  "schema_version": 1,
  "source_compilation_context": {
    "nm": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/nm.json",
      "updated": "2026-10-24"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "nm",
    "label": "New Mexico"
  },
  "records": [
    {
      "id": "atterix-raton-digital-hub-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Atterix Raton Advanced Digital Hub",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Colfax"
      ],
      "city": "Raton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. MOU/study is not development approval or operation. Initial five MW is included in possible total fifty MW, not fifty-five. Deferred moratorium vote is not adopted pause. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.kob.com/news/top-news/raton-residents-push-back-on-proposed-data-center-plans/",
          "host": "kob.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.60615,
        "lng": -104.64696,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "KOB describes Atterix Raton MOU for a six-month feasibility study and possible phased digital hub.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "MOU/study is not development approval or operation. Initial five MW is included in possible total fifty MW, not fifty-five. Deferred moratorium vote is not adopted pause.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.kob.com/news/top-news/raton-residents-push-back-on-proposed-data-center-plans/",
              "host": "kob.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Raton · Colfax · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35007"
      }
    },
    {
      "id": "centersquare-abq1-albuquerque-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Centersquare ABQ1",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bernalillo"
      ],
      "city": "Albuquerque",
      "address": "",
      "who": "Csquare",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Utility8.6MW is not ITload; advertisedarea not explicitlyraisedfloor. Operator PDF identifies ABQ1 and distinct utility/UPS/generator ratings. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://csquare.com/hubfs/CenterSquare/docs/Centersquare-ABQ-SpecSheet.pdf",
          "host": "csquare.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.csquare.com/data-centers/albuquerque",
          "host": "www.csquare.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        },
        {
          "url": "https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ABQ-SpecSheet.pdf",
          "host": "www.csquare.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Current named ABQ1 operator specification sheet address"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=400+Tijeras+Avenue+Northwest%2C+Albuquerque%2C+NM+87102&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Calculated Census street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-106.65513117956382%2C35.08344201721153%2C-106.64744659106216%2C35.089730195436466&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Aerial setting context only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -106.651288885313,
        "lat": 35.086586106324,
        "precision": "address",
        "basis": "Published Centersquare facility address 400 Tijeras Avenue Northwest, Albuquerque, NM 87102 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "street": "400 Tijeras Avenue Northwest",
            "city": "Albuquerque",
            "utility_power_mw": 8.6,
            "ups_capacity_mw": 1.8,
            "generator_capacity_mw": 5,
            "advertised_area_sqft": 12921
          },
          "notes": [
            "Utility8.6MW is not ITload; advertisedarea not explicitlyraisedfloor.",
            "Operator PDF identifies ABQ1 and distinct utility/UPS/generator ratings.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://csquare.com/hubfs/CenterSquare/docs/Centersquare-ABQ-SpecSheet.pdf",
              "host": "csquare.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "Csquare lists current colocation, connectivity and on-site support for its specifically named ABQ1 in Albuquerque facility. Source naming is retained as context; no provider-brand, address, point, capacity or certification field is promoted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "Csquare lists current colocation, connectivity and on-site support for its specifically named ABQ1 in Albuquerque facility. Source naming is retained as context; no provider-brand, address, point, capacity or certification field is promoted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "Csquare lists current colocation, connectivity and on-site support for its specifically named ABQ1 in Albuquerque facility. Source naming is retained as context; no provider-brand, address, point, capacity or certification field is promoted."
          ],
          "sources": [
            {
              "url": "https://www.csquare.com/data-centers/albuquerque",
              "host": "www.csquare.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 15, October 23, 2026",
          "scope": "Current official operator street reference only. All native protected facts and canonical address remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -106.651288885313,
                "lat": 35.086586106324,
                "precision": "address",
                "basis": "Published Centersquare facility address 400 Tijeras Avenue Northwest, Albuquerque, NM 87102 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "400 Tijeras Avenue Northwest, Albuquerque, NM 87102",
              "county_fips": [
                "35001"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The current official market page names the exact facility code and links the operator specification sheet. The named PDF facility address section was rendered and actually viewed. Related facilities, corporate offices and PDF map coordinates are excluded.",
            "The unique Census street range is a calculated address reference inside the existing state and county. Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. The street reference does not locate a surveyed roof, legal parcel, full campus, tenant suite or floor.",
            "Canonical address, stage, status, physical dates, quantities, company roles, jurisdiction and all unrelated wrappers remain exact. Current specifications and marketing do not certify commissioning or current operation.",
            "The retained Census method capture remains dated October 22. Actual operator, match and aerial captures are dated October 23. No source retrieval date is silently advanced."
          ],
          "sources": [
            {
              "url": "https://www.csquare.com/hubfs/Centersquare%20website/docs/Csquare-ABQ-SpecSheet.pdf",
              "host": "www.csquare.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current named ABQ1 operator specification sheet address"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=400+Tijeras+Avenue+Northwest%2C+Albuquerque%2C+NM+87102&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Calculated Census street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-106.65513117956382%2C35.08344201721153%2C-106.64744659106216%2C35.089730195436466&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Aerial setting context only, acquisition date unknown"
            },
            {
              "url": "https://www.csquare.com/data-centers/albuquerque",
              "host": "www.csquare.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current official market page names ABQ1 and links the exact specification sheet"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check26, October23,2026",
          "scope": "The current Csquare provider website names this retained facility code and offers colocation and customer support. Operator per source identifies the provider brand only, not legal property ownership, a legal operating entity or sole operation of the whole building. Existing Centersquare record names are retained. No legal alias, corporate succession, identity merger, new physical building, status, point, street address, jurisdiction, power, water, equipment, certification or completion finding is adopted. Source marketing figures and service levels are not independent measurements. The page publication date remains unknown; retrieval is not an opening date. Only the named ABQ1 service context is reviewed. Other codes on the shared market page keep their separate records and source scopes.",
          "fields": {
            "company_association": {
              "name": "Csquare",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "The current Csquare provider website names this retained facility code and offers colocation and customer support. Operator per source identifies the provider brand only, not legal property ownership, a legal operating entity or sole operation of the whole building. Existing Centersquare record names are retained. No legal alias, corporate succession, identity merger, new physical building, status, point, street address, jurisdiction, power, water, equipment, certification or completion finding is adopted. Source marketing figures and service levels are not independent measurements. The page publication date remains unknown; retrieval is not an opening date. Only the named ABQ1 service context is reviewed. Other codes on the shared market page keep their separate records and source scopes."
            },
            "provider_role": "operator"
          },
          "notes": [
            "The current Csquare provider website names this retained facility code and offers colocation and customer support. Operator per source identifies the provider brand only, not legal property ownership, a legal operating entity or sole operation of the whole building. Existing Centersquare record names are retained. No legal alias, corporate succession, identity merger, new physical building, status, point, street address, jurisdiction, power, water, equipment, certification or completion finding is adopted. Source marketing figures and service levels are not independent measurements. The page publication date remains unknown; retrieval is not an opening date. Only the named ABQ1 service context is reviewed. Other codes on the shared market page keep their separate records and source scopes."
