{
  "schema_version": 1,
  "source_compilation_context": {
    "wi": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/wi.json",
      "updated": "2026-10-25"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "wi",
    "label": "Wisconsin"
  },
  "records": [
    {
      "id": "viridian-apecs-janesville-wi",
      "state": "wi",
      "kind": "facility",
      "name": "APECS Data Center Campus (Former GM Assembly Plant)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Rock"
      ],
      "city": "Janesville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. LOI explicitly does not obligate city land sale or financial participation;120 daynegotiation period is not construction/RFS. Eleven-building conventional versus eight-building hyperscale layouts are alternative concepts, not 19 buildings. Up-to 800 MW is proposed demand with undefined IT/gross basis. More than 8 billioninvestment,1200 construction/600 operatingjobs and 2.05 billionstateeconomicimpact are different forecasts, not spending/employment/taxes. DNR-approved cleanup PLAN is not completed remediation. GMclosure 2008 captionversus 2009 body remains historical discrepancy, not resolved founding date. No operator or current 2026 status verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wpr.org/news/janesville-data-center-abandoned-gm-site",
          "host": "wpr.org",
          "date": "2025-11-11",
          "published": "2025-11-11",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 42.64621,
        "lng": -89.06921,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Wisconsin Public Radio reports Janesville council approved a NONBINDING Viridian letter of intent by 5 to 2 for due diligence and negotiations on a roughly 250 acreformerGMbrownfield.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "LOI explicitly does not obligate city land sale or financial participation;120 daynegotiation period is not construction/RFS. Eleven-building conventional versus eight-building hyperscale layouts are alternative concepts, not 19 buildings. Up-to 800 MW is proposed demand with undefined IT/gross basis. More than 8 billioninvestment,1200 construction/600 operatingjobs and 2.05 billionstateeconomicimpact are different forecasts, not spending/employment/taxes. DNR-approved cleanup PLAN is not completed remediation. GMclosure 2008 captionversus 2009 body remains historical discrepancy, not resolved founding date. No operator or current 2026 status verified.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wpr.org/news/janesville-data-center-abandoned-gm-site",
              "host": "wpr.org",
              "date": "2025-11-11",
              "published": "2025-11-11",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Janesville · Rock · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55105"
      }
    },
    {
      "id": "cascade-digital-power-hatfield-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Cascade Digital Power Hatfield Bitcoin Mine (Lake Arbutus Hydro)",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Jackson"
      ],
      "city": "Hatfield",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Four plant jobs include three generation workers and one IT worker, not four new mine jobs. Hydro generation and portion sold to grid are not mine IT demand; current operator/operation unknown. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2022-03-30",
          "DPO published its March 30, 2022 original issuer account reporting mining operations at Hatfield from mid February. This dates publication, not an invented exact first operation day or independent verification of present load."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wpr.org/jackson-county-home-new-cryptocurrency-mine-surprise-many-local-county-officials",
          "host": "wpr.org",
          "date": "2022-05-03",
          "published": "2022-05-03",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/digital-power-optimization-forms-partnership-to-combine-hydro-power-and-cryptocurrency-mining--cascade-digital-power-301513816.html",
          "host": "www.prnewswire.com",
          "published": "2022-03-30",
          "date": "2022-03-30",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/dpo-acquires-controlling-interest-in-second-hydroelectric-asset-302096312.html",
          "host": "www.prnewswire.com",
          "published": "2024-03-21",
          "date": "2024-03-21",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 44.31929,
        "lng": -90.80502,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "WPR describes Digital Power Optimization partnership at Hatfield hydro plant with mining already underway in2022.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Four plant jobs include three generation workers and one IT worker, not four new mine jobs. Hydro generation and portion sold to grid are not mine IT demand; current operator/operation unknown.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wpr.org/jackson-county-home-new-cryptocurrency-mine-surprise-many-local-county-officials",
              "host": "wpr.org",
              "date": "2022-05-03",
              "published": "2022-05-03",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The original March 30, 2022 DPO issuer release explicitly reports industrial scale mining operations at Hatfield beginning in mid February 2022. Its March 21, 2024 original issuer followup describes developing and managing the colocated data center at Hatfield. These original accounts support reported computing service within the named site scope, without independent confirmation of present measured load or every later condition. The mid February opening period is not converted to an exact first day. The separate second hydroelectric acquisition in the 2024 release is not merged into Hatfield or treated as an expansion there. Asset power ratings and renewable claims are not exported as critical IT capacity or measured environmental performance.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_issuer_reports_mining_service",
              "scope": "The original March 30, 2022 DPO issuer release explicitly reports industrial scale mining operations at Hatfield beginning in mid February 2022. Its March 21, 2024 original issuer followup describes developing and managing the colocated data center at Hatfield. These original accounts support reported computing service within the named site scope, without independent confirmation of present measured load or every later condition. The mid February opening period is not converted to an exact first day. The separate second hydroelectric acquisition in the 2024 release is not merged into Hatfield or treated as an expansion there. Asset power ratings and renewable claims are not exported as critical IT capacity or measured environmental performance."
            },
            "source_read_scope": {
              "original_two_issuer_release_main_bodies_and_source_authorship_read": true,
              "reported_mid_february_not_exact_day": true,
              "separate_second_hydro_asset_not_hatfield": true,
              "no_power_quantity_or_role_export": true
            }
          },
          "notes": [
            "The original March 30, 2022 DPO issuer release explicitly reports industrial scale mining operations at Hatfield beginning in mid February 2022. Its March 21, 2024 original issuer followup describes developing and managing the colocated data center at Hatfield. These original accounts support reported computing service within the named site scope, without independent confirmation of present measured load or every later condition. The mid February opening period is not converted to an exact first day. The separate second hydroelectric acquisition in the 2024 release is not merged into Hatfield or treated as an expansion there. Asset power ratings and renewable claims are not exported as critical IT capacity or measured environmental performance.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/digital-power-optimization-forms-partnership-to-combine-hydro-power-and-cryptocurrency-mining--cascade-digital-power-301513816.html",
              "host": "www.prnewswire.com",
              "published": "2022-03-30",
              "date": "2022-03-30",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/dpo-acquires-controlling-interest-in-second-hydroelectric-asset-302096312.html",
              "host": "www.prnewswire.com",
              "published": "2024-03-21",
              "date": "2024-03-21",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hatfield · Jackson · Source context reviewed",
      "status_scope": "The original March 30, 2022 DPO issuer release explicitly reports industrial scale mining operations at Hatfield beginning in mid February 2022. Its March 21, 2024 original issuer followup describes developing and managing the colocated data center at Hatfield. These original accounts support reported computing service within the named site scope, without independent confirmation of present measured load or every later condition. The mid February opening period is not converted to an exact first day. The separate second hydroelectric acquisition in the 2024 release is not merged into Hatfield or treated as an expansion there. Asset power ratings and renewable claims are not exported as critical IT capacity or measured environmental performance.",
      "event_evidence": [
        {
          "date": "2022-03-30",
          "text": "DPO published its March 30, 2022 original issuer account reporting mining operations at Hatfield from mid February. This dates publication, not an invented exact first operation day or independent verification of present load.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/digital-power-optimization-forms-partnership-to-combine-hydro-power-and-cryptocurrency-mining--cascade-digital-power-301513816.html",
              "host": "www.prnewswire.com",
              "published": "2022-03-30",
              "date": "2022-03-30",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55053"
      }
    },
    {
      "id": "cassville-grant-county-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Cassville Data Center Campus (Undisclosed Developer)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Grant"
      ],
      "city": "Cassville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. Wisconsin Watch published February9,2026, modifiedApril28, reports an unnamed company considering400 to 500acres in the town ofCassville,GrantCounty, for an approximately1B proposal. This is scouting, not a closed land purchase, confirmed operator or precise approved site. One official says he was not asked for an NDA, not every official. No MW or operation date provided. Other Wisconsin campuses are separate. February10 hearing and pending legislation described in the story are historical scheduled/proposed actions, not observed final orders or current law. Not whole-record or current operating-census certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wisconsinwatch.org/2026/02/wisconsin-data-center-billion-dollar-grant-county-cassville-utility-energy/",
          "host": "wisconsinwatch.org",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://gcinternetwebsite.co.grant.wi.gov/wp-content/uploads/simple-file-list/Meetings-Minutes-Agendas/Grant-County-Economic-Development-Corporation/4_22_26-Grant-County-Economic-Development.pdf",
          "host": "gcinternetwebsite.co.grant.wi.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 42.86765,
        "lng": -90.70622,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-and-original-local-reporting-round57-2026-10-15.json",
          "scope": "Operator or original local-reporting context; source dates and proposal stages retained.",
          "fields": {},
          "notes": [
            "Wisconsin Watch published February9,2026, modifiedApril28, reports an unnamed company considering400 to 500acres in the town ofCassville,GrantCounty, for an approximately1B proposal. This is scouting, not a closed land purchase, confirmed operator or precise approved site. One official says he was not asked for an NDA, not every official. No MW or operation date provided. Other Wisconsin campuses are separate. February10 hearing and pending legislation described in the story are historical scheduled/proposed actions, not observed final orders or current law.",
            "Not whole-record or current operating-census certification."
          ],
          "sources": [
            {
              "url": "https://wisconsinwatch.org/2026/02/wisconsin-data-center-billion-dollar-grant-county-cassville-utility-energy/",
              "host": "wisconsinwatch.org",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The original County hosted Economic Development notice schedules an April 22, 2026 meeting in Cassville with a data center project question and answer update. The selected one page notice does not identify an exact project parcel, computing operator or substantive current physical stage. A meeting venue is not necessarily the facility location. The notice does not establish that the meeting occurred, its discussion, a development approval or computing service. No RSVP, payment, email or contact was submitted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_meeting_notice_not_exact_facility_stage",
              "scope": "The original County hosted Economic Development notice schedules an April 22, 2026 meeting in Cassville with a data center project question and answer update. The selected one page notice does not identify an exact project parcel, computing operator or substantive current physical stage. A meeting venue is not necessarily the facility location. The notice does not establish that the meeting occurred, its discussion, a development approval or computing service. No RSVP, payment, email or contact was submitted."
            },
            "source_read_scope": {
              "complete_one_page_text_notice_read": true,
              "meeting_venue_not_facility_address": true,
              "scheduled_past_meeting_not_occurrence": true,
              "no_rsvp_or_contact": true
            }
          },
          "notes": [
            "The original County hosted Economic Development notice schedules an April 22, 2026 meeting in Cassville with a data center project question and answer update. The selected one page notice does not identify an exact project parcel, computing operator or substantive current physical stage. A meeting venue is not necessarily the facility location. The notice does not establish that the meeting occurred, its discussion, a development approval or computing service. No RSVP, payment, email or contact was submitted.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://gcinternetwebsite.co.grant.wi.gov/wp-content/uploads/simple-file-list/Meetings-Minutes-Agendas/Grant-County-Economic-Development-Corporation/4_22_26-Grant-County-Economic-Development.pdf",
              "host": "gcinternetwebsite.co.grant.wi.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Cassville · Grant · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55043"
      }
    },
    {
      "id": "cloverleaf-carlton-kewaunee-county-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Cloverleaf Carlton Data Center Site (Kewaunee County)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kewaunee"
      ],
      "city": "Carlton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No exact cancellation day, enacted ban or nuclear-power allocation inferred. Separate Kewaunee reactor permitting and Greenleaf withdrawal are different projects. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wisconsinwatch.org/2026/01/wisconsin-data-center-kewaunee-county-town-carlton-cloverleaf-nuclear-power/",
          "host": "wisconsinwatch.org",
          "date": "2026-01-21",
          "published": "2026-01-21",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://townofcarltonwi.com/",
          "host": "townofcarltonwi.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://townofcarltonwi.com/agendas-minutes/",
          "host": "townofcarltonwi.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 44.51616,
        "lng": -87.61541,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "Wisconsin Watch reports Cloverleaf and Carlton officials confirmed developer abandoned land pursuit in late2025.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "No exact cancellation day, enacted ban or nuclear-power allocation inferred. Separate Kewaunee reactor permitting and Greenleaf withdrawal are different projects.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wisconsinwatch.org/2026/01/wisconsin-data-center-kewaunee-county-town-carlton-cloverleaf-nuclear-power/",
              "host": "wisconsinwatch.org",
              "date": "2026-01-21",
              "published": "2026-01-21",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 25",
          "scope": "The correct Town of Carlton in Kewaunee County publishes a government homepage and a public meeting portal. The captured portal contains its loading shell, with no specific Cloverleaf disposition or current physical milestone in the captured body. A secondary account of abandoned land pursuit is not substituted for an original company or Town decision. No withdrawal date, permit denial, current construction, operation or countywide prohibition is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "correct_town_public_portal_without_project_disposition_body",
              "scope": "The correct Town of Carlton in Kewaunee County publishes a government homepage and a public meeting portal. The captured portal contains its loading shell, with no specific Cloverleaf disposition or current physical milestone in the captured body. A secondary account of abandoned land pursuit is not substituted for an original company or Town decision. No withdrawal date, permit denial, current construction, operation or countywide prohibition is adopted."
            }
          },
          "notes": [
            "The correct Town of Carlton in Kewaunee County publishes a government homepage and a public meeting portal. The captured portal contains its loading shell, with no specific Cloverleaf disposition or current physical milestone in the captured body. A secondary account of abandoned land pursuit is not substituted for an original company or Town decision. No withdrawal date, permit denial, current construction, operation or countywide prohibition is adopted.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://townofcarltonwi.com/",
              "host": "townofcarltonwi.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://townofcarltonwi.com/agendas-minutes/",
              "host": "townofcarltonwi.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Carlton · Kewaunee · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55061"
      }
    },
    {
      "id": "cloverleaf-wrightstown-village-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Cloverleaf Wrightstown Data Center Inquiry (Village of Wrightstown)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Brown"
      ],
      "city": "Wrightstown",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No concrete imminent project. Referendum scheduling is not its outcome or adopted moratorium; administrator legal interpretation not independently verified law. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://spectrumnews1.com/wi/milwaukee/news/2026/06/01/data-center-wrightstown-meeting",
          "host": "spectrumnews1.com",
          "date": "2026-05-31",
          "published": "2026-05-31",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.wrightstown.us/page/village-resolutions",
          "host": "www.wrightstown.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.wrightstown.us/page/meeting-minutes",
          "host": "www.wrightstown.us",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 44.45242,
        "lng": -88.00376,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "Spectrum reports Wrightstown public information meeting and future nonbinding referendum after Cloverleaf inquiry.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "No concrete imminent project. Referendum scheduling is not its outcome or adopted moratorium; administrator legal interpretation not independently verified law.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://spectrumnews1.com/wi/milwaukee/news/2026/06/01/data-center-wrightstown-meeting",
              "host": "spectrumnews1.com",
              "date": "2026-05-31",
              "published": "2026-05-31",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 25",
          "scope": "The Village of Wrightstown resolutions page original embedded content lists a June 16, 2026 policy regarding data center development pending referendum results and a separate May 27 referendum resolution. The linked policy documents stopped at an unresolved shortlink robots redirect, so their operative language, duration and exceptions were not read. The captured minutes page does not establish an exact project outcome. The Town of Wrightstown and Village of Greenleaf withdrawal reports concern different jurisdictions and are not transferred to this Village inquiry. A referendum result is not inferred to be a permit denial, and current physical stage remains unclear.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "village_policy_title_only_without_operative_instrument_or_project_outcome",
              "scope": "The Village of Wrightstown resolutions page original embedded content lists a June 16, 2026 policy regarding data center development pending referendum results and a separate May 27 referendum resolution. The linked policy documents stopped at an unresolved shortlink robots redirect, so their operative language, duration and exceptions were not read. The captured minutes page does not establish an exact project outcome. The Town of Wrightstown and Village of Greenleaf withdrawal reports concern different jurisdictions and are not transferred to this Village inquiry. A referendum result is not inferred to be a permit denial, and current physical stage remains unclear."
