{
  "schema_version": 1,
  "source_compilation_context": {
    "sc": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/sc.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "sc",
    "label": "South Carolina"
  },
  "records": [
    {
      "id": "cielo-gaffney-cherokee-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Cielo Digital Infrastructure Gaffney Campus",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cherokee"
      ],
      "city": "Gaffney",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 000 is a published placeholder, not independently parcel-geocoded street number. Investment and jobs forecasts, not spend/current employment. No site MW specified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-06-24",
          "The Governor June 24, 2025 release announces the named Cielo Gaffney development. This dates the public announcement rather than physical construction or computing commissioning."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development",
          "host": "governor.sc.gov",
          "date": "2025-06-24",
          "published": "2025-06-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 35.04828,
        "lng": -81.62031,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "named government source",
          "fields": {
            "development_announcement_date": "2025-06-24",
            "planned_investment_usd_approx": 2100000000,
            "expected_new_jobs": 30,
            "planned_buildings": 4,
            "planned_area_per_building_sqft_approx": 400000,
            "initial_operation_target": "2028-year-end",
            "published_location": "000 Ford Road, Gaffney, Cherokee County, South Carolina"
          },
          "notes": [
            "000 is a published placeholder, not independently parcel-geocoded street number. Investment and jobs forecasts, not spend/current employment. No site MW specified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development",
              "host": "governor.sc.gov",
              "date": "2025-06-24",
              "published": "2025-06-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 79",
          "scope": "The complete original Governor June 24, 2025 release names the planned Cielo Gaffney development on Ford Road. This supports an agency listed proposal. Its first operating forecast for the end of 2028, planned facilities, investment and jobs are prospective rather than commissioned computing, physical construction or delivered benefits. No exact future opening day or installed capacity is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_named_gaffney_proposal",
              "scope": "The complete original Governor June 24, 2025 release names the planned Cielo Gaffney development on Ford Road. This supports an agency listed proposal. Its first operating forecast for the end of 2028, planned facilities, investment and jobs are prospective rather than commissioned computing, physical construction or delivered benefits. No exact future opening day or installed capacity is inferred."
            },
            "source_read_scope": {
              "complete_original_governor_release_body_read": true,
              "forecast_not_actual_operation": true
            }
          },
          "notes": [
            "The complete original Governor June 24, 2025 release names the planned Cielo Gaffney development on Ford Road. This supports an agency listed proposal. Its first operating forecast for the end of 2028, planned facilities, investment and jobs are prospective rather than commissioned computing, physical construction or delivered benefits. No exact future opening day or installed capacity is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development",
              "host": "governor.sc.gov",
              "published": "2025-06-24",
              "date": "2025-06-24",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Gaffney · Cherokee · Source context reviewed",
      "status_scope": "The complete original Governor June 24, 2025 release names the planned Cielo Gaffney development on Ford Road. This supports an agency listed proposal. Its first operating forecast for the end of 2028, planned facilities, investment and jobs are prospective rather than commissioned computing, physical construction or delivered benefits. No exact future opening day or installed capacity is inferred.",
      "event_evidence": [
        {
          "date": "2025-06-24",
          "text": "The Governor June 24, 2025 release announces the named Cielo Gaffney development. This dates the public announcement rather than physical construction or computing commissioning.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development",
              "host": "governor.sc.gov",
              "published": "2025-06-24",
              "date": "2025-06-24",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45021"
      }
    },
    {
      "id": "dartpoints-charleston-ladson-sc",
      "state": "sc",
      "kind": "facility",
      "name": "DartPoints Charleston Data Center (CHS01)",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Charleston"
      ],
      "city": "Ladson",
      "address": "",
      "who": "DartPoints",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Utility1MW is not criticalIT0.1MW. Ladson street not provided by reviewed source. Operator explicitly locatesCHS01inCharlestonCountyPalmettoCommercePark and separatesIT/utility. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dartpoints.com/locations/chs01-charleston-sc/",
          "host": "dartpoints.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gisccapps.charlestoncounty.org/arcgis/rest/services/ProVal/ParcelMap/MapServer/0?f=pjson",
          "host": "gisccapps.charlestoncounty.org",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Original public parcel layer metadata and actual situs fields"
        },
        {
          "url": "https://gisccapps.charlestoncounty.org/arcgis/rest/services/ProVal/ParcelMap/MapServer/0/query?where=SDE.P_POLY_PARCEL.PID+%3D+%273930000184%27&outFields=%2A&returnGeometry=true&outSR=4326&f=json",
          "host": "gisccapps.charlestoncounty.org",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete exact source parcel PID and unchanged full geometry"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=8480+Palmetto+Commerce+Pkwy%2C+Ladson%2C+SC+29456&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal operator street query returns zero"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-80.10700878533565%2C32.960019288537545%2C-80.09523121466434%2C32.96990071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed parcel setting, acquisition date unknown"
        },
        {
          "url": "https://dartpoints.com/technology-service-provider/",
          "host": "dartpoints.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lng": -80.10112,
        "lat": 32.96496,
        "precision": "approximate",
        "basis": "Approximate calculated center of Charleston County reference parcel 3930000184, linked to the operator computing property at 8480 Palmetto Commerce Parkway in South Carolina. The operator postal city is Ladson; the county situs city is North Charleston. Both source labels remain retained. This reference describes one source parcel and selects no roof, legal title or complete campus. Existing status and all other facts remain unchanged. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "county": "Charleston",
            "campus": "Palmetto Commerce Park",
            "critical_it_capacity_mw": 0.1,
            "utility_power_mw": 1,
            "data_hall_sqft": 15000
          },
          "notes": [
            "Utility1MW is not criticalIT0.1MW.",
            "Ladson street not provided by reviewed source.",
            "Operator explicitly locatesCHS01inCharlestonCountyPalmettoCommercePark and separatesIT/utility.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/chs01-charleston-sc/",
              "host": "dartpoints.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "DartPoints offers current colocation, cloud and interconnection services at its CHS01 facility in the Charleston area. Design and hurricane-resilience claims are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "DartPoints offers current colocation, cloud and interconnection services at its CHS01 facility in the Charleston area. Design and hurricane-resilience claims are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "DartPoints offers current colocation, cloud and interconnection services at its CHS01 facility in the Charleston area. Design and hurricane-resilience claims are not independently certified."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/chs01-charleston-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 65, 2026-10-24",
          "scope": "Original operator computing property identity and approximate center of one complete official county source parcel only. The exact Census zero result and both postal city labels remain retained. Every other fact and attribute stays unchanged. No legal title, surveyed roof, physical stage or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -80.10112,
                "lat": 32.96496,
                "precision": "approximate",
                "basis": "Approximate calculated center of Charleston County reference parcel 3930000184, linked to the operator computing property at 8480 Palmetto Commerce Parkway in South Carolina. The operator postal city is Ladson; the county situs city is North Charleston. Both source labels remain retained. This reference describes one source parcel and selects no roof, legal title or complete campus. Existing status and all other facts remain unchanged. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": "3930000184",
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "Original operator computing property identity and approximate center of one complete official county source parcel only. The exact Census zero result and both postal city labels remain retained. Every other fact and attribute stays unchanged. No legal title, surveyed roof, physical stage or complete campus is certified.",
            "The inherited general area point was not an independently reviewed computing parcel reference. The original operator identifies the complete 8480 Palmetto Commerce Parkway postal street and ZIP 29456. The complete exact county parcel query independently returns PID 3930000184 with that same house number, street and ZIP and a fifteen vertex geometry inside retained Charleston County. County situs North Charleston and operator postal Ladson remain distinct source labels without a city overwrite. The unchanged calculated center gives a measured correction of 11.5 metres. No source vertex or printed point is selected as a roof, and no operation, ownership, title or complete campus is certified.",
            "Commercial and industrial blocks with wooded strips, roads, parking and nearby water features. Imagery acquisition date is unknown; no building coordinate or physical stage is inferred."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/chs01-charleston-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original named Charleston computing facility and complete postal street, extracted original text"
            },
            {
              "url": "https://gisccapps.charlestoncounty.org/arcgis/rest/services/ProVal/ParcelMap/MapServer/0?f=pjson",
              "host": "gisccapps.charlestoncounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original public parcel layer metadata and actual situs fields"
            },
            {
              "url": "https://gisccapps.charlestoncounty.org/arcgis/rest/services/ProVal/ParcelMap/MapServer/0/query?where=SDE.P_POLY_PARCEL.PID+%3D+%273930000184%27&outFields=%2A&returnGeometry=true&outSR=4326&f=json",
              "host": "gisccapps.charlestoncounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete exact source parcel PID and unchanged full geometry"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=8480+Palmetto+Commerce+Pkwy%2C+Ladson%2C+SC+29456&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal operator street query returns zero"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-80.10700878533565%2C32.960019288537545%2C-80.09523121466434%2C32.96990071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed parcel setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check71, October24,2026",
          "scope": "The original DartPoints CHS01 page identifies Charleston service. The regional page uses Ladson as its postal locality; retained North Charleston county situs and the one reviewed source parcel remain distinct. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted.",
          "fields": {
            "company_association": {
              "name": "DartPoints",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "The original DartPoints CHS01 page identifies Charleston service. The regional page uses Ladson as its postal locality; retained North Charleston county situs and the one reviewed source parcel remain distinct. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "The original DartPoints CHS01 page identifies Charleston service. The regional page uses Ladson as its postal locality; retained North Charleston county situs and the one reviewed source parcel remain distinct. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/chs01-charleston-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://dartpoints.com/technology-service-provider/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate source parcel reference, not a roof or complete campus",
      "summary": "Ladson · Charleston · Source context reviewed",
      "status_scope": "DartPoints offers current colocation, cloud and interconnection services at its CHS01 facility in the Charleston area. Design and hurricane-resilience claims are not independently certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    },
    {
      "id": "dartpoints-columbia-sc",
      "state": "sc",
      "kind": "facility",
      "name": "DartPoints Columbia Data Center (CAE01)",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Richland"
      ],
      "city": "Columbia",
      "address": "",
      "who": "DartPoints",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DartPoints CAE01 capacity bases and area conflict. Area categories/scopes differ and not reconciled; do not choose15000over8200as same measure.110kWITis0.11MW, not1MWutility.120tons cooling is thermal capacity, not electric load. Dallas headquarters is not site. No street address or observed opening date in reviewed body. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dartpoints.com/locations/cae01-columbia-sc/",
          "host": "dartpoints.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1000+Catawba+St%2C+Columbia%2C+SC+29201&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street method and limits"
        },
        {
          "url": "https://dartpoints.com/technology-service-provider/",
          "host": "dartpoints.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.988237356013,
        "lng": -81.030761634007,
        "precision": "address",
        "basis": "Published DartPoints facility address 1000 Catawba St ste 180, Columbia, SC 29201 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "DartPoints CAE01 capacity bases and area conflict",
          "fields": {
            "operator_code": "CAE01",
            "site_description": "SCRA Innovation Center, Columbia, South Carolina",
            "headline_critical_it_kw": 110,
            "utility_power_mw": 1,
            "headline_data_hall_sqft": 8200,
            "narrative_raised_floor_sqft": 15000,
            "canonical_current_area_sqft": null
          },
          "notes": [
            "Area categories/scopes differ and not reconciled; do not choose15000over8200as same measure.110kWITis0.11MW, not1MWutility.120tons cooling is thermal capacity, not electric load. Dallas headquarters is not site. No street address or observed opening date in reviewed body.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/cae01-columbia-sc/",
              "host": "dartpoints.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "DartPoints offers current colocation and cloud services at CAE01 in the SCRA Innovation Center in Columbia. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "DartPoints offers current colocation and cloud services at CAE01 in the SCRA Innovation Center in Columbia. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "DartPoints offers current colocation and cloud services at CAE01 in the SCRA Innovation Center in Columbia."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/cae01-columbia-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 10, October 22, 2026",
          "scope": "Official facility street reference only. No canonical address, status, physical date, quantity, company role, jurisdiction, title, parcel, full campus or distinct building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 33.988237356013,
                "lng": -81.030761634007,
                "precision": "address",
                "basis": "Published DartPoints facility address 1000 Catawba St ste 180, Columbia, SC 29201 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "1000 Catawba St ste 180, Columbia, SC 29201",
              "county_fips": [
                "45079"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The current official operator numeric address section identifies this existing record. Corporate headquarters and related facility cards are excluded. The blank native address wrapper remains exact.",
