{
  "schema_version": 1,
  "source_compilation_context": {
    "mo": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mo.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "mo",
    "label": "Missouri"
  },
  "records": [
    {
      "id": "armory-innovation-district-st-louis-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Armory Innovation District Data Center",
      "group": "approved",
      "status": "Agency reported approval",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [],
      "city": "St. Louis",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. StLouis reported conditional-use approval and employment/forecast boundaries. Conditional-use approval attributed to reporting, actual permit/recordedCBA and later appeals not inspected.3Bcombineddata+Armoryoffices not all actual DCspend.100jobscondition afteryear2 conflicts with separate50permanentDCforecast; retain scopes rather than replacing.1050construction and150office employees not same as directDCjobs. Renewable/water/noincentive provisions are reported commitments, not actual measured performance or final later compliance. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-04-21",
          "The original St Louis City April 21, 2026 release reports unanimous conditional use approval for the old warehouse computing project. Approval and required conditions do not establish construction, a recorded executed benefit agreement or computing operation."
        ],
        [
          "2026-09-11",
          "The original St Louis Board Bill 74 history records introduction and committee referral on September 11, 2026. A bill describing repeal of prior Armory incentive ordinances is not independently verified enactment, effective repeal or computing commissioning."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stlmag.com/news/midtown-data-center-armory-board-of-public-service/",
          "host": "stlmag.com",
          "date": "2026-04-21",
          "published": "2026-04-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.stlouis-mo.gov/government/departments/mayor/news/data-center-permit-approved.cfm",
          "host": "www.stlouis-mo.gov",
          "published": "2026-04-21",
          "date": "2026-04-21",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.stlouis-mo.gov/government/departments/mayor/documents/upload/Conditional-Use-provisions.pdf",
          "host": "www.stlouis-mo.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.stlouis-mo.gov/government/departments/mayor/documents/upload/CBA-provisions.pdf",
          "host": "www.stlouis-mo.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.stlouis-mo.gov/government/city-laws/board-bills/boardbill.cfm?BBId=17912&bbDetail=true",
          "host": "www.stlouis-mo.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.63176,
        "lng": -90.24697,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "StLouis reported conditional-use approval and employment/forecast boundaries",
          "fields": {
            "project": "Armory Innovation District",
            "city": "StLouis, Missouri",
            "reported_conditional_use_approval_date": "2026-04-21",
            "reported_vote": "5-0",
            "reported_data_center_power_mw": 120,
            "power_basis": "reported project MW, not explicit critical IT",
            "reported_combined_development_investment_usd_min_exclusive": 3000000000,
            "proposed_full_operation_deadline": "2028-12-31",
            "reported_20year_job_obligation_schedule": [
              {
                "year": 1,
                "jobs": 25
              },
              {
                "year": 2,
                "jobs": 50
              },
              {
                "year": 3,
                "jobs": 100,
                "continues_through_year": 20
              }
            ],
            "reported_city10year_tax_fee_forecast_usd": 432000000
          },
          "notes": [
            "Conditional-use approval attributed to reporting, actual permit/recordedCBA and later appeals not inspected.3Bcombineddata+Armoryoffices not all actual DCspend.100jobscondition afteryear2 conflicts with separate50permanentDCforecast; retain scopes rather than replacing.1050construction and150office employees not same as directDCjobs. Renewable/water/noincentive provisions are reported commitments, not actual measured performance or final later compliance.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stlmag.com/news/midtown-data-center-armory-board-of-public-service/",
              "host": "stlmag.com",
              "date": "2026-04-21",
              "published": "2026-04-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original City release reports unanimous conditional use approval on April 21, 2026. This supports agency reported approval, without construction or computing operation. The original three page conditions summary describes requirements and the separate three page community benefit summary expressly describes a future agreement. A condition or summary is not proof of a recorded executed agreement, delivered benefits or measured compliance. Board Bill 74 remains introduced and assigned to committee in its current original index; its repeal description is not accomplished TIF termination. Separate office jobs, future operating targets and inconsistent contribution estimates are not silently harmonized or exported.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_reported_armory_conditional_approval",
              "scope": "The complete original City release reports unanimous conditional use approval on April 21, 2026. This supports agency reported approval, without construction or computing operation. The original three page conditions summary describes requirements and the separate three page community benefit summary expressly describes a future agreement. A condition or summary is not proof of a recorded executed agreement, delivered benefits or measured compliance. Board Bill 74 remains introduced and assigned to committee in its current original index; its repeal description is not accomplished TIF termination. Separate office jobs, future operating targets and inconsistent contribution estimates are not silently harmonized or exported."
            },
            "source_read_scope": {
              "complete_original_city_release_and_bill_history_read": true,
              "complete_original_three_page_conditional_summary_and_three_page_cba_term_summary_text_read": true,
              "future_cba_summary_not_executed_recorded_contract": true,
              "no_c4_incentive_water_power_or_air_fields_changed": true,
              "office_jobs_and_future_performance_not_current_computing": true
            }
          },
          "notes": [
            "The complete original City release reports unanimous conditional use approval on April 21, 2026. This supports agency reported approval, without construction or computing operation. The original three page conditions summary describes requirements and the separate three page community benefit summary expressly describes a future agreement. A condition or summary is not proof of a recorded executed agreement, delivered benefits or measured compliance. Board Bill 74 remains introduced and assigned to committee in its current original index; its repeal description is not accomplished TIF termination. Separate office jobs, future operating targets and inconsistent contribution estimates are not silently harmonized or exported.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.stlouis-mo.gov/government/departments/mayor/news/data-center-permit-approved.cfm",
              "host": "www.stlouis-mo.gov",
              "published": "2026-04-21",
              "date": "2026-04-21",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.stlouis-mo.gov/government/departments/mayor/documents/upload/Conditional-Use-provisions.pdf",
              "host": "www.stlouis-mo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.stlouis-mo.gov/government/departments/mayor/documents/upload/CBA-provisions.pdf",
              "host": "www.stlouis-mo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.stlouis-mo.gov/government/city-laws/board-bills/boardbill.cfm?BBId=17912&bbDetail=true",
              "host": "www.stlouis-mo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "St. Louis · Source context reviewed",
      "status_scope": "The complete original City release reports unanimous conditional use approval on April 21, 2026. This supports agency reported approval, without construction or computing operation. The original three page conditions summary describes requirements and the separate three page community benefit summary expressly describes a future agreement. A condition or summary is not proof of a recorded executed agreement, delivered benefits or measured compliance. Board Bill 74 remains introduced and assigned to committee in its current original index; its repeal description is not accomplished TIF termination. Separate office jobs, future operating targets and inconsistent contribution estimates are not silently harmonized or exported.",
      "event_evidence": [
        {
          "date": "2026-04-21",
          "text": "The original St Louis City April 21, 2026 release reports unanimous conditional use approval for the old warehouse computing project. Approval and required conditions do not establish construction, a recorded executed benefit agreement or computing operation.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://www.stlouis-mo.gov/government/departments/mayor/news/data-center-permit-approved.cfm",
              "host": "www.stlouis-mo.gov",
              "published": "2026-04-21",
              "date": "2026-04-21",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2026-09-11",
          "text": "The original St Louis Board Bill 74 history records introduction and committee referral on September 11, 2026. A bill describing repeal of prior Armory incentive ordinances is not independently verified enactment, effective repeal or computing commissioning.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.stlouis-mo.gov/government/city-laws/board-bills/boardbill.cfm?BBId=17912&bbDetail=true",
              "host": "www.stlouis-mo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29510"
      }
    },
    {
      "id": "aws-green-new-florence-mo",
      "state": "mo",
      "kind": "facility",
      "name": "AWS Project Green Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Montgomery"
      ],
      "city": "New Florence",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Tax projections are scenarios, not receipts; announced county/community payments are not verified disbursement. Do not add 25-year minimum and maximum cases. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://themissouritimes.com/aws-new-facilities-near-new-florence-will-double-tax-revenue-for-montgomery-county/",
          "host": "themissouritimes.com",
          "date": "2026-02-04",
          "published": "2026-02-04",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.94132,
        "lng": -91.47029,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Missouri Times describes Project Green minimum and maximum tax projections and different treatment of real and personal property.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Tax projections are scenarios, not receipts; announced county/community payments are not verified disbursement. Do not add 25-year minimum and maximum cases.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://themissouritimes.com/aws-new-facilities-near-new-florence-will-double-tax-revenue-for-montgomery-county/",
              "host": "themissouritimes.com",
              "date": "2026-02-04",
              "published": "2026-02-04",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Florence · Montgomery · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29139"
      }
    },
    {
      "id": "crusoe-callaway-county-kingdom-city-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Crusoe Callaway County Data Center (proposed)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Callaway"
      ],
      "city": "Kingdom City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Exact site undisclosed. Private land transaction and absence of county zoning do not eliminate other permits. Warrenton/Montgomery Google/AWS and their incentives are separate. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.komu.com/news/midmissourinews/callaway-county-hosts-open-house-for-proposed-data-center/article_906df960-8402-48dc-96b4-c23d4cf1750c.html",
          "host": "komu.com",
          "date": "2026-07-14",
          "published": "2026-07-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.83527,
        "lng": -91.92612,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "KOMU describes Callaway County Crusoe open house, with no construction or county contract at report date.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Exact site undisclosed. Private land transaction and absence of county zoning do not eliminate other permits. Warrenton/Montgomery Google/AWS and their incentives are separate.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.komu.com/news/midmissourinews/callaway-county-hosts-open-house-for-proposed-data-center/article_906df960-8402-48dc-96b4-c23d4cf1750c.html",
              "host": "komu.com",
              "date": "2026-07-14",
              "published": "2026-07-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kingdom City · Callaway · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29027"
      }
    },
    {
      "id": "crusoe-warrenton-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Crusoe Warrenton Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Warren"
      ],
      "city": "Warrenton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.. WarrenCountyRecord January15,2026 reports Crusoe Warrenton Planning&Zoning January8 CUP/site-plan vote8 to 2, with tree/lighting conditions and BoardofAldermen review scheduledJanuary20. Not all permits, final board action or current operating certification. Two805000sfhalls plus40000sfadmin,337cityacres and243countybuffer are proposed distinct components, not three campuses. Developer120000galannualcooling and6200gpdALLUSES are different projected water scopes, not measured consumption/zero-water. Building1Q32027operations andBuilding2Q22029 are targets, not observed completion.2000 to 2400construction/100permanent jobs and70 to 80Mannualtax are estimates. Suggested no-abatement guarantees were debated, not adopted in the reported P&Zconditions. Utility representatives described upfront/minimum-use/termination obligations; executed agreements and actual payments not read. Not whole-record, meter, current operating census, signed-contract or legal-compliance certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.warrencountyrecord.com/stories/warrenton-planning-and-zoning-approves-data-center-site-plan-conditional-use,180583",
          "host": "warrencountyrecord.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.76459,
        "lng": -91.16076,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "original-operator-transaction-and-local-outcomes-round61-2026-10-15.json",
          "scope": "Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.",
          "fields": {},
          "notes": [
            "WarrenCountyRecord January15,2026 reports Crusoe Warrenton Planning&Zoning January8 CUP/site-plan vote8 to 2, with tree/lighting conditions and BoardofAldermen review scheduledJanuary20. Not all permits, final board action or current operating certification. Two805000sfhalls plus40000sfadmin,337cityacres and243countybuffer are proposed distinct components, not three campuses.",
            "Developer120000galannualcooling and6200gpdALLUSES are different projected water scopes, not measured consumption/zero-water. Building1Q32027operations andBuilding2Q22029 are targets, not observed completion.2000 to 2400construction/100permanent jobs and70 to 80Mannualtax are estimates. Suggested no-abatement guarantees were debated, not adopted in the reported P&Zconditions. Utility representatives described upfront/minimum-use/termination obligations; executed agreements and actual payments not read.",
            "Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."
