{
  "schema_version": 1,
  "source_compilation_context": {
    "mt": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/mt.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "mt",
    "label": "Montana"
  },
  "records": [
    {
      "id": "atlas-power-butte-mt",
      "state": "mt",
      "kind": "facility",
      "name": "Atlas Power Butte Data Center",
      "group": "operating",
      "status": "Provider reported existing hosting",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Silver Bow"
      ],
      "city": "Butte",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Encoded premium body not decoded. Requested damages are not awarded damages, site capex, operating failure or current court result. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-12-19",
          "NorthWestern Energy original December 19, 2024 announcement describes existing Atlas Butte transmission service and forecasts additional energy supply beginning in 2026. This dates the announcement without certifying accomplished delivery, expansion or computing commissioning."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://mtstandard.com/news/local/atlas-power-suing-equipment-supplier-for-over-11m/article_f9ab550f-1329-5f14-988a-067f974b46a8.html",
          "host": "mtstandard.com",
          "date": "2023-01-17",
          "published": "2023-01-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://atlaspower.io/",
          "host": "atlaspower.io",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://northwesternenergy.com/about-us/our-company/2024/12/19/northwestern-energy-to-supply-power-for-butte-montana-data-center-atlas-power-group",
          "host": "northwesternenergy.com",
          "published": "2024-12-19",
          "date": "2024-12-19",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 45.90267,
        "lng": -112.65668,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Readable Montana Standard preview reports Atlas Butte equipment-supplier suit filed December 27, 2022.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Encoded premium body not decoded. Requested damages are not awarded damages, site capex, operating failure or current court result.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://mtstandard.com/news/local/atlas-power-suing-equipment-supplier-for-over-11m/article_f9ab550f-1329-5f14-988a-067f974b46a8.html",
              "host": "mtstandard.com",
              "date": "2023-01-17",
              "published": "2023-01-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 70",
          "scope": "The original current Atlas body describes operating flexible hosting facilities in Montana, North Dakota and Kentucky. The original utility release specifically identifies the flagship Butte facility, existing transmission service and a direct Atlas statement about continued expansion of its facility. Together these support provider reported existing hosting. The separate forecast for additional energy supply beginning in 2026 is not proof that the forecast delivery or expansion occurred. Generic placeholder text in the provider page is not evidence. Aggregate infrastructure capacity, grid benefits, GPU availability and exact first opening remain unverified and are not exported.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "provider_reported_existing_butte_hosting",
              "scope": "The original current Atlas body describes operating flexible hosting facilities in Montana, North Dakota and Kentucky. The original utility release specifically identifies the flagship Butte facility, existing transmission service and a direct Atlas statement about continued expansion of its facility. Together these support provider reported existing hosting. The separate forecast for additional energy supply beginning in 2026 is not proof that the forecast delivery or expansion occurred. Generic placeholder text in the provider page is not evidence. Aggregate infrastructure capacity, grid benefits, GPU availability and exact first opening remain unverified and are not exported."
            },
            "source_read_scope": {
              "complete_current_original_provider_body_read": true,
              "complete_original_utility_release_body_read": true,
              "future_supply_not_accomplished_operation": true,
              "placeholder_marketing_not_evidence": true,
              "no_capacity_or_grid_benefit_certification": true
            }
          },
          "notes": [
            "The original current Atlas body describes operating flexible hosting facilities in Montana, North Dakota and Kentucky. The original utility release specifically identifies the flagship Butte facility, existing transmission service and a direct Atlas statement about continued expansion of its facility. Together these support provider reported existing hosting. The separate forecast for additional energy supply beginning in 2026 is not proof that the forecast delivery or expansion occurred. Generic placeholder text in the provider page is not evidence. Aggregate infrastructure capacity, grid benefits, GPU availability and exact first opening remain unverified and are not exported.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://atlaspower.io/",
              "host": "atlaspower.io",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://northwesternenergy.com/about-us/our-company/2024/12/19/northwestern-energy-to-supply-power-for-butte-montana-data-center-atlas-power-group",
              "host": "northwesternenergy.com",
              "published": "2024-12-19",
              "date": "2024-12-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Butte · Silver Bow · Source context reviewed",
      "status_scope": "The original current Atlas body describes operating flexible hosting facilities in Montana, North Dakota and Kentucky. The original utility release specifically identifies the flagship Butte facility, existing transmission service and a direct Atlas statement about continued expansion of its facility. Together these support provider reported existing hosting. The separate forecast for additional energy supply beginning in 2026 is not proof that the forecast delivery or expansion occurred. Generic placeholder text in the provider page is not evidence. Aggregate infrastructure capacity, grid benefits, GPU availability and exact first opening remain unverified and are not exported.",
      "event_evidence": [
        {
          "date": "2024-12-19",
          "text": "NorthWestern Energy original December 19, 2024 announcement describes existing Atlas Butte transmission service and forecasts additional energy supply beginning in 2026. This dates the announcement without certifying accomplished delivery, expansion or computing commissioning.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://northwesternenergy.com/about-us/our-company/2024/12/19/northwestern-energy-to-supply-power-for-butte-montana-data-center-atlas-power-group",
              "host": "northwesternenergy.com",
              "published": "2024-12-19",
              "date": "2024-12-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "30093"
      }
    },
    {
      "id": "big-horn-data-hub-hardin-mt",
      "state": "mt",
      "kind": "facility",
