{
  "schema_version": 1,
  "source_compilation_context": {
    "in": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/in.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "in",
    "label": "Indiana"
  },
  "records": [
    {
      "id": "google-fort-wayne-in",
      "state": "in",
      "kind": "facility",
      "name": "Google Fort Wayne Data Center (Project Zodiac)",
      "group": "operating",
      "status": "Operating",
      "raw_status": "operational",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Allen"
      ],
      "city": "Fort Wayne",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Exact coordinates not established by road-intersection description. State press release establishes groundbreaking April 26, 2024, not current opening. Up to 200 jobs includes support categories; incentive term is performance based. Current operator Indiana page now explicitly confirms FortWayne operational; MichiganCity/MorganCounty in development. Current status is sourced separately from2024groundbreaking. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://events.in.gov/event/gov-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana",
          "host": "events.in.gov",
          "date": "2024-04-26",
          "published": "2024-04-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.google/locations/indiana/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/indiana/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        }
      ],
      "loc": {
        "lat": 41.09081,
        "lng": -85.06649,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "event_status": "groundbreaking",
            "event_date": "2024-04-26",
            "investment_usd": 2000000000,
            "investment_basis": "announced campus investment",
            "jobs_max": 200,
            "incentive": "35-year sales tax exemption for minimum800million eligible capital; additional800million increments qualify for5years each, capped50years.",
            "current_status": "operational"
          },
          "notes": [
            "Exact coordinates not established by road-intersection description.",
            "State press release establishes groundbreaking April 26, 2024, not current opening. Up to 200 jobs includes support categories; incentive term is performance based. Current operator Indiana page now explicitly confirms FortWayne operational; MichiganCity/MorganCounty in development. Current status is sourced separately from2024groundbreaking.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://events.in.gov/event/gov-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana",
              "host": "events.in.gov",
              "date": "2024-04-26",
              "published": "2024-04-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            },
            {
              "url": "https://datacenters.google/locations/indiana/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "Fort Wayne, Indiana is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "current_development_scope": "The current Indiana page explicitly calls Fort Wayne operational. The separately reported New Haven annual water row is not assigned to this record without identity corroboration.",
            "existing_status_scope": "Existing Operating label retained. Google explicitly calls Fort Wayne operational; New Haven is a separate unresolved annual-report identity, with no water allocation to Fort Wayne."
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/indiana/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 35, October 23, 2026",
          "scope": "Google identifies its own Fort Wayne, Indiana data center community in the body of its regional location page, separately from the global location menu. The operator per source relationship records its named provider brand, not independent proof that every building or expansion is operating. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown.",
          "fields": {
            "company_association": {
              "name": "Google",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Google identifies its own Fort Wayne, Indiana data center community in the body of its regional location page, separately from the global location menu. The operator per source relationship records its named provider brand, not independent proof that every building or expansion is operating. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Google identifies its own Fort Wayne, Indiana data center community in the body of its regional location page, separately from the global location menu. The operator per source relationship records its named provider brand, not independent proof that every building or expansion is operating. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/indiana/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Fort Wayne · Allen · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18003"
      }
    },
    {
      "id": "dc-blox-warren-township-marion-county-in",
      "state": "in",
      "kind": "facility",
      "name": "DC BLOX Warren Township Data Center",
      "group": "proposed",
      "status": "Evaluation",
      "raw_status": "evaluation",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Marion"
      ],
      "city": "Warren Township",
      "address": "",
      "who": "DC BLOX",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer page describes a reduced design; 28 MW is a reduction, not resulting capacity. Construction cost and labor subset are not extra investment. Schedule conditional on variance/replat approval; no opening date or approval outcome inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. Evaluation sits in the proposed/development filter; it is not final approval, an issued permit or construction. Planned phases and capital/jobs forecasts are not achieved outcomes. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dcblox.com/indianapolisdatacenter/",
          "host": "dcblox.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.79165,
        "lng": -86.14931,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "developer_current_stage": "evaluation, permitting and public engagement",
            "planned_capital_investment_usd_range": [
              1800000000,
              2000000000
            ],
            "peak_construction_jobs_up_to": 600,
            "planned_phases": 2,
            "building1_sqft": 70000,
            "building2_sqft": 250000,
            "building1_target_months_after_approval": 24,
            "construction_cost_estimate_usd": 800000000,
            "labor_cost_subset_usd_approx": 320000000,
            "revised_it_load_reduction_mw": 28
          },
          "notes": [
            "Developer page describes a reduced design; 28 MW is a reduction, not resulting capacity. Construction cost and labor subset are not extra investment. Schedule conditional on variance/replat approval; no opening date or approval outcome inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/indianapolisdatacenter/",
              "host": "dcblox.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Named-site current agency/operator stage, reviewed October 15, 2026",
          "fields": {
            "current_status": "evaluation",
            "status_basis": "DC BLOX explicitly labels the Indianapolis project Evaluation/permitting/public engagement and says evaluation continues.",
            "filter_scope": "Grouped with proposed/development projects; no final permit or exact construction stage is inferred."
          },
          "notes": [
            "Evaluation sits in the proposed/development filter; it is not final approval, an issued permit or construction. Planned phases and capital/jobs forecasts are not achieved outcomes. Publication date of this current page is not established; the review date is not an event date."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/indianapolisdatacenter/",
              "host": "dcblox.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "b70010ee8b53d785cb2a62ff39eee84b2fdca6236a2d650f0753e683bb431525",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check68, October24,2026",
          "scope": "The current project page identifies DC BLOX planning at Thunderbird Commerce Center in Warren Township. Design revisions, relative equipment reductions and phased forecasts do not establish an approved final design, commissioning, actual generator totals or present power demand. Company environmental and rate statements remain attributed leads for separate review. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification.",
          "fields": {
            "company_association": {
              "name": "DC BLOX",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The current project page identifies DC BLOX planning at Thunderbird Commerce Center in Warren Township. Design revisions, relative equipment reductions and phased forecasts do not establish an approved final design, commissioning, actual generator totals or present power demand. Company environmental and rate statements remain attributed leads for separate review. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The current project page identifies DC BLOX planning at Thunderbird Commerce Center in Warren Township. Design revisions, relative equipment reductions and phased forecasts do not establish an approved final design, commissioning, actual generator totals or present power demand. Company environmental and rate statements remain attributed leads for separate review. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/indianapolisdatacenter/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Warren Township · Marion · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18097"
      }
    },
    {
      "id": "aboutbit-merom-sullivan-county-in",
      "state": "in",
      "kind": "facility",
      "name": "AboutBit Merom Cryptocurrency Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Sullivan"
      ],
      "city": "Merom",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Merom historical cryptocurrency supply agreement announcement. Historicalforecastnotactualopening/current2026service. Original executedWINagreementnotinspected. Liquidcooling/noimpactpromises not measurednoise/environmental findings. MiningseparatefromAI/cloud. Existingpowerstationage notDCfounding;115MWnotstationgenerationandnotper-building. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://rejournals.com/aboutbit-to-turn-portion-of-indiana-power-station-into-cryptocurrency-mining-facility/",
          "host": "rejournals.com",
          "date": "2022-05-18",
          "published": "2022-05-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.08905,
        "lng": -87.41399,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Merom historical cryptocurrency supply agreement announcement",
          "fields": {
            "company": "AboutBit LLC",
            "location": "adjacent MeromGeneratingStation, SullivanCounty, Indiana",
            "use": "cryptocurrency mining",
            "reported_electricity_purchase_agreement_mw": 115,
            "reported_agreement_years": 5,
            "power_basis": "reported electricity supply agreement, not explicit IT or metered consumption",
            "expected_new_jobs_max": 15,
            "announced_opening_target": "within30days ofMay18,2022"
          },
          "notes": [
            "Historicalforecastnotactualopening/current2026service. Original executedWINagreementnotinspected. Liquidcooling/noimpactpromises not measurednoise/environmental findings. MiningseparatefromAI/cloud. Existingpowerstationage notDCfounding;115MWnotstationgenerationandnotper-building.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://rejournals.com/aboutbit-to-turn-portion-of-indiana-power-station-into-cryptocurrency-mining-facility/",
              "host": "rejournals.com",
              "date": "2022-05-18",
              "published": "2022-05-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Merom · Sullivan · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18153"
      }
    },
    {
      "id": "agincourt-valparaiso-porter-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Agincourt Valparaiso Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Porter"
      ],
      "city": "Valparaiso",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Valparaiso historical city-authored option statement. City-authored statement republished by local outlet, not independent signed option inspection.50Kdeposit includes10Knonrefundable, not60K. Option not purchase or construction approval.2025terms do not establish current2026continuation. No requested incentives asof2025does not mean perpetual no-incentive covenant. New moratorium reviewed separately. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Valparaiso signed moratorium and trigger-based expiry. Signed ordinance establishes adoption and conditional duration, not a fixed6or12month sunset. No assumption Agincourt has or lacks vested rights. Subsequent repeal/amendment and project outcome need separate record. Citywide restriction not allPorterCounty.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://greatnews.life/article/city-of-valparaiso-statement-on-data-center/",
          "host": "greatnews.life",
          "date": "2025-03-07",
          "published": "2025-03-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.ci.valparaiso.in.us/Archive.aspx?ADID=6192",
          "host": "ci.valparaiso.in.us",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.ci.valparaiso.in.us/DocumentCenter/View/11025/04102025-RDC-Agenda-Packet",
          "host": "www.ci.valparaiso.in.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.ci.valparaiso.in.us/ArchiveCenter/ViewFile/Item/6192",
          "host": "www.ci.valparaiso.in.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.46084,
        "lng": -87.06747,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Valparaiso historical city-authored option statement",
          "fields": {
            "city_statement_date": "2025-03-07",
            "project_company": "Agincourt Investments LLC",
            "rdc_option_approval_date": "2025-01-09",
            "broader_city_owned_land_acres": 238,
            "optioned_acres_approx": 180,
            "initial_due_diligence_days": 180,
            "possible_additional_extension_days": 120,
            "initial_deposit_usd": 50000,
            "included_nonrefundable_usd": 10000,
            "deposit_increase_per30dayextension_usd": 25000,
            "offered_land_price_usd_min_exclusive": 9000000,
            "statement_stage": "no pending data-center design/application asof statement"
          },
          "notes": [
            "City-authored statement republished by local outlet, not independent signed option inspection.50Kdeposit includes10Knonrefundable, not60K. Option not purchase or construction approval.2025terms do not establish current2026continuation. No requested incentives asof2025does not mean perpetual no-incentive covenant. New moratorium reviewed separately.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://greatnews.life/article/city-of-valparaiso-statement-on-data-center/",
              "host": "greatnews.life",
              "date": "2025-03-07",
              "published": "2025-03-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Valparaiso signed moratorium and trigger-based expiry",
          "fields": {
            "agency": "CityofValparaiso, Indiana",
            "ordinance": "16-2026",
            "adopted_date": "2026-08-10",
            "vote": "6-0",
            "mayor_signed_date": "2026-08-10",
            "mayor_signed_time_local": "19:55",
            "scope": "no approval of new data-center establishment or new land-use approvals/permits",
            "exceptions": [
              "existing lawful uses",
              "routine maintenance, repair or renovation",
              "development with established vested rights"
            ],
            "expiry_trigger": "effective date of UDO amendments governing data-center development, unless repealed or extended",
            "fixed_expiry_date": null
          },
          "notes": [
            "Signed ordinance establishes adoption and conditional duration, not a fixed6or12month sunset. No assumption Agincourt has or lacks vested rights. Subsequent repeal/amendment and project outcome need separate record. Citywide restriction not allPorterCounty.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.ci.valparaiso.in.us/Archive.aspx?ADID=6192",
              "host": "ci.valparaiso.in.us",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Valparaiso April 10, 2025 agenda packet contains March 13 draft Redevelopment Commission minutes marked subject to approval. The draft records a unanimous motion to terminate the Agincourt option and release escrow and says the City had not approved a data center project. This is a draft account, not an independently captured executed termination or final approved minutes. The separate signed August 10, 2026 City moratorium has its own exceptions and conditional expiry; it does not cause the earlier reported withdrawal or apply across all Porter County. Current physical stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "draft_option_termination_account_and_later_city_rule_not_physical_closure",
              "scope": "Valparaiso April 10, 2025 agenda packet contains March 13 draft Redevelopment Commission minutes marked subject to approval. The draft records a unanimous motion to terminate the Agincourt option and release escrow and says the City had not approved a data center project. This is a draft account, not an independently captured executed termination or final approved minutes. The separate signed August 10, 2026 City moratorium has its own exceptions and conditional expiry; it does not cause the earlier reported withdrawal or apply across all Porter County. Current physical stage remains unclear."
            },
            "source_scope": {
              "rdc_meeting_on": "2025-03-13",
              "packet_meeting_on": "2025-04-10",
              "draft_minutes_marked_subject_to_approval": true,
              "rdc_relevant_pdf_pages_read": [
                2,
                3,
                4
              ],
              "separate_city_moratorium_adopted_on": "2026-08-10",
              "both_signed_moratorium_pages_visually_read": true,
              "later_udo_changes_and_individual_vested_rights_not_audited": true,
              "mayor_statement_capture_self_redirect_held": true
            }
          },
          "notes": [
            "Valparaiso April 10, 2025 agenda packet contains March 13 draft Redevelopment Commission minutes marked subject to approval. The draft records a unanimous motion to terminate the Agincourt option and release escrow and says the City had not approved a data center project. This is a draft account, not an independently captured executed termination or final approved minutes. The separate signed August 10, 2026 City moratorium has its own exceptions and conditional expiry; it does not cause the earlier reported withdrawal or apply across all Porter County. Current physical stage remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.ci.valparaiso.in.us/DocumentCenter/View/11025/04102025-RDC-Agenda-Packet",
              "host": "www.ci.valparaiso.in.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.ci.valparaiso.in.us/ArchiveCenter/ViewFile/Item/6192",
              "host": "www.ci.valparaiso.in.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Valparaiso · Porter · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18127"
      }
    },
    {
      "id": "amazon-project-rainier-new-carlisle-in",
      "state": "in",
      "kind": "facility",
      "name": "Amazon Project Rainier",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Joseph"
      ],
      "city": "New Carlisle",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical state announcement. Performance conditions and dependency on long-term electricity agreement remain; caps are not disbursements and are not added to capex. Subsequent construction/commissioning needs newer evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
          "host": "iedc.in.gov",
          "date": "2024-04-25",
          "published": "2024-04-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster?trk=test",
          "host": "www.aboutamazon.com",
          "published": "2025-06-24",
          "date": "2025-06-24",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.61663,
        "lng": -86.28996,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "county": "St. Joseph",
            "announced_planned_investment_usd": 11000000000,
            "forecast_jobs_minimum": 1000,
            "announced_sales_tax_exemption_term_years": 50,
            "performance_based_incentive_caps_usd": {
              "headcount_tax_credits": 18300000,
              "training_grants": 5000000,
              "hoosier_business_investment_credits": 55000000,
              "redevelopment_credits": 20000000
            },
            "road_infrastructure_contribution_usd_up_to": 7000000
          },
          "notes": [
            "Historical state announcement. Performance conditions and dependency on long-term electricity agreement remain; caps are not disbursements and are not added to capex. Subsequent construction/commissioning needs newer evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
              "host": "iedc.in.gov",
              "date": "2024-04-25",
              "published": "2024-04-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Amazon current Rainier article describes an operational compute cluster spread across multiple United States data centers and identifies St. Joseph County as one participating location. This does not independently establish the exact current physical phase of every New Carlisle building or assign the entire cluster to this campus. Source metadata records original publication June 24, 2025 and modification October 29, 2025; the updated activation wording is not assigned to the original publication day. The state investment announcement does not supply a current operating milestone. Individual campus phase remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operational_multi_site_compute_cluster_not_complete_new_carlisle_campus",
              "scope": "Amazon current Rainier article describes an operational compute cluster spread across multiple United States data centers and identifies St. Joseph County as one participating location. This does not independently establish the exact current physical phase of every New Carlisle building or assign the entire cluster to this campus. Source metadata records original publication June 24, 2025 and modification October 29, 2025; the updated activation wording is not assigned to the original publication day. The state investment announcement does not supply a current operating milestone. Individual campus phase remains held."