            "The numeric street, name, type and directions are explicitly matched to the single Census result. State and existing county agree. This is a calculated street reference, not a roof, parcel, suite, independent building count or full campus boundary. Status, dates, quantities, roles, jurisdiction and all earlier source wrappers remain exact.",
            "The CAE01 address is 1000 Catawba Street with suite 180. The suite is excluded from the Census street query and remains evidence only. The Dallas headquarters is excluded. The source provider link is read as text without opening it."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/cae01-columbia-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Official named facility numeric street section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=1000+Catawba+St%2C+Columbia%2C+SC+29201&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check71, October24,2026",
          "scope": "The original DartPoints CAE01 page identifies Columbia service at the SCRA Innovation Center. The regional source suite180 remains a published service reference, not a claim that the provider operates the entire research property. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted.",
          "fields": {
            "company_association": {
              "name": "DartPoints",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "The original DartPoints CAE01 page identifies Columbia service at the SCRA Innovation Center. The regional source suite180 remains a published service reference, not a claim that the provider operates the entire research property. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "The original DartPoints CAE01 page identifies Columbia service at the SCRA Innovation Center. The regional source suite180 remains a published service reference, not a claim that the provider operates the entire research property. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/cae01-columbia-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://dartpoints.com/technology-service-provider/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Columbia · Richland · Source context reviewed",
      "status_scope": "DartPoints offers current colocation and cloud services at CAE01 in the SCRA Innovation Center in Columbia. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    },
    {
      "id": "dartpoints-greenville-sc",
      "state": "sc",
      "kind": "facility",
      "name": "DartPoints Greenville Data Center",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Greenville"
      ],
      "city": "Greenville",
      "address": "",
      "who": "DartPoints",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Greenville state-confirmed expansion announcement. Expansion of existing facility is not a separate duplicate campus or 15MW total. July 2027 is projected, not actual operations. 125M and 10 jobs are commitments, not actual spend or employment. Four operator facilities in South Carolina are not four Greenville buildings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.sccommerce.com/news/dartpoints-expands-greenville-county-operations",
          "host": "sccommerce.com",
          "date": "2025-11-12",
          "published": "2025-11-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://dartpoints.com/locations/gsp01-greenville-sc/",
          "host": "dartpoints.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=78+Global+Dr+%23+100%2C+Greenville%2C+SC+29607&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete unique literal published street range, exact raw version retained"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-82.35042540595369%2C34.80301128853755%2C-82.33839059404632%2C34.81289271146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        },
        {
          "url": "https://dartpoints.com/technology-service-provider/",
          "host": "dartpoints.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lng": -82.344408,
        "lat": 34.807952,
        "precision": "address",
        "basis": "The original operator computing location source identifies 78 Global Dr # 100, Greenville, SC 29607. One complete unique literal Census street range supports this calculated reference inside Greenville County. This reference selects no roof, tenant floor, surveyed parcel or complete campus. Source dates do not establish current operation. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "Greenville state-confirmed expansion announcement",
          "fields": {
            "agency": "South Carolina Department of Commerce",
            "announcement_date": "2025-11-12",
            "operator": "DartPoints",
            "address": "78 Global Drive, Greenville, South Carolina",
            "planned_expansion_investment_usd": 125000000,
            "planned_new_jobs": 10,
            "capacity_before_mw": 2.5,
            "capacity_after_mw": 12.5,
            "power_basis": "agency-reported capacity; critical IT mentioned in quote but technical boundary not specified",
            "added_high_density_space_sqft": 88000,
            "agency_reported_stage": "construction underway",
            "operations_target_month": "2027-07"
          },
          "notes": [
            "Expansion of existing facility is not a separate duplicate campus or 15MW total. July 2027 is projected, not actual operations. 125M and 10 jobs are commitments, not actual spend or employment. Four operator facilities in South Carolina are not four Greenville buildings.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.sccommerce.com/news/dartpoints-expands-greenville-county-operations",
              "host": "sccommerce.com",
              "date": "2025-11-12",
              "published": "2025-11-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "DartPoints lists current colocation, cloud, interconnection and locally staffed support at GSP01 in Greenville. Its area and technical figures are not adopted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "DartPoints lists current colocation, cloud, interconnection and locally staffed support at GSP01 in Greenville. Its area and technical figures are not adopted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "DartPoints lists current colocation, cloud, interconnection and locally staffed support at GSP01 in Greenville. Its area and technical figures are not adopted."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/gsp01-greenville-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 65, 2026-10-24",
          "scope": "Original computing street identity and calculated Census reference only. Historical report dates and all source clock limitations remain separate from current operation, certification, ownership and technical quantities. Every other fact and attribute remains exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -82.344408,
                "lat": 34.807952,
                "precision": "address",
                "basis": "The original operator computing location source identifies 78 Global Dr # 100, Greenville, SC 29607. One complete unique literal Census street range supports this calculated reference inside Greenville County. This reference selects no roof, tenant floor, surveyed parcel or complete campus. Source dates do not establish current operation. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "78 Global Dr # 100, Greenville, SC 29607",
              "county_fips": [
                "45045"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Original computing street identity and calculated Census reference only. Historical report dates and all source clock limitations remain separate from current operation, certification, ownership and technical quantities. Every other fact and attribute remains exact.",
            "The inherited general area coordinate was not an independently reviewed computing street reference. The original named operator source and complete unique literal Census street range support this calculated reference inside the retained county. The measured inherited correction is 96.0 metres. Original wording, dates, coordinates and exact versions remain preserved. Existing status group operating and all other fields remain unchanged. This correction is not a physical move or a certification of operation, ownership, a roof, tenant floor, legal title or complete campus.",
            "Industrial and commercial blocks beside a divided road, with homes and athletic fields nearby."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/gsp01-greenville-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original named computing facility heading and complete street, extracted original text view"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=78+Global+Dr+%23+100%2C+Greenville%2C+SC+29607&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete unique literal published street range, exact raw version retained"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-82.35042540595369%2C34.80301128853755%2C-82.33839059404632%2C34.81289271146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check71, October24,2026",
          "scope": "The original DartPoints GSP01 page identifies existing Greenville service. A separately dated November12,2025 expansion announcement has a July2027 forecast and is not a completed new building or evidence that the entire campus is under construction. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted.",
          "fields": {
            "company_association": {
              "name": "DartPoints",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "The original DartPoints GSP01 page identifies existing Greenville service. A separately dated November12,2025 expansion announcement has a July2027 forecast and is not a completed new building or evidence that the entire campus is under construction. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "The original DartPoints GSP01 page identifies existing Greenville service. A separately dated November12,2025 expansion announcement has a July2027 forecast and is not a completed new building or evidence that the entire campus is under construction. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/gsp01-greenville-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://dartpoints.com/technology-service-provider/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated street reference, not a roof or tenant floor",
      "summary": "Greenville · Greenville · Source context reviewed",
      "status_scope": "DartPoints lists current colocation, cloud, interconnection and locally staffed support at GSP01 in Greenville. Its area and technical figures are not adopted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    },
    {
      "id": "dartpoints-spartanburg-sc",
      "state": "sc",
      "kind": "facility",
      "name": "DartPoints Spartanburg Data Center (SPA01)",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Spartanburg"
      ],
      "city": "Spartanburg",
      "address": "",
      "who": "DartPoints",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DartPoints SPA01 explicit IT versus utility power. Cooling tons not electric IT.21kplusheadlineconsistentwith21400notadditionalarea. Dallas headquarters not site. SLA100percent is contractual promise, not observed historical uptime or independent certification. No exact street/parcel in body. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dartpoints.com/locations/spa01-spartanburg-sc/",
          "host": "dartpoints.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5700+N+Blackstock+Rd%2C+Spartanburg%2C+SC+29303&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete unique literal published street range, exact raw version retained"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-82.0418231922319%2C34.990951288537545%2C-82.0297608077681%2C35.00083271146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source setting, acquisition date unknown"
        },
        {
          "url": "https://dartpoints.com/technology-service-provider/",
          "host": "dartpoints.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lng": -82.035792,
        "lat": 34.995892,
        "precision": "address",
        "basis": "The original operator computing location source identifies 5700 N Blackstock Rd, Spartanburg, SC 29303. One complete unique literal Census street range supports this calculated reference inside Spartanburg County. This reference selects no roof, tenant floor, surveyed parcel or complete campus. Source dates do not establish current operation. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "DartPoints SPA01 explicit IT versus utility power",
          "fields": {
            "operator_code": "SPA01",
            "locality": "Spartanburg, South Carolina",
            "critical_it_mw": 0.8,
            "utility_power_mw": 1.5,
            "raised_floor_sqft": 21400,
            "headline_data_hall_sqft_min_exclusive": 21000,
            "cooling_tons": 200
          },
          "notes": [
            "Cooling tons not electric IT.21kplusheadlineconsistentwith21400notadditionalarea. Dallas headquarters not site. SLA100percent is contractual promise, not observed historical uptime or independent certification. No exact street/parcel in body.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/spa01-spartanburg-sc/",
              "host": "dartpoints.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "DartPoints offers current colocation, cloud and interconnection services at SPA01 in Spartanburg, with local support. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "DartPoints offers current colocation, cloud and interconnection services at SPA01 in Spartanburg, with local support. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "DartPoints offers current colocation, cloud and interconnection services at SPA01 in Spartanburg, with local support."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/spa01-spartanburg-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 65, 2026-10-24",
          "scope": "Original computing street identity and calculated Census reference only. Historical report dates and all source clock limitations remain separate from current operation, certification, ownership and technical quantities. Every other fact and attribute remains exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -82.035792,
                "lat": 34.995892,
                "precision": "address",
                "basis": "The original operator computing location source identifies 5700 N Blackstock Rd, Spartanburg, SC 29303. One complete unique literal Census street range supports this calculated reference inside Spartanburg County. This reference selects no roof, tenant floor, surveyed parcel or complete campus. Source dates do not establish current operation. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "5700 N Blackstock Rd, Spartanburg, SC 29303",
              "county_fips": [
                "45083"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Original computing street identity and calculated Census reference only. Historical report dates and all source clock limitations remain separate from current operation, certification, ownership and technical quantities. Every other fact and attribute remains exact.",
            "The inherited general area coordinate was not an independently reviewed computing street reference. The original named operator source and complete unique literal Census street range support this calculated reference inside the retained county. The measured inherited correction is 115.9 metres. Original wording, dates, coordinates and exact versions remain preserved. Existing status group operating and all other fields remain unchanged. This correction is not a physical move or a certification of operation, ownership, a roof, tenant floor, legal title or complete campus.",
            "Industrial blocks and grass or wooded strips with roads and parking."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/spa01-spartanburg-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original named computing facility heading and complete street, extracted original text view"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5700+N+Blackstock+Rd%2C+Spartanburg%2C+SC+29303&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete unique literal published street range, exact raw version retained"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-82.0418231922319%2C34.990951288537545%2C-82.0297608077681%2C35.00083271146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check71, October24,2026",
          "scope": "The original DartPoints SPA01 page identifies Spartanburg service. The regional and facility pages report different floor areas and connectivity counts; these figures are excluded from this identity review. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted.",
          "fields": {
            "company_association": {
              "name": "DartPoints",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "The original DartPoints SPA01 page identifies Spartanburg service. The regional and facility pages report different floor areas and connectivity counts; these figures are excluded from this identity review. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "The original DartPoints SPA01 page identifies Spartanburg service. The regional and facility pages report different floor areas and connectivity counts; these figures are excluded from this identity review. Operator per source means the named current computing service provider brand, not a separate legal entity, property owner or construction contractor. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication day for mutable current page content is unknown; CMS creation and modification metadata are retained privately and do not become opening dates. No technical measurement, environmental outcome or legal certification is adopted."
