{
  "schema_version": 1,
  "source_compilation_context": {
    "wv": {
      "attribution": {
        "inventory": {
          "name": "Compute Atlas",
          "creator": "Edward Kubiak",
          "url": "https://www.compute-atlas.com/api",
          "license": "CC BY 4.0",
          "license_url": "https://creativecommons.org/licenses/by/4.0/",
          "snapshot_url": "https://www.compute-atlas.com/api/facilities",
          "retrieved": "2026-10-14",
          "sha256": "79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37",
          "changes": "Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."
        },
        "counties": "U.S. Census Bureau county boundaries (public domain)",
        "research": "Field-specific source context. See the linked source and limits on each record."
      },
      "source_data_url": "https://datacentersatlas.com/data/wv.json",
      "updated": "2026-10-26"
    }
  },
  "scope": "Source compiled state collection. Research records retain their sources, dates and location limits. Counts are not a census of operating buildings. Company name links alone do not establish ownership or operation.",
  "collection": {
    "kind": "states",
    "key": "wv",
    "label": "West Virginia"
  },
  "records": [
    {
      "id": "google-putnam-county-campus-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Google Putnam County Data Center",
      "group": "proposed",
      "status": "Proposed",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Putnam"
      ],
      "city": "Buffalo",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Google Buffalo proposed campus identity without generic-stat transfer. 688Mannualstateactivity/9supportedjobsperdirect/1000plusconstruction/examples are generic comparison scopes, not approved Buffalo campus estimates. No exact numeric IT, capex, opening date, final permit or historic-preservation clearance in reviewed project text. Claims about rate effects not independent tariff findings. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Named-site current agency/operator stage, reviewed October 15, 2026. Historic-preservation coordination and a proposed site plan are not final approval, construction or operation. Analogous projects’ employment and salary figures are not this project’s realized totals. Publication date of this current page is not established; the review date is not an event date. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://buffalowvdatacenter.com/",
          "host": "buffalowvdatacenter.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.buffalowvdatacenter.com/",
          "host": "buffalowvdatacenter.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.50868,
        "lng": -81.90895,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "primary-source-review-round9-2026-10-14.json",
          "scope": "Google Buffalo proposed campus identity without generic-stat transfer",
          "fields": {
            "operator": "Google",
            "project_locality": "Buffalo, Putnam County, West Virginia",
            "developer_described_stage": "early-stage campus planning with historic-preservation coordination"
          },
          "notes": [
            "688Mannualstateactivity/9supportedjobsperdirect/1000plusconstruction/examples are generic comparison scopes, not approved Buffalo campus estimates. No exact numeric IT, capex, opening date, final permit or historic-preservation clearance in reviewed project text. Claims about rate effects not independent tariff findings.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://buffalowvdatacenter.com/",
              "host": "buffalowvdatacenter.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Atlas targeted primary-source follow-up",
          "scope": "Named-site current agency/operator stage, reviewed October 15, 2026",
          "fields": {
            "current_status": "proposed",
            "status_basis": "The Google project site says it is advancing early plans for the Buffalo/Putnam County campus."
          },
          "notes": [
            "Historic-preservation coordination and a proposed site plan are not final approval, construction or operation. Analogous projects’ employment and salary figures are not this project’s realized totals. Publication date of this current page is not established; the review date is not an event date."
          ],
          "sources": [
            {
              "url": "https://www.buffalowvdatacenter.com/",
              "host": "buffalowvdatacenter.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "checked": "2026-10-15",
          "capture_sha256": "a2e02ccfab712feb846af8ed4359dce8b5b6a660871b8240de6ba09174c66ba2",
          "events": [],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Buffalo · Putnam · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54079"
      }
    },
    {
      "id": "adams-fork-harless-datacenter-logan-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Adams Fork Energy Campus Data Center (Harless Industrial Park, Holden)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Logan"
      ],
      "city": "Holden",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AdamsFork two proposedcampuses and modeled-energy limits. Two reportedOctober2025permits notdirectlyreviewed; no proofallDCpermits orcurrentconstruction.2457MWmayrelatepowerplantscope; do notcertifycriticalIT.4.914GWtimes8760times70percent yields30.13 million MWh,notstated29.4M,soannualenergycalculationheld. Naturalgasestimatesconditional,notactualconsumption. Ammoniaplantseparateuse,9.8GWunpermittedvisionnotadditionaloperatingcapacity. Health/economicpredictions advocacy,notadjudicatedharm. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Historical official public meeting notice, not issued final permits.. Harless base geography says Logan County; generic notice says Mingo. Exact permit/parcel reconciliation remains open. Old original application URL returned 404, preserved in access receipts. Do not promote advocacy generation figures to IT MW.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/",
          "host": "ohiorivervalleyinstitute.org",
          "date": "2026-03-13",
          "published": "2026-03-13",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://dep.wv.gov/events/Pages/event.aspx?eventid=264",
          "host": "dep.wv.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.83064,
        "lng": -81.93477,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "AdamsFork two proposedcampuses and modeled-energy limits",
          "fields": {
            "publisher": "OhioRiverValleyInstitute",
            "separate_projects": [
              "formerTwistedGunGolfCourse nearWharncliffe",
              "HarlessIndustrialPark"
            ],
            "reported_each_electrical_capacity_mw": 2457,
            "power_basis": "advocacy consumption framing; original generation permits not independently inspected",
            "reported_future_expansion_goal_gw": 9.8
          },
          "notes": [
            "Two reportedOctober2025permits notdirectlyreviewed; no proofallDCpermits orcurrentconstruction.2457MWmayrelatepowerplantscope; do notcertifycriticalIT.4.914GWtimes8760times70percent yields30.13 million MWh,notstated29.4M,soannualenergycalculationheld. Naturalgasestimatesconditional,notactualconsumption. Ammoniaplantseparateuse,9.8GWunpermittedvisionnotadditionaloperatingcapacity. Health/economicpredictions advocacy,notadjudicatedharm.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/",
              "host": "ohiorivervalleyinstitute.org",
              "date": "2026-03-13",
              "published": "2026-03-13",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "operator-primary-review-round14-2026-10-14.json",
          "scope": "Historical official public meeting notice, not issued final permits.",
          "fields": {
            "public_meeting_date": "2025-08-18",
            "time": "18:00 to 20:00, as published; timezone not specified here",
            "application_numbers": {
              "R13-3714": "Adams Fork Harless",
              "R13-3715": "Adams Fork"
            },
            "plant_scope": "Two off-grid power generation projects. Generation capacity is not data center IT capacity.",
            "notice_geography": "Two locations described as Mingo County by this notice.",
            "final_permit_issued_verified": false
          },
          "notes": [
            "Harless base geography says Logan County; generic notice says Mingo. Exact permit/parcel reconciliation remains open. Old original application URL returned 404, preserved in access receipts. Do not promote advocacy generation figures to IT MW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dep.wv.gov/events/Pages/event.aspx?eventid=264",
              "host": "dep.wv.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "label": "Status unclear",
              "basis": "The checked WVDEP notice concerns two proposed off-grid generation facilities and draft air permits R13-3714 and R13-3715, with a meeting scheduled for August 18, 2025. It does not establish the current physical stage of either data center.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The notice places both generation locations in Mingo County. The Harless record’s inherited Logan County context remains an identity/location conflict. A search-index final-determination URL returned 404; that does not prove no final permit exists. No approval, construction, operation or geography promotion is made."
          },
          "notes": [
            "The notice places both generation locations in Mingo County. The Harless record’s inherited Logan County context remains an identity/location conflict. A search-index final-determination URL returned 404; that does not prove no final permit exists. No approval, construction, operation or geography promotion is made.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://dep.wv.gov/events/Pages/event.aspx?eventid=264",
              "host": "dep.wv.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed government evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "Selected original agency event content schedules an August 18, 2025 virtual meeting for two distinct off grid power generation permit applications associated with Adams Fork and Harless campus names. This is a historical schedule, without proof the meeting occurred, final permit disposition or computing construction or operation. The notice describes both locations as Mingo County while the inherited Harless record retains a Logan county context; that source conflict is retained without a jurisdiction or location change. An energy permit and a campus name do not independently establish a commissioned computing component or exact physical project crosswalk. The separately attempted original joint notice returned 404 and supplied no missing legal date.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_energy_permit_schedule_computing_stage_and_jurisdiction_held",
              "scope": "Selected original agency event content schedules an August 18, 2025 virtual meeting for two distinct off grid power generation permit applications associated with Adams Fork and Harless campus names. This is a historical schedule, without proof the meeting occurred, final permit disposition or computing construction or operation. The notice describes both locations as Mingo County while the inherited Harless record retains a Logan county context; that source conflict is retained without a jurisdiction or location change. An energy permit and a campus name do not independently establish a commissioned computing component or exact physical project crosswalk. The separately attempted original joint notice returned 404 and supplied no missing legal date."
