{
  "schema_version": 1,
  "source_compilation_context": {
    "nh": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nh.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "nh",
    "label": "New Hampshire"
  },
  "records": [
    {
      "id": "dartmouth-college-data-center-lebanon-nh",
      "state": "nh",
      "kind": "facility",
      "name": "Dartmouth College Data Center (Etna Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Grafton"
      ],
      "city": "Lebanon",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Institution identity verified; Lebanon street/county/site count and MW unverified on this page. Institution confirms enterprise data-center facilities supporting academic/research systems. Selected service page does not state physical Lebanon location. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://services.dartmouth.edu/TDClient/1806/Portal/Requests/ServiceDet?ID=31708",
          "host": "services.dartmouth.edu",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://services.dartmouth.edu/TDClient/1806/Portal/Requests/Service/31708/Data-Center-Services",
          "host": "services.dartmouth.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 43.9407,
        "lng": -71.8207,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "service": "college server hosting"
          },
          "notes": [
            "Institution identity verified; Lebanon street/county/site count and MW unverified on this page.",
            "Institution confirms enterprise data-center facilities supporting academic/research systems. Selected service page does not state physical Lebanon location.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://services.dartmouth.edu/TDClient/1806/Portal/Requests/ServiceDet?ID=31708",
              "host": "services.dartmouth.edu",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "The complete original current Dartmouth service catalog describes computing facilities serving College systems in the plural. It does not independently identify Etna Road or provide an exact crosswalk to this inherited component. Institutional service availability, virtualization and multiple facilities do not independently resolve the exact Etna Road current physical stage or an opening day. No location or identity is silently assigned.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_dartmouth_plural_service_catalog_exact_etna_component_held",
              "scope": "The complete original current Dartmouth service catalog describes computing facilities serving College systems in the plural. It does not independently identify Etna Road or provide an exact crosswalk to this inherited component. Institutional service availability, virtualization and multiple facilities do not independently resolve the exact Etna Road current physical stage or an opening day. No location or identity is silently assigned."
            },
            "source_read_scope": {
              "complete_original_public_service_catalog_body_read": true,
              "plural_facilities_not_exact_etna_road_crosswalk": true,
              "login_request_service_not_opened": true
            }
          },
          "notes": [
            "The complete original current Dartmouth service catalog describes computing facilities serving College systems in the plural. It does not independently identify Etna Road or provide an exact crosswalk to this inherited component. Institutional service availability, virtualization and multiple facilities do not independently resolve the exact Etna Road current physical stage or an opening day. No location or identity is silently assigned.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://services.dartmouth.edu/TDClient/1806/Portal/Requests/Service/31708/Data-Center-Services",
              "host": "services.dartmouth.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lebanon · Grafton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "33009"
      }
    },
    {
      "id": "firstlight-keene-nh",
      "state": "nh",
      "kind": "facility",
      "name": "FirstLight Keene Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cheshire"
      ],
      "city": "Keene",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only site evidence hold. Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.firstlight.net/keene-nh-data-center/",
          "host": "firstlight.net",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.firstlight.net/services/cloud-data-center/data-center/",
          "host": "www.firstlight.net",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        },
        {
          "url": "https://www.firstlight.net/resources/keene-nh-data-center/",
          "host": "www.firstlight.net",
          "published": "2025-10-07",
          "date": "2025-10-07",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 42.91952,
        "lng": -72.2512,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-access-review-round7-2026-10-14.json",
          "scope": "title-only site evidence hold",
          "fields": {},
          "notes": [
            "Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.firstlight.net/keene-nh-data-center/",
              "host": "firstlight.net",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The Keene resource response contains a title and site shell without a usable facility specification. The current colocation page does not list Keene among its featured or additional locations. This is not proof of closure; current facility identity and stage remain held."
            }
          },
          "notes": [
            "The Keene resource response contains a title and site shell without a usable facility specification. The current colocation page does not list Keene among its featured or additional locations. This is not proof of closure; current facility identity and stage remain held."
          ],
          "sources": [
            {
              "url": "https://www.firstlight.net/services/cloud-data-center/data-center/",
              "host": "www.firstlight.net",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.firstlight.net/keene-nh-data-center/",
              "host": "www.firstlight.net",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "The selected original Keene resource body displays its facility title and an October 7, 2025 resource date, without a substantive exact current service description. The current original roster main service body and complete additional colocation list were read; Keene is absent from that list although an older search preview names it. A title, generic company service, older indexed list or current roster omission does not independently establish exact current operation, sale or closure. No hidden resource, alternate identity or login route was used.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_firstlight_resource_and_current_roster_exact_stage_held",
              "scope": "The selected original Keene resource body displays its facility title and an October 7, 2025 resource date, without a substantive exact current service description. The current original roster main service body and complete additional colocation list were read; Keene is absent from that list although an older search preview names it. A title, generic company service, older indexed list or current roster omission does not independently establish exact current operation, sale or closure. No hidden resource, alternate identity or login route was used."