          ],
          "sources": [
            {
              "url": "https://dartpoints.com/locations/spa01-spartanburg-sc/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://dartpoints.com/technology-service-provider/",
              "host": "dartpoints.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated street reference, not a roof or tenant floor",
      "summary": "Spartanburg · Spartanburg · Source context reviewed",
      "status_scope": "DartPoints offers current colocation, cloud and interconnection services at SPA01 in Spartanburg, with local support. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    },
    {
      "id": "dc-blox-camp-hall-berkeley-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "DC BLOX Camp Hall Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Berkeley"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Dated preliminary plan; current construction/opening not established. Corporate footer is not this site capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2023-09-27",
          "DC BLOX announced a Camp Hall land purchase and preliminary development plan. The release dateline does not establish the exact land closing, construction start or opening day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dcblox.com/dc-blox-purchases-land-secures-power-in-berkeley-county-south-carolina/",
          "host": "dcblox.com",
          "date": "2023-09-27",
          "published": "2023-09-27",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.1974,
        "lng": -79.95235,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "purchased_land_acres": 27.5,
            "preliminary_buildings": 4,
            "preliminary_area_sqft": 200000,
            "preliminary_capacity_mw": 45,
            "power_basis": "planned power, unspecified IT versus gross"
          },
          "notes": [
            "Dated preliminary plan; current construction/opening not established. Corporate footer is not this site capacity.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-purchases-land-secures-power-in-berkeley-county-south-carolina/",
              "host": "dcblox.com",
              "date": "2023-09-27",
              "published": "2023-09-27",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 1",
          "scope": "The DC BLOX release dated September 27, 2023 describes a land purchase and a preliminary Camp Hall development plan. The visible header also includes November 13, 2023. The release dateline supports the announcement event only. No construction, commissioned power or operating service is established.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The DC BLOX release dated September 27, 2023 describes a land purchase and a preliminary Camp Hall development plan. The visible header also includes November 13, 2023. The release dateline supports the announcement event only. No construction, commissioned power or operating service is established."
            }
          },
          "notes": [
            "The DC BLOX release dated September 27, 2023 describes a land purchase and a preliminary Camp Hall development plan. The visible header also includes November 13, 2023. The release dateline supports the announcement event only. No construction, commissioned power or operating service is established."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-purchases-land-secures-power-in-berkeley-county-south-carolina/",
              "host": "www.dcblox.com",
              "published": "2023-09-27",
              "date": "2023-09-27",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Berkeley · Source context reviewed",
      "event_evidence": [
        {
          "date": "2023-09-27",
          "text": "DC BLOX announced a Camp Hall land purchase and preliminary development plan. The release dateline does not establish the exact land closing, construction start or opening day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-purchases-land-secures-power-in-berkeley-county-south-carolina/",
              "host": "www.dcblox.com",
              "published": "2023-09-27",
              "date": "2023-09-27",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45015"
      }
    },
    {
      "id": "dc-blox-greenville-sc",
      "state": "sc",
      "kind": "facility",
      "name": "DC BLOX Greenville Data Center",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Greenville"
      ],
      "city": "Greenville",
      "address": "",
      "who": "DC BLOX",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Header8MWcommittedplanned/36493sqft/3centersdiffersfromlegacy54kdatahalland18MWfuture. Keep sourcecontexts, notall8MWenergized. Captiondateisceremony, notexactfirstoperation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dcblox.com/data-centers/greenville/",
          "host": "dcblox.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=33+Global+Drive%2C+Greenville%2C+SC+29607&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Calculated Census street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-82.34650496838776%2C34.80140347670953%2C-82.33884676806025%2C34.807691654934466&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Aerial setting only, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -82.342675868224,
        "lat": 34.804547565822,
        "precision": "address",
        "basis": "Published DC BLOX facility address 33 Global Drive, Greenville, South Carolina 29607 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "published_address": "33 Global Drive, Greenville, SC29607",
            "phase1_critical_load_mw_max": 3,
            "expansion_potential_critical_load_mw_max": 18,
            "ribbon_cutting_month_caption": "2022-04"
          },
          "notes": [
            "Header8MWcommittedplanned/36493sqft/3centersdiffersfromlegacy54kdatahalland18MWfuture. Keep sourcecontexts, notall8MWenergized. Captiondateisceremony, notexactfirstoperation.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/greenville/",
              "host": "dcblox.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "DC BLOX describes current Greenville customers accessing colocation and connectivity, while its summary explicitly combines operational and in-development facilities. Only a service phase is supported. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operating_phase",
              "scope": "DC BLOX describes current Greenville customers accessing colocation and connectivity, while its summary explicitly combines operational and in-development facilities. Only a service phase is supported. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "DC BLOX describes current Greenville customers accessing colocation and connectivity, while its summary explicitly combines operational and in-development facilities. Only a service phase is supported."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/greenville/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 16, October 23, 2026",
          "scope": "Current official facility street reference only. Native protected facts and canonical address remain exact.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -82.342675868224,
                "lat": 34.804547565822,
                "precision": "address",
                "basis": "Published DC BLOX facility address 33 Global Drive, Greenville, South Carolina 29607 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, full campus, floor, suite or ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "33 Global Drive, Greenville, South Carolina 29607",
              "county_fips": [
                "45045"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named official numeric facility section binds the service address to this existing research record. Corporate offices, related facility cards and embedded map coordinates are excluded.",
            "The unique Census calculated street range agrees with the retained state and county. Official aerial setting was actually viewed. Acquisition date is unknown and may predate construction. The reference does not locate a surveyed roof, parcel, full campus, legal owner, floor or suite.",
            "All canonical address, status, physical dates, quantity, role, identity and jurisdiction wrappers remain exact. The retained Census method source keeps its actual October 22 date; new captures are dated October 23."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/greenville/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Official named Greenville numeric facility address section"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=33+Global+Drive%2C+Greenville%2C+SC+29607&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Calculated Census street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-82.34650496838776%2C34.80140347670953%2C-82.33884676806025%2C34.807691654934466&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Aerial setting only, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check68, October24,2026",
          "scope": "The named Greenville colocation page offers DC BLOX computing services. Its specific Data Hall 2 certification statement does not certify the whole campus, every component or a current inspection. The different phase, expansion and headline capacity figures are not adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Operator per source describes the named service provider brand rather than legal property ownership, sole operation of a building or a current operating verification.",
          "fields": {
            "company_association": {
              "name": "DC BLOX",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "The named Greenville colocation page offers DC BLOX computing services. Its specific Data Hall 2 certification statement does not certify the whole campus, every component or a current inspection. The different phase, expansion and headline capacity figures are not adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Operator per source describes the named service provider brand rather than legal property ownership, sole operation of a building or a current operating verification."
            },
            "provider_role": "operator"
          },
          "notes": [
            "The named Greenville colocation page offers DC BLOX computing services. Its specific Data Hall 2 certification statement does not certify the whole campus, every component or a current inspection. The different phase, expansion and headline capacity figures are not adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Operator per source describes the named service provider brand rather than legal property ownership, sole operation of a building or a current operating verification."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/greenville/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Greenville · Greenville · Source context reviewed",
      "status_scope": "DC BLOX describes current Greenville customers accessing colocation and connectivity, while its summary explicitly combines operational and in-development facilities. Only a service phase is supported. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    },
    {
      "id": "dc-blox-myrtle-beach-cls-sc",
      "state": "sc",
      "kind": "facility",
      "name": "DC BLOX Myrtle Beach Cable Landing Station",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Horry"
      ],
      "city": "Myrtle Beach",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Opening is supported by dated operator release; full-build design is not measured energized capacity. UpdatedJuly30,2024header is not opening date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Potential expansion adjacent to MYR1, not a second operating building or completed20MW. Power comes from existing substation; no double count against full-buildMYR1.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dcblox.com/dc-blox-opens-myrtle-beach-cable-landing-station/",
          "host": "dcblox.com",
          "date": "2023-10-10",
          "published": "2023-10-10",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.dcblox.com/dc-blox-to-expand-myrtle-beach-cable-landing-station/",
          "host": "dcblox.com",
          "date": "2025-10-14",
          "published": "2025-10-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.dcblox.com/data-centers/myrtle-beach-sc-cable-landing-station/",
          "host": "www.dcblox.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        }
      ],
      "loc": {
        "lat": 33.92137,
        "lng": -78.99721,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "opening_announcement": "2023-10-10",
            "full_build_design_area_sqft": 125000,
            "full_build_design_capacity_mw": 19,
            "power_basis": "design power, not explicitly critical IT"
          },
          "notes": [
            "Opening is supported by dated operator release; full-build design is not measured energized capacity. UpdatedJuly30,2024header is not opening date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-opens-myrtle-beach-cable-landing-station/",
              "host": "dcblox.com",
              "date": "2023-10-10",
              "published": "2023-10-10",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "expansion_site_code": "MYR2",
            "adjacent_land_acres_approx": 20,
            "potential_additional_power_mw": 20,
            "construction_condition": "pending additional demand"
          },
          "notes": [
            "Potential expansion adjacent to MYR1, not a second operating building or completed20MW. Power comes from existing substation; no double count against full-buildMYR1.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-to-expand-myrtle-beach-cable-landing-station/",
              "host": "dcblox.com",
              "date": "2025-10-14",
              "published": "2025-10-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "DC BLOX lists current cabinet, colocation and dark-fiber services at its Myrtle Beach cable landing station, while retaining development and future cable plans. No full cable portfolio or advertised capacity is certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operating_phase",
              "scope": "DC BLOX lists current cabinet, colocation and dark-fiber services at its Myrtle Beach cable landing station, while retaining development and future cable plans. No full cable portfolio or advertised capacity is certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "DC BLOX lists current cabinet, colocation and dark-fiber services at its Myrtle Beach cable landing station, while retaining development and future cable plans. No full cable portfolio or advertised capacity is certified."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/data-centers/myrtle-beach-sc-cable-landing-station/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Myrtle Beach · Horry · Source context reviewed",
      "status_scope": "DC BLOX lists current cabinet, colocation and dark-fiber services at its Myrtle Beach cable landing station, while retaining development and future cable plans. No full cable portfolio or advertised capacity is certified. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45051"
      }
    },
    {
      "id": "dc-blox-north-augusta-sc",
      "state": "sc",
      "kind": "facility",
      "name": "DC BLOX North Augusta Hyper Edge Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Aiken"
      ],
      "city": "North Augusta",
      "address": "",
      "who": "DC BLOX",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. NorthAugusta-specific section within4-site announcement. Four-site25MWinitialand160MWpotentialforadditionaltenantsnotNorthAugusta-only. Montgomery5initial/40expandandHuntsville5aredifferentlocations. Statusdeveloping2024notcurrentlyonlineproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-11-14",
          "DC BLOX announced plans for a North Augusta hyperscale edge facility. This is the release date, not a construction start, opening or delivery date."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
          "host": "dcblox.com",
          "date": "2024-11-14",
          "published": "2024-11-14",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.dcblox.com/data-center-map/",
          "host": "www.dcblox.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.54447,
        "lng": -81.63447,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "NorthAugusta-specific section within4-site announcement",
          "fields": {
            "north_augusta_planned_anchor_power_mw": 5,
            "north_augusta_county_quote": "Aiken County, South Carolina",
            "power_basis": "dedicatedhyperscaleclientpower, not explicitIT"
          },
          "notes": [
            "Four-site25MWinitialand160MWpotentialforadditionaltenantsnotNorthAugusta-only. Montgomery5initial/40expandandHuntsville5aredifferentlocations. Statusdeveloping2024notcurrentlyonlineproof.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "dcblox.com",
              "date": "2024-11-14",
              "published": "2024-11-14",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 1",
          "scope": "DC BLOX announced the North Augusta development on November 14, 2024. The current regional map combines operating and development campuses. Neither source establishes present construction or delivered service for this record. Planned capacity and regional totals remain separate.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "DC BLOX announced the North Augusta development on November 14, 2024. The current regional map combines operating and development campuses. Neither source establishes present construction or delivered service for this record. Planned capacity and regional totals remain separate."