      "name": "Big Horn Data Hub (Hardin Generating Station)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Big Horn"
      ],
      "city": "Hardin",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Attachment title alone is insufficient to verify exactsite, operator, land, status, MWorwater. No manual exact-site credit or operating certification. Parent article is a separate public follow-up lead; listedfutureMEICevents are not data center project milestones. No inference from sitecopyright, social links or image label. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Historical named-site context only; photo date and current operating status unknown.. NorthWestern400MWportfolio offer,750average-MW/year wording andHB424proposed85percentHardinGENERATIONtaxcut are not BigHorncriticalIT or an awarded data-center subsidy. Legislative and ratepayer allegations are not court or tariff findings.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://meic.org/is-northwestern-hoodwinking-customers-as-it-lures-data-centers-into-the-state/big-horn-data-hardin/",
          "host": "meic.org",
          "date": "2025-04-14",
          "published": "2025-04-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://meic.org/is-northwestern-hoodwinking-customers-as-it-lures-data-centers-into-the-state/",
          "host": "meic.org",
          "date": "2025-03-30",
          "published": "2025-03-30",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 45.42331,
        "lng": -107.48945,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.",
          "fields": {},
          "notes": [
            "Attachment title alone is insufficient to verify exactsite, operator, land, status, MWorwater. No manual exact-site credit or operating certification. Parent article is a separate public follow-up lead; listedfutureMEICevents are not data center project milestones. No inference from sitecopyright, social links or image label.",
            "Later originals and observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://meic.org/is-northwestern-hoodwinking-customers-as-it-lures-data-centers-into-the-state/big-horn-data-hardin/",
              "host": "meic.org",
              "date": "2025-04-14",
              "published": "2025-04-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round34-2026-10-14.json",
          "scope": "Historical named-site context only; photo date and current operating status unknown.",
          "fields": {
            "historical_caption_context": "MEIC parent article dated March30,2025 describes Big Horn Data Hub as crypto mining relying on adjacent Hardin coal generation",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "NorthWestern400MWportfolio offer,750average-MW/year wording andHB424proposed85percentHardinGENERATIONtaxcut are not BigHorncriticalIT or an awarded data-center subsidy. Legislative and ratepayer allegations are not court or tariff findings.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://meic.org/is-northwestern-hoodwinking-customers-as-it-lures-data-centers-into-the-state/",
              "host": "meic.org",
              "date": "2025-03-30",
              "published": "2025-03-30",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hardin · Big Horn · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "30003"
      }
    },
    {
      "id": "quantica-bsdi-billings-mt",
      "state": "mt",
      "kind": "facility",
      "name": "Big Sky Digital Infrastructure Campus",
      "group": "proposed",
      "status": "Operator-listed plan",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Yellowstone"
      ],
      "city": "Billings",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Quantica undisclosed laborMOU and divergent power horizons. MOU text not supplied to reporter, no guaranteedjobcount/unionfraction adopted. Laborframework not signed constructionpermit, interconnection or financingclose.1.1GWnearand7GWpossiblelongterm not8.1GWcurrent. ExactBillingsmunicipal/parcelmatchnotproven; report locates outsideBroadview30milesnorth. Publicenvironmentalconcerns not actualharmfindings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-10-29",
          "Scheduled event: Montana DEQ lists October 29, 2026 as the public-comment deadline for the proposed Big Sky Campus well and associated environmental review. This is not a hearing, an approval or proof of construction."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://montanafreepress.org/2026/06/17/agreement-between-data-center-developer-and-union-federation-thin-on-details/",
          "host": "montanafreepress.org",
          "date": "2026-06-17",
          "published": "2026-06-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://bigskydigitalinfra.com/",
          "host": "bigskydigitalinfra.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        },
        {
          "url": "https://deq.mt.gov/News/pressrelease-folder/Big-Sky-Campus-well-09-29-2026",
          "host": "deq.mt.gov",
          "published": "2026-09-29",
          "date": "2026-09-29",
          "checked": "2026-10-16",
          "label": "Reviewed government evidence"
        }
      ],
      "loc": {
        "lat": 45.97264,
        "lng": -108.31248,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Quantica undisclosed laborMOU and divergent power horizons",
          "fields": {
            "developer": "Quantica Infrastructure",
            "project": "BigSkyCampus nearBroadview, Montana",
            "reported_planned_site_acres_approx": 5000,
            "reported_buildings_range": [
              12,
              16
            ],
            "reported_each_building_sqft_range": [
              200000,
              300000
            ],
            "near_term_expected_power_mw": 1100,
            "longterm_possible_power_mw": 7000,
            "power_basis": "developer expected/potential power, not explicit critical IT or energized",
            "reported_agreement_type": "MOUwithSoutheasternMontanaBuildingandConstructionTradesCouncil",
            "source_update_date": "2026-06-18"
          },
          "notes": [
            "MOU text not supplied to reporter, no guaranteedjobcount/unionfraction adopted. Laborframework not signed constructionpermit, interconnection or financingclose.1.1GWnearand7GWpossiblelongterm not8.1GWcurrent. ExactBillingsmunicipal/parcelmatchnotproven; report locates outsideBroadview30milesnorth. Publicenvironmentalconcerns not actualharmfindings.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://montanafreepress.org/2026/06/17/agreement-between-data-center-developer-and-union-federation-thin-on-details/",
              "host": "montanafreepress.org",
              "date": "2026-06-17",
              "published": "2026-06-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed plan",
              "basis": "The current Big Sky developer page lists first-phase construction as planned in 2026. Montana DEQ’s September 29, 2026 notice describes a proposed well and public comment through October 29.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "A planned construction year and pending well review do not establish physical construction, approved water use or operation. The Broadview office footer address is not promoted to the campus. Water forecasts and power horizons remain separate from actual use."
