locations": [
              "LaGrange",
              "Columbia County"
            ],
            "regional_committed_investment_usd_min_exclusive": 3000000000,
            "investment_scope": "Georgia statewide"
          },
          "notes": [
            "2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/georgia/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "LaGrange, Georgia is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "current_development_scope": "Google names LaGrange and dates the development announcement to 2026.",
            "current_status_basis": "Google’s current location page names LaGrange, Georgia as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/georgia/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "LaGrange · Troup · Source context reviewed",
      "status_scope": "Google’s current location page names LaGrange, Georgia as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13285"
      }
    },
    {
      "id": "montana-property-group-high-falls-road-spalding-ga",
      "state": "ga",
      "kind": "facility",
      "name": "High Falls Road Data Center Campus (Montana Property Group)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Spalding"
      ],
      "city": "Griffin",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html",
          "host": "griffindailynews.com",
          "date": "2026-04-25",
          "published": "2026-04-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.spaldingcounty.com/",
          "host": "www.spaldingcounty.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 33.26102,
        "lng": -84.28379,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The Griffin Daily News distinguishes Montana Property Group's High Falls/Alicia proposal from Spalding Investments' High Falls/South McDonough proposal, with different acreage, buildings and reported approval stages.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html",
              "host": "griffindailynews.com",
              "date": "2026-04-25",
              "published": "2026-04-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 56",
          "scope": "The current original Spalding County home page reports that an applicant withdrew a data center zoning, special exception, variance and future land use application set to permit full Board consideration and more participation before resubmission. The selected main body does not identify this inherited High Falls project or distinguish the two inherited High Falls entries. The linked letter had an unavailable robots response and was not read. Its filename is not an actual withdrawal day or sufficient identity crosswalk. No exact legal outcome, computing stage, duplicate merger or physical closure is assigned to this record.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unnamed_county_application_notice_exact_project_match_held",
              "scope": "The current original Spalding County home page reports that an applicant withdrew a data center zoning, special exception, variance and future land use application set to permit full Board consideration and more participation before resubmission. The selected main body does not identify this inherited High Falls project or distinguish the two inherited High Falls entries. The linked letter had an unavailable robots response and was not read. Its filename is not an actual withdrawal day or sufficient identity crosswalk. No exact legal outcome, computing stage, duplicate merger or physical closure is assigned to this record."
            },
            "source_read_scope": {
              "original_county_withdrawal_notice_main_body_read": true,
              "unnamed_applicant_not_assigned_to_each_high_falls_entry": true,
              "linked_letter_robots_unavailable": true,
              "filename_not_actual_action_day": true,
              "withdrawal_not_physical_closure": true
            }
          },
          "notes": [
            "The current original Spalding County home page reports that an applicant withdrew a data center zoning, special exception, variance and future land use application set to permit full Board consideration and more participation before resubmission. The selected main body does not identify this inherited High Falls project or distinguish the two inherited High Falls entries. The linked letter had an unavailable robots response and was not read. Its filename is not an actual withdrawal day or sufficient identity crosswalk. No exact legal outcome, computing stage, duplicate merger or physical closure is assigned to this record.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.spaldingcounty.com/",
              "host": "www.spaldingcounty.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Griffin · Spalding · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13255"
      }
    },
    {
      "id": "thor-equities-kingston-technology-hub-bartow-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Kingston Technology Hub (Thor Equities)",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Kingston",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. DRI filing is regional-impact review, not rezoning or construction approval.150 MW is requested peak electrical demand, not critical IT/current load; power supplier named in plans is not examined executed ESA.1 billion project value/2 million annual taxes/2030 completion are forecasts. Publication date saysSeptember 8 while body includes aSeptember 22 campaign event, so date-version provenance is inconsistent; no date inferred for project action. Directory 276 statewide count and 17 DRIs are different non-exhaustive populations. Effingham/OpenAI tax effects and Floyd regulations are separate projects/jurisdictions. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.newslinelocal.com/2026/09/08/another-large-data-center-proposed-in-georgia/",
          "host": "newslinelocal.com",
          "date": "2026-09-08",
          "published": "2026-09-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.kingstongadatacenter.com/",
          "host": "www.kingstongadatacenter.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.cityofkingstonga.org/",
          "host": "www.cityofkingstonga.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 34.27727,
        "lng": -84.85076,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Center Square reporting republished by Newsline Local describes Thor Equities’ proposed Kingston DRI, quoting 350,000 squarefeet,559 acres and 150 MW peak power.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "DRI filing is regional-impact review, not rezoning or construction approval.150 MW is requested peak electrical demand, not critical IT/current load; power supplier named in plans is not examined executed ESA.1 billion project value/2 million annual taxes/2030 completion are forecasts. Publication date saysSeptember 8 while body includes aSeptember 22 campaign event, so date-version provenance is inconsistent; no date inferred for project action. Directory 276 statewide count and 17 DRIs are different non-exhaustive populations. Effingham/OpenAI tax effects and Floyd regulations are separate projects/jurisdictions.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.newslinelocal.com/2026/09/08/another-large-data-center-proposed-in-georgia/",
              "host": "newslinelocal.com",
              "date": "2026-09-08",
              "published": "2026-09-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 56",
          "scope": "The current original Kingston Technology Hub project site explicitly describes the Thor Equities project as proposed and in its early stages. The City original page links that project site and schedules an October 27, 2026 developer open house. It expressly says publication is for awareness without City endorsement or approval. This supports a named listed proposal rather than approved permitting, observed construction or computing operation. Project claims about economic benefits, electricity rates, water, noise and environmental performance remain attributed expectations without independent studies, contracts or measured findings, and are not exported as verified quantities or rules.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_proposal_not_city_approval",
              "scope": "The current original Kingston Technology Hub project site explicitly describes the Thor Equities project as proposed and in its early stages. The City original page links that project site and schedules an October 27, 2026 developer open house. It expressly says publication is for awareness without City endorsement or approval. This supports a named listed proposal rather than approved permitting, observed construction or computing operation. Project claims about economic benefits, electricity rates, water, noise and environmental performance remain attributed expectations without independent studies, contracts or measured findings, and are not exported as verified quantities or rules."
            },
            "source_read_scope": {
              "original_project_overview_and_city_notice_read": true,
              "official_city_link_confirms_selected_project_site": true,
              "developer_openhouse_not_hearing_or_endorsement": true,
              "prospective_benefits_and_assurances_not_findings": true,
              "project_faq_not_measured_impacts_or_final_local_law": true
            }
          },
          "notes": [
            "The current original Kingston Technology Hub project site explicitly describes the Thor Equities project as proposed and in its early stages. The City original page links that project site and schedules an October 27, 2026 developer open house. It expressly says publication is for awareness without City endorsement or approval. This supports a named listed proposal rather than approved permitting, observed construction or computing operation. Project claims about economic benefits, electricity rates, water, noise and environmental performance remain attributed expectations without independent studies, contracts or measured findings, and are not exported as verified quantities or rules.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.kingstongadatacenter.com/",
              "host": "www.kingstongadatacenter.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.cityofkingstonga.org/",
              "host": "www.cityofkingstonga.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kingston · Bartow · Source context reviewed",
      "status_scope": "The current original Kingston Technology Hub project site explicitly describes the Thor Equities project as proposed and in its early stages. The City original page links that project site and schedules an October 27, 2026 developer open house. It expressly says publication is for awareness without City endorsement or approval. This supports a named listed proposal rather than approved permitting, observed construction or computing operation. Project claims about economic benefits, electricity rates, water, noise and environmental performance remain attributed expectations without independent studies, contracts or measured findings, and are not exported as verified quantities or rules.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    },
    {
      "id": "edgeconnex-liberty-road-douglas-county-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Liberty Road Data Center Campus (EdgeConneX)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Villa Rica",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Planning recommendations and board votes distinguished. No current appeal result or permanent prohibition inferred. Regional stock counts and advocated tax revenue not adopted as site facts. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.douglascountysentinel.com/douglasville_sentinel/county-rejects-plans-for-700-acre-data-center-campus/article_a5761e68-bcdb-5537-a954-b2a948460ea3.html",
          "host": "douglascountysentinel.com",
          "date": "2026-07-08",
          "published": "2026-07-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.71006,
        "lng": -84.7767,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "land-use-and-special-use-denials",
            "reported_finding": "Douglas County Sentinel reports 4-1 denials of land-use amendment, rezoning and special-use requests for EdgeConneX / East Dothan Village near Liberty Road.",
            "report_display_date": "2026-07-08",
            "independently_verified_current_status": null
          },
          "notes": [
            "Planning recommendations and board votes distinguished. No current appeal result or permanent prohibition inferred. Regional stock counts and advocated tax revenue not adopted as site facts.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.douglascountysentinel.com/douglasville_sentinel/county-rejects-plans-for-700-acre-data-center-campus/article_a5761e68-bcdb-5537-a954-b2a948460ea3.html",
              "host": "douglascountysentinel.com",
              "date": "2026-07-08",
              "published": "2026-07-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Villa Rica · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "ln-compute-cuthbert-ga",
      "state": "ga",
      "kind": "facility",
      "name": "LN Compute Cuthbert Bitcoin Mine",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Randolph"
      ],
      "city": "Cuthbert",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. LN Compute is not named; current operator identity needs a crosswalk. Megawatts per hour and kilowatts per hour in the report are unit errors, so no silent conversion to IT MW or energy. Household equivalence and water tests are not independently verified measurements; another county's future groundbreaking is separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.walb.com/2025/09/25/new-crypto-mine-could-pump-millions-into-south-georgia-community/",
          "host": "walb.com",
          "date": "2025-09-25",
          "published": "2025-09-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.lncompute.com/",
          "host": "www.lncompute.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 31.76257,
        "lng": -84.75399,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WALB reports an opened cryptocurrency facility in Cuthbert industrial park, interviewing manager Hao Chen.",
            "independently_verified_current_operating_status": null,
            "operator_or_site_identity_needs_crosswalk": true
          },
          "notes": [
            "LN Compute is not named; current operator identity needs a crosswalk. Megawatts per hour and kilowatts per hour in the report are unit errors, so no silent conversion to IT MW or energy. Household equivalence and water tests are not independently verified measurements; another county's future groundbreaking is separate.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.walb.com/2025/09/25/new-crypto-mine-could-pump-millions-into-south-georgia-community/",
              "host": "walb.com",
              "date": "2025-09-25",
              "published": "2025-09-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 56",
          "scope": "The current original LN Compute portfolio explicitly calls its five named Georgia sites operational and lists Cuthbert in Randolph County in that operating portfolio. The company describes current Bitcoin hosting and distinguishes future AI and HPC readiness. This supports reported current service at the named Cuthbert site, without certifying every inherited parcel, actual IT load, a physical opening day or commissioned AI workloads. Contracted capacity, past divestments and wider fleet claims are not exported as Cuthbert technical or ownership facts.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_company_reported_bitcoin_service",
              "scope": "The current original LN Compute portfolio explicitly calls its five named Georgia sites operational and lists Cuthbert in Randolph County in that operating portfolio. The company describes current Bitcoin hosting and distinguishes future AI and HPC readiness. This supports reported current service at the named Cuthbert site, without certifying every inherited parcel, actual IT load, a physical opening day or commissioned AI workloads. Contracted capacity, past divestments and wider fleet claims are not exported as Cuthbert technical or ownership facts."
            },
            "source_read_scope": {
              "original_current_portfolio_and_named_cuthbert_row_read": true,
              "current_bitcoin_workloads_distinct_from_future_ai_hpc": true,
              "no_technical_quantity_or_transaction_export": true,
              "exact_opening_day_unknown": true
            }
          },
          "notes": [
            "The current original LN Compute portfolio explicitly calls its five named Georgia sites operational and lists Cuthbert in Randolph County in that operating portfolio. The company describes current Bitcoin hosting and distinguishes future AI and HPC readiness. This supports reported current service at the named Cuthbert site, without certifying every inherited parcel, actual IT load, a physical opening day or commissioned AI workloads. Contracted capacity, past divestments and wider fleet claims are not exported as Cuthbert technical or ownership facts.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.lncompute.com/",
              "host": "www.lncompute.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cuthbert · Randolph · Source context reviewed",
      "status_scope": "The current original LN Compute portfolio explicitly calls its five named Georgia sites operational and lists Cuthbert in Randolph County in that operating portfolio. The company describes current Bitcoin hosting and distinguishes future AI and HPC readiness. This supports reported current service at the named Cuthbert site, without certifying every inherited parcel, actual IT load, a physical opening day or commissioned AI workloads. Contracted capacity, past divestments and wider fleet claims are not exported as Cuthbert technical or ownership facts.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13243"
      }
    },
    {
      "id": "ln-energy-blackshear-pierce-ga",
      "state": "ga",
      "kind": "facility",
      "name": "LN Energy Blackshear Bitcoin Mine",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Pierce"
      ],
      "city": "Blackshear",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The original county decision and any later appeal remain unreviewed. Prior facilities sold to CleanSpark, their combined capacity and sale price are separate from this proposed site. Utility bills are not investment; noise/health allegations and curtailment promises are not measured effects or an executed contract. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://theenergymag.com/news/2025-02-19/georgia-bitcoin-mining-permit-den",
          "host": "theenergymag.com",
          "date": "2025-02-19",
          "published": "2025-02-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 31.35815,
        "lng": -82.21228,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Energy Magazine reports unanimous Pierce County denial of LN Energy's requested conditional use at 1199 Cason Road, citing the Blackshear Times.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The original county decision and any later appeal remain unreviewed. Prior facilities sold to CleanSpark, their combined capacity and sale price are separate from this proposed site. Utility bills are not investment; noise/health allegations and curtailment promises are not measured effects or an executed contract.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://theenergymag.com/news/2025-02-19/georgia-bitcoin-mining-permit-den",
              "host": "theenergymag.com",
              "date": "2025-02-19",
              "published": "2025-02-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Blackshear · Pierce · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13229"
      }
    },
    {
      "id": "stillwater-lovejoy-panhandle-road-clayton-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Lovejoy Data Center Campus (Stillwater Development)",
      "group": "stopped",
      "status": "Reported withdrawal",
      "raw_status": "stopped",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clayton"
      ],
      "city": "Lovejoy",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Lovejoy is separate from unincorporated Clayton County moratorium. Original DRI contains historical applicant forecasts, not current approval, operation, spending or delivered jobs. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Historical governmental form containing applicant forecasts, separate from reported later withdrawal.. Undated captured form. None of these values proves spending, delivered jobs, tax receipts, measured demand, utility commitment or project approval. Water supply and sewage are separate flows, not additive consumption. No radio-button answer inferred from extracted not-selected labels.",
      "date": "",
      "events": [
        [
          "2026-08-06",
          "The City published its withdrawal acknowledgment August 6, 2026. This is the dated official application account, not a physical shutdown or verified construction of replacement housing."
        ],
        [
          "2026-09-21",
          "The City official FAQ and current release report adoption of a citywide data center prohibition September 21, 2026. This is a separate municipal policy action, not approval of this project or a countywide law."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.atlantanewsfirst.com/2026/08/07/proposal-clayton-county-data-center-withdrawn/",
          "host": "atlantanewsfirst.com",
          "date": "2026-08-06",
          "published": "2026-08-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4794",
          "host": "apps.dca.ga.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://apps.dca.ga.gov/robots.txt",
          "host": "apps.dca.ga.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Source-check access limitation"
        },
        {
          "url": "https://www.cityoflovejoy.com/DocumentCenter/View/2799/Agenda---DEC-15",
          "host": "www.cityoflovejoy.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.cityoflovejoy.com/DocumentCenter/View/2959/PressRel-CityOfLovejoy---080626",
          "host": "www.cityoflovejoy.com",
          "published": "2026-08-06",
          "date": "2026-08-06",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.cityoflovejoy.com/DocumentCenter/View/3005/City_of_Lovejoy_Proposed_Zoning_Amendments_FAQ-Sept29_2026",
          "host": "www.cityoflovejoy.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.cityoflovejoy.com/1147/Media-Release",
          "host": "www.cityoflovejoy.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.cityoflovejoy.com/DocumentCenter/View/3000/LJ-Zoning-re-repeal-SAP-and-data-centers-REVISED",
          "host": "www.cityoflovejoy.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4794",
          "host": "apps.dca.ga.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Original named proposed computing campus location, distinct from developer mailing address"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=11760+Panhandle+Road%2C+Lovejoy%2C+Ga+30228&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal project street query, calculated range only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.3652803424597%2C33.427987288537544%2C-84.35343965754029%2C33.43786871146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source street setting, unknown imagery date"
        }
      ],
      "loc": {
        "lng": -84.35936,
        "lat": 33.432928,
        "precision": "approximate",
        "basis": "Approximate calculated street reference for the proposed Stillwater Technology Park, from the original Georgia DCA DRI 4794 project location 11760 Panhandle Road, Lovejoy, Ga 30228 and one complete literal Census street range in unchanged Clayton County. The retained stopped group is unchanged. This multi building campus street selects no individual roof, tenant, present operation, legal title or full campus. Developer Glenridge mail and neighboring structures are excluded. Source publication and imagery acquisition dates are unknown; imagery may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "formal-withdrawal-reported",
            "reported_finding": "Atlanta News First says Stillwater Lovejoy proposal formally withdrawn at special council session; mayor said residential use pursued instead.",
            "report_display_date": "2026-08-06",
            "independently_verified_current_status": null
          },
          "notes": [
            "Lovejoy is separate from unincorporated Clayton County moratorium. Original DRI contains historical applicant forecasts, not current approval, operation, spending or delivered jobs.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.atlantanewsfirst.com/2026/08/07/proposal-clayton-county-data-center-withdrawn/",
              "host": "atlantanewsfirst.com",
              "date": "2026-08-06",
              "published": "2026-08-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Historical governmental form containing applicant forecasts, separate from reported later withdrawal.",
          "fields": {
            "dri_id": "4794",
            "applicant": "Stillwater Development LLC",
            "local_government": "City of Lovejoy",
            "estimated_buildout_value_usd": 13000000000,
            "estimated_annual_local_tax_revenue_usd": 25000000,
            "estimated_full_time_employees": 650,
            "estimated_peak_connected_load_mw": 1250,
            "power_basis": "Peak connected electrical load, not explicit critical IT capacity",
            "estimated_water_supply_mgd": 0.36,
            "estimated_sewage_mgd": 0.36
          },
          "notes": [
            "Undated captured form. None of these values proves spending, delivered jobs, tax receipts, measured demand, utility commitment or project approval. Water supply and sewage are separate flows, not additive consumption. No radio-button answer inferred from extracted not-selected labels.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4794",
              "host": "apps.dca.ga.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "label": "Status unclear",
              "basis": "Current primary-stage verification remains unresolved after a bounded source-access review. The retained government application describes a historical proposal, while the earlier withdrawal account remains separately attributed reporting.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The application endpoint is disallowed by the currently checked website access policy. It was not fetched or mirrored. No withdrawal, approval or physical stage is promoted from the application, policy or news lead."