            }
          },
          "notes": [
            "DC BLOX announced the North Augusta development on November 14, 2024. The current regional map combines operating and development campuses. Neither source establishes present construction or delivered service for this record. Planned capacity and regional totals remain separate."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "www.dcblox.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.dcblox.com/data-center-map/",
              "host": "www.dcblox.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check68, October24,2026",
          "scope": "The November 14, 2024 announcement identifies DC BLOX development at North Augusta. The named site remains distinct from Huntsville and Montgomery even though the same article covers all three. No tenant identity, current completion, location or power measure is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification.",
          "fields": {
            "company_association": {
              "name": "DC BLOX",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The November 14, 2024 announcement identifies DC BLOX development at North Augusta. The named site remains distinct from Huntsville and Montgomery even though the same article covers all three. No tenant identity, current completion, location or power measure is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The November 14, 2024 announcement identifies DC BLOX development at North Augusta. The named site remains distinct from Huntsville and Montgomery even though the same article covers all three. No tenant identity, current completion, location or power measure is adopted. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. Publication and retrieval clocks remain separate from physical milestones. Developer per source describes the named project association rather than legal property ownership, a completed facility or a current operating verification."
          ],
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "www.dcblox.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "North Augusta · Aiken · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-11-14",
          "text": "DC BLOX announced plans for a North Augusta hyperscale edge facility. This is the release date, not a construction start, opening or delivery date.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.dcblox.com/dc-blox-4-southeast-hyperscale-edge-node-data-centers/",
              "host": "www.dcblox.com",
              "published": "2024-11-14",
              "date": "2024-11-14",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45003"
      }
    },
    {
      "id": "genesis-digital-assets-anderson-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Genesis Digital Assets Anderson Bitcoin Mining Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Anderson"
      ],
      "city": "Anderson",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/",
          "host": "scbiz.com",
          "date": "2023-08-01",
          "published": "2023-08-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.51922,
        "lng": -82.63746,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "SCBiz reports Genesis's Anderson site opened in February 2023 and two Union or Lockhart sites ran from March 2023.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/",
              "host": "scbiz.com",
              "date": "2023-08-01",
              "published": "2023-08-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Anderson · Anderson · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45007"
      }
    },
    {
      "id": "genesis-digital-assets-union-lockhart-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Genesis Digital Assets Union-Lockhart Bitcoin Mining Data Centers",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Union"
      ],
      "city": "Lockhart",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/",
          "host": "scbiz.com",
          "date": "2023-08-01",
          "published": "2023-08-01",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.6901,
        "lng": -81.61891,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "SCBiz reports Genesis's Anderson site opened in February 2023 and two Union or Lockhart sites ran from March 2023.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Anderson's 18 MW is separate from a combined 15 MW across two sites. A campus-to-building crosswalk is needed. Of 150 jobs, 125 were construction contractors; the balance is not independently classified permanent. Global capacity is not South Carolina capacity.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://scbiz.com/bitcoin-miner-opens-three-data-centers-in-anderson-union-counties/",
              "host": "scbiz.com",
              "date": "2023-08-01",
              "published": "2023-08-01",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Lockhart · Union · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45087"
      }
    },
    {
      "id": "google-moncks-corner-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Google Berkeley County Data Center (Moncks Corner)",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Berkeley"
      ],
      "city": "Moncks Corner",
      "address": "",
      "who": "Google",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "Calendar-year 2025 operator-reported location totals. Withdrawal, discharge and consumption are separate quantities; methodology permits estimates and does not establish today’s use.",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. South Carolina statewide redirect. PreferredBerkeleyURLredirectsstatewide.13B+not MoncksCorner-onlyinvestment; Dorchester2024opening not Berkeley date.225MWrenewabledeal is generation, not facilityIT. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. three-campus regional historical investment allocation. Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately. Google 2026 quarterly performance table; named regional campus scope. Operator-reported period metrics, not an October operating inspection, current MW load or building-specific measurement. Regional values are not assigned to a separate expansion or street-address record. Blank TTM remains unknown. No status, location precision or whole-campus completion upgrade; publication date unknown.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.google/locations/berkeley-county-south-carolina/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion",
          "host": "governor.sc.gov",
          "date": "2024-09-26",
          "published": "2024-09-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.google/efficiency/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.google/locations/south-carolina/",
          "host": "datacenters.google",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/south-carolina/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://www.datacenters.google/locations/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google official location source"
        },
        {
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "host": "sustainability.google",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Google 2026 Environmental Report"
        },
        {
          "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/",
          "host": "blog.google",
          "published": "2025-10-13",
          "date": "2025-10-13",
          "checked": "2026-10-16",
          "label": "Google dated South Carolina announcement"
        }
      ],
      "loc": {
        "lat": 33.22075,
        "lng": -79.97784,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "South Carolina statewide redirect",
          "fields": {
            "named_locations": [
              "Moncks Corner",
              "Summerville",
              "St. George"
            ],
            "regional_investment_usd_min_exclusive": 13000000000,
            "investment_scope": "South Carolina statewide",
            "dorchester_newest_opening_year": 2024
          },
          "notes": [
            "PreferredBerkeleyURLredirectsstatewide.13B+not MoncksCorner-onlyinvestment; Dorchester2024opening not Berkeley date.225MWrenewabledeal is generation, not facilityIT.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/locations/berkeley-county-south-carolina/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "three-campus regional historical investment allocation",
          "fields": {
            "historical_expansion_announcement": "2024-09-26",
            "combined_regional_planned_investment_usd": 3300000000,
            "dorchester_two_new_campuses_combined_investment_usd": 2000000000,
            "dorchester_two_new_campuses_expected_operational_jobs": 200,
            "berkeley_existing_campus_expansion_planned_investment_usd": 1300000000,
            "named_dorchester_locations": [
              "Pine Hill Business Campus,Ridgeville",
              "Winding Woods Commerce Park,StGeorge"
            ],
            "named_berkeley_location": "Mount Holly Commerce Park,MoncksCorner"
          },
          "notes": [
            "Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion",
              "host": "governor.sc.gov",
              "date": "2024-09-26",
              "published": "2024-09-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Google 2026 quarterly performance table; named regional campus scope",
          "fields": {
            "operator_reported_pue_period": "2026-Q2",
            "operator_reported_campus_pue": [
              {
                "source_campus_label": "Berkeley County, South Carolina",
                "quarterly_pue": 1.11,
                "trailing_twelve_month_pue": 1.1
              }
            ]
          },
          "notes": [
            "Operator-reported period metrics, not an October operating inspection, current MW load or building-specific measurement. Regional values are not assigned to a separate expansion or street-address record. Blank TTM remains unknown. No status, location precision or whole-campus completion upgrade; publication date unknown."
          ],
          "sources": [
            {
              "url": "https://datacenters.google/efficiency/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            },
            {
              "url": "https://datacenters.google/locations/south-carolina/",
              "host": "datacenters.google",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "398f42d55ca9e2ebecd3b24e2dede307ad2d9d3b653469d1efebd135488f9c17",
          "events": [],
          "whole_record_certified": false
        },
        {
          "overlay": "S4-Google-Locations-20261016",
          "scope": "Named Google location research context; regional campus and individual building identity remain separate.",
          "fields": {
            "operator_location_scope": "Berkeley County, South Carolina is named in Google’s current directory and linked location page. Regional entries can include several facilities; directory development flags alone do not establish an operating stage.",
            "record_association_scope": "The named operator location is associated with this existing research context by provider and named city/county. This is an explicit research association, not proof of a distinct physical site or an exact parcel.",
            "annual_water_reporting": {
              "source_location": "Berkeley County, SC",
              "report_year": 2026,
              "reporting_year": 2025,
              "source_page": 97,
              "unit": "Million gallons",
              "withdrawal": 988.5,
              "discharge": 86.8,
              "consumption": 901.7
            },
            "water_method_scope": "Annual calendar-year 2025 figures for the reported location, not instantaneous use, a daily rate, an approved limit or one building. Google uses metered or invoiced values when available and can estimate missing data; the table does not identify each row’s metering completeness. Consumption is calculated as withdrawal minus discharge; values are rounded. Seawater and brackish water over 1,000 mg/L total dissolved solids are excluded. Unless otherwise specified, withdrawals are potable; Douglas County includes reclaimed wastewater. No litres or daily averages are calculated.",
            "water_location_association": "Berkeley County, SC is associated with this regional campus research context only; no allocation to separate expansion/street-address records or individual buildings.",
            "current_status_basis": "An operating component is supported at Google’s named Berkeley County, South Carolina location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.",
            "regional_opening_source_conflict": "The current South Carolina location page gives a 2024 Dorchester opening narrative, but Google’s October 13, 2025 announcement describes continued construction of two new Dorchester sites, and the directory still marks Dorchester in development. The earlier inherited opening-year finding records a statement from that page, not an independently verified opening. These conflicting scopes do not resolve current Ridgeville or St. George operation, construction completion or individual opening dates. Berkeley’s separate operating-component evidence does not certify those Dorchester projects."
          },
          "notes": [
            "A partial operator/field review does not certify every fact or a whole state. No precise address, map point, current IT load or per-campus investment is inferred."
          ],
          "sources": [
            {
              "url": "https://www.datacenters.google/locations/south-carolina/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://www.datacenters.google/locations/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google official location source"
            },
            {
              "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
              "host": "sustainability.google",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Google 2026 Environmental Report"
            },
            {
              "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/",
              "host": "blog.google",
              "published": "2025-10-13",
              "date": "2025-10-13",
              "checked": "2026-10-16",
              "label": "Google dated South Carolina announcement"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Moncks Corner · Berkeley · Source context reviewed",
      "status_scope": "An operating component is supported at Google’s named Berkeley County, South Carolina location by its current operator listing and 2025 operational reporting. This is regional campus scope, not verification that every expansion/building is complete, fully commissioned or operating at a stated MW. Annual reporting is historical, not an October operating inspection.",
      "typed_water_facts": [
        {
          "measure": "withdrawal",
          "value": 988.5,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Berkeley County, SC, calendar year 2025 withdrawal; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "discharge",
          "value": 86.8,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Berkeley County, SC, calendar year 2025 discharge; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        },
        {
          "measure": "consumption",
          "value": 901.7,
          "unit": "million gallons",
          "as_of": null,
          "as_of_basis": "reporting_period",
          "reporting_period": {
            "label": "2025",
            "start": "2025-01-01",
            "end": "2025-12-31"
          },
          "observed_on": "2026-10-16",
          "basis": "operator_reported_total",
          "scope": "Google 2026 Environmental Report p.97: Berkeley County, SC, calendar year 2025 consumption; million gallons as reported. This is a rounded annual operator-reported total, not current/daily usage, a permit limit or a building-only allocation. Method pp.82/87 allows metered/invoiced data and estimates where actual data is unavailable; no row-specific metering guarantee. Consumption is withdrawal minus discharge. Seawater/brackish sources excluded.",
          "sources": [
            "https://sustainability.google/files/google-2026-environmental-report.pdf"
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45015"
      }
    },
    {
      "id": "google-ridgeville-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Google Ridgeville Data Center (Project Dawson)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dorchester"
      ],
      "city": "Ridgeville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. three-campus regional historical investment allocation. Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-09-26",
          "The Governor September 26, 2024 release names two planned Dorchester campuses, including Pine Hill in Ridgeville. This dates the announcement rather than an opening."