            },
            "source_read_scope": {
              "original_resource_main_text_before_cookie_appendix_read": true,
              "current_roster_main_service_and_complete_additional_list_read": true,
              "search_preview_differs_from_captured_body": true,
              "roster_omission_not_closure": true
            }
          },
          "notes": [
            "The selected original Keene resource body displays its facility title and an October 7, 2025 resource date, without a substantive exact current service description. The current original roster main service body and complete additional colocation list were read; Keene is absent from that list although an older search preview names it. A title, generic company service, older indexed list or current roster omission does not independently establish exact current operation, sale or closure. No hidden resource, alternate identity or login route was used.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.firstlight.net/resources/keene-nh-data-center/",
              "host": "www.firstlight.net",
              "published": "2025-10-07",
              "date": "2025-10-07",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.firstlight.net/services/cloud-data-center/data-center/",
              "host": "www.firstlight.net",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Keene · Cheshire · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "33005"
      }
    },
    {
      "id": "firstlight-lebanon-nh",
      "state": "nh",
      "kind": "facility",
      "name": "FirstLight Lebanon Data Center (Dartmouth Regional Technology Center)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Grafton"
      ],
      "city": "Lebanon",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. FirstLight Lebanon thin source with corporate footer only. BodyonlyregionalleadformandAlbany12MetroParkcorporateheadquarters. Do notassignAlbanyaddress/fiberroute-milecounttoLebanonDC. Page date notcommissioning. No usableexactsiteaddress/MW/area. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://firstlight.net/lebanon-nh-data-center",
          "host": "firstlight.net",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.firstlight.net/resources/lebanon-nh-data-center/",
          "host": "www.firstlight.net",
          "published": "2025-10-07",
          "date": "2025-10-07",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.firstlight.net/services/cloud-data-center/data-center/",
          "host": "www.firstlight.net",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 43.97033,
        "lng": -71.85305,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "FirstLight Lebanon thin source with corporate footer only",
          "fields": {
            "operator_page_title": "Lebanon, New Hampshire Data Center",
            "page_date": "2025-10-07"
          },
          "notes": [
            "BodyonlyregionalleadformandAlbany12MetroParkcorporateheadquarters. Do notassignAlbanyaddress/fiberroute-milecounttoLebanonDC. Page date notcommissioning. No usableexactsiteaddress/MW/area.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://firstlight.net/lebanon-nh-data-center",
              "host": "firstlight.net",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "The selected original Lebanon resource body displays its facility title and an October 7, 2025 resource date, without a substantive exact current service description. The current original roster main service body and complete additional colocation list were read; Lebanon is absent from that list although an older search preview names it. A title, generic company service, older indexed list or current roster omission does not independently establish exact current operation, sale or closure. No hidden resource, alternate identity or login route was used.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_firstlight_resource_and_current_roster_exact_stage_held",
              "scope": "The selected original Lebanon resource body displays its facility title and an October 7, 2025 resource date, without a substantive exact current service description. The current original roster main service body and complete additional colocation list were read; Lebanon is absent from that list although an older search preview names it. A title, generic company service, older indexed list or current roster omission does not independently establish exact current operation, sale or closure. No hidden resource, alternate identity or login route was used."