          ],
          "sources": [
            {
              "url": "https://www.warrencountyrecord.com/stories/warrenton-planning-and-zoning-approves-data-center-site-plan-conditional-use,180583",
              "host": "warrencountyrecord.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Warrenton · Warren · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29219"
      }
    },
    {
      "id": "diamond-farms-gateway-digital-villa-ridge-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Diamond Farms (Gateway Digital Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Franklin"
      ],
      "city": "Villa Ridge",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Planningapprovalisrecommendation,notfinalrezoningorconstructionpermission. Developer 3000 totaljobs/2000 construction/250 permanent mixscopesanddonotreconcile; no 3,000 permanentjobsoradditive 5,250 total. Waterless-than 54 homes isanonquantifiedforecast,notactualgallons. Infrastructure 100 percentpaymentpromise is not examinedbindingESA/tariff orguaranteedresidentbills. Genericbillions/tensofmillionsfromsimilarMissouriprojectsarenotsitecapex/taxagreement. NoMW/RFSorcurrentoperatingcertification. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://themissouritimes.com/franklin-county-planning-and-zoning-approves-diamond-farms-data-center-project/",
          "host": "themissouritimes.com",
          "date": "2026-04-23",
          "published": "2026-04-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.42808,
        "lng": -91.09368,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "MissouriTimes reports FranklinPlanning/Zoning voted forward DiamondFarms/GatewayDigital nearGraySummit onover 600 acres,whileexplicitlystating finalcountycommissionapprovalstillrequired.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Planningapprovalisrecommendation,notfinalrezoningorconstructionpermission. Developer 3000 totaljobs/2000 construction/250 permanent mixscopesanddonotreconcile; no 3,000 permanentjobsoradditive 5,250 total. Waterless-than 54 homes isanonquantifiedforecast,notactualgallons. Infrastructure 100 percentpaymentpromise is not examinedbindingESA/tariff orguaranteedresidentbills. Genericbillions/tensofmillionsfromsimilarMissouriprojectsarenotsitecapex/taxagreement. NoMW/RFSorcurrentoperatingcertification.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://themissouritimes.com/franklin-county-planning-and-zoning-approves-diamond-farms-data-center-project/",
              "host": "themissouritimes.com",
              "date": "2026-04-23",
              "published": "2026-04-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Villa Ridge · Franklin · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29071"
      }
    },
    {
      "id": "edged-kansas-city-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Edged Kansas City",
      "group": "operating",
      "status": "Agency reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clay"
      ],
      "city": "Kansas City",
      "address": "",
      "who": "Edged",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historic opening verified; later additions and current measured load remain unchecked. State announcement says facility opened; ribbon cutting was December 11. Capacity describes critical capacity, not measured draw. Water savings are developer comparison estimates. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-12-12",
          "The original Missouri DED December 12, 2024 publication reports the Kansas City Edged opening and says a ribbon ceremony occurred the prior day. The publication and ceremony are distinct from an independently verified exact first computing commissioning day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million",
          "host": "ded.mo.gov",
          "date": "2024-12-12",
          "published": "2024-12-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://edged.us/kansas-city",
          "host": "edged.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "First party named campus and scoped operator relationship"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3420+N+Arlington+Avenue%2C+Kansas+City%2C+MO+64161&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete literal Census street range and county response"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-94.46823866938118%2C39.15205228853755%2C-94.45549533061882%2C39.16193371146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting with unknown image acquisition date"
        }
      ],
      "loc": {
        "lng": -94.461867,
        "lat": 39.156993,
        "precision": "address",
        "basis": "The exact named Edged Kansas City facility page identifies 3420 N Arlington Avenue, Kansas City, MO 64161. One complete literal Census street range supplies only a calculated reference in Clay County. The unknown imagery date may predate later construction; no roof or present physical stage is certified. Existing Native group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "event_status": "opened",
            "event_date": "2024-12-11",
            "power_mw": 26,
            "power_basis": "critical capacity",
            "investment_usd_min": 143000000,
            "investment_basis": "initial facility economic investment",
            "incentive": "Data Center Sales Tax Exemption Program; no award value supplied"
          },
          "notes": [
            "Historic opening verified; later additions and current measured load remain unchecked.",
            "State announcement says facility opened; ribbon cutting was December 11. Capacity describes critical capacity, not measured draw. Water savings are developer comparison estimates.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million",
              "host": "ded.mo.gov",
              "date": "2024-12-12",
              "published": "2024-12-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check25, October23,2026",
          "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The named Missouri facility is retained. No nearby Kansas project or regional market identity is merged.",
          "fields": {
            "company_association": {
              "name": "Edged",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The named Missouri facility is retained. No nearby Kansas project or regional market identity is merged."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Edged presents this named facility or retained campus on its own website. The relationship is the attributed provider brand only, not legal property ownership or the identity of a legal operating entity. No status, location, street address, quantity, cooling consumption, emissions, permit, certification, tenant identity or completion date is changed. Marketing design and efficiency statements are not measured findings. Retrieval does not establish an opening date. The named Missouri facility is retained. No nearby Kansas project or regional market identity is merged."
          ],
          "sources": [
            {
              "url": "https://edged.us/kansas-city",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named campus and scoped operator relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 54, October 23, 2026",
          "scope": "Explicit source bound calculated street reference only. Existing Native group unknown remains unchanged. No new current computing operation, operator role, title, owner, tenant, physical milestone, quantity, roof or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -94.461867,
                "lat": 39.156993,
                "precision": "address",
                "basis": "The exact named Edged Kansas City facility page identifies 3420 N Arlington Avenue, Kansas City, MO 64161. One complete literal Census street range supplies only a calculated reference in Clay County. The unknown imagery date may predate later construction; no roof or present physical stage is certified. Existing Native group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "3420 N Arlington Avenue, Kansas City, MO 64161",
              "county_fips": [
                "29047"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The exact Edged Kansas City facility body identifies 3420 N Arlington Avenue, Kansas City, MO 64161. Corporate contacts, service specifications, numerical capacity, certification claims and operational wording do not change any protected Native field.",
            "Explicit source bound calculated street reference only. Existing Native group unknown remains unchanged. No new current computing operation, operator role, title, owner, tenant, physical milestone, quantity, roof or complete campus is certified.",
            "Open fields, a local road junction, scattered residences and a diagonal rail corridor are visible. The image has unknown acquisition date and may predate later construction. No visible building is selected as the computing facility.",
            "The inherited general area coordinate and county display were not reviewed physical facility destinations. The exact independent official source and complete literal street response now support only the bounded calculated street reference described in the basis. Earlier coordinates and complete source history remain intact. This is a reference correction, not physical relocation or a new physical milestone."
          ],
          "sources": [
            {
              "url": "https://edged.us/kansas-city",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Explicit named computing facility service street in source body"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3420+N+Arlington+Avenue%2C+Kansas+City%2C+MO+64161&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete literal Census street range and county response"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-94.46823866938118%2C39.15205228853755%2C-94.45549533061882%2C39.16193371146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting with unknown image acquisition date"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original State release explicitly reports an opened Kansas City computing facility and a prior day ceremony. The complete current original provider page names the same Arlington Avenue facility and describes present access, interconnection and remote hands service. Together these support agency and provider reported service. The ceremony and older space availability quarter are not exact first computing commissioning. Advertised critical capacity, cooling savings, design efficiency, SLA and tier descriptions are not independently measured current operation or certification. The tax program statement alone is not the basis for operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "state_opening_and_current_provider_named_service",
              "scope": "The complete original State release explicitly reports an opened Kansas City computing facility and a prior day ceremony. The complete current original provider page names the same Arlington Avenue facility and describes present access, interconnection and remote hands service. Together these support agency and provider reported service. The ceremony and older space availability quarter are not exact first computing commissioning. Advertised critical capacity, cooling savings, design efficiency, SLA and tier descriptions are not independently measured current operation or certification. The tax program statement alone is not the basis for operation."
            },
            "source_read_scope": {
              "complete_original_state_release_and_current_provider_body_read": true,
              "opening_account_not_incentive_alone": true,
              "ceremony_not_exact_computing_commissioning": true,
              "no_capacity_savings_or_compliance_certification": true
            }
          },
          "notes": [
            "The complete original State release explicitly reports an opened Kansas City computing facility and a prior day ceremony. The complete current original provider page names the same Arlington Avenue facility and describes present access, interconnection and remote hands service. Together these support agency and provider reported service. The ceremony and older space availability quarter are not exact first computing commissioning. Advertised critical capacity, cooling savings, design efficiency, SLA and tier descriptions are not independently measured current operation or certification. The tax program statement alone is not the basis for operation.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million",
              "host": "ded.mo.gov",
              "published": "2024-12-12",
              "date": "2024-12-12",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://edged.us/kansas-city",
              "host": "edged.us",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated official source street reference, not a surveyed roof or parcel",
      "summary": "Kansas City · Clay · Source context reviewed",
      "status_scope": "The complete original State release explicitly reports an opened Kansas City computing facility and a prior day ceremony. The complete current original provider page names the same Arlington Avenue facility and describes present access, interconnection and remote hands service. Together these support agency and provider reported service. The ceremony and older space availability quarter are not exact first computing commissioning. Advertised critical capacity, cooling savings, design efficiency, SLA and tier descriptions are not independently measured current operation or certification. The tax program statement alone is not the basis for operation.",
      "event_evidence": [
        {
          "date": "2024-12-12",
          "text": "The original Missouri DED December 12, 2024 publication reports the Kansas City Edged opening and says a ribbon ceremony occurred the prior day. The publication and ceremony are distinct from an independently verified exact first computing commissioning day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million",
              "host": "ded.mo.gov",
              "published": "2024-12-12",
              "date": "2024-12-12",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ]
    },
    {
      "id": "crg-festus-data-center-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Festus Data Center Campus",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jefferson"
      ],
      "city": "Festus",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-10-14",
          "The original Festus October 14, 2026 notice publishes a qualification based request for project communication, permit review and coordination assistance for the CRG computing proposal. This is a procurement notice rather than final computing permission, construction or operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.festusmo.gov/",
          "host": "festusmo.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.festusmo.gov/CivicAlerts.aspx?AID=235",
          "host": "www.festusmo.gov",
          "published": "2026-10-14",
          "date": "2026-10-14",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        },
        {
          "url": "https://www.festusmo.gov/m/newsflash/home/detail/235",
          "host": "www.festusmo.gov",
          "published": "2026-10-14",
          "date": "2026-10-14",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.261,
        "lng": -90.53768,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {},
          "notes": [
            "Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.festusmo.gov/",
              "host": "festusmo.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Festus’s October 14, 2026 RFQ notice identifies CRG and an existing development agreement while seeking permit-review and coordination support. This supports an identified development context, not actual construction, full permit issuance or operation."
            }
          },
          "notes": [
            "Festus’s October 14, 2026 RFQ notice identifies CRG and an existing development agreement while seeking permit-review and coordination support. This supports an identified development context, not actual construction, full permit issuance or operation."
          ],
          "sources": [
            {
              "url": "https://www.festusmo.gov/CivicAlerts.aspx?AID=235",
              "host": "www.festusmo.gov",
              "published": "2026-10-14",
              "date": "2026-10-14",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.festusmo.gov/",
              "host": "www.festusmo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original City notice identifies its development agreement with CRG for a computing project and requests qualified assistance with public communication, permit review and coordination. This supports an agency listed proposal. The procurement does not independently establish completed construction permission, actual construction, commissioned computing or resolution of public concerns. The observed same host canonical redirect was followed without bypassing a denial. General October 26 City meetings do not independently establish computing consideration.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_named_crg_project_and_permit_review_proposal",
              "scope": "The complete original City notice identifies its development agreement with CRG for a computing project and requests qualified assistance with public communication, permit review and coordination. This supports an agency listed proposal. The procurement does not independently establish completed construction permission, actual construction, commissioned computing or resolution of public concerns. The observed same host canonical redirect was followed without bypassing a denial. General October 26 City meetings do not independently establish computing consideration."