          ],
          "sources": [
            {
              "url": "https://www.csquare.com/data-centers/albuquerque",
              "host": "www.csquare.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current named ABQ1 provider relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Albuquerque · Bernalillo · Source context reviewed",
      "status_scope": "Csquare lists current colocation, connectivity and on-site support for its specifically named ABQ1 in Albuquerque facility. Source naming is retained as context; no provider-brand, address, point, capacity or certification field is promoted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    },
    {
      "id": "connect-data-centers-albuquerque-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Connect Albuquerque (Westpointe 40)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bernalillo"
      ],
      "city": "Albuquerque",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Signed municipal site-plan decision and separate contractor project section; not full operating-site certification.. Site-plan approval has water/sewer, infrastructure-list, recorded improvement-agreement and plat conditions. Notice expressly separates later building permits from site approval; satisfaction, actual permit issuance and appeal outcome not verified. The operative notice states July31; the signature-audit document title says July24 while signature audit is August1. Preserve different date roles and document-label discrepancy. Printed appeal deadline August16 is not independently recalculated or certified as statutory deadline. 90301squarefeet includes the6800office component; do not add them. Legal tract7.9830acres, requested11.5acreplat and directory10acres are different scopes, not interchangeable exact footprints. City calls it10MW without specifying criticalIT. Utility adequacy finding is not executed10MWservice agreement. Water-meter design conditions and exterior tanks are not measured consumption. PowerDesign participant page labels completion January2026; this is a contractor project milestone claim, not occupancy or tenant-service certificate. Only this project section was read, not the large unrelated portfolio list. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-07-31",
          "The operative body of the original Albuquerque decision states that the computing site plan was administratively approved on July 31, 2024. Its audit label separately says July 24 and its signing completion is dated August 1. This is a planning action without proof of completed conditions or computing operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://documents.cabq.gov/planning/development-facilitation-team/PR-2020-004747%20-%20SI-2024-00451%20July%2031st%2C%202024%20Notice%20of%20Decision%20-%20signed.pdf",
          "host": "documents.cabq.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.powerdesigninc.us/projects/10mw-albq-data-center",
          "host": "powerdesigninc.us",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 35.05131,
        "lng": -106.67023,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round39-2026-10-14.json",
          "scope": "Signed municipal site-plan decision and separate contractor project section; not full operating-site certification.",
          "fields": {
            "city_project": "PR-2020-004747",
            "site_plan_application": "SI-2024-00451",
            "decision_date_in_operative_notice": "2024-07-31",
            "signature_audit_date": "2024-08-01",
            "approved_building_sqft": 90301,
            "office_component_sqft": 6800,
            "printed_legal_tract_acres": 7.983,
            "requested_adjusted_plat_acres": 11.5,
            "planned_mw_with_unspecified_basis": 10,
            "critical_it_mw": null,
            "contractor_published_completion_month": "2026-01",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Site-plan approval has water/sewer, infrastructure-list, recorded improvement-agreement and plat conditions. Notice expressly separates later building permits from site approval; satisfaction, actual permit issuance and appeal outcome not verified.",
            "The operative notice states July31; the signature-audit document title says July24 while signature audit is August1. Preserve different date roles and document-label discrepancy. Printed appeal deadline August16 is not independently recalculated or certified as statutory deadline.",
            "90301squarefeet includes the6800office component; do not add them. Legal tract7.9830acres, requested11.5acreplat and directory10acres are different scopes, not interchangeable exact footprints.",
            "City calls it10MW without specifying criticalIT. Utility adequacy finding is not executed10MWservice agreement. Water-meter design conditions and exterior tanks are not measured consumption.",
            "PowerDesign participant page labels completion January2026; this is a contractor project milestone claim, not occupancy or tenant-service certificate. Only this project section was read, not the large unrelated portfolio list.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://documents.cabq.gov/planning/development-facilitation-team/PR-2020-004747%20-%20SI-2024-00451%20July%2031st%2C%202024%20Notice%20of%20Decision%20-%20signed.pdf",
              "host": "documents.cabq.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.powerdesigninc.us/projects/10mw-albq-data-center",
              "host": "powerdesigninc.us",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 72",
          "scope": "The complete original six page City decision describes administrative site plan approval on July 31, 2024 for the Daytona Road computing proposal. Conditions include infrastructure approval, recorded platting and later final signoff. The appended digital signing audit is dated August 1 and labels the decision July 24, while the operative body says July 31. Those dates are not silently harmonized. This establishes a historical planning action rather than present construction, accomplished conditions or computing service. Exact current stage and operating company crosswalk remain held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_city_siteplan_decision_current_physical_stage_held",
              "scope": "The complete original six page City decision describes administrative site plan approval on July 31, 2024 for the Daytona Road computing proposal. Conditions include infrastructure approval, recorded platting and later final signoff. The appended digital signing audit is dated August 1 and labels the decision July 24, while the operative body says July 31. Those dates are not silently harmonized. This establishes a historical planning action rather than present construction, accomplished conditions or computing service. Exact current stage and operating company crosswalk remain held."
            },
            "source_read_scope": {
              "complete_original_six_page_decision_and_digital_audit_text_read": true,
              "operative_day_audit_label_and_signing_day_distinct": true,
              "conditions_not_accomplished_commissioning": true,
              "no_current_legal_force_capacity_or_role_changes": true
            }
          },
          "notes": [
            "The complete original six page City decision describes administrative site plan approval on July 31, 2024 for the Daytona Road computing proposal. Conditions include infrastructure approval, recorded platting and later final signoff. The appended digital signing audit is dated August 1 and labels the decision July 24, while the operative body says July 31. Those dates are not silently harmonized. This establishes a historical planning action rather than present construction, accomplished conditions or computing service. Exact current stage and operating company crosswalk remain held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://documents.cabq.gov/planning/development-facilitation-team/PR-2020-004747%20-%20SI-2024-00451%20July%2031st%2C%202024%20Notice%20of%20Decision%20-%20signed.pdf",
              "host": "documents.cabq.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Albuquerque · Bernalillo · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-07-31",
          "text": "The operative body of the original Albuquerque decision states that the computing site plan was administratively approved on July 31, 2024. Its audit label separately says July 24 and its signing completion is dated August 1. This is a planning action without proof of completed conditions or computing operation.",
          "kind": "approved",
          "sources": [
            {
              "url": "https://documents.cabq.gov/planning/development-facilitation-team/PR-2020-004747%20-%20SI-2024-00451%20July%2031st%2C%202024%20Notice%20of%20Decision%20-%20signed.pdf",
              "host": "documents.cabq.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35001"
      }
    },
    {
      "id": "green-data-socorro-county-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Green Data Socorro Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Socorro"
      ],
      "city": "Socorro",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Jessica Carranza Pino, El Defensor Chieftain original interviews syndicated by Albuquerque Journal April 15, 2026: Green Data CEO describes a Socorro proposal with 2 GW baseload GENERATION and a monthly delivery goal. No critical IT basis, secured interconnection, binding NMT partnership, construction start or largest-in-world certification. Atmospheric-water/renewable/minimal-grid-use statements are developer design aspirations, not measured consumption or zero-impact findings. Spaceport America 50 MW solar/5 MW continuous concept is another project; neither is additive Socorro IT. The Illinois mayor and developer disagree about an earlier failed venture; reported past conduct is not a verified financing outcome for Socorro. Not all fields, current operation, precise parcel or critical IT independently certified.",
      "date": "",
      "events": [
        [
          "2026-03-06",
          "The original New Mexico Tech minutes record March 6, 2026 direction and authority for continued evaluation of a Green Data Center opportunity. The separate April 17 approval of the minutes does not date construction, an executed lease or computing service."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.abqjournal.com/news/developer-plans-worlds-largest-green-data-center-in-socorro/3023420",
          "host": "abqjournal.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.nmt.edu/leadership/docs/2026-03-06-nmt-bor-regular-mtg-minutes-final.pdf",
          "host": "www.nmt.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 34.00741,
        "lng": -106.93023,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json",
          "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.",
          "fields": {},
          "notes": [
            "Jessica Carranza Pino, El Defensor Chieftain original interviews syndicated by Albuquerque Journal April 15, 2026: Green Data CEO describes a Socorro proposal with 2 GW baseload GENERATION and a monthly delivery goal. No critical IT basis, secured interconnection, binding NMT partnership, construction start or largest-in-world certification. Atmospheric-water/renewable/minimal-grid-use statements are developer design aspirations, not measured consumption or zero-impact findings. Spaceport America 50 MW solar/5 MW continuous concept is another project; neither is additive Socorro IT. The Illinois mayor and developer disagree about an earlier failed venture; reported past conduct is not a verified financing outcome for Socorro.",
            "Not all fields, current operation, precise parcel or critical IT independently certified."