            },
            "source_read_scope": {
              "original_resource_main_text_before_cookie_appendix_read": true,
              "current_roster_main_service_and_complete_additional_list_read": true,
              "search_preview_differs_from_captured_body": true,
              "roster_omission_not_closure": true
            }
          },
          "notes": [
            "The selected original Lebanon resource body displays its facility title and an October 7, 2025 resource date, without a substantive exact current service description. The current original roster main service body and complete additional colocation list were read; Lebanon is absent from that list although an older search preview names it. A title, generic company service, older indexed list or current roster omission does not independently establish exact current operation, sale or closure. No hidden resource, alternate identity or login route was used.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.firstlight.net/resources/lebanon-nh-data-center/",
              "host": "www.firstlight.net",
              "published": "2025-10-07",
              "date": "2025-10-07",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.firstlight.net/services/cloud-data-center/data-center/",
              "host": "www.firstlight.net",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lebanon · Grafton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "33009"
      }
    },
    {
      "id": "firstlight-manchester-nh",
      "state": "nh",
      "kind": "facility",
      "name": "FirstLight Manchester Data Center",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Hillsborough"
      ],
      "city": "Manchester",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only site evidence hold. Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.firstlight.net/resources/data-center-manchester-nh-specifications/",
          "host": "firstlight.net",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.firstlight.net/services/cloud-data-center/data-center/",
          "host": "www.firstlight.net",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        }
      ],
      "loc": {
        "lat": 42.91528,
        "lng": -71.71611,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-access-review-round7-2026-10-14.json",
          "scope": "title-only site evidence hold",
          "fields": {},
          "notes": [
            "Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.firstlight.net/resources/data-center-manchester-nh-specifications/",
              "host": "firstlight.net",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_service",
              "scope": "FirstLight’s current colocation page explicitly offers Manchester space and describes a featured Manchester facility. This supports city-level operator-listed service; a street address and exact match among possible Manchester premises remain unresolved."
            }
          },
          "notes": [
            "FirstLight’s current colocation page explicitly offers Manchester space and describes a featured Manchester facility. This supports city-level operator-listed service; a street address and exact match among possible Manchester premises remain unresolved."
          ],
          "sources": [
            {
              "url": "https://www.firstlight.net/services/cloud-data-center/data-center/",
              "host": "www.firstlight.net",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.firstlight.net/resources/data-center-manchester-nh-specifications/",
              "host": "www.firstlight.net",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Manchester · Hillsborough · Source context reviewed",
      "status_scope": "FirstLight’s current colocation page explicitly offers Manchester space and describes a featured Manchester facility. This supports city-level operator-listed service; a street address and exact match among possible Manchester premises remain unresolved.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "33011"
      }
    },
    {
      "id": "firstlight-portsmouth-nh-data-center-nh",
      "state": "nh",
      "kind": "facility",
      "name": "FirstLight Portsmouth, NH Data Center",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Rockingham"
      ],
      "city": "Portsmouth",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. title-only site evidence hold. Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.firstlight.net/resources/data-center-portsmouth-nh-specifications/",
          "host": "firstlight.net",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.firstlight.net/services/cloud-data-center/data-center/",
          "host": "www.firstlight.net",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed primary source"
        }
      ],
      "loc": {
        "lat": 42.98758,
        "lng": -71.12557,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-access-review-round7-2026-10-14.json",
          "scope": "title-only site evidence hold",
          "fields": {},
          "notes": [
            "Saved page has title, generic corporate footer and inquiry forms, but no specifications or download link. October 7, 2025 displayed date is content publication, not site opening. Albany corporate address excluded.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.firstlight.net/resources/data-center-portsmouth-nh-specifications/",
              "host": "firstlight.net",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_service",
              "scope": "FirstLight’s current colocation page explicitly lists Portsmouth among additional locations offering colocation space. This supports a city-level service context, not a specific building, address, occupied capacity or commissioning date."
            }
          },
          "notes": [
            "FirstLight’s current colocation page explicitly lists Portsmouth among additional locations offering colocation space. This supports a city-level service context, not a specific building, address, occupied capacity or commissioning date."
          ],
          "sources": [
            {
              "url": "https://www.firstlight.net/services/cloud-data-center/data-center/",
              "host": "www.firstlight.net",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            },
            {
              "url": "https://www.firstlight.net/resources/data-center-portsmouth-nh-specifications/",
              "host": "www.firstlight.net",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed primary source"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Portsmouth · Rockingham · Source context reviewed",
      "status_scope": "FirstLight’s current colocation page explicitly lists Portsmouth among additional locations offering colocation space. This supports a city-level service context, not a specific building, address, occupied capacity or commissioning date.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "33015"
      }
    },
    {
      "id": "locke-road-micro-data-center-concord-nh",
      "state": "nh",
      "kind": "facility",
      "name": "Locke Road Micro Data Center",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Merrimack"
      ],
      "city": "Concord",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Concord microfacility application versus completeness and prior land uses. HistoricSeptembermeeting not observed outcome. MidOctober suggested hearing not confirmed specificcalendar event. Earlier selfstorage/poultry proposals separatewithdrawnuses, not data-center approval. Proposedclosedloopimmersioncooling not zero totalwaterclaim; staff sought missing scenarios. Residentialcaretaker/office/garageincludedgrossarea. No numeric criticalITMW or actual operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-10-19",