          },
          "notes": [
            "A planned construction year and pending well review do not establish physical construction, approved water use or operation. The Broadview office footer address is not promoted to the campus. Water forecasts and power horizons remain separate from actual use.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://bigskydigitalinfra.com/",
              "host": "bigskydigitalinfra.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            },
            {
              "url": "https://deq.mt.gov/News/pressrelease-folder/Big-Sky-Campus-well-09-29-2026",
              "host": "deq.mt.gov",
              "published": "2026-09-29",
              "date": "2026-09-29",
              "checked": "2026-10-16",
              "label": "Reviewed government evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Billings · Yellowstone · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current Big Sky developer page lists first-phase construction as planned in 2026. Montana DEQ’s September 29, 2026 notice describes a proposed well and public comment through October 29. A planned construction year and pending well review do not establish physical construction, approved water use or operation. The Broadview office footer address is not promoted to the campus. Water forecasts and power horizons remain separate from actual use.",
      "event_evidence": [
        {
          "date": "2026-10-29",
          "text": "Scheduled event: Montana DEQ lists October 29, 2026 as the public-comment deadline for the proposed Big Sky Campus well and associated environmental review. This is not a hearing, an approval or proof of construction.",
          "kind": "scheduled_event",
          "sources": [
            {
              "url": "https://deq.mt.gov/News/pressrelease-folder/Big-Sky-Campus-well-09-29-2026",
              "host": "deq.mt.gov",
              "published": "2026-09-29",
              "date": "2026-09-29",
              "checked": "2026-10-16",
              "label": "Reviewed government evidence"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "30111"
      }
    },
    {
      "id": "bitzero-polson-lake-county-mt",
      "state": "mt",
      "kind": "facility",
      "name": "Bitzero Polson Data Center (SKQ/Salish-Kootenai Dam)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Lake"
      ],
      "city": "Polson",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Planned fifty MW mine is distinct from dam generation and North Dakota investment. No commissioning, secured allocation, current renewable delivery or later cancellation established. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2022-06-02",
          "The Montana Governor original June 2, 2022 release announces proposed Polson computing investment. This is an announcement date without proof that construction or computing service subsequently began."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.tradeandindustrydev.com/region/montana/news/mt-bitcoin-mining-company-announces-plans-50-30698",
          "host": "tradeandindustrydev.com",
          "date": "2022-08-08",
          "published": "2022-08-08",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://news.mt.gov/Governors-Office/Gov_Gianforte_Celebrates_Announcement_of_New_Investment_in_Data_Center_Montana_Jobs",
          "host": "news.mt.gov",
          "published": "2022-06-02",
          "date": "2022-06-02",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 47.64591,
        "lng": -114.0893,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Trade and Industry Development reports Bitzero Polson proposal announced with tribal/state officials.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Planned fifty MW mine is distinct from dam generation and North Dakota investment. No commissioning, secured allocation, current renewable delivery or later cancellation established.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tradeandindustrydev.com/region/montana/news/mt-bitcoin-mining-company-announces-plans-50-30698",
              "host": "tradeandindustrydev.com",
              "date": "2022-08-08",
              "published": "2022-08-08",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 70",
          "scope": "The complete original Governor body dated June 2, 2022 announces investment to build a future computing facility in Polson. It does not independently establish current construction, delivered power, actual computing service, project abandonment or an exact first opening. Historical planned capacity and hydropower descriptions are not present measured facts. Exact current physical stage remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_state_polson_announcement_current_stage_held",
              "scope": "The complete original Governor body dated June 2, 2022 announces investment to build a future computing facility in Polson. It does not independently establish current construction, delivered power, actual computing service, project abandonment or an exact first opening. Historical planned capacity and hydropower descriptions are not present measured facts. Exact current physical stage remains held."
            },
            "source_read_scope": {
              "complete_original_governor_release_body_read": true,
              "historical_proposal_not_current_construction_or_operation": true
            }
          },
          "notes": [
            "The complete original Governor body dated June 2, 2022 announces investment to build a future computing facility in Polson. It does not independently establish current construction, delivered power, actual computing service, project abandonment or an exact first opening. Historical planned capacity and hydropower descriptions are not present measured facts. Exact current physical stage remains held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://news.mt.gov/Governors-Office/Gov_Gianforte_Celebrates_Announcement_of_New_Investment_in_Data_Center_Montana_Jobs",
              "host": "news.mt.gov",
              "published": "2022-06-02",
              "date": "2022-06-02",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Polson · Lake · Source context reviewed",
      "event_evidence": [
        {
          "date": "2022-06-02",
          "text": "The Montana Governor original June 2, 2022 release announces proposed Polson computing investment. This is an announcement date without proof that construction or computing service subsequently began.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://news.mt.gov/Governors-Office/Gov_Gianforte_Celebrates_Announcement_of_New_Investment_in_Data_Center_Montana_Jobs",
              "host": "news.mt.gov",
              "published": "2022-06-02",
              "date": "2022-06-02",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "30047"
      }
    },
    {
      "id": "cogent-billings-data-center-billings-mt",
      "state": "mt",
      "kind": "facility",
      "name": "Cogent Billings Data Center",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Yellowstone"
      ],
      "city": "Billings",
      "address": "",
      "who": "Cogent Communications",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Three unlabelled area blocks need brochure mapping; no numerical IT load published. Operator regional page explicitly names Billings and separately Missoulaedge. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.cogentco.com/en/cogent-great-plains",
          "host": "cogentco.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.cogentco.com/en/network/service-locations?action=search&continent=&country=United+States&metro=&site_type=CDC&state=",
          "host": "www.cogentco.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact named facility CDC row, separate from network presence"
        },
        {
          "url": "https://www.cogentco.com/en/network/cogent-data-centers",
          "host": "www.cogentco.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Provider explanation of Cogent data center and colocation relationships"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3025+Hesper+Road%2C+Billings%2C+MT+59102&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete unique literal published street range, exact raw version retained"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-108.5995443338468%2C45.735795288537545%2C-108.58538566615321%2C45.74567671146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -108.592465,
        "lat": 45.740736,
        "precision": "address",
        "basis": "The original operator computing property source identifies 3025 Hesper Road, Billings, MT 59102. One complete unique literal Census street range supports this calculated reference inside the retained county. This street reference selects no roof, tenant floor, surveyed parcel or complete campus. Original source publication dates remain unknown. Source dates and a sale offering do not establish current operation, a completed transfer or present operator identity. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "street": "3025 Hesper Road",
            "city": "Billings",
            "marketed_service": "data center"
          },
          "notes": [
            "Three unlabelled area blocks need brochure mapping; no numerical IT load published.",
            "Operator regional page explicitly names Billings and separately Missoulaedge.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.cogentco.com/en/cogent-great-plains",
              "host": "cogentco.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 28, October 23, 2026",
          "scope": "Cogent lists the named retained facility in its own CDC provider listing. Operator per source records its provider brand relationship, not legal property title, sole operation of a shared building or a separate legal entity. The source separates its data centers from other network connected buildings. No new physical site, identity merger, stage, opening date, street, county, coordinate, capacity or certification finding is adopted. Source publication dates remain unknown. Advertised service features are not independently measured outcomes.",
          "fields": {
            "company_association": {
              "name": "Cogent Communications",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Cogent lists the named retained facility in its own CDC provider listing. Operator per source records its provider brand relationship, not legal property title, sole operation of a shared building or a separate legal entity. The source separates its data centers from other network connected buildings. No new physical site, identity merger, stage, opening date, street, county, coordinate, capacity or certification finding is adopted. Source publication dates remain unknown. Advertised service features are not independently measured outcomes."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Cogent lists the named retained facility in its own CDC provider listing. Operator per source records its provider brand relationship, not legal property title, sole operation of a shared building or a separate legal entity. The source separates its data centers from other network connected buildings. No new physical site, identity merger, stage, opening date, street, county, coordinate, capacity or certification finding is adopted. Source publication dates remain unknown. Advertised service features are not independently measured outcomes."