            },
            "source_read_scope": {
              "resolution_title_in_original_embedded_page_data": true,
              "operative_shortlink_document_not_captured": true,
              "town_and_village_projects_not_merged": true,
              "referendum_result_and_permit_decision_not_equated": true
            }
          },
          "notes": [
            "The Village of Wrightstown resolutions page original embedded content lists a June 16, 2026 policy regarding data center development pending referendum results and a separate May 27 referendum resolution. The linked policy documents stopped at an unresolved shortlink robots redirect, so their operative language, duration and exceptions were not read. The captured minutes page does not establish an exact project outcome. The Town of Wrightstown and Village of Greenleaf withdrawal reports concern different jurisdictions and are not transferred to this Village inquiry. A referendum result is not inferred to be a permit denial, and current physical stage remains unclear.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.wrightstown.us/page/village-resolutions",
              "host": "www.wrightstown.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.wrightstown.us/page/meeting-minutes",
              "host": "www.wrightstown.us",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wrightstown · Brown · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55009"
      }
    },
    {
      "id": "cyberlynk-franklin-mke1-wi",
      "state": "wi",
      "kind": "facility",
      "name": "CyberLynk Franklin Data Center (MKE1)",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Milwaukee"
      ],
      "city": "Franklin",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CyberLynk Franklin facility identity. FranklinsiteinMilwaukeemarketnotMilwaukeecityparcel. No numericITMW,areaoropeningday. SOC2operatorclaimnotindependentrestrictedreportinspection. PublictestIP/speedtestroutesnotexercised. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.cyberlynk.net/facilities/milwaukee-datacenter/",
          "host": "cyberlynk.net",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.00715,
        "lng": -87.96695,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "CyberLynk Franklin facility identity",
          "fields": {
            "operator": "CyberLynk",
            "code": "MKE1",
            "address": "10125 South52ndStreet, Franklin, Wisconsin53132",
            "operator_described_use": "flagship hosting, voice and colocation facility"
          },
          "notes": [
            "FranklinsiteinMilwaukeemarketnotMilwaukeecityparcel. No numericITMW,areaoropeningday. SOC2operatorclaimnotindependentrestrictedreportinspection. PublictestIP/speedtestroutesnotexercised.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.cyberlynk.net/facilities/milwaukee-datacenter/",
              "host": "cyberlynk.net",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The current original MKE1 facility page describes the named CyberLynk facility as the backbone of its hosting, voice and colocation platforms and describes current service and support. This supports reported service at the named MKE1 facility within the provider account. The page Milwaukee description is metropolitan context rather than a new exact Franklin street or parcel certification. Security, certification, redundancy and technical marketing are not independently verified or promoted as new quantities, location or provider role fields. No exact original opening day is established.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_current_mke1_service",
              "scope": "The current original MKE1 facility page describes the named CyberLynk facility as the backbone of its hosting, voice and colocation platforms and describes current service and support. This supports reported service at the named MKE1 facility within the provider account. The page Milwaukee description is metropolitan context rather than a new exact Franklin street or parcel certification. Security, certification, redundancy and technical marketing are not independently verified or promoted as new quantities, location or provider role fields. No exact original opening day is established."
            },
            "source_read_scope": {
              "original_named_mke1_main_body_read": true,
              "current_hosting_platform_not_future_announcement": true,
              "metro_description_not_exact_parcel_edit": true,
              "certification_claim_not_independent_audit": true,
              "no_quantity_export": true
            }
          },
          "notes": [
            "The current original MKE1 facility page describes the named CyberLynk facility as the backbone of its hosting, voice and colocation platforms and describes current service and support. This supports reported service at the named MKE1 facility within the provider account. The page Milwaukee description is metropolitan context rather than a new exact Franklin street or parcel certification. Security, certification, redundancy and technical marketing are not independently verified or promoted as new quantities, location or provider role fields. No exact original opening day is established.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.cyberlynk.net/facilities/milwaukee-datacenter/",
              "host": "www.cyberlynk.net",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Franklin · Milwaukee · Source context reviewed",
      "status_scope": "The current original MKE1 facility page describes the named CyberLynk facility as the backbone of its hosting, voice and colocation platforms and describes current service and support. This supports reported service at the named MKE1 facility within the provider account. The page Milwaukee description is metropolitan context rather than a new exact Franklin street or parcel certification. Security, certification, redundancy and technical marketing are not independently verified or promoted as new quantities, location or provider role fields. No exact original opening day is established.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55079"
      }
    },
    {
      "id": "data-holdings-eau-claire-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Data Holdings Eau Claire Data Center",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Eau Claire"
      ],
      "city": "Eau Claire",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Data Holdings Eau Claire site capacity without footer transfer. 3135WestHighlandMilwaukeefootercontactisnotEauClaireaddress. TierIII/SOCclaimsnotindependentcertifierproof. No exactstreet,openingorcurrentmeteredload. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dataholdings.com/eau-claire-data-center",
          "host": "dataholdings.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 44.72678,
        "lng": -91.28604,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Data Holdings Eau Claire site capacity without footer transfer",
          "fields": {
            "operator": "Data Holdings",
            "locality": "southside Eau Claire, Wisconsin",
            "raised_floor_sqft": 4000,
            "advertised_power_mw": 1,
            "maximum_power_per_rack_kw": 16,
            "power_basis": "power not explicitly critical IT"
          },
          "notes": [
            "3135WestHighlandMilwaukeefootercontactisnotEauClaireaddress. TierIII/SOCclaimsnotindependentcertifierproof. No exactstreet,openingorcurrentmeteredload.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dataholdings.com/eau-claire-data-center",
              "host": "dataholdings.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 25",
          "scope": "Data Holdings current named Eau Claire page describes occupying the facility, trained staff on site and its present colocation service offering. Reported service is limited to that company account of the named staffed facility. Generic customer testimonials are not assigned to Eau Claire, and the advertised Tier design, attestation, uptime, power and floor area are not independently certified or promoted. The current page does not establish an exact commissioning day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_staffed_facility_service_account",
              "scope": "Data Holdings current named Eau Claire page describes occupying the facility, trained staff on site and its present colocation service offering. Reported service is limited to that company account of the named staffed facility. Generic customer testimonials are not assigned to Eau Claire, and the advertised Tier design, attestation, uptime, power and floor area are not independently certified or promoted. The current page does not establish an exact commissioning day."
            }
          },
          "notes": [
            "Data Holdings current named Eau Claire page describes occupying the facility, trained staff on site and its present colocation service offering. Reported service is limited to that company account of the named staffed facility. Generic customer testimonials are not assigned to Eau Claire, and the advertised Tier design, attestation, uptime, power and floor area are not independently certified or promoted. The current page does not establish an exact commissioning day.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://dataholdings.com/eau-claire-data-center",
              "host": "dataholdings.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Eau Claire · Eau Claire · Source context reviewed",
      "status_scope": "Data Holdings current named Eau Claire page describes occupying the facility, trained staff on site and its present colocation service offering. Reported service is limited to that company account of the named staffed facility. Generic customer testimonials are not assigned to Eau Claire, and the advertised Tier design, attestation, uptime, power and floor area are not independently certified or promoted. The current page does not establish an exact commissioning day.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55035"
      }
    },
    {
      "id": "data-holdings-milwaukee-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Data Holdings Milwaukee Data Center",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Milwaukee"
      ],
      "city": "Milwaukee",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Data Holdings Milwaukee commissioning and building area. 46kgrossnotallraisedfloor. PUEratingnotindependentmeasuredtime-series. TierIIIplus/LEEDGoldclaimsnotindependentregisterread. No campusnumericITMW.2014yearnotexactday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dataholdings.com/milwaukee-data-center",
          "host": "dataholdings.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.01535,
        "lng": -87.97591,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Data Holdings Milwaukee commissioning and building area",
          "fields": {
            "operator": "Data Holdings",
            "locality": "near westside Milwaukee, Wisconsin",
            "operator_reported_commissioning_year": 2014,
            "building_gross_sqft": 46000,
            "building_stories": 2,
            "advertised_rack_density_kw_max": 30,
            "operator_published_pue": 1.28
          },
          "notes": [
            "46kgrossnotallraisedfloor. PUEratingnotindependentmeasuredtime-series. TierIIIplus/LEEDGoldclaimsnotindependentregisterread. No campusnumericITMW.2014yearnotexactday.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dataholdings.com/milwaukee-data-center",
              "host": "dataholdings.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 25",
          "scope": "Data Holdings current named Milwaukee page describes present colocation and cloud services and says the purpose built facility was commissioned in 2014. Reported service records that company account, not an independently measured uptime finding or verified Tier certification. A commissioning year is not converted to an exact opening day. Advertised capacities, marketing specifications, location and roles remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_colocation_service_with_year_only_historical_commissioning",
              "scope": "Data Holdings current named Milwaukee page describes present colocation and cloud services and says the purpose built facility was commissioned in 2014. Reported service records that company account, not an independently measured uptime finding or verified Tier certification. A commissioning year is not converted to an exact opening day. Advertised capacities, marketing specifications, location and roles remain unchanged."
            }
          },
          "notes": [
            "Data Holdings current named Milwaukee page describes present colocation and cloud services and says the purpose built facility was commissioned in 2014. Reported service records that company account, not an independently measured uptime finding or verified Tier certification. A commissioning year is not converted to an exact opening day. Advertised capacities, marketing specifications, location and roles remain unchanged.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://dataholdings.com/milwaukee-data-center",
              "host": "dataholdings.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Milwaukee · Milwaukee · Source context reviewed",
      "status_scope": "Data Holdings current named Milwaukee page describes present colocation and cloud services and says the purpose built facility was commissioned in 2014. Reported service records that company account, not an independently measured uptime finding or verified Tier certification. A commissioning year is not converted to an exact opening day. Advertised capacities, marketing specifications, location and roles remain unchanged.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55079"
      }
    },
    {
      "id": "dpo-wisconsin-rapids-hpc-wi",
      "state": "wi",
      "kind": "facility",
      "name": "DPO Wisconsin Rapids AI Computing Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Wood"
      ],
      "city": "Wisconsin Rapids",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Hydro utility32MWgeneration not site IT. Leaseup-to50years not ownedland; early2025target superseded by later reporting of developer departure. No current construction inferred. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Exact contract-cancellation day and original termination release not retained. PCH is a separate applicant, not proof DPO moved ahead.",
      "date": "",
      "events": [
        [
          "2025-01-23",
          "DPO issued its January 23, 2025 Wisconsin Rapids development announcement, describing plans and permits still being finalized before groundbreaking. This dates the original publication rather than construction, forecast energization or current computing operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://biztimes.com/data-center-developer-plans-200-million-project-in-wisconsin-rapids/",
          "host": "biztimes.com",
          "date": "2025-01-24",
          "published": "2025-01-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://wiss.fm/news/2026/06/05/data-center-education-in-wisconsin-rapids",
          "host": "wiss.fm",
          "date": "2026-06-05",
          "published": "2026-06-05",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/dpo-launches-200-million-ai-data-center-development-in-partnership-with-billerud-302359217.html",
          "host": "www.prnewswire.com",
          "published": "2025-01-23",
          "date": "2025-01-23",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.digitalpoweroptimization.com/news/dpo-launches-200mm-ai-data-center-in-partnership-with-billerud",
          "host": "www.digitalpoweroptimization.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 44.45535,
        "lng": -90.0415,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "BizTimes reproduces DPO WisconsinRapids20MWplanned AI facility with2026energization target.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Hydro utility32MWgeneration not site IT. Leaseup-to50years not ownedland; early2025target superseded by later reporting of developer departure. No current construction inferred.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://biztimes.com/data-center-developer-plans-200-million-project-in-wisconsin-rapids/",
              "host": "biztimes.com",
              "date": "2025-01-24",
              "published": "2025-01-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "Civic Media reports DPO cancelled its private contract in2025 and distinguishes later PCH proposal.",
            "original_2026_opening_forecast_superseded": true
          },
          "notes": [
            "Exact contract-cancellation day and original termination release not retained. PCH is a separate applicant, not proof DPO moved ahead.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wiss.fm/news/2026/06/05/data-center-education-in-wisconsin-rapids",
              "host": "wiss.fm",
              "date": "2026-06-05",
              "published": "2026-06-05",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The original January 23, 2025 DPO issuer release names Wisconsin Rapids and describes a development still finalizing construction plans and permits before groundbreaking and vertical construction. Its 2026 energization date is a forecast, and energized existing utility infrastructure is not computing service. The company January 24 news item links that original release rather than supplying a new opening. Private later accounts describe a cancellation, but no current original withdrawal instrument or issuer confirmation was independently read in this pass. The historical proposal is retained as context while present physical stage and final legal disposition remain unknown.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_named_proposal_later_original_disposition_held",
              "scope": "The original January 23, 2025 DPO issuer release names Wisconsin Rapids and describes a development still finalizing construction plans and permits before groundbreaking and vertical construction. Its 2026 energization date is a forecast, and energized existing utility infrastructure is not computing service. The company January 24 news item links that original release rather than supplying a new opening. Private later accounts describe a cancellation, but no current original withdrawal instrument or issuer confirmation was independently read in this pass. The historical proposal is retained as context while present physical stage and final legal disposition remain unknown."
            },
            "source_read_scope": {
              "original_issuer_date_source_authorship_and_predevelopment_body_read": true,
              "january24_company_link_not_first_announcement_day": true,
              "energized_substation_not_compute": true,
              "later_private_cancellation_not_original_final_action": true,
              "no_legal_withdrawal_promoted_to_physical_closure": true,
              "no_quantity_or_role_export": true
            }
          },
          "notes": [
            "The original January 23, 2025 DPO issuer release names Wisconsin Rapids and describes a development still finalizing construction plans and permits before groundbreaking and vertical construction. Its 2026 energization date is a forecast, and energized existing utility infrastructure is not computing service. The company January 24 news item links that original release rather than supplying a new opening. Private later accounts describe a cancellation, but no current original withdrawal instrument or issuer confirmation was independently read in this pass. The historical proposal is retained as context while present physical stage and final legal disposition remain unknown.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/dpo-launches-200-million-ai-data-center-development-in-partnership-with-billerud-302359217.html",
              "host": "www.prnewswire.com",
              "published": "2025-01-23",
              "date": "2025-01-23",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.digitalpoweroptimization.com/news/dpo-launches-200mm-ai-data-center-in-partnership-with-billerud",
              "host": "www.digitalpoweroptimization.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wisconsin Rapids · Wood · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-01-23",
          "text": "DPO issued its January 23, 2025 Wisconsin Rapids development announcement, describing plans and permits still being finalized before groundbreaking. This dates the original publication rather than construction, forecast energization or current computing operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/dpo-launches-200-million-ai-data-center-development-in-partnership-with-billerud-302359217.html",
              "host": "www.prnewswire.com",
              "published": "2025-01-23",
              "date": "2025-01-23",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55141"
      }
    },
    {
      "id": "edgeconnex-mad01-madison-wi",
      "state": "wi",
      "kind": "facility",
      "name": "EdgeConneX Madison (MAD01)",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dane"
      ],
      "city": "Madison",
      "address": "",
      "who": "EdgeConneX",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. NoMWspecified. CabinetdensityandN+1topologynotbuildingload. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.edgeconnex.com/locations/americas/madison-wi/",
          "host": "edgeconnex.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.0673,
        "lng": -89.41831,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "operator_site_code": "MAD01",
            "facility_area_sqft": 7800,
            "raised_floor_sqft": 2650
          },
          "notes": [
            "NoMWspecified. CabinetdensityandN+1topologynotbuildingload.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.edgeconnex.com/locations/americas/madison-wi/",
              "host": "edgeconnex.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "EdgeConneX lists current colocation, tenant facilities and carrier interconnection at MAD01 in Madison. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "EdgeConneX lists current colocation, tenant facilities and carrier interconnection at MAD01 in Madison. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "EdgeConneX lists current colocation, tenant facilities and carrier interconnection at MAD01 in Madison."