            },
            "source_version_scope": {
              "article_published_at": "2025-06-24T09:40:35.203Z",
              "article_modified_at": "2025-10-29T11:00:00Z",
              "current_wording_not_backdated_to_original_publication": true,
              "multi_site_cluster_capacity_not_local_capacity": true,
              "no_individual_building_phase_or_provider_role_change": true
            }
          },
          "notes": [
            "Amazon current Rainier article describes an operational compute cluster spread across multiple United States data centers and identifies St. Joseph County as one participating location. This does not independently establish the exact current physical phase of every New Carlisle building or assign the entire cluster to this campus. Source metadata records original publication June 24, 2025 and modification October 29, 2025; the updated activation wording is not assigned to the original publication day. The state investment announcement does not supply a current operating milestone. Individual campus phase remains held.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.aboutamazon.com/news/aws/aws-project-rainier-ai-trainium-chips-compute-cluster?trk=test",
              "host": "www.aboutamazon.com",
              "published": "2025-06-24",
              "date": "2025-06-24",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana",
              "host": "iedc.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Carlisle · St. Joseph · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18141"
      }
    },
    {
      "id": "american-tower-pike-township-indianapolis-in",
      "state": "in",
      "kind": "facility",
      "name": "American Tower Pike Township Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Marion"
      ],
      "city": "Indianapolis",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Withdrawal is not zoning denial, existing-facility closure or necessarily permanent abandonment; company did not explain motive or refiling intent. Exact withdrawal day not supplied. Existingbroadcasttower is not an operating data center. HB 1333 was prospective legislation in this account, not independently reviewed enacted law. NoMW, capex, construction orRFSadopted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.yahoo.com/news/articles/american-tower-corporation-withdraws-data-051459463.html",
          "host": "yahoo.com",
          "date": "2026-02-04",
          "published": "2026-02-04",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.78169,
        "lng": -86.13843,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "WTHR viaYahoo reports AmericanTower withdrew its PikeTownship Indianapolis zoning proposal near 79 thStreet/TownshipLineRoad amid neighborhood opposition.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Withdrawal is not zoning denial, existing-facility closure or necessarily permanent abandonment; company did not explain motive or refiling intent. Exact withdrawal day not supplied. Existingbroadcasttower is not an operating data center. HB 1333 was prospective legislation in this account, not independently reviewed enacted law. NoMW, capex, construction orRFSadopted.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.yahoo.com/news/articles/american-tower-corporation-withdraws-data-051459463.html",
              "host": "yahoo.com",
              "date": "2026-02-04",
              "published": "2026-02-04",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Indianapolis · Marion · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18097"
      }
    },
    {
      "id": "aws-hobart-in",
      "state": "in",
      "kind": "facility",
      "name": "AWS Hobart Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Hobart",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Northwest Indiana investment geography and Hobart announcement. 15Bregional+11Bprior=26Bstate total, not52B.15Band1100jobs not Hobart-only. Publisher expected1B15yearratepayersavings/100percentgenerationcostaccountnot independently read utility agreement, actual savings or universal future guarantee. No exact Hobart parcel, numeric ITMW or observed opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana",
          "host": "nwiforum.org",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.cityofhobart.org/AgendaCenter/ViewFile/Minutes/_03182026-2545",
          "host": "www.cityofhobart.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.41712,
        "lng": -87.38208,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Northwest Indiana investment geography and Hobart announcement",
          "fields": {
            "publisher_role": "Northwest Indiana regional economic-development organization",
            "regional_planned_aws_investment_usd": 15000000000,
            "regional_expected_new_jobs": 1100,
            "statewide_aws_planned_total_usd": 26000000000,
            "prior_st_joseph_county_commitment_usd": 11000000000,
            "hobart_agreement_announcement_date": "2025-11-25"
          },
          "notes": [
            "15Bregional+11Bprior=26Bstate total, not52B.15Band1100jobs not Hobart-only. Publisher expected1B15yearratepayersavings/100percentgenerationcostaccountnot independently read utility agreement, actual savings or universal future guarantee. No exact Hobart parcel, numeric ITMW or observed opening.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana",
              "host": "nwiforum.org",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Hobart signed March 18, 2026 Council minutes record discussion of the Amazon proposal, construction traffic planning, wells, noise and resident concerns. Plans to bus workers and official replies are not an individual occupancy or current physical construction certification. The October construction update and reminder routes returned a missing route redirect or HTTP 404 in this capture, despite search cached text, and are not substituted as captured current status evidence. The separate New Carlisle traffic account quoted by residents is not independently verified or transferred. Exact current Hobart phase remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "signed_city_discussion_and_current_notice_capture_holds_not_operating_phase",
              "scope": "Hobart signed March 18, 2026 Council minutes record discussion of the Amazon proposal, construction traffic planning, wells, noise and resident concerns. Plans to bus workers and official replies are not an individual occupancy or current physical construction certification. The October construction update and reminder routes returned a missing route redirect or HTTP 404 in this capture, despite search cached text, and are not substituted as captured current status evidence. The separate New Carlisle traffic account quoted by residents is not independently verified or transferred. Exact current Hobart phase remains unclear."
            },
            "source_scope": {
              "city_meeting_on": "2026-03-18",
              "all_four_signed_minutes_pages_visually_read": true,
              "public_comment_pages": [
                3,
                4
              ],
              "secondhand_medical_and_new_carlisle_claims_not_verified": true,
              "current_notice_route_failure_not_project_cancellation": true
            }
          },
          "notes": [
            "Hobart signed March 18, 2026 Council minutes record discussion of the Amazon proposal, construction traffic planning, wells, noise and resident concerns. Plans to bus workers and official replies are not an individual occupancy or current physical construction certification. The October construction update and reminder routes returned a missing route redirect or HTTP 404 in this capture, despite search cached text, and are not substituted as captured current status evidence. The separate New Carlisle traffic account quoted by residents is not independently verified or transferred. Exact current Hobart phase remains unclear.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.cityofhobart.org/AgendaCenter/ViewFile/Minutes/_03182026-2545",
              "host": "www.cityofhobart.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hobart · Lake · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "aws-portage-in",
      "state": "in",
      "kind": "facility",
      "name": "AWS Portage Data Center (AmeriPlex at the Port)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Porter"
      ],
      "city": "Portage",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Reported 87 million USD combines 35 million building and 52 million equipment; do not add all three. No opening timeline provided; delivery warehouse is separate. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.insideindianabusiness.com/articles/amazon-building-87m-data-center-in-portage",
          "host": "insideindianabusiness.com",
          "date": "2023-12-20",
          "published": "2023-12-20",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.47073,
        "lng": -87.07827,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Inside INdiana Business, citing Times of Northwest Indiana, reports Portage AWS project and proposed tax treatment.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Reported 87 million USD combines 35 million building and 52 million equipment; do not add all three. No opening timeline provided; delivery warehouse is separate.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.insideindianabusiness.com/articles/amazon-building-87m-data-center-in-portage",
              "host": "insideindianabusiness.com",
              "date": "2023-12-20",
              "published": "2023-12-20",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Portage · Porter · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18127"
      }
    },
    {
      "id": "aws-wheatfield-in",
      "state": "in",
      "kind": "facility",
      "name": "AWS Wheatfield Campus (Project Rise)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jasper"
      ],
      "city": "Wheatfield",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. Northwest Indiana Business June 18, 2026 reports officials approved Project Rise June 17, drawing on Northwest Indiana Forum and other attributed reporting. Exact approval instrument, all permits and current construction were not inspected. AWS Wheatfield/Jasper County identity gains context. $7 billion community investment and 250 future jobs are plans, not spending or actual headcount. $98 million described as paid in advance appears in future-deal narrative; independent payment receipt unread. $25 million public-water expansion and separately funded campus water/wastewater infrastructure are different scopes, not measured withdrawal. Annual-revenue/ten-year wording is ambiguous; no multiplied tax total adopted. 304 acres near Schahfer is attributed reporting, not surveyed parcel. 400 MW NIPSCO peaker and $643.7 million plant construction/financing describe generation, not campus IT or data-center capex. Air cooling except about 2% of the year is not 2% of water volume or zero annual use. 425-acre habitat and 110-million-gallon annual water-availability increase are commitments/projections, not completed restoration or campus use. Other regional Amazon investments are separate/possibly overlapping scopes. No complete record/current operating status, signed instruments, measured impacts or all-field certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://nwindianabusiness.com/industries/professional-services/information-technology/officials-approve-jasper-county-amazon-data-center/78353/",
          "host": "nwindianabusiness.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.jaspercountyin.gov/government/documents/meeting-documents/county-commissioners/2026-county-commissioners-meetings/2026-county-commissioners-meetings-minutes/617-05-18-2026-jasper-county-commissioners-special-meeting-minutes/file",
          "host": "www.jaspercountyin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.02309,
        "lng": -87.116,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json",
          "scope": "Named operator concept or attributed original local reporting, with dates and numerical scopes.",
          "fields": {},
          "notes": [
            "Northwest Indiana Business June 18, 2026 reports officials approved Project Rise June 17, drawing on Northwest Indiana Forum and other attributed reporting. Exact approval instrument, all permits and current construction were not inspected. AWS Wheatfield/Jasper County identity gains context.",
            "$7 billion community investment and 250 future jobs are plans, not spending or actual headcount. $98 million described as paid in advance appears in future-deal narrative; independent payment receipt unread. $25 million public-water expansion and separately funded campus water/wastewater infrastructure are different scopes, not measured withdrawal. Annual-revenue/ten-year wording is ambiguous; no multiplied tax total adopted.",
            "304 acres near Schahfer is attributed reporting, not surveyed parcel. 400 MW NIPSCO peaker and $643.7 million plant construction/financing describe generation, not campus IT or data-center capex. Air cooling except about 2% of the year is not 2% of water volume or zero annual use. 425-acre habitat and 110-million-gallon annual water-availability increase are commitments/projections, not completed restoration or campus use. Other regional Amazon investments are separate/possibly overlapping scopes.",
            "No complete record/current operating status, signed instruments, measured impacts or all-field certification."
          ],
          "sources": [
            {
              "url": "https://nwindianabusiness.com/industries/professional-services/information-technology/officials-approve-jasper-county-amazon-data-center/78353/",
              "host": "nwindianabusiness.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Jasper County May 18, 2026 special meeting minutes record tabling Amazon Data Services and NIPSCO agreements to the June 1 meeting while details were addressed. They do not record June 1 approval or crosswalk the agreement to the inherited Project Rise component. Wheatfield is separately mentioned in County auction business, which is not a site identity match. A later reported approval, a regional Amazon investment or the expiry of that schedule is not a current individual construction or operating fact. The component and phase remain held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_agreement_tabling_not_exact_wheatfield_component_or_later_approval",
              "scope": "Jasper County May 18, 2026 special meeting minutes record tabling Amazon Data Services and NIPSCO agreements to the June 1 meeting while details were addressed. They do not record June 1 approval or crosswalk the agreement to the inherited Project Rise component. Wheatfield is separately mentioned in County auction business, which is not a site identity match. A later reported approval, a regional Amazon investment or the expiry of that schedule is not a current individual construction or operating fact. The component and phase remain held."
            }
          },
          "notes": [
            "Jasper County May 18, 2026 special meeting minutes record tabling Amazon Data Services and NIPSCO agreements to the June 1 meeting while details were addressed. They do not record June 1 approval or crosswalk the agreement to the inherited Project Rise component. Wheatfield is separately mentioned in County auction business, which is not a site identity match. A later reported approval, a regional Amazon investment or the expiry of that schedule is not a current individual construction or operating fact. The component and phase remain held.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.jaspercountyin.gov/government/documents/meeting-documents/county-commissioners/2026-county-commissioners-meetings/2026-county-commissioners-meetings-minutes/617-05-18-2026-jasper-county-commissioners-special-meeting-minutes/file",
              "host": "www.jaspercountyin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wheatfield · Jasper · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18073"
      }
    },
    {
      "id": "province-group-bristol-innovation-park-elkhart-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Bristol Innovation Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Elkhart"
      ],
      "city": "Bristol",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The one-billion-USD plan, million square feet, jobs and five-to-seven-year buildout were forecasts. The future council meeting is not approval, and nearby Amazon/Microsoft projects do not identify the Bristol client. No current operation, utility allocation or critical IT established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvpe.org/wvpe-news/2024-09-10/undisclosed-tech-firm-plans-1-billion-data-center-for-bristol",
          "host": "wvpe.org",
          "date": "2024-09-10",
          "published": "2024-09-10",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://mccmeetings.blob.core.usgovcloudapi.net/bristolin-pubu/MEET-Minutes-28f69c956a6a48a6b51fe224e8835ce8.pdf",
          "host": "mccmeetings.blob.core.usgovcloudapi.net",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.bristolinnovationpark.com/",
          "host": "www.bristolinnovationpark.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.59742,
        "lng": -85.85875,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WVPE reports Province Group's Bristol proposal for an undisclosed tech company, with a favorable planning recommendation but a delayed town-council vote.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The one-billion-USD plan, million square feet, jobs and five-to-seven-year buildout were forecasts. The future council meeting is not approval, and nearby Amazon/Microsoft projects do not identify the Bristol client. No current operation, utility allocation or critical IT established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wvpe.org/wvpe-news/2024-09-10/undisclosed-tech-firm-plans-1-billion-data-center-for-bristol",
              "host": "wvpe.org",
              "date": "2024-09-10",
              "published": "2024-09-10",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "Both original May 19, 2026 work session minute pages describe the Bristol Innovation Park DPUD and proposed resident discussions. Selected original project portal sections display a withdrawal banner while retaining older filed and future hearing descriptions, two named landowner properties and no contingent owner or specific user. This mixed use rezoning account does not independently bind the exact older Province Group computing proposal or establish its present physical stage. Conflicting template dates are not silently repaired, and withdrawal of this rezoning is not computing closure. The original Town home robots request remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_bristol_dpud_context_older_computing_subject_and_current_stage_held",
              "scope": "Both original May 19, 2026 work session minute pages describe the Bristol Innovation Park DPUD and proposed resident discussions. Selected original project portal sections display a withdrawal banner while retaining older filed and future hearing descriptions, two named landowner properties and no contingent owner or specific user. This mixed use rezoning account does not independently bind the exact older Province Group computing proposal or establish its present physical stage. Conflicting template dates are not silently repaired, and withdrawal of this rezoning is not computing closure. The original Town home robots request remains held."