            },
            "source_read_scope": {
              "complete_original_city_notice_body_read": true,
              "observed_same_host_canonical_redirect_only": true,
              "procurement_and_development_agreement_not_computing_operation": true,
              "generic_october26_meetings_not_computing_hearing": true
            }
          },
          "notes": [
            "The complete original City notice identifies its development agreement with CRG for a computing project and requests qualified assistance with public communication, permit review and coordination. This supports an agency listed proposal. The procurement does not independently establish completed construction permission, actual construction, commissioned computing or resolution of public concerns. The observed same host canonical redirect was followed without bypassing a denial. General October 26 City meetings do not independently establish computing consideration.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.festusmo.gov/m/newsflash/home/detail/235",
              "host": "www.festusmo.gov",
              "published": "2026-10-14",
              "date": "2026-10-14",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Festus · Jefferson · Source context reviewed",
      "status_scope": "The complete original City notice identifies its development agreement with CRG for a computing project and requests qualified assistance with public communication, permit review and coordination. This supports an agency listed proposal. The procurement does not independently establish completed construction permission, actual construction, commissioned computing or resolution of public concerns. The observed same host canonical redirect was followed without bypassing a denial. General October 26 City meetings do not independently establish computing consideration.",
      "event_evidence": [
        {
          "date": "2026-10-14",
          "text": "The original Festus October 14, 2026 notice publishes a qualification based request for project communication, permit review and coordination assistance for the CRG computing proposal. This is a procurement notice rather than final computing permission, construction or operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.festusmo.gov/m/newsflash/home/detail/235",
              "host": "www.festusmo.gov",
              "published": "2026-10-14",
              "date": "2026-10-14",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29099"
      }
    },
    {
      "id": "foristell-i70-annexation-data-center-site-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Foristell I-70 Data Center Site (216-acre annexation)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Warren"
      ],
      "city": "Foristell",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. No formal data-center application or tenant is identified. Annexation is not project approval. The two areas are not one campus. Other Missouri developments are separate; later annexation action remains unobserved. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.govtech.com/products/two-data-centers-eye-land-near-st-charles-county-mo",
          "host": "govtech.com",
          "date": "2026-01-05",
          "published": "2026-01-05",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.77964,
        "lng": -91.17718,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "Post-Dispatch reporting via GovTech describes two possible Foristell sites: one seeking annexation and another already within city limits.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "No formal data-center application or tenant is identified. Annexation is not project approval. The two areas are not one campus. Other Missouri developments are separate; later annexation action remains unobserved.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.govtech.com/products/two-data-centers-eye-land-near-st-charles-county-mo",
              "host": "govtech.com",
              "date": "2026-01-05",
              "published": "2026-01-05",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Foristell · Warren · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29219"
      }
    },
    {
      "id": "next-revolution-emerson-campus-ferguson-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Former Emerson Campus Data Center (Next Revolution Technologies)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Louis"
      ],
      "city": "Ferguson",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Proposed 1.5-billion-USD tax benefits, up-to-22-billion-USD bond authority and neighborhood/environmental contributions are not approved benefits, capex or paid funds. Rejection of the earlier incentive bill is not necessarily denial of the underlying development. Closed-loop intent is not a numeric water cap; no later vote is assumed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-04-21",
          "The original Ferguson April 21, 2026 minutes record public discussion of the former Emerson redevelopment and distinguish the forthcoming tax decision from computing permission. This discussion is not an accomplished later vote or computing construction."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stlpr.org/economy-business/2026-09-10/ferguson-tax-break-plan-data-center-emerson-redevelopment",
          "host": "stlpr.org",
          "date": "2026-09-10",
          "published": "2026-09-10",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.fergusoncity.com/DocumentCenter/View/8742/Council-Meeting-Minutes-4212026-outgoing",
          "host": "www.fergusoncity.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.fergusoncity.com/DocumentCenter/View/8645/Project-Butterfly---Complete-Q-and-A-Responses?bidId=",
          "host": "www.fergusoncity.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.64094,
        "lng": -90.44221,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "St. Louis Public Radio reports a renewed Ferguson incentive proposal after a May three-three failure, with a future final vote still pending at publication.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Proposed 1.5-billion-USD tax benefits, up-to-22-billion-USD bond authority and neighborhood/environmental contributions are not approved benefits, capex or paid funds. Rejection of the earlier incentive bill is not necessarily denial of the underlying development. Closed-loop intent is not a numeric water cap; no later vote is assumed.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stlpr.org/economy-business/2026-09-10/ferguson-tax-break-plan-data-center-emerson-redevelopment",
              "host": "stlpr.org",
              "date": "2026-09-10",
              "published": "2026-09-10",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "Selected original Council minutes and project questions distinguish an existing former Emerson computing facility from proposed redevelopment and additional uses. A Council member explicitly says the tour did not enter the computing building and the upcoming decision concerns tax abatement. The selected agency hosted responses identify SSL Investments as the project developer and describe future tenant driven phases, but do not independently establish the inherited Next Revolution corporate crosswalk or the exact present new computing stage. Existing campus service is not automatically operation of every proposed redevelopment component. No later April vote, executed incentive agreement, new building or operator role is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "former_emerson_existing_and_proposed_components_identity_scope_held",
              "scope": "Selected original Council minutes and project questions distinguish an existing former Emerson computing facility from proposed redevelopment and additional uses. A Council member explicitly says the tour did not enter the computing building and the upcoming decision concerns tax abatement. The selected agency hosted responses identify SSL Investments as the project developer and describe future tenant driven phases, but do not independently establish the inherited Next Revolution corporate crosswalk or the exact present new computing stage. Existing campus service is not automatically operation of every proposed redevelopment component. No later April vote, executed incentive agreement, new building or operator role is inferred."
            },
            "source_read_scope": {
              "original_nine_page_minutes_selected_physical_pages1_7_8_9_read": true,
              "original_sixteen_page_agency_hosted_qa_selected_physical_pages1_2_3_read": true,
              "existing_service_not_all_redevelopment_components": true,
              "developer_qa_not_exact_inherited_operator_crosswalk": true,
              "no_unread_april23_vote_or_incentive_terms_adopted": true,
              "private_resident_names_and_addresses_omitted": true
            }
          },
          "notes": [
            "Selected original Council minutes and project questions distinguish an existing former Emerson computing facility from proposed redevelopment and additional uses. A Council member explicitly says the tour did not enter the computing building and the upcoming decision concerns tax abatement. The selected agency hosted responses identify SSL Investments as the project developer and describe future tenant driven phases, but do not independently establish the inherited Next Revolution corporate crosswalk or the exact present new computing stage. Existing campus service is not automatically operation of every proposed redevelopment component. No later April vote, executed incentive agreement, new building or operator role is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.fergusoncity.com/DocumentCenter/View/8742/Council-Meeting-Minutes-4212026-outgoing",
              "host": "www.fergusoncity.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.fergusoncity.com/DocumentCenter/View/8645/Project-Butterfly---Complete-Q-and-A-Responses?bidId=",
              "host": "www.fergusoncity.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ferguson · St. Louis · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-04-21",
          "text": "The original Ferguson April 21, 2026 minutes record public discussion of the former Emerson redevelopment and distinguish the forthcoming tax decision from computing permission. This discussion is not an accomplished later vote or computing construction.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.fergusoncity.com/DocumentCenter/View/8742/Council-Meeting-Minutes-4212026-outgoing",
              "host": "www.fergusoncity.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29189"
      }
    },
    {
      "id": "google-hunt-midwest-kc-northland-mo",
      "state": "mo",
      "kind": "project",
      "name": "Google Kansas City Data Center (Hunt Midwest Business Center)",
      "group": "proposed",
      "status": "Company listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center development",
      "counties": [
        "Clay"
      ],
      "city": "Kansas City",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. The 400 MW statement concerns new-to-grid carbon-free electricity capacity associated with regional opportunity, not facility IT or utility service load. Excluded from site power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-03-20",
          "Hunt Midwest announced Google at Hunt Midwest Business Center and identified JE Dunn as construction partner. This is a project announcement, not a confirmed construction start, actual investment spend or opening."
        ],
        [
          "2024-03-20",
          "The original Hunt Midwest March 20, 2024 release announces the Google proposal at Hunt Midwest Business Center. This is an announcement day rather than an exact construction start or computing opening, and current regional development wording does not commission the campus."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.google/locations/kansas-city-missouri/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/",
          "host": "huntmidwest.com",
          "published": "2024-03-20",
          "date": "2024-03-20",
          "checked": "2026-10-16",
          "label": "Original Hunt Midwest Google project announcement"
        },
        {
          "url": "https://www.datacenters.google/kansas-city-missouri/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google Kansas City page: two facilities, unnamed campus allocation"
        }
      ],
      "loc": {
        "lat": 39.31062,
        "lng": -94.42099,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "current_operator_location_listing": "Kansas City, Missouri"
          },
          "notes": [
            "The 400 MW statement concerns new-to-grid carbon-free electricity capacity associated with regional opportunity, not facility IT or utility service load. Excluded from site power.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/kansas-city-missouri/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Lea County and Kansas City identity and financing review October 16",
          "scope": "Source-specific exploration, planned-development identity or financing context. No precise point, physical-site census, site IT figure, actual construction, opening or realized incentive amount is established.",
          "fields": {
            "identity_bridge": "Hunt Midwest explicitly names Google and Hunt Midwest Business Center in its March 20, 2024 announcement. The existing record is retained; the first-party release is distinct from syndicated news on the same host.",
            "historical_announcement_scope": "The announcement describes a planned $1 billion Google project and names JE Dunn as construction partner. This is a historical announcement scope, not an actual cost, construction start, present physical stage or completed opening.",
            "current_regional_scope": "Google currently describes two Kansas City facilities in development, without mapping those facilities to Hunt Midwest and Project Mica. The Hunt Midwest identity bridge alone does not resolve that regional two-project allocation or present status.",
            "grid_scope": "The 400 MW Beavertail solar agreement concerns new grid generation. It is not Google campus IT load or a campus utility-service authorization.",
            "provider_roles": [
              {
                "name": "Google",
                "role": "planned operator"
              }
            ],
            "location_scope": "The industrial park name and historical release are not a surveyed parcel. Inherited approximate point, address, municipality and county context remain unchanged."
          },
          "notes": [
            "Separate a prospective project, a financing vote and actual physical construction. Follow each finding to its own sources.",
            "All existing location fields, jurisdictions, addresses, legacy quantities and opening dates remain unchanged."
          ],
          "sources": [
            {
              "url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/",
              "host": "huntmidwest.com",
              "published": "2024-03-20",
              "date": "2024-03-20",
              "checked": "2026-10-16",
              "label": "Original Hunt Midwest Google project announcement"
            },
            {
              "url": "https://www.datacenters.google/kansas-city-missouri/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google Kansas City page: two facilities, unnamed campus allocation"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original current Google location body labels Kansas City In development and describes two facilities. The original Hunt Midwest release identifies the inherited Business Center campus proposal. Together these support company listed development, without independently assigning all regional facilities to this exact campus or certifying completed computing service. The earlier announcement, power purchase, career training and future benefits are not installed project capacity or operation. No additional campus, project role or current water and energy measurement is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_google_development_and_named_campus_proposal",
              "scope": "The complete original current Google location body labels Kansas City In development and describes two facilities. The original Hunt Midwest release identifies the inherited Business Center campus proposal. Together these support company listed development, without independently assigning all regional facilities to this exact campus or certifying completed computing service. The earlier announcement, power purchase, career training and future benefits are not installed project capacity or operation. No additional campus, project role or current water and energy measurement is inferred."
            },
            "source_read_scope": {
              "complete_original_google_location_and_hunt_release_bodies_read": true,
              "two_regional_facilities_not_merged_into_one_campus": true,
              "in_development_not_computing_operation": true,
              "no_power_purchase_capacity_or_role_changes": true
            }
          },
          "notes": [
            "The complete original current Google location body labels Kansas City In development and describes two facilities. The original Hunt Midwest release identifies the inherited Business Center campus proposal. Together these support company listed development, without independently assigning all regional facilities to this exact campus or certifying completed computing service. The earlier announcement, power purchase, career training and future benefits are not installed project capacity or operation. No additional campus, project role or current water and energy measurement is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/kansas-city-missouri/",
              "host": "datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/",
              "host": "huntmidwest.com",
              "published": "2024-03-20",
              "date": "2024-03-20",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kansas City · Clay · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-03-20",
          "text": "Hunt Midwest announced Google at Hunt Midwest Business Center and identified JE Dunn as construction partner. This is a project announcement, not a confirmed construction start, actual investment spend or opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/",
              "host": "huntmidwest.com",
              "published": "2024-03-20",
              "date": "2024-03-20",
              "checked": "2026-10-16",
              "label": "Original Hunt Midwest Google project announcement"
            }
          ]
        },
        {
          "date": "2024-03-20",
          "text": "The original Hunt Midwest March 20, 2024 release announces the Google proposal at Hunt Midwest Business Center. This is an announcement day rather than an exact construction start or computing opening, and current regional development wording does not commission the campus.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://huntmidwest.com/2024/03/google-announces-1-billion-data-center-at-hunt-midwest-business-center/",
              "host": "huntmidwest.com",
              "published": "2024-03-20",
              "date": "2024-03-20",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "status_scope": "The complete original current Google location body labels Kansas City In development and describes two facilities. The original Hunt Midwest release identifies the inherited Business Center campus proposal. Together these support company listed development, without independently assigning all regional facilities to this exact campus or certifying completed computing service. The earlier announcement, power purchase, career training and future benefits are not installed project capacity or operation. No additional campus, project role or current water and energy measurement is inferred.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29047"
      }
    },
    {
      "id": "google-project-mica-kc-northland-mo",
      "state": "mo",
      "kind": "project",
      "name": "Project Mica",
      "group": "approved",
      "status": "Financing authorized",
      "raw_status": "approved",
      "status_field": "current_status",
      "crypto": false,
      "type": "Hyperscale data center project",
      "counties": [
        "Clay"
      ],
      "city": "Kansas City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Bond authorization is not public debt, taxpayer cash or construction spending. The first-phase 18-month schedule and school/career contributions are forecasts. Exact jurisdiction and current commissioning remain unverified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-07-28",
          "Port KC board unanimously authorized up to $10 billion in Project Mica taxable revenue bonds and related documents. This is financing authorization, not proof of issuance, a $10 billion subsidy, construction permission or operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.kctv5.com/2025/07/29/10b-500-acre-tech-campus-gets-stamp-approval-near-smithville/",
          "host": "kctv5.com",
          "date": "2025-07-29",
          "published": "2025-07-29",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://portkc.com/project/project-mica/",
          "host": "portkc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Current Port KC Project Mica context"
        },
        {
          "url": "https://portkc.com/wp-content/uploads/2025/08/2025-07-28-Board-of-Commissioners-Meeting-Minutes.pdf",
          "host": "portkc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "July 28 2025 board minutes, page3 financing vote"
        }
      ],
      "loc": {
        "lat": 39.32232,
        "lng": -94.43376,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "KCTV5 reports Port KC authorization of up to 10 billion USD in taxable revenue bonds for Google's planned five-building Northland campus near Smithville, on roughly 500 acres acquired in 2024.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Bond authorization is not public debt, taxpayer cash or construction spending. The first-phase 18-month schedule and school/career contributions are forecasts. Exact jurisdiction and current commissioning remain unverified.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.kctv5.com/2025/07/29/10b-500-acre-tech-campus-gets-stamp-approval-near-smithville/",
              "host": "kctv5.com",
              "date": "2025-07-29",
              "published": "2025-07-29",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Lea County and Kansas City identity and financing review October 16",
          "scope": "Source-specific exploration, planned-development identity or financing context. No precise point, physical-site census, site IT figure, actual construction, opening or realized incentive amount is established.",
          "fields": {
            "identity_scope": "Port KC identifies Project Mica by name and Northland/I-435/Highway169 context but leaves the technology company unnamed. The stable inherited ID remains; the display name is corrected to Project Mica and Google remains an unconfirmed inherited alias, not a certified operator.",
            "financing_authorization": {
              "meeting_date": "2025-07-28",
              "minutes_page": 3,
              "authorized_maximum_principal_usd": 10000000000,
              "vote": "unanimous",
              "scope": "Board authorization for taxable revenue bond issuance and related documents. Not proof bonds were actually issued, capex spent, tax benefit realized or construction permitted."