          ],
          "sources": [
            {
              "url": "https://www.edgeconnex.com/locations/americas/madison-wi/",
              "host": "www.edgeconnex.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check24, October23,2026",
          "scope": "EdgeConneX names this facility or the retained campus components on its current website and offers colocation and facility services there. Operator per source is the attributed provider brand relationship only, not a finding of the legal operating entity or property title. No physical status, coordinates, street address, quantity, cooling volume, air permit, certification, measured reliability, environmental compliance, tenant identity or completed expansion is adopted. First publication dates remain unknown; retrieval does not establish a physical opening date. The exact named MAD01 provider section supplies the relationship. Marketing capability and certification statements remain source claims, not independent findings.",
          "fields": {
            "company_association": {
              "name": "EdgeConneX",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "EdgeConneX names this facility or the retained campus components on its current website and offers colocation and facility services there. Operator per source is the attributed provider brand relationship only, not a finding of the legal operating entity or property title. No physical status, coordinates, street address, quantity, cooling volume, air permit, certification, measured reliability, environmental compliance, tenant identity or completed expansion is adopted. First publication dates remain unknown; retrieval does not establish a physical opening date. The exact named MAD01 provider section supplies the relationship. Marketing capability and certification statements remain source claims, not independent findings."
            },
            "provider_role": "operator"
          },
          "notes": [
            "EdgeConneX names this facility or the retained campus components on its current website and offers colocation and facility services there. Operator per source is the attributed provider brand relationship only, not a finding of the legal operating entity or property title. No physical status, coordinates, street address, quantity, cooling volume, air permit, certification, measured reliability, environmental compliance, tenant identity or completed expansion is adopted. First publication dates remain unknown; retrieval does not establish a physical opening date. The exact named MAD01 provider section supplies the relationship. Marketing capability and certification statements remain source claims, not independent findings."
          ],
          "sources": [
            {
              "url": "https://www.edgeconnex.com/locations/americas/madison-wi/",
              "host": "www.edgeconnex.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current first party named facility, provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Madison · Dane · Source context reviewed",
      "status_scope": "EdgeConneX lists current colocation, tenant facilities and carrier interconnection at MAD01 in Madison. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55025"
      }
    },
    {
      "id": "epic-hosting-verona-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Epic Hosting Verona Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dane"
      ],
      "city": "Verona",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wisconsin named certificate register with scoped building descriptions. Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx",
          "host": "revenue.wi.gov",
          "date": "2026-06-25",
          "published": "2026-06-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.08247,
        "lng": -89.43487,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Wisconsin named certificate register with scoped building descriptions",
          "fields": {
            "certification_register_as_of": "2025-10-31",
            "listed_certifications": [
              {
                "entity": "Epic Hosting LLC",
                "date": "2024-09-24",
                "location": "Milky Way,Verona,WI",
                "scope": "Utility Building3and additions"
              },
              {
                "entity": "Degas LLC",
                "date": "2025-02-18",
                "location": "County RoadA,Beaver Dam,WI",
                "scope": "to be constructed"
              },
              {
                "entity": "Oracle America Cloud Services LLC,formerly Green Chile Ventures LLC",
                "date": "2025-10-31",
                "location": "Port Washington,WI",
                "scope": "four buildings at531,533,701and723E Lake Drive"
              }
            ]
          },
          "notes": [
            "Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx",
              "host": "revenue.wi.gov",
              "date": "2026-06-25",
              "published": "2026-06-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The current original State revenue FAQ lists an Epic Hosting certification for a Verona utility building and additions, with a September 24, 2024 certification date. That incentive certification is not proof of computing operation, full addition completion or an exact facility opening. The selected original Epic careers hosting response was an application shell without a retained substantive hosting body, so search reader text from that page is not substituted as a verified raw source. No private account, technical claim or tax guidance is promoted into a physical status, role or quantity finding.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "incentive_certification_not_physical_service",
              "scope": "The current original State revenue FAQ lists an Epic Hosting certification for a Verona utility building and additions, with a September 24, 2024 certification date. That incentive certification is not proof of computing operation, full addition completion or an exact facility opening. The selected original Epic careers hosting response was an application shell without a retained substantive hosting body, so search reader text from that page is not substituted as a verified raw source. No private account, technical claim or tax guidance is promoted into a physical status, role or quantity finding."
            },
            "source_read_scope": {
              "original_state_faq_named_certification_row_and_guidance_date_read": true,
              "certification_date_not_compute_opening": true,
              "existing_building_and_additions_not_all_commissioned": true,
              "careers_raw_application_shell_not_substantive_service_body": true,
              "no_tax_or_resource_quantity_export": true
            }
          },
          "notes": [
            "The current original State revenue FAQ lists an Epic Hosting certification for a Verona utility building and additions, with a September 24, 2024 certification date. That incentive certification is not proof of computing operation, full addition completion or an exact facility opening. The selected original Epic careers hosting response was an application shell without a retained substantive hosting body, so search reader text from that page is not substituted as a verified raw source. No private account, technical claim or tax guidance is promoted into a physical status, role or quantity finding.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx",
              "host": "www.revenue.wi.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Verona · Dane · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55025"
      }
    },
    {
      "id": "expedient-mke1-milwaukee-franklin-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Expedient MKE1 (Milwaukee/Franklin)",
      "group": "operating",
      "status": "Operating",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Milwaukee"
      ],
      "city": "Franklin",
      "address": "4777 W Ironwood, Franklin, WI 53132",
      "who": "Expedient",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "Operator-advertised MKE1 critical IT technical capacity, not measured consumption. The source calls it Critical IT Load in its facility specifications and gives no technical as-of date. Regional headlines, utility supply and generator capacity remain separate.",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Expedient Milwaukee-market Franklin site. Franklin is site locality within Milwaukee market.3MWgenerator capacity not critical IT. No exact original opening or current metered power established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.expedient.com/data-centers/milwaukee/",
          "host": "expedient.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.expedient.com/uploads/exp-dc-mil-sell-sheet.pdf",
          "host": "www.expedient.com",
          "published": "",
          "date": "",
          "checked": "2026-10-15",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://kb.expedient.com/docs/key-terminology",
          "host": "kb.expedient.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Exact named service address, source clock retained"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4777+West+Ironwood+Drive%2C+Franklin%2C+WI&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Unique contained calculated street"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census address range method and limits"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-87.9840114611626%2C42.85929260067204%2C-87.97175574174742%2C42.868275712421955&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -87.977884,
        "lat": 42.863784,
        "precision": "address",
        "basis": "Current Expedient MKE1 published service street 4777 West Ironwood Drive, Franklin, WI matched to one Census street range inside retained county context. Calculated address reference only. No surveyed roof, tenant floor, legal parcel or complete campus. Imagery acquisition date is unknown. Existing native status remains operating."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-discovery-review-round8-2026-10-14.json",
          "scope": "Expedient Milwaukee-market Franklin site",
          "fields": {
            "operator_code": "MKE1",
            "published_address": "4777 W Ironwood, Franklin, WI53132",
            "critical_it_mw": 1.6,
            "total_area_sqft": 27000,
            "raised_floor_sqft": 10000
          },
          "notes": [
            "Franklin is site locality within Milwaukee market.3MWgenerator capacity not critical IT. No exact original opening or current metered power established.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.expedient.com/data-centers/milwaukee/",
              "host": "expedient.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Operator-Jurisdiction-20261015",
          "scope": "Current operator listing for named MKE1 facility at its published address; current services support operating status, not a dated opening or parcel verification.",
          "fields": {
            "facility_designation": "MKE1",
            "operator_published_address": "4777 W Ironwood, Franklin, WI 53132",
            "current_status": "operating",
            "status_basis": "Current operator facility listing, facility-specific services/technical specifications and tour information.",
            "operator_facility_critical_it_spec_mw": 1.6
          },
          "notes": [
            "Only the named facility is supported. The current operator page is a primary source for its own advertised services, not an independent inspection, parcel survey or legal-ownership verification.",
            "Source publication and technical as-of dates are not published; the review date does not become an opening or measurement date.",
            "Published postal/locality names do not certify an incorporated municipality. Original map point and approximate precision remain unchanged."
          ],
          "sources": [
            {
              "url": "https://www.expedient.com/data-centers/milwaukee/",
              "host": "www.expedient.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.expedient.com/uploads/exp-dc-mil-sell-sheet.pdf",
              "host": "www.expedient.com",
              "published": "",
              "date": "",
              "checked": "2026-10-15",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-15",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 19, October 23, 2026",
          "scope": "Expedient offers colocation and infrastructure service for this exact named facility on its own website. Operator describes the attributed provider brand relationship, not independent verification of the legal operating entity, property ownership or every building and phase. No stage, precise location, street evidence, date, capacity, water, emissions, safety, certifications or compliance is promoted. Exact MKE1 and Franklin within the marketed Milwaukee region are named. Region does not change jurisdiction, and provider identity does not certify environmental or regulatory claims.",
          "fields": {
            "company_association": {
              "name": "Expedient",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Expedient offers colocation and infrastructure service for this exact named facility on its own website. Operator describes the attributed provider brand relationship, not independent verification of the legal operating entity, property ownership or every building and phase. No stage, precise location, street evidence, date, capacity, water, emissions, safety, certifications or compliance is promoted. Exact MKE1 and Franklin within the marketed Milwaukee region are named. Region does not change jurisdiction, and provider identity does not certify environmental or regulatory claims."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Expedient offers colocation and infrastructure service for this exact named facility on its own website. Operator describes the attributed provider brand relationship, not independent verification of the legal operating entity, property ownership or every building and phase. No stage, precise location, street evidence, date, capacity, water, emissions, safety, certifications or compliance is promoted. Exact MKE1 and Franklin within the marketed Milwaukee region are named. Region does not change jurisdiction, and provider identity does not certify environmental or regulatory claims.",
            "First publication dates are not established. Awards, specifications, current retrieval and stated plans are not physical milestones."
          ],
          "sources": [
            {
              "url": "https://www.expedient.com/data-centers/milwaukee/",
              "host": "www.expedient.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party exact building code and named service text, scoped provider relationship reviewed"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 47, October 23, 2026",
          "scope": "Calculated named operator service street only. Existing native status remains operating. No roof, tenant unit, surveyed legal boundary, full campus, title or physical stage is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -87.977884,
                "lat": 42.863784,
                "precision": "address",
                "basis": "Current Expedient MKE1 published service street 4777 West Ironwood Drive, Franklin, WI matched to one Census street range inside retained county context. Calculated address reference only. No surveyed roof, tenant floor, legal parcel or complete campus. Imagery acquisition date is unknown. Existing native status remains operating."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "4777 West Ironwood Drive, Franklin, WI",
              "county_fips": [
                "55079"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "Exact Expedient MKE1 service address evidence is retained as published: 4777 West Ironwood Drive, Franklin, WI. Corporate footer addresses, adjacent facility codes and directory substitutions are excluded. Canonical address, identity, group, county and protected source history remain exact.",
            "Calculated named operator service street only. Existing native status remains operating. No roof, tenant unit, surveyed legal boundary, full campus, title or physical stage is certified.",
            "The frame shows several commercial buildings, roads, parking areas and vegetation. The full MKE1 street from the official code table supports an address reference lead, without choosing any building footprint from imagery.",
            "The exact named operator service street and independently contained government reference replace only an inherited unsupported general area coordinate. The measured 71.3 meter change is a reference correction, not a physical relocation. No nearby code, roof, tenant unit, full campus or physical stage is selected.",
            "Official MKE1 terminology table was published 2023-03-06 and updated 2025-04-08. Its full West Ironwood Drive suffix binds the retained exact Census input; these dates do not certify facility opening or current stage."
          ],
          "sources": [
            {
              "url": "https://kb.expedient.com/docs/key-terminology",
              "host": "kb.expedient.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Exact named service address, source clock retained"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=4777+West+Ironwood+Drive%2C+Franklin%2C+WI&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Unique contained calculated street"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census address range method and limits"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-87.9840114611626%2C42.85929260067204%2C-87.97175574174742%2C42.868275712421955&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Calculated operator street reference, not a surveyed roof",
      "summary": "Franklin · Milwaukee · Source context reviewed",
      "typed_power_facts": [
        {
          "measure": "it_capacity",
          "value": 1.6,
          "unit": "MW",
          "as_of": null,
          "observed_on": "2026-10-15",
          "as_of_basis": "not_published",
          "basis": "operator_reported_capacity",
          "scope": "MKE1 facility-specific advertised critical IT technical specification. The operator labels it Critical IT Load; this is an offered design-capacity specification, not a dated meter reading, utility-service approval or regional total.",
          "sources": [
            "https://www.expedient.com/data-centers/milwaukee/"
          ]
        }
      ]
    },
    {
      "id": "heartland-business-systems-little-chute-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Heartland Business Systems Little Chute Data Center",
      "group": "operating",
      "status": "Operator-listed service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Outagamie"
      ],
      "city": "Little Chute",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Heartland Business Systems office index, exact DC unproven. Contactpagehas1700StephenStreetLittleChuteHQandmanybranchoffices,notexplicitdatacenteraddress. HBSDataCenterstatuslinknotopenedorexercised. Genericservicesnotexactsitecapacity/operationproof. NoHQtoDCassumption. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.hbs.net/contact-us",
          "host": "hbs.net",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hbs.net/services/colocation-data-center",
          "host": "www.hbs.net",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        }
      ],
      "loc": {
        "lat": 44.41602,
        "lng": -88.46502,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Heartland Business Systems office index, exact DC unproven",
          "fields": {},
          "notes": [
            "Contactpagehas1700StephenStreetLittleChuteHQandmanybranchoffices,notexplicitdatacenteraddress. HBSDataCenterstatuslinknotopenedorexercised. Genericservicesnotexactsitecapacity/operationproof. NoHQtoDCassumption.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.hbs.net/contact-us",
              "host": "hbs.net",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator-listed_service",
              "scope": "HBS currently offers Little Chute and Phoenix colocation with round-the-clock access. This supports a city-level Little Chute service context. Its separate headquarters contact page does not establish that every office premise is a data-center building. No address, parcel or point is promoted."
            }
          },
          "notes": [
            "HBS currently offers Little Chute and Phoenix colocation with round-the-clock access. This supports a city-level Little Chute service context. Its separate headquarters contact page does not establish that every office premise is a data-center building. No address, parcel or point is promoted."
          ],
          "sources": [
            {
              "url": "https://www.hbs.net/contact-us",
              "host": "www.hbs.net",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://www.hbs.net/services/colocation-data-center",
              "host": "www.hbs.net",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Little Chute · Outagamie · Source context reviewed",
      "status_scope": "HBS currently offers Little Chute and Phoenix colocation with round-the-clock access. This supports a city-level Little Chute service context. Its separate headquarters contact page does not establish that every office premise is a data-center building. No address, parcel or point is promoted.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55087"
      }
    },
    {
      "id": "iscorp-mequon-mqs5-wi",
      "state": "wi",
      "kind": "facility",
      "name": "ISCorp Mequon Data Center (MQS5)",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ozaukee"
      ],
      "city": "Mequon",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. ISCorp MQS5 space categories and dynamic-counter hold. 8000raisedand20000operationsareasnotnecessarilydisjointtosum28k. Contactaddressnotindependentparcelfootprint.0percentdynamiccountersnotzeroactualuptime;100percentnarrativehistoricaluptimeclaimnotindependentlyobserved. TierIIIplus/SSAE18operatorclaimsnotcertifieraudit. No numericITMWoropeningdate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.iscorp.com/iscorp-facilities/",
          "host": "iscorp.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.38393,
        "lng": -87.95149,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "ISCorp MQS5 space categories and dynamic-counter hold",
          "fields": {
            "operator": "ISCorp",
            "code": "MQS5",
            "locality": "north of Milwaukee, Wisconsin",
            "raised_floor_sqft": 8000,
            "operations_area_sqft": 20000,
            "published_contact_address": "10325 NorthPortWashingtonRoad, Mequon, Wisconsin53092"
          },
          "notes": [
            "8000raisedand20000operationsareasnotnecessarilydisjointtosum28k. Contactaddressnotindependentparcelfootprint.0percentdynamiccountersnotzeroactualuptime;100percentnarrativehistoricaluptimeclaimnotindependentlyobserved. TierIIIplus/SSAE18operatorclaimsnotcertifieraudit. No numericITMWoropeningdate.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.iscorp.com/iscorp-facilities/",
              "host": "iscorp.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 25",
          "scope": "ISCorp current facilities page explicitly identifies MQS5 in Mequon and describes customer data hosted there and ongoing managed cloud and colocation services. Reported service applies to that exact named facility account. Company uptime claims, certifications, advertised space and technical specifications are not independently verified or promoted. No precise opening date, street reference or provider role is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_mqs5_customer_data_service_account",
              "scope": "ISCorp current facilities page explicitly identifies MQS5 in Mequon and describes customer data hosted there and ongoing managed cloud and colocation services. Reported service applies to that exact named facility account. Company uptime claims, certifications, advertised space and technical specifications are not independently verified or promoted. No precise opening date, street reference or provider role is changed."