        ],
        [
          "2025-10-13",
          "The Google October 13, 2025 update reports continued construction of two Dorchester sites. This dates that historical construction account and does not establish exact current Ridgeville operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion",
          "host": "governor.sc.gov",
          "date": "2024-09-26",
          "published": "2024-09-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.datacenters.google/locations/south-carolina/",
          "host": "www.datacenters.google",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/",
          "host": "blog.google",
          "published": "2025-10-13",
          "date": "2025-10-13",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.07938,
        "lng": -80.40599,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "three-campus regional historical investment allocation",
          "fields": {
            "historical_expansion_announcement": "2024-09-26",
            "combined_regional_planned_investment_usd": 3300000000,
            "dorchester_two_new_campuses_combined_investment_usd": 2000000000,
            "dorchester_two_new_campuses_expected_operational_jobs": 200,
            "berkeley_existing_campus_expansion_planned_investment_usd": 1300000000,
            "named_dorchester_locations": [
              "Pine Hill Business Campus,Ridgeville",
              "Winding Woods Commerce Park,StGeorge"
            ],
            "named_berkeley_location": "Mount Holly Commerce Park,MoncksCorner"
          },
          "notes": [
            "Historical commitment, not current cumulative SouthCarolina investment.2B/200jobs combined Ridgeville andStGeorge, not each or Berkeley. No opening dates or electrical MW. Later corporate statewide13Bcontext already recorded separately.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion",
              "host": "governor.sc.gov",
              "date": "2024-09-26",
              "published": "2024-09-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 79",
          "scope": "The complete original Governor September 26, 2024 release identifies two separate planned Dorchester campuses at Pine Hill in Ridgeville and Winding Woods in St. George. The complete original Google October 13, 2025 update reports continued construction of two Dorchester sites. Selected current Google state page text instead describes three facilities, names Summerville and St. George, and contains a generic 2024 Dorchester opening milestone. These source and naming conflicts do not independently establish exact current Ridgeville operation or continued physical construction. The original historical statements are retained without resolving the current stage by elapsed forecasts, a generic opening label or regional branding. No campus identity, role or location is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_dorchester_construction_current_exact_ridgeville_conflict_held",
              "scope": "The complete original Governor September 26, 2024 release identifies two separate planned Dorchester campuses at Pine Hill in Ridgeville and Winding Woods in St. George. The complete original Google October 13, 2025 update reports continued construction of two Dorchester sites. Selected current Google state page text instead describes three facilities, names Summerville and St. George, and contains a generic 2024 Dorchester opening milestone. These source and naming conflicts do not independently establish exact current Ridgeville operation or continued physical construction. The original historical statements are retained without resolving the current stage by elapsed forecasts, a generic opening label or regional branding. No campus identity, role or location is changed."
            },
            "source_read_scope": {
              "complete_original_governor_and_oct2025_update_bodies_read": true,
              "selected_current_state_page_location_and_milestone_text_read": true,
              "current_regional_opening_and_historical_construction_conflict_retained": true,
              "no_exact_current_operation_or_municipal_reassignment": true
            }
          },
          "notes": [
            "The complete original Governor September 26, 2024 release identifies two separate planned Dorchester campuses at Pine Hill in Ridgeville and Winding Woods in St. George. The complete original Google October 13, 2025 update reports continued construction of two Dorchester sites. Selected current Google state page text instead describes three facilities, names Summerville and St. George, and contains a generic 2024 Dorchester opening milestone. These source and naming conflicts do not independently establish exact current Ridgeville operation or continued physical construction. The original historical statements are retained without resolving the current stage by elapsed forecasts, a generic opening label or regional branding. No campus identity, role or location is changed.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion",
              "host": "governor.sc.gov",
              "published": "2024-09-26",
              "date": "2024-09-26",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.datacenters.google/locations/south-carolina/",
              "host": "www.datacenters.google",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/",
              "host": "blog.google",
              "published": "2025-10-13",
              "date": "2025-10-13",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Ridgeville · Dorchester · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-09-26",
          "text": "The Governor September 26, 2024 release names two planned Dorchester campuses, including Pine Hill in Ridgeville. This dates the announcement rather than an opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion",
              "host": "governor.sc.gov",
              "published": "2024-09-26",
              "date": "2024-09-26",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        },
        {
          "date": "2025-10-13",
          "text": "The Google October 13, 2025 update reports continued construction of two Dorchester sites. This dates that historical construction account and does not establish exact current Ridgeville operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-south-carolina/",
              "host": "blog.google",
              "published": "2025-10-13",
              "date": "2025-10-13",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45035"
      }
    },
    {
      "id": "greenidge-spartanburg-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Greenidge Spartanburg (South Carolina)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Spartanburg"
      ],
      "city": "Spartanburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original operator, government announcement or original reported project context.. South Carolina Department of Commerce, January25,2022 original announcement: Greenidge proposed175acres/300JonesRoad Spartanburg crypto facility,264M announced investment/40future jobs/at least100MW fully developed DATACENTER CAPACITY, basis not explicit critical IT. Second-half2022 first phase and expansion through2025 are historical targets, not completed operating proof. Carbon-neutral commitment and local energy mix statements are issuer claims, not verified measured emissions. No grant/payment amount or current owner inferred; historical Greenidge identity does not automatically establish current Lighthouse conversion. Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification.",
      "date": "",
      "events": [
        [
          "2022-01-25",
          "The original Commerce January 25, 2022 release announces Greenidge Spartanburg plans. This dates a proposal account rather than completed computing operation or later cancellation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.sccommerce.com/news/greenidge-generation-establishing-operations-spartanburg-county",
          "host": "sccommerce.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.sccommerce.com/newsroom/greenidge-generation-establishing-operations-spartanburg-county",
          "host": "www.sccommerce.com",
          "published": "2022-01-25",
          "date": "2022-01-25",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 34.93115,
        "lng": -81.99086,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-original-proposals-and-pollutant-correction-round75-2026-10-15.json",
          "scope": "Named original operator, government announcement or original reported project context.",
          "fields": {},
          "notes": [
            "South Carolina Department of Commerce, January25,2022 original announcement: Greenidge proposed175acres/300JonesRoad Spartanburg crypto facility,264M announced investment/40future jobs/at least100MW fully developed DATACENTER CAPACITY, basis not explicit critical IT.",
            "Second-half2022 first phase and expansion through2025 are historical targets, not completed operating proof. Carbon-neutral commitment and local energy mix statements are issuer claims, not verified measured emissions. No grant/payment amount or current owner inferred; historical Greenidge identity does not automatically establish current Lighthouse conversion.",
            "Plans, historical dates, measurement basis and permit stage remain scoped; not current operation or all-field certification."
          ],
          "sources": [
            {
              "url": "https://www.sccommerce.com/news/greenidge-generation-establishing-operations-spartanburg-county",
              "host": "sccommerce.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 79",
          "scope": "The complete original January 25, 2022 Commerce release announces plans for the Greenidge Spartanburg development at Jones Road and forecasts a first phase during the second half of 2022. This historical plan does not establish present operation, cancellation, legal project transfer or physical closure. The original later issuer sale account was unavailable under its robots check and was not read or replaced with a copy or indexed extract. Exact current disposition remains held. The observed original agency redirect was followed to its current canonical page.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_agency_greenidge_plan_current_disposition_held",
              "scope": "The complete original January 25, 2022 Commerce release announces plans for the Greenidge Spartanburg development at Jones Road and forecasts a first phase during the second half of 2022. This historical plan does not establish present operation, cancellation, legal project transfer or physical closure. The original later issuer sale account was unavailable under its robots check and was not read or replaced with a copy or indexed extract. Exact current disposition remains held. The observed original agency redirect was followed to its current canonical page."
            },
            "source_read_scope": {
              "complete_original_agency_release_body_read": true,
              "original_observed_agency_redirect_followed": true,
              "original_later_issuer_sale_body_unavailable_not_substituted": true,
              "no_historical_forecast_as_operation_or_transfer_as_closure": true
            }
          },
          "notes": [
            "The complete original January 25, 2022 Commerce release announces plans for the Greenidge Spartanburg development at Jones Road and forecasts a first phase during the second half of 2022. This historical plan does not establish present operation, cancellation, legal project transfer or physical closure. The original later issuer sale account was unavailable under its robots check and was not read or replaced with a copy or indexed extract. Exact current disposition remains held. The observed original agency redirect was followed to its current canonical page.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.sccommerce.com/newsroom/greenidge-generation-establishing-operations-spartanburg-county",
              "host": "www.sccommerce.com",
              "published": "2022-01-25",
              "date": "2022-01-25",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Spartanburg · Spartanburg · Source context reviewed",
      "event_evidence": [
        {
          "date": "2022-01-25",
          "text": "The original Commerce January 25, 2022 release announces Greenidge Spartanburg plans. This dates a proposal account rather than completed computing operation or later cancellation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.sccommerce.com/newsroom/greenidge-generation-establishing-operations-spartanburg-county",
              "host": "www.sccommerce.com",
              "published": "2022-01-25",
              "date": "2022-01-25",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45083"
      }
    },
    {
      "id": "lighthouse-data-centers-spartanburg-sc",
      "state": "sc",
      "kind": "facility",
      "name": "LightHouse Data Centers Spartanburg (300 Jones Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Spartanburg"
      ],
      "city": "Spartanburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. RipLey Simone, WSPA original report; article metadata published August 26, 2026 at 23:36:24 UTC, modified 23:40:43 UTC. Photo/body identify the August 25 appeals meeting. Names Lighthouse at 300 Jones Road, 200,000 square feet/60 MW undefined power basis: this resolves the earlier held operator/address crosswalk. Appeals board upheld the June 26 application denial; not proof no judicial appeal is possible or all county development is permanently banned. Underlying ordinance, application, decision and current litigation not inspected. $28 million spent is the developer representative claim, not an audited receipt. Representative named Sam Outten; no OpenAI-CEO identity inference. Not all fields, current operation, precise parcel or critical IT independently certified.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wspa.com/news/lighthouse-data-centers-proposal-denied/amp/",
          "host": "wspa.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.94845,
        "lng": -82.00975,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json",
          "scope": "Named-site context, with limited previews/corridor crosswalks explicitly identified.",
          "fields": {},
          "notes": [
            "RipLey Simone, WSPA original report; article metadata published August 26, 2026 at 23:36:24 UTC, modified 23:40:43 UTC. Photo/body identify the August 25 appeals meeting. Names Lighthouse at 300 Jones Road, 200,000 square feet/60 MW undefined power basis: this resolves the earlier held operator/address crosswalk. Appeals board upheld the June 26 application denial; not proof no judicial appeal is possible or all county development is permanently banned. Underlying ordinance, application, decision and current litigation not inspected. $28 million spent is the developer representative claim, not an audited receipt. Representative named Sam Outten; no OpenAI-CEO identity inference.",
            "Not all fields, current operation, precise parcel or critical IT independently certified."
          ],
          "sources": [
            {
              "url": "https://www.wspa.com/news/lighthouse-data-centers-proposal-denied/amp/",
              "host": "wspa.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Spartanburg · Spartanburg · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45083"
      }
    },
    {
      "id": "meta-aiken-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Meta Aiken Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Aiken"
      ],
      "city": "Graniteville",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Historical announced scope, not completed2026capacity. No site MW specified. Renewable matching and plannedLEEDGold do not prove continuous clean supply or current achieved certification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-08-29",
          "The South Carolina governor announced the Meta Aiken development in Sage Mill Industrial Park with a future service target. This is the publication date, not an opening or construction start day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center",
          "host": "governor.sc.gov",
          "date": "2024-08-29",
          "published": "2024-08-29",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/us-locations/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Aiken-Data-Center.pdf",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 33.56742,
        "lng": -81.65952,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "named government source",
          "fields": {
            "development_announcement_date": "2024-08-29",
            "planned_investment_usd": 800000000,
            "expected_operational_jobs": 100,
            "planned_data_center_area_sqft": 715000,
            "operation_target": "spring2027",
            "published_location": "Sage Mill Industrial Park,AikenCounty,SouthCarolina"
          },
          "notes": [
            "Historical announced scope, not completed2026capacity. No site MW specified. Renewable matching and plannedLEEDGold do not prove continuous clean supply or current achieved certification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center",
              "host": "governor.sc.gov",
              "date": "2024-08-29",
              "published": "2024-08-29",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 3",
          "scope": "The South Carolina governor announced the Meta Aiken development on August 29, 2024 with a spring 2027 operating target. The present Meta fleet page reports a groundbreaking year only. Neither establishes commissioning, an exact construction start day or the present physical stage. Renewable matching and planned certification are not measured site effects.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The South Carolina governor announced the Meta Aiken development on August 29, 2024 with a spring 2027 operating target. The present Meta fleet page reports a groundbreaking year only. Neither establishes commissioning, an exact construction start day or the present physical stage. Renewable matching and planned certification are not measured site effects."