          ],
          "sources": [
            {
              "url": "https://www.abqjournal.com/news/developer-plans-worlds-largest-green-data-center-in-socorro/3023420",
              "host": "abqjournal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 72",
          "scope": "Selected original Regents minutes dated March 6, 2026 describe a Green Data Center opportunity and direct further evaluation, information gathering and due diligence about impacts, feasibility, infrastructure and water. The minutes were approved on April 17. Authority to continue evaluation is not approval to construct, an executed land lease or computing service. This bounded body does not independently crosswalk all private developer, land area and campus accounts. The County transparency page was read, but its public document folder is disallowed by robots and no County moratorium instrument was obtained. Exact current physical stage remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "institutional_evaluation_authority_not_project_construction_or_service",
              "scope": "Selected original Regents minutes dated March 6, 2026 describe a Green Data Center opportunity and direct further evaluation, information gathering and due diligence about impacts, feasibility, infrastructure and water. The minutes were approved on April 17. Authority to continue evaluation is not approval to construct, an executed land lease or computing service. This bounded body does not independently crosswalk all private developer, land area and campus accounts. The County transparency page was read, but its public document folder is disallowed by robots and no County moratorium instrument was obtained. Exact current physical stage remains held."
            },
            "source_read_scope": {
              "original_five_page_minutes_selected_physical_pages1_3_5_read": true,
              "meeting_day_distinct_from_minutes_approval_day": true,
              "evaluation_authority_not_final_construction_permission": true,
              "no_unread_county_moratorium_or_exact_corporate_crosswalk_adopted": true
            }
          },
          "notes": [
            "Selected original Regents minutes dated March 6, 2026 describe a Green Data Center opportunity and direct further evaluation, information gathering and due diligence about impacts, feasibility, infrastructure and water. The minutes were approved on April 17. Authority to continue evaluation is not approval to construct, an executed land lease or computing service. This bounded body does not independently crosswalk all private developer, land area and campus accounts. The County transparency page was read, but its public document folder is disallowed by robots and no County moratorium instrument was obtained. Exact current physical stage remains held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.nmt.edu/leadership/docs/2026-03-06-nmt-bor-regular-mtg-minutes-final.pdf",
              "host": "www.nmt.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Socorro · Socorro · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-03-06",
          "text": "The original New Mexico Tech minutes record March 6, 2026 direction and authority for continued evaluation of a Green Data Center opportunity. The separate April 17 approval of the minutes does not date construction, an executed lease or computing service.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.nmt.edu/leadership/docs/2026-03-06-nmt-bor-regular-mtg-minutes-final.pdf",
              "host": "www.nmt.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35053"
      }
    },
    {
      "id": "green-data-spaceport-america-sierra-county-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Green Data Spaceport America Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Sierra"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Green Data proposal requires state land commissioner sublease consent, undecided in report. Do not tag this state-land project cancelled by county resolution. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.abqjournal.com/news/sierra-county-enacts-18-month-data-center-moratorium/3086595",
          "host": "abqjournal.com",
          "date": "2026-07-21",
          "published": "2026-07-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sierraco.org/wp-content/uploads/2026-07-21-minutes.pdf",
          "host": "www.sierraco.org",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.sierraco.org/wp-content/uploads/county-commission-agenda-2026-10-20.pdf",
          "host": "www.sierraco.org",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 33.13068,
        "lng": -107.19232,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "moratorium-with-jurisdiction-limit",
            "reported_finding": "Albuquerque Journal reports unanimous 18-month Sierra County moratorium, but explicitly says resolution does not apply on state land at Spaceport America.",
            "report_display_date": "2026-07-21",
            "independently_verified_current_status": null
          },
          "notes": [
            "Green Data proposal requires state land commissioner sublease consent, undecided in report. Do not tag this state-land project cancelled by county resolution.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.abqjournal.com/news/sierra-county-enacts-18-month-data-center-moratorium/3086595",
              "host": "abqjournal.com",
              "date": "2026-07-21",
              "published": "2026-07-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 72",
          "scope": "All seven original scanned minute pages were actually viewed. The July 21, 2026 minutes record public concerns about a possible AI facility near the Spaceport and, separately, approval of opposition resolution 2026 51 and institution of an eighteen month study moratorium. The signed minutes do not independently name the exact Green Data company or establish this inherited project physical construction, legal eligibility or closure. The complete moratorium instrument, exact commencement, exceptions and current legal force remain unverified. The later October 20 agenda lists a suggested computing study, which is a past proposed discussion rather than proof that it occurred or a new future hearing. No moratorium expiration is calculated.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "signed_county_study_action_exact_project_crosswalk_and_stage_held",
              "scope": "All seven original scanned minute pages were actually viewed. The July 21, 2026 minutes record public concerns about a possible AI facility near the Spaceport and, separately, approval of opposition resolution 2026 51 and institution of an eighteen month study moratorium. The signed minutes do not independently name the exact Green Data company or establish this inherited project physical construction, legal eligibility or closure. The complete moratorium instrument, exact commencement, exceptions and current legal force remain unverified. The later October 20 agenda lists a suggested computing study, which is a past proposed discussion rather than proof that it occurred or a new future hearing. No moratorium expiration is calculated."
            },
            "source_read_scope": {
              "all_original_seven_scanned_minute_pages_actually_viewed": true,
              "physical_pages_used_despite_repeated_printed_page2": true,
              "minute_signatures_and_clerk_attestation_actually_viewed": true,
              "original_october_agenda_selected_physical_page1_read": true,
              "exact_company_crosswalk_not_independently_established": true,
              "no_full_legal_instrument_effective_day_or_calculated_expiry": true,
              "no_county_action_as_physical_closure": true
            }
          },
          "notes": [
            "All seven original scanned minute pages were actually viewed. The July 21, 2026 minutes record public concerns about a possible AI facility near the Spaceport and, separately, approval of opposition resolution 2026 51 and institution of an eighteen month study moratorium. The signed minutes do not independently name the exact Green Data company or establish this inherited project physical construction, legal eligibility or closure. The complete moratorium instrument, exact commencement, exceptions and current legal force remain unverified. The later October 20 agenda lists a suggested computing study, which is a past proposed discussion rather than proof that it occurred or a new future hearing. No moratorium expiration is calculated.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.sierraco.org/wp-content/uploads/2026-07-21-minutes.pdf",
              "host": "www.sierraco.org",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.sierraco.org/wp-content/uploads/county-commission-agenda-2026-10-20.pdf",
              "host": "www.sierraco.org",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Sierra · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35051"
      }
    },
    {
      "id": "h5-data-centers-albuquerque-nm",
      "state": "nm",
      "kind": "facility",
      "name": "H5 Data Centers Albuquerque",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bernalillo"
      ],
      "city": "Albuquerque",
      "address": "",
      "who": "H5 Data Centers",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical announcement. Whole mixed-use building area is not H5 white space; present tenancy/operation requires current evidence. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://h5datacenters.com/h5-Albuquerque.html",
          "host": "h5datacenters.com",
          "date": "2018-03-26",
          "published": "2018-03-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://h5datacenters.com/albuquerque-data-center.html",
          "host": "h5datacenters.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=505+Marquette+Ave+NW%2C+Albuquerque%2C+NM+87102&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street method and limits"
        }
      ],
      "loc": {
        "lat": 35.088401231788,
        "lng": -106.652229489129,
        "precision": "address",
        "basis": "Published H5 Data Centers facility address 505 Marquette Ave NW, Albuquerque, NM 87102 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "h5-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "historical_expansion_announcement_date": "2018-03-26",
            "published_address": "505 Marquette Avenue NW, Albuquerque, New Mexico",
            "mixed_use_carrier_hotel_office_building_sqft": 225000
          },
          "notes": [
            "Historical announcement. Whole mixed-use building area is not H5 white space; present tenancy/operation requires current evidence.",
            "Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://h5datacenters.com/h5-Albuquerque.html",
              "host": "h5datacenters.com",
              "date": "2018-03-26",
              "published": "2018-03-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "H5 offers current wholesale space, suites, cages and interconnection at the named Albuquerque carrier facility. Powered-shell customization does not certify all tenant fitouts. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "H5 offers current wholesale space, suites, cages and interconnection at the named Albuquerque carrier facility. Powered-shell customization does not certify all tenant fitouts. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "H5 offers current wholesale space, suites, cages and interconnection at the named Albuquerque carrier facility. Powered-shell customization does not certify all tenant fitouts."
