  "schema_version": 1,
  "source_compilation_context": {
    "nd": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nd.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "nd",
    "label": "North Dakota"
  },
  "records": [
    {
      "id": "applied-digital-jamestown-nd",
      "state": "nd",
      "kind": "facility",
      "name": "Applied Digital Jamestown Facility",
      "group": "operating",
      "status": "Operating",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Stutsman"
      ],
      "city": "Jamestown",
      "address": "",
      "who": "Applied Digital",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer Form10Q Business Update, printed page 42; existing Jamestown crypto-hosting facility. Period-end claim, not October 15inspection. Crypto-hosting scope stays distinct from AI campuses; no measured load or parcel adopted. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
          "host": "ir.applieddigital.com",
          "date": "2026-10-07",
          "published": "2026-10-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
          "host": "ir.applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
          "host": "ir.applieddigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Applied Digital reviewed source"
        }
      ],
      "loc": {
        "lat": 46.97921,
        "lng": -98.95882,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Issuer reports; readiness is not metered grid demand.",
          "fields": {
            "announcement_date": "2026-10-07",
            "fiscal_quarter_ended": "2026-08-31",
            "polaris_forge_1_reported_ready_for_service_date": "2026-10-01",
            "polaris_forge_1_reported_operational_critical_it_mw": 250,
            "other_named_ai_campuses_reported_stage": "Various construction stages",
            "jamestown_crypto_facility_mw_as_of_quarter_end": 106,
            "separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end": 180,
            "north_dakota_ai_delivered_total_end_2026_forecast_mw": 300,
            "potential_base_electron_generation_mw": 1200
          },
          "notes": [
            "Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
              "host": "ir.applieddigital.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Issuer Form10Q Business Update, printed page 42; existing Jamestown crypto-hosting facility",
          "fields": {
            "current_status": "operating",
            "status_basis": "The issuer says Jamestown continued operating at full capacity.",
            "status_as_of": "2026-08-31",
            "report_signed": "2026-10-07"
          },
          "notes": [
            "Period-end claim, not October 15inspection. Crypto-hosting scope stays distinct from AI campuses; no measured load or parcel adopted."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_property_context": {
              "issuer": "Applied Digital",
              "reporting_period": "2026-05-31",
              "source_name": "Jamestown legacy hosting",
              "scope": "Named annual-filing campus/location context only. Mixed operating and future phases stay separate; no current-stage or inherited town/state certification."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Applied Digital reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 30, October 23, 2026",
          "scope": "Applied Digital identifies its Jamestown hosting facility and operational services in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review.",
          "fields": {
            "company_association": {
              "name": "Applied Digital",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Applied Digital identifies its Jamestown hosting facility and operational services in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Applied Digital identifies its Jamestown hosting facility and operational services in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Jamestown · Stutsman · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "38093"
      }
    },
    {
      "id": "applied-digital-polaris-forge-1-ellendale-nd",
      "state": "nd",
      "kind": "facility",
      "name": "Applied Digital Polaris Forge 1",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dickey"
      ],
      "city": "Ellendale",
      "address": "",
      "who": "Applied Digital",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not sum phases into campus total again. 250MW is operator-reported commissioned criticalIT capacity, not independently measured demand. July1release establishes75MWphase and175MW then-live campus. October2release supersedes campus live total with250MW;400MW remains contracted full buildout. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Issuer Form10Q Business Update, printed page 42; operating buildings and a building under construction. An operating phase is supported by this source; the display label is Operating phase. This does not certify full campus completion, current metered load or precise coordinates. Existing facilities and expansion retain their separate scope. The record remains uncertified as a whole. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [
        [
          "2026-10-01",
          "Applied Digital reported the second phase of Building 2 ready for service; further HPC campus construction continued."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1",
          "host": "ir.applieddigital.com",
          "date": "2026-07-01",
          "published": "2026-07-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai",