          ],
          "sources": [
            {
              "url": "https://www.cogentco.com/en/cogent-great-plains",
              "host": "www.cogentco.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Named facility section and separate service street context"
            },
            {
              "url": "https://www.cogentco.com/en/network/service-locations?action=search&continent=&country=United+States&metro=&site_type=CDC&state=",
              "host": "www.cogentco.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact named facility CDC row, separate from network presence"
            },
            {
              "url": "https://www.cogentco.com/en/network/cogent-data-centers",
              "host": "www.cogentco.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Provider explanation of Cogent data center and colocation relationships"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 70",
          "scope": "The original current Cogent owned facility roster explicitly describes present colocation service and names Billings. Its original Great Plains roster and current service locator identify the exact inherited premise. This supports operator listed colocation service. A property sale or lease offering is not a completed ownership transfer, and the Cheyenne brochure is not a commissioned load certification. Neither site is marked for utility computing in the current roster, so no specific AI service, high density capacity, technical quantity or first opening day is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_cogent_exact_premise_colocation",
              "scope": "The original current Cogent owned facility roster explicitly describes present colocation service and names Billings. Its original Great Plains roster and current service locator identify the exact inherited premise. This supports operator listed colocation service. A property sale or lease offering is not a completed ownership transfer, and the Cheyenne brochure is not a commissioned load certification. Neither site is marked for utility computing in the current roster, so no specific AI service, high density capacity, technical quantity or first opening day is inferred."
            },
            "source_read_scope": {
              "complete_original_current_owned_facility_roster_read": true,
              "original_current_great_plains_full_body_read": true,
              "original_service_locator_relevant_page_read": true,
              "cheyenne_seven_page_brochure_extracted_text_read": false,
              "brochure_photographs_not_used_for_status": true,
              "offering_not_completed_property_transfer": true,
              "no_utility_computing_or_capacity_inferred": true
            }
          },
          "notes": [
            "The original current Cogent owned facility roster explicitly describes present colocation service and names Billings. Its original Great Plains roster and current service locator identify the exact inherited premise. This supports operator listed colocation service. A property sale or lease offering is not a completed ownership transfer, and the Cheyenne brochure is not a commissioned load certification. Neither site is marked for utility computing in the current roster, so no specific AI service, high density capacity, technical quantity or first opening day is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.cogentco.com/en/cogent-great-plains",
              "host": "www.cogentco.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.cogentco.com/en/network/cogent-data-centers",
              "host": "www.cogentco.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.cogentco.com/en/network/service-locations?action=search&continent=&country=United+States&metro=&site_type=CDC&state=",
              "host": "www.cogentco.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 66, 2026-10-24",
          "scope": "Original named operator computing street and calculated literal Census range only. Current operator identity, physical stage, title, source dates, quantities, a roof and complete campus remain independently unresolved unless separately sourced. Every other field and attribute stays exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -108.592465,
                "lat": 45.740736,
                "precision": "address",
                "basis": "The original operator computing property source identifies 3025 Hesper Road, Billings, MT 59102. One complete unique literal Census street range supports this calculated reference inside the retained county. This street reference selects no roof, tenant floor, surveyed parcel or complete campus. Original source publication dates remain unknown. Source dates and a sale offering do not establish current operation, a completed transfer or present operator identity. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "3025 Hesper Road, Billings, MT 59102",
              "county_fips": [
                "30111"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Original named operator computing street and calculated literal Census range only. Current operator identity, physical stage, title, source dates, quantities, a roof and complete campus remain independently unresolved unless separately sourced. Every other field and attribute stays exact.",
            "The inherited general area point was not an independently reviewed computing street reference. The original operator computing heading or brochure and one complete unique literal Census street range support this calculated reference inside the retained county. The measured inherited correction is 46.3 metres. Original source wording and versions, all prior source clocks and every protected field remain intact. This is a documentation correction and does not establish a physical relocation, roof, tenant floor, current operation, legal title or complete campus.",
            "Original Billings Data Center heading is distinct from Cheyenne, Omaha and other listed markets.",
            "Commercial and industrial lots and parking beside a divided highway, with residential blocks nearby. No physical operating state is inferred."
          ],
          "sources": [
            {
              "url": "https://www.cogentco.com/en/cogent-great-plains",
              "host": "www.cogentco.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original named computing property street, exact original response version"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=3025+Hesper+Road%2C+Billings%2C+MT+59102&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete unique literal published street range, exact raw version retained"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-108.5995443338468%2C45.735795288537545%2C-108.58538566615321%2C45.74567671146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated street reference, not a roof or tenant floor",
      "summary": "Billings · Yellowstone · Source context reviewed",
      "status_scope": "The original current Cogent owned facility roster explicitly describes present colocation service and names Billings. Its original Great Plains roster and current service locator identify the exact inherited premise. This supports operator listed colocation service. A property sale or lease offering is not a completed ownership transfer, and the Cheyenne brochure is not a commissioned load certification. Neither site is marked for utility computing in the current roster, so no specific AI service, high density capacity, technical quantity or first opening day is inferred."