            }
          },
          "notes": [
            "ISCorp current facilities page explicitly identifies MQS5 in Mequon and describes customer data hosted there and ongoing managed cloud and colocation services. Reported service applies to that exact named facility account. Company uptime claims, certifications, advertised space and technical specifications are not independently verified or promoted. No precise opening date, street reference or provider role is changed.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.iscorp.com/iscorp-facilities/",
              "host": "www.iscorp.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Mequon · Ozaukee · Source context reviewed",
      "status_scope": "ISCorp current facilities page explicitly identifies MQS5 in Mequon and describes customer data hosted there and ongoing managed cloud and colocation services. Reported service applies to that exact named facility account. Company uptime claims, certifications, advertised space and technical specifications are not independently verified or promoted. No precise opening date, street reference or provider role is changed.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55089"
      }
    },
    {
      "id": "menomonie-data-center-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Menomonie Data Center Campus",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dunn"
      ],
      "city": "Menomonie",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The statement explicitly says annexation/rezoning would not guarantee construction. The proposed 75,000 gallons per day of municipal water/wastewater is not two additive withdrawals or measured operation. Closed-loop language does not mean zero water use. Working with Xcel and the PSC is not executed power service; later votes remain unobserved. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-06-30",
          "The City published its June 30, 2026 Mayor statement about the proposed Menomonie data center and ordinance work, distinguishing the earlier tax incentive negotiation pause from stopping the project. This dates the official statement, not an exact land closing, original concern day, completed ordinance adoption or computing opening."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://menomonienewsnet.org/3707/city/proposed-data-center/",
          "host": "menomonienewsnet.org",
          "date": "2025-07-24",
          "published": "2025-07-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://menomonie-wi.gov/527/Potential-Data-Center-FAQ",
          "host": "menomonie-wi.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://menomonie-wi.gov/DocumentCenter/View/2963/63026-Press-Release-Data-Center-Ordinance-Update-PDF",
          "host": "menomonie-wi.gov",
          "published": "2026-06-30",
          "date": "2026-06-30",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.menomonie-wi.gov/DocumentCenter/View/2569/-92325-Press-Release-Mayor-Randy-Knaack-on-Data-Center-PDF",
          "host": "www.menomonie-wi.gov",
          "published": "2025-09-23",
          "date": "2025-09-23",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 44.94668,
        "lng": -91.89632,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Menomonie's city administrator describes Balloonist's proposed annexation/rezoning near County Highway B and hearings scheduled for July 28 and August 4, 2025.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The statement explicitly says annexation/rezoning would not guarantee construction. The proposed 75,000 gallons per day of municipal water/wastewater is not two additive withdrawals or measured operation. Closed-loop language does not mean zero water use. Working with Xcel and the PSC is not executed power service; later votes remain unobserved.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://menomonienewsnet.org/3707/city/proposed-data-center/",
              "host": "menomonienewsnet.org",
              "date": "2025-07-24",
              "published": "2025-07-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The current original City FAQ describes a potential project in early stages. The original June 30, 2026 Mayor statement names Balloonist LLC and expressly distinguishes pausing tax incentive negotiations from stopping the proposed project. It describes further ordinance work and a future introduction without a vote, then a possible later project rezoning application. These bodies support a listed proposal within the City planning account, without construction, computing operation or final present property permission. The older September 2025 statement about refusing further development agreement or tax district negotiations does not independently establish physical closure. The Mayor legal opinion about banning industries is not certified as a complete statement of current law.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_city_proposal_incentive_pause_not_project_closure",
              "scope": "The current original City FAQ describes a potential project in early stages. The original June 30, 2026 Mayor statement names Balloonist LLC and expressly distinguishes pausing tax incentive negotiations from stopping the proposed project. It describes further ordinance work and a future introduction without a vote, then a possible later project rezoning application. These bodies support a listed proposal within the City planning account, without construction, computing operation or final present property permission. The older September 2025 statement about refusing further development agreement or tax district negotiations does not independently establish physical closure. The Mayor legal opinion about banning industries is not certified as a complete statement of current law."
            },
            "source_read_scope": {
              "current_faq_main_body_and_complete_two_page_june_statement_read": true,
              "older_september_statement_complete_one_page_text_read": true,
              "tax_negotiation_pause_not_project_stop": true,
              "proposed_august_introduction_explicitly_no_vote": true,
              "future_rezoning_not_completed": true,
              "mayor_legal_opinion_not_certified_general_law": true,
              "no_financial_or_resource_quantities_exported": true
            }
          },
          "notes": [
            "The current original City FAQ describes a potential project in early stages. The original June 30, 2026 Mayor statement names Balloonist LLC and expressly distinguishes pausing tax incentive negotiations from stopping the proposed project. It describes further ordinance work and a future introduction without a vote, then a possible later project rezoning application. These bodies support a listed proposal within the City planning account, without construction, computing operation or final present property permission. The older September 2025 statement about refusing further development agreement or tax district negotiations does not independently establish physical closure. The Mayor legal opinion about banning industries is not certified as a complete statement of current law.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://menomonie-wi.gov/527/Potential-Data-Center-FAQ",
              "host": "menomonie-wi.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://menomonie-wi.gov/DocumentCenter/View/2963/63026-Press-Release-Data-Center-Ordinance-Update-PDF",
              "host": "menomonie-wi.gov",
              "published": "2026-06-30",
              "date": "2026-06-30",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.menomonie-wi.gov/DocumentCenter/View/2569/-92325-Press-Release-Mayor-Randy-Knaack-on-Data-Center-PDF",
              "host": "www.menomonie-wi.gov",
              "published": "2025-09-23",
              "date": "2025-09-23",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Menomonie · Dunn · Source context reviewed",
      "status_scope": "The current original City FAQ describes a potential project in early stages. The original June 30, 2026 Mayor statement names Balloonist LLC and expressly distinguishes pausing tax incentive negotiations from stopping the proposed project. It describes further ordinance work and a future introduction without a vote, then a possible later project rezoning application. These bodies support a listed proposal within the City planning account, without construction, computing operation or final present property permission. The older September 2025 statement about refusing further development agreement or tax district negotiations does not independently establish physical closure. The Mayor legal opinion about banning industries is not certified as a complete statement of current law.",
      "event_evidence": [
        {
          "date": "2026-06-30",
          "text": "The City published its June 30, 2026 Mayor statement about the proposed Menomonie data center and ordinance work, distinguishing the earlier tax incentive negotiation pause from stopping the project. This dates the official statement, not an exact land closing, original concern day, completed ordinance adoption or computing opening.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://menomonie-wi.gov/DocumentCenter/View/2963/63026-Press-Release-Data-Center-Ordinance-Update-PDF",
              "host": "menomonie-wi.gov",
              "published": "2026-06-30",
              "date": "2026-06-30",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55033"
      }
    },
    {
      "id": "meta-beaver-dam-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Meta Beaver Dam Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dodge"
      ],
      "city": "Beaver Dam",
      "address": "",
      "who": "Meta",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Once-completed forecasts. Restoration and clean-energy matching promises are not measured campus water use or delivered generation; no campusMWadopted. Donation is not government incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Wisconsin named certificate register with scoped building descriptions. Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.",
      "date": "",
      "events": [
        [
          "2025-11-12",
          "Meta announced its Beaver Dam data center development. This is the release date, not a construction start or an opening day."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://datacenters.atmeta.com/2025/11/hello-beaver-dam/",
          "host": "datacenters.atmeta.com",
          "date": "2025-11-12",
          "published": "2025-11-12",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx",
          "host": "revenue.wi.gov",
          "date": "2026-06-25",
          "published": "2026-06-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://datacenters.atmeta.com/us-locations/",
          "host": "datacenters.atmeta.com",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 43.41624,
        "lng": -88.70742,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "planned_campus_area_sqft_min_exclusive": 700000,
            "planned_investment_usd": 1000000000,
            "forecast_construction_jobs_approx": 1000,
            "forecast_operational_jobs_min_exclusive": 100,
            "energy_assistance_donation_commitment_usd": 15000000,
            "donation_period_years": 10
          },
          "notes": [
            "Once-completed forecasts. Restoration and clean-energy matching promises are not measured campus water use or delivered generation; no campusMWadopted. Donation is not government incentive.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2025/11/hello-beaver-dam/",
              "host": "datacenters.atmeta.com",
              "date": "2025-11-12",
              "published": "2025-11-12",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Wisconsin named certificate register with scoped building descriptions",
          "fields": {
            "certification_register_as_of": "2025-10-31",
            "listed_certifications": [
              {
                "entity": "Epic Hosting LLC",
                "date": "2024-09-24",
                "location": "Milky Way,Verona,WI",
                "scope": "Utility Building3and additions"
              },
              {
                "entity": "Degas LLC",
                "date": "2025-02-18",
                "location": "County RoadA,Beaver Dam,WI",
                "scope": "to be constructed"
              },
              {
                "entity": "Oracle America Cloud Services LLC,formerly Green Chile Ventures LLC",
                "date": "2025-10-31",
                "location": "Port Washington,WI",
                "scope": "four buildings at531,533,701and723E Lake Drive"
              }
            ]
          },
          "notes": [
            "Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx",
              "host": "revenue.wi.gov",
              "date": "2026-06-25",
              "published": "2026-06-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 3",
          "scope": "Meta announced the Beaver Dam development on 2025-11-12. The announcement and current fleet page do not establish a present building completion or exact construction start day. Year only groundbreaking entries, planned jobs and future service language retain their separate scopes. The announcement date is a historical publication event only.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "Meta announced the Beaver Dam development on 2025-11-12. The announcement and current fleet page do not establish a present building completion or exact construction start day. Year only groundbreaking entries, planned jobs and future service language retain their separate scopes. The announcement date is a historical publication event only."
            }
          },
          "notes": [
            "Meta announced the Beaver Dam development on 2025-11-12. The announcement and current fleet page do not establish a present building completion or exact construction start day. Year only groundbreaking entries, planned jobs and future service language retain their separate scopes. The announcement date is a historical publication event only."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2025/11/hello-beaver-dam/",
              "host": "datacenters.atmeta.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://datacenters.atmeta.com/us-locations/",
              "host": "datacenters.atmeta.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check61, October24,2026",
          "scope": "Meta identifies the Beaver Dam campus in the November12,2025 announcement and names Mortenson as general contractor. Its future operational jobs, project costs, energy assistance, renewable matching and wetland restoration descriptions remain source claims, without proof of completion or measured environmental performance. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Meta",
              "role": "developer",
              "identity_scope": "provider_brand_only",
              "scope": "Meta identifies the Beaver Dam campus in the November12,2025 announcement and names Mortenson as general contractor. Its future operational jobs, project costs, energy assistance, renewable matching and wetland restoration descriptions remain source claims, without proof of completion or measured environmental performance. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "developer"
          },
          "notes": [
            "Meta identifies the Beaver Dam campus in the November12,2025 announcement and names Mortenson as general contractor. Its future operational jobs, project costs, energy assistance, renewable matching and wetland restoration descriptions remain source claims, without proof of completion or measured environmental performance. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2025/11/hello-beaver-dam/",
              "host": "datacenters.atmeta.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Beaver Dam · Dodge · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-11-12",
          "text": "Meta announced its Beaver Dam data center development. This is the release date, not a construction start or an opening day.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://datacenters.atmeta.com/2025/11/hello-beaver-dam/",
              "host": "datacenters.atmeta.com",
              "published": "2025-11-12",
              "date": "2025-11-12",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55027"
      }
    },
    {
      "id": "metered-mining-hammond-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Metered Mining Hammond Bitcoin Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "St. Croix"
      ],
      "city": "Hammond",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public introduction was read. Encoded premium conditions, capacity, noise and water limits were not decoded or adopted. The exact legal operator relationship to the Metered Mining baseline needs a crosswalk. A reported appeal permit is not confirmation of construction or current operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.baldwin-bulletin.com/news/board-of-appeals-approves-proposed-data-center-in-hammond/article_65becdf0-7f44-42eb-a268-0352836b7765.html",
          "host": "baldwin-bulletin.com",
          "date": "2026-06-19",
          "published": "2026-06-19",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.meteredmining.io/company",
          "host": "www.meteredmining.io",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 45.03408,
        "lng": -92.45266,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The Baldwin Bulletin's public introduction reports a four-one Hammond Board of Appeals permit decision for Metered North on a two-acre St. Croix Electric property, after an earlier village denial.",
            "independently_verified_current_operating_status": null,
            "operator_or_site_identity_needs_crosswalk": true
          },
          "notes": [
            "Only the public introduction was read. Encoded premium conditions, capacity, noise and water limits were not decoded or adopted. The exact legal operator relationship to the Metered Mining baseline needs a crosswalk. A reported appeal permit is not confirmation of construction or current operation.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.baldwin-bulletin.com/news/board-of-appeals-approves-proposed-data-center-in-hammond/article_65becdf0-7f44-42eb-a268-0352836b7765.html",
              "host": "baldwin-bulletin.com",
              "date": "2026-06-19",
              "published": "2026-06-19",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The current original company page reports operating mining equipment for customers and separately describes a new hydro cooled location as coming soon. Its selected body does not name Hammond or independently complete the exact Wisconsin facility crosswalk. Companywide service and a future new location are not transferred to this inherited inventory point. Testimonials and private customer names are excluded, and no future quarter is treated as completed construction, opening or actual current load.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_company_service_exact_hammond_crosswalk_held",
              "scope": "The current original company page reports operating mining equipment for customers and separately describes a new hydro cooled location as coming soon. Its selected body does not name Hammond or independently complete the exact Wisconsin facility crosswalk. Companywide service and a future new location are not transferred to this inherited inventory point. Testimonials and private customer names are excluded, and no future quarter is treated as completed construction, opening or actual current load."