          },
          "notes": [
            "The application endpoint is disallowed by the currently checked website access policy. It was not fetched or mirrored. No withdrawal, approval or physical stage is promoted from the application, policy or news lead.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://apps.dca.ga.gov/robots.txt",
              "host": "apps.dca.ga.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Source-check access limitation"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 37",
          "scope": "The original City agenda identifies the Stillwater Panhandle Road application, and the August 6, 2026 City release acknowledges withdrawal of the data center permit application and the conclusion of City consideration of that proposal. Reported withdrawal concerns this application, not shutdown of an operating facility or a permanent restriction on all future property uses. The current City account and FAQ separately report a September 21 citywide data center prohibition. The downloadable ordinance has blank adoption and signature fields and conflicts with the FAQ on unrelated housing density, so it is not certified as the signed final instrument. City policy is not applied throughout Clayton County.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_reported_withdrawal_of_exact_stillwater_application",
              "scope": "The original City agenda identifies the Stillwater Panhandle Road application, and the August 6, 2026 City release acknowledges withdrawal of the data center permit application and the conclusion of City consideration of that proposal. Reported withdrawal concerns this application, not shutdown of an operating facility or a permanent restriction on all future property uses. The current City account and FAQ separately report a September 21 citywide data center prohibition. The downloadable ordinance has blank adoption and signature fields and conflicts with the FAQ on unrelated housing density, so it is not certified as the signed final instrument. City policy is not applied throughout Clayton County."
            },
            "local_rule_context": {
              "jurisdiction": "City of Lovejoy",
              "adopted_on": "2026-09-21",
              "effective_on": null,
              "reported_effective_on": "2026-09-21",
              "expires_on": null,
              "source_scope": "The official FAQ reports immediate effect on adoption. The downloaded unsigned version is not certified as the final signed law. Conflicting housing density figures remain held. Individual vested rights were not reviewed."
            }
          },
          "notes": [
            "The original City agenda identifies the Stillwater Panhandle Road application, and the August 6, 2026 City release acknowledges withdrawal of the data center permit application and the conclusion of City consideration of that proposal. Reported withdrawal concerns this application, not shutdown of an operating facility or a permanent restriction on all future property uses. The current City account and FAQ separately report a September 21 citywide data center prohibition. The downloadable ordinance has blank adoption and signature fields and conflicts with the FAQ on unrelated housing density, so it is not certified as the signed final instrument. City policy is not applied throughout Clayton County.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://www.cityoflovejoy.com/DocumentCenter/View/2799/Agenda---DEC-15",
              "host": "www.cityoflovejoy.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.cityoflovejoy.com/DocumentCenter/View/2959/PressRel-CityOfLovejoy---080626",
              "host": "www.cityoflovejoy.com",
              "published": "2026-08-06",
              "date": "2026-08-06",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.cityoflovejoy.com/DocumentCenter/View/3005/City_of_Lovejoy_Proposed_Zoning_Amendments_FAQ-Sept29_2026",
              "host": "www.cityoflovejoy.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.cityoflovejoy.com/1147/Media-Release",
              "host": "www.cityoflovejoy.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.cityoflovejoy.com/DocumentCenter/View/3000/LJ-Zoning-re-repeal-SAP-and-data-centers-REVISED",
              "host": "www.cityoflovejoy.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort71, 2026-10-24",
          "scope": "Original official proposed Stillwater Technology Park computing campus street only. The retained stopped group is unchanged. One calculated literal street range is an approximate campus street reference, with no selected building, title, present operation or full campus boundary. Separate developer Glenridge mail is excluded.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -84.35936,
                "lat": 33.432928,
                "precision": "approximate",
                "basis": "Approximate calculated street reference for the proposed Stillwater Technology Park, from the original Georgia DCA DRI 4794 project location 11760 Panhandle Road, Lovejoy, Ga 30228 and one complete literal Census street range in unchanged Clayton County. The retained stopped group is unchanged. This multi building campus street selects no individual roof, tenant, present operation, legal title or full campus. Developer Glenridge mail and neighboring structures are excluded. Source publication and imagery acquisition dates are unknown; imagery may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "11760 Panhandle Road, Lovejoy, Ga 30228",
              "county_fips": [
                "13063"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Original official proposed Stillwater Technology Park computing campus street only. The retained stopped group is unchanged. One calculated literal street range is an approximate campus street reference, with no selected building, title, present operation or full campus boundary. Separate developer Glenridge mail is excluded.",
            "The inherited general area coordinate was not independently admitted as a reviewed computing source reference. The original Georgia Department of Community Affairs DRI InitialForm4794 identifies Stillwater Technology Park and the complete project location 11760 Panhandle Road, Lovejoy, Ga 30228, distinct from developer mail at 5775 Glenridge Drive in Atlanta. One complete literal Census input returns a unique street range in retained Clayton County 13063; its rounded range coordinates remain inside that unchanged county. The measured correction is 2546.2 metres. The official page describes a proposed multi building computing campus and does not locate an individual building. The stopped group, all original source versions and every protected field remain exact. No present computing use, physical relocation, title or complete campus extent is certified.",
            "The calculated street setting shows wooded land, a curving road, scattered residential structures and a large multi section structure south of the reference. No building or computing roof is selected. No current construction or operating state is inferred. Imagery acquisition date is unknown and may predate the proposal."
          ],
          "sources": [
            {
              "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4794",
              "host": "apps.dca.ga.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original named proposed computing campus location, distinct from developer mailing address"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=11760+Panhandle+Road%2C+Lovejoy%2C+Ga+30228&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal project street query, calculated range only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.3652803424597%2C33.427987288537544%2C-84.35343965754029%2C33.43786871146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source street setting, unknown imagery date"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate proposed campus street reference, not a computing roof",
      "summary": "Lovejoy · Clayton · Source context reviewed",
      "status_scope": "The original City agenda identifies the Stillwater Panhandle Road application, and the August 6, 2026 City release acknowledges withdrawal of the data center permit application and the conclusion of City consideration of that proposal. Reported withdrawal concerns this application, not shutdown of an operating facility or a permanent restriction on all future property uses. The current City account and FAQ separately report a September 21 citywide data center prohibition. The downloadable ordinance has blank adoption and signature fields and conflicts with the FAQ on unrelated housing density, so it is not certified as the signed final instrument. City policy is not applied throughout Clayton County.",
      "event_evidence": [
        {
          "date": "2026-08-06",
          "text": "The City published its withdrawal acknowledgment August 6, 2026. This is the dated official application account, not a physical shutdown or verified construction of replacement housing.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.cityoflovejoy.com/DocumentCenter/View/2959/PressRel-CityOfLovejoy---080626",
              "host": "www.cityoflovejoy.com",
              "published": "2026-08-06",
              "date": "2026-08-06",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2026-09-21",
          "text": "The City official FAQ and current release report adoption of a citywide data center prohibition September 21, 2026. This is a separate municipal policy action, not approval of this project or a countywide law.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.cityoflovejoy.com/DocumentCenter/View/3005/City_of_Lovejoy_Proposed_Zoning_Amendments_FAQ-Sept29_2026",
              "host": "www.cityoflovejoy.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ]
    },
    {
      "id": "meta-stanton-springs-newton-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Meta Newton Data Center (Stanton Springs)",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Newton"
      ],
      "city": "Social Circle",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Displayed March 14, 2021 date conflicts with forward-looking construction through 2020. Do not use displayed date as original project announcement or infer current completion. Hundreds of renewable MW are offsite energy context, not IT load. Employment multipliers are not site headcounts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2021/03/hello-georgia/",
          "host": "datacenters.atmeta.com",
          "date": "2021-03-14",
          "published": "2021-03-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 33.55455,
        "lng": -83.85042,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "historical_planned_structure_area_sqft": 970000,
            "historical_completion_target_year": 2020
          },
          "notes": [
            "Displayed March 14, 2021 date conflicts with forward-looking construction through 2020. Do not use displayed date as original project announcement or infer current completion. Hundreds of renewable MW are offsite energy context, not IT load. Employment multipliers are not site headcounts.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2021/03/hello-georgia/",
              "host": "datacenters.atmeta.com",
              "date": "2021-03-14",
              "published": "2021-03-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed service",
              "basis": "The current named operator factsheet identifies this campus as part of Meta’s infrastructure providing its technologies and reports its existing operational role.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes."
          },
          "notes": [
            "This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 05, October 23, 2026",
          "scope": "Meta presents its named Stanton Springs data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Meta presents its named Stanton Springs data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Meta presents its named Stanton Springs data center as part of its own infrastructure in its first party fact sheet and describes arranging services for that facility. Operator is the attributed provider brand role, not an independently established legal operating entity, property owner or finding about every building and phase. Forward looking employment figures and company resource claims do not establish current completion, measured use, utility costs or environmental outcomes. No status, location, physical date, technical figure or photograph is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/stanton-springs-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus fact sheet, visually reviewed PDF page 1"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Social Circle · Newton · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet identifies this campus as part of Meta’s infrastructure providing its technologies and reports its existing operational role. This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13217"
      }
    },
    {
      "id": "microsoft-firecracker-rome-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Data Center Campus - Rome, GA",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Floyd"
      ],
      "city": "Rome",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending. Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/",
          "host": "allongeorgia.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://developromefloyd.com/targeted-sectors/technology/",
          "host": "developromefloyd.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/",
          "host": "developromefloyd.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        }
      ],
      "loc": {
        "lat": 34.231,
        "lng": -85.21116,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json",
          "scope": "Named original reporter/issuer context with current versus historical stage explicit.",
          "fields": {},
          "notes": [
            "AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending.",
            "Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established.",
            "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."
          ],
          "sources": [
            {
              "url": "https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/",
              "host": "allongeorgia.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The October 2023 acquisition account and its three-year estimate do not establish October 2026 completion. The development authority’s technology page is general company context; its Coosa article explicitly reprints news. Coosa, Jazzy and Battey site contexts are not transferred to Firecracker. Reprinted news does not become a signed permit or incentive award."
            }
          },
          "notes": [
            "The October 2023 acquisition account and its three-year estimate do not establish October 2026 completion. The development authority’s technology page is general company context; its Coosa article explicitly reprints news. Coosa, Jazzy and Battey site contexts are not transferred to Firecracker. Reprinted news does not become a signed permit or incentive award."
          ],
          "sources": [
            {
              "url": "https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/",
              "host": "allongeorgia.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://developromefloyd.com/targeted-sectors/technology/",
              "host": "developromefloyd.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/",
              "host": "developromefloyd.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "distinct_coosa_proposal_and_firecracker_current_stage_hold",
              "scope": "The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage."
            },
            "identity_hold": {
              "coosa_school_proposal_distinct_from_microsoft_huffaker_purchase": true,
              "republication_not_independent_permit_verification": true,
              "current_firecracker_stage_verified": false,
              "minutes_request_state": "HTTP404"
            }
          },
          "notes": [
            "The development authority page republishes a news report about a second proposed data center on land behind Coosa High School. It expressly distinguishes that proposal from the earlier Microsoft purchase on Huffaker Road. Government hosting does not turn the republished account into an independent permit or operating record. The available authority minutes URL returned 404. Neither the second proposal nor land purchase establishes Firecracker current physical stage.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://developromefloyd.com/data-center-planned-for-114-acres-behind-coosa-high-school/",
              "host": "developromefloyd.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Rome · Floyd · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13115"
      }
    },
    {
      "id": "microsoft-douglasville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Douglasville Data Center Campus",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. statewide qualification thresholds, no named-site award. Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county",
          "host": "dor.georgia.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.7182,
        "lng": -84.75584,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "statewide qualification thresholds, no named-site award",
          "fields": {},
          "notes": [
            "Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county",
              "host": "dor.georgia.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Georgia’s tax page describes statewide high-technology equipment exemption investment thresholds by county population. It does not name Microsoft Douglasville, establish a site award, quantify savings or prove current operation. No project-specific incentive is inferred."
            }
          },
          "notes": [
            "Georgia’s tax page describes statewide high-technology equipment exemption investment thresholds by county population. It does not name Microsoft Douglasville, establish a site award, quantify savings or prove current operation. No project-specific incentive is inferred."
          ],
          "sources": [
            {
              "url": "https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county",
              "host": "dor.georgia.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_construction",
              "scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted."
            },
            "tax_source_scope": {
              "county_threshold_table_not_named_facility_registration": true,
              "incentive_threshold_not_actual_expenditure_or_operation": true
            }
          },
          "notes": [
            "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Douglasville · Douglas · Source context reviewed",
      "status_scope": "The current Microsoft Georgia community page expressly lists Douglasville among locations where it is building data centers. Operator reported construction describes this named campus claim. The county tax threshold page is a general exemption rule, not a Microsoft registration, actual investment, construction verification or operating certificate. No exact start date or delivered building capacity is adopted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "microsoft-east-point-ben-hill-road-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft East Point Data Center (Ben Hill Road)",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "East Point",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft regional Georgia context without exact Ben Hill match. Regional statement does not identify BenHillRoadspecificparcel/building or individual opening/MW. Workforce includes contractors and multiple sites, not per-campus permanent staff.2030goalsand2025renewablecoveragecommitmentnotmeasuredcurrentachievement. SouthFultonCountypagewordingnotindependentlegaljurisdictionname. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/east-point-datacenter-project-overview/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/blog/east-point-georgia-datacenter-project-update/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.83707,
        "lng": -84.43133,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Microsoft regional Georgia context without exact Ben Hill match",
          "fields": {
            "operator_region_label": "South Fulton County, Georgia",
            "regional_workforce_forecast": "hundreds of fulltime employees and contractors across operational facilities by end2026",
            "regional_cooling_description": "direct evaporative, no cooling water below29.4degreesCelsius"
          },
          "notes": [
            "Regional statement does not identify BenHillRoadspecificparcel/building or individual opening/MW. Workforce includes contractors and multiple sites, not per-campus permanent staff.2030goalsand2025renewablecoveragecommitmentnotmeasuredcurrentachievement. SouthFultonCountypagewordingnotindependentlegaljurisdictionname.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_construction",
              "scope": "Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities."
            },
            "component_scope": {
              "site_phase_from_current_project_page": "Construction",
              "regional_jobs_not_allocated_to_site": true,
              "community_feedback_historical_context": "Microsoft describes neighborhood feedback and rock excavation discussions, including a February 26, 2024 information session. Its account is an operator statement, not an independently published formal complaint or regulator finding."
            }
          },
          "notes": [
            "Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/east-point-datacenter-project-overview/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/blog/east-point-georgia-datacenter-project-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own East Point data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The Ben Hill Road project is identified as a campus buildout. Its proposed buildings, substation, parcel totals, renderings and screening are not new physical site counts or surveyed boundaries.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own East Point data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The Ben Hill Road project is identified as a campus buildout. Its proposed buildings, substation, parcel totals, renderings and screening are not new physical site counts or surveyed boundaries."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own East Point data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The Ben Hill Road project is identified as a campus buildout. Its proposed buildings, substation, parcel totals, renderings and screening are not new physical site counts or surveyed boundaries."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/east-point-datacenter-project-overview/",
              "host": "local.microsoft.com",
              "published": "2024-06-17",
              "date": "2024-06-17",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "East Point · Fulton · Source context reviewed",
      "status_scope": "Microsoft expressly describes continuing construction of its named East Point Ben Hill Road campus and identifies its current project phase as construction. Operator reported construction is scoped to that campus development. The two building plan, community improvements and regional employment projections are not completed construction, operation or measured site quantities.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "microsoft-fairwater-fayetteville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Fairwater Atlanta (Azure AI Superfactory)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fayette"
      ],
      "city": "Fayetteville",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fayette generic incentives not Fairwater awarded benefits. Not a Microsoft Fairwater project agreement. Generic eligibility and standard abatement descriptions cannot establish an awarded Fairwater benefit or current 2026 tax rates. No project-specific parcel, IT MW, investment, current stage or actual tax payment verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-11-12",
          "Microsoft published its named Fairwater Atlanta operating account on November 12, 2025. The source reports operation beginning in October without an exact day. November 12 is the publication date, not a manufactured opening day or an operating certification for every Georgia campus."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://fayettega.org/doing-business/incentives-tax-rates/",
          "host": "fayettega.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
          "host": "news.microsoft.com",
          "published": "2025-11-12",
          "date": "2025-11-12",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.4136,
        "lng": -84.49495,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Fayette generic incentives not Fairwater awarded benefits",
          "fields": {
            "publisher": "Fayette County Development Authority",
            "scope": "generic incentive eligibility page",
            "tax_table_year": 2021
          },
          "notes": [
            "Not a Microsoft Fairwater project agreement. Generic eligibility and standard abatement descriptions cannot establish an awarded Fairwater benefit or current 2026 tax rates. No project-specific parcel, IT MW, investment, current stage or actual tax payment verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://fayettega.org/doing-business/incentives-tax-rates/",
              "host": "fayettega.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_named_fairwater_operation",
              "scope": "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name."
            },
            "identity_and_date_scope": {
              "matched_named_facility": "Fairwater Atlanta",
              "inherited_fayetteville_jurisdiction_newly_certified": false,
              "exact_opening_day_established": false,
              "operating_start_month_reported": "October 2025",
              "network_total_not_site_capacity": true,
              "cooling_design_not_measured_total_water_use": true
            }
          },
          "notes": [
            "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
              "host": "news.microsoft.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft explicitly describes its Fairwater Atlanta facility as operating. This identifies the provider brand for that retained named facility. It does not newly establish a Fayetteville street, ownership, a cloud region boundary, a customer identity, network wide quantities or measured water use. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft explicitly describes its Fairwater Atlanta facility as operating. This identifies the provider brand for that retained named facility. It does not newly establish a Fayetteville street, ownership, a cloud region boundary, a customer identity, network wide quantities or measured water use. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Microsoft explicitly describes its Fairwater Atlanta facility as operating. This identifies the provider brand for that retained named facility. It does not newly establish a Fayetteville street, ownership, a cloud region boundary, a customer identity, network wide quantities or measured water use. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
              "host": "news.microsoft.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Fayetteville · Fayette · Source context reviewed",
      "status_scope": "Microsoft explicitly reported operation of its named Fairwater Atlanta AI data center in its November 12, 2025 article, with a start month of October. Operating phase describes this named Fairwater site. It does not certify every Atlanta facility, all regional capacity or an exact opening day. The Fairwater name matches the existing record; the inherited Fayetteville jurisdiction and point are not newly certified by an article using the Atlanta market name.",
      "event_evidence": [
        {
          "date": "2025-11-12",
          "text": "Microsoft published its named Fairwater Atlanta operating account on November 12, 2025. The source reports operation beginning in October without an exact day. November 12 is the publication date, not a manufactured opening day or an operating certification for every Georgia campus.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
              "host": "news.microsoft.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13113"
      }
    },
    {
      "id": "microsoft-palmetto-fulton-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Palmetto Data Center",
      "group": "building",
      "status": "Operator-reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Palmetto",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft Palmetto construction chronology. October2025constructiontargetnotobservedcompletionorcustomerenergization. Schoolinformation-sessionvenueandJohnsonRdviewnotverifiedfacilitystreetaddress. No MW or current construction completion in reviewed undated update. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/",
          "host": "local.microsoft.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.78294,
        "lng": -84.50774,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Microsoft Palmetto construction chronology",
          "fields": {
            "operator_site_name": "Palmetto datacenter",
            "locality": "Palmetto, Georgia",
            "construction_start": "2024-04",
            "construction_start_precision": "month",
            "historical_construction_completion_estimate": "beginning of2025-10",
            "operator_community_information_session_date": "2024-07-23",
            "general_contractor": "Turner Construction Company"
          },
          "notes": [
            "October2025constructiontargetnotobservedcompletionorcustomerenergization. Schoolinformation-sessionvenueandJohnsonRdviewnotverifiedfacilitystreetaddress. No MW or current construction completion in reviewed undated update.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_construction",
              "scope": "The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day."