          "host": "ir.applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source for campus operational it mw"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
          "host": "ir.applieddigital.com",
          "date": "2026-10-07",
          "published": "2026-10-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
          "host": "ir.applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
          "host": "ir.applieddigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Applied Digital reviewed source"
        }
      ],
      "loc": {
        "lat": 46.1102,
        "lng": -98.50491,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "city": "Ellendale",
            "event_status": "Building2Phase1ready for service",
            "event_date": "2026-07-01",
            "phase_operational_it_mw": 75,
            "campus_operational_it_mw": 250,
            "contracted_full_buildout_it_mw": 400,
            "campus_operational_it_as_of": "2026-10-02"
          },
          "notes": [
            "Do not sum phases into campus total again.",
            "250MW is operator-reported commissioned criticalIT capacity, not independently measured demand.",
            "July1release establishes75MWphase and175MW then-live campus. October2release supersedes campus live total with250MW;400MW remains contracted full buildout.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1",
              "host": "ir.applieddigital.com",
              "date": "2026-07-01",
              "published": "2026-07-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            },
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai",
              "host": "ir.applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source for campus operational it mw"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Issuer reports; readiness is not metered grid demand.",
          "fields": {
            "announcement_date": "2026-10-07",
            "fiscal_quarter_ended": "2026-08-31",
            "polaris_forge_1_reported_ready_for_service_date": "2026-10-01",
            "polaris_forge_1_reported_operational_critical_it_mw": 250,
            "other_named_ai_campuses_reported_stage": "Various construction stages",
            "jamestown_crypto_facility_mw_as_of_quarter_end": 106,
            "separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end": 180,
            "north_dakota_ai_delivered_total_end_2026_forecast_mw": 300,
            "potential_base_electron_generation_mw": 1200
          },
          "notes": [
            "Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
              "host": "ir.applieddigital.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Issuer Form10Q Business Update, printed page 42; operating buildings and a building under construction",
          "fields": {
            "operating_phase_context": "Two HPC buildings operate; a third is under construction.",
            "current_status": "partly operating",
            "status_basis": "The issuer identifies two operating HPC buildings and a third under construction.",
            "status_scope": "Operating phase only; full campus buildout remains unresolved."
          },
          "notes": [
            "An operating phase is supported by this source; the display label is Operating phase. This does not certify full campus completion, current metered load or precise coordinates. Existing facilities and expansion retain their separate scope. The record remains uncertified as a whole."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
              "host": "ir.applieddigital.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40",
          "events": [
            {
              "date": "2026-10-01",
              "kind": "milestone",
              "text": "Applied Digital reported the second phase of Building 2 ready for service; further HPC campus construction continued.",
              "sources": [
                {
                  "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
                  "host": "ir.applieddigital.com",
                  "date": "2026-10-07",
                  "published": "2026-10-07",
                  "checked": "2026-10-15",
                  "date_kind": "publication",
                  "label": "Reviewed source"
                }
              ]
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_property_context": {
              "issuer": "Applied Digital",
              "reporting_period": "2026-05-31",
              "source_name": "Polaris Forge 1",
              "scope": "Named annual-filing campus/location context only. Mixed operating and future phases stay separate; no current-stage or inherited town/state certification."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Applied Digital reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 30, October 23, 2026",
          "scope": "Applied Digital identifies the same uniquely named Polaris Forge 1 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review. The separate Ellendale cryptocurrency facility is not merged into this HPC campus record. Current marketing and filing building capacity and service descriptions retain their separate scope.",
          "fields": {
            "company_association": {