            },
            "source_read_scope": {
              "original_company_service_and_future_hydro_sections_read": true,
              "exact_hammond_not_named_in_selected_body": true,
              "private_testimonial_names_not_exported": true,
              "no_waitlist_form_or_onboarding_submitted": true,
              "no_quantity_or_role_export": true
            }
          },
          "notes": [
            "The current original company page reports operating mining equipment for customers and separately describes a new hydro cooled location as coming soon. Its selected body does not name Hammond or independently complete the exact Wisconsin facility crosswalk. Companywide service and a future new location are not transferred to this inherited inventory point. Testimonials and private customer names are excluded, and no future quarter is treated as completed construction, opening or actual current load.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.meteredmining.io/company",
              "host": "www.meteredmining.io",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hammond · St. Croix · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55109"
      }
    },
    {
      "id": "microsoft-kenosha-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Microsoft Kenosha Data Center Campus",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kenosha"
      ],
      "city": "Kenosha",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. We Energies regional map not Kenosha project proof. Generic service territory and customer totals do not establish a Microsoft Kenosha interconnection, contracted MW or energized campus. No exact-site utility agreement, build stage or opening evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.we-energies.com/company/area",
          "host": "we-energies.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 42.57671,
        "lng": -88.04203,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "We Energies regional map not Kenosha project proof",
          "fields": {
            "publisher": "We Energies",
            "scope": "utility general service-area page"
          },
          "notes": [
            "Generic service territory and customer totals do not establish a Microsoft Kenosha interconnection, contracted MW or energized campus. No exact-site utility agreement, build stage or opening evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.we-energies.com/company/area",
              "host": "we-energies.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kenosha · Kenosha · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55059"
      }
    },
    {
      "id": "microsoft-mount-pleasant-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Microsoft Mount Pleasant Data Center Campus",
      "group": "operating",
      "status": "Operating phase",
      "raw_status": "partly operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Racine"
      ],
      "city": "Mount Pleasant",
      "address": "",
      "who": "Microsoft",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Completionnotexactcommissioningdate. Final2027fundinguseawaitsbudgetapproval; redirectedpaymentnotnewautomaticannualsiteinvestment. Do not assign550+campusemployees to eachbuilding. VillageSeptember28reportestablishesfirstbuildingcompletedSummer2026;secondconstructionexpected2028;additionalcampusplanspreliminary. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-06-23",
          "Microsoft published its first Mount Pleasant facility operating announcement on June 23, 2026. It separately reports equipment startup activities during April. June 23 is the release date, not a manufactured exact opening day or completion of every campus phase."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.mtpleasantwi.gov/m/newsflash/home/detail/639",
          "host": "mtpleasantwi.gov",
          "date": "2026-09-28",
          "published": "2026-09-28",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
          "host": "news.microsoft.com",
          "published": "2026-06-23",
          "date": "2026-06-23",
          "checked": "2026-10-22",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 42.74745,
        "lng": -88.06152,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "city": "Mount Pleasant",
            "county": "Racine",
            "first_building_completed": "2026 summer",
            "second_building_status": "under construction",
            "second_building_completion_forecast": "2028",
            "campus_employees_min": 550,
            "annual_incentive_redirect_usd": 5000000,
            "village_share_usd": 4900000,
            "rcedc_share_usd": 100000
          },
          "notes": [
            "Completionnotexactcommissioningdate.",
            "Final2027fundinguseawaitsbudgetapproval; redirectedpaymentnotnewautomaticannualsiteinvestment.",
            "Do not assign550+campusemployees to eachbuilding.",
            "VillageSeptember28reportestablishesfirstbuildingcompletedSummer2026;secondconstructionexpected2028;additionalcampusplanspreliminary.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.mtpleasantwi.gov/m/newsflash/home/detail/639",
              "host": "mtpleasantwi.gov",
              "date": "2026-09-28",
              "published": "2026-09-28",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 13",
          "scope": "Microsoft explicitly says its first Mount Pleasant Fairwater facility is fully operational in its June 23, 2026 release. Operating phase describes that first facility only. Equipment startup activities in April are separate from the June announcement and from future campus phases. No exact physical opening day, total campus completion or assignment of every regional investment to this first facility is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_reported_first_facility_operation",
              "scope": "Microsoft explicitly says its first Mount Pleasant Fairwater facility is fully operational in its June 23, 2026 release. Operating phase describes that first facility only. Equipment startup activities in April are separate from the June announcement and from future campus phases. No exact physical opening day, total campus completion or assignment of every regional investment to this first facility is adopted."
            },
            "phase_and_date_scope": {
              "reported_operating_component": "first Mount Pleasant facility",
              "startup_period_reported": "April 2026",
              "release_date": "2026-06-23",
              "exact_opening_day_established": false,
              "all_campus_phases_complete": false
            }
          },
          "notes": [
            "Microsoft explicitly says its first Mount Pleasant Fairwater facility is fully operational in its June 23, 2026 release. Operating phase describes that first facility only. Equipment startup activities in April are separate from the June announcement and from future campus phases. No exact physical opening day, total campus completion or assignment of every regional investment to this first facility is adopted.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Document and source check dates remain separate from physical milestones."
          ],
          "sources": [
            {
              "url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
              "host": "news.microsoft.com",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check60, October24,2026",
          "scope": "Microsoft reports its first Mount Pleasant facility operational in the June23,2026 release, while identifying the adjacent second facility as still under construction. The operator role is bounded to the existing first facility; this does not make the whole campus complete or the2028 expansion forecast an outcome. Regional spending and employment totals are not adopted as facility figures. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained.",
          "fields": {
            "company_association": {
              "name": "Microsoft",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "Microsoft reports its first Mount Pleasant facility operational in the June23,2026 release, while identifying the adjacent second facility as still under construction. The operator role is bounded to the existing first facility; this does not make the whole campus complete or the2028 expansion forecast an outcome. Regional spending and employment totals are not adopted as facility figures. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
            },
            "provider_role": "operator"
          },
          "notes": [
            "Microsoft reports its first Mount Pleasant facility operational in the June23,2026 release, while identifying the adjacent second facility as still under construction. The operator role is bounded to the existing first facility; this does not make the whole campus complete or the2028 expansion forecast an outcome. Regional spending and employment totals are not adopted as facility figures. The previously empty company field is filled only from this explicit provider identity. Existing status, location, address, county, quantities, dates and component identity remain exact. A street in the account does not newly admit a location, parcel or roof. Publication and modification dates are not construction milestones. No personal contact or resident names are retained."
          ],
          "sources": [
            {
              "url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
              "host": "news.microsoft.com",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Mount Pleasant · Racine · Source context reviewed",
      "status_scope": "Microsoft explicitly says its first Mount Pleasant Fairwater facility is fully operational in its June 23, 2026 release. Operating phase describes that first facility only. Equipment startup activities in April are separate from the June announcement and from future campus phases. No exact physical opening day, total campus completion or assignment of every regional investment to this first facility is adopted.",
      "event_evidence": [
        {
          "date": "2026-06-23",
          "text": "Microsoft published its first Mount Pleasant facility operating announcement on June 23, 2026. It separately reports equipment startup activities during April. June 23 is the release date, not a manufactured exact opening day or completion of every campus phase.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/",
              "host": "news.microsoft.com",
              "published": "2026-06-23",
              "date": "2026-06-23",
              "checked": "2026-10-22",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55101"
      }
    },
    {
      "id": "netsonic-green-bay-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Netsonic Green Bay Data Center",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Brown"
      ],
      "city": "Green Bay",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Netsonic available power versus service specification hold. 4MWavailableheadlineand1200A480Vservicecannotbereconciledfromreviewedtext;additionaltransformers/phases/expansionunspecified. Do nottreat4MWascurrentITorcalculateusingassumedpowerfactor.9000plusexpansionnotcurrentgrossfloor.1996companyyearnotoriginalDCopeningday. No independentmeteredloadorstreetparcelverification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.netsonic.net/datacenter.php",
          "host": "netsonic.net",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 44.46726,
        "lng": -88.01996,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Netsonic available power versus service specification hold",
          "fields": {
            "operator": "Netsonic",
            "locality": "Green Bay, Wisconsin",
            "operator_described_control": "owns and operates facility",
            "company_established_year": 1996,
            "advertised_available_power_mw_approx": 4,
            "published_electrical_service_amps": 1200,
            "published_service_voltage": 480,
            "additional_expansion_sqft_min_exclusive": 9000,
            "canonical_current_it_mw": null
          },
          "notes": [
            "4MWavailableheadlineand1200A480Vservicecannotbereconciledfromreviewedtext;additionaltransformers/phases/expansionunspecified. Do nottreat4MWascurrentITorcalculateusingassumedpowerfactor.9000plusexpansionnotcurrentgrossfloor.1996companyyearnotoriginalDCopeningday. No independentmeteredloadorstreetparcelverification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.netsonic.net/datacenter.php",
              "host": "netsonic.net",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The current original Green Bay facility page explicitly says the provider owns and operates the named data center and offers colocation, hosted computing and support there. This supports reported service within the provider account. Available power, possible expansion, historical operating duration and advertised infrastructure are not new measured load, independent technical certification or an exact original opening day. No ownership role, street location or quantity field is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_current_green_bay_service",
              "scope": "The current original Green Bay facility page explicitly says the provider owns and operates the named data center and offers colocation, hosted computing and support there. This supports reported service within the provider account. Available power, possible expansion, historical operating duration and advertised infrastructure are not new measured load, independent technical certification or an exact original opening day. No ownership role, street location or quantity field is changed."
            },
            "source_read_scope": {
              "complete_current_named_facility_main_body_read": true,
              "own_and_operate_service_language_read": true,
              "available_capacity_not_current_it_load": true,
              "no_quantity_location_or_role_export": true
            }
          },
          "notes": [
            "The current original Green Bay facility page explicitly says the provider owns and operates the named data center and offers colocation, hosted computing and support there. This supports reported service within the provider account. Available power, possible expansion, historical operating duration and advertised infrastructure are not new measured load, independent technical certification or an exact original opening day. No ownership role, street location or quantity field is changed.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.netsonic.net/datacenter.php",
              "host": "www.netsonic.net",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Green Bay · Brown · Source context reviewed",
      "status_scope": "The current original Green Bay facility page explicitly says the provider owns and operates the named data center and offers colocation, hosted computing and support there. This supports reported service within the provider account. Available power, possible expansion, historical operating duration and advertised infrastructure are not new measured load, independent technical certification or an exact original opening day. No ownership role, street location or quantity field is changed.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55009"
      }
    },
    {
      "id": "oppidan-beaver-dam-edge-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Oppidan Beaver Dam Edge Data Center",
      "group": "proposed",
      "status": "Listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dodge"
      ],
      "city": "Beaver Dam",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Sale approval is not proof of closed conveyance, construction commencement or commissioning. The 407,340 USD figure is land price, not build cost. Nearby Meta acreage, scale and project attributes are separate. Summer construction and 2028 opening were forecasts. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dailydodge.com/beaver-dam-common-council-approves-second-data-center/",
          "host": "dailydodge.com",
          "date": "2026-04-07",
          "published": "2026-04-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://ci.beaverdam.wi.gov/DocumentCenter/View/2564/Oppidan-Data-Center?bidId=",
          "host": "ci.beaverdam.wi.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 43.43106,
        "lng": -88.7236,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "Daily Dodge reports an eleven-three council vote on sale of just over 14 Beaver Dam acres to Oppidan for a proposed 90,000-square-foot edge facility, targeting 2028 operation.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Sale approval is not proof of closed conveyance, construction commencement or commissioning. The 407,340 USD figure is land price, not build cost. Nearby Meta acreage, scale and project attributes are separate. Summer construction and 2028 opening were forecasts.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dailydodge.com/beaver-dam-common-council-approves-second-data-center/",
              "host": "dailydodge.com",
              "date": "2026-04-07",
              "published": "2026-04-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The original City project information sheet explicitly labels the Oppidan edge data center proposed and gives the Highway 151 and Hemlock Road planning context. This supports a listed proposal, without a verified completed building, construction start or computing service. City statements about anticipated utility use, future revenue, incentives and employment remain prospective institutional accounts and are not exported as measured outcomes or new technical and financial fields. No project location precision or provider role is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_city_explicit_edge_proposal",
              "scope": "The original City project information sheet explicitly labels the Oppidan edge data center proposed and gives the Highway 151 and Hemlock Road planning context. This supports a listed proposal, without a verified completed building, construction start or computing service. City statements about anticipated utility use, future revenue, incentives and employment remain prospective institutional accounts and are not exported as measured outcomes or new technical and financial fields. No project location precision or provider role is changed."
            },
            "source_read_scope": {
              "complete_one_page_original_city_project_sheet_text_read": true,
              "project_proposed_not_operating": true,
              "expected_utility_and_revenue_not_measured": true,
              "street_context_not_location_edit": true,
              "no_quantity_export": true
            }
          },
          "notes": [
            "The original City project information sheet explicitly labels the Oppidan edge data center proposed and gives the Highway 151 and Hemlock Road planning context. This supports a listed proposal, without a verified completed building, construction start or computing service. City statements about anticipated utility use, future revenue, incentives and employment remain prospective institutional accounts and are not exported as measured outcomes or new technical and financial fields. No project location precision or provider role is changed.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://ci.beaverdam.wi.gov/DocumentCenter/View/2564/Oppidan-Data-Center?bidId=",
              "host": "ci.beaverdam.wi.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Beaver Dam · Dodge · Source context reviewed",
      "status_scope": "The original City project information sheet explicitly labels the Oppidan edge data center proposed and gives the Highway 151 and Hemlock Road planning context. This supports a listed proposal, without a verified completed building, construction start or computing service. City statements about anticipated utility use, future revenue, incentives and employment remain prospective institutional accounts and are not exported as measured outcomes or new technical and financial fields. No project location precision or provider role is changed.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55027"
      }
    },
    {
      "id": "cambrin-project-cornmaze-town-of-beloit-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Project Cornmaze Data Center (Town of Beloit)",
      "group": "proposed",
      "status": "Project listed development",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Rock"
      ],
      "city": "Beloit",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No applications/site plans submitted at report date. Up-to175000 USD reimburses town costs, not a grant paid to developer. Shared DNR contact with Degas does not establish Meta identity. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wpr.org/news/town-of-beloit-pre-development-agreement-develop-data-center",
          "host": "wpr.org",
          "date": "2026-03-05",
          "published": "2026-03-05",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.panattoni.com/cornmaze/",
          "host": "www.panattoni.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 42.67125,
        "lng": -89.07141,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.",
          "fields": {
            "reported_context": "WPR reports July15,2025 Cambrin predevelopment cost-recovery agreement for possible Beloit Cornmaze project.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "No applications/site plans submitted at report date. Up-to175000 USD reimburses town costs, not a grant paid to developer. Shared DNR contact with Degas does not establish Meta identity.",
            "Subsequent original decisions and current operator disclosures take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wpr.org/news/town-of-beloit-pre-development-agreement-develop-data-center",
              "host": "wpr.org",
              "date": "2026-03-05",
              "published": "2026-03-05",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 25",
          "scope": "Panattoni current Cornmaze page explicitly describes a potential campus in the Town of Beloit and Town of Turtle, early planning, no final decisions and required local review before development can proceed. Proposed describes that current named project account, not a permit, entitlement to build during any moratorium, current construction or an operating facility. Panattoni naming does not change the inherited Cambrin identity, provider roles, municipality wrapper, end user or quantities. Promised jobs, utility arrangements and environmental benefits are not accomplished outcomes.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_named_cornmaze_early_planning_no_final_decision",
              "scope": "Panattoni current Cornmaze page explicitly describes a potential campus in the Town of Beloit and Town of Turtle, early planning, no final decisions and required local review before development can proceed. Proposed describes that current named project account, not a permit, entitlement to build during any moratorium, current construction or an operating facility. Panattoni naming does not change the inherited Cambrin identity, provider roles, municipality wrapper, end user or quantities. Promised jobs, utility arrangements and environmental benefits are not accomplished outcomes."