            },
            "date_scope": {
              "reported_construction_start_month": "2024-04",
              "exact_start_day_established": false,
              "older_completion_forecast": "beginning of October 2025",
              "forecast_occurrence_verified": false
            }
          },
          "notes": [
            "The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/communities/americas/greater-atlanta/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Palmetto data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft reports construction from April 2024 and names Turner Construction Company as general contractor. The elapsed October 2025 completion estimate is not a verified completion or opening; Palmetto Elementary School was a meeting venue, not the site.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Palmetto data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft reports construction from April 2024 and names Turner Construction Company as general contractor. The elapsed October 2025 completion estimate is not a verified completion or opening; Palmetto Elementary School was a meeting venue, not the site."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Palmetto data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. Microsoft reports construction from April 2024 and names Turner Construction Company as general contractor. The elapsed October 2025 completion estimate is not a verified completion or opening; Palmetto Elementary School was a meeting venue, not the site."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/palmetto-datacenter-construction-update/",
              "host": "local.microsoft.com",
              "published": "2024-07-03",
              "date": "2024-07-03",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Palmetto · Fulton · Source context reviewed",
      "status_scope": "The current Microsoft Georgia location page names Palmetto as a data center construction location. The separate Palmetto update records a start month of April 2024 and an estimated completion by the beginning of October 2025. Operator reported construction is the current listing claim. The expired estimate is not verified completion or operation, and the start month is not converted into an exact day.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "microsoft-tyrone-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Microsoft Tyrone Campus (Project Rita)",
      "group": "approved",
      "status": "Zoning approved",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fayette"
      ],
      "city": "Tyrone",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Tyrone dated land-use and operator water forecast summary. Local zoning approval not construction permission or operating status. June2status is dated, not independentOctober14permit search. Local abatement statement not all state/federal tax treatment.4000gpdforecast not measured use; construction may use more. No utilityMWfrom generic100MWtariff threshold. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-02-22",
          "The Town of Tyrone lists the Planning Commission public hearing for the Microsoft rezoning on February 22, 2024. A hearing is separate from the later Council zoning approval and from construction permits."
        ],
        [
          "2024-03-21",
          "The Town of Tyrone lists the Council public hearing for the Microsoft rezoning on March 21, 2024. This is the hearing date, not final approval or a physical milestone."
        ],
        [
          "2024-03-28",
          "The Town of Tyrone dates Council zoning approval for the Microsoft project to March 28, 2024. This is zoning approval only. Site plan review, land disturbance permits, building permits and operation remain separate."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.tyronega.gov/datacenter",
          "host": "tyronega.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/tyrone-datacenter-update/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/wp-content/uploads/2026/07/Tyrone-May-26-Boards.pdf",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.42187,
        "lng": -84.50398,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Tyrone dated land-use and operator water forecast summary",
          "fields": {
            "town_council_zoning_approval_date": "2024-03-28",
            "town_reported_permit_status_as_of": "2026-06-02",
            "town_reported_permit_status": "no site plan,land-disturbance or building-permit applications submitted",
            "town_reported_local_incentive_status": "no abatement offered or requested",
            "operator_estimated_operational_water_gallons_per_day_approx": 4000
          },
          "notes": [
            "Local zoning approval not construction permission or operating status. June2status is dated, not independentOctober14permit search. Local abatement statement not all state/federal tax treatment.4000gpdforecast not measured use; construction may use more. No utilityMWfrom generic100MWtariff threshold.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "tyronega.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 12",
          "scope": "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "town_zoning_approval_with_later_permits_separate",
              "scope": "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation."
            },
            "regulatory_scope": {
              "zoning_approval_on": "2024-03-28",
              "permit_application_absence_account_as_of": "2026-06-02",
              "later_permit_activity_checked_through_today": false,
              "town_explanation_not_countywide_rule_or_legal_advice": true,
              "operator_concept_board_is_draft_not_approved_site_plan": true
            },
            "community_session_date_conflict": {
              "operator_web_invitation": "May 19, 2026",
              "operator_board_footer": "May 26, 2026",
              "exact_session_day_resolved": false,
              "neither_day_added_as_accomplished_timeline_event": true
            }
          },
          "notes": [
            "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://local.microsoft.com/blog/tyrone-datacenter-update/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/wp-content/uploads/2026/07/Tyrone-May-26-Boards.pdf",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check59, October24,2026",
          "scope": "Microsoft identifies its own Tyrone data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The official page states plans for a new Tyrone data center. Its May 19, 2026 Town Hall information session is not a future hearing, a project address or proof of legal approval or operation.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft identifies its own Tyrone data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The official page states plans for a new Tyrone data center. Its May 19, 2026 Town Hall information session is not a future hearing, a project address or proof of legal approval or operation."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Microsoft identifies its own Tyrone data center project in the main body of the official community update. Developer per source identifies the Microsoft provider brand for this retained project only. The previously empty company field is filled from that explicit source, without assigning a legal subsidiary, landowner, contractor or current operator. Existing status, location, address, county, quantities, dates and component identity remain exact. Any separately retained street is identity context only and does not newly admit a location, parcel or roof. Proposed designs, forecast schedules, contractor descriptions and community measures do not certify current physical completion, operation, permits, impacts or site ownership. Declared publication and modification dates are separate from construction milestones. No personal contact or resident names are retained in the review. The official page states plans for a new Tyrone data center. Its May 19, 2026 Town Hall information session is not a future hearing, a project address or proof of legal approval or operation."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/tyrone-datacenter-update/",
              "host": "local.microsoft.com",
              "published": "2026-05-01",
              "date": "2026-05-01",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Tyrone · Fayette · Source context reviewed",
      "status_scope": "The Town of Tyrone expressly says the Microsoft zoning approval remains in place and dates Council approval to March 28, 2024. Zoning approved describes that entitlement only. Its permit absence account is explicitly bounded to May 2026 and June 2, 2026. That historical application check does not establish the absence of later applications, a current work stoppage, issued construction permits or operation.",
      "event_evidence": [
        {
          "date": "2024-02-22",
          "text": "The Town of Tyrone lists the Planning Commission public hearing for the Microsoft rezoning on February 22, 2024. A hearing is separate from the later Council zoning approval and from construction permits.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2024-03-21",
          "text": "The Town of Tyrone lists the Council public hearing for the Microsoft rezoning on March 21, 2024. This is the hearing date, not final approval or a physical milestone.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2024-03-28",
          "text": "The Town of Tyrone dates Council zoning approval for the Microsoft project to March 28, 2024. This is zoning approval only. Site plan review, land disturbance permits, building permits and operation remain separate.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.tyronega.gov/datacenter",
              "host": "www.tyronega.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13113"
      }
    },
    {
      "id": "northern-data-maysville-jackson-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Northern Data Maysville Data Center",
      "group": "building",
      "status": "Reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jackson"
      ],
      "city": "Maysville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Canceled informational meeting is not a canceled project or a new denial. The city clerk's interpretation of code is attributed, not independently reviewed law. Maysville here is in Jackson County, Georgia, not Kentucky. No construction, critical IT, exact approval date or operating status established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wgtjradio.com/maysville-rezoning-controversy-just-got-more-controversial/",
          "host": "wgtjradio.com",
          "date": "2026-05-31",
          "published": "2026-05-31",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.maysvilleneighbor.com/",
          "host": "www.maysvilleneighbor.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://cts.gaepd.org/Complaint/118359",
          "host": "cts.gaepd.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 34.13408,
        "lng": -83.56654,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WGTJ reports cancellation of a Northern Data Maysville informational meeting because previous zoning/conditional-use action had already occurred and scheduling changed.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Canceled informational meeting is not a canceled project or a new denial. The city clerk's interpretation of code is attributed, not independently reviewed law. Maysville here is in Jackson County, Georgia, not Kentucky. No construction, critical IT, exact approval date or operating status established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wgtjradio.com/maysville-rezoning-controversy-just-got-more-controversial/",
              "host": "wgtjradio.com",
              "date": "2026-05-31",
              "published": "2026-05-31",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 37",
          "scope": "The current original Industrial Drive community site explicitly identifies RUM Group as its responsible publisher and states that the computing facility is being built through Quake AI, whose business includes Northern Data. Reported construction is limited to that company account, not commissioning or an independently verified completion milestone. The agency complaint separately identifies Northern Data in Maysville, Jackson County. Its allegation about land disturbance and permit display is not an agency violation finding or independent proof of data hall construction. No acquisition, operator role, capacity or point is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "company_reported_current_industrial_drive_construction",
              "scope": "The current original Industrial Drive community site explicitly identifies RUM Group as its responsible publisher and states that the computing facility is being built through Quake AI, whose business includes Northern Data. Reported construction is limited to that company account, not commissioning or an independently verified completion milestone. The agency complaint separately identifies Northern Data in Maysville, Jackson County. Its allegation about land disturbance and permit display is not an agency violation finding or independent proof of data hall construction. No acquisition, operator role, capacity or point is promoted."
            }
          },
          "notes": [
            "The current original Industrial Drive community site explicitly identifies RUM Group as its responsible publisher and states that the computing facility is being built through Quake AI, whose business includes Northern Data. Reported construction is limited to that company account, not commissioning or an independently verified completion milestone. The agency complaint separately identifies Northern Data in Maysville, Jackson County. Its allegation about land disturbance and permit display is not an agency violation finding or independent proof of data hall construction. No acquisition, operator role, capacity or point is promoted.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://www.maysvilleneighbor.com/",
              "host": "www.maysvilleneighbor.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://cts.gaepd.org/Complaint/118359",
              "host": "cts.gaepd.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Maysville · Jackson · Source context reviewed",
      "status_scope": "The current original Industrial Drive community site explicitly identifies RUM Group as its responsible publisher and states that the computing facility is being built through Quake AI, whose business includes Northern Data. Reported construction is limited to that company account, not commissioning or an independently verified completion milestone. The agency complaint separately identifies Northern Data in Maysville, Jackson County. Its allegation about land disturbance and permit display is not an agency violation finding or independent proof of data hall construction. No acquisition, operator role, capacity or point is promoted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13157"
      }
    },
    {
      "id": "oakley-brown-farm-road-cartersville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Oakley Real Estate Partners Brown Farm Road Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Cartersville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bartow generic agenda without exact-site evidence. Two-page September2,2026 Bartow Commissioner agenda only says zoning applications see summary sheet, which is not included. No Oakley/Brown Farm project identifier, vote or approval appears in this document. Agenda scheduling cannot establish decision or current stage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf",
          "host": "cms2.revize.com",
          "date": "2026-09-02",
          "published": "2026-09-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.26054,
        "lng": -84.82223,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Bartow generic agenda without exact-site evidence",
          "fields": {},
          "notes": [
            "Two-page September2,2026 Bartow Commissioner agenda only says zoning applications see summary sheet, which is not included. No Oakley/Brown Farm project identifier, vote or approval appears in this document. Agenda scheduling cannot establish decision or current stage.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf",
              "host": "cms2.revize.com",
              "date": "2026-09-02",
              "published": "2026-09-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {},
          "notes": [
            "The original September 2026 agenda host disallows automated retrieval. No final commissioner decision is established. Directory and news claims remain leads; access failure does not qualify as a fresh field review."
          ],
          "sources": [
            {
              "url": "https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf",
              "host": "cms2.revize.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Access-check target"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cartersville · Bartow · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    },
    {
      "id": "eagle-rock-pine-ridge-tech-park-twiggs-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Pine Ridge Tech Park",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Twiggs"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Claims about notice and regional review are plaintiffs allegations; article expressly says county had not responded. No court ruling, injunction or current case outcome established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/products/residents-sue-georgia-county-over-data-center-plans",
          "host": "govtech.com",
          "date": "2025-09-29",
          "published": "2025-09-29",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.twiggscounty.us/planning-and-zoning/",
          "host": "www.twiggscounty.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.twiggscounty.us/notice-data-center-application-hearing-documents/",
          "host": "www.twiggscounty.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 32.66693,
        "lng": -83.42697,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "rezoning-litigation-reported",
            "reported_finding": "Macon Telegraph reporting syndicated by GovTech describes residents suit challenging Twiggs County rezoning for Eagle Rock.",
            "report_display_date": "2025-09-29",
            "independently_verified_current_status": null
          },
          "notes": [
            "Claims about notice and regional review are plaintiffs allegations; article expressly says county had not responded. No court ruling, injunction or current case outcome established.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/products/residents-sue-georgia-county-over-data-center-plans",
              "host": "govtech.com",
              "date": "2025-09-29",
              "published": "2025-09-29",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 56",
          "scope": "The current original Twiggs County planning page lists proposed data center development information and a named Pine Ridge Technology Park environmental package. Its original public notice identifies Eaglerock participant requested information sessions in September 2025. These support a named listed proposal and historical notice scope, without establishing current construction, computing service, a court outcome or the substantive final conditional use instrument. The linked ordinance and hearing PDF paths were disallowed by robots and no body was requested. An ordinance link title or private lawsuit report is not promoted into final legal conditions or physical closure.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_named_project_listing_not_physical_operation",
              "scope": "The current original Twiggs County planning page lists proposed data center development information and a named Pine Ridge Technology Park environmental package. Its original public notice identifies Eaglerock participant requested information sessions in September 2025. These support a named listed proposal and historical notice scope, without establishing current construction, computing service, a court outcome or the substantive final conditional use instrument. The linked ordinance and hearing PDF paths were disallowed by robots and no body was requested. An ordinance link title or private lawsuit report is not promoted into final legal conditions or physical closure."
            },
            "source_read_scope": {
              "original_planning_project_listing_and_public_notice_main_body_read": true,
              "environmental_package_title_not_full_study_review": true,
              "linked_ordinance_body_robots_disallowed": true,
              "historical_session_schedule_not_verified_occurrence": true,
              "no_legal_litigation_outcome_inferred": true
            }
          },
          "notes": [
            "The current original Twiggs County planning page lists proposed data center development information and a named Pine Ridge Technology Park environmental package. Its original public notice identifies Eaglerock participant requested information sessions in September 2025. These support a named listed proposal and historical notice scope, without establishing current construction, computing service, a court outcome or the substantive final conditional use instrument. The linked ordinance and hearing PDF paths were disallowed by robots and no body was requested. An ordinance link title or private lawsuit report is not promoted into final legal conditions or physical closure.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.twiggscounty.us/planning-and-zoning/",
              "host": "www.twiggscounty.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.twiggscounty.us/notice-data-center-application-hearing-documents/",
              "host": "www.twiggscounty.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Twiggs · Source context reviewed",
      "status_scope": "The current original Twiggs County planning page lists proposed data center development information and a named Pine Ridge Technology Park environmental package. Its original public notice identifies Eaglerock participant requested information sessions in September 2025. These support a named listed proposal and historical notice scope, without establishing current construction, computing service, a court outcome or the substantive final conditional use instrument. The linked ordinance and hearing PDF paths were disallowed by robots and no body was requested. An ordinance link title or private lawsuit report is not promoted into final legal conditions or physical closure.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13289"
      }
    },
    {
      "id": "taurus-digital-realty-project-bunkhouse-stilesboro-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Bunkhouse (Digital Realty Data Center Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Stilesboro",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bunkhouse filed initial proposal with operator/area holds. Description prints8,675,0000while sizefieldprints8,675,000; scope/typo conflict held, no approved canonical area. Form lists engineering contact as developer, not independentTaurus/DigitalRealty operator confirmation. InitialDRI not rezoning approval, actual build or energized capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4433",
          "host": "apps.dca.ga.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.21706,
        "lng": -84.80816,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Bunkhouse filed initial proposal with operator/area holds",
          "fields": {
            "dri_id": "4433",
            "project_name": "ProjectBunkhouse",
            "published_location_description": "TaffRoad southofHighway113,BartowCounty,Georgia",
            "published_project_point": {
              "latitude": 34.096532,
              "longitude": -84.911951,
              "geo_precision": "applicant-provided project location,not parcel centroid"
            },
            "proposed_area_sqft_size_field": 8675000,
            "estimated_completion_year": 2035,
            "printed_property_owner": "GainesFamilyLandLLC"
          },
          "notes": [
            "Description prints8,675,0000while sizefieldprints8,675,000; scope/typo conflict held, no approved canonical area. Form lists engineering contact as developer, not independentTaurus/DigitalRealty operator confirmation. InitialDRI not rezoning approval, actual build or energized capacity.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4433",
              "host": "apps.dca.ga.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Stilesboro · Bartow · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    },
    {
      "id": "atlas-project-bus-temple-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Bus (Atlas Development Temple Data Center Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Carroll"
      ],
      "city": "Temple",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Page has two date labels and a corporate-location correction that conflicts with its body. Operator identity and exact publication/action dates remain qualified; 2036 is a forecast. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gradickcommunications.com/data-center-planned-for-development-in-carroll-county/",
          "host": "gradickcommunications.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.58281,
        "lng": -85.07987,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Gradick reports Project Bus / Atlas Development proposal in Carroll County requiring rezoning, annexation and sewer.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Page has two date labels and a corporate-location correction that conflicts with its body. Operator identity and exact publication/action dates remain qualified; 2036 is a forecast.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gradickcommunications.com/data-center-planned-for-development-in-carroll-county/",
              "host": "gradickcommunications.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Temple · Carroll · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13045"
      }
    },
    {
      "id": "openai-project-camellia-effingham-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Camellia (OpenAI Effingham County Campus)",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Effingham"
      ],
      "city": "Rincon",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Camellia county forecasts, benefit scopes and incomplete review. County explanation is not independent inspection of executed PILOT, water agreement or all approvals. Forecast PILOT and sales-tax revenue not actual collections or guaranteed sum. 4.3M meal grant is included in 80M community commitment, not extra. ECIDA relief pledge is separate entity commitment. Earlier section school2031 property32M/ESPLOST10.2M and later2032 PILOT39M/ESPLOST13.6M have distinct years/scopes. Construction and operating dates not proven. No diesel after completion is a design plan, not observed zero emissions. No measured water quantities or critical IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center",
          "host": "effinghamcounty.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.36712,
        "lng": -81.34137,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Camellia county forecasts, benefit scopes and incomplete review",
          "fields": {
            "agency": "Effingham County, Georgia",
            "project": "Project Camellia",
            "named_company": "OpenAI",
            "review_stage": "initial requirements met; county/state reviews, permits and inspections remain",
            "planned_phases": 5,
            "minimum_required_investment_basis_usd": 20000000000,
            "openai_community_commitment_lifetime_usd": 80000000,
            "included_school_meal_grant_2026_27_usd": 4300000,
            "ecida_tax_relief_commitment_annual_usd": 30000000,
            "ecida_tax_relief_years": 3,
            "forecast_pilot_2032_annual_usd": {
              "county": 27000000,
              "schools": 39000000
            },
            "forecast_buildout_year": 2032,
            "planned_nonindustrial_neighbor_buffer_feet_min": 300,
            "cooling_plan": "closed loop; treated surface water, not Floridan aquifer groundwater"
          },
          "notes": [
            "County explanation is not independent inspection of executed PILOT, water agreement or all approvals. Forecast PILOT and sales-tax revenue not actual collections or guaranteed sum. 4.3M meal grant is included in 80M community commitment, not extra. ECIDA relief pledge is separate entity commitment. Earlier section school2031 property32M/ESPLOST10.2M and later2032 PILOT39M/ESPLOST13.6M have distinct years/scopes. Construction and operating dates not proven. No diesel after completion is a design plan, not observed zero emissions. No measured water quantities or critical IT MW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center",
              "host": "effinghamcounty.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 37",
          "scope": "The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_named_camellia_initial_consideration_not_completed_review",
              "scope": "The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service."