            },
            "current_financing_scope": "Current Port KC project context and July 28, 2025 minutes support Financing authorized. This is a specific financing action, not zoning/building authorization, current construction or operation.",
            "advertised_development_envelope": {
              "land_literal": "nearly 500 acres",
              "buildings_planned": 5,
              "planned_area_literal": "1.56 million square feet",
              "power_literal": "nearly 700 MW",
              "scope": "Prospective project-envelope descriptions. No actual building inventory, exact land area, delivered service, explicit critical IT load or separately verified power agreement is established."
            },
            "tax_and_community_scope": "Port KC describes 25-year/75% property-tax exemption, sales-tax exemptions and promised workforce contributions. These are agency-reported terms; executed agreements, realized savings, paid contributions and legal compliance are not independently established. The $10 billion bond ceiling is not the public subsidy or construction cost.",
            "location_scope": "Road-junction context does not upgrade the inherited approximate point, municipal jurisdiction, county or street address. The Port KC office address is not the data-center address."
          },
          "notes": [
            "Separate a prospective project, a financing vote and actual physical construction. Follow each finding to its own sources.",
            "All existing location fields, jurisdictions, addresses, legacy quantities and opening dates remain unchanged."
          ],
          "sources": [
            {
              "url": "https://portkc.com/project/project-mica/",
              "host": "portkc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Current Port KC Project Mica context"
            },
            {
              "url": "https://portkc.com/wp-content/uploads/2025/08/2025-07-28-Board-of-Commissioners-Meeting-Minutes.pdf",
              "host": "portkc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "July 28 2025 board minutes, page3 financing vote"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kansas City · Clay · Source context reviewed",
      "search_extra": "Google Project Mica Kansas City Northland unconfirmed operator alias",
      "status_scope": "Current Port KC project context and July 28, 2025 minutes support Financing authorized. This is a specific financing action, not zoning/building authorization, current construction or operation.",
      "event_evidence": [
        {
          "date": "2025-07-28",
          "text": "Port KC board unanimously authorized up to $10 billion in Project Mica taxable revenue bonds and related documents. This is financing authorization, not proof of issuance, a $10 billion subsidy, construction permission or operation.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://portkc.com/wp-content/uploads/2025/08/2025-07-28-Board-of-Commissioners-Meeting-Minutes.pdf",
              "host": "portkc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "July 28 2025 board minutes, page3 financing vote"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29047"
      }
    },
    {
      "id": "google-spade-new-florence-mo",
      "state": "mo",
      "kind": "project",
      "name": "Google Project Spade Campus",
      "group": "proposed",
      "status": "Development announced",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Montgomery"
      ],
      "city": "New Florence",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. State announcement. Added electricity generation capacity is not data-center load. Energy fund covers multiple Missouri counties, not a single-site incentive. Construction and permanent roles remain forecasts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-05-20",
          "Missouri’s governor reported Google’s New Florence infrastructure/data-center investment announcement. Announced development and future jobs; exact construction-start, completion and opening dates are not established."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county",
          "host": "governor.mo.gov",
          "date": "2026-05-20",
          "published": "2026-05-20",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        }
      ],
      "loc": {
        "lat": 38.95439,
        "lng": -91.48456,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "county": "Montgomery",
            "city": "New Florence",
            "announced_planned_infrastructure_investment_usd": 15000000000,
            "energy_impact_fund_usd": 20000000,
            "additional_power_generation_support_mw_lower_bound": 500
          },
          "notes": [
            "State announcement. Added electricity generation capacity is not data-center load. Energy fund covers multiple Missouri counties, not a single-site incentive. Construction and permanent roles remain forecasts.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county",
              "host": "governor.mo.gov",
              "date": "2026-05-20",
              "published": "2026-05-20",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Pending-20261016",
          "scope": "Scoped Google regional identity and lifecycle review; existing approximate points, jurisdiction, legacy totals and opening fields are retained.",
          "fields": {
            "record_association_scope": "Explicit association of the existing named Google New Florence, Missouri research context with the primary named location. This does not resolve a parcel, building allocation or distinct physical-site census; inherited project-code aliases are retained rather than independently certified.",
            "announced_investment_scope": "The governor announces a $15 billion New Florence infrastructure investment. Scope includes supporting infrastructure and programs; the amount is not normalized as installed data center value, current spending or a building-specific amount.",
            "planned_cooling_scope": "The governor says the future Montgomery County data center will use air cooling. Future design statement; no measured water total, permit limit or zero total water use is inferred.",
            "regional_generation_not_it_capacity": "The governor’s contracted new generation and additional Ameren capacity are grid-supply context. They are not New Florence IT load or commissioned data center capacity.",
            "current_status_basis": "Missouri’s governor reports Google’s May20,2026 New Florence infrastructure/data-center announcement. The published account describes planned facilities and future jobs; it supports an announced development, not a specific construction permit, completed building or operation. The inherited Spade project-code alias and approximate location remain unverified."
          },
          "notes": [
            "Partial record/field review only. No point movement, exact opening day, commissioned IT capacity, or whole-state freshness certification."
          ],
          "sources": [
            {
              "url": "https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county",
              "host": "governor.mo.gov",
              "published": "2026-05-20",
              "date": "2026-05-20",
              "checked": "2026-10-16",
              "label": "Office of the Governor of Missouri reviewed primary source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "New Florence · Montgomery · Source context reviewed",
      "status_scope": "Missouri’s governor reports Google’s May20,2026 New Florence infrastructure/data-center announcement. The published account describes planned facilities and future jobs; it supports an announced development, not a specific construction permit, completed building or operation. The inherited Spade project-code alias and approximate location remain unverified.",
      "event_evidence": [
        {
          "date": "2026-05-20",
          "text": "Missouri’s governor reported Google’s New Florence infrastructure/data-center investment announcement. Announced development and future jobs; exact construction-start, completion and opening dates are not established.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county",
              "host": "governor.mo.gov",
              "published": "2026-05-20",
              "date": "2026-05-20",
              "checked": "2026-10-16",
              "label": "Office of the Governor of Missouri reviewed primary source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29139"
      }
    },
    {
      "id": "hematite-bitcoin-mining-jefferson-county-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Hematite Bitcoin Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Jefferson"
      ],
      "city": "Hematite",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Possible immediate startup is not observed commissioning. NYDIG and Global Connect Communications both appear but their relationship is explicitly unknown. Substation proximity is not a confirmed electrical allocation; current occupancy remains unverified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.myleaderpaper.com/business/bitcoin-mining-facility-to-possibly-open-in-hematite/article_b383ae61-29e9-42cd-b1e0-95f291992a93.html",
          "host": "myleaderpaper.com",
          "date": "2025-08-28",
          "published": "2025-08-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.27782,
        "lng": -90.55604,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The Leader reports building and stormwater permits for the Hematite cryptocurrency proposal, with occupancy still waiting on permanent access through neighboring National Guard property.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Possible immediate startup is not observed commissioning. NYDIG and Global Connect Communications both appear but their relationship is explicitly unknown. Substation proximity is not a confirmed electrical allocation; current occupancy remains unverified.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.myleaderpaper.com/business/bitcoin-mining-facility-to-possibly-open-in-hematite/article_b383ae61-29e9-42cd-b1e0-95f291992a93.html",
              "host": "myleaderpaper.com",
              "date": "2025-08-28",
              "published": "2025-08-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hematite · Jefferson · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29099"
      }
    },
    {
      "id": "geronimo-jasper-county-powered-data-park-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Jasper County Powered Data Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jasper"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. KOAM March20,2026, updatedApril23, reports Geronimo Power discussions with Sarcoxie-area residents about a possible Jasper County data park. CountyRoad20 is a potential location indicated by resident-obtained images. Company says no final decisions have been made. Community opposition is documented reporting, not a final permitting decision or signed moratorium. No exact parcel, developer land ownership, tenant, MW or operation date verified. Not whole-record or current operating-census certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.koamnewsnow.com/news/top-stories/jasper-county-residents-voice-concerns-over-proposed-data-center-development/article_6faf3e40-f7dd-40d1-ad5e-215025dbd4b5.html",
          "host": "koamnewsnow.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.20356,
        "lng": -94.34057,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-and-original-local-reporting-round57-2026-10-15.json",
          "scope": "Operator or original local-reporting context; source dates and proposal stages retained.",
          "fields": {},
          "notes": [
            "KOAM March20,2026, updatedApril23, reports Geronimo Power discussions with Sarcoxie-area residents about a possible Jasper County data park. CountyRoad20 is a potential location indicated by resident-obtained images. Company says no final decisions have been made. Community opposition is documented reporting, not a final permitting decision or signed moratorium. No exact parcel, developer land ownership, tenant, MW or operation date verified.",
            "Not whole-record or current operating-census certification."
          ],
          "sources": [
            {
              "url": "https://www.koamnewsnow.com/news/top-stories/jasper-county-residents-voice-concerns-over-proposed-data-center-development/article_6faf3e40-f7dd-40d1-ad5e-215025dbd4b5.html",
              "host": "koamnewsnow.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Jasper · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29097"
      }
    },
    {
      "id": "lambda-kansas-city-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Lambda Kansas City AI Supercomputer",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Platte"
      ],
      "city": "Kansas City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Past target does not prove launch. Program benefit is stated, but exemption value/term/executed agreement are absent. Future capacity remains potential; exact physical address not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-10-28",
          "The original Missouri and Lambda October 28, 2025 releases announce a proposed Kansas City factory conversion and forecast an early 2026 launch. This dates the proposal announcement without certifying the forecast was accomplished or particular computing equipment was installed."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city",
          "host": "ded.mo.gov",
          "date": "2025-10-28",
          "published": "2025-10-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo",
          "host": "lambda.ai",
          "published": "2025-10-28",
          "date": "2025-10-28",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.38017,
        "lng": -94.7737,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "historical_status": "planned conversion of unoccupied building",
            "existing_building_year": 2009,
            "initial_power_mw": 24,
            "initial_power_basis": "capacity, not independently defined as gross or critical IT",
            "future_power_mw_lower_bound": 100,
            "launch_target": "early 2026",
            "initial_phase_investment_usd_lower_bound": 500000000,
            "state_program_as_reported": "Data Center Sales Tax Exemption Program"
          },
          "notes": [
            "Past target does not prove launch. Program benefit is stated, but exemption value/term/executed agreement are absent. Future capacity remains potential; exact physical address not established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city",
              "host": "ded.mo.gov",
              "date": "2025-10-28",
              "published": "2025-10-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "state_and_issuer_named_kansascity_conversion_proposal",
              "scope": "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted."
            },
            "source_read_scope": {
              "complete_original_state_and_issuer_release_bodies_read": true,
              "early2026_forecast_not_actual_launch": true,
              "incentive_not_operation": true,
              "no_gpu_tenant_capacity_or_role_changes": true
            }
          },
          "notes": [
            "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city",
              "host": "ded.mo.gov",
              "published": "2025-10-28",
              "date": "2025-10-28",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo",
              "host": "lambda.ai",
              "published": "2025-10-28",
              "date": "2025-10-28",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kansas City · Platte · Source context reviewed",
      "status_scope": "The complete original State and issuer releases announce a plan to convert an existing vacant Kansas City building. This supports agency and company listed proposal at the October 28, 2025 statement scope. An early 2026 launch forecast and prospective GPU, capacity, tenant and investment descriptions do not establish that launch or conversion was accomplished. Incentive participation is not computing operation. No independently verified current commissioning, installed workload or particular customer identity is adopted.",
      "event_evidence": [
        {
          "date": "2025-10-28",
          "text": "The original Missouri and Lambda October 28, 2025 releases announce a proposed Kansas City factory conversion and forecast an early 2026 launch. This dates the proposal announcement without certifying the forecast was accomplished or particular computing equipment was installed.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city",
              "host": "ded.mo.gov",
              "published": "2025-10-28",
              "date": "2025-10-28",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo",
              "host": "lambda.ai",
              "published": "2025-10-28",
              "date": "2025-10-28",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29165"
      }
    },
    {
      "id": "lumon-solutions-marshfield-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Marshfield Data Center (Lumon Solutions)",
      "group": "building",
      "status": "Agency reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Webster"
      ],
      "city": "Marshfield",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. County report identifies a project, but does not name Lumon in the reviewed text. Facility/developer crosswalk remains pending. No analogy from a different McDonald County facility is adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-05-21",
          "The original Webster County May 21, 2026 update describes ongoing construction of its Rifle Range Road computing project. The linked original Conservation report names Lumon Solutions Marshfield LLC, but neither the statement nor report is computing commissioning."