            },
            "source_read_scope": {
              "both_may19_original_minute_pages_text_read": true,
              "selected_original_project_portal_sections_read": true,
              "withdrawal_banner_and_stale_filed_fields_retained": true,
              "mixed_use_properties_not_forced_older_province_identity": true,
              "no_roles_locations_or_quantities_exported": true
            }
          },
          "notes": [
            "Both original May 19, 2026 work session minute pages describe the Bristol Innovation Park DPUD and proposed resident discussions. Selected original project portal sections display a withdrawal banner while retaining older filed and future hearing descriptions, two named landowner properties and no contingent owner or specific user. This mixed use rezoning account does not independently bind the exact older Province Group computing proposal or establish its present physical stage. Conflicting template dates are not silently repaired, and withdrawal of this rezoning is not computing closure. The original Town home robots request remains held.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://mccmeetings.blob.core.usgovcloudapi.net/bristolin-pubu/MEET-Minutes-28f69c956a6a48a6b51fe224e8835ce8.pdf",
              "host": "mccmeetings.blob.core.usgovcloudapi.net",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.bristolinnovationpark.com/",
              "host": "www.bristolinnovationpark.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Bristol · Elkhart · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18039"
      }
    },
    {
      "id": "coreweave-digital-crossroads-hammond-in",
      "state": "in",
      "kind": "facility",
      "name": "CoreWeave Digital Crossroads",
      "group": "stopped",
      "status": "Development agreement expired",
      "raw_status": "stopped",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Hammond",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hammond official expiration of proposed development agreement. Expired proposed-project agreement does not establish closure of all existing Digital Crossroads operations. No permanent site-wide prohibition or inability to negotiate a different future project inferred. No new operating CoreWeave campus under the expired agreement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-07-01",
          "Hammond published its development agreement expiration notice on July 1, 2026, saying conditions for the proposed 301 Digital Crossroads project were not met by June 30 and no further extension of that agreement would be offered. This is the dated City notice, not an operating data center shutdown or the closure of an adjacent facility."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
          "host": "gohammond.com",
          "date": "2026-07-01",
          "published": "2026-07-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.42752,
        "lng": -87.39343,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Hammond official expiration of proposed development agreement",
          "fields": {
            "agency": "City of Hammond, Indiana",
            "announcement_date": "2026-07-01",
            "project_address": "301 Digital Crossroads",
            "agreement_parties": [
              "City of Hammond",
              "Hammond Redevelopment Commission",
              "Decennial Group",
              "CoreWeave"
            ],
            "development_agreement_expired_date": "2026-06-30",
            "previous_extensions": 2,
            "reason": "required milestones and obligations not satisfied",
            "city_position": "no additional extensions of the current agreement"
          },
          "notes": [
            "Expired proposed-project agreement does not establish closure of all existing Digital Crossroads operations. No permanent site-wide prohibition or inability to negotiate a different future project inferred. No new operating CoreWeave campus under the expired agreement.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
              "host": "gohammond.com",
              "date": "2026-07-01",
              "published": "2026-07-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Hammond July 1, 2026 notice says the development agreement for the proposed project at 301 Digital Crossroads expired after required conditions were not satisfied by June 30, and that no further extension of that agreement would be offered. Development agreement expired describes that specific proposed agreement. It does not establish physical shutdown of an existing nearby Digital Crossroads facility, a permanent ban on future projects or a new provider role. No opening or closure field is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_proposed_development_agreement_expired_not_existing_facility_shutdown",
              "scope": "Hammond July 1, 2026 notice says the development agreement for the proposed project at 301 Digital Crossroads expired after required conditions were not satisfied by June 30, and that no further extension of that agreement would be offered. Development agreement expired describes that specific proposed agreement. It does not establish physical shutdown of an existing nearby Digital Crossroads facility, a permanent ban on future projects or a new provider role. No opening or closure field is changed."
            }
          },
          "notes": [
            "Hammond July 1, 2026 notice says the development agreement for the proposed project at 301 Digital Crossroads expired after required conditions were not satisfied by June 30, and that no further extension of that agreement would be offered. Development agreement expired describes that specific proposed agreement. It does not establish physical shutdown of an existing nearby Digital Crossroads facility, a permanent ban on future projects or a new provider role. No opening or closure field is changed.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
              "host": "www.gohammond.com",
              "published": "2026-07-01",
              "date": "2026-07-01",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hammond · Lake · Source context reviewed",
      "status_scope": "Hammond July 1, 2026 notice says the development agreement for the proposed project at 301 Digital Crossroads expired after required conditions were not satisfied by June 30, and that no further extension of that agreement would be offered. Development agreement expired describes that specific proposed agreement. It does not establish physical shutdown of an existing nearby Digital Crossroads facility, a permanent ban on future projects or a new provider role. No opening or closure field is changed.",
      "event_evidence": [
        {
          "date": "2026-07-01",
          "text": "Hammond published its development agreement expiration notice on July 1, 2026, saying conditions for the proposed 301 Digital Crossroads project were not met by June 30 and no further extension of that agreement would be offered. This is the dated City notice, not an operating data center shutdown or the closure of an adjacent facility.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/",
              "host": "www.gohammond.com",
              "published": "2026-07-01",
              "date": "2026-07-01",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "decennial-akron-fulton-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Decennial Group Akron Data Center",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Fulton"
      ],
      "city": "Akron",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. ABC57 Kylee Leahy February 4, 2026 original open-house report identifies Decennial Group's Akron/Fulton County proposal. Developer said no specific site selected, roughly 300 acres needed, no finalized agreements or construction timeline. Commissioner said no formal proposal received. Early conversations and public open houses are not permits or project approval. $100 million to $150 million describes prospective INFRASTRUCTURE improvements such as roads, bridges and community water, not total campus capex or spent funds. Closed-loop, lighting and noise promises are design claims, not measurements. Prospective hyperscale buyer was unnamed; CoreWeave belongs to the separately described Hammond facility and is not an Akron tenant confirmation. No complete record/current operating status, signed instruments, measured impacts or all-field certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns",
          "host": "abc57.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_02102026-349",
          "host": "www.co.fulton.in.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_03022026-368",
          "host": "www.co.fulton.in.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Agenda/_10262026-415",
          "host": "www.co.fulton.in.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.04695,
        "lng": -86.26349,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json",
          "scope": "Named operator concept or attributed original local reporting, with dates and numerical scopes.",
          "fields": {},
          "notes": [
            "ABC57 Kylee Leahy February 4, 2026 original open-house report identifies Decennial Group's Akron/Fulton County proposal. Developer said no specific site selected, roughly 300 acres needed, no finalized agreements or construction timeline. Commissioner said no formal proposal received. Early conversations and public open houses are not permits or project approval.",
            "$100 million to $150 million describes prospective INFRASTRUCTURE improvements such as roads, bridges and community water, not total campus capex or spent funds. Closed-loop, lighting and noise promises are design claims, not measurements. Prospective hyperscale buyer was unnamed; CoreWeave belongs to the separately described Hammond facility and is not an Akron tenant confirmation.",
            "No complete record/current operating status, signed instruments, measured impacts or all-field certification."
          ],
          "sources": [
            {
              "url": "https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns",
              "host": "abc57.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_named_decennial_exploratory_proposal",
              "scope": "All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation."
            },
            "source_read_scope": {
              "all12_original_feb10_scan_pages_actually_viewed": true,
              "decennial_accounts_on_pages6and7_read": true,
              "no_selected_site_signed_agreement_or_verified_power": true,
              "feb10_recommendation_not_commissioners_adoption": true,
              "march2_physical_page1_text_read_and_viewed": true,
              "oct26_complete_original_agenda_text_read_and_viewed": true,
              "private_resident_names_and_addresses_excluded": true
            }
          },
          "notes": [
            "All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_02102026-349",
              "host": "www.co.fulton.in.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Minutes/_03022026-368",
              "host": "www.co.fulton.in.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.co.fulton.in.us/AgendaCenter/ViewFile/Agenda/_10262026-415",
              "host": "www.co.fulton.in.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Akron · Fulton · Source context reviewed",
      "status_scope": "All twelve original February 10, 2026 scanned minute pages were read and visually checked. Named Decennial representatives describe exploration without a selected site, signed agreement or verified adequate power, supporting a listed exploratory proposal with those limits. The exact inherited Akron property is not independently confirmed. The six to one recommendation for a twelve month pause is distinct from the separate committee motion and from Commissioners March 2 adoption. The October 26 ordinance language agenda is prospective policy discussion. No general pause, utility claim or private stalled label establishes permanent cancellation, construction or computing operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18049"
      }
    },
    {
      "id": "google-michigan-city-in",
      "state": "in",
      "kind": "project",
      "name": "Google Michigan City Data Center",
      "group": "proposed",
      "status": "Development listed",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "LaPorte"
      ],
      "city": "Michigan City",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Indiana regional page with named stages. FortWayne2Blink is not MichiganCityinvestment. Regional page supplies no exact MichiganCityopening/MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.google/locations/indiana/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/michigan-city-indiana/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/indiana/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.546,
        "lng": -86.74018,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "Indiana regional page with named stages",
          "fields": {
            "michigan_city_announcement_year": 2026,
            "michigan_city_stage_at_page": "in development",
            "other_named_location_stages": {
              "Fort Wayne": "operational",
              "Morgan County": "in development"
            }
          },
          "notes": [
            "FortWayne2Blink is not MichiganCityinvestment. Regional page supplies no exact MichiganCityopening/MW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/indiana/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "Michigan City, Indiana is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "current_development_scope": "The named page says In development and describes a property acquisition for potential future development. General staffing and future operational language do not establish construction or operation.",
            "current_status_basis": "Google’s current location page names Michigan City, Indiana as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence."
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/michigan-city-indiana/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 35, October 23, 2026",
          "scope": "Google identifies its own Michigan City, Indiana data center community in the body of its regional location page, separately from the global location menu. The developer per source relationship records its expressly described campus establishment or development, not completion, current computing or a final approval. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown.",
          "fields": {
            "company_association": {
              "name": "Google",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Google identifies its own Michigan City, Indiana data center community in the body of its regional location page, separately from the global location menu. The developer per source relationship records its expressly described campus establishment or development, not completion, current computing or a final approval. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Google identifies its own Michigan City, Indiana data center community in the body of its regional location page, separately from the global location menu. The developer per source relationship records its expressly described campus establishment or development, not completion, current computing or a final approval. The named campus is retained at its existing record scope without assigning individual buildings, lots or street destinations. Regional investment and economic impact figures, targets and community programs are not site quantities. Legal title, sole control and a distinct legal entity are not established. Existing status, location, address, county, quantities, dates and component identity remain exact. The source publication date is unknown."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/indiana/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Michigan City · LaPorte · Source context reviewed",
      "status_scope": "Google’s current location page names Michigan City, Indiana as an announced campus/development. Development listed does not establish a specific zoning approval, issued construction permit, active construction or current operation. Regional investment and directory flags are not per-building lifecycle evidence.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18091"
      }
    },
    {
      "id": "google-project-louie-monrovia-in",
      "state": "in",
      "kind": "project",
      "name": "Google Project Louie (Morgan County)",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Morgan"
      ],
      "city": "Monrovia",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. utility procurement testimony without exact site match. AESIndianaCause46394testimonyherecoversresourceprocurementRFPdesign,evaluation andgenerationbids,notidentifiedGoogleMonroviaProjectLouiesiteapproval. Aggregate14.2GWresourcesoffered and26.7GWproposaloptionsnotdatacenterloadornewbuiltgeneration. Publicredactedcopyonly; noattempttoobtainorreconstructconfidentialattachments. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/9859d501-903e-f111-88b3-001dd802f839/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46394_AESIN_Lee+Direct+Testimony+-+3_042226.pdf",
          "host": "iurc.portal.in.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/morgan-county-indiana/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        }
      ],
      "loc": {
        "lat": 39.48164,
        "lng": -86.44632,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "utility procurement testimony without exact site match",
          "fields": {},
          "notes": [
            "AESIndianaCause46394testimonyherecoversresourceprocurementRFPdesign,evaluation andgenerationbids,notidentifiedGoogleMonroviaProjectLouiesiteapproval. Aggregate14.2GWresourcesoffered and26.7GWproposaloptionsnotdatacenterloadornewbuiltgeneration. Publicredactedcopyonly; noattempttoobtainorreconstructconfidentialattachments.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/9859d501-903e-f111-88b3-001dd802f839/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46394_AESIN_Lee+Direct+Testimony+-+3_042226.pdf",
              "host": "iurc.portal.in.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "Morgan County, Indiana is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "current_development_scope": "The named Morgan County page explicitly says construction begins in 2026 and discusses the preconstruction Monrovia community harvest. No month or exact construction-start day is published.",
            "current_status_basis": "Google’s named Morgan County page reports construction beginning in 2026 and describes activity before construction began. The operator supports an Under construction observation; the year-only account does not establish an exact start day or current energization. Generic operational/careers text is not operation proof."
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/morgan-county-indiana/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Monrovia · Morgan · Source context reviewed",
      "status_scope": "Google’s named Morgan County page reports construction beginning in 2026 and describes activity before construction began. The operator supports an Under construction observation; the year-only account does not establish an exact start day or current energization. Generic operational/careers text is not operation proof.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18109"
      }
    },
    {
      "id": "surge-hancock-county-megasite-buck-creek-township-in",
      "state": "in",
      "kind": "facility",
      "name": "Hancock County MegaSite",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hancock"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Company response sought more specificity; withdrawal does not prove no future proposal. Different Hancock counties in Iowa, Indiana and Kentucky must remain separate. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wibc.com/623821/developer-pulls-application-to-build-data-center-in-hancock-county/",
          "host": "wibc.com",
          "date": "2025-05-14",
          "published": "2025-05-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hancockin.gov/AgendaCenter/ViewFile/Minutes/_04102025-440",
          "host": "www.hancockin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.hancockin.gov/DocumentCenter/View/3193/Ordinance-2026-6E-Data-Center-Sitingpdf",
          "host": "www.hancockin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 39.82346,
        "lng": -85.77327,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "rezoning-application-withdrawn",
            "reported_finding": "WIBC reports Surge withdrew 775-acre Buck Creek / Hancock MegaSite rezoning application and planning meeting was cancelled.",
            "report_display_date": "2025-05-14",
            "independently_verified_current_status": null
          },
          "notes": [
            "Company response sought more specificity; withdrawal does not prove no future proposal. Different Hancock counties in Iowa, Indiana and Kentucky must remain separate.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wibc.com/623821/developer-pulls-application-to-build-data-center-in-hancock-county/",
              "host": "wibc.com",
              "date": "2025-05-14",
              "published": "2025-05-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Hancock April 10, 2025 Technical Committee record names Surge PUD 25 2592 at Buck Creek and forwards it with neither support nor objection and technical comments. It is not a final rezoning approval. The signed later County data center siting ordinance was adopted June 16, 2026 and creates an overlay process within County planning jurisdiction; the exact effective day depends on passage and publication. It does not adjudicate this older proposal or establish that a reported withdrawal occurred. Current individual phase and final project outcome remain held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "technical_forwarding_without_endorsement_and_later_overlay_not_project_approval",
              "scope": "Hancock April 10, 2025 Technical Committee record names Surge PUD 25 2592 at Buck Creek and forwards it with neither support nor objection and technical comments. It is not a final rezoning approval. The signed later County data center siting ordinance was adopted June 16, 2026 and creates an overlay process within County planning jurisdiction; the exact effective day depends on passage and publication. It does not adjudicate this older proposal or establish that a reported withdrawal occurred. Current individual phase and final project outcome remain held."
            },
            "regulatory_scope": {
              "signed_ordinance_adopted_on": "2026-06-16",
              "signed_ordinance_pages_visually_read": [
                1,
                2,
                3,
                4
              ],
              "actual_publication_day_not_established": true,
              "industrial_general_with_overlay_not_unconditional_permission": true,
              "county_planning_jurisdiction_not_all_municipalities": true,
              "declaratory_resolution_allows_application_not_construction": true,
              "confirmatory_resolution_and_fees_precede_improvement_location_permit": true,
              "individual_surge_applicability_or_final_outcome_not_verified": true
            },
            "source_scope": {
              "technical_meeting_on": "2025-04-10",
              "project_petition": "PUD 25 2592",
              "relevant_pdf_pages_read": [
                1,
                2,
                3
              ],
              "neither_support_nor_objection_not_approval": true,
              "developer_power_claim_not_utility_service_verification": true
            }
          },
          "notes": [
            "Hancock April 10, 2025 Technical Committee record names Surge PUD 25 2592 at Buck Creek and forwards it with neither support nor objection and technical comments. It is not a final rezoning approval. The signed later County data center siting ordinance was adopted June 16, 2026 and creates an overlay process within County planning jurisdiction; the exact effective day depends on passage and publication. It does not adjudicate this older proposal or establish that a reported withdrawal occurred. Current individual phase and final project outcome remain held.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.hancockin.gov/AgendaCenter/ViewFile/Minutes/_04102025-440",
              "host": "www.hancockin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.hancockin.gov/DocumentCenter/View/3193/Ordinance-2026-6E-Data-Center-Sitingpdf",
              "host": "www.hancockin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hancock · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18059"
      }
    },
    {
      "id": "heartland-industrial-park-sullivan-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Heartland Industrial Park (Fluidstack Sullivan County Campus)",
      "group": "proposed",
      "status": "Project listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Sullivan"
      ],
      "city": "Merom",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fluidstack Sullivan large planned valuation and scoped commitments. 65Bdevelopmentscopeunspecifiedequipment/long-termphases;notverifiedactualspend/annuallyrecurringinvestment.4.5Msubsetof50Mnotadditional54.5M. Commitmentsnotactualpayments/transferredland;contractsnotread.55dBnearestDWELLINGnotboundaryorprovenAweighting. No numericITMWorcurrentenergization. Ratepayer/waterguaranteesremainattributeddeveloperclaims. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.sullivanfluidstack.io/",
          "host": "sullivanfluidstack.io",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.10114,
        "lng": -87.42718,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Fluidstack Sullivan large planned valuation and scoped commitments",
          "fields": {
            "developer": "Fluidstack",
            "project": "Sullivan County Data Center",
            "state": "Indiana",
            "planned_development_value_usd": 65000000000,
            "forecast_operations_start_year": 2027,
            "community_enhancement_commitment_usd": 50000000,
            "named_community_program_subset_usd": 4500000,
            "land_donation_commitment_acres": 15,
            "operator_named_power_provider": "WIN Energy REMC",
            "voluntary_nearest_dwelling_sound_limit_db": 55,
            "developer_claims_no_local_property_tax_incentives_sought": true
          },
          "notes": [
            "65Bdevelopmentscopeunspecifiedequipment/long-termphases;notverifiedactualspend/annuallyrecurringinvestment.4.5Msubsetof50Mnotadditional54.5M. Commitmentsnotactualpayments/transferredland;contractsnotread.55dBnearestDWELLINGnotboundaryorprovenAweighting. No numericITMWorcurrentenergization. Ratepayer/waterguaranteesremainattributeddeveloperclaims.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.sullivanfluidstack.io/",
              "host": "sullivanfluidstack.io",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_sullivan_project_proposal_not_future_benefits_as_actual_outcomes",
              "scope": "The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed."