            }
          },
          "notes": [
            "The South Carolina governor announced the Meta Aiken development on August 29, 2024 with a spring 2027 operating target. The present Meta fleet page reports a groundbreaking year only. Neither establishes commissioning, an exact construction start day or the present physical stage. Renewable matching and planned certification are not measured site effects."
          ],
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center",
              "host": "governor.sc.gov",
              "published": "2024-08-29",
              "date": "2024-08-29",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://datacenters.atmeta.com/us-locations/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check70, October24,2026",
          "scope": "The original Meta Aiken brochure identifies its planned Aiken data center as future global infrastructure. Developer per source means the named project proponent, not a construction contractor or legal property title. Its words will be part and once completed do not certify present operation. PDF creation metadata is not a publication, opening or commissioning day. Publication day remains unknown. Energy and water cost pledges, future restoration goals and job forecasts are attributed company statements and are not adopted as measured outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "The original Meta Aiken brochure identifies its planned Aiken data center as future global infrastructure. Developer per source means the named project proponent, not a construction contractor or legal property title. Its words will be part and once completed do not certify present operation. PDF creation metadata is not a publication, opening or commissioning day. Publication day remains unknown. Energy and water cost pledges, future restoration goals and job forecasts are attributed company statements and are not adopted as measured outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."
            },
            "provider_role": "developer"
          },
          "notes": [
            "The original Meta Aiken brochure identifies its planned Aiken data center as future global infrastructure. Developer per source means the named project proponent, not a construction contractor or legal property title. Its words will be part and once completed do not certify present operation. PDF creation metadata is not a publication, opening or commissioning day. Publication day remains unknown. Energy and water cost pledges, future restoration goals and job forecasts are attributed company statements and are not adopted as measured outcomes. Only the previously empty provider brand and source role evidence are filled. Existing status, location, address, county, quantities, dates and component identity remain exact. This does not newly admit a location, parcel or roof. No current operation, environmental effect or legal compliance is inferred."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Aiken-Data-Center.pdf",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Graniteville · Aiken · Source context reviewed",
      "event_evidence": [
        {
          "date": "2024-08-29",
          "text": "The South Carolina governor announced the Meta Aiken development in Sage Mill Industrial Park with a future service target. This is the publication date, not an opening or construction start day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center",
              "host": "governor.sc.gov",
              "published": "2024-08-29",
              "date": "2024-08-29",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45003"
      }
    },
    {
      "id": "northmark-valara-spartanburg-sc",
      "state": "sc",
      "kind": "facility",
      "name": "NorthMark Strategies Spartanburg High-Performance Computing Center",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Spartanburg"
      ],
      "city": "Spartanburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Valara siteidentity andproposed onsitegeneration modification. Applicationcopy/digitalsignaturenotapprovalofnewturbines orcurrentoperations. Existing24times2MWenginesandrequestedgenerationnotcriticalIT,donotsumasenergizedcampuscapacity. Northmarkoperatoraliasnotindependentlyestablishedinthisform. Noexactcompletionorcapitalvalue. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf",
          "host": "des.sc.gov",
          "date": "2026-04-23",
          "published": "2026-04-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.89506,
        "lng": -81.9877,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Valara siteidentity andproposed onsitegeneration modification",
          "fields": {
            "application_copy_of_record_date": "2026-04-23",
            "facility_name": "ValaraHoldingsHighPerformanceComputeCenter",
            "published_physical_address": "4000 SouthPineStreet,Spartanburg,SC29302",
            "applicant_reported_facility_point": {
              "latitude": 34.923,
              "longitude": -81.8519,
              "geo_precision": "applicant-reported permitted-process center,notparcelcentroid"
            },
            "referenced_existing_air_permit": "CP-50000316v1.0",
            "referenced_existing_permit_issue_date": "2025-09-17",
            "requested_additional_generation": [
              {
                "units": 5,
                "mw_each": 17,
                "fuel": "naturalgas"
              },
              {
                "units": 6,
                "mw_each": 54,
                "fuel": "naturalgas"
              }
            ]
          },
          "notes": [
            "Applicationcopy/digitalsignaturenotapprovalofnewturbines orcurrentoperations. Existing24times2MWenginesandrequestedgenerationnotcriticalIT,donotsumasenergizedcampuscapacity. Northmarkoperatoraliasnotindependentlyestablishedinthisform. Noexactcompletionorcapitalvalue.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf",
              "host": "des.sc.gov",
              "date": "2026-04-23",
              "published": "2026-04-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 79",
          "scope": "Selected physical pages 1 through 4 of the original sixteen page Valara application identify the named High Performance Compute Center and planned onsite generation. The record describes a computing project and already permitted generator installation, without proving that equipment was installed, computing construction began or the center operates. This supports an agency listed proposal. The April 23, 2026 signed digital record copy is not independently verified as first submission or web publication day. The exact NorthMark legal role and the inherited project crosswalk are not changed. Neither generation permitting nor an application narrative establishes installed computing capacity.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_named_valara_computing_application",
              "scope": "Selected physical pages 1 through 4 of the original sixteen page Valara application identify the named High Performance Compute Center and planned onsite generation. The record describes a computing project and already permitted generator installation, without proving that equipment was installed, computing construction began or the center operates. This supports an agency listed proposal. The April 23, 2026 signed digital record copy is not independently verified as first submission or web publication day. The exact NorthMark legal role and the inherited project crosswalk are not changed. Neither generation permitting nor an application narrative establishes installed computing capacity."
            },
            "source_read_scope": {
              "original_application_selected_physical_pages1_through4_text_read": true,
              "not_entire_sixteen_page_application_read": true,
              "digital_record_copy_signature_not_verified_submission_or_publication_day": true,
              "generator_permission_not_physical_installation_or_computing_operation": true,
              "no_legal_role_crosswalk_or_capacity_change": true
            }
          },
          "notes": [
            "Selected physical pages 1 through 4 of the original sixteen page Valara application identify the named High Performance Compute Center and planned onsite generation. The record describes a computing project and already permitted generator installation, without proving that equipment was installed, computing construction began or the center operates. This supports an agency listed proposal. The April 23, 2026 signed digital record copy is not independently verified as first submission or web publication day. The exact NorthMark legal role and the inherited project crosswalk are not changed. Neither generation permitting nor an application narrative establishes installed computing capacity.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf",
              "host": "des.sc.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Spartanburg · Spartanburg · Source context reviewed",
      "status_scope": "Selected physical pages 1 through 4 of the original sixteen page Valara application identify the named High Performance Compute Center and planned onsite generation. The record describes a computing project and already permitted generator installation, without proving that equipment was installed, computing construction began or the center operates. This supports an agency listed proposal. The April 23, 2026 signed digital record copy is not independently verified as first submission or web publication day. The exact NorthMark legal role and the inherited project crosswalk are not changed. Neither generation permitting nor an application narrative establishes installed computing capacity.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45083"
      }
    },
    {
      "id": "pollard-mccormick-county-data-center-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Pollard Data Center Site (McCormick County)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "McCormick"
      ],
      "city": "McCormick",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Original publication metadata is July 28, with an August 12 update and an August 18 future council date; the exact information-session date is not established. Planning denial/recommendations are separate from council law. Pipeline cost is not DC capex, and a proposed gas-powered system is not critical IT or an executed fuel contract. Unrelated inserted political material is excluded. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wrdw.com/2026/08/12/hundreds-gather-debate-proposed-mccormick-county-data-center/",
          "host": "wrdw.com",
          "date": "2026-07-28",
          "published": "2026-07-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.8995,
        "lng": -82.30937,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WRDW reports Pollard's McCormick informational proposal with a gas pipeline, planned water use and a planning recommendation for a pause, while county action remained future.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Original publication metadata is July 28, with an August 12 update and an August 18 future council date; the exact information-session date is not established. Planning denial/recommendations are separate from council law. Pipeline cost is not DC capex, and a proposed gas-powered system is not critical IT or an executed fuel contract. Unrelated inserted political material is excluded.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wrdw.com/2026/08/12/hundreds-gather-debate-proposed-mccormick-county-data-center/",
              "host": "wrdw.com",
              "date": "2026-07-28",
              "published": "2026-07-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "McCormick · McCormick · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45065"
      }
    },
    {
      "id": "clarendon-county-ram-bay-data-center-manning-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Potential Data Center, Ram Bay Industrial Park (Clarendon County)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Clarendon"
      ],
      "city": "Manning",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Clarendon early proposal, first reading and water-fill scope. Secondary account of countyfactsheet, not signedutilityagreement. Firstreading not effective moratorium; thirdreading/outcome unknown.40Kcoolingfill not gallonsperday or nofuturewateruse guarantee.4.5Mannualforecast not actualpaidtax. Officials noharm/nojurisdiction statements not independent legal or environmental finding. No named operator, exactparcel, ITMW or operation. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wistv.com/2026/08/19/clarendon-county-administration-responds-pushback-proposed-data-center/",
          "host": "wistv.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.66595,
        "lng": -80.2164,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "Clarendon early proposal, first reading and water-fill scope",
          "fields": {
            "county": "Clarendon, SouthCarolina",
            "project_location": "RamBayIndustrialPark",
            "report_date_as_url": "2026-08-19",
            "reported_stage": "potential site secured through SanteeElectric contract; formal plans not official",
            "reported_moratorium_first_reading_date": "2026-08-10",
            "reported_projected_tax_revenue_annual_usd": 4500000,
            "reported_initial_cooling_water_gallons_approx": 40000
          },
          "notes": [
            "Secondary account of countyfactsheet, not signedutilityagreement. Firstreading not effective moratorium; thirdreading/outcome unknown.40Kcoolingfill not gallonsperday or nofuturewateruse guarantee.4.5Mannualforecast not actualpaidtax. Officials noharm/nojurisdiction statements not independent legal or environmental finding. No named operator, exactparcel, ITMW or operation.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wistv.com/2026/08/19/clarendon-county-administration-responds-pushback-proposed-data-center/",
              "host": "wistv.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Manning · Clarendon · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45027"
      }
    },
    {
      "id": "volt-edge-project-alpaca-union-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Project Alpaca (Midway Green Industrial Park)",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Union"
      ],
      "city": "Union",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original participant/economic-development presentation for proposal and claims, not independent performance validation.. Economic-development presentation establishes attributed VoltEdge proposal at MidwayGreen; it is not executed FILOT, permit, utility/fuel agreement or observed operation. USD410million is proposed fixed assets, not money spent. USD1million-plus yearly taxes for40years and USD42/hour wages are developer forecasts, not audited collections, net benefit or current payroll. Construction and permanent jobs are separate cohorts. Zero-water-impact headline still acknowledges office, landscaping and fire-protection water. Closed loop does not prove zero total withdrawal or consumption. No measured gallons, noise, traffic, heat or no-rate-hike outcome established. Existing49MWtransmission/generation claim is not49MWcriticalIT or executed campus allocation. Page4 is unlabeled illustrative project imagery, not verified current-site photography or a licensed press asset. A promotion asking why approve now does not establish approval; later incentive tabling remains separate secondary context until an original vote record is inspected. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf",
          "host": "gearupunionsc.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gearupunionsc.com/public-notices/",
          "host": "gearupunionsc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        },
        {
          "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Public-Hearing-Ordinance-413_Project-Alpaca.docx.pdf",
          "host": "gearupunionsc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 34.70482,
        "lng": -81.63498,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round39-2026-10-14.json",
          "scope": "Original participant/economic-development presentation for proposal and claims, not independent performance validation.",
          "fields": {
            "issuer_presentation_date": "2026-04",
            "issuer_proposed_fixed_asset_investment_usd": 410000000,
            "issuer_proposed_permanent_jobs_lower_bound": 50,
            "issuer_proposed_construction_jobs_lower_bound": 500,
            "issuer_mw_label": 49,
            "issuer_mw_basis": "Presentation says existing transmission and generation capacity, not explicitly criticalIT",
            "critical_it_mw": null,
            "issuer_construction_target": "2026",
            "issuer_operating_target": "2027/2028",
            "executed_utility_agreement_verified": false,
            "incentive_award_verified": false
          },
          "notes": [
            "Economic-development presentation establishes attributed VoltEdge proposal at MidwayGreen; it is not executed FILOT, permit, utility/fuel agreement or observed operation.",
            "USD410million is proposed fixed assets, not money spent. USD1million-plus yearly taxes for40years and USD42/hour wages are developer forecasts, not audited collections, net benefit or current payroll. Construction and permanent jobs are separate cohorts.",
            "Zero-water-impact headline still acknowledges office, landscaping and fire-protection water. Closed loop does not prove zero total withdrawal or consumption. No measured gallons, noise, traffic, heat or no-rate-hike outcome established.",
            "Existing49MWtransmission/generation claim is not49MWcriticalIT or executed campus allocation. Page4 is unlabeled illustrative project imagery, not verified current-site photography or a licensed press asset.",
            "A promotion asking why approve now does not establish approval; later incentive tabling remains separate secondary context until an original vote record is inspected.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf",
              "host": "gearupunionsc.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 79",
          "scope": "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "county_hosted_named_alpaca_proposal",
              "scope": "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings."