            }
          },
          "notes": [
            "The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center",
              "host": "www.effinghamcounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Rincon · Effingham · Source context reviewed",
      "status_scope": "The current County original Project Camellia page says initial requirements for consideration have been met but the review process is incomplete, with County and state reviews, approvals, permits and inspections remaining before construction and operation. Agency listed proposal describes that exact procedural scope. Future land purchase, tax revenue phases, power and noise designs are forecasts or commitments rather than delivered outcomes, completed reviews, current construction or computing service.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13103"
      }
    },
    {
      "id": "project-oak-walt-sanders-road-coweta-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Oak Data Center (Walt Sanders Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Coweta"
      ],
      "city": "Newnan",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Existing industrial zoning is not data-center approval. Reduced 255-acre scheme distinct from earlier footprint; applicant future plan undecided. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.times-herald.com/news/project-oak-data-center-denied-by-commissioners/article_76db6b0a-615b-48e6-aacd-5042bdd0f401.html",
          "host": "times-herald.com",
          "date": "2026-08-25",
          "published": "2026-08-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.33099,
        "lng": -84.76181,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "rezoning-condition-change-denied",
            "reported_finding": "Newnan Times-Herald reports unanimous Coweta denial of Project Oak request to remove office/warehouse-only condition on previously industrial-zoned land.",
            "report_display_date": "2026-08-25",
            "independently_verified_current_status": null
          },
          "notes": [
            "Existing industrial zoning is not data-center approval. Reduced 255-acre scheme distinct from earlier footprint; applicant future plan undecided.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.times-herald.com/news/project-oak-data-center-denied-by-commissioners/article_76db6b0a-615b-48e6-aacd-5042bdd0f401.html",
              "host": "times-herald.com",
              "date": "2026-08-25",
              "published": "2026-08-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Newnan · Coweta · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13077"
      }
    },
    {
      "id": "cyrusone-project-peach-palmetto-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Peach (CyrusOne Palmetto Data Center Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Coweta"
      ],
      "city": "Palmetto",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Peach described as April2025 while May2026 roundup prints April2026: approval year held for original resolution. Allegations/communications not court findings. Sail economics not Peach figures. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-10-20",
          "Coweta County October 21, 2026 recap records October 20 Board approval of reversion of the former Project Peach REZONE 24 14 property from Light Industrial to Rural Conservation. This is a zoning action, not a data center opening, physical shutdown or an exact finding about construction activity."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.desmog.com/2026/04/07/how-data-center-developers-staked-their-claim-in-rural-georgia/",
          "host": "desmog.com",
          "date": "2026-04-07",
          "published": "2026-04-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.coweta.ga.us/m/newsflash/Home/Detail/53",
          "host": "www.coweta.ga.us",
          "published": "2026-10-21",
          "date": "2026-10-21",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 33.36438,
        "lng": -84.77561,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "DeSmog distinguishes Project Peach CyrusOne rezoning from Project Sail Atlas/Prologis approval campaign.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Peach described as April2025 while May2026 roundup prints April2026: approval year held for original resolution. Allegations/communications not court findings. Sail economics not Peach figures.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.desmog.com/2026/04/07/how-data-center-developers-staked-their-claim-in-rural-georgia/",
              "host": "desmog.com",
              "date": "2026-04-07",
              "published": "2026-04-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 19",
          "scope": "Coweta October 21, 2026 recap says the Board approved reversion of the former Project Peach REZONE 24 14 property from Light Industrial to Rural Conservation on October 20. This is an affirmative zoning action, not the older industrial approval or a mere scheduled hearing. The recap does not establish an operating facility shutdown, a physical construction phase, the final resolution of concerns or a new operator role. Current physical stage remains unclear; zoning reversion is retained as its own dated event.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "recent_zoning_reversion_not_physical_shutdown",
              "scope": "Coweta October 21, 2026 recap says the Board approved reversion of the former Project Peach REZONE 24 14 property from Light Industrial to Rural Conservation on October 20. This is an affirmative zoning action, not the older industrial approval or a mere scheduled hearing. The recap does not establish an operating facility shutdown, a physical construction phase, the final resolution of concerns or a new operator role. Current physical stage remains unclear; zoning reversion is retained as its own dated event."
            },
            "government_record_scope": {
              "board_action_on": "2026-10-20",
              "county_recap_published_on": "2026-10-21",
              "zoning_reversion_not_operating_closure": true,
              "prior_industrial_approval_not_current_zone": true
            }
          },
          "notes": [
            "Coweta October 21, 2026 recap says the Board approved reversion of the former Project Peach REZONE 24 14 property from Light Industrial to Rural Conservation on October 20. This is an affirmative zoning action, not the older industrial approval or a mere scheduled hearing. The recap does not establish an operating facility shutdown, a physical construction phase, the final resolution of concerns or a new operator role. Current physical stage remains unclear; zoning reversion is retained as its own dated event.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.coweta.ga.us/m/newsflash/Home/Detail/53",
              "host": "www.coweta.ga.us",
              "published": "2026-10-21",
              "date": "2026-10-21",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Palmetto · Coweta · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-10-20",
          "text": "Coweta County October 21, 2026 recap records October 20 Board approval of reversion of the former Project Peach REZONE 24 14 property from Light Industrial to Rural Conservation. This is a zoning action, not a data center opening, physical shutdown or an exact finding about construction activity.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.coweta.ga.us/m/newsflash/Home/Detail/53",
              "host": "www.coweta.ga.us",
              "published": "2026-10-21",
              "date": "2026-10-21",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13077"
      }
    },
    {
      "id": "project-ruby-upatoi-muscogee-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Ruby (Upatoi Data Center Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Muscogee"
      ],
      "city": "Columbus",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Framework adoption is not approval/operating proof for Ruby. USD5.18billion,865acres,600MWand195jobs are proposal/promoter metrics, powerbasisnotcriticalITverified. USD68.7millionannual2030tax forecast is predepreciation, not cash collected or net fiscal impact. Reported500footbuffer/noise/TierIVconditions need original adopted text; ordinance applies beyond one campus. Open-meetings complaint undecided, not established violation; petition5000not verified local residents. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.aol.com/articles/columbus-council-votes-rules-allow-144112000.html",
          "host": "aol.com",
          "date": "2026-06-16",
          "published": "2026-06-16",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.51027,
        "lng": -84.8763,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "Ledger-Enquirer local report syndicated onAOL says ColumbusCouncil voted6-2 June16 for a technology-overlay ordinance; ProjectRuby still needed a developer rezoning request, which had not been submitted.",
            "independently_verified_current_operating_status": null,
            "reported_framework_vote": "2026-06-16",
            "reported_vote_for": 6,
            "reported_vote_against": 2,
            "developer_rezoning_application_submitted_at_publication": false,
            "project_approval_verified": false
          },
          "notes": [
            "Framework adoption is not approval/operating proof for Ruby. USD5.18billion,865acres,600MWand195jobs are proposal/promoter metrics, powerbasisnotcriticalITverified. USD68.7millionannual2030tax forecast is predepreciation, not cash collected or net fiscal impact. Reported500footbuffer/noise/TierIVconditions need original adopted text; ordinance applies beyond one campus. Open-meetings complaint undecided, not established violation; petition5000not verified local residents.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.aol.com/articles/columbus-council-votes-rules-allow-144112000.html",
              "host": "aol.com",
              "date": "2026-06-16",
              "published": "2026-06-16",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Columbus · Muscogee · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13215"
      }
    },
    {
      "id": "prologis-project-sail-coweta-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Sail - Prologis Data Center Campus",
      "group": "proposed",
      "status": "Project listed for development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Coweta"
      ],
      "city": "Newnan",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Coweta Project Sail nine-building concept and fiscal estimate. 100Mfutureannualestimate notpaidincentiveoractualtaxreceipt;tenyearsundatednotexact2036. GeorgiaPower2025IRPclaimedapprovalnotthissiteexecutedESA/energization. No numericcriticalITMWoractualsignedincentive/capexverified. Plannedwatercapacity/lowvisibilitystatementsnotindependentengineeringmeasurements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.cowetaprojectsail.com/coweta-lp/",
          "host": "cowetaprojectsail.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.37558,
        "lng": -84.74691,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Coweta Project Sail nine-building concept and fiscal estimate",
          "fields": {
            "project": "Project Sail",
            "county": "Coweta County, Georgia",
            "planned_buildings": 9,
            "planned_data_center_area_sqft": 4340000,
            "estimated_annual_tax_at_fullbuildout_usd_approx": 100000000,
            "tax_forecast_condition": "fully assessed, completed buildout in roughly10years",
            "site_view_reference": "Wagers Mill Road"
          },
          "notes": [
            "100Mfutureannualestimate notpaidincentiveoractualtaxreceipt;tenyearsundatednotexact2036. GeorgiaPower2025IRPclaimedapprovalnotthissiteexecutedESA/energization. No numericcriticalITMWoractualsignedincentive/capexverified. Plannedwatercapacity/lowvisibilitystatementsnotindependentengineeringmeasurements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.cowetaprojectsail.com/coweta-lp/",
              "host": "cowetaprojectsail.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 37",
          "scope": "The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_project_sail_planned_campus_account",
              "scope": "The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted."
            }
          },
          "notes": [
            "The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://www.cowetaprojectsail.com/coweta-lp/",
              "host": "www.cowetaprojectsail.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Newnan · Coweta · Source context reviewed",
      "status_scope": "The current original Project Sail informational site describes a planned campus and refinement of its site plan. Project listed for development is limited to that continuing proposal account. Advertised buildings, investment benefits, water and acoustic designs remain proposed or forecast. The account is not an original County decision, construction report, operating service account or proof of delivered fiscal benefits. No capacity, developer role or new site reference is promoted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13077"
      }
    },
    {
      "id": "atlas-project-sassy-rome-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Sassy (Atlas Development Rome Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Floyd"
      ],
      "city": "Rome",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Atlas Gracie versus Sassy proposal identity. Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.27861,
        "lng": -85.23083,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Atlas Gracie versus Sassy proposal identity",
          "fields": {
            "developer": "Atlas Development",
            "separate_proposals": [
              {
                "name": "Project Gracie",
                "locality": "Coosa, FloydCounty, Georgia",
                "proposed_acres": 200,
                "proposed_area_sqft": 2400000,
                "proposed_buildings": 7,
                "target_completion_month": "2032-12",
                "reported_planning_recommendation": "4-3 in favor; CountyBoard decision still required"
              },
              {
                "name": "Project Sassy",
                "locality": "Rome, Georgia",
                "proposed_initial_acres": 178,
                "sought_additional_acres": 15
              }
            ]
          },
          "notes": [
            "Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Rome · Floyd · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13115"
      }
    },
    {
      "id": "atlas-project-springbank-adairsville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Springbank (Atlas Development Bartow County Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Adairsville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. filed initial regional-impact proposal. Initial regional-impact information form not rezoning approval, final permit or construction proof. Checkbox selection states not inferred from plain text. Closed-loop description not measured water use or zero wastewater. Mailing address in Carrollton is developer address, not site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4403",
          "host": "apps.dca.ga.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.23733,
        "lng": -84.84002,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "filed initial regional-impact proposal",
          "fields": {
            "dri_id": "4403",
            "project_name": "Project Springbank",
            "submitting_jurisdiction": "Bartow County, Georgia",
            "developer": "Atlas Development LLC",
            "planned_buildings": 6,
            "planned_total_area_sqft": 2274000,
            "published_project_location": {
              "latitude": 34.30926,
              "longitude": -84.96325,
              "geo_precision": "applicant-provided project location; not parcel centroid"
            },
            "estimated_completion_month": "2031-12"
          },
          "notes": [
            "Initial regional-impact information form not rezoning approval, final permit or construction proof. Checkbox selection states not inferred from plain text. Closed-loop description not measured water use or zero wastewater. Mailing address in Carrollton is developer address, not site.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4403",
              "host": "apps.dca.ga.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Adairsville · Bartow · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    },
    {
      "id": "project-turbo-okelly-road-gainesville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Project Turbo (Gainesville Data Center)",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hall"
      ],
      "city": "Gainesville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Material headline/body stage conflict: canonical withdrawal/approval/currentstatus stays unknown until original county record or later reporting. Do not choose abandonment from headline or construction from proposal. USD25millionannualtax is developer forecast oncefinished, not actual taxes or incentive. No119acrefootprintfrom this visible story, no IT/secured power/water independently verified. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-09-15",
          "Hall County staff account records five people speaking in opposition at the September 15, 2025 Planning Commission public hearing on Project Turbo. This dates the recorded hearing episode rather than the first concern, a final project disposition or measured impacts."
        ],
        [
          "2025-10-06",
          "Hall County staff account records an October 6, 2025 Planning Commission recommendation for Project Turbo with ten conditions by three affirmative votes, with one recusal and one absence. The recommendation does not establish a final Board approval or computing commissioning."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.yahoo.com/news/articles/119-acre-data-center-proposed-152324626.html",
          "host": "yahoo.com",
          "date": "2025-08-26",
          "published": "2025-08-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf",
          "host": "nyc3.digitaloceanspaces.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 34.31718,
        "lng": -83.81975,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "WSBTV story syndicated onYahoo describes ProjectTurbo proposed atOkellyRoad GainesvilleHallCounty,900000squarefeet/threebuildings/substation, USD1.2billionproposedvalue and developer-requested delay to aSeptember15planning meeting. Headline says plans abandoned while body still says proposed.",
            "independently_verified_current_operating_status": null,
            "canonical_current_status": null,
            "headline_body_stage_conflict": true
          },
          "notes": [
            "Material headline/body stage conflict: canonical withdrawal/approval/currentstatus stays unknown until original county record or later reporting. Do not choose abandonment from headline or construction from proposal. USD25millionannualtax is developer forecast oncefinished, not actual taxes or incentive. No119acrefootprintfrom this visible story, no IT/secured power/water independently verified.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.yahoo.com/news/articles/119-acre-data-center-proposed-152324626.html",
              "host": "yahoo.com",
              "date": "2025-08-26",
              "published": "2025-08-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 56",
          "scope": "The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_special_use_proposal",
              "scope": "The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance."
            },
            "source_read_scope": {
              "original_memo_all_two_text_pages_read": true,
              "header_and_footer_dates_retained": true,
              "planning_recommendation_not_final_board_action": true,
              "proposed_conditions_not_final_ordinance": true,
              "public_opposition_not_measured_harm": true
            }
          },
          "notes": [
            "The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf",
              "host": "nyc3.digitaloceanspaces.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gainesville · Hall · Source context reviewed",
      "status_scope": "The original Hall County staff memo identifies Project Turbo LLC request for a data center special use at 2400 Okelly Road and records an October 6, 2025 Planning Commission recommendation with ten conditions by three votes to zero, one recusal and one absence. It supports a named formal proposal, without a verified later Board decision, issued building permit, construction start or computing service. The memo header dates October 7, 2025 while its footer references December 11, 2025 Board consideration; neither is assumed to be original publication or final approval. Recommended noise limits, engineering studies, buffers and monitoring are proposed project conditions, not certified Countywide law or measured performance.",
      "event_evidence": [
        {
          "date": "2025-09-15",
          "text": "Hall County staff account records five people speaking in opposition at the September 15, 2025 Planning Commission public hearing on Project Turbo. This dates the recorded hearing episode rather than the first concern, a final project disposition or measured impacts.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf",
              "host": "nyc3.digitaloceanspaces.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2025-10-06",
          "text": "Hall County staff account records an October 6, 2025 Planning Commission recommendation for Project Turbo with ten conditions by three affirmative votes, with one recusal and one absence. The recommendation does not establish a final Board approval or computing commissioning.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://nyc3.digitaloceanspaces.com/hall-county-agenda-pub/media/attachments/17721/Board_Memo_okelly_SU.pdf",
              "host": "nyc3.digitaloceanspaces.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13139"
      }
    },
    {
      "id": "cloverleaf-pumpkin-technology-campus-harlem-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Pumpkin Technology Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Columbia"
      ],
      "city": "Harlem",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Publisher correction: First Bank made EDACC loan; county supplied security deposit. White Oak transaction/loan is separate from Pumpkin project. Four data buildings, two warehouses and offices are different uses; background acoustics not operational noise. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://theaugustapress.com/data-center-project-proposed-along-appling-harlem-road/",
          "host": "theaugustapress.com",
          "date": "2025-12-15",
          "published": "2025-12-15",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.54424,
        "lng": -82.2642,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "Augusta Press describes Pumpkin Technology Campus rezoning request and scheduled January planning review.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Publisher correction: First Bank made EDACC loan; county supplied security deposit. White Oak transaction/loan is separate from Pumpkin project. Four data buildings, two warehouses and offices are different uses; background acoustics not operational noise.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://theaugustapress.com/data-center-project-proposed-along-appling-harlem-road/",
              "host": "theaugustapress.com",
              "date": "2025-12-15",
              "published": "2025-12-15",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Harlem · Columbia · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13073"
      }
    },
    {
      "id": "qts-atlanta-1-atlanta-metro-dc1-ga",
      "state": "ga",
      "kind": "facility",
      "name": "QTS Atlanta 1 (Atlanta-Metro DC1)",
      "group": "operating",
      "status": "Operator-reported operation",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Atlanta",
      "address": "",
      "who": "QTS",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus total, not DC1 alone. Substations are planned; no energized utilization or all-building completion inferred. Company conservation acres and annual report totals excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://q.com/data-centers/atlanta/",
          "host": "q.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://q.com/data-centers/fayetteville/",
          "host": "q.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://q.com/data-centers/atlanta-1/",
          "host": "q.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1033+Jefferson+St+NW%2C+Atlanta%2C+GA+30318&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street method and limits"
        }
      ],
      "loc": {
        "lat": 33.77566228073,
        "lng": -84.422626439969,
        "precision": "address",
        "basis": "Published QTS facility address 1033 Jefferson St NW, Atlanta, GA 30318 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "campus_acres": 99,
            "advertised_critical_campus_capacity_mw_lower_bound": 278,
            "planned_dedicated_substations": 3
          },
          "notes": [
            "Campus total, not DC1 alone. Substations are planned; no energized utilization or all-building completion inferred. Company conservation acres and annual report totals excluded.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/atlanta/",
              "host": "q.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 2",
          "scope": "QTS explicitly says it operates its Atlanta campus in the current Fayetteville page and links that campus to Atlanta 1. The Atlanta 1 page lists DC1 at 1033 Jefferson Street with other campus buildings. The label is a source reported campus operation context. It does not certify every building, advertised capacity, commissioning date or an independent physical site count.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_operation",
              "scope": "QTS explicitly says it operates its Atlanta campus in the current Fayetteville page and links that campus to Atlanta 1. The Atlanta 1 page lists DC1 at 1033 Jefferson Street with other campus buildings. The label is a source reported campus operation context. It does not certify every building, advertised capacity, commissioning date or an independent physical site count."