            }
          },
          "notes": [
            "The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.sullivanfluidstack.io/",
              "host": "www.sullivanfluidstack.io",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Merom · Sullivan · Source context reviewed",
      "status_scope": "The current Fluidstack Sullivan County project website describes development of a campus with a target to begin operation in 2027. Project listed development describes that self attributed proposal. Promised community payments, cooling performance, local jobs and infrastructure cost allocation are developer claims or commitments, not actual payments, measured effects, final permit approval or current operation. The exact physical building phase is not established and no provider role or resource quantity is changed.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18153"
      }
    },
    {
      "id": "jefferson-proving-ground-data-center-jefferson-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Jefferson Proving Ground Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jefferson"
      ],
      "city": "Madison",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Bob Demaree/Paxton, Madison Courier April1,2026 original Ford-family interviews/planning report:549-acre JPG airport proposal/nine buildings7,175,657sf, February site-plan approval reported CONDITIONED on federal/state permits. Not all construction approvals or an operating campus.1880-acre family property is broader, not additive. Three-to-four-year phased timeline has no exact RFS.300 future onsite jobs/$60M annual county tax are forecasts, not payroll/paid receipts. No-abatement/developer-pays-upgrades/closed-loop-water promises not executed ESA, no-rate-increase finding or measured zero site water.25M charitable commitment includes1.5M fairground allocation and500k initial expected, not all additive or verified disbursed. No actual MW stated. Not all fields, current operation, permits, exact parcel or critical IT independently verified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.madisoncourier.com/carroll_news_democrat/news/proposed-jpg-data-center-could-generate-60m-taxes-annually/article_2804a794-5c76-548f-be98-8975b84b2284.html",
          "host": "madisoncourier.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.jeffersoncounty.in.gov/",
          "host": "www.jeffersoncounty.in.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.78558,
        "lng": -85.43845,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json",
          "scope": "Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.",
          "fields": {},
          "notes": [
            "Bob Demaree/Paxton, Madison Courier April1,2026 original Ford-family interviews/planning report:549-acre JPG airport proposal/nine buildings7,175,657sf, February site-plan approval reported CONDITIONED on federal/state permits. Not all construction approvals or an operating campus.1880-acre family property is broader, not additive. Three-to-four-year phased timeline has no exact RFS.300 future onsite jobs/$60M annual county tax are forecasts, not payroll/paid receipts. No-abatement/developer-pays-upgrades/closed-loop-water promises not executed ESA, no-rate-increase finding or measured zero site water.25M charitable commitment includes1.5M fairground allocation and500k initial expected, not all additive or verified disbursed. No actual MW stated.",
            "Not all fields, current operation, permits, exact parcel or critical IT independently verified."
          ],
          "sources": [
            {
              "url": "https://www.madisoncourier.com/carroll_news_democrat/news/proposed-jpg-data-center-could-generate-60m-taxes-annually/article_2804a794-5c76-548f-be98-8975b84b2284.html",
              "host": "madisoncourier.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete original County home body describes government and a rescheduled two mile buffer hearing. It does not independently name the exact Jefferson Proving Ground computing project or establish present construction or service. The buffer notice is not assigned to a computing application without a read exact subject. An inherited private permitted label and military property history are not computing operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_county_context_exact_proving_ground_stage_held",
              "scope": "The complete original County home body describes government and a rescheduled two mile buffer hearing. It does not independently name the exact Jefferson Proving Ground computing project or establish present construction or service. The buffer notice is not assigned to a computing application without a read exact subject. An inherited private permitted label and military property history are not computing operation."
            },
            "source_read_scope": {
              "complete_original_county_home_body_read": true,
              "buffer_hearing_not_assumed_computing_subject": true,
              "no_physical_status_or_permission_inferred": true
            }
          },
          "notes": [
            "The complete original County home body describes government and a rescheduled two mile buffer hearing. It does not independently name the exact Jefferson Proving Ground computing project or establish present construction or service. The buffer notice is not assigned to a computing application without a read exact subject. An inherited private permitted label and military property history are not computing operation.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.jeffersoncounty.in.gov/",
              "host": "www.jeffersoncounty.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Madison · Jefferson · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18077"
      }
    },
    {
      "id": "jumping-bison-greensburg-decatur-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Jumping Bison Greensburg Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Decatur"
      ],
      "city": "Greensburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Publication date is not established. Two 400-million-USD phases form the stated 800-million-USD plan and must not be counted again. A 125-percent wage commitment is not a job count. Hotel investment and jobs in the same story belong to another project; additional approval stages remain. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wrbiradio.com/greensburg-council-approves-era-establishment-data-center-abatement/",
          "host": "wrbiradio.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://assets.simpleviewinc.com/simpleview/image/upload/v1/clients/greensburgin/12_10_2024_CC_885b3948-f7ca-4967-a466-f8ececc4913b.pdf",
          "host": "assets.simpleviewinc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.cityofgreensburg.com/government/agendas-and-minutes/city-council/",
          "host": "www.cityofgreensburg.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 39.30705,
        "lng": -85.50107,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WRBI reports unanimous seven-zero approval of an economic revitalization area and a ten-year, 60-percent real-property abatement for Jumping Bison's proposed two-phase Greensburg project.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Publication date is not established. Two 400-million-USD phases form the stated 800-million-USD plan and must not be counted again. A 125-percent wage commitment is not a job count. Hotel investment and jobs in the same story belong to another project; additional approval stages remain.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wrbiradio.com/greensburg-council-approves-era-establishment-data-center-abatement/",
              "host": "wrbiradio.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "All four original December 10, 2024 signed Council minute scans were actually viewed. They record Resolution 2024 12 confirming an economic revitalization area and tax abatement by seven ayes, but the selected minute body does not name Jumping Bison or a computing use. A private crosswalk is not substituted for the unread underlying resolution and exact project identity. The archive, tax assumptions and separate allocation area name do not establish current construction or commissioned computing. No financial amount, benefit or project approval is exported.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_era_action_exact_jumping_bison_subject_crosswalk_and_stage_held",
              "scope": "All four original December 10, 2024 signed Council minute scans were actually viewed. They record Resolution 2024 12 confirming an economic revitalization area and tax abatement by seven ayes, but the selected minute body does not name Jumping Bison or a computing use. A private crosswalk is not substituted for the unread underlying resolution and exact project identity. The archive, tax assumptions and separate allocation area name do not establish current construction or commissioned computing. No financial amount, benefit or project approval is exported."
            },
            "source_read_scope": {
              "all4_original_dec10_scans_actually_viewed": true,
              "no_exact_jumping_bison_name_or_computing_subject_in_minute_body": true,
              "underlying_resolution_not_read": true,
              "no_incentive_or_status_promotion": true
            }
          },
          "notes": [
            "All four original December 10, 2024 signed Council minute scans were actually viewed. They record Resolution 2024 12 confirming an economic revitalization area and tax abatement by seven ayes, but the selected minute body does not name Jumping Bison or a computing use. A private crosswalk is not substituted for the unread underlying resolution and exact project identity. The archive, tax assumptions and separate allocation area name do not establish current construction or commissioned computing. No financial amount, benefit or project approval is exported.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://assets.simpleviewinc.com/simpleview/image/upload/v1/clients/greensburgin/12_10_2024_CC_885b3948-f7ca-4967-a466-f8ececc4913b.pdf",
              "host": "assets.simpleviewinc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.cityofgreensburg.com/government/agendas-and-minutes/city-council/",
              "host": "www.cityofgreensburg.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Greensburg · Decatur · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18031"
      }
    },
    {
      "id": "karis-critical-deep-river-merrillville-in",
      "state": "in",
      "kind": "facility",
      "name": "Karis Critical Deep River Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Merrillville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-09-10",
          "The original Merrillville Citizen Advisory Committee memorandum records that the Karis zoning ordinance was approved by the Town Council on September 10, 2024. This dates the reported zoning action without establishing final whole campus permission, a computing opening, current construction or utility authorization."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
          "host": "govtech.com",
          "date": "2024-11-25",
          "published": "2024-11-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/0paovsbc/data-center-citizen-advisory-committee-minutes-9924.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
          "host": "www.merrillville.in.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.39543,
        "lng": -87.38018,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
              "host": "govtech.com",
              "date": "2024-11-25",
              "published": "2024-11-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete original three page September 9, 2024 advisory memorandum identifies the Karis proposal east of Deep River and records a later parenthetical September 10 zoning approval. Support and utility authorization discussions are not construction or computing service. The original Town narrative gives an older June 2026 through May 2027 pause, while selected July 14, 2026 signed Council minute pages sixteen and seventeen record a seven to zero extension through January 1, 2028 at noon. The later exact motion controls that recorded account without certifying an executed separate ordinance, exemptions or this property eligibility. Present exact computing stage remains unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_karis_advisory_and_later_general_pause_physical_stage_held",
              "scope": "The complete original three page September 9, 2024 advisory memorandum identifies the Karis proposal east of Deep River and records a later parenthetical September 10 zoning approval. Support and utility authorization discussions are not construction or computing service. The original Town narrative gives an older June 2026 through May 2027 pause, while selected July 14, 2026 signed Council minute pages sixteen and seventeen record a seven to zero extension through January 1, 2028 at noon. The later exact motion controls that recorded account without certifying an executed separate ordinance, exemptions or this property eligibility. Present exact computing stage remains unverified."
            },
            "source_read_scope": {
              "complete3page_original_sept9_memorandum_text_read": true,
              "later_sept10_approval_parenthetical_not_meeting_day": true,
              "july14_physical_pages16and17_extension_actually_viewed": true,
              "noon_endpoint_not_midnight_or_prior_dec31suggestion": true,
              "old_town_term_and_later_minutes_distinct": true,
              "original_july2024_planminute_robots_disallow_retained": true
            }
          },
          "notes": [
            "The complete original three page September 9, 2024 advisory memorandum identifies the Karis proposal east of Deep River and records a later parenthetical September 10 zoning approval. Support and utility authorization discussions are not construction or computing service. The original Town narrative gives an older June 2026 through May 2027 pause, while selected July 14, 2026 signed Council minute pages sixteen and seventeen record a seven to zero extension through January 1, 2028 at noon. The later exact motion controls that recorded account without certifying an executed separate ordinance, exemptions or this property eligibility. Present exact computing stage remains unverified.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/0paovsbc/data-center-citizen-advisory-committee-minutes-9924.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
              "host": "www.merrillville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Merrillville · Lake · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-09-10",
          "text": "The original Merrillville Citizen Advisory Committee memorandum records that the Karis zoning ordinance was approved by the Town Council on September 10, 2024. This dates the reported zoning action without establishing final whole campus permission, a computing opening, current construction or utility authorization.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/0paovsbc/data-center-citizen-advisory-committee-minutes-9924.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "logix-reality-frankfort-clinton-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Logix Reality Frankfort Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clinton"
      ],
      "city": "Frankfort",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The full retained article was read; the automatic largest-article excerpt incorrectly selected a related January 7 story. A reported twelve-month reconsideration restriction is not a countywide ban. The separate city zoning variance dated April 23, 2025 does not approve the county project. City-land plans and later outcomes remain unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.clintoncountytoday.com/commissioners-say-no-to-the-rezoning-of-land-for-data-center/",
          "host": "clintoncountytoday.com",
          "date": "2026-01-20",
          "published": "2026-01-20",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.30181,
        "lng": -86.47524,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Clinton County Today reports the commissioners' unanimous January 20 denial of Logix's 714.55-acre rezoning after a favorable January 6 planning recommendation.",
            "independently_verified_current_operating_status": null,
            "reported_rezoning_status": "denied",
            "reported_denial_date": "2026-01-20",
            "countywide_moratorium_verified": false
          },
          "notes": [
            "The full retained article was read; the automatic largest-article excerpt incorrectly selected a related January 7 story. A reported twelve-month reconsideration restriction is not a countywide ban. The separate city zoning variance dated April 23, 2025 does not approve the county project. City-land plans and later outcomes remain unknown.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.clintoncountytoday.com/commissioners-say-no-to-the-rezoning-of-land-for-data-center/",
              "host": "clintoncountytoday.com",
              "date": "2026-01-20",
              "published": "2026-01-20",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Frankfort · Clinton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18023"
      }
    },
    {
      "id": "province-group-merrillville-technology-park-in",
      "state": "in",
      "kind": "facility",
      "name": "Merrillville Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Merrillville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
          "host": "govtech.com",
          "date": "2024-11-25",
          "published": "2024-11-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/huplrp0o/meeting-memo-11212024-data-center-committeee.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
          "host": "www.merrillville.in.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.39865,
        "lng": -87.35304,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
              "host": "govtech.com",
              "date": "2024-11-25",
              "published": "2024-11-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "Both original November 21, 2024 advisory memorandum pages identify the Province proposal near Colorado Street and Harms Road. The account expressly requires further power study and local approval, with later design dependent on support. Its weekday header conflicts with the Thursday body and is retained without repair. Utility feasibility, a letter of support and forecast economic benefits are not physical construction or service. The later July 14 recorded general pause extension is separate from exact site eligibility or current disposition.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_province_merrillville_proposal_history_and_general_pause_current_stage_held",
              "scope": "Both original November 21, 2024 advisory memorandum pages identify the Province proposal near Colorado Street and Harms Road. The account expressly requires further power study and local approval, with later design dependent on support. Its weekday header conflicts with the Thursday body and is retained without repair. Utility feasibility, a letter of support and forecast economic benefits are not physical construction or service. The later July 14 recorded general pause extension is separate from exact site eligibility or current disposition."