            },
            "source_read_scope": {
              "selected_original_event_title_description_and_schedule_read": true,
              "not_complete_linked_permit_or_public_comment_history_review": true,
              "past_scheduled_aug18_2025_not_actual_hearing": true,
              "energy_generation_not_computing_component_operation": true,
              "agency_mingo_and_inherited_harless_logan_conflict_retained": true,
              "no_jurisdiction_role_or_location_change": true,
              "missing_original_joint_notice_not_substituted": true
            }
          },
          "notes": [
            "Selected original agency event content schedules an August 18, 2025 virtual meeting for two distinct off grid power generation permit applications associated with Adams Fork and Harless campus names. This is a historical schedule, without proof the meeting occurred, final permit disposition or computing construction or operation. The notice describes both locations as Mingo County while the inherited Harless record retains a Logan county context; that source conflict is retained without a jurisdiction or location change. An energy permit and a campus name do not independently establish a commissioned computing component or exact physical project crosswalk. The separately attempted original joint notice returned 404 and supplied no missing legal date.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://dep.wv.gov/events/Pages/event.aspx?eventid=264",
              "host": "dep.wv.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Holden · Logan · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54045"
      }
    },
    {
      "id": "adams-fork-wharncliffe-datacenter-mingo-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Adams Fork Energy Campus Data Center (Twisted Gun Golf Course, Wharncliffe)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Mingo"
      ],
      "city": "Wharncliffe",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AdamsFork two proposedcampuses and modeled-energy limits. Two reportedOctober2025permits notdirectlyreviewed; no proofallDCpermits orcurrentconstruction.2457MWmayrelatepowerplantscope; do notcertifycriticalIT.4.914GWtimes8760times70percent yields30.13 million MWh,notstated29.4M,soannualenergycalculationheld. Naturalgasestimatesconditional,notactualconsumption. Ammoniaplantseparateuse,9.8GWunpermittedvisionnotadditionaloperatingcapacity. Health/economicpredictions advocacy,notadjudicatedharm. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Historical official public meeting notice, not issued final permits.. Harless base geography says Logan County; generic notice says Mingo. Exact permit/parcel reconciliation remains open. Old original application URL returned 404, preserved in access receipts. Do not promote advocacy generation figures to IT MW.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/",
          "host": "ohiorivervalleyinstitute.org",
          "date": "2026-03-13",
          "published": "2026-03-13",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://dep.wv.gov/events/Pages/event.aspx?eventid=264",
          "host": "dep.wv.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.72776,
        "lng": -82.13548,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round13-2026-10-14.json",
          "scope": "AdamsFork two proposedcampuses and modeled-energy limits",
          "fields": {
            "publisher": "OhioRiverValleyInstitute",
            "separate_projects": [
              "formerTwistedGunGolfCourse nearWharncliffe",
              "HarlessIndustrialPark"
            ],
            "reported_each_electrical_capacity_mw": 2457,
            "power_basis": "advocacy consumption framing; original generation permits not independently inspected",
            "reported_future_expansion_goal_gw": 9.8
          },
          "notes": [
            "Two reportedOctober2025permits notdirectlyreviewed; no proofallDCpermits orcurrentconstruction.2457MWmayrelatepowerplantscope; do notcertifycriticalIT.4.914GWtimes8760times70percent yields30.13 million MWh,notstated29.4M,soannualenergycalculationheld. Naturalgasestimatesconditional,notactualconsumption. Ammoniaplantseparateuse,9.8GWunpermittedvisionnotadditionaloperatingcapacity. Health/economicpredictions advocacy,notadjudicatedharm.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/",
              "host": "ohiorivervalleyinstitute.org",
              "date": "2026-03-13",
              "published": "2026-03-13",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "operator-primary-review-round14-2026-10-14.json",
          "scope": "Historical official public meeting notice, not issued final permits.",
          "fields": {
            "public_meeting_date": "2025-08-18",
            "time": "18:00 to 20:00, as published; timezone not specified here",
            "application_numbers": {
              "R13-3714": "Adams Fork Harless",
              "R13-3715": "Adams Fork"
            },
            "plant_scope": "Two off-grid power generation projects. Generation capacity is not data center IT capacity.",
            "notice_geography": "Two locations described as Mingo County by this notice.",
            "final_permit_issued_verified": false
          },
          "notes": [
            "Harless base geography says Logan County; generic notice says Mingo. Exact permit/parcel reconciliation remains open. Old original application URL returned 404, preserved in access receipts. Do not promote advocacy generation figures to IT MW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dep.wv.gov/events/Pages/event.aspx?eventid=264",
              "host": "dep.wv.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "label": "Status unclear",
              "basis": "The checked WVDEP notice concerns two proposed off-grid generation facilities and draft air permits R13-3714 and R13-3715, with a meeting scheduled for August 18, 2025. It does not establish the current physical stage of either data center.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "The notice places both generation locations in Mingo County. The Harless record’s inherited Logan County context remains an identity/location conflict. A search-index final-determination URL returned 404; that does not prove no final permit exists. No approval, construction, operation or geography promotion is made."
          },
          "notes": [
            "The notice places both generation locations in Mingo County. The Harless record’s inherited Logan County context remains an identity/location conflict. A search-index final-determination URL returned 404; that does not prove no final permit exists. No approval, construction, operation or geography promotion is made.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://dep.wv.gov/events/Pages/event.aspx?eventid=264",
              "host": "dep.wv.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed government evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "Selected original agency event content schedules an August 18, 2025 virtual meeting for two distinct off grid power generation permit applications associated with Adams Fork and Harless campus names. This is a historical schedule, without proof the meeting occurred, final permit disposition or computing construction or operation. The notice describes both locations as Mingo County while the inherited Harless record retains a Logan county context; that source conflict is retained without a jurisdiction or location change. An energy permit and a campus name do not independently establish a commissioned computing component or exact physical project crosswalk. The separately attempted original joint notice returned 404 and supplied no missing legal date.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_energy_permit_schedule_computing_stage_and_jurisdiction_held",
              "scope": "Selected original agency event content schedules an August 18, 2025 virtual meeting for two distinct off grid power generation permit applications associated with Adams Fork and Harless campus names. This is a historical schedule, without proof the meeting occurred, final permit disposition or computing construction or operation. The notice describes both locations as Mingo County while the inherited Harless record retains a Logan county context; that source conflict is retained without a jurisdiction or location change. An energy permit and a campus name do not independently establish a commissioned computing component or exact physical project crosswalk. The separately attempted original joint notice returned 404 and supplied no missing legal date."