          ],
          "sources": [
            {
              "url": "https://h5datacenters.com/albuquerque-data-center.html",
              "host": "h5datacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 7, October 22, 2026",
          "scope": "Official facility service street reference only. No canonical address, current operation, physical date, capacity, company role, jurisdiction, parcel, complete campus or distinct building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 35.088401231788,
                "lng": -106.652229489129,
                "precision": "address",
                "basis": "Published H5 Data Centers facility address 505 Marquette Ave NW, Albuquerque, NM 87102 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "505 Marquette Ave NW, Albuquerque, NM 87102",
              "county_fips": [
                "35001"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named operator facility page publishes this service address in its facility location section. Navigation, related facilities, corporate addresses, embedded maps and operator template coordinates are excluded. The canonical address wrapper remains exact; the published address is retained as reviewed location evidence.",
            "The unique Census street match and retained county boundary agree with the existing county. Street interpolation does not identify a roof, suite, floor, campus boundary, legal parcel, ownership or distinct physical building. Status, dates, quantities and jurisdiction remain unchanged."
          ],
          "sources": [
            {
              "url": "https://h5datacenters.com/albuquerque-data-center.html",
              "host": "h5datacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Official named facility street address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=505+Marquette+Ave+NW%2C+Albuquerque%2C+NM+87102&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 12, October 23, 2026",
          "scope": "H5 Data Centers presents this named facility or campus in its own colocation service portfolio. Operator is the attributed provider brand relationship, not an independently established legal operating entity, property owner or confirmation that every building and phase is operating. No status, location, physical date, capacity, certification, outage guarantee, utility price or environmental outcome is promoted. The page describes colocation across multiple facilities and also offers powered shells. This role is provider campus context, not a separate tenant operator or resolved individual building.",
          "fields": {
            "company_association": {
              "name": "H5 Data Centers",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "H5 Data Centers presents this named facility or campus in its own colocation service portfolio. Operator is the attributed provider brand relationship, not an independently established legal operating entity, property owner or confirmation that every building and phase is operating. No status, location, physical date, capacity, certification, outage guarantee, utility price or environmental outcome is promoted. The page describes colocation across multiple facilities and also offers powered shells. This role is provider campus context, not a separate tenant operator or resolved individual building."
            },
            "provider_role": "operator"
          },
          "notes": [
            "H5 Data Centers presents this named facility or campus in its own colocation service portfolio. Operator is the attributed provider brand relationship, not an independently established legal operating entity, property owner or confirmation that every building and phase is operating. No status, location, physical date, capacity, certification, outage guarantee, utility price or environmental outcome is promoted. The page describes colocation across multiple facilities and also offers powered shells. This role is provider campus context, not a separate tenant operator or resolved individual building.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://h5datacenters.com/albuquerque-data-center.html",
              "host": "h5datacenters.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named colocation portfolio page, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Albuquerque · Bernalillo · Source context reviewed",
      "status_scope": "H5 offers current wholesale space, suites, cages and interconnection at the named Albuquerque carrier facility. Powered-shell customization does not certify all tenant fitouts. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    },
    {
      "id": "nova-innova-data-center-albuquerque-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Innova Data Center (Mesa del Sol)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bernalillo"
      ],
      "city": "Albuquerque",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 130,000-square-foot building, 6,000 delivered first-phase data space and potential 80,000 data space are different scopes. The inherited 8 MW power and 100-to-150-million-USD full-campus expectation are not current critical IT or completed spending. A ten-year lease with purchase option is not verified ownership today. Largest-in-state was an operator claim, not independently established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.datacenterknowledge.com/archives/2015/06/29/navajo-owned-data-center-offers-way-to-diversify-tribes-revenue-base-beyond-casinos",
          "host": "datacenterknowledge.com",
          "date": "2015-06-29",
          "published": "2015-06-29",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 35.06314,
        "lng": -106.68314,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Data Center Knowledge reports Innava/Nova's launched first phase at a former solar-panel plant in Albuquerque, separate from an earlier proposed site about a mile away.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The 130,000-square-foot building, 6,000 delivered first-phase data space and potential 80,000 data space are different scopes. The inherited 8 MW power and 100-to-150-million-USD full-campus expectation are not current critical IT or completed spending. A ten-year lease with purchase option is not verified ownership today. Largest-in-state was an operator claim, not independently established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.datacenterknowledge.com/archives/2015/06/29/navajo-owned-data-center-offers-way-to-diversify-tribes-revenue-base-beyond-casinos",
              "host": "datacenterknowledge.com",
              "date": "2015-06-29",
              "published": "2015-06-29",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Albuquerque · Bernalillo · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35001"
      }
    },
    {
      "id": "new-era-energy-digital-lea-county-data-center-nm",
      "state": "nm",
      "kind": "project",
      "name": "Lea County Data Center",
      "group": "proposed",
      "status": "Operator-listed plan",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center development",
      "counties": [
        "Lea"
      ],
      "city": "",
      "address": "",
      "who": "New Era Energy & Digital",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "County-only New Era project context. The inherited Lovington label and approximate point are retained in location and field history but are not verified as this project location. Current company wording supports an Operator-listed plan, not construction, energization, tenants, ownership or operation. Its 7+ GW energy-integrated pipeline is not normalized critical IT or approved service. Texas and company-wide pipeline figures remain separate; Google Lea County evaluation is a different record.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.newerainfra.ai/",
          "host": "newerainfra.ai",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.81782,
        "lng": -103.44057,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "New Era Lea County planned pipeline versus Texas project",
          "fields": {
            "developer": "New Era Energy and Digital",
            "project": "Lea County, New Mexico",
            "planned_capacity_gw_min_exclusive": 7,
            "power_basis": "planned energy-integrated pipeline, not explicit critical IT",
            "planned_land_acres": 3500,
            "separate_texas_tcdc_planned_capacity_gw_min_exclusive": 1.4,
            "texas_acreage_conflict": [
              493,
              492
            ]
          },
          "notes": [
            "7GWLeaCountyand1.4GWTexasseparateprojects,notsite-leveloperatingIT. Company8plusGWpipelineincludesprojectsnotadditionalcapacity. Generic12to15monthmodulardeploymenttargetnotdatedLeaCountyRFS. No exactparcel,energization/permitsorconfirmedtenant.493/492Texasacredifferenceheldforlatercrosswalk.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.newerainfra.ai/",
              "host": "newerainfra.ai",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Lea County and Kansas City identity and financing review October 16",
          "scope": "Source-specific exploration, planned-development identity or financing context. No precise point, physical-site census, site IT figure, actual construction, opening or realized incentive amount is established.",
          "fields": {
            "project_identity": "New Era Energy & Digital currently lists a Lea County, New Mexico pipeline project. This review uses the existing record and does not merge it with Google exploration in the same county.",
            "current_plan_scope": "The company portfolio supports an Operator-listed plan label for a development-stage project, not current construction, energization, tenants or an operating data center. New Era is the project developer brand, not a verified property owner or current tenant.",
            "advertised_envelope": {
              "planned_capacity_literal": "7+ GW",
              "planned_acres_literal": "3500 acres",
              "scope": "Advertised energy-integrated pipeline envelope. Capacity is not explicitly critical IT or approved utility service. Land is a plan/option context, not a surveyed owned parcel."
            },
            "separate_texas_scope": "The separately advertised Texas Critical Data Centers project and company-wide 8+ GW pipeline are not additive Lea County figures. The homepage Texas acreage variants 493/492 and modular 12-15-month targets do not date or quantify Lea County completion.",
            "location_scope": "Lovington and the inherited approximate point remain legacy research context. A county-level portfolio label does not certify municipality, parcel, roof, street or a Google relationship.",
            "provider_roles": [
              {
                "name": "New Era Energy & Digital",
                "role": "developer"
              }
            ]
          },
          "notes": [
            "Separate a prospective project, a financing vote and actual physical construction. Follow each finding to its own sources.",
            "All existing location fields, jurisdictions, addresses, legacy quantities and opening dates remain unchanged."