            },
            "source_read_scope": {
              "both_original_nov21_memorandum_text_pages_read": true,
              "blank_approval_and_execution_fields_retained": true,
              "weekday_header_conflict_not_repaired": true,
              "utility_study_and_special_exception_not_accomplished": true,
              "july14_extension_pages16and17_actually_viewed": true
            }
          },
          "notes": [
            "Both original November 21, 2024 advisory memorandum pages identify the Province proposal near Colorado Street and Harms Road. The account expressly requires further power study and local approval, with later design dependent on support. Its weekday header conflicts with the Thursday body and is retained without repair. Utility feasibility, a letter of support and forecast economic benefits are not physical construction or service. The later July 14 recorded general pause extension is separate from exact site eligibility or current disposition.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/huplrp0o/meeting-memo-11212024-data-center-committeee.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
              "host": "www.merrillville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Merrillville · Lake · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "meta-jeffersonville-in",
      "state": "in",
      "kind": "facility",
      "name": "Meta Jeffersonville Data Center",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "Jeffersonville",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical operator announcement. No completion date or delivered renewable supply established by an intent to build and match electricity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/",
          "host": "datacenters.atmeta.com",
          "date": "2024-01-25",
          "published": "2024-01-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/jeffersonville-data-center/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        },
        {
          "url": "https://www.riverridgecc.com/choose-river-ridge/sites-buildings/",
          "host": "www.riverridgecc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Authority published link to the public property map"
        },
        {
          "url": "https://services7.arcgis.com/o2lKcq2uliF8aljX/arcgis/rest/services/Parcels_(Public)/FeatureServer/0/query?where=Tract_ID+LIKE+%2719B%25%27+OR+UPPER%28Project_Name%29+LIKE+%27%25META%25%27+OR+UPPER%28Purch_Alias%29+LIKE+%27%25META%25%27&outFields=OBJECTID%2CTract_ID%2CProp_Acres%2CParcel_No%2CAdd_Even%2CAdd_Odd%2CProject_Name%2CPurch_Alias%2CDate_Sold%2CEditDate%2CYear&returnGeometry=true&outSR=4326&orderByFields=OBJECTID&resultRecordCount=100&f=json",
          "host": "services7.arcgis.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Public Tract 19B and separate Meta associated property references"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-85.6662%2C38.36302%2C-85.6542%2C38.371019999999994&bboxSR=4326&imageSR=3857&size=1200%2C900&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Aerial reference context; acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -85.6602,
        "lat": 38.36702,
        "precision": "approximate",
        "basis": "Approximate reference center inside Tract 19B in the River Ridge Development Authority public property map at 300 International Drive. This references the named tract, not a roof, surveyed parcel, legal title or complete campus boundary. The separately listed small Meta associated feature is excluded. Aerial imagery may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "announcement_date": "2024-01-25",
            "planned_campus_sqft_approx": 700000,
            "forecast_investment_usd_lower_bound": 800000000,
            "forecast_operational_jobs_approx": 100,
            "forecast_peak_construction_workers_lower_bound": 1250
          },
          "notes": [
            "Historical operator announcement. No completion date or delivered renewable supply established by an intent to build and match electricity.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/",
              "host": "datacenters.atmeta.com",
              "date": "2024-01-25",
              "published": "2024-01-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed development",
              "basis": "The current named operator factsheet describes this campus in future terms and gives operational employment only once completed.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation."
          },
          "notes": [
            "This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/jeffersonville-data-center/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "K2 River Ridge tract review October 22, 2026",
          "scope": "Approximate reference inside the authority listed Meta tract only. No present operating stage, opening day, legal title, surveyed parcel, whole campus boundary, company role or technical quantity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -85.6602,
                "lat": 38.36702,
                "precision": "approximate",
                "basis": "Approximate reference center inside Tract 19B in the River Ridge Development Authority public property map at 300 International Drive. This references the named tract, not a roof, surveyed parcel, legal title or complete campus boundary. The separately listed small Meta associated feature is excluded. Aerial imagery may predate construction."
              },
              "reference_tract": {
                "agency_objectid": 448,
                "tract": "19B",
                "agency_listed_parcel_reference": "10-42-02-600-010.000-039",
                "agency_reference_address": "300 International Drive",
                "purchaser_alias": "Meta",
                "project_name": "Slugger",
                "calculated_acres": 613.2075820680872,
                "excluded_objectids": [
                  364
                ],
                "legal_parcel_or_title_verified": false
              },
              "prior_inherited_reference": "rejected, retained only in native history"
            }
          },
          "notes": [
            "The authority site directly links a public ArcGIS app, web map and parcel layer. Exact Tract 19B, Meta purchaser alias and 300 International Drive select OBJECTID 448.",
            "OBJECTID 364 is separately associated with Meta and is excluded. Its 6.38 acres are not merged with the main tract. The 613.20758 calculated acres differ from earlier printed approximate 619 acres and a separate 623.20 acre transaction scope.",
            "The original USGS and Indiana source images were actually viewed. The state catalog includes a Clark 2022 tile; overview image year fields are null. Imagery does not establish current development, absence, operation or severity of any concern.",
            "The earlier inherited point is rejected and retained in native history. It is not included as a current public destination."
          ],
          "sources": [
            {
              "url": "https://www.riverridgecc.com/choose-river-ridge/sites-buildings/",
              "host": "www.riverridgecc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Authority published link to the public property map"
            },
            {
              "url": "https://services7.arcgis.com/o2lKcq2uliF8aljX/arcgis/rest/services/Parcels_(Public)/FeatureServer/0/query?where=Tract_ID+LIKE+%2719B%25%27+OR+UPPER%28Project_Name%29+LIKE+%27%25META%25%27+OR+UPPER%28Purch_Alias%29+LIKE+%27%25META%25%27&outFields=OBJECTID%2CTract_ID%2CProp_Acres%2CParcel_No%2CAdd_Even%2CAdd_Odd%2CProject_Name%2CPurch_Alias%2CDate_Sold%2CEditDate%2CYear&returnGeometry=true&outSR=4326&orderByFields=OBJECTID&resultRecordCount=100&f=json",
              "host": "services7.arcgis.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Public Tract 19B and separate Meta associated property references"
            },
            {
              "url": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-21",
              "label": "Reviewed company identity source"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-85.6662%2C38.36302%2C-85.6542%2C38.371019999999994&bboxSR=4326&imageSR=3857&size=1200%2C900&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Aerial reference context; acquisition date unknown"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "K3 company role review October22,2026",
          "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Company identity and developer relationship only, based on attributed first-party material. Provider brand, not a legal property owner finding. No current physical stage, service date, capacity, water quantity, parcel or map point is certified. Existing statuses and all location-withholding decisions remain unchanged.",
            "A source read is not a construction, opening, transaction-closing or operating date."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/jeffersonville-data-center/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed company identity source"
            },
            {
              "url": "https://datacenters.atmeta.com/2024/01/hello-jeffersonville/",
              "host": "datacenters.atmeta.com",
              "published": "2024-01-25",
              "date": "2024-01-25",
              "checked": "2026-10-22",
              "label": "Reviewed company identity source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate River Ridge Tract 19B reference",
      "summary": "Jeffersonville · Clark · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet describes this campus in future terms and gives operational employment only once completed. This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation."
    },
    {
      "id": "meta-lebanon-in",
      "state": "in",
      "kind": "facility",
      "name": "Meta Lebanon (Project Domino)",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Boone"
      ],
      "city": "Lebanon",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Meta original dated February11,2026 says it is breaking ground on LebanonIndiana/BooneCounty campus designed for1GW when operational. Basis undefined; not commissionedITMW or observed2026 operation. Over10B planned infrastructure/community investment is not proven spending to date. More than4,000 peak construction jobs and about300operational jobs are forecasts, not current payroll. 1Mannually20years toBooneREMCfund, more than120Mwater/public-infrastructure investments and200Mgal/year watershed-restoration project for10years are stated commitments. They are not verified paid totals, campus water consumption or additional DC capacity. Annual clean-energy matching is not hourly physical supply. Zero water for MAJORITY of year is not zero annual use; LEEDGold is future once-operational claim. No executedESA or measured rate impact verified. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
          "host": "about.fb.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/meta-lebanon-data-center-info-sheet/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 40.05087,
        "lng": -86.46871,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-states-and-named-operator-review-round53-2026-10-15.json",
          "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.",
          "fields": {},
          "notes": [
            "Meta original dated February11,2026 says it is breaking ground on LebanonIndiana/BooneCounty campus designed for1GW when operational. Basis undefined; not commissionedITMW or observed2026 operation.",
            "Over10B planned infrastructure/community investment is not proven spending to date. More than4,000 peak construction jobs and about300operational jobs are forecasts, not current payroll.",
            "1Mannually20years toBooneREMCfund, more than120Mwater/public-infrastructure investments and200Mgal/year watershed-restoration project for10years are stated commitments. They are not verified paid totals, campus water consumption or additional DC capacity.",
            "Annual clean-energy matching is not hourly physical supply. Zero water for MAJORITY of year is not zero annual use; LEEDGold is future once-operational claim. No executedESA or measured rate impact verified.",
            "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."
          ],
          "sources": [
            {
              "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
              "host": "about.fb.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed development",
              "basis": "The current named operator factsheet describes this campus in future terms and gives operational employment only once completed.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation."
          },
          "notes": [
            "This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/meta-lebanon-data-center-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check61, October24,2026",
          "scope": "Meta identifies its Lebanon, Indiana campus in the February11,2026 announcement. The reported groundbreaking and designed1GWcapacity do not prove current service or delivered power. Employment, infrastructure investment, cooling and water restoration promises remain attributed forecasts and commitments. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Meta identifies its Lebanon, Indiana campus in the February11,2026 announcement. The reported groundbreaking and designed1GWcapacity do not prove current service or delivered power. Employment, infrastructure investment, cooling and water restoration promises remain attributed forecasts and commitments. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Meta identifies its Lebanon, Indiana campus in the February11,2026 announcement. The reported groundbreaking and designed1GWcapacity do not prove current service or delivered power. Employment, infrastructure investment, cooling and water restoration promises remain attributed forecasts and commitments. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/",
              "host": "about.fb.com",
              "published": "2026-02-11",
              "date": "2026-02-11",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lebanon · Boone · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet describes this campus in future terms and gives operational employment only once completed. This supports an operator-listed development, not current service. Historical groundbreaking years, shared fleet boilerplate and photographs do not establish current physical construction, completion, staffing or operation.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18011"
      }
    },
    {
      "id": "metrobloks-martindale-brightwood-indianapolis-in",
      "state": "in",
      "kind": "facility",
      "name": "Metrobloks Martindale-Brightwood Data Center",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Marion"
      ],
      "city": "Indianapolis",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. The Indiana Lawyer May 13, 2026 republishes Taylor Wooten/Indianapolis Business Journal reporting. It reports five residents/property owners and Hoosier Environmental Council filed May 1 challenging MDC's earlier Metrobloks rezoning. Alleged environmental-justice and review failures are plaintiffs' allegations, not a ruling or adjudicated harm. Underlying complaint/docket/current disposition unread; other cited Sabey and Virginia cases are different projects. $500 million, 14 acres and 75 MW are reported project descriptions, with MW basis unspecified. Generator testing 20-to-30 hours, approximately 60,000 gallons initial cooling fill and 5,000 gallons annual top-off are reported developer/filing commitments, not measured use. WFYI's two-building fill figures differ; do not silently choose or add them. Utility-upgrade cost commitment is not proof of actual payment or executed service agreement. No complete record/current operating status, signed instruments, measured impacts or all-field certification. WFYI Farrah Anderson May 4, 2026 original reporting describes City-County Council approval of Metrobloks rezoning for nearly 14 acres at 2505 N. Sherman Ave., a former drive-in. This is a later procedural stage than MDC approval, not construction approval, occupancy or operation. Same meeting's temporary-stay resolution was explicitly NON-BINDING, not an enacted moratorium. Reported letter describes AES contracts, not an inspected executed agreement; no implication that physical residential infrastructure is unaffected. Closed-loop claim is not zero consumption. About 19,000 gallons for building one plus 47,500 for building two are initial fills, not annual consumption. Their 66,500-gallon derived sum differs from IBJ's approximate 60,000 figure; scopes/version unresolved. Community concerns retain attribution. A reported shooting is not evidence identifying who committed it, and is not generalized to opponents.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.theindianalawyer.com/articles/martindale-brightwood-residents-cite-environmental-concerns-in-suit-against-data-center-plan",
          "host": "theindianalawyer.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood",
          "host": "wfyi.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.metrobloks.com/sites/indianapolis",
          "host": "www.metrobloks.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.76091,
        "lng": -86.13661,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json",
          "scope": "Named operator concept or attributed original local reporting, with dates and numerical scopes.",
          "fields": {},
          "notes": [
            "The Indiana Lawyer May 13, 2026 republishes Taylor Wooten/Indianapolis Business Journal reporting. It reports five residents/property owners and Hoosier Environmental Council filed May 1 challenging MDC's earlier Metrobloks rezoning. Alleged environmental-justice and review failures are plaintiffs' allegations, not a ruling or adjudicated harm. Underlying complaint/docket/current disposition unread; other cited Sabey and Virginia cases are different projects.",
            "$500 million, 14 acres and 75 MW are reported project descriptions, with MW basis unspecified. Generator testing 20-to-30 hours, approximately 60,000 gallons initial cooling fill and 5,000 gallons annual top-off are reported developer/filing commitments, not measured use. WFYI's two-building fill figures differ; do not silently choose or add them. Utility-upgrade cost commitment is not proof of actual payment or executed service agreement.",
            "No complete record/current operating status, signed instruments, measured impacts or all-field certification."
          ],
          "sources": [
            {
              "url": "https://www.theindianalawyer.com/articles/martindale-brightwood-residents-cite-environmental-concerns-in-suit-against-data-center-plan",
              "host": "theindianalawyer.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json",
          "scope": "Named operator concept or attributed original local reporting, with dates and numerical scopes.",
          "fields": {},
          "notes": [
            "WFYI Farrah Anderson May 4, 2026 original reporting describes City-County Council approval of Metrobloks rezoning for nearly 14 acres at 2505 N. Sherman Ave., a former drive-in. This is a later procedural stage than MDC approval, not construction approval, occupancy or operation. Same meeting's temporary-stay resolution was explicitly NON-BINDING, not an enacted moratorium.",
            "Reported letter describes AES contracts, not an inspected executed agreement; no implication that physical residential infrastructure is unaffected. Closed-loop claim is not zero consumption. About 19,000 gallons for building one plus 47,500 for building two are initial fills, not annual consumption. Their 66,500-gallon derived sum differs from IBJ's approximate 60,000 figure; scopes/version unresolved. Community concerns retain attribution. A reported shooting is not evidence identifying who committed it, and is not generalized to opponents.",
            "No complete record/current operating status, signed instruments, measured impacts or all-field certification."
          ],
          "sources": [
            {
              "url": "https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood",
              "host": "wfyi.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete original Metrobloks Indianapolis facility body expressly says the data center is coming soon and describes developing IND A1. This supports a listed proposal. Specification cards, uptime marketing, carrier links and closed cooling assurances do not independently establish commissioned service, measured use, a final permit or actual benefits. The raw capacity text differs from discovery excerpts and no quantity is exported.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_metrobloks_explicit_coming_soon_proposal",
              "scope": "The complete original Metrobloks Indianapolis facility body expressly says the data center is coming soon and describes developing IND A1. This supports a listed proposal. Specification cards, uptime marketing, carrier links and closed cooling assurances do not independently establish commissioned service, measured use, a final permit or actual benefits. The raw capacity text differs from discovery excerpts and no quantity is exported."
            },
            "source_read_scope": {
              "complete_original_provider_body_read": true,
              "explicit_coming_soon_not_compute_service": true,
              "raw_specification_and_search_excerpt_conflict_not_exported": true,
              "no_roles_locations_or_quantities_changed": true
            }
          },
          "notes": [
            "The complete original Metrobloks Indianapolis facility body expressly says the data center is coming soon and describes developing IND A1. This supports a listed proposal. Specification cards, uptime marketing, carrier links and closed cooling assurances do not independently establish commissioned service, measured use, a final permit or actual benefits. The raw capacity text differs from discovery excerpts and no quantity is exported.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.metrobloks.com/sites/indianapolis",
              "host": "www.metrobloks.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Indianapolis · Marion · Source context reviewed",
      "status_scope": "The complete original Metrobloks Indianapolis facility body expressly says the data center is coming soon and describes developing IND A1. This supports a listed proposal. Specification cards, uptime marketing, carrier links and closed cooling assurances do not independently establish commissioned service, measured use, a final permit or actual benefits. The raw capacity text differs from discovery excerpts and no quantity is exported.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18097"
      }
    },
    {
      "id": "microsoft-granger-in",
      "state": "in",
      "kind": "facility",
      "name": "Microsoft Granger Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Joseph"
      ],
      "city": "Granger",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Advocates' generalized thousand-MW examples and other projects' cost-allocation allegations are not Granger's confirmed IT demand or a regulator's findings. Panel concerns are attributed positions. No executed development agreement, decommissioning bond, utility tariff or completed power plants were independently reviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting",
          "host": "wvpe.org",
          "date": "2026-02-19",
          "published": "2026-02-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/st-joseph-county-public-meeting-recap/",
          "host": "local.microsoft.com",
          "published": "2026-05-20",
          "date": "2026-05-20",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://mishawaka.in.gov/news/city-of-mishawaka-and-regional-partners-sign-mou-to-support-water-sewer-service-and-wastewater-expansion/",
          "host": "mishawaka.in.gov",
          "published": "2025-08-26",
          "date": "2025-08-26",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.62769,
        "lng": -86.30205,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WVPE reports a Granger community panel on Microsoft's proposed campus and a county official still negotiating a development agreement under an NDA.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Advocates' generalized thousand-MW examples and other projects' cost-allocation allegations are not Granger's confirmed IT demand or a regulator's findings. Panel concerns are attributed positions. No executed development agreement, decommissioning bond, utility tariff or completed power plants were independently reviewed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting",
              "host": "wvpe.org",
              "date": "2026-02-19",
              "published": "2026-02-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 14",
          "scope": "Microsoft records a May 19, 2026 St. Joseph County community meeting at which it presented data center concepts. The City of Mishawaka separately reports an August 26, 2025 regional utility planning memorandum supporting the Microsoft project. This planning and public session evidence does not establish the current physical stage of the individual Granger record. La Porte groundbreaking is a separate project. Existing Granger reporting and its concern item remain retained without a duplicate concern episode.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "primary_concept_and_regional_utility_planning_not_current_site_stage",
              "scope": "Microsoft records a May 19, 2026 St. Joseph County community meeting at which it presented data center concepts. The City of Mishawaka separately reports an August 26, 2025 regional utility planning memorandum supporting the Microsoft project. This planning and public session evidence does not establish the current physical stage of the individual Granger record. La Porte groundbreaking is a separate project. Existing Granger reporting and its concern item remain retained without a duplicate concern episode."