            }
          },
          "notes": [
            "QTS explicitly says it operates its Atlanta campus in the current Fayetteville page and links that campus to Atlanta 1. The Atlanta 1 page lists DC1 at 1033 Jefferson Street with other campus buildings. The label is a source reported campus operation context. It does not certify every building, advertised capacity, commissioning date or an independent physical site count."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/fayetteville/",
              "host": "q.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://q.com/data-centers/atlanta-1/",
              "host": "q.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 10, October 22, 2026",
          "scope": "Official facility street reference only. No canonical address, status, physical date, quantity, company role, jurisdiction, title, parcel, full campus or distinct building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 33.77566228073,
                "lng": -84.422626439969,
                "precision": "address",
                "basis": "Published QTS facility address 1033 Jefferson St NW, Atlanta, GA 30318 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1033 Jefferson St NW, Atlanta, GA 30318",
              "county_fips": [
                "13121"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The current official operator numeric address section identifies this existing record. Corporate headquarters and related facility cards are excluded. The blank native address wrapper remains exact.",
            "The numeric street, name, type and directions are explicitly matched to the single Census result. State and existing county agree. This is a calculated street reference, not a roof, parcel, suite, independent building count or full campus boundary. Status, dates, quantities, roles, jurisdiction and all earlier source wrappers remain exact.",
            "The existing record explicitly names Atlanta Metro DC1. The official campus page explicitly binds DC1 to 1033 Jefferson Street NW; other building addresses are excluded. Aerial context shows a street beside industrial building forms. No roof or additional campus building is assigned."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/atlanta-1/",
              "host": "q.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Official named facility numeric street section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1033+Jefferson+St+NW%2C+Atlanta%2C+GA+30318&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 08, October 23, 2026",
          "scope": "QTS presents this named facility or campus as part of its data center service offering on its first party location page. Operator is the attributed provider brand role, not an independently established legal operating entity or property owner. Company capacity, resilience, sustainability and community claims do not establish measured effects. No status, location, physical date, technical figure, certification or environmental outcome is promoted. The source describes the Atlanta 1 campus, with multiple buildings, addresses and future components. This role does not resolve a particular DC1 code, change its point or establish completion of all campus works.",
          "fields": {
            "company_association": {
              "name": "QTS",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "QTS presents this named facility or campus as part of its data center service offering on its first party location page. Operator is the attributed provider brand role, not an independently established legal operating entity or property owner. Company capacity, resilience, sustainability and community claims do not establish measured effects. No status, location, physical date, technical figure, certification or environmental outcome is promoted. The source describes the Atlanta 1 campus, with multiple buildings, addresses and future components. This role does not resolve a particular DC1 code, change its point or establish completion of all campus works."
            },
            "provider_role": "operator"
          },
          "notes": [
            "QTS presents this named facility or campus as part of its data center service offering on its first party location page. Operator is the attributed provider brand role, not an independently established legal operating entity or property owner. Company capacity, resilience, sustainability and community claims do not establish measured effects. No status, location, physical date, technical figure, certification or environmental outcome is promoted. The source describes the Atlanta 1 campus, with multiple buildings, addresses and future components. This role does not resolve a particular DC1 code, change its point or establish completion of all campus works.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/atlanta-1/",
              "host": "q.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named facility service page, scoped provider context reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Atlanta · Fulton · Source context reviewed",
      "status_scope": "QTS explicitly says it operates its Atlanta campus in the current Fayetteville page and links that campus to Atlanta 1. The Atlanta 1 page lists DC1 at 1033 Jefferson Street with other campus buildings. The label is a source reported campus operation context. It does not certify every building, advertised capacity, commissioning date or an independent physical site count."
    },
    {
      "id": "qts-blue-hole-blakely-ga",
      "state": "ga",
      "kind": "facility",
      "name": "QTS Project Blue Hole",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Early"
      ],
      "city": "Blakely",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. JacklynnLambert WTVY August11,2026 originalBlakelymeetingreport sayscityapprovedMOUwithEarlyCounty,schools,developmentauthority/QTS. SOURCECORRECTED earlier TAXBREAK label.7.5Mfirstphasefollowed7Mannualpaymentsreportedcommitments, notabatementvalue/paidreceipts. Sharedfunddistributionandwater/sewer/transportdetailsSTILLTOBEAGREEDpercityattorney. Nofullyexecutedallpartycounterpartread, no unconditionalpaymentguarantee/allpermits/ITMWoroperatingdate. Do notmultiplyundefinedannualdurationoraddunrelatedcommunityprojectcosts. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wtvy.com/2026/08/11/blakely-approves-agreement-with-qts-data-centers-related-proposed-facility/",
          "host": "wtvy.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://q.com/data-centers/blakely/",
          "host": "q.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 31.32321,
        "lng": -84.90307,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-opening-land-and-approval-stage-review-round77-2026-10-15.json",
          "scope": "Named original reporter/issuer context with current versus historical stage explicit.",
          "fields": {},
          "notes": [
            "JacklynnLambert WTVY August11,2026 originalBlakelymeetingreport sayscityapprovedMOUwithEarlyCounty,schools,developmentauthority/QTS. SOURCECORRECTED earlier TAXBREAK label.7.5Mfirstphasefollowed7Mannualpaymentsreportedcommitments, notabatementvalue/paidreceipts.",
            "Sharedfunddistributionandwater/sewer/transportdetailsSTILLTOBEAGREEDpercityattorney. Nofullyexecutedallpartycounterpartread, no unconditionalpaymentguarantee/allpermits/ITMWoroperatingdate. Do notmultiplyundefinedannualdurationoraddunrelatedcommunityprojectcosts.",
            "Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."
          ],
          "sources": [
            {
              "url": "https://www.wtvy.com/2026/08/11/blakely-approves-agreement-with-qts-data-centers-related-proposed-facility/",
              "host": "wtvy.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The August 2026 account reports a QTS agreement with future utility and payment arrangements. The publisher expressly corrected the claim that it was a tax break. Proposed amounts are not payments received, and an original signed MOU was not established in this pass. Current construction and operation remain unresolved."
            }
          },
          "notes": [
            "The August 2026 account reports a QTS agreement with future utility and payment arrangements. The publisher expressly corrected the claim that it was a tax break. Proposed amounts are not payments received, and an original signed MOU was not established in this pass. Current construction and operation remain unresolved."
          ],
          "sources": [
            {
              "url": "https://www.wtvy.com/2026/08/11/blakely-approves-agreement-with-qts-data-centers-related-proposed-facility/",
              "host": "www.wtvy.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 2",
          "scope": "QTS describes a proposed Blakely campus in early planning, with final designs and a start date not yet determined. The page does not identify the Project Blue Hole code in the inherited record. Retain the proposal lead while an exact project identity and approval crosswalk remain open. Future commitments and assurances do not establish paid funds or measured effects.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "QTS describes a proposed Blakely campus in early planning, with final designs and a start date not yet determined. The page does not identify the Project Blue Hole code in the inherited record. Retain the proposal lead while an exact project identity and approval crosswalk remain open. Future commitments and assurances do not establish paid funds or measured effects."
            }
          },
          "notes": [
            "QTS describes a proposed Blakely campus in early planning, with final designs and a start date not yet determined. The page does not identify the Project Blue Hole code in the inherited record. Retain the proposal lead while an exact project identity and approval crosswalk remain open. Future commitments and assurances do not establish paid funds or measured effects."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/blakely/",
              "host": "q.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Blakely · Early · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13099"
      }
    },
    {
      "id": "qts-eisenhower-augusta-ga",
      "state": "ga",
      "kind": "facility",
      "name": "QTS Project Eisenhower",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Richmond"
      ],
      "city": "Augusta",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Historical pause is not proof of a moratorium still effective October 14; no later extension or current rule is assumed. Exclusion from the pause is not all permits or commissioning. The proposed one-year extension requested by residents was not the adopted 49-day measure. Neighbor concerns are not health/property-value findings, and nearby Columbia/McDuffie campuses are separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wrdw.com/2026/06/02/augustans-urge-city-leaders-put-data-centers-hold/",
          "host": "wrdw.com",
          "date": "2026-06-02",
          "published": "2026-06-02",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://q.com/data-centers/augusta/",
          "host": "q.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.36,
        "lng": -82.07419,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WRDW reports Augusta's 49-day pause on new projects and explicit exclusion of the existing QTS Eisenhower proposal, where groundwork had been observed.",
            "independently_verified_current_operating_status": null,
            "reported_moratorium_days": 49,
            "reported_action_date": "2026-06-02",
            "source_says_this_project_excluded": true,
            "moratorium_currently_effective": null
          },
          "notes": [
            "Historical pause is not proof of a moratorium still effective October 14; no later extension or current rule is assumed. Exclusion from the pause is not all permits or commissioning. The proposed one-year extension requested by residents was not the adopted 49-day measure. Neighbor concerns are not health/property-value findings, and nearby Columbia/McDuffie campuses are separate.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wrdw.com/2026/06/02/augustans-urge-city-leaders-put-data-centers-hold/",
              "host": "wrdw.com",
              "date": "2026-06-02",
              "published": "2026-06-02",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 2",
          "scope": "QTS describes planned Augusta campuses and an early concept design with a future first building target. This page does not identify Project Eisenhower by code. Neither a citywide discussion nor the displayed June 24 event without a verified year establishes the exact named project stage, an accomplished event or satisfaction of conditions.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "QTS describes planned Augusta campuses and an early concept design with a future first building target. This page does not identify Project Eisenhower by code. Neither a citywide discussion nor the displayed June 24 event without a verified year establishes the exact named project stage, an accomplished event or satisfaction of conditions."
            }
          },
          "notes": [
            "QTS describes planned Augusta campuses and an early concept design with a future first building target. This page does not identify Project Eisenhower by code. Neither a citywide discussion nor the displayed June 24 event without a verified year establishes the exact named project stage, an accomplished event or satisfaction of conditions."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/augusta/",
              "host": "q.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Augusta · Richmond · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13245"
      }
    },
    {
      "id": "serverfarm-covington-hazelbrand-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Serverfarm Covington Data Center (Hazelbrand Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Newton"
      ],
      "city": "Covington",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. GrantBlankenship GPB July7 updatedJuly8,2026 original reporting of GeorgiaEPD letter: likely air-rule violation and construction pause for VoltaGrid gas generation at ServerfarmCovington. Eight of33planned engines reportedly installed before permit;33GENunits not ITMW. Agencyresponse deadline midJuly is historical, later compliance/currentpermit outcome unknown. UnderlyingEPDletter not directlyread. SELCallegations and regulatorlikely wording not final penalty/settledruling. Blackstone/Halliburton1BVoltaGridinvestment notServerfarmcampuscapex. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law",
          "host": "gpb.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.selc.org/wp-content/uploads/2026/06/VoltaGrid-and-Serverfarm-Enforcement-Request.pdf",
          "host": "www.selc.org",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://www.serverfarmllc.com/data-centers/",
          "host": "www.serverfarmllc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.56728,
        "lng": -83.86432,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "GrantBlankenship GPB July7 updatedJuly8,2026 original reporting of GeorgiaEPD letter: likely air-rule violation and construction pause for VoltaGrid gas generation at ServerfarmCovington. Eight of33planned engines reportedly installed before permit;33GENunits not ITMW. Agencyresponse deadline midJuly is historical, later compliance/currentpermit outcome unknown. UnderlyingEPDletter not directlyread. SELCallegations and regulatorlikely wording not final penalty/settledruling. Blackstone/Halliburton1BVoltaGridinvestment notServerfarmcampuscapex.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law",
              "host": "gpb.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The GPB report concerns generation enforcement at Serverfarm Covington, not automatically closure of the whole data center. SELC’s June 25 request is advocacy alleging violations, not an agency finding. Its separate emergency-generator and VoltaGrid prime-engine proposals are not summed as IT capacity. The public DocumentCloud page supplied metadata only; the actual July 2 agency letter was not read and supplies no adopted finding."
            }
          },
          "notes": [
            "The GPB report concerns generation enforcement at Serverfarm Covington, not automatically closure of the whole data center. SELC’s June 25 request is advocacy alleging violations, not an agency finding. Its separate emergency-generator and VoltaGrid prime-engine proposals are not summed as IT capacity. The public DocumentCloud page supplied metadata only; the actual July 2 agency letter was not read and supplies no adopted finding."
          ],
          "sources": [
            {
              "url": "https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law",
              "host": "www.gpb.org",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://www.selc.org/wp-content/uploads/2026/06/VoltaGrid-and-Serverfarm-Enforcement-Request.pdf",
              "host": "www.selc.org",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 56",
          "scope": "The current original Serverfarm locations page lists Covington Georgia as coming soon and separately describes its Atlanta ATL1 facility. The selected current city listing does not independently establish the exact Hazelbrand project identity, physical construction stage, commissioned computing, current tenant or the contents and disposition of a separate enforcement request. Atlanta ATL1 service is not transferred to Covington. City level coming soon wording and contracted or planned infrastructure remain separate from exact facility operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_listing_exact_hazelbrand_crosswalk_and_stage_held",
              "scope": "The current original Serverfarm locations page lists Covington Georgia as coming soon and separately describes its Atlanta ATL1 facility. The selected current city listing does not independently establish the exact Hazelbrand project identity, physical construction stage, commissioned computing, current tenant or the contents and disposition of a separate enforcement request. Atlanta ATL1 service is not transferred to Covington. City level coming soon wording and contracted or planned infrastructure remain separate from exact facility operation."
            },
            "source_read_scope": {
              "current_named_covington_coming_soon_listing_read": true,
              "atlanta_atl1_distinct_from_covington": true,
              "exact_hazelbrand_project_crosswalk_unverified": true,
              "private_enforcement_account_not_adopted_as_official_findings": true
            }
          },
          "notes": [
            "The current original Serverfarm locations page lists Covington Georgia as coming soon and separately describes its Atlanta ATL1 facility. The selected current city listing does not independently establish the exact Hazelbrand project identity, physical construction stage, commissioned computing, current tenant or the contents and disposition of a separate enforcement request. Atlanta ATL1 service is not transferred to Covington. City level coming soon wording and contracted or planned infrastructure remain separate from exact facility operation.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.serverfarmllc.com/data-centers/",
              "host": "www.serverfarmllc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Covington · Newton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13217"
      }
    },
    {
      "id": "tpa-social-circle-technology-park-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Social Circle Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Newton"
      ],
      "city": "Social Circle",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Jarred Schenke, Bisnow January17,2025 original DRI application report: TPA NewtonCountyTechnologyPark near SocialCircle planned nine buildings/about2.6Msf/317ac/$5B, with$7Mannual local-tax forecast. Filing is not approval, secured power or construction. Separate TilfordYards sale/Meta/Rivian projects not site funding or tenant proof. No MW/firm RFS. Underlying application not inspected; company did not respond. Not all fields, current operation, permits, exact parcel or critical IT independently verified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4376",
          "host": "apps.dca.ga.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Access-check target"
        }
      ],
      "loc": {
        "lat": 33.52799,
        "lng": -83.84809,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json",
          "scope": "Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.",
          "fields": {},
          "notes": [
            "Jarred Schenke, Bisnow January17,2025 original DRI application report: TPA NewtonCountyTechnologyPark near SocialCircle planned nine buildings/about2.6Msf/317ac/$5B, with$7Mannual local-tax forecast. Filing is not approval, secured power or construction. Separate TilfordYards sale/Meta/Rivian projects not site funding or tenant proof. No MW/firm RFS. Underlying application not inspected; company did not respond.",
            "Not all fields, current operation, permits, exact parcel or critical IT independently verified."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The reviewed January 2025 news account links the TPA Newton County proposal to DRI 4376; other applications in the article are separate. The original DRI route was access-limited. A filed regional review is not final county approval or construction. This is a limited news-context review, without a new stage label."
            }
          },
          "notes": [
            "The reviewed January 2025 news account links the TPA Newton County proposal to DRI 4376; other applications in the article are separate. The original DRI route was access-limited. A filed regional review is not final county approval or construction. This is a limited news-context review, without a new stage label."
          ],
          "sources": [
            {
              "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4376",
              "host": "apps.dca.ga.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Access-check target"
            },
            {
              "url": "https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605",
              "host": "www.bisnow.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Social Circle · Newton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13217"
      }
    },
    {
      "id": "spalding-investments-high-falls-road-campus-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Spalding Investments Data Center Campus (High Falls Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Spalding"
      ],
      "city": "Griffin",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html",
          "host": "griffindailynews.com",
          "date": "2026-04-25",
          "published": "2026-04-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.spaldingcounty.com/",
          "host": "www.spaldingcounty.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 33.2669,
        "lng": -84.2902,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The Griffin Daily News distinguishes Montana Property Group's High Falls/Alicia proposal from Spalding Investments' High Falls/South McDonough proposal, with different acreage, buildings and reported approval stages.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html",
              "host": "griffindailynews.com",
              "date": "2026-04-25",
              "published": "2026-04-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 56",
          "scope": "The current original Spalding County home page reports that an applicant withdrew a data center zoning, special exception, variance and future land use application set to permit full Board consideration and more participation before resubmission. The selected main body does not identify this inherited High Falls project or distinguish the two inherited High Falls entries. The linked letter had an unavailable robots response and was not read. Its filename is not an actual withdrawal day or sufficient identity crosswalk. No exact legal outcome, computing stage, duplicate merger or physical closure is assigned to this record.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unnamed_county_application_notice_exact_project_match_held",
              "scope": "The current original Spalding County home page reports that an applicant withdrew a data center zoning, special exception, variance and future land use application set to permit full Board consideration and more participation before resubmission. The selected main body does not identify this inherited High Falls project or distinguish the two inherited High Falls entries. The linked letter had an unavailable robots response and was not read. Its filename is not an actual withdrawal day or sufficient identity crosswalk. No exact legal outcome, computing stage, duplicate merger or physical closure is assigned to this record."
            },
            "source_read_scope": {
              "original_county_withdrawal_notice_main_body_read": true,
              "unnamed_applicant_not_assigned_to_each_high_falls_entry": true,
              "linked_letter_robots_unavailable": true,
              "filename_not_actual_action_day": true,
              "withdrawal_not_physical_closure": true
            }
          },
          "notes": [
            "The current original Spalding County home page reports that an applicant withdrew a data center zoning, special exception, variance and future land use application set to permit full Board consideration and more participation before resubmission. The selected main body does not identify this inherited High Falls project or distinguish the two inherited High Falls entries. The linked letter had an unavailable robots response and was not read. Its filename is not an actual withdrawal day or sufficient identity crosswalk. No exact legal outcome, computing stage, duplicate merger or physical closure is assigned to this record.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.spaldingcounty.com/",
              "host": "www.spaldingcounty.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Griffin · Spalding · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13255"
      }
    },
    {
      "id": "t5-atlanta-i-ga",
      "state": "ga",
      "kind": "facility",
      "name": "STACK ATL01 (formerly T5@Atlanta)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Alpharetta",
      "address": "",
      "who": "STACK Infrastructure",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. operator/name crosswalk hold. Preferred source is STACK ATL01 while upstream record is named T5 Atlanta I. This source alone does not prove historical ownership/address equivalence. All specifications held as source context until exact crosswalk established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stackinfra.com/locations/americas/atlanta/atl01/",
          "host": "stackinfra.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.74906,
        "lng": -84.40286,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "operator/name crosswalk hold",
          "fields": {
            "source_identifies_operator": "STACK",
            "source_identifies_site_code": "ATL01",
            "source_identifies_city": "Alpharetta, Georgia",
            "source_campus_critical_capacity_mw": 20,
            "source_campus_buildings": 2,
            "source_campus_acres": 18,
            "source_building_sections": [
              {
                "code": "ATL01A",
                "area_sqft": 105000,
                "power_mw": 8
              },
              {
                "code": "ATL01B",
                "area_sqft": 133000,
                "power_mw": 12
              }
            ]
          },
          "notes": [
            "Preferred source is STACK ATL01 while upstream record is named T5 Atlanta I. This source alone does not prove historical ownership/address equivalence. All specifications held as source context until exact crosswalk established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/atlanta/atl01/",
              "host": "stackinfra.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 17, October 23, 2026",
          "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current ATL01 explicitly names Alpharetta and ATL01A and ATL01B. The retained former T5 record ID stays unchanged; no legal T5 transaction, precise location or whole campus commissioning is inferred.",
          "fields": {
            "company_association": {
              "name": "STACK Infrastructure",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current ATL01 explicitly names Alpharetta and ATL01A and ATL01B. The retained former T5 record ID stays unchanged; no legal T5 transaction, precise location or whole campus commissioning is inferred."