          "The original City of Concord Planning Board agenda bears an October 19, 2026 print date and lists the requested Locke Road micro data center for October 21 review. This dates the document account without independently establishing first publication, an accomplished hearing outcome, a later scheduled decision day or computing service."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/",
          "host": "concordmonitor.com",
          "date": "2026-09-14",
          "published": "2026-09-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C",
          "host": "concordnh.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://concordnh.legistar.com/Calendar.aspx",
          "host": "concordnh.legistar.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 43.31766,
        "lng": -71.70251,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Concord microfacility application versus completeness and prior land uses",
          "fields": {
            "project": "LockeRoad micro data center",
            "address": "52 LockeRoad, Concord, NewHampshire",
            "owner_applicant": "Granite Municipal Manufacturing and Sales LLC",
            "engineer": "Northpoint Engineering LLC",
            "proposed_building_gross_sqft": 8160,
            "proposed_data_center_space_sqft": 7220,
            "parent_site_acres_approx": 21,
            "reported_buildable_acres_approx": 9.3,
            "stage_asofreport": "application completeness/site design consideration, not final approval",
            "scheduled_completeness_meeting": "2026-09-16T19:00:00-04:00"
          },
          "notes": [
            "HistoricSeptembermeeting not observed outcome. MidOctober suggested hearing not confirmed specificcalendar event. Earlier selfstorage/poultry proposals separatewithdrawnuses, not data-center approval. Proposedclosedloopimmersioncooling not zero totalwaterclaim; staff sought missing scenarios. Residentialcaretaker/office/garageincludedgrossarea. No numeric criticalITMW or actual operation.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.concordmonitor.com/2026/09/14/concord-plans-micro-data-center/",
              "host": "concordmonitor.com",
              "date": "2026-09-14",
              "published": "2026-09-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 66",
          "scope": "The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_named_locke_road_micro_compute_proposal",
              "scope": "The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day."
            },
            "source_read_scope": {
              "original_current_calendar_selected_oct21_row_read": true,
              "original_agenda_physical_page9_item7L_complete_text_read": true,
              "full_agenda_review_not_claimed": true,
              "october19_is_print_date_not_first_publication": true,
              "private_november18_account_not_officially_verified": true,
              "unrelated_private_property_details_excluded": true
            }
          },
          "notes": [
            "The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. Source retrieval does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C",
              "host": "concordnh.legistar.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://concordnh.legistar.com/Calendar.aspx",
              "host": "concordnh.legistar.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Concord · Merrimack · Source context reviewed",
      "status_scope": "The original current City calendar and selected agenda page nine item7L explicitly describe a requested micro data center site plan and conditional use review at 52 Locke Road. This supports a listed proposal. The calendar says minutes and video are not available in that selected row. The October 21 notice does not independently establish an accomplished hearing outcome, a later November 18 decision day, final permission, construction or current computing service. The original agenda page carries an October 19 print date, which is not an independently established posting or physical opening day.",
      "event_evidence": [
        {
          "date": "2026-10-19",
          "text": "The original City of Concord Planning Board agenda bears an October 19, 2026 print date and lists the requested Locke Road micro data center for October 21 review. This dates the document account without independently establishing first publication, an accomplished hearing outcome, a later scheduled decision day or computing service.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://concordnh.legistar.com/View.ashx?M=A&ID=1398973&GUID=B2297D10-756C-4354-BE7A-08F84415E03C",
              "host": "concordnh.legistar.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "33013"
      }
    },
    {
      "id": "granite-shore-merrimack-station-bow-nh",
      "state": "nh",
      "kind": "facility",
      "name": "Merrimack Station Data Center (proposed, Bow)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Merrimack"
      ],
      "city": "Bow",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original local reporting or attributed original syndication; project and regional groups separate.. NHPR September1,2026 republishes ConcordMonitor original reporting on GraniteShorePower/MerrimackStation Bow discussions. April350MWviability request is not approvedinterconnection, executedpower, ITload or DCapplication;200MWfromconsumeradvocate account is differentdiscussedscope, not550MWsum.343acres is ownerlandholding, not approvedcampus. Site described likely rather than confirmed inthisearlyreport. Statewideten-count is directory-derived/notnewcensus. Governor opposition/proposedmora and tabledbill are not a currentstateban. No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification. VermontPublic September23,2026 republishes KateDario/NHPR original report of Bow public-commentmeeting. Selectboardchair says no projectapplication orGraniteShorecommunication received asofmeeting; planningboard would decide a futureapplication. Publicrecords350MWviabilityassessment and200MWdiscussion do notprove commissionedIT. StorycontainsGraniteState/GraniteShore naming inconsistency; legalcounterpartyrequiresoriginalfiling, notsilentrename. Taxeffects explicitlyunknown; oldcoalplant70%historictaxshare notDCforecast. Governor2027budgetmoraproposal notadoptedlaw. Different original reporting fromSeptember1ConcordMonitor, not independentVermont onsite reporting.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
          "host": "nhpr.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.vermontpublic.org/2026-09-23/were-not-willing-to-trade-lower-taxes-for-this-bow-residents-speak-out-against-proposed-data-centers",
          "host": "vermontpublic.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.29733,
        "lng": -71.68032,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json",
          "scope": "Original local reporting or attributed original syndication; project and regional groups separate.",
          "fields": {},
          "notes": [
            "NHPR September1,2026 republishes ConcordMonitor original reporting on GraniteShorePower/MerrimackStation Bow discussions. April350MWviability request is not approvedinterconnection, executedpower, ITload or DCapplication;200MWfromconsumeradvocate account is differentdiscussedscope, not550MWsum.343acres is ownerlandholding, not approvedcampus. Site described likely rather than confirmed inthisearlyreport. Statewideten-count is directory-derived/notnewcensus. Governor opposition/proposedmora and tabledbill are not a currentstateban.",
            "No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."