    },
    {
      "id": "krambu-bonner-mill-data-center-bonner-mt",
      "state": "mt",
      "kind": "facility",
      "name": "Krambu Bonner Data Center (former UFP Edge building, Bonner Mill Industrial Park)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Missoula"
      ],
      "city": "Bonner",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bonner divergent scale claims and conditional opening forecast. Juneopening conditional forecast, not observed outcome.1/3/10/100MWdifferent statements not additive or canonicalcurrentload.240Kwholeoldbuilding not occupiedwhitefloor.500gallonsperMWhas no explicit recurringtimebasis; do not labelgallonsperday. Closedloopnotzerowater/noisefinding. EarlierHyperblockoperation separateoperator and historicalbankruptcy notKrambuclosure. No actual issuedpermit or clientlease. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-06-01",
          "The original Missoula County Bonner project timeline identifies June 1, 2026 as submission of the fifth special exception application and states that it was deemed incomplete. This application history is separate from the undated later withdrawal update and does not establish approval or operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://missoulacurrent.com/krambu-data-center/",
          "host": "missoulacurrent.com",
          "date": "2026-03-23",
          "published": "2026-03-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://missoulacountyvoice.com/bonner-data-center",
          "host": "missoulacountyvoice.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 47.03646,
        "lng": -113.92341,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Bonner divergent scale claims and conditional opening forecast",
          "fields": {
            "company": "Krambu",
            "site": "former BonnerMill planerbuilding, Bonner, MissoulaCounty, Montana",
            "reported_existing_industrial_building_sqft_approx": 240000,
            "stage_asofreport": "due diligence, no final countyapplication or client confirmed",
            "developer_initial_phase_possible_mw": 1,
            "engineer_described_initial_request_mw": 3,
            "planner_described_preliminary_application_mw": 10,
            "developer_longterm_vision_mw": 100,
            "power_basis": "conflicting proposal/request horizons, none established criticalIT or operating",
            "suggested_initial_operation_target_month": "2026-06",
            "reported_review_meeting_date": "2026-05-06"
          },
          "notes": [
            "Juneopening conditional forecast, not observed outcome.1/3/10/100MWdifferent statements not additive or canonicalcurrentload.240Kwholeoldbuilding not occupiedwhitefloor.500gallonsperMWhas no explicit recurringtimebasis; do not labelgallonsperday. Closedloopnotzerowater/noisefinding. EarlierHyperblockoperation separateoperator and historicalbankruptcy notKrambuclosure. No actual issuedpermit or clientlease.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://missoulacurrent.com/krambu-data-center/",
              "host": "missoulacurrent.com",
              "date": "2026-03-23",
              "published": "2026-03-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 70",
          "scope": "The original County project update publishes the property owner statement withdrawing his signature from the Krambu special exception application and states that the project will not move forward. The exact update and withdrawal days are not independently printed in the selected body. The same page retains the earlier fifth application as incomplete and says the expected hearing is postponed until further notice. The latest withdrawal account is distinguished from that earlier application history. This is a proposed project outcome rather than physical closure of an operating facility, a general computing ban or a new future hearing. The property owner is not relabeled as the computing operator.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_reported_proposal_withdrawal_exact_day_held",
              "scope": "The original County project update publishes the property owner statement withdrawing his signature from the Krambu special exception application and states that the project will not move forward. The exact update and withdrawal days are not independently printed in the selected body. The same page retains the earlier fifth application as incomplete and says the expected hearing is postponed until further notice. The latest withdrawal account is distinguished from that earlier application history. This is a proposed project outcome rather than physical closure of an operating facility, a general computing ban or a new future hearing. The property owner is not relabeled as the computing operator."
            },
            "source_read_scope": {
              "original_county_project_update_overview_review_criteria_and_timeline_read": true,
              "selected_original_public_comments_read": true,
              "complete_comment_history_not_reviewed": true,
              "comments_relative_timestamps_not_exact_dates": true,
              "owner_signature_withdrawal_not_operator_response": true,
              "hearing_postponed_no_new_date": true,
              "no_measured_harm_or_physical_closure_inferred": true
            }
          },
          "notes": [
            "The original County project update publishes the property owner statement withdrawing his signature from the Krambu special exception application and states that the project will not move forward. The exact update and withdrawal days are not independently printed in the selected body. The same page retains the earlier fifth application as incomplete and says the expected hearing is postponed until further notice. The latest withdrawal account is distinguished from that earlier application history. This is a proposed project outcome rather than physical closure of an operating facility, a general computing ban or a new future hearing. The property owner is not relabeled as the computing operator.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://missoulacountyvoice.com/bonner-data-center",
              "host": "missoulacountyvoice.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Bonner · Missoula · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-06-01",
          "text": "The original Missoula County Bonner project timeline identifies June 1, 2026 as submission of the fifth special exception application and states that it was deemed incomplete. This application history is separate from the undated later withdrawal update and does not establish approval or operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://missoulacountyvoice.com/bonner-data-center",
              "host": "missoulacountyvoice.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "30063"
      }
    },
    {
      "id": "nydig-dfm-kraken-richland-mt",
      "state": "mt",
      "kind": "facility",
      "name": "NYDIG DFM Kraken Central Site",
      "group": "operating",
      "status": "Agency reported existing operations",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Richland"
      ],
      "city": "Sidney vicinity (unincorporated)",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. final Montana air permit identity, point and equipment scope. Final effective air permit is established, but engine horsepower is not critical IT MW and does not prove current workload or site opening. VOC limit change is a permitted standard, not a measured emissions exceedance. New York mailing office is not the Montana facility. Source prints both minus sign and W for longitude; retained ordinary western signed coordinate without a second inversion. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-11-15",
          "The original DEQ cover and permit state that Kraken permit 5262-05 became final and effective on November 15, 2025. This is an administrative permit date rather than a first computing opening or measured compliance finding."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5262-05.pdf",
          "host": "deq.mt.gov",
          "date": "2025-11-17",
          "published": "2025-11-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 47.78791,
        "lng": -104.56146,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "final Montana air permit identity, point and equipment scope",
          "fields": {
            "permittee": "NYDIG DFM LLC",
            "site_name": "Kraken Central Site",
            "air_permit": "MAQP 5262-05",
            "permit_final_effective_date": "2025-11-15",
            "agency_posting_date": "2025-11-17",
            "published_location": "Section 8, Township 25 North, Range 59 East, approximately 15.2 miles northeast of Sidney, Richland County, Montana",
            "agency_published_point": {
              "latitude": 47.934,
              "longitude": -104.137,
              "geo_precision": "agency site reference point, not independently parcel geocoded"
            },
            "permitted_rich_burn_natural_gas_engines_max": 7,
            "permitted_engine_brake_horsepower_each_max": 2500
          },
          "notes": [
            "Final effective air permit is established, but engine horsepower is not critical IT MW and does not prove current workload or site opening. VOC limit change is a permitted standard, not a measured emissions exceedance. New York mailing office is not the Montana facility. Source prints both minus sign and W for longitude; retained ordinary western signed coordinate without a second inversion.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5262-05.pdf",
              "host": "deq.mt.gov",
              "date": "2025-11-17",
              "published": "2025-11-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 70",
          "scope": "The original DEQ process analysis explicitly describes NYDIG operating generators used to power small computing facilities at the named Kraken site. The accompanying assessment refers to existing computing operations. This supports agency reported existing operations at the time of that record. The permit becoming final and effective on November 15, 2025 does not itself establish a first computing opening or certify uninterrupted service today. The November 17 posting day is separate. Emissions limits, allowed equipment and modeled impacts are not measured emissions, installed capacity or current compliance findings.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_explicit_existing_kraken_operations",
              "scope": "The original DEQ process analysis explicitly describes NYDIG operating generators used to power small computing facilities at the named Kraken site. The accompanying assessment refers to existing computing operations. This supports agency reported existing operations at the time of that record. The permit becoming final and effective on November 15, 2025 does not itself establish a first computing opening or certify uninterrupted service today. The November 17 posting day is separate. Emissions limits, allowed equipment and modeled impacts are not measured emissions, installed capacity or current compliance findings."