            },
            "scope_limits": {
              "operator_meeting_on": "2026-05-19",
              "city_regional_mou_release_on": "2025-08-26",
              "mou_not_built_utility_service": true,
              "laporte_not_granger": true,
              "existing_concern_item_not_duplicated": true
            }
          },
          "notes": [
            "Microsoft records a May 19, 2026 St. Joseph County community meeting at which it presented data center concepts. The City of Mishawaka separately reports an August 26, 2025 regional utility planning memorandum supporting the Microsoft project. This planning and public session evidence does not establish the current physical stage of the individual Granger record. La Porte groundbreaking is a separate project. Existing Granger reporting and its concern item remain retained without a duplicate concern episode.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/st-joseph-county-public-meeting-recap/",
              "host": "local.microsoft.com",
              "published": "2026-05-20",
              "date": "2026-05-20",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://mishawaka.in.gov/news/city-of-mishawaka-and-regional-partners-sign-mou-to-support-water-sewer-service-and-wastewater-expansion/",
              "host": "mishawaka.in.gov",
              "published": "2025-08-26",
              "date": "2025-08-26",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Granger · St. Joseph · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18141"
      }
    },
    {
      "id": "new-carlisle-chicago-trail-data-center-st-joseph-county-in",
      "state": "in",
      "kind": "facility",
      "name": "New Carlisle Chicago Trail Data Center",
      "group": "stopped",
      "status": "Reported rezoning denial",
      "raw_status": "stopped",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Joseph"
      ],
      "city": "New Carlisle",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. A yes vote meant denying rezoning; do not reverse vote semantics. Article does not identify developer corporate entity or establish current resubmission outcome. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle",
          "host": "wvpe.org",
          "date": "2025-12-10",
          "published": "2025-12-10",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.59354,
        "lng": -86.28794,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "rezoning-denied",
            "reported_finding": "WVPE reports St Joseph County Council rejected rezoning needed for Chicago Trail proposal near New Carlisle after overnight meeting.",
            "report_display_date": "2025-12-10",
            "independently_verified_current_status": null
          },
          "notes": [
            "A yes vote meant denying rezoning; do not reverse vote semantics. Article does not identify developer corporate entity or establish current resubmission outcome.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle",
              "host": "wvpe.org",
              "date": "2025-12-10",
              "published": "2025-12-10",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-F1-label-review-2026-10-20",
          "scope": "WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.",
          "fields": {
            "identity_label_context": {
              "previous_name": "New Carlisle Chicago Trail Data Center (rezoning denied)",
              "plain_name": "New Carlisle Chicago Trail Data Center",
              "interpretation": "WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.",
              "outcome_wording_is_not_identity": true
            },
            "current_stage_evidence": {
              "outcome": "reported_rezoning_denial",
              "scope": "WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure."
            }
          },
          "notes": [
            "WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.",
            "Inherited inventory name: New Carlisle Chicago Trail Data Center (rezoning denied). The wording is retained as provenance, not as an independently verified outcome.",
            "An application decision is separate from a current physical stage. No coordinate, address, parcel, company role, technical figure or physical milestone date is changed."
          ],
          "sources": [
            {
              "url": "https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle",
              "host": "www.wvpe.org",
              "published": "2025-12-10",
              "date": "2025-12-10",
              "checked": "2026-10-20",
              "label": "WVPE"
            }
          ],
          "checked": "2026-10-20",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Carlisle · St. Joseph · Source context reviewed",
      "status_scope": "WVPE reports that St. Joseph County Council rejected the Chicago Trail proposal's rezoning in December 2025. This label concerns that rezoning decision; it does not establish the fate of every future use of the property or physical closure.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18141"
      }
    },
    {
      "id": "outrigger-washington-daviess-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Outrigger Industrial Washington Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Daviess"
      ],
      "city": "Washington",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Google, Meta, Amazon, hospitals and banks are examples, not tenants. Projected 250 to 500 MW has no critical-IT basis. Building and equipment cost ranges have different scopes; forecasts of jobs and ten-year tax receipts are not observed benefits. A requested will-serve letter is not an executed service agreement. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.ipm.org/news/2026-03-24/new-data-center-proposed-near-washington-ind",
          "host": "ipm.org",
          "date": "2026-03-24",
          "published": "2026-03-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.washingtonin.us/",
          "host": "www.washingtonin.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.70267,
        "lng": -87.07258,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WFIU reports Outrigger's preliminary 120-acre Washington-area concept, with water/sewer assurances, ordinance work and utility agreements still needed before an end user would commit.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Google, Meta, Amazon, hospitals and banks are examples, not tenants. Projected 250 to 500 MW has no critical-IT basis. Building and equipment cost ranges have different scopes; forecasts of jobs and ten-year tax receipts are not observed benefits. A requested will-serve letter is not an executed service agreement.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.ipm.org/news/2026-03-24/new-data-center-proposed-near-washington-ind",
              "host": "ipm.org",
              "date": "2026-03-24",
              "published": "2026-03-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete original City home body lists general Council and separate municipal tax code notices. It does not independently identify the exact Outrigger computing proposal or prove a private cancellation account. Two selected Council notice bodies remained unread during a bounded transport hold. A recurring Council date or municipal property tax exemption hearing is not assigned to this computing project. Exact current project disposition and physical stage remain unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_washington_general_notices_exact_outrigger_stage_held",
              "scope": "The complete original City home body lists general Council and separate municipal tax code notices. It does not independently identify the exact Outrigger computing proposal or prove a private cancellation account. Two selected Council notice bodies remained unread during a bounded transport hold. A recurring Council date or municipal property tax exemption hearing is not assigned to this computing project. Exact current project disposition and physical stage remain unverified."
            },
            "source_read_scope": {
              "complete_original_city_home_body_read": true,
              "oct26_and_oct19_notice_bodies_unread_transport_hold": true,
              "no_exact_outcome_or_hearing_subject_substitution": true
            }
          },
          "notes": [
            "The complete original City home body lists general Council and separate municipal tax code notices. It does not independently identify the exact Outrigger computing proposal or prove a private cancellation account. Two selected Council notice bodies remained unread during a bounded transport hold. A recurring Council date or municipal property tax exemption hearing is not assigned to this computing project. Exact current project disposition and physical stage remain unverified.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.washingtonin.us/",
              "host": "www.washingtonin.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Washington · Daviess · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18027"
      }
    },
    {
      "id": "posey-county-boberg-road-data-center-in",
      "state": "in",
      "kind": "facility",
      "name": "Posey County Boberg Road Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Posey"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Do not convert headline or URL into completed denial vote. Two-year moratorium was residents request, not adoption. Signed NDA is not a development approval. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.14news.com/2026/08/04/posey-co-commissioners-vote-no-proposed-data-center-near-boberg-hoenert-rd/",
          "host": "14news.com",
          "date": "2026-08-04",
          "published": "2026-08-04",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/08/Commissioners-August-4-2026.pdf",
          "host": "www.poseycountyin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/09/Commissioners-August-18-2026.pdf",
          "host": "www.poseycountyin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/09/Commissioners-Special-Meeting-August-27-2026.pdf",
          "host": "www.poseycountyin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.02192,
        "lng": -87.86865,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "commissioner-intention-not-recorded-vote",
            "reported_finding": "WFIE body says commissioners would vote no on Boberg/Hoenert proposal, yet also says no official proposal received and meeting adjourned after comment.",
            "report_display_date": "2026-08-04",
            "independently_verified_current_status": null
          },
          "notes": [
            "Do not convert headline or URL into completed denial vote. Two-year moratorium was residents request, not adoption. Signed NDA is not a development approval.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.14news.com/2026/08/04/posey-co-commissioners-vote-no-proposed-data-center-near-boberg-hoenert-rd/",
              "host": "14news.com",
              "date": "2026-08-04",
              "published": "2026-08-04",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Posey signed August 4, 2026 Board minutes say no rezoning or project request had been brought before that Board. Commissioners stated opposition to a possible Boberg Road rezoning and preferred agricultural use. Those prospective statements are not an actual vote denying a submitted project. The August 18 minutes approve the August 4 minutes and record further requests for a moratorium, not its adoption. Neither requests nor an advertised ordinance discussion establish an enacted rule, current physical construction, operating service or a final countywide project outcome.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "prospective_boberg_opposition_not_formal_denial_or_adopted_moratorium",
              "scope": "Posey signed August 4, 2026 Board minutes say no rezoning or project request had been brought before that Board. Commissioners stated opposition to a possible Boberg Road rezoning and preferred agricultural use. Those prospective statements are not an actual vote denying a submitted project. The August 18 minutes approve the August 4 minutes and record further requests for a moratorium, not its adoption. Neither requests nor an advertised ordinance discussion establish an enacted rule, current physical construction, operating service or a final countywide project outcome."
            },
            "source_scope": {
              "board_meeting_on": "2026-08-04",
              "later_minutes_approval_on": "2026-08-18",
              "all_eight_august_minutes_pages_visually_read": true,
              "no_request_before_board_not_no_application_anywhere": true,
              "would_vote_no_not_denial_vote": true,
              "public_requests_for_moratorium_not_ordinance_adoption": true,
              "no_later_disposition_or_complete_policy_audit": true
            }
          },
          "notes": [
            "Posey signed August 4, 2026 Board minutes say no rezoning or project request had been brought before that Board. Commissioners stated opposition to a possible Boberg Road rezoning and preferred agricultural use. Those prospective statements are not an actual vote denying a submitted project. The August 18 minutes approve the August 4 minutes and record further requests for a moratorium, not its adoption. Neither requests nor an advertised ordinance discussion establish an enacted rule, current physical construction, operating service or a final countywide project outcome.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/08/Commissioners-August-4-2026.pdf",
              "host": "www.poseycountyin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/09/Commissioners-August-18-2026.pdf",
              "host": "www.poseycountyin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.poseycountyin.gov/wp-content/uploads/2026/09/Commissioners-Special-Meeting-August-27-2026.pdf",
              "host": "www.poseycountyin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Posey · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18129"
      }
    },
    {
      "id": "powerhouse-hobart-lake-county-in",
      "state": "in",
      "kind": "facility",
      "name": "PowerHouse Hobart",
      "group": "proposed",
      "status": "Developer-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Hobart",
      "address": "",
      "who": "PowerHouse Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW. DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
          "host": "powerhousedata.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.powerhousedata.com/",
          "host": "www.powerhousedata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 41.43828,
        "lng": -87.36586,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-states-and-named-operator-review-round53-2026-10-15.json",
          "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.",
          "fields": {},
          "notes": [
            "Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW.",
            "DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued.",
            "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
              "host": "powerhousedata.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 1",
          "scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "developer_listed_development",
              "scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service."
            }
          },
          "notes": [
            "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check72, October24,2026",
          "scope": "The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred.",
          "fields": {
            "company_association": {
              "name": "PowerHouse Data Centers",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The original named PowerHouse Hobart project page and market list identify its Indiana development association. Advertised delivery and construction quarters are forecasts, not physical progress, commissioning or tenant operation. Developer per source means the named project proponent or documented historical developer, not a separate legal entity, construction contractor or property title. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Mutable portfolio publication days remain unknown; original dated announcements retain their own dates. No current operation, environmental outcome or legal certification is inferred."
          ],
          "sources": [
            {
              "url": "https://www.powerhousedata.com/data-center/powerhouse-hobart",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.powerhousedata.com/",
              "host": "www.powerhousedata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hobart · Lake · Source context reviewed",
      "status_scope": "PowerHouse currently lists Hobart as a development with delivery, entitlement, construction and power schedules. This supports a developer listed development only. The quarter labels are forecasts and do not establish construction underway, issued permits, available power or operating service.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "project-shirley-eagle-creek-township-lake-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Project Shirley",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Eagle Creek Township",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. A five-billion-USD plan, 500 MW and promised jobs are prospective with no verified critical-IT basis. Negotiable community benefits are not paid commitments. Other Amazon/Google GenCo deals, statewide utility demand and derivative narrow census counts are not this site's capacity or an independent national census. Regulatory/tariff assertions remain attributed pending original orders; nearby land speculation is not another confirmed campus. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/",
          "host": "latitudemedia.com",
          "date": "2026-05-01",
          "published": "2026-05-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://lakecountyin.gov/departments/council/meeting-minutes-c/2026/2026-04-14_meeting%20minutes.pdf",
          "host": "lakecountyin.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.41176,
        "lng": -87.4124,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Latitude Media discusses Sentinel's proposed Eagle Creek Project Shirley and a postponed rezoning vote, saying no executed IURC service agreement had been filed at publication.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "A five-billion-USD plan, 500 MW and promised jobs are prospective with no verified critical-IT basis. Negotiable community benefits are not paid commitments. Other Amazon/Google GenCo deals, statewide utility demand and derivative narrow census counts are not this site's capacity or an independent national census. Regulatory/tariff assertions remain attributed pending original orders; nearby land speculation is not another confirmed campus.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/",
              "host": "latitudemedia.com",
              "date": "2026-05-01",
              "published": "2026-05-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_named_project_shirley_proposal",
              "scope": "Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts."
            },
            "source_read_scope": {
              "original_april14_physical_page24_text_read": true,
              "no_open_house_occurrence_or_outcome_inferred": true,
              "unrelated_fiscal_audit_not_project_concern": true
            }
          },
          "notes": [
            "Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://lakecountyin.gov/departments/council/meeting-minutes-c/2026/2026-04-14_meeting%20minutes.pdf",
              "host": "lakecountyin.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Eagle Creek Township · Lake · Source context reviewed",
      "status_scope": "Physical page twenty four of the original April 14, 2026 County Council minutes names Project Shirley and advertises an open house to discuss the proposed south Lake County data center. This supports a listed proposal within that dated official account. The prospective April 16 event is not independently an accomplished hearing, exact selected property, final facility approval, construction or computing operation. The separate County fiscal audit discussion is unrelated to computing project cost or impacts.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "prologis-shelbyville-in",
      "state": "in",
      "kind": "facility",
      "name": "Prologis Shelbyville Data Center Campus",
      "group": "approved",
      "status": "City reported land use approval",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Shelby"
      ],
      "city": "Shelbyville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. City explicitly requires separate applications, permits and regulatory approvals before construction. Annexation, rezoning and economic agreement are not construction/operation approval. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-04-06",
          "Shelbyville current City account records April 6, 2026 Council approval of the amended annexation and rezoning ordinance 26 3052 and the Prologis economic development agreement. The City says separate applications, permits and regulatory approvals are required before construction. This is the land use and agreement action, not a physical start or opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364",
          "host": "shelbyville.in.gov",
          "date": "2026-04-06",
          "published": "2026-04-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.52346,
        "lng": -85.79164,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "municipal_action_date": "2026-04-06",
            "annexation_and_rezoning_approved": true,
            "economic_development_resolution": "2026-06",
            "resolution_vote": "4-2-1",
            "site_acres_approx": 429,
            "buildings_up_to": 11,
            "estimated_investment_usd_approx": 2000000000
          },
          "notes": [
            "City explicitly requires separate applications, permits and regulatory approvals before construction. Annexation, rezoning and economic agreement are not construction/operation approval.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364",
              "host": "shelbyville.in.gov",
              "date": "2026-04-06",
              "published": "2026-04-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 23",
          "scope": "Shelbyville current City account records April 6, 2026 approval of an amended voluntary annexation and rezoning ordinance, the fiscal plan and the Prologis economic development agreement. City reported land use approval describes those actions. The City expressly says future development needs separate applications, permits and regulatory approvals before construction. Projected buildings, investment and multiphase development are not completed construction or actual operating service. No individual permit, physical date or quantity is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_annexation_rezoning_and_agreement_approval_not_construction_permission",
              "scope": "Shelbyville current City account records April 6, 2026 approval of an amended voluntary annexation and rezoning ordinance, the fiscal plan and the Prologis economic development agreement. City reported land use approval describes those actions. The City expressly says future development needs separate applications, permits and regulatory approvals before construction. Projected buildings, investment and multiphase development are not completed construction or actual operating service. No individual permit, physical date or quantity is changed."