            },
            "source_read_scope": {
              "selected_original_event_title_description_and_schedule_read": true,
              "not_complete_linked_permit_or_public_comment_history_review": true,
              "past_scheduled_aug18_2025_not_actual_hearing": true,
              "energy_generation_not_computing_component_operation": true,
              "agency_mingo_and_inherited_harless_logan_conflict_retained": true,
              "no_jurisdiction_role_or_location_change": true,
              "missing_original_joint_notice_not_substituted": true
            }
          },
          "notes": [
            "Selected original agency event content schedules an August 18, 2025 virtual meeting for two distinct off grid power generation permit applications associated with Adams Fork and Harless campus names. This is a historical schedule, without proof the meeting occurred, final permit disposition or computing construction or operation. The notice describes both locations as Mingo County while the inherited Harless record retains a Logan county context; that source conflict is retained without a jurisdiction or location change. An energy permit and a campus name do not independently establish a commissioned computing component or exact physical project crosswalk. The separately attempted original joint notice returned 404 and supplied no missing legal date.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://dep.wv.gov/events/Pages/event.aspx?eventid=264",
              "host": "dep.wv.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wharncliffe · Mingo · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54059"
      }
    },
    {
      "id": "alpha-technologies-huntington-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Alpha Technologies Huntington Headquarters Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Cabell"
      ],
      "city": "Huntington",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Alpha named Huntington site within three-site platform. OnlyHuntingtonpreferredIDboundhere;otherlistedlocationscontextnotnewphysicalrecords. Genericcoming-soonsectionnotclearHuntingtonstatus. Multiple-megawattgeneratorsnotnumericIToravailableutilitycapacity. No originalopeningorindependentownershipverification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://myalphainnovations.com/alpha-cloud/",
          "host": "myalphainnovations.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.42038,
        "lng": -82.24157,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Alpha named Huntington site within three-site platform",
          "fields": {
            "operator": "Alpha Innovations",
            "named_sites": [
              {
                "site": "Data Center1",
                "address": "2020 Union Carbide Drive, Building6000, South Charleston, West Virginia25303"
              },
              {
                "site": "Data Center2",
                "address": "44274 Round Table Plaza, BuildingL, Ashburn, Virginia20147"
              },
              {
                "site": "Data Center3",
                "address": "1125 6th Avenue, Huntington, West Virginia25701"
              }
            ]
          },
          "notes": [
            "OnlyHuntingtonpreferredIDboundhere;otherlistedlocationscontextnotnewphysicalrecords. Genericcoming-soonsectionnotclearHuntingtonstatus. Multiple-megawattgeneratorsnotnumericIToravailableutilitycapacity. No originalopeningorindependentownershipverification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://myalphainnovations.com/alpha-cloud/",
              "host": "myalphainnovations.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "Selected original current provider overview and location roster identify a Huntington DC3 center alongside Charleston and Ashburn locations and describe general current cloud and colocation offerings. The selected page also contains a nonspecific coming soon label. This does not independently establish exact present service, completion or the inherited headquarters component crosswalk for Huntington. General company service and a roster address are not silently converted into an exact site operating claim, and legal company roles remain unchanged.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_provider_roster_exact_huntington_service_held",
              "scope": "Selected original current provider overview and location roster identify a Huntington DC3 center alongside Charleston and Ashburn locations and describe general current cloud and colocation offerings. The selected page also contains a nonspecific coming soon label. This does not independently establish exact present service, completion or the inherited headquarters component crosswalk for Huntington. General company service and a roster address are not silently converted into an exact site operating claim, and legal company roles remain unchanged."
            },
            "source_read_scope": {
              "selected_original_overview_and_three_center_roster_text_read": true,
              "not_complete_site_or_current_dc3_service_review": true,
              "generic_coming_soon_label_not_silently_assigned_to_specific_center": true,
              "no_headquarters_component_company_role_or_location_change": true
            }
          },
          "notes": [
            "Selected original current provider overview and location roster identify a Huntington DC3 center alongside Charleston and Ashburn locations and describe general current cloud and colocation offerings. The selected page also contains a nonspecific coming soon label. This does not independently establish exact present service, completion or the inherited headquarters component crosswalk for Huntington. General company service and a roster address are not silently converted into an exact site operating claim, and legal company roles remain unchanged.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://myalphainnovations.com/alpha-cloud/",
              "host": "myalphainnovations.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Huntington · Cabell · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54011"
      }
    },
    {
      "id": "alpha-technologies-south-charleston-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Alpha Technologies South Charleston DC01",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kanawha"
      ],
      "city": "South Charleston",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. City is described generically as Charleston, not precise South Charleston address. Multiple megawatt backup generators is not a numeric IT-load capacity. Operator describes DC1 as built at West Virginia Regional Technology Park and offers services. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://myalphainnovations.com/dc1/",
          "host": "myalphainnovations.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://myalphainnovations.com/alpha-cloud/",
          "host": "myalphainnovations.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 38.33612,
        "lng": -81.52845,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "marketed_service": "data center, colocation and cloud services",
            "campus": "West Virginia Regional Technology Park"
          },
          "notes": [
            "City is described generically as Charleston, not precise South Charleston address.",
            "Multiple megawatt backup generators is not a numeric IT-load capacity.",
            "Operator describes DC1 as built at West Virginia Regional Technology Park and offers services.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://myalphainnovations.com/dc1/",
              "host": "myalphainnovations.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "The complete original current DC1 page describes active computing and hosting services, and the selected original provider overview separately names the South Charleston DC1 center. Together these support operator listed colocation service at the named center scope. The Charleston market label does not move the facility into a different municipality. Advertised redundancy, audits, security compliance and pending certification are not independently certified results, and the provider branding does not change a legal company role.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_provider_named_south_charleston_dc1_service",
              "scope": "The complete original current DC1 page describes active computing and hosting services, and the selected original provider overview separately names the South Charleston DC1 center. Together these support operator listed colocation service at the named center scope. The Charleston market label does not move the facility into a different municipality. Advertised redundancy, audits, security compliance and pending certification are not independently certified results, and the provider branding does not change a legal company role."
            },
            "source_read_scope": {
              "complete_original_current_dc1_page_body_read": true,
              "original_parent_location_roster_selected_text_read": true,
              "charleston_market_name_not_municipal_reassignment": true,
              "provider_branding_not_new_legal_company_role": true,
              "no_pending_certification_uptime_or_capacity_claim_adopted": true
            }
          },
          "notes": [
            "The complete original current DC1 page describes active computing and hosting services, and the selected original provider overview separately names the South Charleston DC1 center. Together these support operator listed colocation service at the named center scope. The Charleston market label does not move the facility into a different municipality. Advertised redundancy, audits, security compliance and pending certification are not independently certified results, and the provider branding does not change a legal company role.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://myalphainnovations.com/alpha-cloud/",
              "host": "myalphainnovations.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://myalphainnovations.com/dc1/",
              "host": "myalphainnovations.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "South Charleston · Kanawha · Source context reviewed",
      "status_scope": "The complete original current DC1 page describes active computing and hosting services, and the selected original provider overview separately names the South Charleston DC1 center. Together these support operator listed colocation service at the named center scope. The Charleston market label does not move the facility into a different municipality. Advertised redundancy, audits, security compliance and pending certification are not independently certified results, and the provider branding does not change a legal company role.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54039"
      }
    },
    {
      "id": "penzance-bedington-berkeley-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Bedington Campus",
      "group": "proposed",
      "status": "Agency listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Berkeley"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Governor announcement. Designation threshold above 90 MW is not the project capacity. Planned private capital and jobs are not spent/actual. No-state-funding statement does not establish absence of all tax benefits. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2026-02-26",
          "The original Governor February 26, 2026 release announces Penzance Bedington Campus and reports a State designation. This dates the public account, without establishing an exact certificate execution day, physical construction, commissioned computing or delivered community benefits."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact",
          "host": "governor.wv.gov",
          "date": "2026-02-26",
          "published": "2026-02-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.46426,
        "lng": -78.02721,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "county": "Berkeley",
            "district": "Falling Waters",
            "planned_campus_acres": 548,
            "full_buildout_capital_usd": 4000000000,
            "full_buildout_sqft_approx": 1900000,
            "full_buildout_critical_it_mw": 600,
            "forecast_construction_jobs_approx": 1000,
            "forecast_permanent_jobs": 125,
            "designation": "High Impact Intelligence Center",
            "state_funding_statement": "No state funding used to secure the development"
          },
          "notes": [
            "Governor announcement. Designation threshold above 90 MW is not the project capacity. Planned private capital and jobs are not spent/actual. No-state-funding statement does not establish absence of all tax benefits.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact",
              "host": "governor.wv.gov",
              "date": "2026-02-26",
              "published": "2026-02-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "The complete original Governor February 26, 2026 release names Penzance Bedington Campus and describes a future computing development and approved High Impact Intelligence Center designation. This supports an agency listed proposal. Certification, projected load, reviewed engineering plans and future utility milestones are not computing construction or operation. The prospective investment, jobs, revenue allocations, reclaimed water opportunity and private funding assertions are attributed plans rather than independently measured delivered results. No legal site eligibility, installed capacity or corporate role is changed.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "governor_named_bedington_future_campus",
              "scope": "The complete original Governor February 26, 2026 release names Penzance Bedington Campus and describes a future computing development and approved High Impact Intelligence Center designation. This supports an agency listed proposal. Certification, projected load, reviewed engineering plans and future utility milestones are not computing construction or operation. The prospective investment, jobs, revenue allocations, reclaimed water opportunity and private funding assertions are attributed plans rather than independently measured delivered results. No legal site eligibility, installed capacity or corporate role is changed."