            },
            "source_read_scope": {
              "original_physical_pages1_2_3_8_23_24_read": true,
              "selected_assessment_existing_operations_text_read": true,
              "complete_49_page_packet_not_claimed": true,
              "explicit_process_description_not_permit_alone": true,
              "no_emissions_capacity_or_location_change": true
            }
          },
          "notes": [
            "The original DEQ process analysis explicitly describes NYDIG operating generators used to power small computing facilities at the named Kraken site. The accompanying assessment refers to existing computing operations. This supports agency reported existing operations at the time of that record. The permit becoming final and effective on November 15, 2025 does not itself establish a first computing opening or certify uninterrupted service today. The November 17 posting day is separate. Emissions limits, allowed equipment and modeled impacts are not measured emissions, installed capacity or current compliance findings.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5262-05.pdf",
              "host": "deq.mt.gov",
              "published": "2025-11-17",
              "date": "2025-11-17",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Sidney vicinity (unincorporated) · Richland · Source context reviewed",
      "status_scope": "The original DEQ process analysis explicitly describes NYDIG operating generators used to power small computing facilities at the named Kraken site. The accompanying assessment refers to existing computing operations. This supports agency reported existing operations at the time of that record. The permit becoming final and effective on November 15, 2025 does not itself establish a first computing opening or certify uninterrupted service today. The November 17 posting day is separate. Emissions limits, allowed equipment and modeled impacts are not measured emissions, installed capacity or current compliance findings.",
      "event_evidence": [
        {
          "date": "2025-11-15",
          "text": "The original DEQ cover and permit state that Kraken permit 5262-05 became final and effective on November 15, 2025. This is an administrative permit date rather than a first computing opening or measured compliance finding.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://deq.mt.gov/files/Air/AirQuality/Documents/ARMpermits/5262-05.pdf",
              "host": "deq.mt.gov",
              "published": "2025-11-17",
              "date": "2025-11-17",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "30083"
      }
    },
    {
      "id": "parsec-data-management-billings-mt",
      "state": "mt",
      "kind": "facility",
      "name": "Parsec Data Management Billings",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Yellowstone"
      ],
      "city": "Billings",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Parsec Billings published operator address. Footeraddressoperatorpublishednotindependentwholebuildingparcelownership. Tier3marketingclaimnotindependentcertificate. BusinessofficeMonFri8to5notdata-centeroperatinghoursoruptime. No numericITMWoropeningday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.parsecdata.com/",
          "host": "parsecdata.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://parsecdata.com/",
          "host": "parsecdata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://parsecdata.com/about-us/",
          "host": "parsecdata.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 45.93766,
        "lng": -108.2743,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Parsec Billings published operator address",
          "fields": {
            "operator": "Parsec Data Management",
            "published_address": "3470 Gabel Road, Billings, Montana59102",
            "advertised_services": [
              "colocation",
              "hosting",
              "cloud",
              "disaster recovery"
            ]
          },
          "notes": [
            "Footeraddressoperatorpublishednotindependentwholebuildingparcelownership. Tier3marketingclaimnotindependentcertificate. BusinessofficeMonFri8to5notdata-centeroperatinghoursoruptime. No numericITMWoropeningday.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.parsecdata.com/",
              "host": "parsecdata.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 70",
          "scope": "The complete original provider about and service bodies identify its commercial computing facility in the Transtech Center campus in Billings and describe present colocation, hosting and managed infrastructure services. This supports operator listed colocation service. Claimed tier, compliance, regional environmental advantages, historical airline lists and performance comparisons are not independently certified current facts. No location, technical quantity, ownership or exact first opening is changed. The expressly observed canonical public redirect was resolved without bypassing an access denial.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_parsec_named_billings_colocation",
              "scope": "The complete original provider about and service bodies identify its commercial computing facility in the Transtech Center campus in Billings and describe present colocation, hosting and managed infrastructure services. This supports operator listed colocation service. Claimed tier, compliance, regional environmental advantages, historical airline lists and performance comparisons are not independently certified current facts. No location, technical quantity, ownership or exact first opening is changed. The expressly observed canonical public redirect was resolved without bypassing an access denial."