            },
            "provider_role": "operator"
          },
          "notes": [
            "STACK Infrastructure explicitly lists this exact named campus or code in its own source. The operator role is an attributed provider brand relationship, not independently verified legal ownership, whole building control or operation of every phase. Current service and future development stay separate. No status, coordinate, address, physical date, power figure, water figure, safety, certification or environmental outcome is promoted. Current ATL01 explicitly names Alpharetta and ATL01A and ATL01B. The retained former T5 record ID stays unchanged; no legal T5 transaction, precise location or whole campus commissioning is inferred.",
            "Global Stack and Fluidstack are not assigned to STACK Infrastructure by substring matching. Retrieval and publication dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/atlanta/atl01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact code or campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 37",
          "scope": "The current original ATL01 page offers named facility specifications and a tour, including separate building quantities. These marketing and capacity descriptions do not explicitly establish current customer computing or certify the commissioned scope of both buildings. Existing market identity remains intact and current exact physical operation stays held rather than inferred from available capacity or portfolio language.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_atl01_specifications_without_explicit_current_compute_phase",
              "scope": "The current original ATL01 page offers named facility specifications and a tour, including separate building quantities. These marketing and capacity descriptions do not explicitly establish current customer computing or certify the commissioned scope of both buildings. Existing market identity remains intact and current exact physical operation stays held rather than inferred from available capacity or portfolio language."
            }
          },
          "notes": [
            "The current original ATL01 page offers named facility specifications and a tour, including separate building quantities. These marketing and capacity descriptions do not explicitly establish current customer computing or certify the commissioned scope of both buildings. Existing market identity remains intact and current exact physical operation stays held rather than inferred from available capacity or portfolio language.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://www.stackinfra.com/locations/americas/atlanta/atl01/",
              "host": "www.stackinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Alpharetta · Fulton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "switch-atlanta-the-keep-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Switch Atlanta: The KEEP",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Lithia Springs",
      "address": "",
      "who": "Switch",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.switch.com/sustainable-data-center-designs/",
          "host": "switch.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/atlanta/",
          "host": "www.switch.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        }
      ],
      "loc": {
        "lat": 33.69813,
        "lng": -84.79106,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "corporate energy context only",
          "fields": {},
          "notes": [
            "Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "switch.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_service",
              "scope": "Switch currently markets colocation at its Atlanta KEEP campus. The page separately describes future expansion and up-to capacity upon completion. The label applies to campus service context, not every expansion building or delivered future MW."
            }
          },
          "notes": [
            "Switch currently markets colocation at its Atlanta KEEP campus. The page separately describes future expansion and up-to capacity upon completion. The label applies to campus service context, not every expansion building or delivered future MW."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/atlanta/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.switch.com/sustainable-data-center-designs/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 14, October 23, 2026",
          "scope": "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The existing Keep campus and the separately listed Keep 2.0 expansion stay distinct. Marketed Atlanta does not resolve municipal jurisdiction.",
          "fields": {
            "company_association": {
              "name": "Switch",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The existing Keep campus and the separately listed Keep 2.0 expansion stay distinct. Marketed Atlanta does not resolve municipal jurisdiction."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Switch explicitly names this campus in its current location portfolio. Operator is the attributed provider brand relationship, not independent legal ownership, a commissioning finding or completion of every campus phase. Future power, sustainability, certification, reliability and tax marketing claims are not adopted. No status, point, address, physical date, resource value or environmental outcome is promoted. The existing Keep campus and the separately listed Keep 2.0 expansion stay distinct. Marketed Atlanta does not resolve municipal jurisdiction.",
            "Source publication and retrieval dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/atlanta/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lithia Springs · Douglas · Source context reviewed",
      "status_scope": "Switch currently markets colocation at its Atlanta KEEP campus. The page separately describes future expansion and up-to capacity upon completion. The label applies to campus service context, not every expansion building or delivered future MW.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "switch-keep-2-atlanta-north-cartersville-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Switch KEEP 2.0 Atlanta North Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bartow"
      ],
      "city": "Cartersville",
      "address": "",
      "who": "Switch",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Switch phased regional-impact application. 126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061",
          "host": "apps.dca.ga.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.switch.com/atlanta/",
          "host": "www.switch.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party exact campus text, scoped provider relationship reviewed"
        }
      ],
      "loc": {
        "lat": 34.23145,
        "lng": -84.87327,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Switch phased regional-impact application",
          "fields": {
            "dri_id": "4061",
            "project_name": "SwitchKEEP2.0AtlantaNorthCampus",
            "initial_phase_site_acres": 126,
            "initial_phase_buildings": 1,
            "initial_phase_completion_target": "2026-Q2",
            "overall_project_completion_target_year": 2046,
            "published_location_description": "south ofOldAlabamaRoad/BatesRoad intersection towardPauldingCountyline,CityofCartersville"
          },
          "notes": [
            "126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061",
              "host": "apps.dca.ga.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 14, October 23, 2026",
          "scope": "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The current Atlanta page labels a Keep 2.0 construction flyover. Only that written named expansion relationship is adopted. The video was not inspected and supplies no present construction observation or location decision.",
          "fields": {
            "company_association": {
              "name": "Switch",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The current Atlanta page labels a Keep 2.0 construction flyover. Only that written named expansion relationship is adopted. The video was not inspected and supplies no present construction observation or location decision."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Switch explicitly describes development of this named campus in its own source. Developer is an attributed provider brand relationship, not proof of current construction, completed phases, operation, property title or a confirmed parcel. No status, point, address, physical date, resource figure or environmental outcome is promoted. The current Atlanta page labels a Keep 2.0 construction flyover. Only that written named expansion relationship is adopted. The video was not inspected and supplies no present construction observation or location decision.",
            "Source publication and retrieval dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.switch.com/atlanta/",
              "host": "www.switch.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact campus text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cartersville · Bartow · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13015"
      }
    },
    {
      "id": "t5-atlanta-iv-palmetto-ga",
      "state": "ga",
      "kind": "facility",
      "name": "T5 @ Atlanta IV",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Palmetto",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Jarred Schenke, Bisnow June 12, 2024 original Fairburn planning-director interview: early T5 proposal near I-85/Gullatt, 495,000 square feet/two buildings, land not yet owned and use permit still needed. Limited corridor crosswalk to inherited Atlanta IV/Palmetto row; exact parcel/city-boundary discrepancy and later 200/300 MW claims not resolved here. Existing Lithia Springs and Coweta proposal are separate campuses. DRI filing/review is not construction approval or current operation. Not all fields, current operation, precise parcel or critical IT independently certified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.bisnow.com/atlanta/news/data-center/t5-plotting-data-center-campus-in-fairburn-124663",
          "host": "bisnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://t5datacenters.com/locations/t5-atlanta-iv/",
          "host": "t5datacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Access-check target"
        },
        {
          "url": "https://t5datacenters.com/locations/",
          "host": "t5datacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        }
      ],
      "loc": {
        "lat": 33.81838,
        "lng": -84.47496,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json",
          "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.",
          "fields": {},
          "notes": [
            "Jarred Schenke, Bisnow June 12, 2024 original Fairburn planning-director interview: early T5 proposal near I-85/Gullatt, 495,000 square feet/two buildings, land not yet owned and use permit still needed. Limited corridor crosswalk to inherited Atlanta IV/Palmetto row; exact parcel/city-boundary discrepancy and later 200/300 MW claims not resolved here. Existing Lithia Springs and Coweta proposal are separate campuses. DRI filing/review is not construction approval or current operation.",
            "Not all fields, current operation, precise parcel or critical IT independently certified."
          ],
          "sources": [
            {
              "url": "https://www.bisnow.com/atlanta/news/data-center/t5-plotting-data-center-campus-in-fairburn-124663",
              "host": "bisnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {},
          "notes": [
            "The old Atlanta IV URL is unavailable, and the current T5 locations page yielded a category shell without named campus content in the ordinary browser view. Search-index wording is not current captured evidence. No closure is inferred. This attempt receives no freshness credit or stage change."
          ],
          "sources": [
            {
              "url": "https://t5datacenters.com/locations/t5-atlanta-iv/",
              "host": "t5datacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Access-check target"
            },
            {
              "url": "https://t5datacenters.com/locations/",
              "host": "t5datacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Palmetto · Fulton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "ta-realty-east-tanners-church-ellenwood-ga",
      "state": "ga",
      "kind": "facility",
      "name": "TA Realty East Tanners Church Road Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clayton"
      ],
      "city": "Ellenwood",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Ten-year property-tax arrangement starts with 50 percent reduction in year 1 then declines; not 50 percent every year. More than 36 million savings is AJC estimate, not disclosed executed award value or paid subsidy. Forecast 93 million tax revenue is cumulative over ten years, not annual/collected. More than 700 jobs includes temporary construction; roughly 30 employees and 30 contractors are separate operating projections. End 2026 RFS remains future and 180 MW basis is undefined, not critical IT. Site-plan approval in previousOctober is reported history, not all permits/ESA. Later 2026 web modification does not redate the 2025 event. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/policy/clayton-county-ga-agency-approves-tax-break-for-data-center",
          "host": "govtech.com",
          "date": "2025-06-17",
          "published": "2025-06-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.54144,
        "lng": -84.35781,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Atlanta Journal-Constitution reporting republished by Government Technology describes Clayton development-authority approval of a TA Realty incentive package for a proposed 959 million-dollar/180 MW East Tanners Church Road data center.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Ten-year property-tax arrangement starts with 50 percent reduction in year 1 then declines; not 50 percent every year. More than 36 million savings is AJC estimate, not disclosed executed award value or paid subsidy. Forecast 93 million tax revenue is cumulative over ten years, not annual/collected. More than 700 jobs includes temporary construction; roughly 30 employees and 30 contractors are separate operating projections. End 2026 RFS remains future and 180 MW basis is undefined, not critical IT. Site-plan approval in previousOctober is reported history, not all permits/ESA. Later 2026 web modification does not redate the 2025 event.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/policy/clayton-county-ga-agency-approves-tax-break-for-data-center",
              "host": "govtech.com",
              "date": "2025-06-17",
              "published": "2025-06-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ellenwood · Clayton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13063"
      }
    },
    {
      "id": "edgeconnex-union-city-campus-fulton-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Union City Data Center Campus (EdgeConneX / TA Realty)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Union City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The 324 MW total has an undefined basis. First-phase 2026 delivery, overall 2029 target and 2032 requirement are distinct. Land cost, tax abatement, investment and economic impact must not be summed. Original agreements were not reviewed. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.datacenterfrontier.com/hyperscale/article/55126626/details-emerge-on-microsofts-18-billion-investment-in-atlanta-data-centers-amid-tax-development-wrangles",
          "host": "datacenterfrontier.com",
          "date": "2024-07-18",
          "published": "2024-07-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.79008,
        "lng": -84.46735,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "Data Center Frontier names Union City's Project Steamboat, TA Realty, EdgeConneX and Microsoft end use, citing planning records.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The 324 MW total has an undefined basis. First-phase 2026 delivery, overall 2029 target and 2032 requirement are distinct. Land cost, tax abatement, investment and economic impact must not be summed. Original agreements were not reviewed.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.datacenterfrontier.com/hyperscale/article/55126626/details-emerge-on-microsofts-18-billion-investment-in-atlanta-data-centers-amid-tax-development-wrangles",
              "host": "datacenterfrontier.com",
              "date": "2024-07-18",
              "published": "2024-07-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Union City · Fulton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "vantage-douglasville-campus-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Vantage Data Centers Douglasville Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Douglasville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/",
          "host": "insidetowers.com",
          "date": "2024-08-16",
          "published": "2024-08-16",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.72975,
        "lng": -84.77552,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Inside Towers relays Vantage DRI filings for Westlake inSouthFulton 754,000 squarefeet/January 2028 target and separate StacksRoad 697,000 squarefeet/January 2027 target, plus earlier Douglasville 1.7 million-square-foot three-building plan/December 2025 target.",
            "independently_verified_current_operating_status": null,
            "site_specific_scope": "Douglasville1700000sqft/December2025forecast; Stacks Road is a different campus"
          },
          "notes": [
            "Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/",
              "host": "insidetowers.com",
              "date": "2024-08-16",
              "published": "2024-08-16",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Douglasville · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "vantage-westlake-south-fulton-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Vantage Data Centers Westlake",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "South Fulton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/",
          "host": "insidetowers.com",
          "date": "2024-08-16",
          "published": "2024-08-16",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.70983,
        "lng": -84.50903,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Inside Towers relays Vantage DRI filings for Westlake inSouthFulton 754,000 squarefeet/January 2028 target and separate StacksRoad 697,000 squarefeet/January 2027 target, plus earlier Douglasville 1.7 million-square-foot three-building plan/December 2025 target.",
            "independently_verified_current_operating_status": null,
            "site_specific_scope": "Westlake754000sqft/January2028forecast"
          },
          "notes": [
            "Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/",
              "host": "insidetowers.com",
              "date": "2024-08-16",
              "published": "2024-08-16",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "South Fulton · Fulton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13121"
      }
    },
    {
      "id": "white-oak-technology-park-columbia-county-ga",
      "state": "ga",
      "kind": "facility",
      "name": "White Oak Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Columbia"
      ],
      "city": "Appling",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. LizOwens/EthanHunter WRDW originalFebruary25updated26,2026 plaintiffinterview reports TWOjudicialreviewpetitions filedFebruary25 reWhiteOakandPumpkinCenterrezonings. Allegations oftraffic/water/notice/comprehensiveplanfailures notcourtfindings. WhiteOak1635ApplingHarlemRdaccesschangeattributedtopetition, notsurveyedparcel. Originalpleadings/casenumbers/laterorderunread. JournalistinterpretationthatOCGA5-4-3wasoutdatednotcurrentlegalopinion; do notdeclarecaseinvalid/dismissedfromthisreport. Twofilingsnotonecombinedproject; PumpkinCenteralreadycontextreviewedelsewhere. No ITMW/newcurrentoperations. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wrdw.com/2026/02/26/citizen-files-lawsuits-over-columbia-county-data-centers/",
          "host": "wrdw.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://developcolumbiacounty.com/wp-content/uploads/2025/12/11.19.2025-Board-meeting-minutes.pdf",
          "host": "developcolumbiacounty.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 33.51988,
        "lng": -82.26207,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "LizOwens/EthanHunter WRDW originalFebruary25updated26,2026 plaintiffinterview reports TWOjudicialreviewpetitions filedFebruary25 reWhiteOakandPumpkinCenterrezonings. Allegations oftraffic/water/notice/comprehensiveplanfailures notcourtfindings. WhiteOak1635ApplingHarlemRdaccesschangeattributedtopetition, notsurveyedparcel.",
            "Originalpleadings/casenumbers/laterorderunread. JournalistinterpretationthatOCGA5-4-3wasoutdatednotcurrentlegalopinion; do notdeclarecaseinvalid/dismissedfromthisreport. Twofilingsnotonecombinedproject; PumpkinCenteralreadycontextreviewedelsewhere. No ITMW/newcurrentoperations.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://www.wrdw.com/2026/02/26/citizen-files-lawsuits-over-columbia-county-data-centers/",
              "host": "wrdw.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The February 2026 account describes separate White Oak and Pumpkin rezoning challenges. Allegations in petitions are not court findings, and filing a petition does not itself vacate an approval. Final case outcomes and current project stage remain unresolved. No technical quantity is inferred."
            }
          },
          "notes": [
            "The February 2026 account describes separate White Oak and Pumpkin rezoning challenges. Allegations in petitions are not court findings, and filing a petition does not itself vacate an approval. Final case outcomes and current project stage remain unresolved. No technical quantity is inferred."
          ],
          "sources": [
            {
              "url": "https://www.wrdw.com/2026/02/26/citizen-files-lawsuits-over-columbia-county-data-centers/",
              "host": "www.wrdw.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 37",
          "scope": "The November 19, 2025 original authority minutes discuss a future data center rezoning application and approve changed property agreement terms and removal of contractual covenants. These are not final data center zoning approval, current construction or commissioned operation. The minutes print inconsistent years in the projected rezoning schedule, which are not silently corrected. Amazon distribution buildings and proposed cooling and acoustic commitments are not substituted for a current computing phase or measured performance.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historic_white_oak_contract_and_future_rezoning_context",
              "scope": "The November 19, 2025 original authority minutes discuss a future data center rezoning application and approve changed property agreement terms and removal of contractual covenants. These are not final data center zoning approval, current construction or commissioned operation. The minutes print inconsistent years in the projected rezoning schedule, which are not silently corrected. Amazon distribution buildings and proposed cooling and acoustic commitments are not substituted for a current computing phase or measured performance."
            }
          },
          "notes": [
            "The November 19, 2025 original authority minutes discuss a future data center rezoning application and approve changed property agreement terms and removal of contractual covenants. These are not final data center zoning approval, current construction or commissioned operation. The minutes print inconsistent years in the projected rezoning schedule, which are not silently corrected. Amazon distribution buildings and proposed cooling and acoustic commitments are not substituted for a current computing phase or measured performance.",
            "Existing identities, roles, locations, jurisdictions, quantities and physical opening fields remain exact. Source publication, check dates, forecasts and physical milestones have distinct meanings."
          ],
          "sources": [
            {
              "url": "https://developcolumbiacounty.com/wp-content/uploads/2025/12/11.19.2025-Board-meeting-minutes.pdf",
              "host": "developcolumbiacounty.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Appling · Columbia · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13073"
      }
    },
    {
      "id": "tc-atlanta-development-winston-douglas-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Winston Data Center (Waldrop Farms)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Douglas"
      ],
      "city": "Winston",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Reported rezoning action is not all building/environmental approvals, executed utility service or operation. Conditions concern appearance, paths/transit, utility connection, emergency access and heavy vehicles, but exact legal instrument not reviewed; internally awkward project/property reversion wording is not independently interpreted. Forecast 2.4 million/year in 2025 and 96 million over next ten years have unclear annual-versus-cumulative endpoint scope; do not infer 96 million yearly or received taxes. No MW/RFS/capital verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.yahoo.com/news/douglas-county-commissioners-approve-data-210537294.html",
          "host": "yahoo.com",
          "date": "2025-02-05",
          "published": "2025-02-05",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.68821,
        "lng": -84.74613,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "WSB-TV reporting on Yahoo describes Douglas commissioners approving TC Atlanta’s two-building/substation Winston rezoning with added conditions after staff recommended denial.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Reported rezoning action is not all building/environmental approvals, executed utility service or operation. Conditions concern appearance, paths/transit, utility connection, emergency access and heavy vehicles, but exact legal instrument not reviewed; internally awkward project/property reversion wording is not independently interpreted. Forecast 2.4 million/year in 2025 and 96 million over next ten years have unclear annual-versus-cumulative endpoint scope; do not infer 96 million yearly or received taxes. No MW/RFS/capital verified.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.yahoo.com/news/douglas-county-commissioners-approve-data-210537294.html",
              "host": "yahoo.com",
              "date": "2025-02-05",
              "published": "2025-02-05",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Winston · Douglas · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "13097"
      }
    },
    {
      "id": "equinix-at1-atlanta-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Equinix AT1 (Atlanta)",
      "group": "operating",
      "status": "Operator-listed service",
      "crypto": false,
      "type": "Colocation",
      "counties": [
        "Fulton"
      ],
      "city": "Atlanta",
      "address": "180 Peachtree Street NW, 2nd, 3rd and 6th Floors, Atlanta, GA 30303",
      "who": "Equinix",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Primary operator-service research context. Published address only, without a map point. Floor, pod or campus components are not certified separate physical sites. County, legal municipality, ownership, parcel and opening date remain unresolved.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at1",
          "host": "www.equinix.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Equinix official location specifications"
        },
        {
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers",
          "host": "www.equinix.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Equinix official location specifications"
        },
        {
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "host": "www.equinix.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Equinix official U.S. directory"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=180+Peachtree+Street+NW%2C+Atlanta%2C+GA+30303&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Unique Census county of the exact published street"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-84.39145661674475%2C33.75534003631253%2C-84.38389314067526%2C33.76162821453747&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -84.387675,
        "lat": 33.758484,
        "precision": "address",
        "basis": "Current Equinix AT1 published service address 180 Peachtree Street NW, 2nd, 3rd and 6th Floors, Atlanta, GA 30303 matched to one Census street range inside reviewed Fulton County. First calculated street reference, not a surveyed roof, parcel, tenant floor, pod or complete campus. No previous native site coordinate exists for a physical distance comparison. Imagery acquisition date is unknown. Existing native status remains operating."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Operator service street reference, not a surveyed building or parcel",
      "summary": "Atlanta postal locality · Equinix operator listing · no site point",
      "reviewed_evidence": [
        {
          "overlay": "S4-Equinix-Directory-Followup-20261016",
          "scope": "Explicit operator-code service research admission; source address and design descriptions only, without geometry, legal jurisdiction, ownership or physical-site certification.",
          "fields": {
            "operator_facility_code": "AT1",
            "record_association_scope": "Explicit AT1 operator-service research context absent from the 1,852 canonical identities, 314 held IDs and 2,136 retained inventory identities reviewed. No same operator/code or full street-address competitor was identified. Street-number-only candidates are insufficient and are rejected. This does not certify a distinct building/campus, parcel, title, county or municipal jurisdiction; floor/pod/campus components may overlap physical sites.",
            "published_location_address": {
              "lines": [
                "180 Peachtree Street NW",
                "2nd, 3rd and 6th Floors",
                "Atlanta, GA 30303"
              ],
              "scope": "Operator address block as printed, including floors, pod and literal N/A where present. Postal locality only; no geocoding or site point."