            },
            "source_read_scope": {
              "complete_original_named_governor_release_body_read": true,
              "certification_not_computing_construction_or_operation": true,
              "no_projected_load_finance_jobs_or_water_as_measured_results": true,
              "no_exact_legal_certificate_execution_day_invented": true
            }
          },
          "notes": [
            "The complete original Governor February 26, 2026 release names Penzance Bedington Campus and describes a future computing development and approved High Impact Intelligence Center designation. This supports an agency listed proposal. Certification, projected load, reviewed engineering plans and future utility milestones are not computing construction or operation. The prospective investment, jobs, revenue allocations, reclaimed water opportunity and private funding assertions are attributed plans rather than independently measured delivered results. No legal site eligibility, installed capacity or corporate role is changed.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact",
              "host": "governor.wv.gov",
              "published": "2026-02-26",
              "date": "2026-02-26",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Berkeley · Source context reviewed",
      "status_scope": "The complete original Governor February 26, 2026 release names Penzance Bedington Campus and describes a future computing development and approved High Impact Intelligence Center designation. This supports an agency listed proposal. Certification, projected load, reviewed engineering plans and future utility milestones are not computing construction or operation. The prospective investment, jobs, revenue allocations, reclaimed water opportunity and private funding assertions are attributed plans rather than independently measured delivered results. No legal site eligibility, installed capacity or corporate role is changed.",
      "event_evidence": [
        {
          "date": "2026-02-26",
          "text": "The original Governor February 26, 2026 release announces Penzance Bedington Campus and reports a State designation. This dates the public account, without establishing an exact certificate execution day, physical construction, commissioned computing or delivered community benefits.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact",
              "host": "governor.wv.gov",
              "published": "2026-02-26",
              "date": "2026-02-26",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54003"
      }
    },
    {
      "id": "qts-kearneysville-berkeley-jefferson-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Berkeley/Jefferson County Data Center Campus (QTS Kearneysville)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Berkeley"
      ],
      "city": "Kearneysville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not assign one county's approval to the whole roughly 300-acre, two-county campus. The photo is Atlanta1 and its 278 MW is not West Virginia capacity. Parcel acquisition and nearby gas/transmission do not establish executed service or operating IT. Initial water/sewer plans are not independently reviewed utility agreements; later Jefferson outcome remains unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://observerwv.com/plan-for-data-center-complex-near-kearneysville-approved/",
          "host": "observerwv.com",
          "date": "2025-04-07",
          "published": "2025-04-07",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.47629,
        "lng": -78.04034,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round30-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The Observer describes a March Berkeley County concept approval for two QTS-related parcels, while the separate Jefferson County portion had no submitted plan at publication.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Do not assign one county's approval to the whole roughly 300-acre, two-county campus. The photo is Atlanta1 and its 278 MW is not West Virginia capacity. Parcel acquisition and nearby gas/transmission do not establish executed service or operating IT. Initial water/sewer plans are not independently reviewed utility agreements; later Jefferson outcome remains unknown.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://observerwv.com/plan-for-data-center-complex-near-kearneysville-approved/",
              "host": "observerwv.com",
              "date": "2025-04-07",
              "published": "2025-04-07",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kearneysville · Berkeley · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54003"
      }
    },
    {
      "id": "blockchain-power-bens-run-tyler-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Blockchain Power Corp. Ben's Run Bitcoin Mining Site",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Tyler"
      ],
      "city": "Bens Run",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blockchain Power WV portfolio scope and future target. Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.blockchain-power.com/",
          "host": "blockchain-power.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.4656,
        "lng": -80.88508,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Blockchain Power WV portfolio scope and future target",
          "fields": {
            "operator": "Blockchain Power Corp",
            "operator_reported_energized_wv_sites": 5,
            "combined_mining_capacity_mw": 107,
            "additional_sites_in_development": 2,
            "additional_planned_capacity_mw": 74,
            "yearend_capacity_target_mw": 200,
            "target_year": 2026,
            "operator_reported_technicians_hired_trained": 45,
            "additional_2026_technician_target": 24
          },
          "notes": [
            "Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.blockchain-power.com/",
              "host": "blockchain-power.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Bens Run · Tyler · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54095"
      }
    },
    {
      "id": "blockchain-power-blacksville-monongalia-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Blockchain Power Corp. Blacksville Bitcoin Mining Site",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Monongalia"
      ],
      "city": "Blacksville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Tax exoneration is not a cash incentive grant. Original ruling not retained; company statewide power ranges, water circulation and future staffing are not exact measured Blacksville figures. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.dominionpost.com/2026/03/11/commission-approves-sizable-tax-exoneration-for-bitcoin-mining-site/",
          "host": "dominionpost.com",
          "date": "2026-03-11",
          "published": "2026-03-11",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.63027,
        "lng": -80.04606,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "Dominion Post reports county approved Blacksville property-tax exoneration after Office of Tax Appeals decision for 2025 assessment.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Tax exoneration is not a cash incentive grant. Original ruling not retained; company statewide power ranges, water circulation and future staffing are not exact measured Blacksville figures.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.dominionpost.com/2026/03/11/commission-approves-sizable-tax-exoneration-for-bitcoin-mining-site/",
              "host": "dominionpost.com",
              "date": "2026-03-11",
              "published": "2026-03-11",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Blacksville · Monongalia · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54061"
      }
    },
    {
      "id": "blockchain-power-hazelton-preston-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Blockchain Power Corp. Hazelton Bitcoin Mining Site",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Preston"
      ],
      "city": "Hazelton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blockchain Power WV portfolio scope and future target. Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.blockchain-power.com/",
          "host": "blockchain-power.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.46935,
        "lng": -79.66824,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Blockchain Power WV portfolio scope and future target",
          "fields": {
            "operator": "Blockchain Power Corp",
            "operator_reported_energized_wv_sites": 5,
            "combined_mining_capacity_mw": 107,
            "additional_sites_in_development": 2,
            "additional_planned_capacity_mw": 74,
            "yearend_capacity_target_mw": 200,
            "target_year": 2026,
            "operator_reported_technicians_hired_trained": 45,
            "additional_2026_technician_target": 24
          },
          "notes": [
            "Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.blockchain-power.com/",
              "host": "blockchain-power.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Hazelton · Preston · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54077"
      }
    },
    {
      "id": "blockchain-power-miracle-run-monongalia-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Blockchain Power Corp. Miracle Run Bitcoin Mining Site",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Monongalia"
      ],
      "city": "Miracle Run",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blockchain Power WV portfolio scope and future target. Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.blockchain-power.com/",
          "host": "blockchain-power.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.63993,
        "lng": -80.05659,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Blockchain Power WV portfolio scope and future target",
          "fields": {
            "operator": "Blockchain Power Corp",
            "operator_reported_energized_wv_sites": 5,
            "combined_mining_capacity_mw": 107,
            "additional_sites_in_development": 2,
            "additional_planned_capacity_mw": 74,
            "yearend_capacity_target_mw": 200,
            "target_year": 2026,
            "operator_reported_technicians_hired_trained": 45,
            "additional_2026_technician_target": 24
          },
          "notes": [
            "Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.blockchain-power.com/",
              "host": "blockchain-power.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Miracle Run · Monongalia · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54061"
      }
    },
    {
      "id": "blockchain-power-tunnelton-preston-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Blockchain Power Corp. Tunnelton Bitcoin Mining Site",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Preston"
      ],
      "city": "Tunnelton",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Blockchain Power WV portfolio scope and future target. Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.blockchain-power.com/",
          "host": "blockchain-power.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.48364,
        "lng": -79.68384,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Blockchain Power WV portfolio scope and future target",
          "fields": {
            "operator": "Blockchain Power Corp",
            "operator_reported_energized_wv_sites": 5,
            "combined_mining_capacity_mw": 107,
            "additional_sites_in_development": 2,
            "additional_planned_capacity_mw": 74,
            "yearend_capacity_target_mw": 200,
            "target_year": 2026,
            "operator_reported_technicians_hired_trained": 45,
            "additional_2026_technician_target": 24
          },
          "notes": [
            "Combined107MWforfiveunnamedsites,notper-boundfourIDs.107+74=181doesnotbyitselfsupport200energizedtoday. Yearendtargetnotobserved.255NorthpointeBrucetonMillsfootercontactnotfourcampuslocations. Earliesttwo-yearoperationperiodnotdated. Source12/4/2025featurelabelnotnecessarilywholepagepublication.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.blockchain-power.com/",
              "host": "blockchain-power.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Tunnelton · Preston · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54077"
      }
    },
    {
      "id": "blockware-sunpark-boone-lincoln-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Blockware Solutions SunPark Bitcoin Mining Facility",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Boone"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Sixty MW initial phase is inside 150 MW project, not additive. Ten-million-USD company plan differs from wider mixed-use investment. Q4 2022 start was anticipated, not observed. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wchstv.com/news/local/bitcoin-mining-leader-to-build-facility-as-extension-of-former-hobet-site-project",