              "name": "Applied Digital",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Applied Digital identifies the same uniquely named Polaris Forge 1 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review. The separate Ellendale cryptocurrency facility is not merged into this HPC campus record. Current marketing and filing building capacity and service descriptions retain their separate scope."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Applied Digital identifies the same uniquely named Polaris Forge 1 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review. The separate Ellendale cryptocurrency facility is not merged into this HPC campus record. Current marketing and filing building capacity and service descriptions retain their separate scope."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ellendale · Dickey · Source context reviewed",
      "status_scope": "An operating phase is supported; full campus completion is not established.",
      "event_evidence": [
        {
          "date": "2026-10-01",
          "kind": "milestone",
          "text": "Applied Digital reported the second phase of Building 2 ready for service; further HPC campus construction continued.",
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
              "host": "ir.applieddigital.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-15",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "38021"
      }
    },
    {
      "id": "applied-digital-polaris-forge-2-harwood-nd",
      "state": "nd",
      "kind": "facility",
      "name": "Applied Digital Polaris Forge 2",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cass"
      ],
      "city": "Harwood",
      "address": "",
      "who": "Applied Digital",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Minnkota Harwood project load and workforce forecast. 3Bdeveloper investment excludes unspecified additional tenant investment; not money already spent.280MWnot per building or measured. Utility ratepayer assurances not independently audited actual future bills. Company2021founding does not date Harwood opening. No exact parcel, current energization or customer lease read. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Issuer Form10Q Business Update, printed page 42; named-campus construction statement. Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.minnkota.com/minnkota-website/our-press/data-center-faqs",
          "host": "minnkota.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
          "host": "ir.applieddigital.com",
          "date": "2026-10-07",
          "published": "2026-10-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
          "host": "ir.applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
          "host": "ir.applieddigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Applied Digital reviewed source"
        }
      ],
      "loc": {
        "lat": 46.93297,
        "lng": -97.2482,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Minnkota Harwood project load and workforce forecast",
          "fields": {
            "utility": "Minnkota Power Cooperative",
            "retail_utility": "Cass County Electric Cooperative",
            "developer_operator": "Applied Digital",
            "location": "near Harwood, North Dakota",
            "planned_buildings": 2,
            "combined_planned_area_sqft_min_exclusive": 1800000,
            "projected_applied_digital_investment_usd_min_exclusive": 3000000000,
            "expected_fulltime_personnel_min_exclusive": 200,
            "expected_peak_construction_workers_approx": 700,
            "expected_peak_electrical_usage_mw": 280,
            "power_basis": "expected facility peak usage, not explicit critical IT"
          },
          "notes": [
            "3Bdeveloper investment excludes unspecified additional tenant investment; not money already spent.280MWnot per building or measured. Utility ratepayer assurances not independently audited actual future bills. Company2021founding does not date Harwood opening. No exact parcel, current energization or customer lease read.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.minnkota.com/minnkota-website/our-press/data-center-faqs",
              "host": "minnkota.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Issuer reports; readiness is not metered grid demand.",
          "fields": {
            "announcement_date": "2026-10-07",
            "fiscal_quarter_ended": "2026-08-31",
            "polaris_forge_1_reported_ready_for_service_date": "2026-10-01",
            "polaris_forge_1_reported_operational_critical_it_mw": 250,
            "other_named_ai_campuses_reported_stage": "Various construction stages",
            "jamestown_crypto_facility_mw_as_of_quarter_end": 106,
            "separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end": 180,
            "north_dakota_ai_delivered_total_end_2026_forecast_mw": 300,
            "potential_base_electron_generation_mw": 1200
          },
          "notes": [
            "Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
              "host": "ir.applieddigital.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Issuer Form10Q Business Update, printed page 42; named-campus construction statement",
          "fields": {
            "current_status": "under construction",
            "status_basis": "Polaris Forge 2 is explicitly described as under construction.",
            "status_as_of": "2026-10-07",
            "report_period_ended": "2026-08-31"
          },
          "notes": [
            "Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_property_context": {
              "issuer": "Applied Digital",
              "reporting_period": "2026-05-31",
              "source_name": "Polaris Forge 2",
              "scope": "Named annual-filing campus/location context only. Mixed operating and future phases stay separate; no current-stage or inherited town/state certification."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Applied Digital reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 30, October 23, 2026",