            }
          },
          "notes": [
            "Shelbyville current City account records April 6, 2026 approval of an amended voluntary annexation and rezoning ordinance, the fiscal plan and the Prologis economic development agreement. City reported land use approval describes those actions. The City expressly says future development needs separate applications, permits and regulatory approvals before construction. Projected buildings, investment and multiphase development are not completed construction or actual operating service. No individual permit, physical date or quantity is changed.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364",
              "host": "www.shelbyville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Shelbyville · Shelby · Source context reviewed",
      "status_scope": "Shelbyville current City account records April 6, 2026 approval of an amended voluntary annexation and rezoning ordinance, the fiscal plan and the Prologis economic development agreement. City reported land use approval describes those actions. The City expressly says future development needs separate applications, permits and regulatory approvals before construction. Projected buildings, investment and multiphase development are not completed construction or actual operating service. No individual permit, physical date or quantity is changed.",
      "event_evidence": [
        {
          "date": "2026-04-06",
          "text": "Shelbyville current City account records April 6, 2026 Council approval of the amended annexation and rezoning ordinance 26 3052 and the Prologis economic development agreement. The City says separate applications, permits and regulatory approvals are required before construction. This is the land use and agreement action, not a physical start or opening.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364",
              "host": "www.shelbyville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18145"
      }
    },
    {
      "id": "provident-chesterton-porter-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Provident Chesterton Data Center Campus (former Brassie Golf Club)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Porter"
      ],
      "city": "Chesterton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named municipal/limited original-witness or operator context; dates and source origins explicit.. Original Chesterton TownCouncil minutes datedJune10,2024, pages1 to 2, record DanaLafata referencing attorneyGregBabcock's letter on behalfofPPMChestertonLLC, BrassieDevelopmentLLC andProvidentRealtyAdvisors. Minutes state clientformallywithdrew PUDandannexationpetitions forformerBrassieGolfCourse. Page2 continues the account and records official/residentresponses. This corroborates the inherited cancelled/withdrawn stage with original municipal context, not a newly discovered2026cancellation. Underlying letter/petitionwithdrawal and citedJune7pressrelease notseparatelyinspected. No permanentcityban, laterrevival, exactparceladdress, publishedMW or new investmentfigure inferred. Unrelatedlight/HOA/publiccomment subjects are differentpropertyissues. Textpages1 to 3read;only1 to 2visuallyinspected;otherthreepagesnotread. Not full-field, exact parcel, currentoperations or independently audited numerical certification.",
      "date": "",
      "events": [
        [
          "2024-06-10",
          "Chesterton Council reported the named Provident and Brassie parties withdrawal of PUD and annexation petitions at its June 10, 2024 meeting. This dates the official Council account rather than an inferred letter day, permanent ban or physical computing closure."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024",
          "host": "chestertonin.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 41.44021,
        "lng": -87.06566,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-state-original-minutes-and-source-origin-review-round69-2026-10-15.json",
          "scope": "Named municipal/limited original-witness or operator context; dates and source origins explicit.",
          "fields": {},
          "notes": [
            "Original Chesterton TownCouncil minutes datedJune10,2024, pages1 to 2, record DanaLafata referencing attorneyGregBabcock's letter on behalfofPPMChestertonLLC, BrassieDevelopmentLLC andProvidentRealtyAdvisors. Minutes state clientformallywithdrew PUDandannexationpetitions forformerBrassieGolfCourse. Page2 continues the account and records official/residentresponses.",
            "This corroborates the inherited cancelled/withdrawn stage with original municipal context, not a newly discovered2026cancellation. Underlying letter/petitionwithdrawal and citedJune7pressrelease notseparatelyinspected. No permanentcityban, laterrevival, exactparceladdress, publishedMW or new investmentfigure inferred. Unrelatedlight/HOA/publiccomment subjects are differentpropertyissues. Textpages1 to 3read;only1 to 2visuallyinspected;otherthreepagesnotread.",
            "Not full-field, exact parcel, currentoperations or independently audited numerical certification."
          ],
          "sources": [
            {
              "url": "https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024",
              "host": "chestertonin.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete six page original June 10, 2024 Council minute text records counsel for the named Provident and Brassie parties reporting withdrawal of PUD and annexation petitions. This is a documented proposal withdrawal account rather than physical computing closure or present site use. The exact letter day is not inferred from a separate reference to a June 7 press release. The withdrawal is not a general Town ban, and present ownership, new applications and current physical stage remain unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_provident_brassie_petition_withdrawal_account_current_physical_stage_held",
              "scope": "The complete six page original June 10, 2024 Council minute text records counsel for the named Provident and Brassie parties reporting withdrawal of PUD and annexation petitions. This is a documented proposal withdrawal account rather than physical computing closure or present site use. The exact letter day is not inferred from a separate reference to a June 7 press release. The withdrawal is not a general Town ban, and present ownership, new applications and current physical stage remain unverified."
            },
            "source_read_scope": {
              "complete6page_original_minute_text_read": true,
              "original_selected_pages1and2_rendered": true,
              "withdrawal_account_not_computing_closure": true,
              "no_exact_letter_day_inferred": true
            }
          },
          "notes": [
            "The complete six page original June 10, 2024 Council minute text records counsel for the named Provident and Brassie parties reporting withdrawal of PUD and annexation petitions. This is a documented proposal withdrawal account rather than physical computing closure or present site use. The exact letter day is not inferred from a separate reference to a June 7 press release. The withdrawal is not a general Town ban, and present ownership, new applications and current physical stage remain unverified.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024",
              "host": "www.chestertonin.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Chesterton · Porter · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-06-10",
          "text": "Chesterton Council reported the named Provident and Brassie parties withdrawal of PUD and annexation petitions at its June 10, 2024 meeting. This dates the official Council account rather than an inferred letter day, permanent ban or physical computing closure.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024",
              "host": "www.chestertonin.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18127"
      }
    },
    {
      "id": "qlevr-charlestown-clark-county-in",
      "state": "in",
      "kind": "facility",
      "name": "QLEVR Charlestown Data Center",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clark"
      ],
      "city": "Charlestown",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public introduction was read. Encoded premium body was not decoded. The economic summary's 105-million-USD and fourteen-to-sixteen-month schedule are proposal claims, not spending or observed completion. A future plan-commission hearing is not approval; original filing and power basis remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.newsandtribune.com/news/data-center-proposed-for-charlestowns-shadow-lake-park/article_b0967582-6664-4499-a2b4-44dfcfa4702a.html",
          "host": "newsandtribune.com",
          "date": "2026-05-27",
          "published": "2026-05-27",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.cityofcharlestown.com/202/Advisory-Plan-Commission",
          "host": "www.cityofcharlestown.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.cityofcharlestown.com/DocumentCenter/View/2143/Data-Center---Community-Presentation---Slideshow",
          "host": "www.cityofcharlestown.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.cityofcharlestown.com/AgendaCenter/ViewFile/Item/944?fileID=3292",
          "host": "www.cityofcharlestown.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.47784,
        "lng": -85.70716,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The News and Tribune's public introduction identifies QLEVR LLC's Shadow Lake request, with 12 acres, about 55,000 square feet and a proposed 3 MW facility.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Only the public introduction was read. Encoded premium body was not decoded. The economic summary's 105-million-USD and fourteen-to-sixteen-month schedule are proposal claims, not spending or observed completion. A future plan-commission hearing is not approval; original filing and power basis remain unreviewed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.newsandtribune.com/news/data-center-proposed-for-charlestowns-shadow-lake-park/article_b0967582-6664-4499-a2b4-44dfcfa4702a.html",
              "host": "newsandtribune.com",
              "date": "2026-05-27",
              "published": "2026-05-27",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The original City planning body and selected hosted forum and economic report pages identify a proposed QLEVR Charlestown computing facility. This supports a listed proposal. The economic study uses a three MW scenario while the forum uses five MW; neither figure is silently selected or exported. Forecast jobs, tax revenue, construction timing, closed cooling and noise assurances are not actual performance or accomplished benefits. A generic Fortune 50 description is not a named tenant, and a separate Project Bedrock noise report is not used to change inherited roles or identity.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_named_qlevr_proposal_with_conflicting_scenarios",
              "scope": "The original City planning body and selected hosted forum and economic report pages identify a proposed QLEVR Charlestown computing facility. This supports a listed proposal. The economic study uses a three MW scenario while the forum uses five MW; neither figure is silently selected or exported. Forecast jobs, tax revenue, construction timing, closed cooling and noise assurances are not actual performance or accomplished benefits. A generic Fortune 50 description is not a named tenant, and a separate Project Bedrock noise report is not used to change inherited roles or identity."
            },
            "source_read_scope": {
              "complete_original_city_planning_body_read": true,
              "selected_forum_proposal_and_design_sections_read": true,
              "economic_report_descriptive_page1_read": true,
              "complete_one_page_forum_faq_actually_viewed": true,
              "three_and_five_mw_scenarios_not_merged": true,
              "june8_packet_oversize_hold_retained": true,
              "no_named_tenant_role_or_quantity_export": true
            }
          },
          "notes": [
            "The original City planning body and selected hosted forum and economic report pages identify a proposed QLEVR Charlestown computing facility. This supports a listed proposal. The economic study uses a three MW scenario while the forum uses five MW; neither figure is silently selected or exported. Forecast jobs, tax revenue, construction timing, closed cooling and noise assurances are not actual performance or accomplished benefits. A generic Fortune 50 description is not a named tenant, and a separate Project Bedrock noise report is not used to change inherited roles or identity.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.cityofcharlestown.com/202/Advisory-Plan-Commission",
              "host": "www.cityofcharlestown.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.cityofcharlestown.com/DocumentCenter/View/2143/Data-Center---Community-Presentation---Slideshow",
              "host": "www.cityofcharlestown.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.cityofcharlestown.com/AgendaCenter/ViewFile/Item/944?fileID=3292",
              "host": "www.cityofcharlestown.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Charlestown · Clark · Source context reviewed",
      "status_scope": "The original City planning body and selected hosted forum and economic report pages identify a proposed QLEVR Charlestown computing facility. This supports a listed proposal. The economic study uses a three MW scenario while the forum uses five MW; neither figure is silently selected or exported. Forecast jobs, tax revenue, construction timing, closed cooling and noise assurances are not actual performance or accomplished benefits. A generic Fortune 50 description is not a named tenant, and a separate Project Bedrock noise report is not used to change inherited roles or identity.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18019"
      }
    },
    {
      "id": "radiusdc-plainfield-hendricks-county-in",
      "state": "in",
      "kind": "facility",
      "name": "RadiusDC Plainfield Campus (Indy I / Indy II)",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hendricks"
      ],
      "city": "Plainfield",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. RadiusDC says it is DEVELOPING two facilities IndyI/IndyII at9323AllPointsParkway,PlainfieldIN46168. Each100,000sf and12MWBUILDINGUTILITYcapacity; not100,000sf/12MW shared-campus total or12MWIT. Two6MWhalls and rack power400W/sf are subfacility specs, not extra utility capacity to add. The isolated In-Service label near utility information does not override developing prose or establish both buildings are operating. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.",
      "date": "",
      "events": [
        [
          "2026-01-12",
          "RadiusDC announced its Indianapolis colocation development on January 12, 2026. The original issuer account distinguishes planned Indy I from future Indy II. The announcement does not establish accomplished construction, actual utility load or a computing opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.radius-dc.com/location/indianapolis",
          "host": "radius-dc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-expands-its-footprint-with-edge-colocation-campus-in-indianapolis-in",
          "host": "www.radius-dc.com",
          "published": "2026-01-12",
          "date": "2026-01-12",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.76952,
        "lng": -86.51,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-states-and-named-operator-review-round53-2026-10-15.json",
          "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.",
          "fields": {},
          "notes": [
            "RadiusDC says it is DEVELOPING two facilities IndyI/IndyII at9323AllPointsParkway,PlainfieldIN46168. Each100,000sf and12MWBUILDINGUTILITYcapacity; not100,000sf/12MW shared-campus total or12MWIT.",
            "Two6MWhalls and rack power400W/sf are subfacility specs, not extra utility capacity to add. The isolated In-Service label near utility information does not override developing prose or establish both buildings are operating.",
            "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."
          ],
          "sources": [
            {
              "url": "https://www.radius-dc.com/location/indianapolis",
              "host": "radius-dc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_radius_indianapolis_development_proposal",
              "scope": "The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls."
            },
            "source_read_scope": {
              "complete_original_announcement_platform_and_current_facility_bodies_read": true,
              "indy1_and_future_indy2_not_both_operating": true,
              "nashville_building_statement_not_indianapolis": true,
              "utility_in_service_specification_not_computing_service": true
            }
          },
          "notes": [
            "The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-expands-its-footprint-with-edge-colocation-campus-in-indianapolis-in",
              "host": "www.radius-dc.com",
              "published": "2026-01-12",
              "date": "2026-01-12",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.radius-dc.com/location/indianapolis",
              "host": "www.radius-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Plainfield · Hendricks · Source context reviewed",
      "status_scope": "The complete original January 12, 2026 issuer announcement and current Indianapolis facility body describe a purpose built campus being developed, with Indy I and future Indy II distinguished. This supports a listed proposal without independently dating accomplished vertical construction or computing service. The separate Nashville construction statement does not apply to Indianapolis. An in service utility label and substation development are not computing operation, actual load or commissioned data halls.",
      "event_evidence": [
        {
          "date": "2026-01-12",
          "text": "RadiusDC announced its Indianapolis colocation development on January 12, 2026. The original issuer account distinguishes planned Indy I from future Indy II. The announcement does not establish accomplished construction, actual utility load or a computing opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.radius-dc.com/newsroom-and-events/radiusdc-expands-its-footprint-with-edge-colocation-campus-in-indianapolis-in",
              "host": "www.radius-dc.com",
              "published": "2026-01-12",
              "date": "2026-01-12",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18063"
      }
    },
    {
      "id": "vantage-pittsboro-in",
      "state": "in",
      "kind": "facility",
      "name": "Vantage Pittsboro Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hendricks"
      ],
      "city": "Pittsboro",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Agricultural rezoning request and futureFebruary 25 planning/March 18 earliest council review are not approvals. Building MWbasis is undefined, not commissioned critical IT.618 rezoningacreage includes 285 DCacres; do not add them. Incentives/site review were future steps and no award value is given. Vantage 13 billion debt/equity and 9.2 billion equity are global/company financing, not Pittsboro capex. Other Indiana 25 billion potential pipeline and unrelatedMorgan 391 acreproposal cannot be assigned to this site. No exact RFS or tenant verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.insideindianabusiness.com/articles/data-center-developer-eyeing-618-acre-site-in-hendricks-county",
          "host": "insideindianabusiness.com",
          "date": "2025-02-07",
          "published": "2025-02-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.townofpittsboro.org/DocumentCenter/View/1168/2026-10-27-PC-Agenda_V3?bidId=",
          "host": "www.townofpittsboro.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.townofpittsboro.org/agendacenter",
          "host": "www.townofpittsboro.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 39.78044,
        "lng": -86.52192,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Inside INdiana Business publicly readable article describes Vantage’s 618-acre Pittsboro rezoning request, with about 285 acres intended for the data center and three buildings described as 256/96/48 MW.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Agricultural rezoning request and futureFebruary 25 planning/March 18 earliest council review are not approvals. Building MWbasis is undefined, not commissioned critical IT.618 rezoningacreage includes 285 DCacres; do not add them. Incentives/site review were future steps and no award value is given. Vantage 13 billion debt/equity and 9.2 billion equity are global/company financing, not Pittsboro capex. Other Indiana 25 billion potential pipeline and unrelatedMorgan 391 acreproposal cannot be assigned to this site. No exact RFS or tenant verified.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.insideindianabusiness.com/articles/data-center-developer-eyeing-618-acre-site-in-hendricks-county",
              "host": "insideindianabusiness.com",
              "date": "2025-02-07",
              "published": "2025-02-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete four page original October 27, 2026 agenda text addresses landscape standards, a residential subdivision, an address resolution and redevelopment plan review. Those selected subjects do not independently identify an exact Vantage computing hearing, project approval or current physical stage. The old staff PDF URL instead returned an HTML custom not found page. One observed agenda target self redirects and remains held; the separately advertised second target returned the original readable agenda. Generic buffers and inherited private project reports do not certify computing construction or service.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_pittsboro_current_agenda_exact_vantage_stage_held",
              "scope": "The complete four page original October 27, 2026 agenda text addresses landscape standards, a residential subdivision, an address resolution and redevelopment plan review. Those selected subjects do not independently identify an exact Vantage computing hearing, project approval or current physical stage. The old staff PDF URL instead returned an HTML custom not found page. One observed agenda target self redirects and remains held; the separately advertised second target returned the original readable agenda. Generic buffers and inherited private project reports do not certify computing construction or service."