            }
          },
          "notes": [
            "Panattoni current Cornmaze page explicitly describes a potential campus in the Town of Beloit and Town of Turtle, early planning, no final decisions and required local review before development can proceed. Proposed describes that current named project account, not a permit, entitlement to build during any moratorium, current construction or an operating facility. Panattoni naming does not change the inherited Cambrin identity, provider roles, municipality wrapper, end user or quantities. Promised jobs, utility arrangements and environmental benefits are not accomplished outcomes.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.panattoni.com/cornmaze/",
              "host": "www.panattoni.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Beloit · Rock · Source context reviewed",
      "status_scope": "Panattoni current Cornmaze page explicitly describes a potential campus in the Town of Beloit and Town of Turtle, early planning, no final decisions and required local review before development can proceed. Proposed describes that current named project account, not a permit, entitlement to build during any moratorium, current construction or an operating facility. Panattoni naming does not change the inherited Cambrin identity, provider roles, municipality wrapper, end user or quantities. Promised jobs, utility arrangements and environmental benefits are not accomplished outcomes.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55105"
      }
    },
    {
      "id": "microsoft-project-nova-caledonia-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Project Nova Data Center Campus (Caledonia)",
      "group": "stopped",
      "status": "Operator ended site proposal",
      "raw_status": "stopped",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Racine"
      ],
      "city": "Caledonia",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The expected 2025 board date is not a 2026 event and is not an observed final approval. Mount Pleasant's four-billion-USD project is separate. Caledonia employment and fiscal benefits are projections. Not being in a TIF district does not independently prove the absence of all state or other incentives. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-10-10",
          "Microsoft dated its Caledonia site project update October 10, 2025, saying it would not proceed with that particular site while continuing regional site work. This is the dated company update, not an exact legal withdrawal day, a physical facility shutdown or the closure of other Racine projects."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wpr.org/news/caledonia-rezoning-microsoft-data-center-wisconsin",
          "host": "wpr.org",
          "date": "2025-09-30",
          "published": "2025-09-30",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-racine-county/",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://local.microsoft.com/wp-content/uploads/2025/09/202509_CaledoniaNeighborhoodMeeting_web.pdf",
          "host": "local.microsoft.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 42.75531,
        "lng": -88.0701,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WPR reports a September 29 five-two Caledonia plan-commission recommendation on Microsoft's proposed 244-acre campus, with the village board expected to consider it October 14, 2025.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The expected 2025 board date is not a 2026 event and is not an observed final approval. Mount Pleasant's four-billion-USD project is separate. Caledonia employment and fiscal benefits are projections. Not being in a TIF district does not independently prove the absence of all state or other incentives.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wpr.org/news/caledonia-rezoning-microsoft-data-center-wisconsin",
              "host": "wpr.org",
              "date": "2025-09-30",
              "published": "2025-09-30",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 20",
          "scope": "Microsoft October 10, 2025 Caledonia update says it decided not to proceed with that particular site and would seek another suitable site with local leaders. Operator ended site proposal describes that specific development decision, not an operating shutdown or withdrawal from every Racine County project. Linked original September 24, 2025 company meeting boards identify Project Nova as the Douglas Avenue Assemblage. The later decision supersedes the earlier planning description for that site. No exact decision day, replacement site, government permit outcome or physical closure is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_ended_named_site_proposal_not_regional_exit_or_operating_shutdown",
              "scope": "Microsoft October 10, 2025 Caledonia update says it decided not to proceed with that particular site and would seek another suitable site with local leaders. Operator ended site proposal describes that specific development decision, not an operating shutdown or withdrawal from every Racine County project. Linked original September 24, 2025 company meeting boards identify Project Nova as the Douglas Avenue Assemblage. The later decision supersedes the earlier planning description for that site. No exact decision day, replacement site, government permit outcome or physical closure is inferred."
            },
            "identity_and_date_scope": {
              "company_update_on": "2025-10-10",
              "exact_decision_day_not_established": true,
              "company_meeting_boards_on": "2025-09-24",
              "meeting_boards_page_visually_read": 10,
              "board_label": "Project Nova Douglas Avenue Assemblage",
              "other_racine_campuses_separate": true,
              "no_location_or_provider_role_change": true
            }
          },
          "notes": [
            "Microsoft October 10, 2025 Caledonia update says it decided not to proceed with that particular site and would seek another suitable site with local leaders. Operator ended site proposal describes that specific development decision, not an operating shutdown or withdrawal from every Racine County project. Linked original September 24, 2025 company meeting boards identify Project Nova as the Douglas Avenue Assemblage. The later decision supersedes the earlier planning description for that site. No exact decision day, replacement site, government permit outcome or physical closure is inferred.",
            "The review preserves existing physical identity, locations, roles, quantities and opening fields. Source issue dates, review checks and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-racine-county/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://local.microsoft.com/wp-content/uploads/2025/09/202509_CaledoniaNeighborhoodMeeting_web.pdf",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Caledonia · Racine · Source context reviewed",
      "status_scope": "Microsoft October 10, 2025 Caledonia update says it decided not to proceed with that particular site and would seek another suitable site with local leaders. Operator ended site proposal describes that specific development decision, not an operating shutdown or withdrawal from every Racine County project. Linked original September 24, 2025 company meeting boards identify Project Nova as the Douglas Avenue Assemblage. The later decision supersedes the earlier planning description for that site. No exact decision day, replacement site, government permit outcome or physical closure is inferred.",
      "event_evidence": [
        {
          "date": "2025-10-10",
          "text": "Microsoft dated its Caledonia site project update October 10, 2025, saying it would not proceed with that particular site while continuing regional site work. This is the dated company update, not an exact legal withdrawal day, a physical facility shutdown or the closure of other Racine projects.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-racine-county/",
              "host": "local.microsoft.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55101"
      }
    },
    {
      "id": "qts-dane-county-deforest-wi",
      "state": "wi",
      "kind": "facility",
      "name": "QTS Dane County Hyperscale Campus (DeForest)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dane"
      ],
      "city": "DeForest",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DeForest consolidated annexation procedure and unexecuted commitments. Procedural rejection of two petitions does not establish rejection of entire development. Proposed pre-annexation agreement not signed final award from this account. Village index contains older timelines and records throughFebruary2026; no final current outcome established.50M is pledge, not actual distribution. Conditional future approvals, sewer/service-area amendments and site plans still separate. No numeric IT MW or operating date verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.engagedeforest.com/QTS",
          "host": "engagedeforest.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.deforestwi.gov/m/NewsFlash/Home/Detail/75",
          "host": "www.deforestwi.gov",
          "published": "2026-01-27",
          "date": "2026-01-27",
          "checked": "2026-10-22",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 43.03566,
        "lng": -89.41554,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "public-institution-review-round11-2026-10-14.json",
          "scope": "DeForest consolidated annexation procedure and unexecuted commitments",
          "fields": {
            "agency": "Village of DeForest, Wisconsin",
            "company": "QTS",
            "land_origin": "Town of Vienna, Dane County",
            "source_stage": "due diligence and proposed public consideration processes",
            "two_petition_rejection_date": "2025-12-04",
            "rejection_scope": "replace separate petitions with consolidated annexation petition",
            "new_notice_of_intention_date": "2025-12-12",
            "company_community_pledge_usd": 50000000
          },
          "notes": [
            "Procedural rejection of two petitions does not establish rejection of entire development. Proposed pre-annexation agreement not signed final award from this account. Village index contains older timelines and records throughFebruary2026; no final current outcome established.50M is pledge, not actual distribution. Conditional future approvals, sewer/service-area amendments and site plans still separate. No numeric IT MW or operating date verified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.engagedeforest.com/QTS",
              "host": "engagedeforest.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 5",
          "scope": "The Village of DeForest project page records a February 3, 2026 unanimous vote rejecting the 1572.5 acre direct annexation petition. Its January 27 release was a prior staff recommendation and conditional expectation of application withdrawal. This later rejection differs from the procedural December 4, 2025 rejection of two petitions in favor of consolidation. This review adds the annexation outcome only. Final application withdrawal and any different proposal or subsequent physical stage remain unverified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "annexation_rejection_physical_stage_held",
              "scope": "The Village of DeForest project page records a February 3, 2026 unanimous vote rejecting the 1572.5 acre direct annexation petition. Its January 27 release was a prior staff recommendation and conditional expectation of application withdrawal. This later rejection differs from the procedural December 4, 2025 rejection of two petitions in favor of consolidation. This review adds the annexation outcome only. Final application withdrawal and any different proposal or subsequent physical stage remain unverified."
            },
            "local_rule_context": {
              "jurisdiction": "Village of DeForest",
              "annexation_origin": "Town of Vienna",
              "scope": "The village explains annexation, comprehensive plan, zoning, service area, sewer, conditional use, subdivision and site plan processes as separate potential approvals. No completed service extension or full set of permits is inferred.",
              "annexation_rejected_on": "2026-02-03",
              "other_application_withdrawal_verified": false
            },
            "annexation_event_adoption_hold": {
              "date": "2026-02-03",
              "kind": "denied",
              "reason": "The native schema supports denial events but the generic adopter currently does not. The dated decision remains in the source bound observation and concern without a mislabeled timeline event."
            }
          },
          "notes": [
            "The Village of DeForest project page records a February 3, 2026 unanimous vote rejecting the 1572.5 acre direct annexation petition. Its January 27 release was a prior staff recommendation and conditional expectation of application withdrawal. This later rejection differs from the procedural December 4, 2025 rejection of two petitions in favor of consolidation. This review adds the annexation outcome only. Final application withdrawal and any different proposal or subsequent physical stage remain unverified.",
            "An agency decision or a source publication date does not certify an opening, a physical site count or a technical quantity."
          ],
          "sources": [
            {
              "url": "https://www.engagedeforest.com/QTS",
              "host": "www.engagedeforest.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.deforestwi.gov/m/NewsFlash/Home/Detail/75",
              "host": "www.deforestwi.gov",
              "published": "2026-01-27",
              "date": "2026-01-27",
              "checked": "2026-10-22",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "DeForest · Dane · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55025"
      }
    },
    {
      "id": "sos-limited-park-falls-wi",
      "state": "wi",
      "kind": "facility",
      "name": "SOS Limited Park Falls Crypto Mine (Former Flambeau River Paper Mill)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Price"
      ],
      "city": "Park Falls",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Historical observed/reported operation is not a 2026 operating certification. $1 million city bridge loan and remaining $828,108 collection order concern an earlier paper-mill restart, not a new awarded crypto subsidy or recovered money. Corporate fundraising above $600 million and $5 million shareholder settlement are company-level, not site capex; settlement admitted no wrongdoing. Worker safety/visa/pay allegations, denials and attorney opinions are attributed, not court findings of site violations. Niagara/Stacyville stalled plans and partner’s uncorroborated Fort Stockton claim are distinct projects, not operating campuses. Statewide one-other-known-mine statement is not an exhaustive census. No site MW adopted. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wisconsinwatch.org/2023/01/crypto-mine-in-park-falls-wisconsin-creates-controversy-at-former-paper-mill/",
          "host": "wisconsinwatch.org",
          "date": "2023-01-17",
          "published": "2023-01-17",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/sos-limited-reports-2026-interim-financial-results-302901291.html",
          "host": "www.prnewswire.com",
          "published": "2026-10-07",
          "date": "2026-10-07",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.prnewswire.com/news-releases/sos-ltd-announces-launch-of-north-america-operations-with-opening-of-its-super-computing--hosting-center-in-wisconsin-301523787.html",
          "host": "www.prnewswire.com",
          "published": "2022-04-12",
          "date": "2022-04-12",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 45.68013,
        "lng": -90.3615,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Wisconsin Watch’s historical investigation documents cryptocurrency equipment and activity at SOS’s former Park Falls paper mill and an outdoor-expansion permit denial in August 2022.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Historical observed/reported operation is not a 2026 operating certification. $1 million city bridge loan and remaining $828,108 collection order concern an earlier paper-mill restart, not a new awarded crypto subsidy or recovered money. Corporate fundraising above $600 million and $5 million shareholder settlement are company-level, not site capex; settlement admitted no wrongdoing. Worker safety/visa/pay allegations, denials and attorney opinions are attributed, not court findings of site violations. Niagara/Stacyville stalled plans and partner’s uncorroborated Fort Stockton claim are distinct projects, not operating campuses. Statewide one-other-known-mine statement is not an exhaustive census. No site MW adopted.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wisconsinwatch.org/2023/01/crypto-mine-in-park-falls-wisconsin-creates-controversy-at-former-paper-mill/",
              "host": "wisconsinwatch.org",
              "date": "2023-01-17",
              "published": "2023-01-17",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The original October 7, 2026 issuer results describe companywide hosting and other business lines without naming Park Falls, Price County or Wisconsin in the selected body. The original April 12, 2022 opening account reports initial hosting in Price County but does not name Park Falls in its substantive body. Those accounts do not independently complete this exact inherited site crosswalk or verify present physical operation or closure. Company revenue mix and the absence of a mining revenue line do not prove that a particular facility stopped computing. Future phases in the older release are not accomplished current capacity.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_county_opening_and_current_company_results_exact_site_stage_held",
              "scope": "The original October 7, 2026 issuer results describe companywide hosting and other business lines without naming Park Falls, Price County or Wisconsin in the selected body. The original April 12, 2022 opening account reports initial hosting in Price County but does not name Park Falls in its substantive body. Those accounts do not independently complete this exact inherited site crosswalk or verify present physical operation or closure. Company revenue mix and the absence of a mining revenue line do not prove that a particular facility stopped computing. Future phases in the older release are not accomplished current capacity."
            },
            "source_read_scope": {
              "current_original_issuer_selected_operating_context_and_business_description_read": true,
              "older_original_wisconsin_opening_main_body_read": true,
              "exact_park_falls_not_named_in_selected_bodies": true,
              "companywide_revenue_not_exact_facility_operation_or_closure": true,
              "older_future_phases_not_current_completed_capacity": true,
              "no_financial_or_technical_quantity_export": true
            }
          },
          "notes": [
            "The original October 7, 2026 issuer results describe companywide hosting and other business lines without naming Park Falls, Price County or Wisconsin in the selected body. The original April 12, 2022 opening account reports initial hosting in Price County but does not name Park Falls in its substantive body. Those accounts do not independently complete this exact inherited site crosswalk or verify present physical operation or closure. Company revenue mix and the absence of a mining revenue line do not prove that a particular facility stopped computing. Future phases in the older release are not accomplished current capacity.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.prnewswire.com/news-releases/sos-limited-reports-2026-interim-financial-results-302901291.html",
              "host": "www.prnewswire.com",
              "published": "2026-10-07",
              "date": "2026-10-07",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.prnewswire.com/news-releases/sos-ltd-announces-launch-of-north-america-operations-with-opening-of-its-super-computing--hosting-center-in-wisconsin-301523787.html",
              "host": "www.prnewswire.com",
              "published": "2022-04-12",
              "date": "2022-04-12",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Park Falls · Price · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55099"
      }
    },
    {
      "id": "stargate-port-washington-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Stargate Lighthouse Campus",
      "group": "building",
      "status": "Reported construction",
      "raw_status": "under construction",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ozaukee"
      ],
      "city": "Port Washington",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Nearly1GWis AI capacity, not exact measured utility load.4.5GWStargatepartnership and40BcombinedFrontierinvestment are broader scopes. Proposed dedicated utility rate not reviewed approved tariff; no guarantee other ratepayers unaffected. Renewable generation is separate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Wisconsin named certificate register with scoped building descriptions. Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.",
      "date": "",
      "events": [
        [
          "2025-12-18",
          "The Weitz Company published its named Lighthouse construction account December 18, 2025. This is the publication date of the contractor account and does not establish an exact excavation start, completion, delivered capacity or operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/",
          "host": "vantage-dc.com",
          "date": "2025-10-22",
          "published": "2025-10-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx",
          "host": "revenue.wi.gov",
          "date": "2026-06-25",
          "published": "2026-06-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin",
          "host": "vantage-dc.com",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://www.weitz.com/groundbreaking-marks-new-era-for-data-center-infrastructure-in-wisconsin/",
          "host": "www.weitz.com",
          "published": "2025-12-18",
          "date": "2025-12-18",
          "checked": "2026-10-23",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 43.39307,
        "lng": -87.96147,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "remaining-operators-review-round5-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "campus_name": "Lighthouse",
            "planned_investment_usd_min_exclusive": 15000000000,
            "planned_data_centers": 4,
            "planned_ai_capacity_gw_approx": 1,
            "scheduled_completion_year": 2028,
            "total_acres": 672,
            "development_acres": 500,
            "regional_infrastructure_commitment_usd_min": 175000000,
            "forecast_construction_jobs_min_exclusive": 4000,
            "forecast_long_term_jobs_min_exclusive": 1000
          },
          "notes": [
            "Nearly1GWis AI capacity, not exact measured utility load.4.5GWStargatepartnership and40BcombinedFrontierinvestment are broader scopes. Proposed dedicated utility rate not reviewed approved tariff; no guarantee other ratepayers unaffected. Renewable generation is separate.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/",
              "host": "vantage-dc.com",
              "date": "2025-10-22",
              "published": "2025-10-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "government-primary-review-round7-2026-10-14.json",
          "scope": "Wisconsin named certificate register with scoped building descriptions",
          "fields": {
            "certification_register_as_of": "2025-10-31",
            "listed_certifications": [
              {
                "entity": "Epic Hosting LLC",
                "date": "2024-09-24",
                "location": "Milky Way,Verona,WI",
                "scope": "Utility Building3and additions"
              },
              {
                "entity": "Degas LLC",
                "date": "2025-02-18",
                "location": "County RoadA,Beaver Dam,WI",
                "scope": "to be constructed"
              },
              {
                "entity": "Oracle America Cloud Services LLC,formerly Green Chile Ventures LLC",
                "date": "2025-10-31",
                "location": "Port Washington,WI",
                "scope": "four buildings at531,533,701and723E Lake Drive"
              }
            ]
          },
          "notes": [
            "Register is dated October31,2025; guidance law cut-off June25,2026 is not updated certificate verification. Certification not completed building or dollar tax benefit paid. Degas-to-Meta exact legal-entity alias requires crosswalk; do not silently substitute. Epic utility building scope not entire campus.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.revenue.wi.gov/Pages/FAQS/ExemptionforQualifiedDataCenter.aspx",
              "host": "revenue.wi.gov",
              "date": "2026-06-25",
              "published": "2026-06-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 25",
          "scope": "The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "named_contractor_reported_construction_with_future_completion_target",
              "scope": "The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted."
