  "schema_version": 1,
  "source_compilation_context": {
    "me": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/me.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "me",
    "label": "Maine"
  },
  "records": [
    {
      "id": "centra-portland-me",
      "state": "me",
      "kind": "facility",
      "name": "CENTRA Digital Interconnect -- 340 Cumberland (PMW01)",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cumberland"
      ],
      "city": "Portland",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Headline2.5K MVA conflicts with prose up to2.5MVA; suppress malformed headline. Headline1.1K SF building footprint should be checked against tech sheet before publication. MVA is not MW without power-factor basis. Operator identifies PWM1 carrier hotel and1MW critical capacity. Page headline power/area typography conflicts with prose. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.centradigital.com/data-centers/pwm1",
          "host": "centradigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=340+Cumberland+Ave%2C+Portland%2C+ME+04101%2C+USA&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal computing street query, calculated range only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-70.26860812111306%2C43.65276728853755%2C-70.25494987888695%2C43.66264871146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -70.261779,
        "lat": 43.657708,
        "precision": "address",
        "basis": "The original named operator computing property source identifies 340 Cumberland Ave, Portland, ME 04101, USA. One complete unique literal Census street range supports this calculated street reference inside the unchanged county. The operator page and separately captured original brochure preserve PWM1 and the literal Cumberland computing street; the retained PMW01 inventory spelling is unchanged. No roof, legal title or complete campus is certified. Source publication and imagery acquisition dates are unknown; imagery may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "city": "Portland",
            "street": "340 Cumberland Ave",
            "facility_code": "PWM1",
            "critical_capacity_mw": 1,
            "utility_potential_mva": 2.5,
            "utility_basis": "up to2.5MVA potential, apparent power"
          },
          "notes": [
            "Headline2.5K MVA conflicts with prose up to2.5MVA; suppress malformed headline.",
            "Headline1.1K SF building footprint should be checked against tech sheet before publication.",
            "MVA is not MW without power-factor basis.",
            "Operator identifies PWM1 carrier hotel and1MW critical capacity. Page headline power/area typography conflicts with prose.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.centradigital.com/data-centers/pwm1",
              "host": "centradigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "The complete original current Portland 1 provider body offers colocation space and interconnection at its named carrier hotel and says it is home to the internet exchange. This supports operator listed interconnection and colocation service without certifying measured critical load, occupancy, total future capacity, uninterrupted performance or an exact first opening day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "provider_named_portland1_current_colocation_service",
              "scope": "The complete original current Portland 1 provider body offers colocation space and interconnection at its named carrier hotel and says it is home to the internet exchange. This supports operator listed interconnection and colocation service without certifying measured critical load, occupancy, total future capacity, uninterrupted performance or an exact first opening day."
            },
            "source_read_scope": {
              "complete_original_current_portland1_text_body_read": true,
              "no_capacity_location_or_first_opening_export": true
            }
          },
          "notes": [
            "The complete original current Portland 1 provider body offers colocation space and interconnection at its named carrier hotel and says it is home to the internet exchange. This supports operator listed interconnection and colocation service without certifying measured critical load, occupancy, total future capacity, uninterrupted performance or an exact first opening day.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.centradigital.com/data-centers/pwm1",
              "host": "www.centradigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 69, 2026-10-24",
          "scope": "Original named operator computing street and calculated literal Census range only. All existing facts, address, county and source history remain exact. No roof, tenant floor, current operation, title or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -70.261779,
                "lat": 43.657708,
                "precision": "address",
                "basis": "The original named operator computing property source identifies 340 Cumberland Ave, Portland, ME 04101, USA. One complete unique literal Census street range supports this calculated street reference inside the unchanged county. The operator page and separately captured original brochure preserve PWM1 and the literal Cumberland computing street; the retained PMW01 inventory spelling is unchanged. No roof, legal title or complete campus is certified. Source publication and imagery acquisition dates are unknown; imagery may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "340 Cumberland Ave, Portland, ME 04101, USA",
              "county_fips": [
                "23005"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Original named operator computing street and calculated literal Census range only. All existing facts, address, county and source history remain exact. No roof, tenant floor, current operation, title or complete campus is certified.",
            "The inherited general area coordinate was not an independently reviewed computing street reference. The complete original named operator computing address and one complete literal Census query uniquely support this calculated street reference inside the unchanged county. The measured correction is 35.3 metres. Every source version and protected fact remains exact. This documents a source reference correction, not physical relocation, legal title, current operation, tenant floor or a selected computing roof.",
            "Original operator named PWM1 computing page gives the complete street. The separately captured brochure repeats 340 CUMBERLAND AVE. The retained PMW01 inventory spelling is preserved without renaming; the literal Portland and Cumberland computing identity is joined, not another city or footprint.",
            "The setting shows the literal street in an urban district with many substantial buildings. It supports street context only, with no selected roof, tenant floor, title or complete campus. Acquisition date is unknown."