            },
            "current_status_basis": "Current operator-listed AT1 colocation service context. The named facility page and published specifications support an operating service component; individual expansions, live availability and complete campus buildout are not independently inspected.",
            "published_technical_specs": {
              "UPS Redundancy": "N+1",
              "Generator Redundancy": "N+1",
              "Generator Autonomy": "30 Hours or more (at full load)",
              "Cooling Redundancy": "N+1"
            },
            "technical_scope": "Operator-published design/redundancy and autonomy descriptions with no technical as-of date. Expressions, floor-specific generator statements and duration lower bounds stay as printed; they are not installed MW, IT capacity, metered consumption, fuel volume, cooling-water quantity or observed uptime."
          },
          "notes": [
            "The new stable ID is absent from the original inventory and withheld-ID cohort. Existing canonical records are unchanged. Commercial-directory hints are not factual sources.",
            "Published floor/pod/N/A details are preserved. An operator code is not automatically a physical building or campus. No point, opening date, MW, water, incentive or guaranteed-uptime outcome is inferred."
          ],
          "sources": [
            {
              "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at1",
              "host": "www.equinix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Equinix official location specifications"
            },
            {
              "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers",
              "host": "www.equinix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Equinix official location specifications"
            },
            {
              "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
              "host": "www.equinix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Equinix official U.S. directory"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 county context cohort 42, October 23, 2026",
          "scope": "Reviewed county of the exact current published street only. No site point, roof, parcel, legal title, municipal boundary, physical stage, party role or quantity is admitted. Existing native location and protected wrappers remain exact.",
          "fields": {
            "county_context": {
              "fips": [
                "13121"
              ],
              "names": [
                "Fulton"
              ],
              "point_admission": false
            }
          },
          "notes": [
            "Only the exact named facility code Address section is used. Floors, suites, pods and business park text remain exact source context, not surveyed units. Nearby facility cards and corporate headquarters are excluded.",
            "Reviewed county of the exact current published street only. No site point, roof, parcel, legal title, municipal boundary, physical stage, party role or quantity is admitted. Existing native location and protected wrappers remain exact.",
            "One unique Census county and its state county display polygon agree. The calculated coordinate remains research evidence only, with no public site point or destination. Postal Richmond and Manassas are not independent city jurisdiction findings.",
            "The original empty county and jurisdiction wrappers remain in conflicts and source history. The canonical published address stays byte exact."
          ],
          "sources": [
            {
              "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at1",
              "host": "www.equinix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current exact facility code service address"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=180+Peachtree+Street+NW%2C+Atlanta%2C+GA+30303&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Unique Census county of the exact published street"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 43, October 23, 2026",
          "scope": "First calculated named operator service street only. Existing native status remains operating. Separately reviewed county context and all protected facts remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -84.387675,
                "lat": 33.758484,
                "precision": "address",
                "basis": "Current Equinix AT1 published service address 180 Peachtree Street NW, 2nd, 3rd and 6th Floors, Atlanta, GA 30303 matched to one Census street range inside reviewed Fulton County. First calculated street reference, not a surveyed roof, parcel, tenant floor, pod or complete campus. No previous native site coordinate exists for a physical distance comparison. Imagery acquisition date is unknown. Existing native status remains operating."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "180 Peachtree Street NW, 2nd, 3rd and 6th Floors, Atlanta, GA 30303",
              "county_fips": [
                "13121"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "No prior native site coordinate exists. The prior county ring is geography only and cannot be compared as a physical site reference. This first calculated street follows the exact current Equinix AT1 service address, unique Census county and street, separately installed county context and actual official imagery setting review. No zero move, roof, parcel or tenant unit is invented.",
            "Actually viewed dense city and commercial blocks, streets and larger structures. No particular roof or tenant floor is selected. Imagery acquisition date is unknown and no current physical stage is inferred.",
            "Exact facility Address section takes precedence over nearby cards. Suites, floors, pods and business park text remain source context, not unit geometry. All canonical wrappers remain exact."
          ],
          "sources": [
            {
              "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at1",
              "host": "www.equinix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current exact named facility code service street"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=180+Peachtree+Street+NW%2C+Atlanta%2C+GA+30303&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Unique calculated street and independently reviewed county match"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-84.39145661674475%2C33.75534003631253%2C-84.38389314067526%2C33.76162821453747&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check54, October24,2026",
          "scope": "Equinix identifies the named AT1 facility and its published service street in the main body of its own location page and advertises its colocation space and facility services. Operator per source records the Equinix provider brand for that component only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised area, redundancy, renewable percentages, certifications, sustainability and market superlatives are not independently verified measurements, legal title or environmental outcomes. Metropolitan market labels do not replace the service municipality. The source publication date is unknown. The source specifies second, third and sixth floors. This provider relationship does not cover every occupant or assert ownership of the entire carrier hotel.",
          "fields": {
            "company_association": {
              "name": "Equinix",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Equinix identifies the named AT1 facility and its published service street in the main body of its own location page and advertises its colocation space and facility services. Operator per source records the Equinix provider brand for that component only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised area, redundancy, renewable percentages, certifications, sustainability and market superlatives are not independently verified measurements, legal title or environmental outcomes. Metropolitan market labels do not replace the service municipality. The source publication date is unknown. The source specifies second, third and sixth floors. This provider relationship does not cover every occupant or assert ownership of the entire carrier hotel."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Equinix identifies the named AT1 facility and its published service street in the main body of its own location page and advertises its colocation space and facility services. Operator per source records the Equinix provider brand for that component only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised area, redundancy, renewable percentages, certifications, sustainability and market superlatives are not independently verified measurements, legal title or environmental outcomes. Metropolitan market labels do not replace the service municipality. The source publication date is unknown. The source specifies second, third and sixth floors. This provider relationship does not cover every occupant or assert ownership of the entire carrier hotel."
          ],
          "sources": [
            {
              "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at1",
              "host": "www.equinix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "raw_status": "partly operating",
      "status_field": "current_status",
      "status_scope": "Current operator-listed AT1 colocation service context. The named facility page and published specifications support an operating service component; individual expansions, live availability and complete campus buildout are not independently inspected.",
      "reviewed_area_context": {
        "checked": "2026-10-23",
        "confidence": "inference",
        "fips": [
          "13121"
        ],
        "review_id": "location-codex2-context042-equinix-at1-atlanta-ga",
        "scope": "Reviewed county of the exact current published street only. No site point, roof, parcel, legal title, municipal boundary, physical stage, party role or quantity is admitted. Existing native location and protected wrappers remain exact.",
        "source_urls": [
          "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at1",
          "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=180+Peachtree+Street+NW%2C+Atlanta%2C+GA+30303&benchmark=Public_AR_Current&vintage=Current_Current&format=json"
        ]
      }
    },
    {
      "id": "equinix-at4-atlanta-ga",
      "state": "ga",
      "kind": "facility",
      "name": "Equinix AT4 (Atlanta)",
      "group": "operating",
      "status": "Operator-listed service",
      "crypto": false,
      "type": "Colocation",
      "counties": [
        "Cobb"
      ],
      "city": "Atlanta",
      "address": "450 Interstate to N PKWY, Atlanta, GA 30339",
      "who": "Equinix",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Primary operator-service research context. Published address only, without a map point. Floor, pod or campus components are not certified separate physical sites. County, legal municipality, ownership, parcel and opening date remain unresolved.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at4",
          "host": "www.equinix.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Equinix official location specifications"
        },
        {
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers",
          "host": "www.equinix.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Equinix official location specifications"
        },
        {
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "host": "www.equinix.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Equinix official U.S. directory"
        },
        {
          "url": "https://delivery-p112322-e1154416.adobeaemcloud.com/adobe/assets/deliver/urn:aaid:aem:e277427d-df16-4720-b4cd-4a30adbefa26/QRG_IBX-Sustainability-Quick-Reference.pdf",
          "host": "delivery-p112322-e1154416.adobeaemcloud.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "AT4 row, current operator linked guide page3"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=450+Interstate+North+Parkway%2C+Atlanta%2C+GA+30339&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Unique literal source street county equivalent match"
        },
        {
          "url": "https://gis.cobbcounty.org/gisserver/rest/services/tax/taxassessorsdaily/MapServer/0/query?where=ST_NUMBER+%3D+450+AND+SITUS_ADDR+LIKE+%27%25INTERSTATE%25%27&outFields=OBJECTID%2CPIN%2CPARID%2CST_NUMBER%2CSITUS_ADDR%2CPARCEL_TYPE%2CHAS_MULTIUNIT&returnGeometry=true&outSR=4326&resultRecordCount=50&f=json",
          "host": "gis.cobbcounty.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact PIN and situs with original source geometry"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-84.45840119122344%2C33.89169844412504%2C-84.44757880877656%2C33.900681555874954&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -84.45299,
        "lat": 33.89619,
        "precision": "approximate",
        "basis": "Approximate calculated center of exact official Cobb County GIS source parcel 17101000020 for AT4 at 450 Interstate North Parkway, Atlanta, GA 30339. No roof, surveyed legal boundary, title, tenant, complete campus or new physical milestone is certified. Source geometry and imagery acquisition dates are unknown. Existing native status remains operating."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Approximate source parcel reference, not a roof or complete campus",
      "summary": "Atlanta postal locality · Equinix operator listing · no site point",
      "reviewed_evidence": [
        {
          "overlay": "S4-Equinix-Directory-Followup-20261016",
          "scope": "Explicit operator-code service research admission; source address and design descriptions only, without geometry, legal jurisdiction, ownership or physical-site certification.",
          "fields": {
            "operator_facility_code": "AT4",
            "record_association_scope": "Explicit AT4 operator-service research context absent from the 1,852 canonical identities, 314 held IDs and 2,136 retained inventory identities reviewed. No same operator/code or full street-address competitor was identified. Street-number-only candidates are insufficient and are rejected. This does not certify a distinct building/campus, parcel, title, county or municipal jurisdiction; floor/pod/campus components may overlap physical sites.",
            "published_location_address": {
              "lines": [
                "450 Interstate to N PKWY",
                "Atlanta, GA 30339"
              ],
              "scope": "Operator address block as printed, including floors, pod and literal N/A where present. Postal locality only; no geocoding or site point."
            },
            "current_status_basis": "Current operator-listed AT4 colocation service context. The named facility page and published specifications support an operating service component; individual expansions, live availability and complete campus buildout are not independently inspected.",
            "published_technical_specs": {
              "UPS Redundancy": "N+1",
              "Generator Redundancy": "N+1",
              "Generator Autonomy": "30 Hours or more (at full load)",
              "Cooling Redundancy": "N+2"
            },
            "technical_scope": "Operator-published design/redundancy and autonomy descriptions with no technical as-of date. Expressions, floor-specific generator statements and duration lower bounds stay as printed; they are not installed MW, IT capacity, metered consumption, fuel volume, cooling-water quantity or observed uptime.",
            "address_source_wording": "The main Address block prints 450 Interstate to N PKWY, while another operator description uses 450 Interstate North Parkway. The main address is retained literally; the street wording is unresolved and no geocoder or point is selected."
          },
          "notes": [
            "The new stable ID is absent from the original inventory and withheld-ID cohort. Existing canonical records are unchanged. Commercial-directory hints are not factual sources.",
            "Published floor/pod/N/A details are preserved. An operator code is not automatically a physical building or campus. No point, opening date, MW, water, incentive or guaranteed-uptime outcome is inferred."
          ],
          "sources": [
            {
              "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at4",
              "host": "www.equinix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Equinix official location specifications"
            },
            {
              "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers",
              "host": "www.equinix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Equinix official location specifications"
            },
            {
              "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
              "host": "www.equinix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Equinix official U.S. directory"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 county context cohort 48, October 23, 2026",
          "scope": "County or county equivalent context only from the exact named source street and official geographic authority. No site point, municipal boundary, surveyed parcel, full campus, physical stage, operator role or quantity is admitted. Any independent point review retains its own scope and precision.",
          "fields": {
            "county_context": {
              "fips": [
                "13067"
              ],
              "names": [
                "Cobb"
              ],
              "point_admission": false
            }
          },
          "notes": [
            "Canonical identity, address, inherited location wrapper, group, all protected facts and source history stay exact. The government street coordinates remain private geographic evidence only.",
            "The old inference municipality wrapper is retained in conflicts. The new county review leaves municipality null because no municipal boundary is certified.",
            "Current canonical operator page literally says450Interstate to N PKWY and its original zero Census result remains retained. The independently operator linked guide actually viewed page3labelsAT4at450InterstateNorthParkway. This is an explicit alternate published spelling review, not silent address replacement. Current official Cobb assessor exact situs and parcelPIN17101000020also corroborate county13067. Guide reporting year2025is not an invented publication or geometry date; no energy or certification finding is adopted."
          ],
          "sources": [
            {
              "url": "https://delivery-p112322-e1154416.adobeaemcloud.com/adobe/assets/deliver/urn:aaid:aem:e277427d-df16-4720-b4cd-4a30adbefa26/QRG_IBX-Sustainability-Quick-Reference.pdf",
              "host": "delivery-p112322-e1154416.adobeaemcloud.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "AT4 row, current operator linked guide page3"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=450+Interstate+North+Parkway%2C+Atlanta%2C+GA+30339&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Unique literal source street county equivalent match"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 49, October 23, 2026",
          "scope": "Approximate official source parcel reference only. Existing native status remains operating. No roof, tenant unit, surveyed legal boundary, complete campus, title, source role or new physical stage is admitted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -84.45299,
                "lat": 33.89619,
                "precision": "approximate",
                "basis": "Approximate calculated center of exact official Cobb County GIS source parcel 17101000020 for AT4 at 450 Interstate North Parkway, Atlanta, GA 30339. No roof, surveyed legal boundary, title, tenant, complete campus or new physical milestone is certified. Source geometry and imagery acquisition dates are unknown. Existing native status remains operating."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": {
                "identifier": "17101000020",
                "identifier_field": "PIN",
                "objectid": 122964,
                "agency": "Cobb County GIS",
                "reference_method": "calculated_polygon_centroid",
                "not_survey_quality": true,
                "legal_title_verified": false,
                "independent_building_identity": false,
                "full_campus_verified": false,
                "operator_ownership_verified": false,
                "county_codes_inferred": false,
                "geometry_acquisition_date": null
              },
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "Explicit current operator linked AT4 guide page3 supplies450InterstateNorthParkway, separately corroborated by exact Cobb assessor PIN17101000020 OBJECTID122964 situs450INTERSTATENORTHPKWY. Canonical450Interstate to N PKWY and its original literal zero stay exact. The unique alternate Census calculation is355.3meters from the county parcel center and is not selected as the site reference. Reporting year2025is not an exact publication date, survey or current physical milestone.",
            "Approximate official source parcel reference only. Existing native status remains operating. No roof, tenant unit, surveyed legal boundary, complete campus, title, source role or new physical stage is admitted.",
            "The source parcel setting contains separate commercial forms, a curved local road, parking, vegetation and an adjacent major highway. No individual roof, surveyed boundary, title or complete campus is selected. The separate Census frame shows the interpolated street beside major highway infrastructure, so its coordinate is retained as corroboration only; the exact county reference polygon supplies the approximate center.",
            "There is no prior native site coordinate. This first contained reference follows explicit source identity and county review. A displayed county ring is discovery context rather than a previous verified site; no physical relocation, roof, full campus or new physical stage is inferred."
          ],
          "sources": [
            {
              "url": "https://delivery-p112322-e1154416.adobeaemcloud.com/adobe/assets/deliver/urn:aaid:aem:e277427d-df16-4720-b4cd-4a30adbefa26/QRG_IBX-Sustainability-Quick-Reference.pdf",
              "host": "delivery-p112322-e1154416.adobeaemcloud.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "AT4 row, current operator linked guide page3"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=450+Interstate+North+Parkway%2C+Atlanta%2C+GA+30339&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Unique literal source street county equivalent match"
            },
            {
              "url": "https://gis.cobbcounty.org/gisserver/rest/services/tax/taxassessorsdaily/MapServer/0/query?where=ST_NUMBER+%3D+450+AND+SITUS_ADDR+LIKE+%27%25INTERSTATE%25%27&outFields=OBJECTID%2CPIN%2CPARID%2CST_NUMBER%2CSITUS_ADDR%2CPARCEL_TYPE%2CHAS_MULTIUNIT&returnGeometry=true&outSR=4326&resultRecordCount=50&f=json",
              "host": "gis.cobbcounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact PIN and situs with original source geometry"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-84.45840119122344%2C33.89169844412504%2C-84.44757880877656%2C33.900681555874954&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check54, October24,2026",
          "scope": "Equinix identifies the named AT4 facility and its published service street in the main body of its own location page and advertises its colocation space and facility services. Operator per source records the Equinix provider brand for that component only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised area, redundancy, renewable percentages, certifications, sustainability and market superlatives are not independently verified measurements, legal title or environmental outcomes. Metropolitan market labels do not replace the service municipality. The source publication date is unknown. The current main address block literally says Interstate to N PKWY, while the related AT1 page links Interstate North Parkway. That wording discrepancy is not repaired through geocoding or used to move a pin.",
          "fields": {
            "company_association": {
              "name": "Equinix",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Equinix identifies the named AT4 facility and its published service street in the main body of its own location page and advertises its colocation space and facility services. Operator per source records the Equinix provider brand for that component only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised area, redundancy, renewable percentages, certifications, sustainability and market superlatives are not independently verified measurements, legal title or environmental outcomes. Metropolitan market labels do not replace the service municipality. The source publication date is unknown. The current main address block literally says Interstate to N PKWY, while the related AT1 page links Interstate North Parkway. That wording discrepancy is not repaired through geocoding or used to move a pin."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Equinix identifies the named AT4 facility and its published service street in the main body of its own location page and advertises its colocation space and facility services. Operator per source records the Equinix provider brand for that component only. Existing who value and its complete source wrapper remain exact. The service street is identity context only and does not newly admit a location, parcel or roof. Existing status, location, address, county, quantities, dates and component identity remain exact. Advertised area, redundancy, renewable percentages, certifications, sustainability and market superlatives are not independently verified measurements, legal title or environmental outcomes. Metropolitan market labels do not replace the service municipality. The source publication date is unknown. The current main address block literally says Interstate to N PKWY, while the related AT1 page links Interstate North Parkway. That wording discrepancy is not repaired through geocoding or used to move a pin."