        ],
        [
          "2026-05-14",
          "The original Conservation report is generated May 14, 2026 and the linked original DNR groundwater email is dated the same day. These are document dates for a resource review and forecast, not proof of site clearance, actual consumption or current aquifer measurements."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://webstercountymo.gov/commission-data-center-update-may-21/",
          "host": "webstercountymo.gov",
          "date": "2026-05-21",
          "published": "2026-05-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf",
          "host": "webstercountymo.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-MO-DNR-email-re-impact-of-data-center-well.pdf",
          "host": "webstercountymo.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 37.28092,
        "lng": -92.87578,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "county_reported_status": "under construction",
            "county": "Webster",
            "site_description": "Rifle Range Road, northeast of Marshfield"
          },
          "notes": [
            "County report identifies a project, but does not name Lumon in the reviewed text. Facility/developer crosswalk remains pending. No analogy from a different McDonald County facility is adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://webstercountymo.gov/commission-data-center-update-may-21/",
              "host": "webstercountymo.gov",
              "date": "2026-05-21",
              "published": "2026-05-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original County update explicitly describes construction on Rifle Range Road. Its linked original Conservation report names Lumon Solutions Marshfield LLC, resolving the earlier missing company crosswalk at the County project scope. Together these support agency reported construction, without computing operation. The six page report text says it is not a site clearance or completed species consultation; no known recorded species is not proof of no species. The groundwater email gives a forecast based on supplied design information and cites monitoring data only through 2017, not current measured drawdown or actual water use. The unrelated McDonald County visit is not this facility performance evidence.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_construction_and_original_named_lumon_crosswalk",
              "scope": "The complete original County update explicitly describes construction on Rifle Range Road. Its linked original Conservation report names Lumon Solutions Marshfield LLC, resolving the earlier missing company crosswalk at the County project scope. Together these support agency reported construction, without computing operation. The six page report text says it is not a site clearance or completed species consultation; no known recorded species is not proof of no species. The groundwater email gives a forecast based on supplied design information and cites monitoring data only through 2017, not current measured drawdown or actual water use. The unrelated McDonald County visit is not this facility performance evidence."
            },
            "source_read_scope": {
              "complete_original_county_update_body_read": true,
              "original_conservation_report_all_six_page_text_read": true,
              "physical_page3_map_pixels_not_reviewed": true,
              "original_two_page_groundwater_email_complete_text_read": true,
              "conservation_page1_explicit_company_crosswalk_resolves_prior_hold": true,
              "resource_review_not_site_clearance_or_species_absence": true,
              "historical2017_monitoring_not_current_measured_water_effects": true,
              "no_c4_resource_quantity_or_location_changes": true
            }
          },
          "notes": [
            "The complete original County update explicitly describes construction on Rifle Range Road. Its linked original Conservation report names Lumon Solutions Marshfield LLC, resolving the earlier missing company crosswalk at the County project scope. Together these support agency reported construction, without computing operation. The six page report text says it is not a site clearance or completed species consultation; no known recorded species is not proof of no species. The groundwater email gives a forecast based on supplied design information and cites monitoring data only through 2017, not current measured drawdown or actual water use. The unrelated McDonald County visit is not this facility performance evidence.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://webstercountymo.gov/commission-data-center-update-may-21/",
              "host": "webstercountymo.gov",
              "published": "2026-05-21",
              "date": "2026-05-21",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf",
              "host": "webstercountymo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-MO-DNR-email-re-impact-of-data-center-well.pdf",
              "host": "webstercountymo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Marshfield · Webster · Source context reviewed",
      "status_scope": "The complete original County update explicitly describes construction on Rifle Range Road. Its linked original Conservation report names Lumon Solutions Marshfield LLC, resolving the earlier missing company crosswalk at the County project scope. Together these support agency reported construction, without computing operation. The six page report text says it is not a site clearance or completed species consultation; no known recorded species is not proof of no species. The groundwater email gives a forecast based on supplied design information and cites monitoring data only through 2017, not current measured drawdown or actual water use. The unrelated McDonald County visit is not this facility performance evidence.",
      "event_evidence": [
        {
          "date": "2026-05-21",
          "text": "The original Webster County May 21, 2026 update describes ongoing construction of its Rifle Range Road computing project. The linked original Conservation report names Lumon Solutions Marshfield LLC, but neither the statement nor report is computing commissioning.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://webstercountymo.gov/commission-data-center-update-may-21/",
              "host": "webstercountymo.gov",
              "published": "2026-05-21",
              "date": "2026-05-21",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf",
              "host": "webstercountymo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2026-05-14",
          "text": "The original Conservation report is generated May 14, 2026 and the linked original DNR groundwater email is dated the same day. These are document dates for a resource review and forecast, not proof of site clearance, actual consumption or current aquifer measurements.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-Dept-of-Conservation-project_report_proposed_data_center__88547_90690_FINAL.pdf",
              "host": "webstercountymo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://webstercountymo.gov/wp-content/uploads/2026/05/2026-05-14-MO-DNR-email-re-impact-of-data-center-well.pdf",
              "host": "webstercountymo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29225"
      }
    },
    {
      "id": "beltline-meramec-valley-technology-park-pacific-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Meramec Valley Technology Park (Beltline Energy)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Franklin"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Caption notes application later moved to Franklin County. No final approval, measured sound, tax receipts or permanent jobs established. Diamond Farms is another proposal. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stlmag.com/business/pacific-data-center-beltline-energy-proposal/",
          "host": "stlmag.com",
          "date": "2026-01-28",
          "published": "2026-01-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.41104,
        "lng": -91.07508,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "St Louis Magazine reports Beltline presentation for Pacific-area proposal, seeking annexation and wastewater partnership.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Caption notes application later moved to Franklin County. No final approval, measured sound, tax receipts or permanent jobs established. Diamond Farms is another proposal.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stlmag.com/business/pacific-data-center-beltline-energy-proposal/",
              "host": "stlmag.com",
              "date": "2026-01-28",
              "published": "2026-01-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Franklin · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29071"
      }
    },
    {
      "id": "meta-kansas-city-northland-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Meta Kansas City Northland",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clay"
      ],
      "city": "Kansas City",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Document concerns the Golden Plains Zone 3 preliminary plat, not a named Meta operating facility or its full campus. Do not infer end user, capacity or completion from a plat. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://clerk.kcmo.gov/LegislationDetail.aspx?ID=5140162&GUID=B4B56878-A985-43D7-A86E-1C499DF6EC99",
          "host": "clerk.kcmo.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/kansas-city-info-sheet/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 39.28622,
        "lng": -94.41885,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "municipal_file": "210841",
            "plat_scope_acres_approx": 374.89,
            "plat_proposed_lots": 2,
            "county_in_legal_description": "Platte"
          },
          "notes": [
            "Document concerns the Golden Plains Zone 3 preliminary plat, not a named Meta operating facility or its full campus. Do not infer end user, capacity or completion from a plat.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://clerk.kcmo.gov/LegislationDetail.aspx?ID=5140162&GUID=B4B56878-A985-43D7-A86E-1C499DF6EC99",
              "host": "clerk.kcmo.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed service",
              "basis": "The current named operator factsheet identifies this campus as part of Meta’s infrastructure providing its technologies and reports its existing operational role.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes."
          },
          "notes": [
            "This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/kansas-city-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 07, October 23, 2026",
          "scope": "Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted. This is the retained Kansas City campus context; the company sheet does not identify an additional separate Northland facility or establish jurisdiction.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted. This is the retained Kansas City campus context; the company sheet does not identify an additional separate Northland facility or establish jurisdiction."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Meta presents its named data center as part of its own infrastructure and service network in this first party source. Operator is an attributed provider brand role, not an independently established legal entity, property owner or finding about completion of every building or phase. Company resource, rate payer, community and certification claims are not adopted as measured effects or independent findings. No physical date, technical figure, photograph, status or location is promoted. This is the retained Kansas City campus context; the company sheet does not identify an additional separate Northland facility or establish jurisdiction.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/kansas-city-info-sheet/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named facility source, PDF first page visually reviewed where supplied"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kansas City · Clay · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current named operator factsheet identifies this campus as part of Meta’s infrastructure providing its technologies and reports its existing operational role. This is a current operator-listed service context, not independent certification of every building, all planned jobs, occupancy or technical capacity. Offsite renewable procurement and future restoration goals are not site IT load or measured water outcomes.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29047"
      }
    },
    {
      "id": "metrobloks-liberty-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Metrobloks Liberty Campus",
      "group": "proposed",
      "status": "Company listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clay"
      ],
      "city": "Liberty",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Metrobloks Liberty proposed three-building campus. Up-to1.4Bfutureinvestmentnotactual.150MWcampusnotperbuilding. Hundredsotherjobsincludeconstruction/security/maintenance,notsameas30directfulltime. No exactparcel,RFSdateorapprovedpermitsread. Linkedstateannouncementnotadditionalindependentsourceunlessread. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-03-24",
          "The original Metrobloks March 24, 2026 release announces the Liberty computing campus proposal. This is the issuer announcement date rather than completed investment, construction, installed capacity or computing operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri",
          "host": "metrobloks.com",
          "date": "2026-03-24",
          "published": "2026-03-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.33443,
        "lng": -94.40273,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Metrobloks Liberty proposed three-building campus",
          "fields": {
            "developer": "Metrobloks",
            "announcement_date": "2026-03-24",
            "locality": "Liberty, Missouri",
            "planned_investment_usd_max": 1400000000,
            "planned_campus_power_mw": 150,
            "power_basis": "power, not explicit critical IT",
            "planned_campus_sqft_approx": 568800,
            "planned_buildings": 3,
            "expected_fulltime_jobs_min_inclusive": 30
          },
          "notes": [
            "Up-to1.4Bfutureinvestmentnotactual.150MWcampusnotperbuilding. Hundredsotherjobsincludeconstruction/security/maintenance,notsameas30directfulltime. No exactparcel,RFSdateorapprovedpermitsread. Linkedstateannouncementnotadditionalindependentsourceunlessread.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri",
              "host": "metrobloks.com",
              "date": "2026-03-24",
              "published": "2026-03-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original issuer body announces plans for the Liberty campus. This supports a company listed proposal. Prospective investment, buildings, power, employment, tax revenue and low water claims are design or benefit expectations rather than accomplished construction, commissioned computing or measured community effects. No independently read current permission, installed capacity or exact first opening is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_named_liberty_development_proposal",
              "scope": "The complete original issuer body announces plans for the Liberty campus. This supports a company listed proposal. Prospective investment, buildings, power, employment, tax revenue and low water claims are design or benefit expectations rather than accomplished construction, commissioned computing or measured community effects. No independently read current permission, installed capacity or exact first opening is inferred."
            },
            "source_read_scope": {
              "complete_original_issuer_release_body_read": true,
              "future_investment_jobs_water_and_power_not_accomplished": true,
              "no_capacity_role_or_location_changes": true
            }
          },
          "notes": [
            "The complete original issuer body announces plans for the Liberty campus. This supports a company listed proposal. Prospective investment, buildings, power, employment, tax revenue and low water claims are design or benefit expectations rather than accomplished construction, commissioned computing or measured community effects. No independently read current permission, installed capacity or exact first opening is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri",
              "host": "www.metrobloks.com",
              "published": "2026-03-24",
              "date": "2026-03-24",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Liberty · Clay · Source context reviewed",
      "status_scope": "The complete original issuer body announces plans for the Liberty campus. This supports a company listed proposal. Prospective investment, buildings, power, employment, tax revenue and low water claims are design or benefit expectations rather than accomplished construction, commissioned computing or measured community effects. No independently read current permission, installed capacity or exact first opening is inferred.",
      "event_evidence": [
        {
          "date": "2026-03-24",
          "text": "The original Metrobloks March 24, 2026 release announces the Liberty computing campus proposal. This is the issuer announcement date rather than completed investment, construction, installed capacity or computing operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri",
              "host": "www.metrobloks.com",
              "published": "2026-03-24",
              "date": "2026-03-24",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29047"
      }
    },
    {
      "id": "nebius-independence-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Nebius AI Factory (Independence)",
      "group": "building",
      "status": "Company reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jackson"
      ],
      "city": "Independence",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. First-phase computing capacity is inside the campus ambition, not additive. The page's last-modified timestamp is not a publication or groundbreaking day. Closed-loop cooling and no-rate-increase design are planned/attributed, not measured outcomes or an executed utility contract. Construction is not ready-for-service or occupied critical IT. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.arconational.com/nebius-independence-mo/",
          "host": "arconational.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.00837,
        "lng": -94.34625,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "ARCO's project page labels Nebius Independence under construction and describes a first 200 MW computing-capacity building of about 490,000 square feet within a planned 1.2 GW campus.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "First-phase computing capacity is inside the campus ambition, not additive. The page's last-modified timestamp is not a publication or groundbreaking day. Closed-loop cooling and no-rate-increase design are planned/attributed, not measured outcomes or an executed utility contract. Construction is not ready-for-service or occupied critical IT.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.arconational.com/nebius-independence-mo/",
              "host": "arconational.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "contractor_explicit_named_independence_construction",
              "scope": "The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed."