          ],
          "sources": [
            {
              "url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
              "host": "nhpr.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "original-reporting-regional-scope-and-conditional-stages-round62-2026-10-15.json",
          "scope": "Original local reporting or attributed original syndication; project and regional groups separate.",
          "fields": {},
          "notes": [
            "VermontPublic September23,2026 republishes KateDario/NHPR original report of Bow public-commentmeeting. Selectboardchair says no projectapplication orGraniteShorecommunication received asofmeeting; planningboard would decide a futureapplication. Publicrecords350MWviabilityassessment and200MWdiscussion do notprove commissionedIT. StorycontainsGraniteState/GraniteShore naming inconsistency; legalcounterpartyrequiresoriginalfiling, notsilentrename. Taxeffects explicitlyunknown; oldcoalplant70%historictaxshare notDCforecast. Governor2027budgetmoraproposal notadoptedlaw. Different original reporting fromSeptember1ConcordMonitor, not independentVermont onsite reporting.",
            "No exact/current operating census, signed-contract, court/permit, measured impact or all-field certification."
          ],
          "sources": [
            {
              "url": "https://www.vermontpublic.org/2026-09-23/were-not-willing-to-trade-lower-taxes-for-this-bow-residents-speak-out-against-proposed-data-centers",
              "host": "vermontpublic.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Bow · Merrimack · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "33013"
      }
    },
    {
      "id": "nh-doit-hazen-concord-data-center-nh",
      "state": "nh",
      "kind": "facility",
      "name": "New Hampshire DoIT Hazen Drive Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "crypto": false,
      "type": "Data center research context",
      "counties": [
        "Merrimack"
      ],
      "city": "Concord",
      "address": "",
      "who": "New Hampshire Department of Information Technology",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
      "date": "",
      "events": [
        [
          "2026-10-25",
          "Added to the atlas. Compilation date only, not opening or construction."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.gc.nh.gov/LBA/budget/FiscalItems/2-1-13%20Agenda%20Items.pdf",
          "host": "www.gc.nh.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=27+Hazen+Drive+Concord+NH&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ],
      "loc": {
        "lat": 43.25493,
        "lng": -71.6766,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Concord sourced data center research context. County level only.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 3 inherited discovery review 16",
          "scope": "Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
          "fields": {
            "source_context": {
              "name": "New Hampshire DoIT Hazen Drive Data Center",
              "operator": "New Hampshire Department of Information Technology",
              "scope": "Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
              "address": "",
              "exact_street_unpublished": true
            },
            "county_association": {
              "county": "Merrimack",
              "county_fips": "33013",
              "scope": "Exact retained Census27HazenDriveConcord match gives Merrimack33013, corroborating the legislative premises address."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-25",
              "scope": "Intended compilation day only. Must equal actual admission day before Native commit; never a physical milestone."
            }
          },
          "notes": [
            "Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
            "Historical forecasts, permits, funding and building occupancy do not establish current data center operation."
          ],
          "sources": [
            {
              "url": "https://www.gc.nh.gov/LBA/budget/FiscalItems/2-1-13%20Agenda%20Items.pdf",
              "host": "www.gc.nh.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Official source retained for premises or county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=27+Hazen+Drive+Concord+NH&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Official source retained for premises or county context"
            }
          ],
          "checked": "2026-10-25",
          "whole_record_certified": false
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "33013"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