            },
            "source_read_scope": {
              "complete_original_oct27_agenda4page_text_read": true,
              "old_staff_pdf_url_returned_html_custom404": true,
              "observed1167_self_redirect_stopped": true,
              "independent1168_original_pdf_read": true,
              "no_generic_landscape_concern_assigned_exact_vantage": true
            }
          },
          "notes": [
            "The complete four page original October 27, 2026 agenda text addresses landscape standards, a residential subdivision, an address resolution and redevelopment plan review. Those selected subjects do not independently identify an exact Vantage computing hearing, project approval or current physical stage. The old staff PDF URL instead returned an HTML custom not found page. One observed agenda target self redirects and remains held; the separately advertised second target returned the original readable agenda. Generic buffers and inherited private project reports do not certify computing construction or service.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.townofpittsboro.org/DocumentCenter/View/1168/2026-10-27-PC-Agenda_V3?bidId=",
              "host": "www.townofpittsboro.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.townofpittsboro.org/agendacenter",
              "host": "www.townofpittsboro.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pittsboro · Hendricks · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18063"
      }
    },
    {
      "id": "blue-ladder-wolcott-white-county-in",
      "state": "in",
      "kind": "facility",
      "name": "Wolcott Data Center",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "White"
      ],
      "city": "Wolcott",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wolcott developer concept and conflicting buildout timing. Homepage says full build-out2029 while tax chart labels2030; keep exact completion date null. Four building footprints exclude separate office/warehouse. Noise under50dBA is proposed limit, not measured observation. No numeric ITMW or signed no-incentive agreement. Tax-cut claims and35Mcommitment not actual receipts or independent fiscal finding. NoBlueLadderlegalentityidentityinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wolcottdatacenter.com/",
          "host": "wolcottdatacenter.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.74982,
        "lng": -86.86526,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Wolcott developer concept and conflicting buildout timing",
          "fields": {
            "project_name": "Wolcott Data Center",
            "county": "White County, Indiana",
            "proposed_campus_acres": 322,
            "planned_data_center_buildings": 4,
            "planned_each_data_building_footprint_sqft": 327612,
            "planned_office_sqft": 50000,
            "planned_warehouse_sqft": 100000,
            "expected_construction_jobs_approx": 1000,
            "developer_community_enhancement_commitment_usd": 35000000,
            "developer_claims_no_incentives_sought": true,
            "full_buildout_year_conflict": [
              2029,
              2030
            ]
          },
          "notes": [
            "Homepage says full build-out2029 while tax chart labels2030; keep exact completion date null. Four building footprints exclude separate office/warehouse. Noise under50dBA is proposed limit, not measured observation. No numeric ITMW or signed no-incentive agreement. Tax-cut claims and35Mcommitment not actual receipts or independent fiscal finding. NoBlueLadderlegalentityidentityinreviewedbody.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wolcottdatacenter.com/",
              "host": "wolcottdatacenter.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_wolcott_project_portal_proposal",
              "scope": "The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes."
            },
            "source_read_scope": {
              "complete_original_project_portal_text_body_read": true,
              "illustrative_concept_and_final_engineering_limits_retained": true,
              "year2029_prose_and2030_chart_years_not_accomplished": true,
              "no_benefit_quantity_role_or_location_export": true
            }
          },
          "notes": [
            "The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.wolcottdatacenter.com/",
              "host": "www.wolcottdatacenter.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wolcott · White · Source context reviewed",
      "status_scope": "The complete original Wolcott project portal describes a proposed campus and illustrative concept plan subject to engineering. This supports a listed proposal under the exact inherited project source. Future full development years differ between prose and chart labeling, and none is an accomplished opening. Tax savings, local benefits, no incentive requests, closed cooling and noise descriptions are project claims rather than measured results, independently verified rate outcomes or issued rules. No provider role, exact property, construction day or technical quantity changes.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18181"
      }
    },
    {
      "id": "wylie-capital-broadway-merrillville-in",
      "state": "in",
      "kind": "facility",
      "name": "Wylie Capital Broadway Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Merrillville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
          "host": "govtech.com",
          "date": "2024-11-25",
          "published": "2024-11-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/c1qpdrdq/11-20-24-meeting-memo-data-center-committeee.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
          "host": "www.merrillville.in.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
          "host": "media-002-us.cdn.govstack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 41.45354,
        "lng": -87.39187,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind",
              "host": "govtech.com",
              "date": "2024-11-25",
              "published": "2024-11-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 63",
          "scope": "Selected original November 20, 2024 advisory memorandum page one identifies the Wylie proposal on 93rd Avenue between Broadway and Georgia Street. The account describes utilities, possible road improvements and support discussions, without establishing construction, present operation or utility authorization. The original provider home returned an empty content body. The later July 14 general pause extension is separate from exact project eligibility and present disposition. Proposed benefits and traffic or noise assurances are not measured results.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_wylie_proposal_history_and_general_pause_present_stage_held",
              "scope": "Selected original November 20, 2024 advisory memorandum page one identifies the Wylie proposal on 93rd Avenue between Broadway and Georgia Street. The account describes utilities, possible road improvements and support discussions, without establishing construction, present operation or utility authorization. The original provider home returned an empty content body. The later July 14 general pause extension is separate from exact project eligibility and present disposition. Proposed benefits and traffic or noise assurances are not measured results."
            },
            "source_read_scope": {
              "original_nov20_memorandum_selected_page1_read": true,
              "empty_original_provider_home_not_service_evidence": true,
              "july14_extension_pages16and17_actually_viewed": true,
              "no_current_site_specific_eligibility_or_stage_inferred": true
            }
          },
          "notes": [
            "Selected original November 20, 2024 advisory memorandum page one identifies the Wylie proposal on 93rd Avenue between Broadway and Georgia Street. The account describes utilities, possible road improvements and support discussions, without establishing construction, present operation or utility authorization. The original provider home returned an empty content body. The later July 14 general pause extension is separate from exact project eligibility and present disposition. Proposed benefits and traffic or noise assurances are not measured results.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Administrative evidence and prospective dates do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/c1qpdrdq/11-20-24-meeting-memo-data-center-committeee.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.merrillville.in.gov/business-building-economic-development/data-centers/",
              "host": "www.merrillville.in.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://media-002-us.cdn.govstack.com/merrillville-us/media/bklof5mo/minutes-meeting-07-14-26.pdf",
              "host": "media-002-us.cdn.govstack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Merrillville · Lake · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "18089"
      }
    },
    {
      "id": "databank-ind1-indianapolis-in",
      "state": "in",
      "kind": "facility",
      "name": "DataBank IND1 Downtown Indianapolis Data Center",
      "group": "operating",
      "status": "Operator listed service component",
      "crypto": false,
      "type": "Colocation",
      "counties": [
        "Marion"
      ],
      "city": "Indianapolis",
      "address": "731 West Henry Street, Indianapolis, IN 46225",
      "who": "DataBank",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Operator listed service component. County level map context. Whole campus delivery remains unverified.",
      "date": "",
      "events": [
        [
          "2026-10-24",
          "Added to the atlas. Admission date, not an opening or construction milestone."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/indianapolis/731-west-henry-street/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=731+West+Henry+Street%2C+Indianapolis%2C+IN+46225&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-86.17766309154752%2C39.75489228853755%2C-86.16480890845247%2C39.76477371146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -86.171236,
        "lat": 39.759833,
        "precision": "address",
        "basis": "Original operator reported street 731 West Henry Street, Indianapolis, IN 46225 matched through the complete literal Census query. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Calculated street reference, not a roof or tenant floor",
      "summary": "Indianapolis operator listing. County level map context.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 5 discovery cohort 2",
          "scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. Distinct named carrier hotel at 731 West Henry Street. Operator describes fiber connectivity to IND2 at a separate address; not a separate tenant at the same street.",
          "fields": {
            "operator_reported_context": {
              "provider": "DataBank",
              "name": "DataBank IND1 Downtown Indianapolis Data Center",
              "address": "731 West Henry Street, Indianapolis, IN 46225",
              "codes": [
                "IND1"
              ],
              "scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. Distinct named carrier hotel at 731 West Henry Street. Operator describes fiber connectivity to IND2 at a separate address; not a separate tenant at the same street."
            },
            "county_association": {
              "county": "Marion",
              "county_fips": "18097",
              "scope": "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-24",
              "scope": "Atlas admission date only. Not publication, opening or construction."
            }
          },
          "notes": [
            "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted.",
            "Census matched 731 W HENRY ST, INDIANAPOLIS, IN, 46225. Publication date is unknown. Technical capacity, floor area, uptime, renewable and security claims are excluded.",
            "Distinct named carrier hotel at 731 West Henry Street. Operator describes fiber connectivity to IND2 at a separate address; not a separate tenant at the same street."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/indianapolis/731-west-henry-street/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Operator facility or campus listing"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=731+West+Henry+Street%2C+Indianapolis%2C+IN+46225&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Census county context only"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 75, 2026-10-24",
          "scope": "The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -86.171236,
                "lat": 39.759833,
                "precision": "address",
                "basis": "Original operator reported street 731 West Henry Street, Indianapolis, IN 46225 matched through the complete literal Census query. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "731 West Henry Street, Indianapolis, IN 46225",
              "county_fips": [
                "18097"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
            "The original Native location is null, so a prior point offset cannot be calculated and remains unknown. This source review supplies the first independently qualified location reference for this existing record. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. The complete literal Census input and independently calculated reference agree with the unchanged retained county 18097. This is no claim of physical relocation.",
            "Industrial blocks, paved areas, roads, rail, river and a bridge occupy the frame. Source setting only. Acquisition date is unknown and may predate construction. No pixel supplies coordinates, a computing roof, current stage, room, suite, ownership or full campus boundary."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/indianapolis/731-west-henry-street/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original operator named computing street, source scope retained"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=731+West+Henry+Street%2C+Indianapolis%2C+IN+46225&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal computing street query, interpolated reference only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-86.17766309154752%2C39.75489228853755%2C-86.16480890845247%2C39.76477371146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "raw_status": "partly operating",
      "status_field": "current_status",
      "status_scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. Distinct named carrier hotel at 731 West Henry Street. Operator describes fiber connectivity to IND2 at a separate address; not a separate tenant at the same street."
    },
    {
      "id": "databank-ind2-indianapolis-in",
      "state": "in",
      "kind": "facility",
      "name": "DataBank IND2 Downtown Indianapolis Data Center",
      "group": "operating",
      "status": "Operator listed service component",
      "crypto": false,
      "type": "Colocation",
      "counties": [
        "Marion"
      ],
      "city": "Indianapolis",
      "address": "650 West Henry Street, Indianapolis, IN 46225",
      "who": "DataBank",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Operator listed service component. County level map context. Whole campus delivery remains unverified.",
      "date": "",
      "events": [
        [
          "2026-10-24",
          "Added to the atlas. Admission date, not an opening or construction milestone."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.databank.com/data-centers/indianapolis/650-west-henry-street/",
          "host": "www.databank.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility or campus listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=650+West+Henry+Street%2C+Indianapolis%2C+IN+46225&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-86.17681410340005%2C39.75501928853755%2C-86.16395989659996%2C39.76490071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -86.170387,
        "lat": 39.75996,
        "precision": "address",
        "basis": "Original operator reported street 650 West Henry Street, Indianapolis, IN 46225 matched through the complete literal Census query. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Calculated street reference, not a roof or tenant floor",
      "summary": "Indianapolis operator listing. County level map context.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 5 discovery cohort 2",
          "scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. Distinct named carrier hotel at 650 West Henry Street, paired by operator with IND1 at a different address.",
          "fields": {
            "operator_reported_context": {
              "provider": "DataBank",
              "name": "DataBank IND2 Downtown Indianapolis Data Center",
              "address": "650 West Henry Street, Indianapolis, IN 46225",
              "codes": [
                "IND2"
              ],
              "scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. Distinct named carrier hotel at 650 West Henry Street, paired by operator with IND1 at a different address."
            },
            "county_association": {
              "county": "Marion",
              "county_fips": "18097",
              "scope": "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-24",
              "scope": "Atlas admission date only. Not publication, opening or construction."
            }
          },
          "notes": [
            "County association only. No point, parcel, roof, municipal jurisdiction, street spelling or postal correction is adopted.",
            "Census matched 650 W HENRY ST, INDIANAPOLIS, IN, 46225. Publication date is unknown. Technical capacity, floor area, uptime, renewable and security claims are excluded.",
            "Distinct named carrier hotel at 650 West Henry Street, paired by operator with IND1 at a different address."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/indianapolis/650-west-henry-street/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Operator facility or campus listing"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=650+West+Henry+Street%2C+Indianapolis%2C+IN+46225&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Census county context only"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 75, 2026-10-24",
          "scope": "The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -86.170387,
                "lat": 39.75996,
                "precision": "address",
                "basis": "Original operator reported street 650 West Henry Street, Indianapolis, IN 46225 matched through the complete literal Census query. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "650 West Henry Street, Indianapolis, IN 46225",
              "county_fips": [
                "18097"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
            "The original Native location is null, so a prior point offset cannot be calculated and remains unknown. This source review supplies the first independently qualified location reference for this existing record. The original operator identifies this named computing facility and its published street. This is a calculated street reference, never a roof, tenant floor or suite position. The complete literal Census input and independently calculated reference agree with the unchanged retained county 18097. This is no claim of physical relocation.",
            "Industrial blocks, paved areas, roads, rail, river and a bridge occupy the frame. The overlapping IND1 setting does not independently resolve separate roofs. Source setting only. Acquisition date is unknown and may predate construction. No pixel supplies coordinates, a computing roof, current stage, room, suite, ownership or full campus boundary."
          ],
          "sources": [
            {
              "url": "https://www.databank.com/data-centers/indianapolis/650-west-henry-street/",
              "host": "www.databank.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original operator named computing street, source scope retained"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=650+West+Henry+Street%2C+Indianapolis%2C+IN+46225&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal computing street query, interpolated reference only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-86.17681410340005%2C39.75501928853755%2C-86.16395989659996%2C39.76490071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "raw_status": "partly operating",
      "status_field": "current_status",
      "status_scope": "Current operator service context only. Source review date is not an opening date; no full campus completion or measured utilization is established. Distinct named carrier hotel at 650 West Henry Street, paired by operator with IND1 at a different address."
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