          "scope": "Applied Digital identifies the same uniquely named Polaris Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review.",
          "fields": {
            "company_association": {
              "name": "Applied Digital",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Applied Digital identifies the same uniquely named Polaris Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Applied Digital identifies the same uniquely named Polaris Forge 2 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Harwood · Cass · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "38017"
      }
    },
    {
      "id": "applied-digital-polaris-forge-3-oliver-nd",
      "state": "nd",
      "kind": "facility",
      "name": "Applied Digital Polaris Forge 3",
      "group": "building",
      "status": "Under construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Oliver"
      ],
      "city": "Hanover",
      "address": "",
      "who": "Applied Digital",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Application filing and repealed pause are not zoning approval. Summer groundbreaking and 18 to 24 month completion were hopes, not observed milestones. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Issuer Form10Q Business Update, printed page 42; named-campus construction statement. Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.kfyrtv.com/2026/05/05/applied-digital-submits-rezoning-application-data-center-oliver-county/",
          "host": "kfyrtv.com",
          "date": "2026-05-04",
          "published": "2026-05-04",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
          "host": "ir.applieddigital.com",
          "date": "2026-10-07",
          "published": "2026-10-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
          "host": "ir.applieddigital.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
          "host": "ir.applieddigital.com",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Applied Digital reviewed source"
        }
      ],
      "loc": {
        "lat": 47.11529,
        "lng": -101.34065,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "KFYR reports Applied Digital filed Oliver County rezoning request after county repealed its moratorium.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Application filing and repealed pause are not zoning approval. Summer groundbreaking and 18 to 24 month completion were hopes, not observed milestones.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.kfyrtv.com/2026/05/05/applied-digital-submits-rezoning-application-data-center-oliver-county/",
              "host": "kfyrtv.com",
              "date": "2026-05-04",
              "published": "2026-05-04",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Issuer reports; readiness is not metered grid demand.",
          "fields": {
            "announcement_date": "2026-10-07",
            "fiscal_quarter_ended": "2026-08-31",
            "polaris_forge_1_reported_ready_for_service_date": "2026-10-01",
            "polaris_forge_1_reported_operational_critical_it_mw": 250,
            "other_named_ai_campuses_reported_stage": "Various construction stages",
            "jamestown_crypto_facility_mw_as_of_quarter_end": 106,
            "separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end": 180,
            "north_dakota_ai_delivered_total_end_2026_forecast_mw": 300,
            "potential_base_electron_generation_mw": 1200
          },
          "notes": [
            "Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
              "host": "ir.applieddigital.com",
              "date": "2026-10-07",
              "published": "2026-10-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Issuer Form10Q Business Update, printed page 42; named-campus construction statement",
          "fields": {
            "current_status": "under construction",
            "status_basis": "Polaris Forge 3 is explicitly described as under construction.",
            "status_as_of": "2026-10-07",
            "report_period_ended": "2026-08-31"
          },
          "notes": [
            "Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_property_context": {
              "issuer": "Applied Digital",
              "reporting_period": "2026-05-31",
              "source_name": "Polaris Forge 3",
              "scope": "Named annual-filing campus/location context only. Mixed operating and future phases stay separate; no current-stage or inherited town/state certification."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Applied Digital reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 30, October 23, 2026",
          "scope": "Applied Digital identifies the same uniquely named Polaris Forge 3 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review.",
          "fields": {
            "company_association": {
              "name": "Applied Digital",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Applied Digital identifies the same uniquely named Polaris Forge 3 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Applied Digital identifies the same uniquely named Polaris Forge 3 campus in its data center development business in its Form 10-Q for the period ending August 31, 2026. This records the provider brand relationship only, without legal title, sole control, tenant identity or a distinct corporate entity finding. No new status, dates, quantities, address, point, county, component or physical milestone is promoted. The reporting period is not a publication date; the exact filing publication date remains unknown in this review."