            },
            "source_read_scope": {
              "complete_original_current_contractor_project_body_read": true,
              "explicit_under_construction_not_completed_build": true,
              "first_building_not_full_campus_commissioning": true,
              "no_rate_water_noise_or_capacity_certification": true
            }
          },
          "notes": [
            "The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.arconational.com/nebius-independence-mo/",
              "host": "www.arconational.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Independence · Jackson · Source context reviewed",
      "status_scope": "The complete original contractor project body explicitly labels the named Nebius Independence factory Under Construction. This supports contractor reported construction. The same page separates the first building from a larger planned campus; designed and built wording is not completion while the explicit project status remains construction. Future cooling, noise mitigation, utility arrangements and rate protections are attributed plans rather than measured performance or commissioned computing. No whole campus capacity or operator role is changed.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29095"
      }
    },
    {
      "id": "patmos-kansas-city-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Patmos KC Star Building Campus",
      "group": "building",
      "status": "Company reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jackson"
      ],
      "city": "Kansas City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The financing amount is not verified spending or total capex. The whole 400,000-square-foot building includes proposed coworking and event uses; it is not all DC floor area. Partial operation and leases do not commission the entire building. No IT MW or named cloud tenant established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-01-12",
          "The original Patmos January 12, 2026 release announces financing for continued conversion and infrastructure work at its Kansas City campus. The loan announcement is separate from exact completion of the forecast March work or computing commissioning across the campus."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.kctv5.com/2026/01/12/company-transforming-downtown-kansas-city-landmark-announces-expansion/",
          "host": "kctv5.com",
          "date": "2026-01-12",
          "published": "2026-01-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.patmos.tech/news/patmos-secures-100m-cpace",
          "host": "www.patmos.tech",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Named computing facility or project street in original source body"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1601+McGee+Street%2C+Kansas+City%2C+MO&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete literal Census street response and county context"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-94.58623606447564%2C39.09006428853755%2C-94.57350393552436%2C39.09994571146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting with unknown image acquisition date"
        },
        {
          "url": "https://www.patmos.tech/tech-campus",
          "host": "www.patmos.tech",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lng": -94.57987,
        "lat": 39.095005,
        "precision": "address",
        "basis": "The original January 12, 2026 operator announcement identifies the former Kansas City Star property and mixed use AI campus at 1601 McGee Street, Kansas City, Missouri. One complete literal Census street range supplies only a calculated reference in Jackson County, without selecting a data hall, tenant room or roof boundary. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "KCTV5 reports Patmos bought the former KC Star building after occupying part of it and announced a 100-million-USD clean-energy loan for further improvements.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The financing amount is not verified spending or total capex. The whole 400,000-square-foot building includes proposed coworking and event uses; it is not all DC floor area. Partial operation and leases do not commission the entire building. No IT MW or named cloud tenant established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.kctv5.com/2026/01/12/company-transforming-downtown-kansas-city-landmark-announces-expansion/",
              "host": "kctv5.com",
              "date": "2026-01-12",
              "published": "2026-01-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 55, October 23, 2026",
          "scope": "Explicit source bound reference only. Existing status group unknown remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -94.57987,
                "lat": 39.095005,
                "precision": "address",
                "basis": "The original January 12, 2026 operator announcement identifies the former Kansas City Star property and mixed use AI campus at 1601 McGee Street, Kansas City, Missouri. One complete literal Census street range supplies only a calculated reference in Jackson County, without selecting a data hall, tenant room or roof boundary. Existing status group unknown remains unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1601 McGee Street, Kansas City, MO",
              "county_fips": [
                "29095"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named operator announcement explicitly ties 1601 McGee Street to its former newspaper property retrofit and AI data center project. The general technology campus page is corroboration only. Financing amounts, executed leases, forecast March 2026 completion and reported earlier buildouts do not create new roles, physical stages, quantities or opening events in this location review.",
            "Explicit source bound reference only. Existing status group unknown remains unchanged. No new computing operation, operator role, title, owner, tenant, physical milestone, quantity, certification, roof or complete campus is certified.",
            "Dense downtown blocks, large roof forms, road corridors, parking and an arena are visible. The source numeric street identifies the former newspaper property without selecting an individual data hall, tenant space, roof boundary or current computing milestone.",
            "The inherited general area coordinate and county display were not reviewed physical facility destinations. The exact independent official sources now support only the bounded reference described in the basis. Earlier coordinates and complete source history remain intact. This is a reference correction, without a claim of physical relocation or a new physical milestone."
          ],
          "sources": [
            {
              "url": "https://www.patmos.tech/news/patmos-secures-100m-cpace",
              "host": "www.patmos.tech",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Named computing facility or project street in original source body"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1601+McGee+Street%2C+Kansas+City%2C+MO&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete literal Census street response and county context"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-94.58623606447564%2C39.09006428853755%2C-94.57350393552436%2C39.09994571146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting with unknown image acquisition date"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_named_kansascity_continued_construction_account",
              "scope": "The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster."
            },
            "source_read_scope": {
              "complete_original_issuer_release_and_current_general_campus_body_read": true,
              "continued_work_explicit_not_inferred_from_loan_alone": true,
              "forecast_march2026_not_accomplished": true,
              "signed_tenants_and_built_capacity_not_full_campus_operation": true,
              "no_financial_capacity_or_role_fields_changed": true
            }
          },
          "notes": [
            "The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.patmos.tech/news/patmos-secures-100m-cpace",
              "host": "www.patmos.tech",
              "published": "2026-01-12",
              "date": "2026-01-12",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.patmos.tech/tech-campus",
              "host": "www.patmos.tech",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated official source street reference, not a surveyed roof or parcel",
      "summary": "Kansas City · Jackson · Source context reviewed",
      "status_scope": "The complete original January 12, 2026 issuer release explicitly describes continued development and infrastructure upgrades at the named former newspaper building. This supports company reported construction at the statement scope. Initial built phases and signed tenants do not establish commissioned computing throughout the campus, and the forecast March completion is not independently certified as accomplished. The current general campus page does not independently commission this exact project. Loan proceeds, prospective mixed use space and future power are not actual computing load or an independently verified tenant roster.",
      "event_evidence": [
        {
          "date": "2026-01-12",
          "text": "The original Patmos January 12, 2026 release announces financing for continued conversion and infrastructure work at its Kansas City campus. The loan announcement is separate from exact completion of the forecast March work or computing commissioning across the campus.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.patmos.tech/news/patmos-secures-100m-cpace",
              "host": "www.patmos.tech",
              "published": "2026-01-12",
              "date": "2026-01-12",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ]
    },
    {
      "id": "crg-project-cumulus-st-charles-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Project Cumulus (St. Charles)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Charles"
      ],
      "city": "St. Charles",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Withdrawal is not an irrevocable permanent cancellation or proof a replacement was filed. Linked original company letter separately reviewed. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original publicly published company email, hosted by reporter.. Email asks for receipt; acknowledgement not included. No filed replacement or later outcome established. Do not label irrevocably cancelled.",
      "date": "",
      "events": [
        [
          "2025-08-19",
          "The original Saint Charles August 19, 2025 Council minutes record the Cumulus application as withdrawn by the applicant and state no Council action was required. This is the dated City record of the proposal outcome, without adopting the unread letter date, a Council denial or physical computing closure."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.stlpr.org/news-briefs/2025-08-18/developer-controversial-data-center-st-charles",
          "host": "stlpr.org",
          "date": "2025-08-18",
          "published": "2025-08-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://npr.brightspotcdn.com/81/a0/8ba01da44bfd963fe7ef6281241f/crg-letter.pdf",
          "host": "npr.brightspotcdn.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.stcharlescitymo.gov/AgendaCenter/ViewFile/Minutes/_08192025-1737",
          "host": "www.stcharlescitymo.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.78199,
        "lng": -90.67474,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "permit-application-withdrawn",
            "reported_finding": "CRG withdrew Cumulus conditional-use-permit application before council vote and said it intended to revise outreach and proposal.",
            "report_display_date": "2025-08-18",
            "independently_verified_current_status": null
          },
          "notes": [
            "Withdrawal is not an irrevocable permanent cancellation or proof a replacement was filed. Linked original company letter separately reviewed.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.stlpr.org/news-briefs/2025-08-18/developer-controversial-data-center-st-charles",
              "host": "stlpr.org",
              "date": "2025-08-18",
              "published": "2025-08-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Original publicly published company email, hosted by reporter.",
          "fields": {
            "operator_email_sent": "2025-08-18T14:42:00",
            "timezone_in_email": null,
            "application_withdrawal": "Conditional use permit consideration at August 19 council meeting",
            "future_intent": "Revised proposal and outreach planned."
          },
          "notes": [
            "Email asks for receipt; acknowledgement not included. No filed replacement or later outcome established. Do not label irrevocably cancelled.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://npr.brightspotcdn.com/81/a0/8ba01da44bfd963fe7ef6281241f/crg-letter.pdf",
              "host": "npr.brightspotcdn.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "Selected original City Council minutes explicitly identify the CRG Cumulus application and state it was withdrawn by the applicant with no Council action required. A Council member separately criticizes the applicant withdrawal and communication. This establishes a historical proposal outcome in the August 19, 2025 record rather than denial by Council, a general ban or physical closure of an operating computing facility. The original agenda packet containing the applicant letter exceeded the bounded capture limit, so its indexed letter text and alternate distributed copy were not adopted. Exact present revised proposal stage and the letter day remain held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_recorded_cumulus_application_withdrawal_current_revision_held",
              "scope": "Selected original City Council minutes explicitly identify the CRG Cumulus application and state it was withdrawn by the applicant with no Council action required. A Council member separately criticizes the applicant withdrawal and communication. This establishes a historical proposal outcome in the August 19, 2025 record rather than denial by Council, a general ban or physical closure of an operating computing facility. The original agenda packet containing the applicant letter exceeded the bounded capture limit, so its indexed letter text and alternate distributed copy were not adopted. Exact present revised proposal stage and the letter day remain held."
            },
            "source_read_scope": {
              "original_fifteen_page_council_minutes_selected_physical_pages1_5_10_read": true,
              "oversize_original_agenda_letter_not_read_or_replaced": true,
              "applicant_withdrawal_not_council_denial_or_physical_closure": true,
              "no_new_exact_revised_hearing_or_current_stage_inferred": true
            }
          },
          "notes": [
            "Selected original City Council minutes explicitly identify the CRG Cumulus application and state it was withdrawn by the applicant with no Council action required. A Council member separately criticizes the applicant withdrawal and communication. This establishes a historical proposal outcome in the August 19, 2025 record rather than denial by Council, a general ban or physical closure of an operating computing facility. The original agenda packet containing the applicant letter exceeded the bounded capture limit, so its indexed letter text and alternate distributed copy were not adopted. Exact present revised proposal stage and the letter day remain held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.stcharlescitymo.gov/AgendaCenter/ViewFile/Minutes/_08192025-1737",
              "host": "www.stcharlescitymo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "St. Charles · St. Charles · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-08-19",
          "text": "The original Saint Charles August 19, 2025 Council minutes record the Cumulus application as withdrawn by the applicant and state no Council action was required. This is the dated City record of the proposal outcome, without adopting the unread letter date, a Council denial or physical computing closure.",
          "kind": "withdrawn",
          "sources": [
            {
              "url": "https://www.stcharlescitymo.gov/AgendaCenter/ViewFile/Minutes/_08192025-1737",
              "host": "www.stcharlescitymo.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29183"
      }
    },
    {
      "id": "shenandoah-project-kestrel-kc-northland-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Project Kestrel",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Platte"
      ],
      "city": "Kansas City",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Port KC Kestrel source arithmetic and project-identity limits. Source arithmetic conflict:0.25times1.8Msqft is450000, not15.75M. Hold workforce forecast pending actual agreement. Headline100B unspecified lifetime scope is not actual spent or automatically new issued bonds. No developer/tenant identity in this release sufficient to confirm preferred Shenandoah operator.50jobs perphase not50perbuilding and no total phases proven. Water replacement/carbonfree pledges not observed consumption or energy mix. No numeric critical IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-08-26",
          "The original Port KC August 26, 2025 release announces the planned Kestrel Northland campus and forecasts first phase construction in 2026. This is an announcement date without proof the future construction start, full buildout or computing operation occurred."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/",
          "host": "portkc.com",
          "date": "2025-08-26",
          "published": "2025-08-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.39301,
        "lng": -94.78771,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Port KC Kestrel source arithmetic and project-identity limits",
          "fields": {
            "agency": "Port KC",
            "project": "Project Kestrel",
            "announcement_date": "2025-08-26",
            "site": "KCI-29 industrial mega site, Kansas City, Missouri",
            "planned_site_acres": 379,
            "planned_hyperscale_buildings": 6,
            "planned_full_buildout_sqft_max": 1800000,
            "headline_projected_investment_usd": 100000000000,
            "expected_jobs_per_phase_approx": 50,
            "first_phase_construction_target_year": 2026,
            "forecast_new_tax_revenue_over_bond_term_usd_min_exclusive": 110000000,
            "stated_workforce_fee_usd_per_sqft": 0.25,
            "stated_workforce_forecast_usd": 15750000
          },
          "notes": [
            "Source arithmetic conflict:0.25times1.8Msqft is450000, not15.75M. Hold workforce forecast pending actual agreement. Headline100B unspecified lifetime scope is not actual spent or automatically new issued bonds. No developer/tenant identity in this release sufficient to confirm preferred Shenandoah operator.50jobs perphase not50perbuilding and no total phases proven. Water replacement/carbonfree pledges not observed consumption or energy mix. No numeric critical IT MW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/",
              "host": "portkc.com",
              "date": "2025-08-26",
              "published": "2025-08-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 74",
          "scope": "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "public_port_named_kestrel_campus_proposal",
              "scope": "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance."