          "host": "wchstv.com",
          "date": "2022-05-25",
          "published": "2022-05-25",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.02194,
        "lng": -81.71102,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round22-2026-10-14.json",
          "scope": "Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.",
          "fields": {
            "reported_context": "WCHS reports SEVA-issued announcement of Blockware SunPark / Hobet project, with initial phase and later total.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Sixty MW initial phase is inside 150 MW project, not additive. Ten-million-USD company plan differs from wider mixed-use investment. Q4 2022 start was anticipated, not observed.",
            "Original executed approvals, current operator disclosures and subsequent decisions take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wchstv.com/news/local/bitcoin-mining-leader-to-build-facility-as-extension-of-former-hobet-site-project",
              "host": "wchstv.com",
              "date": "2022-05-25",
              "published": "2022-05-25",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Boone · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54005"
      }
    },
    {
      "id": "citynet-bridgeport-harrison-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Citynet Bridgeport Data Center",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Harrison"
      ],
      "city": "Bridgeport",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Operator explicitly identifies four service locations, including Bridgeport. Offices can contain a colo; locations are not automatically hyperscale campuses. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Citynet two explicitly listed WV colocation sites. PittsburghAlleghenyCenterandColumbus251NeilstonothermarketscontextnotboundWVsites. No numericITMW/area.99.999percentavailabilitymarketingnotobservedperformance. Officeco-locationdoesnotmakeentireheadquartersareaDC.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.citynet.net/network-services/data-center-colocation/",
          "host": "citynet.net",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://services.wvgis.wvu.edu/arcgis/rest/services/Planning_Cadastre/WV_Parcels/MapServer/0/query?where=CountyID+%3D+%2717%27+AND+UPPER%28FullPhysicalAddress%29+LIKE+%27100+CITYNET%25%27&outFields=OBJECTID%2CGISPID%2CCountyID%2CFullOwnerName%2CFullOwnerAddress%2CFullPhysicalAddress%2CFullLegalDescription%2CCALC_ACRE&returnGeometry=true&outSR=4326&f=json",
          "host": "services.wvgis.wvu.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Exact county provided physical situs and full six vertex source parcel, distinct from owner mail"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=100+Citynet+Drive%2C+Bridgeport%2C+WV+26330&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Complete literal current street query returns zero"
        },
        {
          "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-80.2767225113727%2C39.271419288537544%2C-80.26395748862731%2C39.28130071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
          "host": "imagery.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Actually viewed source parcel setting, acquisition date unknown"
        }
      ],
      "loc": {
        "lng": -80.27034,
        "lat": 39.27636,
        "precision": "approximate",
        "basis": "Approximate calculated center of Harrison County source parcel 17-16-033B-0011-0001, independently joined to the operator colocation street at 100 Citynet Drive, Bridgeport, WV 26330. The complete current street Census query returns zero; older Platinum Drive directions remain in source history. The official physical situs is distinct from owner mail and other properties returned by owner discovery. Source tax year 2023 does not establish current title, geometry age or a physical event. This source parcel reference selects no roof, tenant floor, complete campus or whole parcel computing use. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "field-verification-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "street": "100 Citynet Drive",
            "city": "Bridgeport",
            "marketed_service": "colocation"
          },
          "notes": [
            "Operator explicitly identifies four service locations, including Bridgeport. Offices can contain a colo; locations are not automatically hyperscale campuses.",
            "Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.citynet.net/network-services/data-center-colocation/",
              "host": "citynet.net",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Citynet two explicitly listed WV colocation sites",
          "fields": {
            "operator": "Citynet",
            "named_wv_sites": [
              {
                "locality": "Bridgeport",
                "address": "100 Citynet Drive, Bridgeport, West Virginia26330",
                "scope": "data center in corporate headquarters"
              },
              {
                "locality": "Charleston",
                "address": "226 Kanawha Boulevard, Charleston, West Virginia25301",
                "scope": "data center in Charleston office"
              }
            ]
          },
          "notes": [
            "PittsburghAlleghenyCenterandColumbus251NeilstonothermarketscontextnotboundWVsites. No numericITMW/area.99.999percentavailabilitymarketingnotobservedperformance. Officeco-locationdoesnotmakeentireheadquartersareaDC.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.citynet.net/network-services/data-center-colocation/",
              "host": "citynet.net",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "The complete original current provider colocation page lists its Bridgeport center among four separate locations and offers cabinets, cages, connectivity and managed support. This supports operator listed colocation service at that named center scope. The separate centers remain distinct, and advertised uptime, redundancy and security are not independently measured or certified. No exact first commissioning day, address refinement or installed capacity is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_provider_named_bridgeport_colocation",
              "scope": "The complete original current provider colocation page lists its Bridgeport center among four separate locations and offers cabinets, cages, connectivity and managed support. This supports operator listed colocation service at that named center scope. The separate centers remain distinct, and advertised uptime, redundancy and security are not independently measured or certified. No exact first commissioning day, address refinement or installed capacity is inferred."
            },
            "source_read_scope": {
              "complete_original_current_provider_service_and_location_body_read": true,
              "separate_named_centers_not_merged": true,
              "no_uptime_redundancy_security_capacity_or_first_day_certification": true
            }
          },
          "notes": [
            "The complete original current provider colocation page lists its Bridgeport center among four separate locations and offers cabinets, cages, connectivity and managed support. This supports operator listed colocation service at that named center scope. The separate centers remain distinct, and advertised uptime, redundancy and security are not independently measured or certified. No exact first commissioning day, address refinement or installed capacity is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.citynet.net/network-services/data-center-colocation/",
              "host": "www.citynet.net",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 69, 2026-10-24",
          "scope": "Original Citynet colocation computing identity and approximate calculated center of one complete official Harrison County source parcel only. Source tax year, original Census zero and older Platinum directions remain distinct. All protected facts stay exact; no roof, tenant floor, legal title, current operation or whole campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -80.27034,
                "lat": 39.27636,
                "precision": "approximate",
                "basis": "Approximate calculated center of Harrison County source parcel 17-16-033B-0011-0001, independently joined to the operator colocation street at 100 Citynet Drive, Bridgeport, WV 26330. The complete current street Census query returns zero; older Platinum Drive directions remain in source history. The official physical situs is distinct from owner mail and other properties returned by owner discovery. Source tax year 2023 does not establish current title, geometry age or a physical event. This source parcel reference selects no roof, tenant floor, complete campus or whole parcel computing use. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Approximate county reference parcel center",
              "reference_parcel": "17-16-033B-0011-0001",
              "operator_coordinates_adopted": false,
              "census_range_adopted": false
            }
          },
          "notes": [
            "Original Citynet colocation computing identity and approximate calculated center of one complete official Harrison County source parcel only. Source tax year, original Census zero and older Platinum directions remain distinct. All protected facts stay exact; no roof, tenant floor, legal title, current operation or whole campus is certified.",
            "The inherited general area coordinate was not an independently reviewed computing source parcel reference. The original operator explicitly locates this colocation center in its purpose built headquarters and gives 100 Citynet Drive, Bridgeport, WV 26330. The exact official county provided physical address query returns one complete source parcel, GISPID 17-16-033B-0011-0001 and OBJECTID 389808. Owner mail is not the query field and three additional owner discovery parcels are not selected or unioned. The unchanged calculated center and every source vertex are inside retained Harrison County 54033. The measured correction is 157.5 metres. No physical relocation, title, current computing operation, selected roof or complete campus is certified.",
            "The setting at the calculated source parcel center shows a substantial building and drives among wooded slopes and nearby structures. It does not certify which part computes, a surveyed roof, title, a floor or a complete campus. Pixel coordinates are not adopted."
          ],
          "sources": [
            {
              "url": "https://www.citynet.net/network-services/data-center-colocation/",
              "host": "www.citynet.net",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Original colocation center inside the purpose built headquarters and complete current street"
            },
            {
              "url": "https://services.wvgis.wvu.edu/arcgis/rest/services/Planning_Cadastre/WV_Parcels/MapServer/0/query?where=CountyID+%3D+%2717%27+AND+UPPER%28FullPhysicalAddress%29+LIKE+%27100+CITYNET%25%27&outFields=OBJECTID%2CGISPID%2CCountyID%2CFullOwnerName%2CFullOwnerAddress%2CFullPhysicalAddress%2CFullLegalDescription%2CCALC_ACRE&returnGeometry=true&outSR=4326&f=json",
              "host": "services.wvgis.wvu.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Exact county provided physical situs and full six vertex source parcel, distinct from owner mail"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=100+Citynet+Drive%2C+Bridgeport%2C+WV+26330&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Complete literal current street query returns zero"
            },
            {
              "url": "https://imagery.nationalmap.gov/arcgis/rest/services/USGSNAIPPlus/ImageServer/exportImage?bbox=-80.2767225113727%2C39.271419288537544%2C-80.26395748862731%2C39.28130071146245&bboxSR=4326&imageSR=3857&size=600%2C600&format=png&f=image",
              "host": "imagery.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Actually viewed source parcel setting, acquisition date unknown"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Approximate source parcel reference, not a roof or complete campus",
      "summary": "Bridgeport · Harrison · Source context reviewed",
      "status_scope": "The complete original current provider colocation page lists its Bridgeport center among four separate locations and offers cabinets, cages, connectivity and managed support. This supports operator listed colocation service at that named center scope. The separate centers remain distinct, and advertised uptime, redundancy and security are not independently measured or certified. No exact first commissioning day, address refinement or installed capacity is inferred."