          ],
          "sources": [
            {
              "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm",
              "host": "ir.applieddigital.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hanover · Oliver · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "38065"
      }
    },
    {
      "id": "atlas-power-williston-nd",
      "state": "nd",
      "kind": "facility",
      "name": "Atlas Power Data Center (Williston)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Williams"
      ],
      "city": "Williston",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Vendor analysis, not independent regulator determination. Do not turn historical proprietary load analysis into current metered capacity or 700 MW future expansion into existing IT power. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.yesenergy.com/blog/crypto-mining-power-consumption-atlas-power",
          "host": "yesenergy.com",
          "date": "2024-05-09",
          "published": "2024-05-09",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://atlaspower.io/",
          "host": "atlaspower.io",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://northwesternenergy.com/about-us/our-company/2024/12/19/northwestern-energy-to-supply-power-for-butte-montana-data-center-atlas-power-group",
          "host": "northwesternenergy.com",
          "published": "2024-12-19",
          "date": "2024-12-19",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 48.34381,
        "lng": -103.48011,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Yes Energy publishes its own historical Atlas Williston load/congestion analysis and describes possible future phases.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Vendor analysis, not independent regulator determination. Do not turn historical proprietary load analysis into current metered capacity or 700 MW future expansion into existing IT power.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.yesenergy.com/blog/crypto-mining-power-consumption-atlas-power",
              "host": "yesenergy.com",
              "date": "2024-05-09",
              "published": "2024-05-09",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 71",
          "scope": "The complete original provider body describes current hosting facilities in Montana, North Dakota and Kentucky, and the historical utility release refers to established North Dakota activity. Neither independently names the inherited Williston premise in its read body. The exact site crosswalk and current specific physical stage remain held rather than transferring aggregate state activity to an unverified component. Future power supply, aggregate infrastructure capacity and grid benefit claims are not current commissioned computing at this site.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "aggregate_north_dakota_hosting_exact_williston_crosswalk_held",
              "scope": "The complete original provider body describes current hosting facilities in Montana, North Dakota and Kentucky, and the historical utility release refers to established North Dakota activity. Neither independently names the inherited Williston premise in its read body. The exact site crosswalk and current specific physical stage remain held rather than transferring aggregate state activity to an unverified component. Future power supply, aggregate infrastructure capacity and grid benefit claims are not current commissioned computing at this site."
            },
            "source_read_scope": {
              "complete_original_current_provider_and_historical_utility_bodies_read": true,
              "state_activity_not_exact_premise_operation": true,
              "aggregate_capacity_not_site_capacity": true
            }
          },
          "notes": [
            "The complete original provider body describes current hosting facilities in Montana, North Dakota and Kentucky, and the historical utility release refers to established North Dakota activity. Neither independently names the inherited Williston premise in its read body. The exact site crosswalk and current specific physical stage remain held rather than transferring aggregate state activity to an unverified component. Future power supply, aggregate infrastructure capacity and grid benefit claims are not current commissioned computing at this site.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://atlaspower.io/",
              "host": "atlaspower.io",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://northwesternenergy.com/about-us/our-company/2024/12/19/northwestern-energy-to-supply-power-for-butte-montana-data-center-atlas-power-group",
              "host": "northwesternenergy.com",
              "published": "2024-12-19",
              "date": "2024-12-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Williston · Williams · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "38105"
      }
    },
    {
      "id": "bitzero-nekoma-nd",
      "state": "nd",
      "kind": "facility",
      "name": "Bitzero Nekoma Data Center (Stanley R. Mickelsen Safeguard Complex)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Cavalier"
      ],
      "city": "Nekoma",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Acquisition agreements are not completed data-center construction. 200MW refers announced North American company buildout, not a Nekoma site allocation. Military site operational1975 is not data-center opening. Offset strategy and waste-heat greenhouse are plans, not measured environmental performance. No2026operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2022-07-18",
          "The original North Dakota Governor July 25, 2022 release reports that the local development authority Board accepted the Bitzero Nekoma bid on July 18, 2022. This is a reported historical bid decision rather than computing commissioning or completed redevelopment."