            },
            "source_read_scope": {
              "complete_original_current_service_and_about_bodies_read": true,
              "observed_canonical_redirect_not_denied_copy": true,
              "no_current_compliance_or_performance_certification": true,
              "no_contact_or_form_submission": true
            }
          },
          "notes": [
            "The complete original provider about and service bodies identify its commercial computing facility in the Transtech Center campus in Billings and describe present colocation, hosting and managed infrastructure services. This supports operator listed colocation service. Claimed tier, compliance, regional environmental advantages, historical airline lists and performance comparisons are not independently certified current facts. No location, technical quantity, ownership or exact first opening is changed. The expressly observed canonical public redirect was resolved without bypassing an access denial.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://parsecdata.com/",
              "host": "parsecdata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://parsecdata.com/about-us/",
              "host": "parsecdata.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Billings · Yellowstone · Source context reviewed",
      "status_scope": "The complete original provider about and service bodies identify its commercial computing facility in the Transtech Center campus in Billings and describe present colocation, hosting and managed infrastructure services. This supports operator listed colocation service. Claimed tier, compliance, regional environmental advantages, historical airline lists and performance comparisons are not independently certified current facts. No location, technical quantity, ownership or exact first opening is changed. The expressly observed canonical public redirect was resolved without bypassing an access denial.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "30111"
      }
    },
    {
      "id": "tac-project-cardinal-great-falls-mt",
      "state": "mt",
      "kind": "facility",
      "name": "Project Cardinal (TAC Data Centers Great Falls Campus)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cascade"
      ],
      "city": "Great Falls",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. JennRowell TheElectric November18,2025 originalGFDAinterview reports ArdentTACProjectCardinalGreatFallsOFF andlandoptionreleased becausepowertimingdidnotwork. NotProjectFalconmanufacturing orAdmiralBeverageconstruction.1-1.5B/2M sf/569acres/150-200opsjobspastfailedproposalnotactualspend/operations. 500-600MW CRITICAL LOAD requested is explicitlycriticalbasis but POWERNOTSECURED; no energization. TransmissionSTUDYqueue notapprovedinterconnection. Late2027/early2028firstphase/2030fulltargets obsoleteforwithdrawnsite, notlatestfuturecalendar. No originaloptionterminationdocumentorlaterrevivalinspected. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://theelectricgf.com/2025/11/18/proposed-data-center-project-off/",
          "host": "theelectricgf.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 47.30824,
        "lng": -111.34718,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "JennRowell TheElectric November18,2025 originalGFDAinterview reports ArdentTACProjectCardinalGreatFallsOFF andlandoptionreleased becausepowertimingdidnotwork. NotProjectFalconmanufacturing orAdmiralBeverageconstruction.1-1.5B/2M sf/569acres/150-200opsjobspastfailedproposalnotactualspend/operations.",
            "500-600MW CRITICAL LOAD requested is explicitlycriticalbasis but POWERNOTSECURED; no energization. TransmissionSTUDYqueue notapprovedinterconnection. Late2027/early2028firstphase/2030fulltargets obsoleteforwithdrawnsite, notlatestfuturecalendar. No originaloptionterminationdocumentorlaterrevivalinspected.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://theelectricgf.com/2025/11/18/proposed-data-center-project-off/",
              "host": "theelectricgf.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Great Falls · Cascade · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "30013"
      }
    },
    {
      "id": "sabey-butte-mt",
      "state": "mt",
      "kind": "facility",
      "name": "Sabey Data Centers Butte Campus (Montana Connections)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Silver Bow"
      ],
      "city": "Butte",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Automatic excerpt selected unrelated infrastructure article; actual mainstory read in retained body. Headline acquires conflicts with body sale-not-closed: do not mark completed purchase. LOI/optional futurepower not ESA/deliveredIT or300MWsum. Possible second Montana facility is unnamed/unconfirmed, not duplicateoperatingcampus or confirmed governmentcontract. Deadline elapsed does not establish closing, cancellation or extension.35percentutilityhydroportfolio not campus hourlyrenewable share; landprice not buildoutcapex. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-02-11",
          "The original Butte Silver Bow committee page reports that the Council granted Sabey a six month extension on February 11, 2026. This is an extension account without independently read completion, an inferred expiration day or a computing commissioning date."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://bebeez.eu/2025/10/20/sabey-dc-acquires-land-for-data-center-in-butte-montana/",
          "host": "bebeez.eu",
          "date": "2025-10-20",
          "published": "2025-10-20",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.bsbmt.gov/3468/Ad--Hoc-Data-Center-Impact-Committee",
          "host": "www.bsbmt.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 45.92159,
        "lng": -112.67733,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "BeBeez syndicatedDCD main story reports Sabey proposed600acre Butte MontanaConnections acquisition for estimatedUSD1.2million, with council extending unclosed sale deadline fromOctober15toFebruary11,2026. Northwestern nonbindingLOI reportedly50MWstarting2027, optional250plusMWby2029.",
            "independently_verified_current_operating_status": null,
            "land_closing_verified": false,
            "reported_nonbinding_loi_mw": 50,
            "optional_future_total_mw_lower_bound": 250,
            "critical_it_mw": null
          },
          "notes": [
            "Automatic excerpt selected unrelated infrastructure article; actual mainstory read in retained body. Headline acquires conflicts with body sale-not-closed: do not mark completed purchase. LOI/optional futurepower not ESA/deliveredIT or300MWsum. Possible second Montana facility is unnamed/unconfirmed, not duplicateoperatingcampus or confirmed governmentcontract. Deadline elapsed does not establish closing, cancellation or extension.35percentutilityhydroportfolio not campus hourlyrenewable share; landprice not buildoutcapex.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://bebeez.eu/2025/10/20/sabey-dc-acquires-land-for-data-center-in-butte-montana/",
              "host": "bebeez.eu",
              "date": "2025-10-20",
              "published": "2025-10-20",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 70",
          "scope": "The complete original local government committee body identifies a proposed Montana Connections project, reports a six month extension granted to Sabey on February 11, 2026 and says no committee meetings are currently scheduled. An extension and impact study are not an executed land sale, construction or operation. The current physical project outcome and any later withdrawal are not independently established in this source. A private ballot or court account is not adopted as a verified election event or computing ban. No expiration is calculated from the extension.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_committee_proposal_extension_current_outcome_held",
              "scope": "The complete original local government committee body identifies a proposed Montana Connections project, reports a six month extension granted to Sabey on February 11, 2026 and says no committee meetings are currently scheduled. An extension and impact study are not an executed land sale, construction or operation. The current physical project outcome and any later withdrawal are not independently established in this source. A private ballot or court account is not adopted as a verified election event or computing ban. No expiration is calculated from the extension."