    },
    {
      "id": "citynet-charleston-kanawha-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Citynet Charleston Data Center",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kanawha"
      ],
      "city": "Charleston",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Citynet two explicitly listed WV colocation sites. PittsburghAlleghenyCenterandColumbus251NeilstonothermarketscontextnotboundWVsites. No numericITMW/area.99.999percentavailabilitymarketingnotobservedperformance. Officeco-locationdoesnotmakeentireheadquartersareaDC. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.citynet.net/network-services/data-center-colocation/",
          "host": "citynet.net",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 38.35836,
        "lng": -81.55273,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Citynet two explicitly listed WV colocation sites",
          "fields": {
            "operator": "Citynet",
            "named_wv_sites": [
              {
                "locality": "Bridgeport",
                "address": "100 Citynet Drive, Bridgeport, West Virginia26330",
                "scope": "data center in corporate headquarters"
              },
              {
                "locality": "Charleston",
                "address": "226 Kanawha Boulevard, Charleston, West Virginia25301",
                "scope": "data center in Charleston office"
              }
            ]
          },
          "notes": [
            "PittsburghAlleghenyCenterandColumbus251NeilstonothermarketscontextnotboundWVsites. No numericITMW/area.99.999percentavailabilitymarketingnotobservedperformance. Officeco-locationdoesnotmakeentireheadquartersareaDC.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.citynet.net/network-services/data-center-colocation/",
              "host": "citynet.net",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "The complete original current provider colocation page lists its Charleston center among four separate locations and offers cabinets, cages, connectivity and managed support. This supports operator listed colocation service at that named center scope. The separate centers remain distinct, and advertised uptime, redundancy and security are not independently measured or certified. No exact first commissioning day, address refinement or installed capacity is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_provider_named_charleston_colocation",
              "scope": "The complete original current provider colocation page lists its Charleston center among four separate locations and offers cabinets, cages, connectivity and managed support. This supports operator listed colocation service at that named center scope. The separate centers remain distinct, and advertised uptime, redundancy and security are not independently measured or certified. No exact first commissioning day, address refinement or installed capacity is inferred."
            },
            "source_read_scope": {
              "complete_original_current_provider_service_and_location_body_read": true,
              "separate_named_centers_not_merged": true,
              "no_uptime_redundancy_security_capacity_or_first_day_certification": true
            }
          },
          "notes": [
            "The complete original current provider colocation page lists its Charleston center among four separate locations and offers cabinets, cages, connectivity and managed support. This supports operator listed colocation service at that named center scope. The separate centers remain distinct, and advertised uptime, redundancy and security are not independently measured or certified. No exact first commissioning day, address refinement or installed capacity is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.citynet.net/network-services/data-center-colocation/",
              "host": "www.citynet.net",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Charleston · Kanawha · Source context reviewed",
      "status_scope": "The complete original current provider colocation page lists its Charleston center among four separate locations and offers cabinets, cages, connectivity and managed support. This supports operator listed colocation service at that named center scope. The separate centers remain distinct, and advertised uptime, redundancy and security are not independently measured or certified. No exact first commissioning day, address refinement or installed capacity is inferred.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54039"
      }
    },
    {
      "id": "continent-8-west-virginia-dc1-south-charleston-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Continent 8 West Virginia DC1",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Kanawha"
      ],
      "city": "South Charleston",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Continent8 two distinct WV site chronologies. Petersburgannouncementnotexactfirstserviceday. Distinctgeographiesnotonecampusexpansion. PCI/gaming-cloudregulatoryclaimsnotindependentregulatorregistercheck.30USstates/100globallocations/20brandsnotbuildingcountorMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-02-26",
          "The original Continent 8 February 26, 2024 release names the Petersburg opening and existing South Charleston service. This dates the issuer account rather than exact first computing commissioning or an independently verified current compliance certificate."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/",
          "host": "continent8.com",
          "date": "2024-02-26",
          "published": "2024-02-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.continent8.com/locations/us/west-virginia/",
          "host": "www.continent8.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 38.28974,
        "lng": -81.52438,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Continent8 two distinct WV site chronologies",
          "fields": {
            "operator": "Continent8",
            "named_sites": [
              {
                "locality": "South Charleston, West Virginia",
                "operator_reported_go_live_year": 2018
              },
              {
                "locality": "Petersburg, West Virginia",
                "opening_announced_on_or_before": "2024-02-26",
                "partner": "Seneca Rocks Regional Development Authority"
              }
            ]
          },
          "notes": [
            "Petersburgannouncementnotexactfirstserviceday. Distinctgeographiesnotonecampusexpansion. PCI/gaming-cloudregulatoryclaimsnotindependentregulatorregistercheck.30USstates/100globallocations/20brandsnotbuildingcountorMW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/",
              "host": "continent8.com",
              "date": "2024-02-26",
              "published": "2024-02-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "The complete original current provider state page explicitly offers live dual colocation facilities and installed regional cloud service. Its complete original February 26, 2024 release separately identifies South Charleston and Petersburg as the two sites. Together these support operator listed colocation service at the named South Charleston center scope. The year only 2018 start and the 2024 opening account do not establish an exact first computing day. Provider statements about gaming compliance, audits and resilience are not an independently read current regulatory certificate or measured uptime. The two centers remain separate.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_provider_dual_service_named_south_charleston",
              "scope": "The complete original current provider state page explicitly offers live dual colocation facilities and installed regional cloud service. Its complete original February 26, 2024 release separately identifies South Charleston and Petersburg as the two sites. Together these support operator listed colocation service at the named South Charleston center scope. The year only 2018 start and the 2024 opening account do not establish an exact first computing day. Provider statements about gaming compliance, audits and resilience are not an independently read current regulatory certificate or measured uptime. The two centers remain separate."