          ],
          "sources": [
            {
              "url": "https://www.newerainfra.ai/",
              "host": "www.newerainfra.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Current New Era project portfolio"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Primary project scope and county-only location review, October 16, 2026",
          "scope": "Bounded primary-source planning and location review; current physical activity is separately sourced.",
          "fields": {
            "location_review_decision": {
              "decision": "county_only_no_point",
              "county": "Lea",
              "county_fips": "35025",
              "municipality": null,
              "street_address": null,
              "precise_parcel": null,
              "reason": "Current issuer location section identifies Lea County, New Mexico only. The inherited Lovington label and approximate point are not supported as the project location by this source; remove them from current location fields without declaring the project absent from Lovington."
            },
            "planned_pipeline_scope": {
              "issuer_display": "7+ GW planned capacity; 3500 acres and energy-integrated pipeline",
              "normalized_it_mw": null,
              "approved_service_mw": null,
              "operating_capacity_mw": null,
              "land_title_verified": false,
              "scope": "Company plan, not construction, parcel ownership, a confirmed tenant or delivered capacity."
            },
            "separate_project_contexts": "Texas Critical Data Centers and company-wide 8+ GW pipeline are separate scopes. Google Lea County evaluation remains a separate research record; no shared parcel, operator relationship or capacity addition is established."
          },
          "notes": [
            "County-wide display only, with no invented site, street, municipality or aerial destination.",
            "Review date is October 16 in America/New_York; UTC retrieval is October 17. The undated page has no inferred publication date."
          ],
          "sources": [
            {
              "url": "https://www.newerainfra.ai/",
              "host": "www.newerainfra.ai",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "New Era current Lea County planned pipeline; county-only location"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lea County · Exact site location unconfirmed",
      "status_scope": "The company portfolio supports an Operator-listed plan label for a development-stage project, not current construction, energization, tenants or an operating data center. New Era is the project developer brand, not a verified property owner or current tenant.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "35025"
      }
    },
    {
      "id": "meta-los-lunas-ai-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Meta Los Lunas AI Expansion",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Valencia"
      ],
      "city": "Los Lunas",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Secondary consultant compilation only, not original permits, audited spending, signed IRBs, water records or utility contract. Internal timeline describes spring2025 groundbreaking as future in March2026 and alternates six/eight completed structures and phase milestones; current building count held. Generic40MWperbuilding/80MWexpansion not adopted as criticalIT. USD30billion and series IRB ceilings are not grants, public debt or capex spent; 145million cumulative GRT cannot be annualized or netted against incomparable PILOT schedules. 283ML2023consumption, allocations up to4.5MGD, 885MWrenewable procurement and100MWbattery are distinct measures, not current campus IT, actual water withdrawal or continuous renewable supply. Photo-based commissioning/tier/power inferences and asserted population causation remain unverified; original sources needed. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico",
          "host": "mmcginvest.com",
          "date": "2026-03-07",
          "published": "2026-03-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/asset/los-lunas/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 34.71532,
        "lng": -106.80882,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round35-2026-10-14.json",
          "scope": "Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.",
          "fields": {
            "reported_context": "MMCG commercial analysis describes Meta Los Lunas phased expansion and reports an approximately USD3.3billion completed-buildout investment, eight completed buildings and later AI-building plans.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Secondary consultant compilation only, not original permits, audited spending, signed IRBs, water records or utility contract. Internal timeline describes spring2025 groundbreaking as future in March2026 and alternates six/eight completed structures and phase milestones; current building count held. Generic40MWperbuilding/80MWexpansion not adopted as criticalIT. USD30billion and series IRB ceilings are not grants, public debt or capex spent; 145million cumulative GRT cannot be annualized or netted against incomparable PILOT schedules. 283ML2023consumption, allocations up to4.5MGD, 885MWrenewable procurement and100MWbattery are distinct measures, not current campus IT, actual water withdrawal or continuous renewable supply. Photo-based commissioning/tier/power inferences and asserted population causation remain unverified; original sources needed.",
            "Historical observations and forecasts are dated; no later outcome assumed.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico",
              "host": "mmcginvest.com",
              "date": "2026-03-07",
              "published": "2026-03-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "label": "Status unclear",
              "basis": "The current Los Lunas factsheet says the base campus went online in 2018, but does not establish the physical stage of the AI expansion represented by this inherited research record.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The older campus and the named AI expansion are different scopes. The expansion remains unresolved; no generic campus service label, building count, commissioning date or power figure is transferred to it."
          },
          "notes": [
            "The older campus and the named AI expansion are different scopes. The expansion remains unresolved; no generic campus service label, building count, commissioning date or power figure is transferred to it.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/asset/los-lunas/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Los Lunas · Valencia · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35061"
      }
    },
    {
      "id": "roswell-information-park-chaves-county-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Roswell Information Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Chaves"
      ],
      "city": "Roswell",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Lease rights are not DC commissioning or construction approval. Management fees on gas and excess electricity are not taxes or incentives. An off-grid description alongside grid-export provisions does not establish permanent disconnection. Limited water rights are unquantified; produced-water treatment and the fourteen-acre battery plant are prospective. Support letters are not permits or awarded funds, and the changed site requires a geographic crosswalk. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.thenewswire.com/press-releases/1A0vFwYPV-desert-mountain-energy-signs-long-term-lease-agreement-with-roswell-information-park-developer.html",
          "host": "thenewswire.com",
          "date": "2026-05-29",
          "published": "2026-05-29",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.36332,
        "lng": -104.46697,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Issuer-distributed release says Desert Mountain Energy signed a25-year Roswell Information Park lease with a five-year option, while a separate long-term gas contract and new pipeline route remained to be developed.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Lease rights are not DC commissioning or construction approval. Management fees on gas and excess electricity are not taxes or incentives. An off-grid description alongside grid-export provisions does not establish permanent disconnection. Limited water rights are unquantified; produced-water treatment and the fourteen-acre battery plant are prospective. Support letters are not permits or awarded funds, and the changed site requires a geographic crosswalk.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.thenewswire.com/press-releases/1A0vFwYPV-desert-mountain-energy-signs-long-term-lease-agreement-with-roswell-information-park-developer.html",
              "host": "thenewswire.com",
              "date": "2026-05-29",
              "published": "2026-05-29",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Roswell · Chaves · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35005"
      }
    },
    {
      "id": "sandia-725e-hpc-data-center-albuquerque-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Sandia National Laboratories 725E High-Performance Computing Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Bernalillo"
      ],
      "city": "Albuquerque",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Completion month not precise public-opening day. Certification source is lab announcement, not independentUSGBCregistry review.250kWsolar not criticalITcapacity. Cooling savings over initial sixmonths not current annual measured water withdrawal. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2020-06-19",
          "The original Sandia June 19, 2020 issue publishes its 725E computing facility and sustainability certification account. This is the issue publication date rather than an independently dated certification award, exact construction completion day or first computing opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.sandia.gov/labnews/2020/06/19/leedv4-gold/",
          "host": "sandia.gov",
          "date": "2020-06-19",
          "published": "2020-06-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 35.02664,
        "lng": -106.66806,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "named government source",
          "fields": {
            "operator_reported_building_completion_month": "2018-10",
            "building_identifier": "725E",
            "reported_use": "HPC addition,Albuquerque campus",
            "operator_reported_certification": "LEEDv4GoldBD+C,DataCenter",
            "certification_announcement_date": "2020-06-19"
          },
          "notes": [
            "Completion month not precise public-opening day. Certification source is lab announcement, not independentUSGBCregistry review.250kWsolar not criticalITcapacity. Cooling savings over initial sixmonths not current annual measured water withdrawal.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.sandia.gov/labnews/2020/06/19/leedv4-gold/",
              "host": "sandia.gov",
              "date": "2020-06-19",
              "published": "2020-06-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 72",
          "scope": "The complete original Lab article in its June 19, 2020 issue describes the 725E facility as home to Astra and Vanguard and reports earlier construction completion only to the month October 2018. It discusses a sustainability certification and historical cooling performance. This is an attributed historical computing account, without independently verified present service for every system, current certification, current resource consumption or an exact first computing day. Neither the publication day nor a certification becomes a physical opening.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_institutional_service_and_certification_current_scope_held",
              "scope": "The complete original Lab article in its June 19, 2020 issue describes the 725E facility as home to Astra and Vanguard and reports earlier construction completion only to the month October 2018. It discusses a sustainability certification and historical cooling performance. This is an attributed historical computing account, without independently verified present service for every system, current certification, current resource consumption or an exact first computing day. Neither the publication day nor a certification becomes a physical opening."