          ],
          "sources": [
            {
              "url": "https://www.centradigital.com/data-centers/pwm1",
              "host": "www.centradigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original named computing address, literal suite or facility spelling retained"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=340+Cumberland+Ave%2C+Portland%2C+ME+04101%2C+USA&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal computing street query, calculated range only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-70.26860812111306%2C43.65276728853755%2C-70.25494987888695%2C43.66264871146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated street reference, not a roof or tenant floor",
      "summary": "Portland · Cumberland · Source context reviewed",
      "status_scope": "The complete original current Portland 1 provider body offers colocation space and interconnection at its named carrier hotel and says it is home to the internet exchange. This supports operator listed interconnection and colocation service without certifying measured critical load, occupancy, total future capacity, uninterrupted performance or an exact first opening day."
    },
    {
      "id": "liquidcool-loring-afb-me",
      "state": "me",
      "kind": "facility",
      "name": "Loring LiquidCool Data Center (Green 4 Maine Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Aroostook"
      ],
      "city": "Limestone",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification. DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/",
          "host": "mainemorningstar.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://legislature.maine.gov/legis/bills/getTestimonyDoc.asp?id=10061699",
          "host": "legislature.maine.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 46.65905,
        "lng": -68.59871,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification.",
            "DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/",
              "host": "mainemorningstar.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "All five original State hosted testimony text pages were read. The document bears March 11, 2026 and a resubmission heading for LD713 with earlier LD307 wording. It identifies Loring LiquidCool, raises potential utility rate and environmental concerns and suggests Loring as a policy case study. These are attributed residents statements, not an agency technical finding, actual enacted exemption, commissioned computing or an exact current physical stage. The attachment repeats third party project and engineering accounts that are not independently adopted. Private author identity and address are excluded.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_loring_public_testimony_exact_physical_stage_held",
              "scope": "All five original State hosted testimony text pages were read. The document bears March 11, 2026 and a resubmission heading for LD713 with earlier LD307 wording. It identifies Loring LiquidCool, raises potential utility rate and environmental concerns and suggests Loring as a policy case study. These are attributed residents statements, not an agency technical finding, actual enacted exemption, commissioned computing or an exact current physical stage. The attachment repeats third party project and engineering accounts that are not independently adopted. Private author identity and address are excluded."