            },
            "source_read_scope": {
              "complete_original_current_state_service_and_historical_release_bodies_read": true,
              "dual_named_facilities_crosswalk_read": true,
              "year2018_only_not_invented_exact_opening_day": true,
              "no_independent_regulatory_or_uptime_certification": true
            }
          },
          "notes": [
            "The complete original current provider state page explicitly offers live dual colocation facilities and installed regional cloud service. Its complete original February 26, 2024 release separately identifies South Charleston and Petersburg as the two sites. Together these support operator listed colocation service at the named South Charleston center scope. The year only 2018 start and the 2024 opening account do not establish an exact first computing day. Provider statements about gaming compliance, audits and resilience are not an independently read current regulatory certificate or measured uptime. The two centers remain separate.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.continent8.com/locations/us/west-virginia/",
              "host": "www.continent8.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/",
              "host": "www.continent8.com",
              "published": "2024-02-26",
              "date": "2024-02-26",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "South Charleston · Kanawha · Source context reviewed",
      "status_scope": "The complete original current provider state page explicitly offers live dual colocation facilities and installed regional cloud service. Its complete original February 26, 2024 release separately identifies South Charleston and Petersburg as the two sites. Together these support operator listed colocation service at the named South Charleston center scope. The year only 2018 start and the 2024 opening account do not establish an exact first computing day. Provider statements about gaming compliance, audits and resilience are not an independently read current regulatory certificate or measured uptime. The two centers remain separate.",
      "event_evidence": [
        {
          "date": "2024-02-26",
          "text": "The original Continent 8 February 26, 2024 release names the Petersburg opening and existing South Charleston service. This dates the issuer account rather than exact first computing commissioning or an independently verified current compliance certificate.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/",
              "host": "www.continent8.com",
              "published": "2024-02-26",
              "date": "2024-02-26",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54039"
      }
    },
    {
      "id": "continent-8-west-virginia-dc2-petersburg-grant-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Continent 8 West Virginia DC2",
      "group": "operating",
      "status": "Operator listed colocation service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Grant"
      ],
      "city": "Petersburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Continent8 two distinct WV site chronologies. Petersburgannouncementnotexactfirstserviceday. Distinctgeographiesnotonecampusexpansion. PCI/gaming-cloudregulatoryclaimsnotindependentregulatorregistercheck.30USstates/100globallocations/20brandsnotbuildingcountorMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2024-02-26",
          "The original Continent 8 February 26, 2024 release names the Petersburg opening and existing South Charleston service. This dates the issuer account rather than exact first computing commissioning or an independently verified current compliance certificate."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/",
          "host": "continent8.com",
          "date": "2024-02-26",
          "published": "2024-02-26",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.continent8.com/locations/us/west-virginia/",
          "host": "www.continent8.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.10519,
        "lng": -79.19569,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Continent8 two distinct WV site chronologies",
          "fields": {
            "operator": "Continent8",
            "named_sites": [
              {
                "locality": "South Charleston, West Virginia",
                "operator_reported_go_live_year": 2018
              },
              {
                "locality": "Petersburg, West Virginia",
                "opening_announced_on_or_before": "2024-02-26",
                "partner": "Seneca Rocks Regional Development Authority"
              }
            ]
          },
          "notes": [
            "Petersburgannouncementnotexactfirstserviceday. Distinctgeographiesnotonecampusexpansion. PCI/gaming-cloudregulatoryclaimsnotindependentregulatorregistercheck.30USstates/100globallocations/20brandsnotbuildingcountorMW.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/",
              "host": "continent8.com",
              "date": "2024-02-26",
              "published": "2024-02-26",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "The complete original current provider state page explicitly offers live dual colocation facilities and installed regional cloud service. Its complete original February 26, 2024 release separately identifies South Charleston and Petersburg as the two sites. Together these support operator listed colocation service at the named Petersburg center scope. The year only 2018 start and the 2024 opening account do not establish an exact first computing day. Provider statements about gaming compliance, audits and resilience are not an independently read current regulatory certificate or measured uptime. The two centers remain separate.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_provider_dual_service_named_petersburg",
              "scope": "The complete original current provider state page explicitly offers live dual colocation facilities and installed regional cloud service. Its complete original February 26, 2024 release separately identifies South Charleston and Petersburg as the two sites. Together these support operator listed colocation service at the named Petersburg center scope. The year only 2018 start and the 2024 opening account do not establish an exact first computing day. Provider statements about gaming compliance, audits and resilience are not an independently read current regulatory certificate or measured uptime. The two centers remain separate."
            },
            "source_read_scope": {
              "complete_original_current_state_service_and_historical_release_bodies_read": true,
              "dual_named_facilities_crosswalk_read": true,
              "year2018_only_not_invented_exact_opening_day": true,
              "no_independent_regulatory_or_uptime_certification": true
            }
          },
          "notes": [
            "The complete original current provider state page explicitly offers live dual colocation facilities and installed regional cloud service. Its complete original February 26, 2024 release separately identifies South Charleston and Petersburg as the two sites. Together these support operator listed colocation service at the named Petersburg center scope. The year only 2018 start and the 2024 opening account do not establish an exact first computing day. Provider statements about gaming compliance, audits and resilience are not an independently read current regulatory certificate or measured uptime. The two centers remain separate.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.continent8.com/locations/us/west-virginia/",
              "host": "www.continent8.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/",
              "host": "www.continent8.com",
              "published": "2024-02-26",
              "date": "2024-02-26",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Petersburg · Grant · Source context reviewed",
      "status_scope": "The complete original current provider state page explicitly offers live dual colocation facilities and installed regional cloud service. Its complete original February 26, 2024 release separately identifies South Charleston and Petersburg as the two sites. Together these support operator listed colocation service at the named Petersburg center scope. The year only 2018 start and the 2024 opening account do not establish an exact first computing day. Provider statements about gaming compliance, audits and resilience are not an independently read current regulatory certificate or measured uptime. The two centers remain separate.",
      "event_evidence": [
        {
          "date": "2024-02-26",
          "text": "The original Continent 8 February 26, 2024 release names the Petersburg opening and existing South Charleston service. This dates the issuer account rather than exact first computing commissioning or an independently verified current compliance certificate.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://www.continent8.com/continent-8-technologies-doubles-down-in-west-virginia/",
              "host": "www.continent8.com",
              "published": "2024-02-26",
              "date": "2024-02-26",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54023"
      }
    },
    {
      "id": "dedispec-berkeley-springs-morgan-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Dedispec Berkeley Springs Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Morgan"
      ],
      "city": "Berkeley Springs",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Dedispec Berkeley Springs listing and old performance scope. 2016uptimenotcurrent2026performanceorSLA. AshburnconnectivitycomparisondoesnotlocateDCinVirginia. Noexactstreet,capacity,originalopeningorownershipdeedverification. Publictestdownloadsnotexercised. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://dedispec.com/wvdatacenter.php",
          "host": "dedispec.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://dedispec.com/network/",
          "host": "dedispec.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.56055,
        "lng": -78.25682,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Dedispec Berkeley Springs listing and old performance scope",
          "fields": {
            "operator": "Dedispec",
            "advertised_locality": "Berkeley Springs, West Virginia",
            "operator_described_use": [
              "dedicated servers",
              "colocation",
              "web hosting"
            ],
            "operator_historical_power_uptime_percent": 99.99,
            "operator_historical_network_uptime_percent": 99.9,
            "uptime_period_year": 2016
          },
          "notes": [
            "2016uptimenotcurrent2026performanceorSLA. AshburnconnectivitycomparisondoesnotlocateDCinVirginia. Noexactstreet,capacity,originalopeningorownershipdeedverification. Publictestdownloadsnotexercised.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://dedispec.com/wvdatacenter.php",
              "host": "dedispec.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "The original inherited West Virginia page redirects through the observed canonical network addresses to the current provider roster. The complete current roster names Kansas City, Dallas and San Jose and offers service there, but does not independently name or establish the present physical disposition of the inherited Berkeley Springs center. Absence from a selected current roster is not proof of closure. Diagnostic tools and test downloads on the page were not used, and no network address or new location is adopted.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_roster_without_exact_berkeley_springs_stage",
              "scope": "The original inherited West Virginia page redirects through the observed canonical network addresses to the current provider roster. The complete current roster names Kansas City, Dallas and San Jose and offers service there, but does not independently name or establish the present physical disposition of the inherited Berkeley Springs center. Absence from a selected current roster is not proof of closure. Diagnostic tools and test downloads on the page were not used, and no network address or new location is adopted."