            },
            "source_read_scope": {
              "complete_original_lab_article_body_read": true,
              "october2018_month_not_invented_exact_day": true,
              "publication_not_award_or_opening_day": true,
              "historical_water_savings_not_current_measured_claim": true,
              "no_current_compliance_capacity_or_security_certification": true
            }
          },
          "notes": [
            "The complete original Lab article in its June 19, 2020 issue describes the 725E facility as home to Astra and Vanguard and reports earlier construction completion only to the month October 2018. It discusses a sustainability certification and historical cooling performance. This is an attributed historical computing account, without independently verified present service for every system, current certification, current resource consumption or an exact first computing day. Neither the publication day nor a certification becomes a physical opening.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.sandia.gov/labnews/2020/06/19/leedv4-gold/",
              "host": "www.sandia.gov",
              "published": "2020-06-19",
              "date": "2020-06-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Albuquerque · Bernalillo · Source context reviewed",
      "event_evidence": [
        {
          "date": "2020-06-19",
          "text": "The original Sandia June 19, 2020 issue publishes its 725E computing facility and sustainability certification account. This is the issue publication date rather than an independently dated certification award, exact construction completion day or first computing opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.sandia.gov/labnews/2020/06/19/leedv4-gold/",
              "host": "www.sandia.gov",
              "published": "2020-06-19",
              "date": "2020-06-19",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35001"
      }
    },
    {
      "id": "stargate-project-jupiter-dona-ana-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Stargate Project Jupiter",
      "group": "building",
      "status": "Company reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dona Ana"
      ],
      "city": "Santa Teresa",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. DiegoMendozaMoyers ElPasoMatters September25,2025 originalmainreport read; updateOctober20timestamp doesnotdatevotes. CountySeptember19incentivedeal4-1 notallair/water/buildingpermits.165B30yearplanINCLUDESthreeequipmentrefreshes/50Bfirst5years nested, not215Bnewbuildingsorpaidspending.1400acre campus/fourDCs notfournewindependentprojects.750ops/2500construction2025differentfrom2026broaderjobsdefinition. 360M30year/12MannualPILOT,50Mwaterupgrade and6.9Mcommunitypromises notverifiedreceipts. Initial10Mgalfillover2years/20kgpdDCaverage/60kgpdmaximum separatefrom20kgpdoldGENestimate, notzero-waterclosedloop. Historical700-900MWsimplecycleGENplan REPLACEDbyApril2026fuelcelldesign; do notaddto2.45GW orlabelIT. Currentwithdrawalapproval/conditionalcontractsnotread. Legislative/health/rateclaimsnotcurrentlaworcausationcertified. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification. Oracle/BorderPlex originalApril27,2026 jointissuerannouncement: up2.45GW INSTALLED FUEL CELL GENERATION plannedtofullypowerJupiter, replacingpriorgasturbines/diesel andconsolidatingonecampusmicrogrid. Not2.45GWIT, notinstalledoperatingproof andnotadd700-900MWsupersededplan.92%NOxreduction ismodeledcomparisonwithpriorgasdesign, notactualCO2reduction/emissionsmeasurement. No-combustionfuelcells notzero-carbonorrenewablefuelclaim; negligiblewater/nohouseholdrateimpact arepromisesnotmeteredoutcomes/approvedtariff.4000construction/1500ongoingONSITEANDCOMMUNITYjobsforecast differsfrom2025narrowercounts, notadditional5500currentstaff.50M/360M/6.9Mcommitments notcashpaid. No newexactRFSdateorpermitexecutionproven.",
      "date": "",
      "events": [
        [
          "2026-04-27",
          "Oracle original April 27, 2026 release describes ongoing Jupiter construction and announces an updated fuel cell power design. This dates the issuer statement without certifying installed generation, completed construction, measured environmental benefits or computing operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/",
          "host": "elpasomatters.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
          "host": "oracle.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.35265,
        "lng": -106.83267,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "DiegoMendozaMoyers ElPasoMatters September25,2025 originalmainreport read; updateOctober20timestamp doesnotdatevotes. CountySeptember19incentivedeal4-1 notallair/water/buildingpermits.165B30yearplanINCLUDESthreeequipmentrefreshes/50Bfirst5years nested, not215Bnewbuildingsorpaidspending.1400acre campus/fourDCs notfournewindependentprojects.750ops/2500construction2025differentfrom2026broaderjobsdefinition.",
            "360M30year/12MannualPILOT,50Mwaterupgrade and6.9Mcommunitypromises notverifiedreceipts. Initial10Mgalfillover2years/20kgpdDCaverage/60kgpdmaximum separatefrom20kgpdoldGENestimate, notzero-waterclosedloop. Historical700-900MWsimplecycleGENplan REPLACEDbyApril2026fuelcelldesign; do notaddto2.45GW orlabelIT. Currentwithdrawalapproval/conditionalcontractsnotread. Legislative/health/rateclaimsnotcurrentlaworcausationcertified.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/",
              "host": "elpasomatters.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "Oracle/BorderPlex originalApril27,2026 jointissuerannouncement: up2.45GW INSTALLED FUEL CELL GENERATION plannedtofullypowerJupiter, replacingpriorgasturbines/diesel andconsolidatingonecampusmicrogrid. Not2.45GWIT, notinstalledoperatingproof andnotadd700-900MWsupersededplan.92%NOxreduction ismodeledcomparisonwithpriorgasdesign, notactualCO2reduction/emissionsmeasurement.",
            "No-combustionfuelcells notzero-carbonorrenewablefuelclaim; negligiblewater/nohouseholdrateimpact arepromisesnotmeteredoutcomes/approvedtariff.4000construction/1500ongoingONSITEANDCOMMUNITYjobsforecast differsfrom2025narrowercounts, notadditional5500currentstaff.50M/360M/6.9Mcommitments notcashpaid. No newexactRFSdateorpermitexecutionproven.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
              "host": "oracle.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 72",
          "scope": "The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "issuer_explicit_jupiter_construction_account",
              "scope": "The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred."