            },
            "source_read_scope": {
              "all5_original_testimony_text_pages_read": true,
              "printed_march11_not_independent_filing_or_hearing_clock": true,
              "resubmitted_ld713_and_earlier_ld307_wording_retained": true,
              "residents_concerns_not_government_engineering_findings": true,
              "third_party_quotes_and_private_author_details_excluded": true
            }
          },
          "notes": [
            "All five original State hosted testimony text pages were read. The document bears March 11, 2026 and a resubmission heading for LD713 with earlier LD307 wording. It identifies Loring LiquidCool, raises potential utility rate and environmental concerns and suggests Loring as a policy case study. These are attributed residents statements, not an agency technical finding, actual enacted exemption, commissioned computing or an exact current physical stage. The attachment repeats third party project and engineering accounts that are not independently adopted. Private author identity and address are excluded.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://legislature.maine.gov/legis/bills/getTestimonyDoc.asp?id=10061699",
              "host": "legislature.maine.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Limestone · Aroostook · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "23003"
      }
    },
    {
      "id": "millcompute-bates-mill-lewiston-me",
      "state": "me",
      "kind": "facility",
      "name": "MillCompute Bates Mill No. 3 AI Data Center",
      "group": "proposed",
      "status": "Provider listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Androscoggin"
      ],
      "city": "Lewiston",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The requested 20-year TIF/credit-enhancement terms were not awarded. Developer claims about utility prices and water were not independently verified. Rejection of this proposal is not a citywide moratorium or permanent prohibition on all later proposals. No operating facility is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.mainepublic.org/business-and-economy/2025-12-17/lewiston-city-council-shoots-down-data-center-proposal",
          "host": "mainepublic.org",
          "date": "2025-12-17",
          "published": "2025-12-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.millcompute.com/faq",
          "host": "www.millcompute.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 44.16548,
        "lng": -70.20676,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Maine Public reports unanimous Lewiston council rejection on December 16 of MillCompute's Bates Mill No. 3 proposal.",
            "independently_verified_current_operating_status": null,
            "reported_proposal_status": "rejected",
            "reported_rejection_date": "2025-12-16"
          },
          "notes": [
            "The requested 20-year TIF/credit-enhancement terms were not awarded. Developer claims about utility prices and water were not independently verified. Rejection of this proposal is not a citywide moratorium or permanent prohibition on all later proposals. No operating facility is established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.mainepublic.org/business-and-economy/2025-12-17/lewiston-city-council-shoots-down-data-center-proposal",
              "host": "mainepublic.org",
              "date": "2025-12-17",
              "published": "2025-12-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "The complete original public MillCompute questions and answers body describes planned computing space, future phases, intended approvals and projected benefits at Bates Mill 3. This supports a provider listed proposal without independently establishing construction, issued environmental permissions, commissioned workloads or current legal eligibility. The undated body retains a December 2 meeting reference and a 2025 copyright; neither is an exact publication day. The much larger original December 16 City packet exceeded the capture limit and remains unread, as do the exact official meeting outcome and later disposition. A data room and request access route were not opened.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_millcompute_public_proposal_current_legal_outcome_held",
              "scope": "The complete original public MillCompute questions and answers body describes planned computing space, future phases, intended approvals and projected benefits at Bates Mill 3. This supports a provider listed proposal without independently establishing construction, issued environmental permissions, commissioned workloads or current legal eligibility. The undated body retains a December 2 meeting reference and a 2025 copyright; neither is an exact publication day. The much larger original December 16 City packet exceeded the capture limit and remains unread, as do the exact official meeting outcome and later disposition. A data room and request access route were not opened."
            },
            "source_read_scope": {
              "complete_original_public_faq_text_body_read": true,
              "undated_december2_reference_not_current_scheduled_day": true,
              "original_city_packet_oversize_hold_retained": true,
              "private_reported_city_rejection_not_adopted": true,
              "marketing_mitigation_not_independently_verified": true,
              "no_data_room_access_or_contact": true
            }
          },
          "notes": [