        ],
        [
          "2022-07-25",
          "The original North Dakota Governor release dated July 25, 2022 announces the Nekoma acquisition and redevelopment agreement. This dates the announcement without certifying that redevelopment, computing operation or planned heat reuse subsequently began."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center",
          "host": "governor.nd.gov",
          "date": "2022-07-25",
          "published": "2022-07-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 48.77236,
        "lng": -98.46471,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "named government source",
          "fields": {
            "historical_acquisition_redevelopment_announcement": "2022-07-25",
            "reported_bid_acceptance_date": "2022-07-18",
            "historical_expected_investment_usd_approx": 500000000,
            "historical_expected_operational_jobs_min": 35,
            "historical_expected_operational_jobs_max": 50,
            "published_site": "Stanley R Mickelsen Safeguard Complex, Nekoma, Cavalier County, North Dakota"
          },
          "notes": [
            "Acquisition agreements are not completed data-center construction. 200MW refers announced North American company buildout, not a Nekoma site allocation. Military site operational1975 is not data-center opening. Offset strategy and waste-heat greenhouse are plans, not measured environmental performance. No2026operating proof.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center",
              "host": "governor.nd.gov",
              "date": "2022-07-25",
              "published": "2022-07-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 71",
          "scope": "The complete original Governor release dated July 25, 2022 describes a binding acquisition and redevelopment agreement for the Nekoma pyramid and reports a July 18 Board decision accepting the bid. These are historical transaction and proposal accounts rather than independently verified present computing service, completed redevelopment or physical construction. The military installation operational and shutdown history is not a computing opening or closure. Planned heat reuse, jobs, investment and zero carbon descriptions are not measured present outcomes.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_nekoma_acquisition_and_redevelopment_current_stage_held",
              "scope": "The complete original Governor release dated July 25, 2022 describes a binding acquisition and redevelopment agreement for the Nekoma pyramid and reports a July 18 Board decision accepting the bid. These are historical transaction and proposal accounts rather than independently verified present computing service, completed redevelopment or physical construction. The military installation operational and shutdown history is not a computing opening or closure. Planned heat reuse, jobs, investment and zero carbon descriptions are not measured present outcomes."
            },
            "source_read_scope": {
              "complete_original_governor_release_body_read": true,
              "bid_and_agreement_not_present_operation": true,
              "military_shutdown_not_computing_closure": true,
              "no_measured_heat_carbon_jobs_or_capacity_export": true
            }
          },
          "notes": [
            "The complete original Governor release dated July 25, 2022 describes a binding acquisition and redevelopment agreement for the Nekoma pyramid and reports a July 18 Board decision accepting the bid. These are historical transaction and proposal accounts rather than independently verified present computing service, completed redevelopment or physical construction. The military installation operational and shutdown history is not a computing opening or closure. Planned heat reuse, jobs, investment and zero carbon descriptions are not measured present outcomes.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center",
              "host": "www.governor.nd.gov",
              "published": "2022-07-25",
              "date": "2022-07-25",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Nekoma · Cavalier · Source context reviewed",
      "event_evidence": [
        {
          "date": "2022-07-18",
          "text": "The original North Dakota Governor July 25, 2022 release reports that the local development authority Board accepted the Bitzero Nekoma bid on July 18, 2022. This is a reported historical bid decision rather than computing commissioning or completed redevelopment.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center",
              "host": "www.governor.nd.gov",
              "published": "2022-07-25",
              "date": "2022-07-25",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2022-07-25",
          "text": "The original North Dakota Governor release dated July 25, 2022 announces the Nekoma acquisition and redevelopment agreement. This dates the announcement without certifying that redevelopment, computing operation or planned heat reuse subsequently began.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center",
              "host": "www.governor.nd.gov",
              "published": "2022-07-25",
              "date": "2022-07-25",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "38019"
      }
    },
    {
      "id": "core-scientific-grand-forks-nd",
      "state": "nd",
      "kind": "facility",
      "name": "Core Scientific Grand Forks Data Center (Grand Forks 1)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Grand Forks"
      ],
      "city": "Grand Forks",
      "address": "",
      "who": "Core Scientific",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operatorofferingnotindependentlyverifiedcurrentenergizedload/AIoccupancy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://corescientific.com/high-density-data-centers/grand-forks-nd/",
          "host": "corescientific.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm",
          "host": "www.sec.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Core Scientific reviewed source"
        },
        {
          "url": "https://corescientific.com/high-density-data-centers/",
          "host": "corescientific.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-013305/core-20251231.htm",
          "host": "investors.corescientific.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 47.92187,
        "lng": -97.45703,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "published_address": "5601 11th Ave S, Grand Forks, ND58201",
            "advertised_total_power_capacity_mw": 100,
            "campus_acres": 20,
            "total_area_sqft": 90000,
            "power_basis": "totalpowercapacity, not explicitlycriticalIT"
          },
          "notes": [
            "Operatorofferingnotindependentlyverifiedcurrentenergizedload/AIoccupancy.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://corescientific.com/high-density-data-centers/grand-forks-nd/",
              "host": "corescientific.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-discovery-2026-10-17",
          "scope": "Source-scoped official discovery and annual-filing comparison; research-context associations do not certify distinct physical sites or current whole-campus activity.",
          "fields": {
            "issuer_annual_utility_context": {
              "issuer": "Core Scientific",
              "reporting_period": "2025-12-31",
              "source_rows": [
                {
                  "location": "Grand Forks, North Dakota",
                  "utility": "Nodak Electric Cooperative, Inc.",
                  "gross_utility_capacity_mw": 100
                }
              ],
              "scope": "Annual gross utility-capacity context only; not critical IT, current load, an opened phase or an unambiguous physical-site boundary. No typed MW fact or summed campus total added."