            }
          },
          "notes": [
            "The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin",
              "host": "vantage-dc.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.weitz.com/groundbreaking-marks-new-era-for-data-center-infrastructure-in-wisconsin/",
              "host": "www.weitz.com",
              "published": "2025-12-18",
              "date": "2025-12-18",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Port Washington · Ozaukee · Source context reviewed",
      "status_scope": "The Weitz Company December 18, 2025 account identifies its construction work on the named Lighthouse campus in Port Washington and describes building the project. The current Vantage campus page still describes completion in 2028 as scheduled. Reported construction is the bounded contractor account, not present operation, completion of all buildings or independent verification of current progress. The release describes future environmental designs and benefits, not measured outcomes. The City page stopped at robots HTTP 403 and the project microsite stopped at a robots redirect; cached construction updates are not adopted.",
      "event_evidence": [
        {
          "date": "2025-12-18",
          "text": "The Weitz Company published its named Lighthouse construction account December 18, 2025. This is the publication date of the contractor account and does not establish an exact excavation start, completion, delivered capacity or operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.weitz.com/groundbreaking-marks-new-era-for-data-center-infrastructure-in-wisconsin/",
              "host": "www.weitz.com",
              "published": "2025-12-18",
              "date": "2025-12-18",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55089"
      }
    },
    {
      "id": "stonebridge-pacific-columbia-county-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Stonebridge Pacific AI Data Center (Columbia County)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Columbia"
      ],
      "city": "Pacific",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Describe dormant/reportedly no follow-up, not a formally withdrawn application or legally cancelled development; developer did not explain motive. Public-meeting demand preceded silence but causation is not established. Ten-billion-dollar value,400 permanent jobs and 2027 opening came from earlier exploratory statements, not current commitments. Other Pennsylvania 15 billion/569 acres and Florida 2.6 billion/1,300 acres are distinct projects. Reported July county NDA restriction is not a data center construction ban; original policy not independently reviewed. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wisconsinwatch.org/2026/08/wisconsin-10-billion-data-center-proposal-columbia-county-town-pacific-developer/",
          "host": "wisconsinwatch.org",
          "date": "2026-08-03",
          "published": "2026-08-03",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.46658,
        "lng": -89.33344,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "Wisconsin Watch reports Stonebridge stopped following up on exploratory Town of Pacific discussions, with county and town officials saying there had been no further contact for months.",
            "independently_verified_current_operating_status": null,
            "reported_stage": "dormant/no further contact reported; no formal withdrawal established"
          },
          "notes": [
            "Describe dormant/reportedly no follow-up, not a formally withdrawn application or legally cancelled development; developer did not explain motive. Public-meeting demand preceded silence but causation is not established. Ten-billion-dollar value,400 permanent jobs and 2027 opening came from earlier exploratory statements, not current commitments. Other Pennsylvania 15 billion/569 acres and Florida 2.6 billion/1,300 acres are distinct projects. Reported July county NDA restriction is not a data center construction ban; original policy not independently reviewed.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wisconsinwatch.org/2026/08/wisconsin-10-billion-data-center-proposal-columbia-county-town-pacific-developer/",
              "host": "wisconsinwatch.org",
              "date": "2026-08-03",
              "published": "2026-08-03",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Pacific · Columbia · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55021"
      }
    },
    {
      "id": "supranet-madison-wi",
      "state": "wi",
      "kind": "facility",
      "name": "SupraNet Madison Data Center",
      "group": "operating",
      "status": "Reported service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dane"
      ],
      "city": "Madison",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. SupraNet Madison facility services, contact-location scope held. Companycontactaddressnotexplicitserverfacilitypoint. GenericMadisoncolocationcloudserviceswithoutnumericITMW/area/originalopening. SOC2TypeIIoperatorreportnotindependentrestrictedreportread. Noquote/pricing/currentcustomtariffadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.supranet.net/cloud-solutions/",
          "host": "supranet.net",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 43.09817,
        "lng": -89.39464,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "SupraNet Madison facility services, contact-location scope held",
          "fields": {
            "operator": "SupraNet",
            "advertised_data_center_market": "Madison, Wisconsin",
            "published_corporate_contact_address": "8000 Excelsior Drive, Suite204, Madison, Wisconsin53717"
          },
          "notes": [
            "Companycontactaddressnotexplicitserverfacilitypoint. GenericMadisoncolocationcloudserviceswithoutnumericITMW/area/originalopening. SOC2TypeIIoperatorreportnotindependentrestrictedreportread. Noquote/pricing/currentcustomtariffadopted.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.supranet.net/cloud-solutions/",
              "host": "supranet.net",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The current original cloud solutions page explicitly describes Madison data center services, current colocation, platform hosting and technical support for customer infrastructure. This supports reported service at the named Madison facility within the provider account. The substantive content is outside the page main element and was read from the full raw body; the short footer alone is not the evidence. Certification, redundancy, quoted prices and technical marketing are not independently certified or promoted as new quantities, roles or measured performance. No exact original opening day is verified.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_current_madison_services",
              "scope": "The current original cloud solutions page explicitly describes Madison data center services, current colocation, platform hosting and technical support for customer infrastructure. This supports reported service at the named Madison facility within the provider account. The substantive content is outside the page main element and was read from the full raw body; the short footer alone is not the evidence. Certification, redundancy, quoted prices and technical marketing are not independently certified or promoted as new quantities, roles or measured performance. No exact original opening day is verified."
            },
            "source_read_scope": {
              "original_full_raw_body_service_sections_read": true,
              "main_element_was_footer_only_not_complete_body": true,
              "named_madison_current_colocation_and_hosting": true,
              "no_form_or_contact_submitted": true,
              "no_quantity_or_role_export": true
            }
          },
          "notes": [
            "The current original cloud solutions page explicitly describes Madison data center services, current colocation, platform hosting and technical support for customer infrastructure. This supports reported service at the named Madison facility within the provider account. The substantive content is outside the page main element and was read from the full raw body; the short footer alone is not the evidence. Certification, redundancy, quoted prices and technical marketing are not independently certified or promoted as new quantities, roles or measured performance. No exact original opening day is verified.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://www.supranet.net/cloud-solutions/",
              "host": "www.supranet.net",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Madison · Dane · Source context reviewed",
      "status_scope": "The current original cloud solutions page explicitly describes Madison data center services, current colocation, platform hosting and technical support for customer infrastructure. This supports reported service at the named Madison facility within the provider account. The substantive content is outside the page main element and was read from the full raw body; the short footer alone is not the evidence. Certification, redundancy, quoted prices and technical marketing are not independently certified or promoted as new quantities, roles or measured performance. No exact original opening day is verified.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55025"
      }
    },
    {
      "id": "tierpoint-milwaukee-wi",
      "state": "wi",
      "kind": "facility",
      "name": "TierPoint Milwaukee",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Milwaukee"
      ],
      "city": "Milwaukee",
      "address": "",
      "who": "TierPoint",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.tierpoint.com/data-centers/wisconsin/milwaukee/",
          "host": "tierpoint.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 42.99004,
        "lng": -87.96545,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-specifications-round3-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "gross_area_sqft": 28000,
            "gross_area_is_lower_bound": true,
            "raised_floor_sqft": 3600,
            "raised_floor_is_lower_bound": true,
            "backup_generator_configuration_source_statement": "Two 1 MW, redundant generators and one 500 kW generator",
            "current_operator_listing": "Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."
          },
          "notes": [
            "Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/wisconsin/milwaukee/",
              "host": "tierpoint.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "TierPoint lists colocation and managed services at its Milwaukee location. This supports an operator-listed colocation service label, not an opening date, full energized capacity, independently verified certification, legal ownership or a surveyed parcel.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "TierPoint lists colocation and managed services at its Milwaukee location. This supports an operator-listed colocation service label, not an opening date, full energized capacity, independently verified certification, legal ownership or a surveyed parcel."
            }
          },
          "notes": [
            "Named main-body introduction, current product-availability passage and physical-location block. Promotional guarantees, technical totals and certifications were not adopted."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/wisconsin/milwaukee/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 06, October 23, 2026",
          "scope": "TierPoint presents this named facility as part of its own colocation service network on its first party facility page. Operator is the attributed provider brand role, not an independently established legal operating entity or property owner. No status, location, physical date, technical figure, certification or environmental outcome is promoted.",
          "fields": {
            "company_association": {
              "name": "TierPoint",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "TierPoint presents this named facility as part of its own colocation service network on its first party facility page. Operator is the attributed provider brand role, not an independently established legal operating entity or property owner. No status, location, physical date, technical figure, certification or environmental outcome is promoted."
            },
            "provider_role": "operator"
          },
          "notes": [
            "TierPoint presents this named facility as part of its own colocation service network on its first party facility page. Operator is the attributed provider brand role, not an independently established legal operating entity or property owner. No status, location, physical date, technical figure, certification or environmental outcome is promoted.",
            "Source dates remain separate from physical milestones and the retained status field."
          ],
          "sources": [
            {
              "url": "https://www.tierpoint.com/data-centers/wisconsin/milwaukee/",
              "host": "www.tierpoint.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "First party named facility page, reviewed named service or development context"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Milwaukee · Milwaukee · Source context reviewed",
      "status_scope": "TierPoint lists colocation and managed services at its Milwaukee location. This supports an operator-listed colocation service label, not an opening date, full energized capacity, independently verified certification, legal ownership or a surveyed parcel.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55079"
      }
    },
    {
      "id": "town-of-janesville-data-center-rock-county-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Town of Janesville Data Center Inquiry (Polzin/Fenric Roads)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Rock"
      ],
      "city": "Janesville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. KathrynLarson Spectrum May13,2026 originaltown/Countyofficialinterviews: TownofJanesville80acredevelopmentcontact NOFORMALAPPLICATION, consultingfirmunnamed. PRE-applicationnotice notpermitapplication/counterpartlease. CityofJanesvilleformerGM andTownofBeloitMetaquarry areSEPARATEproposals, notsamejurisdiction/operator. Rough100petition signatures isclerkhearsay, notvalidatedsignaturecount. No currenttenant/MW/approval/operations. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://spectrumnews1.com/wi/milwaukee/news/2026/05/13/town-of-janesville--data-center--rock-county--paul-terpstra--petition",
          "host": "spectrumnews1.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://townofjanesville.org/",
          "host": "townofjanesville.org",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 42.68326,
        "lng": -89.08452,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json",
          "scope": "Original reporter/issuer named-project context, with inference and stages explicit.",
          "fields": {},
          "notes": [
            "KathrynLarson Spectrum May13,2026 originaltown/Countyofficialinterviews: TownofJanesville80acredevelopmentcontact NOFORMALAPPLICATION, consultingfirmunnamed. PRE-applicationnotice notpermitapplication/counterpartlease. CityofJanesvilleformerGM andTownofBeloitMetaquarry areSEPARATEproposals, notsamejurisdiction/operator. Rough100petition signatures isclerkhearsay, notvalidatedsignaturecount. No currenttenant/MW/approval/operations.",
            "Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."
          ],
          "sources": [
            {
              "url": "https://spectrumnews1.com/wi/milwaukee/news/2026/05/13/town-of-janesville--data-center--rock-county--paul-terpstra--petition",
              "host": "spectrumnews1.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 59",
          "scope": "The current original Town home lists an ad hoc data center committee sign up form and general government navigation. It does not substantively identify an exact developer, parcel, completed project vote or physical computing stage in the selected body. Committee recruitment and election dates do not establish a project hearing or computing operation. City of Janesville is a different municipality and is not substituted for the Town. No subscription, form, email or contact request was submitted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "official_town_committee_navigation_exact_project_stage_held",
              "scope": "The current original Town home lists an ad hoc data center committee sign up form and general government navigation. It does not substantively identify an exact developer, parcel, completed project vote or physical computing stage in the selected body. Committee recruitment and election dates do not establish a project hearing or computing operation. City of Janesville is a different municipality and is not substituted for the Town. No subscription, form, email or contact request was submitted."
            },
            "source_read_scope": {
              "current_original_town_home_main_body_read": true,
              "committee_recruitment_not_project_approval": true,
              "town_not_city_janesville": true,
              "no_subscriptions_or_contact": true
            }
          },
          "notes": [
            "The current original Town home lists an ad hoc data center committee sign up form and general government navigation. It does not substantively identify an exact developer, parcel, completed project vote or physical computing stage in the selected body. Committee recruitment and election dates do not establish a project hearing or computing operation. City of Janesville is a different municipality and is not substituted for the Town. No subscription, form, email or contact request was submitted.",
            "Existing location, jurisdiction, provider roles, identities, quantities and physical opening dates remain unchanged. Proposal and administrative evidence do not certify computing operation."
          ],
          "sources": [
            {
              "url": "https://townofjanesville.org/",
              "host": "townofjanesville.org",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Janesville · Rock · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55105"
      }
    },
    {
      "id": "us-signal-wi01-madison-wi",
      "state": "wi",
      "kind": "facility",
      "name": "US Signal WI01 Madison",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dane"
      ],
      "city": "Madison",
      "address": "",
      "who": "US Signal",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ussignal.com/data-centers/wi01-madison/",
          "host": "ussignal.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=222+W+Washington+Ave.%2C+Madison%2C+WI+53703&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street method and limits"
        }
      ],
      "loc": {
        "lat": 43.073114088596,
        "lng": -89.386504065746,
        "precision": "address",
        "basis": "Published US Signal facility address 222 W Washington Ave. Ste. 1, Madison, WI 53703 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "named operator source",
          "fields": {
            "operator_site_code": "WI01",
            "published_address": "222 W Washington Ave, Suite1, Madison, WI53703",
            "generator_kw": 280,
            "ups_kw": 150,
            "utility_kva": 300,
            "operator_reported_year_built": 1972
          },
          "notes": [
            "Headline zero counters not usable area or IT capacity. Generator/UPS and utility kVA retained separately; redundancy does not multiply usable IT MW. Year built not exact data-center opening.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers/wi01-madison/",
              "host": "ussignal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "US Signal lists its specifically named WI01 downtown Madison facility in its current colocation and infrastructure offering. No healthcare compliance certification is independently adopted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "US Signal lists its specifically named WI01 downtown Madison facility in its current colocation and infrastructure offering. No healthcare compliance certification is independently adopted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "US Signal lists its specifically named WI01 downtown Madison facility in its current colocation and infrastructure offering. No healthcare compliance certification is independently adopted."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers/wi01-madison/",
              "host": "ussignal.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 8, October 22, 2026",
          "scope": "Official facility street reference only. No canonical address, status, physical date, quantity, company role, jurisdiction, title, parcel, full campus or distinct building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 43.073114088596,
                "lng": -89.386504065746,
                "precision": "address",
                "basis": "Published US Signal facility address 222 W Washington Ave. Ste. 1, Madison, WI 53703 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "222 W Washington Ave. Ste. 1, Madison, WI 53703",
              "county_fips": [
                "55025"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named official facility source publishes this service address. Corporate headquarters, related locations and maps are excluded. The blank native address wrapper remains exact, with the facility address retained only in reviewed location evidence.",
            "The unique Census street match and retained county boundary agree with the existing county. A calculated street reference does not establish a roof, floor, suite, full campus boundary, parcel, title or independent physical building. Status, dates, capacity and jurisdiction remain exact.",
            "The published suite remains address context. The Census query omits Ste. 1 and does not locate a suite or floor."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers/wi01-madison/",
              "host": "ussignal.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Official named facility street address block"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=222+W+Washington+Ave.%2C+Madison%2C+WI+53703&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 27, October 23, 2026",
          "scope": "US Signal identifies the retained WI01 facility on its current provider page. Operator per source records that provider relationship. It does not establish legal property ownership, sole operation of a shared building or a separate legal operating entity. Existing identity, stage, street, county, coordinates and quantities stay unchanged. Publication date is unknown; the source check is not an opening date. Marketing service levels, certification claims and animated zero counters are not adopted as measured facility facts.",
          "fields": {
            "company_association": {
              "name": "US Signal",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "US Signal identifies the retained WI01 facility on its current provider page. Operator per source records that provider relationship. It does not establish legal property ownership, sole operation of a shared building or a separate legal operating entity. Existing identity, stage, street, county, coordinates and quantities stay unchanged. Publication date is unknown; the source check is not an opening date. Marketing service levels, certification claims and animated zero counters are not adopted as measured facility facts."