            },
            "source_read_scope": {
              "original_current_public_notice_index_selected_alpaca_rows_read": true,
              "original_presentation_selected_physical_pages1_through3_text_read": true,
              "not_entire_four_page_presentation_visual_review": true,
              "complete_original_linked_single_page_notice_text_read": true,
              "current_index_cancellation_and_historical_notice_conflict_retained": true,
              "no_actual_hearing_vote_or_cancellation_day_invented": true,
              "no_promotional_resource_or_benefit_claim_as_measured_result": true
            }
          },
          "notes": [
            "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://gearupunionsc.com/public-notices/",
              "host": "gearupunionsc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Project_Alpaca_UC-V2.pdf",
              "host": "gearupunionsc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            },
            {
              "url": "https://gearupunionsc.com/wp-content/uploads/2026/04/Public-Hearing-Ordinance-413_Project-Alpaca.docx.pdf",
              "host": "gearupunionsc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Union · Union · Source context reviewed",
      "status_scope": "The current original County notice index links the Project Alpaca presentation and identifies its April 14, 2026 Council presentation context. Selected text on the first three pages of the four page original presentation proposes computing development at Midway Green and forecasts construction in 2026 and operation during 2027 or 2028. This supports an agency listed proposal rather than accomplished construction or computing service. The current index labels its linked Ordinance 413 hearing canceled, while that original linked notice still schedules May 12, 2026 at 5 PM. The cancellation day and any replacement hearing or final fiscal vote remain unverified. A canceled fiscal hearing does not establish abandonment of the physical project. Claims about rates, water, noise, heat, jobs and taxes remain promotional assertions, without measured results or legal compliance findings.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45087"
      }
    },
    {
      "id": "project-altair-newberry-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Project Altair (Mid-Carolina Commerce Park II)",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Newberry"
      ],
      "city": "Prosperity",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Newberry County due-diligence proposal status. Option/due-diligence proposal not finalized sale, construction approval, cancellation or operating campus. Informational session has no confirmed date. No MW, budget, tax incentive amount or exact parcel adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-04-15",
          "The original County account explicitly reports that Council held a Project Altair public hearing April 15, 2026. A delayed third reading and unconfirmed separate information session are not final approval or physical construction."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers",
          "host": "newberrycounty.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.28992,
        "lng": -81.60001,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Newberry County due-diligence proposal status",
          "fields": {
            "project_name": "Altair",
            "county_public_hearing_date": "2026-04-15",
            "ordinance_id": "03-01-2026",
            "reported_review_stage": "third reading delayed; community information session to be scheduled",
            "published_location": "remaining acreage,MidCarolinaCommerceParkII",
            "utility_feasibility_review": "SanteeCooper grid study"
          },
          "notes": [
            "Option/due-diligence proposal not finalized sale, construction approval, cancellation or operating campus. Informational session has no confirmed date. No MW, budget, tax incentive amount or exact parcel adopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers",
              "host": "newberrycounty.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 79",
          "scope": "The complete original County account describes Project Altair as a proposed computing development associated with a land option at Mid Carolina Commerce Park II. It explicitly reports that Council held a public hearing April 15, 2026 and that a third reading was delayed for utility feasibility and due diligence. A separate community information session had no confirmed date in the account. This supports an agency listed proposal. The selected account does not establish a completed land sale, final project approval, physical construction, present cancellation or operation. The publication day is unverified and is not invented from the hearing day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_named_altair_proposal_and_past_hearing",
              "scope": "The complete original County account describes Project Altair as a proposed computing development associated with a land option at Mid Carolina Commerce Park II. It explicitly reports that Council held a public hearing April 15, 2026 and that a third reading was delayed for utility feasibility and due diligence. A separate community information session had no confirmed date in the account. This supports an agency listed proposal. The selected account does not establish a completed land sale, final project approval, physical construction, present cancellation or operation. The publication day is unverified and is not invented from the hearing day."
            },
            "source_read_scope": {
              "complete_original_county_project_account_body_read": true,
              "explicit_past_hearing_distinct_from_future_unconfirmed_information_session": true,
              "delayed_third_reading_not_completed_approval_or_cancellation": true,
              "no_unverified_publication_day_invented": true
            }
          },
          "notes": [
            "The complete original County account describes Project Altair as a proposed computing development associated with a land option at Mid Carolina Commerce Park II. It explicitly reports that Council held a public hearing April 15, 2026 and that a third reading was delayed for utility feasibility and due diligence. A separate community information session had no confirmed date in the account. This supports an agency listed proposal. The selected account does not establish a completed land sale, final project approval, physical construction, present cancellation or operation. The publication day is unverified and is not invented from the hearing day.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers",
              "host": "www.newberrycounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Prosperity · Newberry · Source context reviewed",
      "status_scope": "The complete original County account describes Project Altair as a proposed computing development associated with a land option at Mid Carolina Commerce Park II. It explicitly reports that Council held a public hearing April 15, 2026 and that a third reading was delayed for utility feasibility and due diligence. A separate community information session had no confirmed date in the account. This supports an agency listed proposal. The selected account does not establish a completed land sale, final project approval, physical construction, present cancellation or operation. The publication day is unverified and is not invented from the hearing day.",
      "event_evidence": [
        {
          "date": "2026-04-15",
          "text": "The original County account explicitly reports that Council held a Project Altair public hearing April 15, 2026. A delayed third reading and unconfirmed separate information session are not final approval or physical construction.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://www.newberrycounty.gov/news/newberry-county-governments-statement-data-centers",
              "host": "www.newberrycounty.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45071"
      }
    },
    {
      "id": "project-boulder-colleton-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Project Boulder",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Colleton"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. This is counsel/advocacy, not an adopted zoning finding or permit outcome. The approximately 850-acre project, wetlands and larger 2,600-acre tract have different scopes. Generic power/water/health impacts, the separate Canadys plant and its pipeline are not measured site consumption, actual emissions or committed project infrastructure. No original application was read in this pass. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.scelp.org/news/colleton-data-center",
          "host": "scelp.org",
          "date": "2026-03-06",
          "published": "2026-03-06",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.colletoncounty.org/sites/default/files/uploads/minutes/12-1-25-regular-meeting-minutes.pdf",
          "host": "www.colletoncounty.org",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 32.89034,
        "lng": -80.69506,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "SCELP describes Thomas and Hutton/Eagle Rock's proposed Colleton campus and need for a special exception, with a hearing not yet scheduled in its account.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "This is counsel/advocacy, not an adopted zoning finding or permit outcome. The approximately 850-acre project, wetlands and larger 2,600-acre tract have different scopes. Generic power/water/health impacts, the separate Canadys plant and its pipeline are not measured site consumption, actual emissions or committed project infrastructure. No original application was read in this pass.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.scelp.org/news/colleton-data-center",
              "host": "scelp.org",
              "date": "2026-03-06",
              "published": "2026-03-06",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 79",
          "scope": "All three physical pages of the original December 1, 2025 Council minutes were actually viewed. They record executive session economic development discussion that names Project Boulder and explicitly state that no action was taken during executive session. The minutes were approved January 5, 2026. The selected minutes do not independently identify a computing component, exact operator, later physical stage, project approval or current local restriction. The codename alone does not establish an exact computing project crosswalk. Current disposition remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_boulder_economic_session_exact_computing_stage_held",
              "scope": "All three physical pages of the original December 1, 2025 Council minutes were actually viewed. They record executive session economic development discussion that names Project Boulder and explicitly state that no action was taken during executive session. The minutes were approved January 5, 2026. The selected minutes do not independently identify a computing component, exact operator, later physical stage, project approval or current local restriction. The codename alone does not establish an exact computing project crosswalk. Current disposition remains held."
            },
            "source_read_scope": {
              "all_three_original_minute_physical_pages_actually_viewed": true,
              "no_ocr_or_indexed_text_substitution": true,
              "executive_session_no_action_explicit": true,
              "minute_approval_day_not_project_approval": true,
              "no_exact_computing_identity_or_current_stage_inferred": true
            }
          },
          "notes": [
            "All three physical pages of the original December 1, 2025 Council minutes were actually viewed. They record executive session economic development discussion that names Project Boulder and explicitly state that no action was taken during executive session. The minutes were approved January 5, 2026. The selected minutes do not independently identify a computing component, exact operator, later physical stage, project approval or current local restriction. The codename alone does not establish an exact computing project crosswalk. Current disposition remains held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.colletoncounty.org/sites/default/files/uploads/minutes/12-1-25-regular-meeting-minutes.pdf",
              "host": "www.colletoncounty.org",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Colleton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45029"
      }
    },
    {
      "id": "stream-data-centers-project-liberty-marion-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Project Liberty (Stream Data Centers, Marion County Industrial Park)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Marion"
      ],
      "city": "Marion",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Community funding commitments reportedly continue but no recipients, amounts or disbursements established. County approval did not guarantee power or construction. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wmbfnews.com/2026/06/11/stream-data-centers-pulls-out-controversial-marion-county-project/",
          "host": "wmbfnews.com",
          "date": "2026-06-11",
          "published": "2026-06-11",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.08062,
        "lng": -79.36258,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "developer-withdrawal-reported",
            "reported_finding": "WMBF reports Stream no longer proceeding with Marion Project Liberty due to utility timing, despite earlier county approval.",
            "report_display_date": "2026-06-11",
            "independently_verified_current_status": null
          },
          "notes": [
            "Community funding commitments reportedly continue but no recipients, amounts or disbursements established. County approval did not guarantee power or construction.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wmbfnews.com/2026/06/11/stream-data-centers-pulls-out-controversial-marion-county-project/",
              "host": "wmbfnews.com",
              "date": "2026-06-11",
              "published": "2026-06-11",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Marion · Marion · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45067"
      }
    },
    {
      "id": "tigerdc-project-spero-spartanburg-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Project Spero (TigerDC), Tyger River Industrial Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Spartanburg"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. County explicitly did not close door to all data centers. Existing TigerDC presence since 2022 is not operation of withdrawn Spero; technology/water claims remain company assertions. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.foxcarolina.com/2026/02/27/company-withdraws-ai-data-center-spartanburg-county-consideration/",
          "host": "foxcarolina.com",
          "date": "2026-02-27",
          "published": "2026-02-27",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.96636,
        "lng": -81.96387,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-outcomes-review-round20-2026-10-14.json",
          "scope": "Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.",
          "fields": {
            "reported_action_type": "developer-withdrawal-after-incentive-rejection",
            "reported_finding": "FOX Carolina reports TigerDC formally withdrew Project Spero and would seek other communities after county declined tax incentive.",
            "report_display_date": "2026-02-27",
            "independently_verified_current_status": null
          },
          "notes": [
            "County explicitly did not close door to all data centers. Existing TigerDC presence since 2022 is not operation of withdrawn Spero; technology/water claims remain company assertions.",
            "Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.foxcarolina.com/2026/02/27/company-withdraws-ai-data-center-spartanburg-county-consideration/",
              "host": "foxcarolina.com",
              "date": "2026-02-27",
              "published": "2026-02-27",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Spartanburg · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45083"
      }
    },
    {
      "id": "qts-york-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "QTS York County Data Center Campus",
      "group": "proposed",
      "status": "Developer-listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "York"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Four buildings is the first phase, nine is the three-phase plan, not a numerical conflict. Later land beyond approved campus would require additional investment; current estimate is not all spent. Per-billion tax examples are estimates, not guaranteed annual collections. Old May event has no verified current upcoming date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "http://q.com/data-centers/york/",
          "host": "q.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://q.com/data-centers/york/",
          "host": "q.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 34.97497,
        "lng": -81.18444,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "direct-operators-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_total_buildings": 9,
            "planned_phases": 3,
            "first_phase_buildings": 4,
            "first_phase_acres_approx": 109,
            "second_phase_construction_target": "early2027",
            "planned_approved_campus_investment_usd_approx": 8000000000,
            "forecast_construction_jobs": 1000,
            "forecast_permanent_jobs": 200
          },
          "notes": [
            "Four buildings is the first phase, nine is the three-phase plan, not a numerical conflict. Later land beyond approved campus would require additional investment; current estimate is not all spent. Per-billion tax examples are estimates, not guaranteed annual collections. Old May event has no verified current upcoming date.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "http://q.com/data-centers/york/",
              "host": "q.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 5",
          "scope": "QTS says it is developing the named York County campus. The developer listed development label describes that proposal and phased planning. The page does not independently establish an observed construction start, completion of all planned buildings or operation. Its May event listing has no verified occurrence in this review.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_development",
              "scope": "QTS says it is developing the named York County campus. The developer listed development label describes that proposal and phased planning. The page does not independently establish an observed construction start, completion of all planned buildings or operation. Its May event listing has no verified occurrence in this review."