            "The complete original public MillCompute questions and answers body describes planned computing space, future phases, intended approvals and projected benefits at Bates Mill 3. This supports a provider listed proposal without independently establishing construction, issued environmental permissions, commissioned workloads or current legal eligibility. The undated body retains a December 2 meeting reference and a 2025 copyright; neither is an exact publication day. The much larger original December 16 City packet exceeded the capture limit and remains unread, as do the exact official meeting outcome and later disposition. A data room and request access route were not opened.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.millcompute.com/faq",
              "host": "www.millcompute.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lewiston · Androscoggin · Source context reviewed",
      "status_scope": "The complete original public MillCompute questions and answers body describes planned computing space, future phases, intended approvals and projected benefits at Bates Mill 3. This supports a provider listed proposal without independently establishing construction, issued environmental permissions, commissioned workloads or current legal eligibility. The undated body retains a December 2 meeting reference and a 2025 copyright; neither is an exact publication day. The much larger original December 16 City packet exceeded the capture limit and remains unread, as do the exact official meeting outcome and later disposition. A data room and request access route were not opened.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "23001"
      }
    },
    {
      "id": "nautilus-millinocket-me",
      "state": "me",
      "kind": "facility",
      "name": "Nautilus Data Technologies Data Center (Former Great Northern Paper Mill / One North)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Penobscot"
      ],
      "city": "Millinocket",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. industrial remediation funding context, site match limited. Cleanup grant to OurKatahdin, not Nautilus data-center capex or a data-center approval.1400acres describes former mill complex, not specific campus footprint. No ITMW or current operation established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.epa.gov/newsreleases/investing-millinocket-epa-maine-officials-highlight-former-paper-mill-site",
          "host": "epa.gov",
          "date": "2025-06-09",
          "published": "2025-06-09",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 45.40026,
        "lng": -68.64944,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "industrial remediation funding context, site match limited",
          "fields": {
            "cleanup_property_address": "1 Katahdin Avenue,Millinocket,Maine",
            "reported_brownfields_cleanup_grant_selection_usd": 4000000,
            "cleanup_scope": "former paper-mill roll-storage and machine-shop buildings"
          },
          "notes": [
            "Cleanup grant to OurKatahdin, not Nautilus data-center capex or a data-center approval.1400acres describes former mill complex, not specific campus footprint. No ITMW or current operation established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.epa.gov/newsreleases/investing-millinocket-epa-maine-officials-highlight-former-paper-mill-site",
              "host": "epa.gov",
              "date": "2025-06-09",
              "published": "2025-06-09",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "The complete original EPA June 9, 2025 account concerns cleanup funding and redevelopment of the former paper mill. It does not independently name the exact Nautilus computing proposal or establish commissioned computing. Grant selection is not money spent or building completion, and past paper mill contamination and closure are not a finding about a computing operation. The exact current Nautilus computing stage and opening day remain held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_epa_cleanup_account_exact_nautilus_compute_stage_held",
              "scope": "The complete original EPA June 9, 2025 account concerns cleanup funding and redevelopment of the former paper mill. It does not independently name the exact Nautilus computing proposal or establish commissioned computing. Grant selection is not money spent or building completion, and past paper mill contamination and closure are not a finding about a computing operation. The exact current Nautilus computing stage and opening day remain held."
            },
            "source_read_scope": {
              "complete_original_epa_redevelopment_body_read": true,
              "paper_mill_contamination_not_computing_finding": true,
              "cleanup_grant_not_computing_construction_or_operation": true
            }
          },
          "notes": [
            "The complete original EPA June 9, 2025 account concerns cleanup funding and redevelopment of the former paper mill. It does not independently name the exact Nautilus computing proposal or establish commissioned computing. Grant selection is not money spent or building completion, and past paper mill contamination and closure are not a finding about a computing operation. The exact current Nautilus computing stage and opening day remain held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.epa.gov/newsreleases/investing-millinocket-epa-maine-officials-highlight-former-paper-mill-site",
              "host": "www.epa.gov",
              "published": "2025-06-09",
              "date": "2025-06-09",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Millinocket · Penobscot · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "23019"
      }
    },
    {
      "id": "new-england-energy-sanford-woods-dc-me",
      "state": "me",
      "kind": "facility",
      "name": "Sanford Woods Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "York"
      ],