            },
            "source_read_scope": {
              "complete_original_public_port_release_body_read": true,
              "forecast2026_construction_not_accomplished": true,
              "unnamed_end_user_not_inferred": true,
              "no_jobs_tax_water_energy_or_capacity_fields_changed": true
            }
          },
          "notes": [
            "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/",
              "host": "portkc.com",
              "published": "2025-08-26",
              "date": "2025-08-26",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kansas City · Platte · Source context reviewed",
      "status_scope": "The complete original Port KC announcement describes the planned Kestrel campus and forecasts a first phase construction start in 2026. This supports an agency listed proposal, without independently establishing that start or computing service. The original does not name the end user, so no inferred technology company is adopted. Prospective tax revenues, job salaries, renewable commitments, water replacement and full buildout are not completed benefits, installed computing capacity or current legal compliance.",
      "event_evidence": [
        {
          "date": "2025-08-26",
          "text": "The original Port KC August 26, 2025 release announces the planned Kestrel Northland campus and forecasts first phase construction in 2026. This is an announcement date without proof the future construction start, full buildout or computing operation occurred.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/",
              "host": "portkc.com",
              "published": "2025-08-26",
              "date": "2025-08-26",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29165"
      }
    },
    {
      "id": "tierpoint-st-louis-locust-mo",
      "state": "mo",
      "kind": "facility",
      "name": "TierPoint St. Louis - Locust",
      "group": "proposed",
      "status": "Operator-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Louis city"
      ],
      "city": "Saint Louis",
      "address": "",
      "who": "TierPoint",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-locust/",
          "host": "tierpoint.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2300+Locust+Street%2C+St.+Louis%2C+MO+63103&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Calculated Census street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-90.21623955265295%2C38.63059811374853%2C-90.20818968429504%2C38.63688629197347&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Viewed aerial setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -90.212214618474,
        "lat": 38.633742202861,
        "precision": "approximate",
        "basis": "Approximate planned facility area based on the published TierPoint service address 2300 Locust Street, St. Louis, MO 63103 and one Census street range inside the existing county. This is not a surveyed roof, confirmed parcel, full campus or ownership finding. Existing native status remains proposed."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-specifications-round3-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "gross_area_sqft": 135840,
            "gross_area_is_lower_bound": true,
            "raised_floor_sqft": 22640,
            "raised_floor_is_lower_bound": false,
            "raised_floor_basis": "phase 1",
            "expansion_area_sqft": 45000,
            "backup_generator_configuration_source_statement": "Four 2.0 MW redundant generators",
            "current_operator_listing": "Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."
          },
          "notes": [
            "Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-locust/",
              "host": "tierpoint.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "TierPoint describes its St. Louis Locust facility as currently under development. This supports an operator-listed development plan, not verified construction, opening, energized capacity or operation.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_development",
              "scope": "TierPoint describes its St. Louis Locust facility as currently under development. This supports an operator-listed development plan, not verified construction, opening, energized capacity or operation."
            }
          },
          "notes": [
            "Named main-body introduction, current product-availability passage and physical-location block. Promotional guarantees, technical totals and certifications were not adopted."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-locust/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 06, October 23, 2026",
          "scope": "TierPoint describes the named St. Louis Locust facility as under development on its own page. Developer is the attributed provider brand role. This source does not establish current operation, completion, a legal property owner or the stage of any other St. Louis facility. No status, location, physical date, technical figure or environmental outcome is promoted.",
          "fields": {
            "company_association": {
              "name": "TierPoint",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "TierPoint describes the named St. Louis Locust facility as under development on its own page. Developer is the attributed provider brand role. This source does not establish current operation, completion, a legal property owner or the stage of any other St. Louis facility. No status, location, physical date, technical figure or environmental outcome is promoted."
            },
            "provider_role": "developer"
          },
          "notes": [
            "TierPoint describes the named St. Louis Locust facility as under development on its own page. Developer is the attributed provider brand role. This source does not establish current operation, completion, a legal property owner or the stage of any other St. Louis facility. No status, location, physical date, technical figure or environmental outcome is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-locust/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named facility page, reviewed named service or development context"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 22, October 23, 2026",
          "scope": "Named operator service street reference only. Existing native status remains proposed. Protected facts and canonical address remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -90.212214618474,
                "lat": 38.633742202861,
                "precision": "approximate",
                "basis": "Approximate planned facility area based on the published TierPoint service address 2300 Locust Street, St. Louis, MO 63103 and one Census street range inside the existing county. This is not a surveyed roof, confirmed parcel, full campus or ownership finding. Existing native status remains proposed."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "2300 Locust Street, St. Louis, MO 63103",
              "county_fips": [
                "29510"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named official numeric facility section binds this one service street to the existing research record. Company offices, related facility cards, embedded map coordinates and source quantities remain excluded.",
            "The unique Census street range agrees with the existing county and retained display polygon. The calculated reference does not establish a surveyed roof, parcel, tenant, suite, floor, full campus, legal title or current operation.",
            "The canonical address remains blank. All status, physical date, quantity, role, identity and jurisdiction wrappers remain exact. Existing native status remains proposed.",
            "The existing record remains proposed. This service street identifies only an approximate planned facility area. No parcel, operating building or solid project site point is certified. The current operator marketing does not change stage, roles, quantity or opening dates."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-locust/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Official named St. Louis Locust facility street section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2300+Locust+Street%2C+St.+Louis%2C+MO+63103&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Calculated Census street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-90.21623955265295%2C38.63059811374853%2C-90.20818968429504%2C38.63688629197347&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Viewed aerial setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate planned facility area, not a confirmed parcel",
      "summary": "Saint Louis · St. Louis city · Source context reviewed",
      "status_scope": "TierPoint describes its St. Louis Locust facility as currently under development. This supports an operator-listed development plan, not verified construction, opening, energized capacity or operation."
    },
    {
      "id": "tierpoint-st-louis-millpark-mo",
      "state": "mo",
      "kind": "facility",
      "name": "TierPoint St. Louis - Millpark",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Louis"
      ],
      "city": "Maryland Heights",
      "address": "",
      "who": "TierPoint",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-millpark/",
          "host": "tierpoint.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2315+Millpark+Drive%2C+Maryland+Heights%2C+MO+63043&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://www.tierpoint.com/data-centers/arkansas/little-rock/",
          "host": "www.tierpoint.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "TierPoint facility navigation links and separate corporate headquarters section"
        }
      ],
      "loc": {
        "lat": 38.698909598474,
        "lng": -90.409986914444,
        "precision": "address",
        "basis": "Published TierPoint facility address 2315 Millpark Drive, STE 104, Maryland Heights, MO 63043 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, full campus or property ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-specifications-round3-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "gross_area_sqft": 23000,
            "gross_area_is_lower_bound": true,
            "raised_floor_sqft": 14400,
            "raised_floor_is_lower_bound": true,
            "backup_generator_configuration_source_statement": "Two 2 MW redundant generators",
            "current_operator_listing": "Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."
          },
          "notes": [
            "Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-millpark/",
              "host": "tierpoint.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "TierPoint lists colocation and managed services at its St. Louis - Millpark location. This supports an operator-listed colocation service label, not an opening date, full energized capacity, independently verified certification, legal ownership or a surveyed parcel.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "TierPoint lists colocation and managed services at its St. Louis - Millpark location. This supports an operator-listed colocation service label, not an opening date, full energized capacity, independently verified certification, legal ownership or a surveyed parcel."
            }
          },
          "notes": [
            "Named main-body introduction, current product-availability passage and physical-location block. Promotional guarantees, technical totals and certifications were not adopted."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-millpark/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 5, October 22, 2026",
          "scope": "Published operator street reference only. No canonical address, status, date, quantity, legal jurisdiction, title, surveyed parcel, whole campus or distinct building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 38.698909598474,
                "lng": -90.409986914444,
                "precision": "address",
                "basis": "Published TierPoint facility address 2315 Millpark Drive, STE 104, Maryland Heights, MO 63043 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, full campus or property ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "2315 Millpark Drive, STE 104, Maryland Heights, MO 63043",
              "county_fips": [
                "29189"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named facility address section supplies the street and locality. The corporate headquarters footer is excluded. The published facility address is retained as location evidence; the existing blank canonical address field is not changed in this location only transaction.",
            "The source facility page and its current navigation link identify the same existing research record. A regional market name does not replace the published locality or county. The existing service status, physical dates, technical figures, organizations and jurisdiction wrappers remain exact."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-millpark/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "TierPoint named facility address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=2315+Millpark+Drive%2C+Maryland+Heights%2C+MO+63043&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://www.tierpoint.com/data-centers/arkansas/little-rock/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "TierPoint facility navigation links and separate corporate headquarters section"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "K3 sourced operator roles October 22, 2026",
          "scope": "Operator relationship attributed to the named facility page published by TierPoint. This identifies the provider brand, not a legal property owner. No new status, service date, address, map reference, capacity or current physical milestone is adopted.",
          "fields": {
            "company_association": {
              "name": "TierPoint",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Operator relationship attributed to the named facility page published by TierPoint. This identifies the provider brand, not a legal property owner. No new status, service date, address, map reference, capacity or current physical milestone is adopted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Operator relationship attributed to the named facility page published by TierPoint. This identifies the provider brand, not a legal property owner. No new status, service date, address, map reference, capacity or current physical milestone is adopted.",
            "Source retrieval is not an opening or operating date."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-millpark/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator identity source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Maryland Heights · St. Louis · Source context reviewed",
      "status_scope": "TierPoint lists colocation and managed services at its St. Louis - Millpark location. This supports an operator-listed colocation service label, not an opening date, full energized capacity, independently verified certification, legal ownership or a surveyed parcel."
    },
    {
      "id": "tierpoint-st-louis-olive-mo",
      "state": "mo",
      "kind": "facility",
      "name": "TierPoint St. Louis - Olive",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "St. Louis city"
      ],
      "city": "Saint Louis",
      "address": "",
      "who": "TierPoint",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-olive/",
          "host": "tierpoint.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1111+Olive+Street%2C+St.+Louis%2C+MO+63101&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Calculated Census street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-90.19983091514327%2C38.62629593202853%2C-90.19178152983675%2C38.63258411025347&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Viewed aerial setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -90.19580622249,
        "lat": 38.629440021141,
        "precision": "address",
        "basis": "Published TierPoint service address 1111 Olive Street, St. Louis, MO 63101 and one Census street range inside the existing county. This is not a surveyed roof, confirmed parcel, full campus or ownership finding. Existing native status remains operating."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-specifications-round3-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "gross_area_sqft": 124000,
            "gross_area_is_lower_bound": true,
            "raised_floor_sqft": 11000,
            "raised_floor_is_lower_bound": true,
            "backup_generator_configuration_source_statement": "Two 2 MW redundant generators",
            "current_operator_listing": "Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."
          },
          "notes": [
            "Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-olive/",
              "host": "tierpoint.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "TierPoint lists colocation and managed services at its St. Louis - Olive location. This supports an operator-listed colocation service label, not an opening date, full energized capacity, independently verified certification, legal ownership or a surveyed parcel.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "TierPoint lists colocation and managed services at its St. Louis - Olive location. This supports an operator-listed colocation service label, not an opening date, full energized capacity, independently verified certification, legal ownership or a surveyed parcel."
            }
          },
          "notes": [
            "Named main-body introduction, current product-availability passage and physical-location block. Promotional guarantees, technical totals and certifications were not adopted."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-olive/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "K3 sourced operator roles October 22, 2026",
          "scope": "Operator relationship attributed to the named facility page published by TierPoint. This identifies the provider brand, not a legal property owner. No new status, service date, address, map reference, capacity or current physical milestone is adopted.",
          "fields": {
            "company_association": {
              "name": "TierPoint",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Operator relationship attributed to the named facility page published by TierPoint. This identifies the provider brand, not a legal property owner. No new status, service date, address, map reference, capacity or current physical milestone is adopted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Operator relationship attributed to the named facility page published by TierPoint. This identifies the provider brand, not a legal property owner. No new status, service date, address, map reference, capacity or current physical milestone is adopted.",
            "Source retrieval is not an opening or operating date."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-olive/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator identity source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 22, October 23, 2026",
          "scope": "Named operator service street reference only. Existing native status remains operating. Protected facts and canonical address remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -90.19580622249,
                "lat": 38.629440021141,
                "precision": "address",
                "basis": "Published TierPoint service address 1111 Olive Street, St. Louis, MO 63101 and one Census street range inside the existing county. This is not a surveyed roof, confirmed parcel, full campus or ownership finding. Existing native status remains operating."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1111 Olive Street, St. Louis, MO 63101",
              "county_fips": [
                "29510"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named official numeric facility section binds this one service street to the existing research record. Company offices, related facility cards, embedded map coordinates and source quantities remain excluded.",
            "The unique Census street range agrees with the existing county and retained display polygon. The calculated reference does not establish a surveyed roof, parcel, tenant, suite, floor, full campus, legal title or current operation.",
            "The canonical address remains blank. All status, physical date, quantity, role, identity and jurisdiction wrappers remain exact. Existing native status remains operating."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/missouri/st-louis-olive/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Official named St. Louis Olive facility street section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1111+Olive+Street%2C+St.+Louis%2C+MO+63101&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Calculated Census street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-90.19983091514327%2C38.62629593202853%2C-90.19178152983675%2C38.63258411025347&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Viewed aerial setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Saint Louis · St. Louis city · Source context reviewed",
      "status_scope": "TierPoint lists colocation and managed services at its St. Louis - Olive location. This supports an operator-listed colocation service label, not an opening date, full energized capacity, independently verified certification, legal ownership or a surveyed parcel."