            }
          },
          "notes": [
            "QTS says it is developing the named York County campus. The developer listed development label describes that proposal and phased planning. The page does not independently establish an observed construction start, completion of all planned buildings or operation. Its May event listing has no verified occurrence in this review.",
            "An agency decision or a source publication date does not certify an opening, a physical site count or a technical quantity."
          ],
          "sources": [
            {
              "url": "https://q.com/data-centers/york/",
              "host": "q.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "York · Source context reviewed",
      "status_scope": "QTS says it is developing the named York County campus. The developer listed development label describes that proposal and phased planning. The page does not independently establish an observed construction start, completion of all planned buildings or operation. Its May event listing has no verified occurrence in this review.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45091"
      }
    },
    {
      "id": "eagle-rock-rhodes-technology-park-colleton-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Rhodes Technology Park",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Colleton"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The proposed 1,000 MW, investment, jobs and tax benefits are forecasts. Construction was expected in 2028 or 2029. No tenant was identified; named technology companies were examples. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.live5news.com/2026/09/23/new-proposed-colleton-county-data-center-campus-draws-residents-questions/",
          "host": "live5news.com",
          "date": "2026-09-22",
          "published": "2026-09-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 32.86636,
        "lng": -80.66888,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "WCSC reports a Rhodes Technology Park information session after overlay passage, with the development agreement and energy studies pending.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The proposed 1,000 MW, investment, jobs and tax benefits are forecasts. Construction was expected in 2028 or 2029. No tenant was identified; named technology companies were examples.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.live5news.com/2026/09/23/new-proposed-colleton-county-data-center-campus-draws-residents-questions/",
              "host": "live5news.com",
              "date": "2026-09-22",
              "published": "2026-09-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Colleton · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45029"
      }
    },
    {
      "id": "srs-ai-data-center-savannah-river-site-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Savannah River Site AI Data Center (Amentum)",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Barnwell"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Savannah River federal negotiation selection, not awarded operating campus. Selection explicitly not final lease award. Subject to negotiations, permits,safety/security and federal approvals. Data-center1GWand onsitegeneration2GWnot3GWIT. No executed lease, operating date or investment value established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-07-20",
          "The original NNSA July 20, 2026 release selects Amentum for Savannah River Site lease negotiations and explicitly distinguishes selection from a final lease award. This dates the agency account rather than executed leasing or commissioned computing."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site",
          "host": "energy.gov",
          "date": "2026-07-20",
          "published": "2026-07-20",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 33.26606,
        "lng": -81.4351,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Savannah River federal negotiation selection, not awarded operating campus",
          "fields": {
            "developer_selection_for_negotiations_announcement": "2026-07-20",
            "selected_negotiating_party": "Amentum",
            "proposed_data_center_power_gw": 1,
            "data_center_power_basis": "not explicitly criticalIT",
            "proposed_dedicated_generation_gw_approx": 2,
            "proposed_generation_transition": "natural gas bridging to nuclear"
          },
          "notes": [
            "Selection explicitly not final lease award. Subject to negotiations, permits,safety/security and federal approvals. Data-center1GWand onsitegeneration2GWnot3GWIT. No executed lease, operating date or investment value established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site",
              "host": "energy.gov",
              "date": "2026-07-20",
              "published": "2026-07-20",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 79",
          "scope": "The complete original NNSA July 20, 2026 release selects Amentum for negotiations concerning a phased AI computing and onsite energy lease at Savannah River Site. It explicitly says that selection is not a final lease award and retains future permitting, safety, security and federal review conditions. This supports an agency listed proposal. Selection is not executed leasing, computing construction, installed generation or computing operation. No new legal company role, exact parcel, technical quantity or delivered benefit is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_preliminary_amentum_lease_negotiation_selection",
              "scope": "The complete original NNSA July 20, 2026 release selects Amentum for negotiations concerning a phased AI computing and onsite energy lease at Savannah River Site. It explicitly says that selection is not a final lease award and retains future permitting, safety, security and federal review conditions. This supports an agency listed proposal. Selection is not executed leasing, computing construction, installed generation or computing operation. No new legal company role, exact parcel, technical quantity or delivered benefit is adopted."
            },
            "source_read_scope": {
              "complete_original_nnsa_release_body_read": true,
              "explicit_not_final_lease_award": true,
              "no_selection_as_executed_lease_construction_or_operation": true
            }
          },
          "notes": [
            "The complete original NNSA July 20, 2026 release selects Amentum for negotiations concerning a phased AI computing and onsite energy lease at Savannah River Site. It explicitly says that selection is not a final lease award and retains future permitting, safety, security and federal review conditions. This supports an agency listed proposal. Selection is not executed leasing, computing construction, installed generation or computing operation. No new legal company role, exact parcel, technical quantity or delivered benefit is adopted.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site",
              "host": "www.energy.gov",
              "published": "2026-07-20",
              "date": "2026-07-20",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Barnwell · Source context reviewed",
      "status_scope": "The complete original NNSA July 20, 2026 release selects Amentum for negotiations concerning a phased AI computing and onsite energy lease at Savannah River Site. It explicitly says that selection is not a final lease award and retains future permitting, safety, security and federal review conditions. This supports an agency listed proposal. Selection is not executed leasing, computing construction, installed generation or computing operation. No new legal company role, exact parcel, technical quantity or delivered benefit is adopted.",
      "event_evidence": [
        {
          "date": "2026-07-20",
          "text": "The original NNSA July 20, 2026 release selects Amentum for Savannah River Site lease negotiations and explicitly distinguishes selection from a final lease award. This dates the agency account rather than executed leasing or commissioned computing.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site",
              "host": "www.energy.gov",
              "published": "2026-07-20",
              "date": "2026-07-20",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45011"
      }
    },
    {
      "id": "terra-nexus-camden-kershaw-county-sc",
      "state": "sc",
      "kind": "facility",
      "name": "Terra Nexus Ventures Camden Data Center (771 Park Road)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kershaw"
      ],
      "city": "Camden",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. LenahAllen WIS mainbodypublishedSeptember23,2025 despiteURL24. September8planningrecommendationrezoning161acres771ParkRdTerraNexusstillneededcountyfinalapproval.2warehouses/10-15jobsproposalnotnew2pins/hiredstaff. Garbledwordnotincompanysentence notadopted; sourceendexplicitTerraNexuscontact. CountyOctoberdiscussionfuturethen, currentvote/constructionunverified. No ITMW/capex/actualwater established. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wistv.com/2025/09/24/questions-concerns-raised-about-planned-kershaw-county-data-center/",
          "host": "wistv.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 34.33868,
        "lng": -80.59023,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "LenahAllen WIS mainbodypublishedSeptember23,2025 despiteURL24. September8planningrecommendationrezoning161acres771ParkRdTerraNexusstillneededcountyfinalapproval.2warehouses/10-15jobsproposalnotnew2pins/hiredstaff. Garbledwordnotincompanysentence notadopted; sourceendexplicitTerraNexuscontact. CountyOctoberdiscussionfuturethen, currentvote/constructionunverified. No ITMW/capex/actualwater established.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://www.wistv.com/2025/09/24/questions-concerns-raised-about-planned-kershaw-county-data-center/",
              "host": "wistv.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Camden · Kershaw · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "45055"
      }
    },
    {
      "id": "south-carolina-state-data-center-columbia-sc",
      "state": "sc",
      "kind": "facility",
      "name": "South Carolina State Data Center Columbia",
      "group": "unknown",
      "status": "Status unclear",
      "crypto": false,
      "type": "Data center research context",
      "counties": [
        "Richland"
      ],
      "city": "Columbia",
      "address": "",
      "who": "South Carolina Department of Administration",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
      "date": "",
      "events": [
        [
          "2026-10-26",
          "Added to the atlas. Compilation date only, not opening or construction."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://apps.sceis.sc.gov/SCSolicitationWeb/attachmentDisplay.do?attachName=Amendment+01&attachType=PDF&dateModified=04%2F09%2F2026+10%3A47%3A26+AM&phioClass=BBP_P_DOC&phioObject=005056AC75401FE18D83F1F2AE138C8A&solicitNumber=5400029320&type=S",
          "host": "apps.sceis.sc.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://sck12techinit.sc.gov/node/37",
          "host": "sck12techinit.sc.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4430+Broad+River+Road+Columbia+SC&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ],
      "loc": {
        "lat": 34.02133,
        "lng": -80.90305,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Columbia sourced data center research context. County level only.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 3 inherited discovery review 17",
          "scope": "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
          "fields": {
            "source_context": {
              "name": "South Carolina State Data Center Columbia",
              "operator": "South Carolina Department of Administration",
              "scope": "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
              "address": "",
              "exact_street_unpublished": true
            },
            "county_association": {
              "county": "Richland",
              "county_fips": "45079",
              "scope": "Independent retained jurisdiction evidence supports county level placement. No exact data center street or point is adopted."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-26",
              "scope": "Intended compilation day only. Must equal actual admission day before Native commit; never a physical milestone."
            }
          },
          "notes": [
            "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
            "Historical schedules, permits, funding and announcements do not establish current operation."
          ],
          "sources": [
            {
              "url": "https://apps.sceis.sc.gov/SCSolicitationWeb/attachmentDisplay.do?attachName=Amendment+01&attachType=PDF&dateModified=04%2F09%2F2026+10%3A47%3A26+AM&phioClass=BBP_P_DOC&phioObject=005056AC75401FE18D83F1F2AE138C8A&solicitNumber=5400029320&type=S",
              "host": "apps.sceis.sc.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            },
            {
              "url": "https://sck12techinit.sc.gov/node/37",
              "host": "sck12techinit.sc.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4430+Broad+River+Road+Columbia+SC&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            }
          ],
          "checked": "2026-10-26",
          "whole_record_certified": false
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "45079"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