            },
            "source_read_scope": {
              "complete_original_committee_body_read": true,
              "no_future_meetings_currently_listed": true,
              "extension_not_executed_sale_or_operation": true,
              "no_private_court_or_ballot_outcome_adopted": true
            }
          },
          "notes": [
            "The complete original local government committee body identifies a proposed Montana Connections project, reports a six month extension granted to Sabey on February 11, 2026 and says no committee meetings are currently scheduled. An extension and impact study are not an executed land sale, construction or operation. The current physical project outcome and any later withdrawal are not independently established in this source. A private ballot or court account is not adopted as a verified election event or computing ban. No expiration is calculated from the extension.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.bsbmt.gov/3468/Ad--Hoc-Data-Center-Impact-Committee",
              "host": "www.bsbmt.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Butte · Silver Bow · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-02-11",
          "text": "The original Butte Silver Bow committee page reports that the Council granted Sabey a six month extension on February 11, 2026. This is an extension account without independently read completion, an inferred expiration day or a computing commissioning date.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.bsbmt.gov/3468/Ad--Hoc-Data-Center-Impact-Committee",
              "host": "www.bsbmt.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "30093"
      }
    },
    {
      "id": "vision-net-billings-central-ave-billings-mt",
      "state": "mt",
      "kind": "facility",
      "name": "Vision Net Billings 2 (1030 Central Avenue)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Yellowstone"
      ],
      "city": "Billings",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant retrospective ribbon-cutting section in company events archive.. Company says it held a September 9 ribbon cutting after acquiring a data center, with manager Shawn Helmbrecht providing tours. Read in conjunction with the separately dated September 7, 2022 invitation identifying 1030 Central Avenue. Same publisher, not two independent confirmations. Only targeted event section and neighboring headings reviewed, not all event articles, conference speeches, images or videos. Other statewide AI-ready fiber-network launches are not new data-center opening events. Limited context; company office, renovation, acquisition, offering and physical operation are different facts. September 7, 2022 operator invitation and facility description.. Specifies September 9 open house 11:00 to 13:00 at 1030 Central Avenue, Billings, and says facility was acquired with iConnect Montana. Invitation is future-tense at publication; company retrospective separately reports an event held. 24000 square feet is operator-reported facility figure in 2022, not verified current occupied white space. 200-plus pounds/square-foot floor loading is a structural load rating, not watts per square foot or MW. SOC1 Type2 and PCI DSS SAQ language is company compliance wording; no current auditor report or Uptime Tier award inspected. Acquisition celebration is not proof this was first construction, first energization or a newly operating Montana building in 2022. No purchase price or closing deed inspected.",
      "date": "",
      "events": [
        [
          "2022-09-07",
          "Vision Net original release is dated September 7, 2022 and invites a September 9 Billings open house. This dates the invitation rather than independently verified completion of the ceremony or a first computing opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vision.net/category/events/",
          "host": "vision.net",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://vision.net/vision-net-opens-the-doors-on-its-newest-data-center/",
          "host": "vision.net",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://vision.net/enterprise-solutions/enterprise-data-center/",
          "host": "vision.net",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 45.86472,
        "lng": -108.2679,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-renovation-acquisition-and-office-role-review-round91-2026-10-15.json",
          "scope": "Relevant retrospective ribbon-cutting section in company events archive.",
          "fields": {},
          "notes": [
            "Company says it held a September 9 ribbon cutting after acquiring a data center, with manager Shawn Helmbrecht providing tours. Read in conjunction with the separately dated September 7, 2022 invitation identifying 1030 Central Avenue. Same publisher, not two independent confirmations.",
            "Only targeted event section and neighboring headings reviewed, not all event articles, conference speeches, images or videos. Other statewide AI-ready fiber-network launches are not new data-center opening events.",
            "Limited context; company office, renovation, acquisition, offering and physical operation are different facts."
          ],
          "sources": [
            {
              "url": "https://vision.net/category/events/",
              "host": "vision.net",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-renovation-acquisition-and-office-role-review-round91-2026-10-15.json",
          "scope": "September 7, 2022 operator invitation and facility description.",
          "fields": {},
          "notes": [
            "Specifies September 9 open house 11:00 to 13:00 at 1030 Central Avenue, Billings, and says facility was acquired with iConnect Montana. Invitation is future-tense at publication; company retrospective separately reports an event held.",
            "24000 square feet is operator-reported facility figure in 2022, not verified current occupied white space. 200-plus pounds/square-foot floor loading is a structural load rating, not watts per square foot or MW.",
            "SOC1 Type2 and PCI DSS SAQ language is company compliance wording; no current auditor report or Uptime Tier award inspected. Acquisition celebration is not proof this was first construction, first energization or a newly operating Montana building in 2022. No purchase price or closing deed inspected.",
            "Limited context; company office, renovation, acquisition, offering and physical operation are different facts."
          ],
          "sources": [
            {
              "url": "https://vision.net/vision-net-opens-the-doors-on-its-newest-data-center/",
              "host": "vision.net",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 70",
          "scope": "The original September 7, 2022 provider release invites a future September 9 open house at the inherited Central Avenue facility. An invitation does not establish that the ceremony occurred or date first computing operation. The current enterprise page offers general colocation and virtual infrastructure but does not independently identify this exact premise current service. Current specific physical stage remains held rather than transferring generic provider service to every location.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_exact_premise_invitation_current_specific_service_held",
              "scope": "The original September 7, 2022 provider release invites a future September 9 open house at the inherited Central Avenue facility. An invitation does not establish that the ceremony occurred or date first computing operation. The current enterprise page offers general colocation and virtual infrastructure but does not independently identify this exact premise current service. Current specific physical stage remains held rather than transferring generic provider service to every location."
            },
            "source_read_scope": {
              "complete_original_release_and_current_enterprise_body_read": true,
              "invitation_not_accomplished_opening": true,
              "generic_current_service_not_exact_premise_crosswalk": true
            }
          },
          "notes": [
            "The original September 7, 2022 provider release invites a future September 9 open house at the inherited Central Avenue facility. An invitation does not establish that the ceremony occurred or date first computing operation. The current enterprise page offers general colocation and virtual infrastructure but does not independently identify this exact premise current service. Current specific physical stage remains held rather than transferring generic provider service to every location.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://vision.net/vision-net-opens-the-doors-on-its-newest-data-center/",
              "host": "vision.net",
              "published": "2022-09-07",
              "date": "2022-09-07",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://vision.net/enterprise-solutions/enterprise-data-center/",
              "host": "vision.net",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Billings · Yellowstone · Source context reviewed",
      "event_evidence": [
        {
          "date": "2022-09-07",
          "text": "Vision Net original release is dated September 7, 2022 and invites a September 9 Billings open house. This dates the invitation rather than independently verified completion of the ceremony or a first computing opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://vision.net/vision-net-opens-the-doors-on-its-newest-data-center/",
              "host": "vision.net",
              "published": "2022-09-07",
              "date": "2022-09-07",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "30111"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