    },
    {
      "id": "white-cloud-acres-barnard-mo",
      "state": "mo",
      "kind": "facility",
      "name": "White Cloud Acres",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Nodaway"
      ],
      "city": "Barnard",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. White Cloud source-role correction and separate nearby power plant. Upstream countygovernment label incorrect: site describes movies, podcasts, photos, stories and maps. Secondary4B/600MW/200000gallons-day/noise analogies not primary technical record and not adopted as verified. Nearby440MWMullinCreek power plant separate project, not addable IT. Exact site, permit, hearing outcome and actual service remain unknown. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://nodaway.org/6270/proposed-4-billion-white-cloud-acres-ai-data-center-in-rural-barnard/",
          "host": "nodaway.org",
          "date": "2026-04-29",
          "published": "2026-04-29",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.36086,
        "lng": -94.8832,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "White Cloud source-role correction and separate nearby power plant",
          "fields": {
            "publisher_role": "personal/local blog nodaway.org, author roger",
            "article_date": "2026-04-29",
            "project_name": "White Cloud Acres",
            "developer_as_reported": "Scale Microgrids",
            "reported_location": "rural Barnard, Nodaway County, Missouri"
          },
          "notes": [
            "Upstream countygovernment label incorrect: site describes movies, podcasts, photos, stories and maps. Secondary4B/600MW/200000gallons-day/noise analogies not primary technical record and not adopted as verified. Nearby440MWMullinCreek power plant separate project, not addable IT. Exact site, permit, hearing outcome and actual service remain unknown.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://nodaway.org/6270/proposed-4-billion-white-cloud-acres-ai-data-center-in-rural-barnard/",
              "host": "nodaway.org",
              "date": "2026-04-29",
              "published": "2026-04-29",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Barnard · Nodaway · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29147"
      }
    },
    {
      "id": "wildwood-ranch-joplin-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Wildwood Ranch Industrial Complex (potential data center)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jasper"
      ],
      "city": "Joplin",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. City explicitly says construction still needs normal permits. Latest update says no construction applications and power feasibility study first; printed MondayMarch 6,2026 weekday/date is inconsistent, so preserve printed date as uncorrected source label and do not treat as freshOctoberstatus. Annexation/industrial zoning is not a DCbuilding permit, electricity-service contract or operation. DeveloperFAQlink is not itself verified impact evidence. No MW/capex/RFSadopted. Original page is primary municipal stage evidence, not a site inspection. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://mo-joplin2.civicplus.com/1286/Wildwood-Ranch-Industrial-Complex",
          "host": "mo-joplin2.civicplus.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.21423,
        "lng": -94.35222,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {
            "reported_context": "CityofJoplin’s official page records Wildwood’sDecember 4,2025 application,January 12,2026 planning hearing andFebruary 17,2026 council approval of annexation/rezoning bills 2026-256 and 2026-257 for roughly 600.4 acres.",
            "independently_verified_current_operating_status": null,
            "city_recorded_annexation_rezoning_approval": "2026-02-17",
            "construction_permit_verified": false,
            "source_update_weekday_date_inconsistent": true
          },
          "notes": [
            "City explicitly says construction still needs normal permits. Latest update says no construction applications and power feasibility study first; printed MondayMarch 6,2026 weekday/date is inconsistent, so preserve printed date as uncorrected source label and do not treat as freshOctoberstatus. Annexation/industrial zoning is not a DCbuilding permit, electricity-service contract or operation. DeveloperFAQlink is not itself verified impact evidence. No MW/capex/RFSadopted. Original page is primary municipal stage evidence, not a site inspection.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://mo-joplin2.civicplus.com/1286/Wildwood-Ranch-Industrial-Complex",
              "host": "mo-joplin2.civicplus.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Joplin · Jasper · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "29097"
      }
    },
    {
      "id": "lightedge-kansas-city-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Lightedge Kansas City",
      "group": "operating",
      "status": "Operator listed colocation service",
      "crypto": false,
      "type": "Colocation",
      "counties": [
        "Clay"
      ],
      "city": "Kansas City",
      "address": "9050 NE Underground Drive, Kansas City, MO 64161",
      "who": "Lightedge",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Operator listed colocation service. County level map context. Technical performance and whole campus delivery remain unverified.",
      "date": "",
      "events": [
        [
          "2026-10-24",
          "Added to the atlas. Admission date, not an opening or construction milestone."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://lightedge.com/data-centers/kansas-city-data-center/",
          "host": "lightedge.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Operator facility listing"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=9050+NE+Underground+Drive%2C+Kansas+City%2C+MO+64161&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Census county context only"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=9050+NE+Underground+Drive%2C+Pillar+312%2C+Kansas+City%2C+MO+64161&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal computing street query, interpolated reference only"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-94.47933980305116%2C39.153528288537544%2C-94.46659619694883%2C39.16340971146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -94.472968,
        "lat": 39.158469,
        "precision": "approximate",
        "basis": "Original operator reported street 9050 NE Underground Drive, Pillar 312, Kansas City, MO 64161 matched through the complete literal Census query. The retained original operator version explicitly names this computing facility and complete street. The later direct request returned HTTP 403, preserved separately. No fresh successful retrieval is claimed. Calculated street reference only, never a tenant floor, suite, present operation or roof. The operator explicitly describes an underground facility. Pillar 312 is retained literally. Any street interpolation is an approximate surface access context only and cannot locate the underground room, pillar or extent. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Approximate component street context, not a building or complete campus",
      "summary": "Kansas City operator listing. County level map context.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 5 discovery cohort 1",
          "scope": "Lightedge currently lists colocation service at the named facility and published address. Operator reported service context checked October 24, 2026. Whole campus completion, occupancy, measured performance and opening day remain unverified.",
          "fields": {
            "operator_reported_service": {
              "provider": "Lightedge",
              "name": "Lightedge Kansas City",
              "address": "9050 NE Underground Drive, Kansas City, MO 64161",
              "scope": "Lightedge currently lists colocation service at the named facility and published address. Operator reported service context checked October 24, 2026. Whole campus completion, occupancy, measured performance and opening day remain unverified."
            },
            "county_association": {
              "county": "Clay",
              "county_fips": "29047",
              "scope": "Census matched 9050 NE UNDERGROUND DR, KANSAS CITY, MO, 64161. Only county context is adopted. No point, parcel, roof, street spelling, ZIP correction or legal municipality is adopted."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-24",
              "scope": "Atlas admission date only. Not publication, opening or construction."
            }
          },
          "notes": [
            "Census matched 9050 NE UNDERGROUND DR, KANSAS CITY, MO, 64161. Only county context is adopted. No point, parcel, roof, street spelling, ZIP correction or legal municipality is adopted.",
            "Publication date is unknown. Advertised capacity, area, uptime and security claims are excluded."
          ],
          "sources": [
            {
              "url": "https://lightedge.com/data-centers/kansas-city-data-center/",
              "host": "lightedge.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Operator facility listing"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=9050+NE+Underground+Drive%2C+Kansas+City%2C+MO+64161&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Census county context only"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 75, 2026-10-24",
          "scope": "The retained original operator version explicitly names this computing facility and complete street. The later direct request returned HTTP 403, preserved separately. No fresh successful retrieval is claimed. Calculated street reference only, never a tenant floor, suite, present operation or roof. The operator explicitly describes an underground facility. Pillar 312 is retained literally. Any street interpolation is an approximate surface access context only and cannot locate the underground room, pillar or extent. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -94.472968,
                "lat": 39.158469,
                "precision": "approximate",
                "basis": "Original operator reported street 9050 NE Underground Drive, Pillar 312, Kansas City, MO 64161 matched through the complete literal Census query. The retained original operator version explicitly names this computing facility and complete street. The later direct request returned HTTP 403, preserved separately. No fresh successful retrieval is claimed. Calculated street reference only, never a tenant floor, suite, present operation or roof. The operator explicitly describes an underground facility. Pillar 312 is retained literally. Any street interpolation is an approximate surface access context only and cannot locate the underground room, pillar or extent. No roof, tenant floor, title, present operation or complete campus is certified. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "9050 NE Underground Drive, Pillar 312, Kansas City, MO 64161",
              "county_fips": [
                "29047"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The retained original operator version explicitly names this computing facility and complete street. The later direct request returned HTTP 403, preserved separately. No fresh successful retrieval is claimed. Calculated street reference only, never a tenant floor, suite, present operation or roof. The operator explicitly describes an underground facility. Pillar 312 is retained literally. Any street interpolation is an approximate surface access context only and cannot locate the underground room, pillar or extent. All inherited discovery facts, exact source history, county wrappers, quantities, roles and physical stages remain unchanged. Unresolved legacy identity and physical site counting eligibility remain unchanged.",
            "The original Native location is null, so a prior point offset cannot be calculated and remains unknown. This source review supplies the first independently qualified location reference for this existing record. The retained original operator version explicitly names this computing facility and complete street. The later direct request returned HTTP 403, preserved separately. No fresh successful retrieval is claimed. Calculated street reference only, never a tenant floor, suite, present operation or roof. The operator explicitly describes an underground facility. Pillar 312 is retained literally. Any street interpolation is an approximate surface access context only and cannot locate the underground room, pillar or extent. The complete literal Census input and independently calculated reference agree with the unchanged retained county 29047. This is no claim of physical relocation.",
            "Wooded and partly cleared hillside, roads, vehicle storage and surface industrial buildings occupy the frame. No underground room, pillar or extent is visible or selected. Source setting only. Acquisition date is unknown and may predate construction. No pixel supplies coordinates, a computing roof, current stage, room, suite, ownership or full campus boundary."
          ],
          "sources": [
            {
              "url": "https://lightedge.com/data-centers/kansas-city-data-center/",
              "host": "lightedge.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original operator named computing street, source scope retained"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=9050+NE+Underground+Drive%2C+Pillar+312%2C+Kansas+City%2C+MO+64161&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal computing street query, interpolated reference only"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-94.47933980305116%2C39.153528288537544%2C-94.46659619694883%2C39.16340971146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "raw_status": "partly operating",
      "status_field": "current_status",
      "status_scope": "Lightedge currently lists colocation service at the named facility and published address. Operator reported service context checked October 24, 2026. Whole campus completion, occupancy, measured performance and opening day remain unverified."
    },
    {
      "id": "missouri-state-telecommunications-center-springfield-mo",
      "state": "mo",
      "kind": "facility",
      "name": "Missouri State University Telecommunications Center Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "crypto": false,
      "type": "Data center research context",
      "counties": [
        "Greene"
      ],
      "city": "Springfield",
      "address": "",
      "who": "Missouri State University",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
      "date": "",
      "events": [
        [
          "2026-10-26",
          "Added to the atlas. Compilation date only, not opening or construction."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://design.missouristate.edu/_Files/PlansAvailableForReview/25-017/25-017SchematicDesignNarrative.pdf",
          "host": "design.missouristate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://ntg.missouristate.edu/contacts/NTGDirections.aspx",
          "host": "ntg.missouristate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://map.missouristate.edu/location.aspx?id=7",
          "host": "map.missouristate.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1001+E+Madison+Street+Springfield+MO&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ],
      "loc": {
        "lat": 37.25803,
        "lng": -93.34196,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Springfield sourced data center research context. County level only.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 3 inherited discovery review 17",
          "scope": "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
          "fields": {
            "source_context": {
              "name": "Missouri State University Telecommunications Center Data Center",
              "operator": "Missouri State University",
              "scope": "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
              "address": "",
              "exact_street_unpublished": true
            },
            "county_association": {
              "county": "Greene",
              "county_fips": "29077",
              "scope": "Independent retained jurisdiction evidence supports county level placement. No exact data center street or point is adopted."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-26",
              "scope": "Intended compilation day only. Must equal actual admission day before Native commit; never a physical milestone."
            }
          },
          "notes": [
            "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
            "Historical schedules, permits, funding and announcements do not establish current operation."
          ],
          "sources": [
            {
              "url": "https://design.missouristate.edu/_Files/PlansAvailableForReview/25-017/25-017SchematicDesignNarrative.pdf",
              "host": "design.missouristate.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            },
            {
              "url": "https://ntg.missouristate.edu/contacts/NTGDirections.aspx",
              "host": "ntg.missouristate.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            },
            {
              "url": "https://map.missouristate.edu/location.aspx?id=7",
              "host": "map.missouristate.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1001+E+Madison+Street+Springfield+MO&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            }
          ],
          "checked": "2026-10-26",
          "whole_record_certified": false
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "29077"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