            },
            "source_read_scope": {
              "complete_original_issuer_release_and_forward_looking_limits_read": true,
              "explicit_construction_not_inferred_from_power_design": true,
              "future_environmental_and_rate_assurances_not_measured_findings": true,
              "no_capacity_or_role_changes": true
            }
          },
          "notes": [
            "The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
              "host": "www.oracle.com",
              "published": "2026-04-27",
              "date": "2026-04-27",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Santa Teresa · Dona Ana · Source context reviewed",
      "status_scope": "The complete original Oracle release dated April 27, 2026 explicitly says construction continues on the named Dona Ana County Jupiter campus. This supports issuer reported construction at that statement scope. The same release proposes replacing earlier generation designs with a fuel cell microgrid and describes prospective environmental, water, rate, employment and community benefits. Those are attributed forecasts, not actual installed generation, measured emissions, completed infrastructure or computing operation. No capacity, utility role, current approval or first opening is inferred.",
      "event_evidence": [
        {
          "date": "2026-04-27",
          "text": "Oracle original April 27, 2026 release describes ongoing Jupiter construction and announces an updated fuel cell power design. This dates the issuer statement without certifying installed generation, completed construction, measured environmental benefits or computing operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
              "host": "www.oracle.com",
              "published": "2026-04-27",
              "date": "2026-04-27",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35013"
      }
    },
    {
      "id": "teraplex-gallup-tradeport-mckinley-county-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Teraplex Gallup Tradeport Data Center",
      "group": "proposed",
      "status": "City listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "McKinley"
      ],
      "city": "Gallup",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Originalcityagenda,draftthirdamendment,signedhistoricaloption/assignmentandtariff; conditional/historycontextnotcurrentexecution/operationcertification.. NoApril28vote/minutesor laterexecutedthirdamendment read; agendadoesnotprove deferral/adoption. Secondarydeferralclaims remainseparate. Nooptionexercise/paymentreceipt,landclosing,constructionpermit,effluentdeliverymetering or currentoperationproof. No MW/generation/tenant/capex/jobs certified. The2023signedoption doesnot establish that2026draftterms arebinding;first/secondamendments notindependentlyreadinthispass. Noexactparcelcoordinates or boundary merged.330approximateacresversus324.787LOIarea requiresscope/revisioncrosswalk. Originaldeliverysystem allocated planning/permitting/design/construction/operationexpensestodeveloper; notreceipt,publicsubsidyaward orproofall permitsgranted. Consultrecord-leveldate-role,signature,water-optionandareaholds.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Agenda/_04282026-1450",
          "host": "gallupnm.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15084",
          "host": "gallupnm.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15085",
          "host": "gallupnm.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15088",
          "host": "gallupnm.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15089",
          "host": "gallupnm.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 35.58062,
        "lng": -108.26222,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "gallup-effluent-originals-round45-2026-10-14.json",
          "scope": "Originalcityagenda,draftthirdamendment,signedhistoricaloption/assignmentandtariff; conditional/historycontextnotcurrentexecution/operationcertification.",
          "fields": {
            "proposal_identity_context": {
              "source": "gallup-original",
              "pages": [
                1,
                2,
                9,
                10
              ],
              "value": "April28,2026 city agenda names Teraplex and Gutami potential GallupTradeport project; presentation only. ItemF5 proposes effluent option amendment forTeraplexDataCentersLLC,notsiteapproval."
            },
            "water_option_context": {
              "sources": [
                "gallup-original",
                "gallup-third",
                "gallup-original-agreement",
                "gallup-rate"
              ],
              "value": {
                "proposed_annual_effluent_gallons": 109500000,
                "printed_approximate_acre_feet": 336,
                "basis": "Annual fiscal-year option/right quantity, not actual withdrawals/consumption, not potable-source measurement",
                "annual_quantity_carry_forward": false,
                "additional_surplus_possible": "Subject to city commitments; not unlimited guaranteed water",
                "proposed_rate_usd_per_1000_gallons": 5.66,
                "rate_basis": "FY26reclaimedwastewater tariff attachment, not fresh potable tariff or executedTeraplexbill",
                "third_amendment_execution_status": "Supplied draft date/day,payment deadline and signatures blank",
                "effectiveness_fee_usd": 5000,
                "effectiveness_basis": "Proposed collectedfundsbydeadline plusCouncilapproval; no paidreceipt/approvalverified",
                "proposed_purchase_deadline_years": 4,
                "proposed_construction_start_deadline_years": 5,
                "proposed_take_or_pay_start_year": 7,
                "printed_minimum_take_or_pay_percent": 33.33,
                "termination_basis": "Mayterminate,with15-day exercise windows; not automatic cancellation merely from target elapsed",
                "proposed_rate_lock_years": 15,
                "next_rate_reference_year": 2041,
                "fixed_calendar_deadlines": null,
                "critical_it_mw": null
              }
            },
            "original_option_history": {
              "sources": [
                "gallup-original-agreement",
                "gallup-third"
              ],
              "value": {
                "original_printed_effective_date": "2023-07-25",
                "city_signature_date_visually_read": "2023-07-27",
                "developer_signature_date_visually_read": "2023-08-01",
                "initial_use": "Recycling/manufacturing complex, not original2023data-centeroperation",
                "original_land_intention_acres_approx": 330,
                "original_plant_effluent_million_gallons_per_day": 2.33,
                "plant_effluent_measure": "Historical2023plant-output description, notTeraplexusage or currentmeasured2026plantoutput",
                "term_scope": "Original20-yearterm references definedOptionExerciseDate;10-yearextension requiresnotice andUSD5000payment. Not automatically30yearsfromApril28."
              }
            },
            "assignment_history": {
              "source": "gallup-assignment",
              "value": {
                "body_date": "2026-03-03",
                "third_amendment_recital_date": "2026-03-06",
                "exact_assignment_execution_date": null,
                "date_hold": "BodydatedasofMarch3 versuslaterrecitalMarch6; signaturesbothpresentbutpageundated. No automatic reconciliation.",
                "loi_printed_date": "2025-07-28",
                "loi_recited_execution_date": "2025-07-29",
                "loi_acres_approx": 324.787,
                "land_closed": null,
                "basis": "Assignment of effluent-option andexclusiveLOIrights, notdeed/landclosing. OriginalLOIexhibit is onlycoverinthisfile. Financialterms partlyredacted;no recoveryor inference."
              }
            }
          },
          "notes": [
            "NoApril28vote/minutesor laterexecutedthirdamendment read; agendadoesnotprove deferral/adoption. Secondarydeferralclaims remainseparate.",
            "Nooptionexercise/paymentreceipt,landclosing,constructionpermit,effluentdeliverymetering or currentoperationproof. No MW/generation/tenant/capex/jobs certified.",
            "The2023signedoption doesnot establish that2026draftterms arebinding;first/secondamendments notindependentlyreadinthispass.",
            "Noexactparcelcoordinates or boundary merged.330approximateacresversus324.787LOIarea requiresscope/revisioncrosswalk.",
            "Originaldeliverysystem allocated planning/permitting/design/construction/operationexpensestodeveloper; notreceipt,publicsubsidyaward orproofall permitsgranted.",
            "Consultrecord-leveldate-role,signature,water-optionandareaholds."
          ],
          "sources": [
            {
              "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Agenda/_04282026-1450",
              "host": "gallupnm.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15084",
              "host": "gallupnm.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15085",
              "host": "gallupnm.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15088",
              "host": "gallupnm.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Item/4950?fileID=15089",
              "host": "gallupnm.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 72",
          "scope": "Selected original City agenda pages explicitly identify the Teraplex and Gutami potential Tradeport project and a proposed effluent option amendment. This supports a City documented proposal. The agenda describes effectiveness as contingent on Council approval and a required payment, and land acquisition, exercising an effluent option and construction as later conditions. It is not an independently read accomplished Council vote, executed amendment, delivered water or operating computing facility. A presentation only item is not project approval, and an option quantity is not actual consumption.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "city_named_teraplex_tradeport_proposal",
              "scope": "Selected original City agenda pages explicitly identify the Teraplex and Gutami potential Tradeport project and a proposed effluent option amendment. This supports a City documented proposal. The agenda describes effectiveness as contingent on Council approval and a required payment, and land acquisition, exercising an effluent option and construction as later conditions. It is not an independently read accomplished Council vote, executed amendment, delivered water or operating computing facility. A presentation only item is not project approval, and an option quantity is not actual consumption."