          ],
          "sources": [
            {
              "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at4",
              "host": "www.equinix.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "raw_status": "partly operating",
      "status_field": "current_status",
      "status_scope": "Current operator-listed AT4 colocation service context. The named facility page and published specifications support an operating service component; individual expansions, live availability and complete campus buildout are not independently inspected.",
      "reviewed_area_context": {
        "fips": [
          "13067"
        ],
        "review_id": "location-codex2-context048-equinix-at4-atlanta-ga",
        "checked": "2026-10-23",
        "confidence": "inference",
        "scope": "County or county equivalent context only from the exact named source street and official geographic authority. No site point, municipal boundary, surveyed parcel, full campus, physical stage, operator role or quantity is admitted. Any independent point review retains its own scope and precision.",
        "source_urls": [
          "https://delivery-p112322-e1154416.adobeaemcloud.com/adobe/assets/deliver/urn:aaid:aem:e277427d-df16-4720-b4cd-4a30adbefa26/QRG_IBX-Sustainability-Quick-Reference.pdf",
          "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=450+Interstate+North+Parkway%2C+Atlanta%2C+GA+30339&benchmark=Public_AR_Current&vintage=Current_Current&format=json"
        ]
      }
    },
    {
      "id": "databank-atl1-midtown-ga",
      "state": "ga",
      "kind": "facility",
      "name": "DataBank ATL1 Midtown Atlanta Data Center",
      "group": "operating",
      "status": "Operator listed service component",
      "crypto": false,
      "type": "Colocation",
      "counties": [
        "Fulton"
      ],
      "city": "Atlanta",
      "address": "760 W Peachtree St NW, Atlanta, GA 30308",
      "who": "DataBank",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Operator listed service component. County level map context. Whole campus delivery remains unverified.",
      "date": "",
      "events": [
        [
          "2026-10-24",
          "Added to the atlas. Admission date, not an opening or construction milestone."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/atlanta/760-peachtree-street/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=760+W+Peachtree+St+NW%2C+Atlanta%2C+GA+30308&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.39333289509808%2C33.77032528853755%2C-84.38144510490191%2C33.780206711462455&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -84.387389,
        "lat": 33.775266,
        "precision": "address",
        "basis": "Original operator reported street 760 W Peachtree St NW, Atlanta, GA 30308 matched through the complete literal Census query. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Calculated street reference, not a roof or tenant floor",
      "summary": "Atlanta operator listing. County level map context.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 5 discovery cohort 2",
          "scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. Part of CODA development in Georgia Tech Technology Square. Do not treat the university HPC occupant or Southern Crossroads connectivity as separate physical additions.",
          "fields": {
            "operator_reported_context": {
              "provider": "DataBank",
              "name": "DataBank ATL1 Midtown Atlanta Data Center",
              "address": "760 W Peachtree St NW, Atlanta, GA 30308",
              "codes": [
                "ATL1"
              ],
              "scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. Part of CODA development in Georgia Tech Technology Square. Do not treat the university HPC occupant or Southern Crossroads connectivity as separate physical additions."
            },
            "county_association": {
              "county": "Fulton",
              "county_fips": "13121",
              "scope": "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-24",
              "scope": "Atlas admission date only. Not publication, opening or construction."
            }
          },
          "notes": [
            "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted.",
            "Census matched 760 W PEACHTREE ST NW, ATLANTA, GA, 30308. Publication date is unknown. Technical capacity, floor area, uptime, renewable and security claims are excluded.",
            "Part of CODA development in Georgia Tech Technology Square. Do not treat the university HPC occupant or Southern Crossroads connectivity as separate physical additions."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/atlanta/760-peachtree-street/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Operator facility or campus listing"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=760+W+Peachtree+St+NW%2C+Atlanta%2C+GA+30308&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Census county context only"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 75, 2026-10-24",
          "scope": "The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -84.387389,
                "lat": 33.775266,
                "precision": "address",
                "basis": "Original operator reported street 760 W Peachtree St NW, Atlanta, GA 30308 matched through the complete literal Census query. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "760 W Peachtree St NW, Atlanta, GA 30308",
              "county_fips": [
                "13121"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
            "The original Native location is null, so a prior point offset cannot be calculated and remains unknown. This source review supplies the first independently qualified location reference for this existing record. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. The complete literal Census input and independently calculated reference agree with the unchanged retained county 13121. This is no claim of physical relocation.",
            "Dense urban blocks, towers, roads and a large divided highway occupy the frame. Source setting only. Acquisition date is unknown and may predate construction. No pixel supplies coordinates, a computing roof, current stage, room, suite, ownership or full campus boundary."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/atlanta/760-peachtree-street/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original operator named computing street, source scope retained"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=760+W+Peachtree+St+NW%2C+Atlanta%2C+GA+30308&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal computing street query, interpolated reference only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.39333289509808%2C33.77032528853755%2C-84.38144510490191%2C33.780206711462455&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "raw_status": "partly operating",
      "status_field": "current_status",
      "status_scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. Part of CODA development in Georgia Tech Technology Square. Do not treat the university HPC occupant or Southern Crossroads connectivity as separate physical additions."
    },
    {
      "id": "databank-atl4-south-fulton-ga",
      "state": "ga",
      "kind": "facility",
      "name": "DataBank ATL4 South Fulton Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "crypto": false,
      "type": "Colocation",
      "counties": [
        "Fulton"
      ],
      "city": "Atlanta",
      "address": "200 Selig Dr SW, Atlanta, GA 30336",
      "who": "DataBank",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Operator facility context. County level map context. Current stage remains unclear.",
      "date": "",
      "events": [
        [
          "2026-10-24",
          "Added to the atlas. Admission date, not an opening or construction milestone."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/atlanta/200-selig-dr-sw/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=200+Selig+Dr+SW%2C+Atlanta%2C+GA+30336&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.54664664002823%2C33.752228288537545%2C-84.53476135997178%2C33.76210971146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -84.540704,
        "lat": 33.757169,
        "precision": "address",
        "basis": "Original operator reported street 200 Selig Dr SW, Atlanta, GA 30336 matched through the complete literal Census query. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Calculated street reference, not a roof or tenant floor",
      "summary": "Atlanta operator listing. County level map context.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 5 discovery cohort 2",
          "scope": "The source describes a single tenant facility and uses future will deliver wording. No present operating or construction status is inferred. Single tenant facility listing includes future will deliver wording for capacity. Current service stage remains unresolved; do not infer operating, building or approval from the advertised capacity.",
          "fields": {
            "operator_reported_context": {
              "provider": "DataBank",
              "name": "DataBank ATL4 South Fulton Data Center",
              "address": "200 Selig Dr SW, Atlanta, GA 30336",
              "codes": [
                "ATL4"
              ],
              "scope": "The source describes a single tenant facility and uses future will deliver wording. No present operating or construction status is inferred. Single tenant facility listing includes future will deliver wording for capacity. Current service stage remains unresolved; do not infer operating, building or approval from the advertised capacity."
            },
            "county_association": {
              "county": "Fulton",
              "county_fips": "13121",
              "scope": "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-24",
              "scope": "Atlas admission date only. Not publication, opening or construction."
            }
          },
          "notes": [
            "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted.",
            "Census matched 200 SELIG DR SW, ATLANTA, GA, 30336. Publication date is unknown. Technical capacity, floor area, uptime, renewable and security claims are excluded.",
            "Single tenant facility listing includes future will deliver wording for capacity. Current service stage remains unresolved; do not infer operating, building or approval from the advertised capacity."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/atlanta/200-selig-dr-sw/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Operator facility or campus listing"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=200+Selig+Dr+SW%2C+Atlanta%2C+GA+30336&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Census county context only"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 75, 2026-10-24",
          "scope": "The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -84.540704,
                "lat": 33.757169,
                "precision": "address",
                "basis": "Original operator reported street 200 Selig Dr SW, Atlanta, GA 30336 matched through the complete literal Census query. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "200 Selig Dr SW, Atlanta, GA 30336",
              "county_fips": [
                "13121"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
            "The original Native location is null, so a prior point offset cannot be calculated and remains unknown. This source review supplies the first independently qualified location reference for this existing record. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. The complete literal Census input and independently calculated reference agree with the unchanged retained county 13121. This is no claim of physical relocation.",
            "Large industrial forms, loading areas, trucks, curving access roads and substantial woodland occupy the frame. Source setting only. Acquisition date is unknown and may predate construction. No pixel supplies coordinates, a computing roof, current stage, room, suite, ownership or full campus boundary."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/atlanta/200-selig-dr-sw/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original operator named computing street, source scope retained"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=200+Selig+Dr+SW%2C+Atlanta%2C+GA+30336&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal computing street query, interpolated reference only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.54664664002823%2C33.752228288537545%2C-84.53476135997178%2C33.76210971146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ]
    },
    {
      "id": "databank-lithia-springs-campus-ga",
      "state": "ga",
      "kind": "facility",
      "name": "DataBank Lithia Springs Campus",
      "group": "operating",
      "status": "Operator listed service component",
      "crypto": false,
      "type": "Colocation",
      "counties": [
        "Fulton"
      ],
      "city": "South Fulton",
      "address": "4764 Bakers Ferry Rd SW, South Fulton, GA 30336",
      "who": "DataBank",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Operator listed service component. County level map context. Whole campus delivery remains unverified.",
      "date": "",
      "events": [
        [
          "2026-10-24",
          "Added to the atlas. Admission date, not an opening or construction milestone."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/atlanta/lithia-springs/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4764+Bakers+Ferry+Rd+SW%2C+South+Fulton%2C+GA+30336&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4764+Bakers+Ferry+Rd.+SW%2C+South+Fulton%2C+GA+30336&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal computing street query, interpolated reference only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.54909093361373%2C33.742035288537544%2C-84.53720706638627%2C33.75191671146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -84.543149,
        "lat": 33.746976,
        "precision": "approximate",
        "basis": "Original operator reported street 4764 Bakers Ferry Rd. SW, South Fulton, GA 30336 matched through the complete literal Census query. The original operator identifies this street for a named member of the retained campus or complex. Use only an approximate component street reference for one aggregate record. No complete campus center, boundary, extra record or selected computing roof is established. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Approximate component street context, not a building or complete campus",
      "summary": "South Fulton operator listing. County level map context.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 5 discovery cohort 2",
          "scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. One campus context for ATL5 and ATL6. ATL5 is described as first deployed facility; does not establish full campus completion. Lithia Springs is campus branding; operator postal service address states South Fulton.",
          "fields": {
            "operator_reported_context": {
              "provider": "DataBank",
              "name": "DataBank Lithia Springs Campus",
              "address": "4764 Bakers Ferry Rd SW, South Fulton, GA 30336",
              "codes": [
                "ATL5",
                "ATL6"
              ],
              "scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. One campus context for ATL5 and ATL6. ATL5 is described as first deployed facility; does not establish full campus completion. Lithia Springs is campus branding; operator postal service address states South Fulton."
            },
            "county_association": {
              "county": "Fulton",
              "county_fips": "13121",
              "scope": "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-24",
              "scope": "Atlas admission date only. Not publication, opening or construction."
            }
          },
          "notes": [
            "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted.",
            "Census matched 4764 BAKERS FERRY RD SW, SOUTH FULTON, GA, 30336. Publication date is unknown. Technical capacity, floor area, uptime, renewable and security claims are excluded.",
            "One campus context for ATL5 and ATL6. ATL5 is described as first deployed facility; does not establish full campus completion. Lithia Springs is campus branding; operator postal service address states South Fulton.",
            "Lithia Springs is operator campus branding. The operator street address uses South Fulton. Only Census Fulton County context is adopted."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/atlanta/lithia-springs/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Operator facility or campus listing"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4764+Bakers+Ferry+Rd+SW%2C+South+Fulton%2C+GA+30336&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Census county context only"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 75, 2026-10-24",
          "scope": "The original operator identifies this street for a named member of the retained campus or complex. Use only an approximate component street reference for one aggregate record. No complete campus center, boundary, extra record or selected computing roof is established. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -84.543149,
                "lat": 33.746976,
                "precision": "approximate",
                "basis": "Original operator reported street 4764 Bakers Ferry Rd. SW, South Fulton, GA 30336 matched through the complete literal Census query. The original operator identifies this street for a named member of the retained campus or complex. Use only an approximate component street reference for one aggregate record. No complete campus center, boundary, extra record or selected computing roof is established. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "4764 Bakers Ferry Rd. SW, South Fulton, GA 30336",
              "county_fips": [
                "13121"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original operator identifies this street for a named member of the retained campus or complex. Use only an approximate component street reference for one aggregate record. No complete campus center, boundary, extra record or selected computing roof is established. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
            "The original Native location is null, so a prior point offset cannot be calculated and remains unknown. This source review supplies the first independently qualified location reference for this existing record. The original operator identifies this street for a named member of the retained campus or complex. Use only an approximate component street reference for one aggregate record. No complete campus center, boundary, extra record or selected computing roof is established. The complete literal Census input and independently calculated reference agree with the unchanged retained county 13121. This is no claim of physical relocation.",
            "Industrial buildings, roads, extensive trees and warehouse parking occupy the frame. Unknown imagery date may precede the named campus development. Source setting only. Acquisition date is unknown and may predate construction. No pixel supplies coordinates, a computing roof, current stage, room, suite, ownership or full campus boundary."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/atlanta/lithia-springs/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original operator named computing street, source scope retained"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4764+Bakers+Ferry+Rd.+SW%2C+South+Fulton%2C+GA+30336&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal computing street query, interpolated reference only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.54909093361373%2C33.742035288537544%2C-84.53720706638627%2C33.75191671146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "raw_status": "partly operating",
      "status_field": "current_status",
      "status_scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. One campus context for ATL5 and ATL6. ATL5 is described as first deployed facility; does not establish full campus completion. Lithia Springs is campus branding; operator postal service address states South Fulton."
    },
    {
      "id": "databank-west-end-complex-ga",
      "state": "ga",
      "kind": "facility",
      "name": "DataBank Atlanta West End complex",
      "group": "operating",
      "status": "Operator listed service component",
      "crypto": false,
      "type": "Colocation",
      "counties": [
        "Fulton"
      ],
      "city": "Atlanta",
      "address": "1100 White Street Southwest, Atlanta, GA 30310",
      "who": "DataBank",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Operator listed service component. County level map context. Whole campus delivery remains unverified.",
      "date": "",
      "events": [
        [
          "2026-10-24",
          "Added to the atlas. Admission date, not an opening or construction milestone."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/atlanta/1100-white-street-southwest/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1100+White+Street+Southwest%2C+Atlanta%2C+GA+30310&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://www.databank.com/data-centers/atlanta/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator complex and component identity context"
        },
        {
          "url": "https://www.databank.com/data-centers/atlanta/1150-white-street-southwest/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator complex and component identity context"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.42964099793599%2C33.728526288537545%2C-84.417759002064%2C33.73840771146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -84.4237,
        "lat": 33.733467,
        "precision": "approximate",
        "basis": "Original operator reported street 1100 White Street Southwest, Atlanta, GA 30310 matched through the complete literal Census query. The original operator identifies this street for a named member of the retained campus or complex. Use only an approximate component street reference for one aggregate record. No complete campus center, boundary, extra record or selected computing roof is established. The source names ATL2 while the retained aggregate name is West End Complex; this review does not assign ATL3 to the same street. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Approximate component street context, not a building or complete campus",
      "summary": "Atlanta operator listing. County level map context.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 5 discovery cohort 2",
          "scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. One source described West End complex with ATL2 at 1100 and ATL3 at 1150 White Street Southwest. Do not count the complex plus its two component buildings as three projects.",
          "fields": {
            "operator_reported_context": {
              "provider": "DataBank",
              "name": "DataBank Atlanta West End complex",
              "address": "1100 White Street Southwest, Atlanta, GA 30310",
              "codes": [
                "ATL2",
                "ATL3"
              ],
              "scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. One source described West End complex with ATL2 at 1100 and ATL3 at 1150 White Street Southwest. Do not count the complex plus its two component buildings as three projects."
            },
            "county_association": {
              "county": "Fulton",
              "county_fips": "13121",
              "scope": "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-24",
              "scope": "Atlas admission date only. Not publication, opening or construction."
            }
          },
          "notes": [
            "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted.",
            "Census matched 1100 WHITE ST SW, ATLANTA, GA, 30310. Publication date is unknown. Technical capacity, floor area, uptime, renewable and security claims are excluded.",
            "One source described West End complex with ATL2 at 1100 and ATL3 at 1150 White Street Southwest. Do not count the complex plus its two component buildings as three projects."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/atlanta/1100-white-street-southwest/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Operator facility or campus listing"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1100+White+Street+Southwest%2C+Atlanta%2C+GA+30310&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Census county context only"
            },
            {
              "url": "https://www.databank.com/data-centers/atlanta/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Operator complex and component identity context"
            },
            {
              "url": "https://www.databank.com/data-centers/atlanta/1150-white-street-southwest/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Operator complex and component identity context"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 75, 2026-10-24",
          "scope": "The original operator identifies this street for a named member of the retained campus or complex. Use only an approximate component street reference for one aggregate record. No complete campus center, boundary, extra record or selected computing roof is established. The source names ATL2 while the retained aggregate name is West End Complex; this review does not assign ATL3 to the same street. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -84.4237,
                "lat": 33.733467,
                "precision": "approximate",
                "basis": "Original operator reported street 1100 White Street Southwest, Atlanta, GA 30310 matched through the complete literal Census query. The original operator identifies this street for a named member of the retained campus or complex. Use only an approximate component street reference for one aggregate record. No complete campus center, boundary, extra record or selected computing roof is established. The source names ATL2 while the retained aggregate name is West End Complex; this review does not assign ATL3 to the same street. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1100 White Street Southwest, Atlanta, GA 30310",
              "county_fips": [
                "13121"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original operator identifies this street for a named member of the retained campus or complex. Use only an approximate component street reference for one aggregate record. No complete campus center, boundary, extra record or selected computing roof is established. The source names ATL2 while the retained aggregate name is West End Complex; this review does not assign ATL3 to the same street. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
            "The original Native location is null, so a prior point offset cannot be calculated and remains unknown. This source review supplies the first independently qualified location reference for this existing record. The original operator identifies this street for a named member of the retained campus or complex. Use only an approximate component street reference for one aggregate record. No complete campus center, boundary, extra record or selected computing roof is established. The source names ATL2 while the retained aggregate name is West End Complex; this review does not assign ATL3 to the same street. The complete literal Census input and independently calculated reference agree with the unchanged retained county 13121. This is no claim of physical relocation.",
            "A long industrial complex, rail corridor, residential blocks, trees and recreation grounds occupy the frame. Source setting only. Acquisition date is unknown and may predate construction. No pixel supplies coordinates, a computing roof, current stage, room, suite, ownership or full campus boundary."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/atlanta/1100-white-street-southwest/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original operator named computing street, source scope retained"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1100+White+Street+Southwest%2C+Atlanta%2C+GA+30310&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal computing street query, interpolated reference only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-84.42964099793599%2C33.728526288537545%2C-84.417759002064%2C33.73840771146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "raw_status": "partly operating",
      "status_field": "current_status",
      "status_scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. One source described West End complex with ATL2 at 1100 and ATL3 at 1150 White Street Southwest. Do not count the complex plus its two component buildings as three projects."
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