      "city": "Sanford",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Feasibility and a legislator's confidence are not a development commitment or operating plant. The 900-million to 1.5-billion-USD range is a generic cost-guide comparison for 100 MW, not a Sanford project budget. Utility water capacity and a crossing main are not allocated rights; future committee and legislative outcomes are unknown. The blank automatic article selection was corrected using the retained main body. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://sanfordspringvalenews.com/company-eyes-sanford-site-for-data-center/",
          "host": "sanfordspringvalenews.com",
          "date": "2026-02-20",
          "published": "2026-02-20",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.4784,
        "lng": -70.71428,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Sanford Springvale News reports New England Energy exploring a 100 to 300 MW concept on 1,060 acres, with on-site hydrogen fuel cells/solar discussed by a legislator.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Feasibility and a legislator's confidence are not a development commitment or operating plant. The 900-million to 1.5-billion-USD range is a generic cost-guide comparison for 100 MW, not a Sanford project budget. Utility water capacity and a crossing main are not allocated rights; future committee and legislative outcomes are unknown. The blank automatic article selection was corrected using the retained main body.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://sanfordspringvalenews.com/company-eyes-sanford-site-for-data-center/",
              "host": "sanfordspringvalenews.com",
              "date": "2026-02-20",
              "published": "2026-02-20",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Sanford · York · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "23031"
      }
    },
    {
      "id": "sentinel-jay-me",
      "state": "me",
      "kind": "facility",
      "name": "Sentinel Data Centers Androscoggin Mill Campus, Jay",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Franklin"
      ],
      "city": "Jay",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Support letter is not final construction authorization, operating status or legislative exemption. January 1, 2027 stripping/handover contract deadline is future, not service availability. Developer’s 150 MW solar generation, at-most 25 MW grid draw and 82 MW local supply are different scopes, not additive critical IT. Reported 300,000 gallons/day makeup and historical mill 35 to 40 million gallons/day remain attributed, not actual metered use or zero-water cooling. $550 million investment, 800 to 1,000 construction workers and 125 to 150 operating jobs are forecasts. Proposed LD307 and minority amendment were not law in this report; later enacted/vetoed outcomes govern. Auto extractor chose unrelated related story, corrected from retained main body. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://themainemonitor.org/jay-backs-data-center-plan/",
          "host": "themainemonitor.org",
          "date": "2026-03-25",
          "published": "2026-03-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.jay-maine.org/warrant-for-november-3-2026-special-town-meeting/",
          "host": "www.jay-maine.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 44.97407,
        "lng": -70.44379,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Maine Monitor reports Jay’s board voted 4 to 0 with one abstention to prepare a letter supporting JGT2’s proposed former-mill redevelopment for identified client Sentinel.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Support letter is not final construction authorization, operating status or legislative exemption. January 1, 2027 stripping/handover contract deadline is future, not service availability. Developer’s 150 MW solar generation, at-most 25 MW grid draw and 82 MW local supply are different scopes, not additive critical IT. Reported 300,000 gallons/day makeup and historical mill 35 to 40 million gallons/day remain attributed, not actual metered use or zero-water cooling. $550 million investment, 800 to 1,000 construction workers and 125 to 150 operating jobs are forecasts. Proposed LD307 and minority amendment were not law in this report; later enacted/vetoed outcomes govern. Auto extractor chose unrelated related story, corrected from retained main body.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://themainemonitor.org/jay-backs-data-center-plan/",
              "host": "themainemonitor.org",
              "date": "2026-03-25",
              "published": "2026-03-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "The complete original September 16, 2026 Town warrant post describes November 3 ballot questions for mobile home rent stabilization and new commercial ground mounted solar facilities. Those questions are not computing restrictions or a Sentinel computing hearing. A generic Town election, the prior mill closure and private accounts of Sentinel withdrawal do not independently resolve the exact current computing stage, legal outcome or physical closure.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_jay_solar_ballot_not_sentinel_compute_disposition",
              "scope": "The complete original September 16, 2026 Town warrant post describes November 3 ballot questions for mobile home rent stabilization and new commercial ground mounted solar facilities. Those questions are not computing restrictions or a Sentinel computing hearing. A generic Town election, the prior mill closure and private accounts of Sentinel withdrawal do not independently resolve the exact current computing stage, legal outcome or physical closure."