            },
            "provider_role": "operator"
          },
          "notes": [
            "US Signal identifies the retained WI01 facility on its current provider page. Operator per source records that provider relationship. It does not establish legal property ownership, sole operation of a shared building or a separate legal operating entity. Existing identity, stage, street, county, coordinates and quantities stay unchanged. Publication date is unknown; the source check is not an opening date. Marketing service levels, certification claims and animated zero counters are not adopted as measured facility facts."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers/wi01-madison/",
              "host": "ussignal.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current named WI01 provider relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Madison · Dane · Source context reviewed",
      "status_scope": "US Signal lists its specifically named WI01 downtown Madison facility in its current colocation and infrastructure offering. No healthcare compliance certification is independently adopted. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    },
    {
      "id": "us-signal-wi02-fitchburg-wi",
      "state": "wi",
      "kind": "facility",
      "name": "US Signal WI02 Madison (Fitchburg)",
      "group": "operating",
      "status": "Operator-listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Dane"
      ],
      "city": "Fitchburg",
      "address": "",
      "who": "US Signal",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. operator location index only. Network hub supplies no exact addresses or facility MW for the three bound records. 17 is operator network count, not three building capacities or independently reconciled census. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ussignal.com/data-centers",
          "host": "ussignal.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://ussignal.com/data-centers/wi02-madison/",
          "host": "ussignal.com",
          "published": "",
          "date": "",
          "checked": "2026-10-19",
          "label": "Operator source for the qualified stage"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5515+Nobel+Drive%2C+Fitchburg%2C+WI+53711&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street range and county context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-22",
          "label": "Census calculated street method and limits"
        }
      ],
      "loc": {
        "lat": 42.995234882883,
        "lng": -89.423208142379,
        "precision": "address",
        "basis": "Published US Signal facility address 5515 Nobel Drive, Fitchburg, WI 53711 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
      },
      "reviewed_evidence": [
        {
          "overlay": "captured-operator-review-round6-2026-10-14.json",
          "scope": "operator location index only",
          "fields": {
            "named_locations": [
              "MI01 Grand Rapids",
              "MN01 Minneapolis",
              "WI02 Madison"
            ],
            "operator_network_data_center_count": 17
          },
          "notes": [
            "Network hub supplies no exact addresses or facility MW for the three bound records. 17 is operator network count, not three building capacities or independently reconciled census.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers",
              "host": "ussignal.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "orchestra-status-2026-10-19",
          "scope": "US Signal lists WI02 in Fitchburg as a current purpose-built counterpart to WI01 for customer scaling in the Madison market. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "operator_listed_colocation_service",
              "scope": "US Signal lists WI02 in Fitchburg as a current purpose-built counterpart to WI01 for customer scaling in the Madison market. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
            }
          },
          "notes": [
            "US Signal lists WI02 in Fitchburg as a current purpose-built counterpart to WI01 for customer scaling in the Madison market."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers/wi02-madison/",
              "host": "ussignal.com",
              "published": "",
              "date": "",
              "checked": "2026-10-19",
              "label": "Operator source for the qualified stage"
            }
          ],
          "checked": "2026-10-19",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 8, October 22, 2026",
          "scope": "Official facility street reference only. No canonical address, status, physical date, quantity, company role, jurisdiction, title, parcel, full campus or distinct building identity is adopted.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lat": 42.995234882883,
                "lng": -89.423208142379,
                "precision": "address",
                "basis": "Published US Signal facility address 5515 Nobel Drive, Fitchburg, WI 53711 matched to one Census street range inside the existing county. Calculated street reference, not a surveyed parcel, roof, suite, floor, full campus or property ownership finding."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "5515 Nobel Drive, Fitchburg, WI 53711",
              "county_fips": [
                "55025"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The named official facility source publishes this service address. Corporate headquarters, related locations and maps are excluded. The blank native address wrapper remains exact, with the facility address retained only in reviewed location evidence.",
            "The unique Census street match and retained county boundary agree with the existing county. A calculated street reference does not establish a roof, floor, suite, full campus boundary, parcel, title or independent physical building. Status, dates, capacity and jurisdiction remain exact."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers/wi02-madison/",
              "host": "ussignal.com",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Official named facility street address block"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=5515+Nobel+Drive%2C+Fitchburg%2C+WI+53711&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street range and county context"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/Geocoding_Services_API.html",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-22",
              "label": "Census calculated street method and limits"
            }
          ],
          "checked": "2026-10-22",
          "whole_record_certified": false
        },
        {
          "overlay": "Company role source check 27, October 23, 2026",
          "scope": "US Signal identifies the retained WI02 facility on its current provider page. Operator per source records that provider relationship. It does not establish legal property ownership, sole operation of a shared building or a separate legal operating entity. Existing identity, stage, street, county, coordinates and quantities stay unchanged. Publication date is unknown; the source check is not an opening date. Marketing service levels, certification claims and animated zero counters are not adopted as measured facility facts.",
          "fields": {
            "company_association": {
              "name": "US Signal",
              "role": "operator",
              "identity_scope": "provider_brand_only",
              "scope": "US Signal identifies the retained WI02 facility on its current provider page. Operator per source records that provider relationship. It does not establish legal property ownership, sole operation of a shared building or a separate legal operating entity. Existing identity, stage, street, county, coordinates and quantities stay unchanged. Publication date is unknown; the source check is not an opening date. Marketing service levels, certification claims and animated zero counters are not adopted as measured facility facts."
            },
            "provider_role": "operator"
          },
          "notes": [
            "US Signal identifies the retained WI02 facility on its current provider page. Operator per source records that provider relationship. It does not establish legal property ownership, sole operation of a shared building or a separate legal operating entity. Existing identity, stage, street, county, coordinates and quantities stay unchanged. Publication date is unknown; the source check is not an opening date. Marketing service levels, certification claims and animated zero counters are not adopted as measured facility facts."
          ],
          "sources": [
            {
              "url": "https://ussignal.com/data-centers/wi02-madison/",
              "host": "ussignal.com",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Current named WI02 provider relationship"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Published address reference, not a surveyed building or parcel",
      "summary": "Fitchburg · Dane · Source context reviewed",
      "status_scope": "US Signal lists WI02 in Fitchburg as a current purpose-built counterpart to WI01 for customer scaling in the Madison market. This supports only the qualified stage described by the source, not an opening date, every hall being operational, full energized capacity, independently verified certification, legal ownership or parcel accuracy."
    },
    {
      "id": "pch-wi-holdings-wisconsin-rapids-wood-county-wi",
      "state": "wi",
      "kind": "facility",
      "name": "Wisconsin Rapids Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Wood"
      ],
      "city": "Wisconsin Rapids",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. City timeline says October5 council adopted recommendations including12-month development moratorium; signed ordinance/effective scope/exemptions not yet retained. City process says commission recommendation proceeds to council; do not report September16 as final countywide ban or assume October20 outcome. City says it has no legal/financial partnership or NDA with developer. Private land marketing and municipal processing are separate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-09-16",
          "The City reports that the Planning Commission held the September 16, 2026 hearing on the DC Rapids application and denied it. The same City process description separates that body recommendation from Council action. The exact later Council outcome is not established by this review."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wirapids.gov/612/Papermill-Redevelopment",
          "host": "wirapids.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.wirapids.gov/DocumentCenter/View/2706/MC-1415-Ordinance-Amendment---Data-Centers-PDF",
          "host": "www.wirapids.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        },
        {
          "url": "https://www.wirapids.gov/DocumentCenter/View/3124/2026-10-05-Special-Common-Council-Agenda-Packet?bidId=",
          "host": "www.wirapids.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 44.47013,
        "lng": -90.05763,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round24-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "reported_context": "City timeline names PCH WI Holdings, PNK and DC Rapids LLC as names used for applicant submissions; September16 Planning Commission denied application, with possible Common Council action October20 still ahead.",
            "application_date_reported_by_city": "2026-04-27",
            "planning_commission_denial_date_reported_by_city": "2026-09-16",
            "moratorium_approval_date_reported_by_city": "2026-10-05",
            "common_council_possible_action_date": "2026-10-20",
            "final_cup_outcome_verified": false
          },
          "notes": [
            "City timeline says October5 council adopted recommendations including12-month development moratorium; signed ordinance/effective scope/exemptions not yet retained.",
            "City process says commission recommendation proceeds to council; do not report September16 as final countywide ban or assume October20 outcome.",
            "City says it has no legal/financial partnership or NDA with developer. Private land marketing and municipal processing are separate.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wirapids.gov/612/Papermill-Redevelopment",
              "host": "wirapids.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 25",
          "scope": "The City current papermill page explicitly groups PCH WI Holdings, PNK and DC Rapids submissions for its data center application at 950 Fourth Avenue North. It reports the Planning Commission denied the application at the September 16, 2026 hearing but separately describes that body making a recommendation before Council action. The same page still says Council may act October 20. The later final Council outcome was not captured, so no final denial, approval or physical stage is adopted. Existing paper converting and power activities on the redevelopment site are not data center operation. The City reports October 5 moratorium adoption, but the reviewed agenda packet contains unsigned proposed text with blanks and expressly excludes conditional use applications and earlier submissions. Its draft is not certified as the final ordinance or used to call this application paused. The signed earlier data center amendment was adopted April 14, approved April 21 and published April 24, 2026, with effectiveness conditioned on passage and publication. Its bounded standards are City requirements, not verified individual compliance, all of Wood County law or a complete current code audit.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "planning_commission_denial_report_not_final_council_disposition",
              "scope": "The City current papermill page explicitly groups PCH WI Holdings, PNK and DC Rapids submissions for its data center application at 950 Fourth Avenue North. It reports the Planning Commission denied the application at the September 16, 2026 hearing but separately describes that body making a recommendation before Council action. The same page still says Council may act October 20. The later final Council outcome was not captured, so no final denial, approval or physical stage is adopted. Existing paper converting and power activities on the redevelopment site are not data center operation. The City reports October 5 moratorium adoption, but the reviewed agenda packet contains unsigned proposed text with blanks and expressly excludes conditional use applications and earlier submissions. Its draft is not certified as the final ordinance or used to call this application paused. The signed earlier data center amendment was adopted April 14, approved April 21 and published April 24, 2026, with effectiveness conditioned on passage and publication. Its bounded standards are City requirements, not verified individual compliance, all of Wood County law or a complete current code audit."
            },
            "local_instrument_scope": {
              "april_instrument_all_three_signed_pages_visually_read": true,
              "adopted_on": "2026-04-14",
              "approved_on": "2026-04-21",
              "published_on": "2026-04-24",
              "effectiveness_requires_passage_and_publication": true,
              "principal_building_residential_separation_feet": 400,
              "liquid_cooling_closed_or_recycled_water_required": true,
              "generator_testing_weekdays_10_to_16": true,
              "continuous_generator_use_except_power_outage_prohibited": true,
              "noise_study_and_utility_verification_requirements_not_compliance_finding": true,
              "october_packet_pdf_pages_visually_read": [
                37,
                40,
                42
              ],
              "october_packet_unsigned_blank_instrument_not_final": true,
              "draft_excludes_conditional_use_and_prior_submissions": true,
              "final_october20_council_outcome_unknown": true
            }
          },
          "notes": [
            "The City current papermill page explicitly groups PCH WI Holdings, PNK and DC Rapids submissions for its data center application at 950 Fourth Avenue North. It reports the Planning Commission denied the application at the September 16, 2026 hearing but separately describes that body making a recommendation before Council action. The same page still says Council may act October 20. The later final Council outcome was not captured, so no final denial, approval or physical stage is adopted. Existing paper converting and power activities on the redevelopment site are not data center operation. The City reports October 5 moratorium adoption, but the reviewed agenda packet contains unsigned proposed text with blanks and expressly excludes conditional use applications and earlier submissions. Its draft is not certified as the final ordinance or used to call this application paused. The signed earlier data center amendment was adopted April 14, approved April 21 and published April 24, 2026, with effectiveness conditioned on passage and publication. Its bounded standards are City requirements, not verified individual compliance, all of Wood County law or a complete current code audit.",
            "The review preserves existing identity, roles, locations, jurisdictions, quantities and physical opening fields. Source publication, checked dates and physical milestones remain distinct."
          ],
          "sources": [
            {
              "url": "https://www.wirapids.gov/612/Papermill-Redevelopment",
              "host": "www.wirapids.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.wirapids.gov/DocumentCenter/View/2706/MC-1415-Ordinance-Amendment---Data-Centers-PDF",
              "host": "www.wirapids.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            },
            {
              "url": "https://www.wirapids.gov/DocumentCenter/View/3124/2026-10-05-Special-Common-Council-Agenda-Packet?bidId=",
              "host": "www.wirapids.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wisconsin Rapids · Wood · Source context reviewed",
      "event_evidence": [
        {
          "date": "2026-09-16",
          "text": "The City reports that the Planning Commission held the September 16, 2026 hearing on the DC Rapids application and denied it. The same City process description separates that body recommendation from Council action. The exact later Council outcome is not established by this review.",
          "kind": "hearing",
          "sources": [
            {
              "url": "https://www.wirapids.gov/612/Papermill-Redevelopment",
              "host": "www.wirapids.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "55141"
      }
    },
    {
      "id": "uwsp-src-campus-data-center-stevens-point-wi",
      "state": "wi",
      "kind": "facility",
      "name": "UW Stevens Point SRC Campus Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "crypto": false,
      "type": "Data center research context",
      "counties": [
        "Portage"
      ],
      "city": "Stevens Point",
      "address": "",
      "who": "University of Wisconsin Stevens Point",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
      "date": "",
      "events": [
        [
          "2026-10-25",
          "Added to the atlas. Compilation date only, not opening or construction."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.uwsp.edu/news/article/library-and-student-resource-center/",
          "host": "www.uwsp.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        },
        {
          "url": "https://www.uwsp.edu/emergency-management/portage-county-community-alert/",
          "host": "www.uwsp.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Official source retained for premises or county context"
        }
      ],
      "loc": {
        "lat": 44.47607,
        "lng": -89.50144,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Stevens Point sourced data center research context. County level only.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 3 inherited discovery review 16",
          "scope": "Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
          "fields": {
            "source_context": {
              "name": "UW Stevens Point SRC Campus Data Center",
              "operator": "University of Wisconsin Stevens Point",
              "scope": "Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
              "address": "",
              "exact_street_unpublished": true
            },
            "county_association": {
              "county": "Portage",
              "county_fips": "55097",
              "scope": "University emergency management page explicitly says StevensPoint campus resides in PortageCounty. Campus context supports county association only."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-25",
              "scope": "Intended compilation day only. Must equal actual admission day before Native commit; never a physical milestone."
            }
          },
          "notes": [
            "Official source identifies a named physical or planned data center context. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
            "Historical forecasts, permits, funding and building occupancy do not establish current data center operation."
          ],
          "sources": [
            {
              "url": "https://www.uwsp.edu/news/article/library-and-student-resource-center/",
              "host": "www.uwsp.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Official source retained for premises or county context"
            },
            {
              "url": "https://www.uwsp.edu/emergency-management/portage-county-community-alert/",
              "host": "www.uwsp.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Official source retained for premises or county context"
            }
          ],
          "checked": "2026-10-25",
          "whole_record_certified": false
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "55097"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