            }
          },
          "notes": [
            "No status, address, map point, jurisdiction, operating date or technical quantity is promoted in this review. Annual filings retain their reporting periods; a fresh retrieval is not a fresh physical-site certification."
          ],
          "sources": [
            {
              "url": "https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm",
              "host": "www.sec.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Core Scientific reviewed source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 31, October 23, 2026",
          "scope": "Core Scientific identifies the same named Grand Forks 1 data center on its current first party location page and lists the facility in its own location portfolio. Operator per source records the advertised provider brand relationship; service marketing does not independently certify current computing, commissioning, performance or whole campus operation. Legal title, sole control, tenant identity and a distinct corporate entity are not established. Existing status, location, address, county, quantities, dates, certification and component identity remain exact. The source publication date is unknown.",
          "fields": {
            "company_association": {
              "name": "Core Scientific",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Core Scientific identifies the same named Grand Forks 1 data center on its current first party location page and lists the facility in its own location portfolio. Operator per source records the advertised provider brand relationship; service marketing does not independently certify current computing, commissioning, performance or whole campus operation. Legal title, sole control, tenant identity and a distinct corporate entity are not established. Existing status, location, address, county, quantities, dates, certification and component identity remain exact. The source publication date is unknown."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Core Scientific identifies the same named Grand Forks 1 data center on its current first party location page and lists the facility in its own location portfolio. Operator per source records the advertised provider brand relationship; service marketing does not independently certify current computing, commissioning, performance or whole campus operation. Legal title, sole control, tenant identity and a distinct corporate entity are not established. Existing status, location, address, county, quantities, dates, certification and component identity remain exact. The source publication date is unknown."
          ],
          "sources": [
            {
              "url": "https://corescientific.com/high-density-data-centers/grand-forks-nd/",
              "host": "corescientific.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://corescientific.com/high-density-data-centers/",
              "host": "corescientific.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 71",
          "scope": "The complete original current provider facility and roster bodies identify Grand Forks 1 and describe advertised infrastructure and nationwide colocation offerings. The selected original annual filing table lists utility power by location as of December 31, 2025. A power capacity table and aggregate AI factories under development do not independently establish this exact site current commissioned high density service, completed conversion or computing load. The precise present physical scope remains held; an old mining or current general product description is not transferred to every component.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_grandforks_infrastructure_current_commissioned_scope_held",
              "scope": "The complete original current provider facility and roster bodies identify Grand Forks 1 and describe advertised infrastructure and nationwide colocation offerings. The selected original annual filing table lists utility power by location as of December 31, 2025. A power capacity table and aggregate AI factories under development do not independently establish this exact site current commissioned high density service, completed conversion or computing load. The precise present physical scope remains held; an old mining or current general product description is not transferred to every component."