            },
            "source_read_scope": {
              "complete_original_town_warrant_post_body_read": true,
              "solar_moratorium_not_computing_moratorium": true,
              "private_sentinel_withdrawal_not_physical_closure": true
            }
          },
          "notes": [
            "The complete original September 16, 2026 Town warrant post describes November 3 ballot questions for mobile home rent stabilization and new commercial ground mounted solar facilities. Those questions are not computing restrictions or a Sentinel computing hearing. A generic Town election, the prior mill closure and private accounts of Sentinel withdrawal do not independently resolve the exact current computing stage, legal outcome or physical closure.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.jay-maine.org/warrant-for-november-3-2026-special-town-meeting/",
              "host": "www.jay-maine.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Jay · Franklin · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "23007"
      }
    },
    {
      "id": "wiscasset-proposed-me",
      "state": "me",
      "kind": "facility",
      "name": "Wiscasset Data Center (Old Ferry Road Site)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Lincoln"
      ],
      "city": "Wiscasset",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification. DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/",
          "host": "mainemorningstar.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.wiscasset.gov/m/NewsFlash",
          "host": "www.wiscasset.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.wiscasset.gov/DocumentCenter/View/1726/Special-Town-Meeting-Warrant---November-3-2026",
          "host": "www.wiscasset.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.wiscasset.gov/DocumentCenter/View/1743/Data-Center-Moratorium-Ordinance---Final",
          "host": "www.wiscasset.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 44.06476,
        "lng": -69.54326,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification.",
            "DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/",
              "host": "mainemorningstar.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "Complete original election notice and proposed pause text, plus the complete one page warrant text and scan, retain the November 3, 2026 prospective Article4 vote from eight AM to eight PM at Wiscasset Community Center. The signed warrant date and a separate handwritten certification date do not establish ordinance adoption. The pause would take effect upon adoption, with a six month term and stated exceptions, but no adoption or expiry is calculated. This is general municipal policy rather than independently verified current Old Ferry Road computing permission, construction, cancellation or commissioned service. The already retained calendar vote and proposed restriction are not duplicated.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_wiscasset_prospective_policy_exact_old_ferry_stage_held",
              "scope": "Complete original election notice and proposed pause text, plus the complete one page warrant text and scan, retain the November 3, 2026 prospective Article4 vote from eight AM to eight PM at Wiscasset Community Center. The signed warrant date and a separate handwritten certification date do not establish ordinance adoption. The pause would take effect upon adoption, with a six month term and stated exceptions, but no adoption or expiry is calculated. This is general municipal policy rather than independently verified current Old Ferry Road computing permission, construction, cancellation or commissioned service. The already retained calendar vote and proposed restriction are not duplicated."
            },
            "source_read_scope": {
              "complete_original_current_notice_body_read": true,
              "all_original_proposed_pause_text_pages_read": true,
              "complete_original_one_page_warrant_scan_actually_viewed": true,
              "five_select_board_signatures_and_september15_date_read": true,
              "clerk_attestation_signature_line_blank_handwritten_september17_retained": true,
              "november3_not_adoption_yet": true,
              "existing_calendar_and_restriction_not_duplicated": true,
              "exceptions_and_conditional_six_month_term_retained": true
            }
          },
          "notes": [
            "Complete original election notice and proposed pause text, plus the complete one page warrant text and scan, retain the November 3, 2026 prospective Article4 vote from eight AM to eight PM at Wiscasset Community Center. The signed warrant date and a separate handwritten certification date do not establish ordinance adoption. The pause would take effect upon adoption, with a six month term and stated exceptions, but no adoption or expiry is calculated. This is general municipal policy rather than independently verified current Old Ferry Road computing permission, construction, cancellation or commissioned service. The already retained calendar vote and proposed restriction are not duplicated.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.wiscasset.gov/m/NewsFlash",
              "host": "www.wiscasset.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.wiscasset.gov/DocumentCenter/View/1726/Special-Town-Meeting-Warrant---November-3-2026",
              "host": "www.wiscasset.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.wiscasset.gov/DocumentCenter/View/1743/Data-Center-Moratorium-Ordinance---Final",
              "host": "www.wiscasset.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wiscasset · Lincoln · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "23015"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}