            },
            "source_read_scope": {
              "original_eleven_page_agenda_selected_physical_pages1_2_9_10_read": true,
              "presentation_only_not_approval": true,
              "contingent_option_not_executed_agreement_or_actual_water_use": true,
              "no_capacity_role_or_location_changes": true
            }
          },
          "notes": [
            "Selected original City agenda pages explicitly identify the Teraplex and Gutami potential Tradeport project and a proposed effluent option amendment. This supports a City documented proposal. The agenda describes effectiveness as contingent on Council approval and a required payment, and land acquisition, exercising an effluent option and construction as later conditions. It is not an independently read accomplished Council vote, executed amendment, delivered water or operating computing facility. A presentation only item is not project approval, and an option quantity is not actual consumption.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.gallupnm.gov/AgendaCenter/ViewFile/Agenda/_04282026-1450",
              "host": "www.gallupnm.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gallup · McKinley · Source context reviewed",
      "status_scope": "Selected original City agenda pages explicitly identify the Teraplex and Gutami potential Tradeport project and a proposed effluent option amendment. This supports a City documented proposal. The agenda describes effectiveness as contingent on Council approval and a required payment, and land acquisition, exercising an effluent option and construction as later conditions. It is not an independently read accomplished Council vote, executed amendment, delivered water or operating computing facility. A presentation only item is not project approval, and an option quantity is not actual consumption.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35031"
      }
    },
    {
      "id": "westblock-shiprock-nm",
      "state": "nm",
      "kind": "facility",
      "name": "WestBlock Capital Bitcoin Mine (Shiprock)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "San Juan"
      ],
      "city": "Shiprock",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Historical claimed 23 to 25 bitcoin/month and 1.4 to 1.6 million-dollarvalue are 2021 commodity/revenue context, not current revenue, profit or site capex. Reported 48,000 dollartaxoverthree years is cumulative;60,000 landlease payment period is not clear, so never label annual. CEO’s 6 percenttaxonpower/services and 6 to 10 staff are attributed, not current audited totals or a reviewed tribal tax instrument. Criticism of resource access is not an adjudicated legal violation or measured site water impact. No MW,currentownership or operating status independently verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://futurism.com/navajo-bitcoin-mine-startup",
          "host": "futurism.com",
          "date": "2021-11-10",
          "published": "2021-11-10",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 36.5085,
        "lng": -108.32049,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Futurism relays Vice/Grist reporting about WestBlock’s bitcoin mine near Shiprock on Navajo Nation land and community concerns over distribution of benefits.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Historical claimed 23 to 25 bitcoin/month and 1.4 to 1.6 million-dollarvalue are 2021 commodity/revenue context, not current revenue, profit or site capex. Reported 48,000 dollartaxoverthree years is cumulative;60,000 landlease payment period is not clear, so never label annual. CEO’s 6 percenttaxonpower/services and 6 to 10 staff are attributed, not current audited totals or a reviewed tribal tax instrument. Criticism of resource access is not an adjudicated legal violation or measured site water impact. No MW,currentownership or operating status independently verified.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://futurism.com/navajo-bitcoin-mine-startup",
              "host": "futurism.com",
              "date": "2021-11-10",
              "published": "2021-11-10",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Shiprock · San Juan · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35045"
      }
    },
    {
      "id": "zenith-volts-roswell-chaves-county-data-center-nm",
      "state": "nm",
      "kind": "facility",
      "name": "Zenith Volts Roswell / Chaves County Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Chaves"
      ],
      "city": "Roswell",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Chaves combined solar/storage/DC summary power-basis correction. Economic-development summary not original signed permit or independent inspection.1265MWisSOLARgeneration, not data-center IT or battery energy.300/250acare different uses, not550acDC.6Bcombined project estimate not actual DC-onlycapex. Roswell publisher office not project city/location. No current construction or actual opening verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.chavescounty.net/news/p/item/64481/county-approves-permit-for-data-center-solar-facility",
          "host": "chavescounty.net",
          "date": "2025-08-22",
          "published": "2025-08-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.41634,
        "lng": -104.52484,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Chaves combined solar/storage/DC summary power-basis correction",
          "fields": {
            "publisher_role": "Roswell Chaves County Economic Development Corporation summary linking original article",
            "publication_date": "2025-08-22",
            "developer": "Zenith Volts Corp.",
            "reported_action": "county approved special use permit",
            "proposed_solar_generation_mw": 1265,
            "proposed_data_center_acres": 300,
            "proposed_battery_storage_acres": 250,
            "combined_estimated_project_cost_usd": 6000000000,
            "location": "north side of700/800block WestPearsonRoad near LakeArthur, Chaves/Eddy boundary"
          },
          "notes": [
            "Economic-development summary not original signed permit or independent inspection.1265MWisSOLARgeneration, not data-center IT or battery energy.300/250acare different uses, not550acDC.6Bcombined project estimate not actual DC-onlycapex. Roswell publisher office not project city/location. No current construction or actual opening verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.chavescounty.net/news/p/item/64481/county-approves-permit-for-data-center-solar-facility",
              "host": "chavescounty.net",
              "date": "2025-08-22",
              "published": "2025-08-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Roswell · Chaves · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "35005"
      }
    },
    {
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "utility": "",
      "water": "",
      "incentives": "",
      "date": "",
      "opened": "",
      "tier": "",
      "id": "google-lea-county-evaluation-nm",
      "state": "nm",
      "kind": "project",
      "name": "Google Lea County evaluation",
      "group": "proposed",
      "status": "Evaluation",
      "crypto": false,
      "type": "Potential data center project",
      "counties": [
        "Lea"
      ],
      "city": "",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "acres": null,
      "note": "Google describes an exploratory county-level proposal. New Era has a separate Lea County project; no relationship, shared parcel, current construction, operating load or precise location is established.",
      "events": [
        [
          "2026-09-14",
          "Google publicly announced that it was exploring a potential Lea County, New Mexico data center. Discussions and details remained open; this is not an approval, construction start or opening."
        ]
      ],
      "timeline": [],
      "sources": [
        {
          "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/lea-county-new-mexico/",
          "host": "blog.google",
          "published": "2026-09-14",
          "date": "2026-09-14",
          "checked": "2026-10-16",
          "label": "Google potential Lea County project announcement"
        }
      ],
      "loc": {
        "lat": 32.79208,
        "lng": -103.41248,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lea County, New Mexico potential project",
      "reviewed_evidence": [
        {
          "overlay": "Lea County and Kansas City identity and financing review October 16",
          "scope": "Source-specific exploration, planned-development identity or financing context. No precise point, physical-site census, site IT figure, actual construction, opening or realized incentive amount is established.",
          "fields": {
            "identity_scope": "Google publicly names Lea County, New Mexico as a potential data-center location. Complete canonical/original New Mexico and exclusion checks found no Google Lea County record. The separate New Era Lea County record is retained without a demonstrated Google relationship.",
            "evaluation_scope": "Google describes an early potential project with discussions ongoing and details outstanding. Evaluation is a company-stated exploration stage, not a permit, committed construction project, site acquisition or operating facility.",
            "energy_water_pledges": "The announcement gives responsibility and cost-coverage pledges. It publishes no site MW, water quantity, signed utility/water agreement, cooling specification, parcel or construction date.",
            "location_scope": "Only Lea County is used. No city, street, parcel, coordinate or municipality is inferred from an unrelated proposal or self-attributed microsite.",
            "provider_roles": [
              {
                "name": "Google",
                "role": "developer"
              }
            ]
          },
          "notes": [
            "Separate a prospective project, a financing vote and actual physical construction. Follow each finding to its own sources.",
            "All existing location fields, jurisdictions, addresses, legacy quantities and opening dates remain unchanged."
          ],
          "sources": [
            {
              "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/lea-county-new-mexico/",
              "host": "blog.google",
              "published": "2026-09-14",
              "date": "2026-09-14",
              "checked": "2026-10-16",
              "label": "Google potential Lea County project announcement"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "raw_status": "proposed",
      "status_field": "current_status",
      "status_scope": "Google describes an early potential project with discussions ongoing and details outstanding. Evaluation is a company-stated exploration stage, not a permit, committed construction project, site acquisition or operating facility.",
      "event_evidence": [
        {
          "date": "2026-09-14",
          "text": "Google publicly announced that it was exploring a potential Lea County, New Mexico data center. Discussions and details remained open; this is not an approval, construction start or opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/lea-county-new-mexico/",
              "host": "blog.google",
              "published": "2026-09-14",
              "date": "2026-09-14",
              "checked": "2026-10-16",
              "label": "Google potential Lea County project announcement"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "35025"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}