            },
            "source_read_scope": {
              "complete_original_current_facility_and_roster_bodies_read": true,
              "original_annual_filing_selected_utility_power_table_and_surrounding_process_text_read": true,
              "complete_annual_filing_not_claimed": true,
              "utility_capacity_not_commissioned_computing": true,
              "no_capacity_or_ai_conversion_certification": true
            }
          },
          "notes": [
            "The complete original current provider facility and roster bodies identify Grand Forks 1 and describe advertised infrastructure and nationwide colocation offerings. The selected original annual filing table lists utility power by location as of December 31, 2025. A power capacity table and aggregate AI factories under development do not independently establish this exact site current commissioned high density service, completed conversion or computing load. The precise present physical scope remains held; an old mining or current general product description is not transferred to every component.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://corescientific.com/high-density-data-centers/grand-forks-nd/",
              "host": "corescientific.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://corescientific.com/high-density-data-centers/",
              "host": "corescientific.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-26-013305/core-20251231.htm",
              "host": "investors.corescientific.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Grand Forks · Grand Forks · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "38035"
      }
    },
    {
      "id": "enerfore-pleasant-valley-tioga-nd",
      "state": "nd",
      "kind": "facility",
      "name": "Enerfore Pleasant Valley Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Williams"
      ],
      "city": "Tioga",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The headline does not establish an issued permit. Early 2025 opening was a forecast. Dry Fork and Pleasant Valley naming needs a parcel crosswalk. Company-wide 200 MW does not belong to this facility. Original minutes are reviewed separately. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Appeal acceptance does not grant either permit or variance. Original location failed the one-mile setback; staff had refused to accept a CUP application. Residents discuss Pleasant Valley and Dry Fork; exact parcel crosswalk still requires the later application. Claims in public comments are not findings of misconduct. Agenda is a request, not an adopted outcome. Do not move coordinates or replace township based on an incomplete parcel crosswalk. No later commissioning or current permit result established.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.sdxcentral.com/news/enerfore-digital-gets-go-ahead-for-data-center-proposal-in-north-dakota/",
          "host": "sdxcentral.com",
          "date": "2024-10-04",
          "published": "2024-10-04",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://williamsnd.civicweb.net/document/174556/",
          "host": "williamsnd.civicweb.net",
          "date": "2024-09-17",
          "published": "2024-09-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://williamsnd.civicweb.net/document/175356/",
          "host": "williamsnd.civicweb.net",
          "date": "2024-12-19",
          "published": "2024-12-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 48.36671,
        "lng": -103.50511,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "SDxCentral describes Enerfore's successful appeal allowing a permit application, with a sound study and public comment still ahead.",
            "independently_verified_current_operating_status": null,
            "operator_or_site_identity_needs_crosswalk": true
          },
          "notes": [
            "The headline does not establish an issued permit. Early 2025 opening was a forecast. Dry Fork and Pleasant Valley naming needs a parcel crosswalk. Company-wide 200 MW does not belong to this facility. Original minutes are reviewed separately.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.sdxcentral.com/news/enerfore-digital-gets-go-ahead-for-data-center-proposal-in-north-dakota/",
              "host": "sdxcentral.com",
              "date": "2024-10-04",
              "published": "2024-10-04",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "Original county minutes record a four-zero vote approving the appeal so Enerfore could concurrently submit a conditional-use and reduced-setback variance application.",
            "appeal_approval_date": "2024-09-17",
            "vote_ayes": 4,
            "vote_nays": 0,
            "conditional_use_permit_issuance_verified": false
          },
          "notes": [
            "Appeal acceptance does not grant either permit or variance. Original location failed the one-mile setback; staff had refused to accept a CUP application.",
            "Residents discuss Pleasant Valley and Dry Fork; exact parcel crosswalk still requires the later application. Claims in public comments are not findings of misconduct.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://williamsnd.civicweb.net/document/174556/",
              "host": "williamsnd.civicweb.net",
              "date": "2024-09-17",
              "published": "2024-09-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "Later official agenda lists Enerfore Digital Valley request LU-0086-24 for a cryptocurrency facility in Dry Fork Township.",
            "application_number": "LU-0086-24",
            "printed_location": "Sublot 2 and Sublot 3, Section 4, T155N, R95W; Dry Fork Township",
            "permit_outcome_verified": false
          },
          "notes": [
            "Agenda is a request, not an adopted outcome. Do not move coordinates or replace township based on an incomplete parcel crosswalk.",
            "No later commissioning or current permit result established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://williamsnd.civicweb.net/document/175356/",
              "host": "williamsnd.civicweb.net",
              "date": "2024-12-19",
              "published": "2024-12-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Tioga · Williams · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "38105"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}