            },
            "source_read_scope": {
              "original_observed_redirect_chain_followed": true,
              "complete_current_roster_body_read": true,
              "absence_from_selected_roster_not_physical_closure": true,
              "no_ping_traceroute_diagnostic_command_or_test_download_executed": true,
              "no_network_address_or_location_field_adopted": true
            }
          },
          "notes": [
            "The original inherited West Virginia page redirects through the observed canonical network addresses to the current provider roster. The complete current roster names Kansas City, Dallas and San Jose and offers service there, but does not independently name or establish the present physical disposition of the inherited Berkeley Springs center. Absence from a selected current roster is not proof of closure. Diagnostic tools and test downloads on the page were not used, and no network address or new location is adopted.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://dedispec.com/network/",
              "host": "dedispec.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Berkeley Springs · Morgan · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54065"
      }
    },
    {
      "id": "fbi-cjis-division-clarksburg-harrison-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "FBI Criminal Justice Information Services (CJIS) Division Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Harrison"
      ],
      "city": "Clarksburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. A design description does not establish whole-campus data-center floor area, power or current commissioning. The visible September 2017 article date differs from later metadata. The linked full article was not reviewed. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.som.com/?p=9976",
          "host": "som.com",
          "date": "2017-09-18",
          "published": "2017-09-18",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.28336,
        "lng": -80.37939,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "Architect SOM names the FBI and DOD Biometric Technology Center on the existing CJIS campus in Clarksburg.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "A design description does not establish whole-campus data-center floor area, power or current commissioning. The visible September 2017 article date differs from later metadata. The linked full article was not reviewed.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.som.com/?p=9976",
              "host": "som.com",
              "date": "2017-09-18",
              "published": "2017-09-18",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Clarksburg · Harrison · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54033"
      }
    },
    {
      "id": "grant-town-power-plant-crypto-mine-marion-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Grant Town Power Plant Cryptocurrency Mining Containers",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": true,
      "type": "Crypto/HPC (inventory classification)",
      "counties": [
        "Marion"
      ],
      "city": "Grant Town",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only public text was read. Encoded premium body was neither decoded nor adopted. Container appearance is not confirmation of mining operation, IT demand or a power agreement. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.timeswv.com/news/local_news/grant-town-power-plant-believed-to-be-mining-cryptocurrency-in-marion-county/article_a13502ed-4c9e-4589-8608-383e7b9d8bc3.html",
          "host": "timeswv.com",
          "date": "2026-04-16",
          "published": "2026-04-16",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.50967,
        "lng": -80.24249,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round27-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "The Times West Virginian's public first paragraph says a pair of apparent cryptocurrency containers has appeared at Grant Town power plant and recalls a rejected 2022 power-purchase-agreement buyout proposal.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Only public text was read. Encoded premium body was neither decoded nor adopted. Container appearance is not confirmation of mining operation, IT demand or a power agreement.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.timeswv.com/news/local_news/grant-town-power-plant-believed-to-be-mining-cryptocurrency-in-marion-county/article_a13502ed-4c9e-4589-8608-383e7b9d8bc3.html",
              "host": "timeswv.com",
              "date": "2026-04-16",
              "published": "2026-04-16",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Grant Town · Marion · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54049"
      }
    },
    {
      "id": "hog-lick-aggregates-white-hall-marion-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Hog Lick Aggregates Data Center / Microgrid Proposal",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Marion"
      ],
      "city": "White Hall",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. WDTV May5,2026 original reports HogLickAggregates feasibility study on277ac WhiteHall/MarionCounty WV property. Company describes preliminary study expected to take years, no development timetable. Not approved/breakingground/operating. Mine-water geothermal cooling, nearby gas power and possible carbon capture are options under study, not measuredzero-water/carbon performance or permitted plant. Adjacent I79HighTechPark NOAA supercomputing facility is separate; possible support role is not a tenant agreement or same campus. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wdtv.com/2026/05/05/local-company-proposes-data-center-marion-county/",
          "host": "wdtv.com",
          "date": "",
          "published": "",
          "checked": "2026-10-15",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.51822,
        "lng": -80.25182,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "border-states-and-named-operator-review-round53-2026-10-15.json",
          "scope": "Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.",
          "fields": {},
          "notes": [
            "WDTV May5,2026 original reports HogLickAggregates feasibility study on277ac WhiteHall/MarionCounty WV property. Company describes preliminary study expected to take years, no development timetable. Not approved/breakingground/operating.",
            "Mine-water geothermal cooling, nearby gas power and possible carbon capture are options under study, not measuredzero-water/carbon performance or permitted plant. Adjacent I79HighTechPark NOAA supercomputing facility is separate; possible support role is not a tenant agreement or same campus.",
            "Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."
          ],
          "sources": [
            {
              "url": "https://www.wdtv.com/2026/05/05/local-company-proposes-data-center-marion-county/",
              "host": "wdtv.com",
              "date": "",
              "published": "",
              "checked": "2026-10-15",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "White Hall · Marion · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54049"
      }
    },
    {
      "id": "irs-enterprise-computing-center-kearneysville-wv",
      "state": "wv",
      "kind": "facility",
      "name": "IRS Enterprise Computing Center (Martinsburg Computing Center)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Berkeley"
      ],
      "city": "Kearneysville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred response is legacy binary Office content parsed as HTML. HTTP success is not readable documentary verification. Obtain an actual readable IRS/GSA source; no fields certified here. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.irs.gov/pub/irs-procure/techexhibit1_general_loc_site_info.doc",
          "host": "irs.gov",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.energy.gov/nepa/articles/cx-032001-internal-revenue-service-martinsburg-enterprise-computing-center-espc",
          "host": "www.energy.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://www.irs.gov/pub/irs-pdf/p4801.pdf",
          "host": "www.irs.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-17",
          "label": "Reviewed source context"
        },
        {
          "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=250+Murall+Drive%2C+Kearneysville%2C+WV&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
          "host": "geocoding.geo.census.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Complete literal Census street range and county response"
        },
        {
          "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.92054859848552%2C39.392754288537546%2C-77.90776140151446%2C39.40263571146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
          "host": "basemap.nationalmap.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-23",
          "label": "Actually viewed setting with unknown image acquisition date"
        }
      ],
      "loc": {
        "lng": -77.914155,
        "lat": 39.397695,
        "precision": "address",
        "basis": "The public IRS Technical Exhibit 1 identifies the Enterprise Computing Center main building at 250 Murall Drive, Kearneysville, WV. One literal Census street range supplies only the historical filed main building street reference in Berkeley County. No annex, mail trailer, separate building, surveyed parcel or current computing operation is selected. Existing Native status remains unknown. Imagery acquisition date is unknown and may predate construction."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {},
          "notes": [
            "Preferred response is legacy binary Office content parsed as HTML. HTTP success is not readable documentary verification. Obtain an actual readable IRS/GSA source; no fields certified here.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.irs.gov/pub/irs-procure/techexhibit1_general_loc_site_info.doc",
              "host": "irs.gov",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch2",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The legacy IRS procurement exhibit identifies the Kearneysville facility, but its procurement identifier does not supply an exact publication day or current status. A September 24, 2024 DOE proposal identifies the IRS facility without confirming October 2026 operation. The 2026 IRS statistics publication concerns calendar-year 2024 processing. Historical facility identity and reporting periods are kept separate from current stage."
            }
          },
          "notes": [
            "The legacy IRS procurement exhibit identifies the Kearneysville facility, but its procurement identifier does not supply an exact publication day or current status. A September 24, 2024 DOE proposal identifies the IRS facility without confirming October 2026 operation. The 2026 IRS statistics publication concerns calendar-year 2024 processing. Historical facility identity and reporting periods are kept separate from current stage."
          ],
          "sources": [
            {
              "url": "https://www.irs.gov/pub/irs-procure/techexhibit1_general_loc_site_info.doc",
              "host": "www.irs.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://www.energy.gov/nepa/articles/cx-032001-internal-revenue-service-martinsburg-enterprise-computing-center-espc",
              "host": "www.energy.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            },
            {
              "url": "https://www.irs.gov/pub/irs-pdf/p4801.pdf",
              "host": "www.irs.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-17",
              "label": "Reviewed source context"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 2 location cohort 53, October 23, 2026",
          "scope": "Explicit source bound reference only. Existing Native status remains unknown. No current computing operation, operator role, title, owner, tenant, physical milestone, quantity, roof or complete campus is certified.",
          "fields": {
            "location_review_decision": {
              "location": {
                "lng": -77.914155,
                "lat": 39.397695,
                "precision": "address",
                "basis": "The public IRS Technical Exhibit 1 identifies the Enterprise Computing Center main building at 250 Murall Drive, Kearneysville, WV. One literal Census street range supplies only the historical filed main building street reference in Berkeley County. No annex, mail trailer, separate building, surveyed parcel or current computing operation is selected. Existing Native status remains unknown. Imagery acquisition date is unknown and may predate construction."
              },
              "reference_method": "Census interpolated street address",
              "published_address": "250 Murall Drive, Kearneysville, WV",
              "county_fips": [
                "54003"
              ],
              "operator_coordinates_adopted": false,
              "corporate_address_adopted": false
            }
          },
          "notes": [
            "The public source ties its named Enterprise Computing Center mission to the main building street. The document publication date is unknown. Occupied 1999 and occupied 1995/1997 are historical statements, not newly admitted opening dates, milestones or evidence of current computing. Solicitation TIRNO-09-R-00018 does not supply an invented publication day.",
            "Explicit source bound reference only. Existing Native status remains unknown. No current computing operation, operator role, title, owner, tenant, physical milestone, quantity, roof or complete campus is certified.",
            "The calculated street reference lies beside a large developed complex with parking, internal curved roads, wooded edges and a divided road to the south. No particular roof, annex, mail trailer, current computing operation or complete campus is selected. The historical exhibit street remains independent of the image.",
            "The original inherited general area coordinate was not a reviewed physical facility destination. The exact independent official source and bounded reference now support only the scope explicitly stated in the basis. Earlier coordinates and complete source history remain intact. This is a reference correction, not physical relocation or a new physical milestone."
          ],
          "sources": [
            {
              "url": "https://www.irs.gov/pub/irs-procure/techexhibit1_general_loc_site_info.doc",
              "host": "www.irs.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Technical Exhibit 1 General Location and Site Information, main building street only"
            },
            {
              "url": "https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=250+Murall+Drive%2C+Kearneysville%2C+WV&benchmark=Public_AR_Current&vintage=Current_Current&format=json",
              "host": "geocoding.geo.census.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Complete literal Census street range and county response"
            },
            {
              "url": "https://basemap.nationalmap.gov/arcgis/rest/services/USGSImageryOnly/MapServer/export?bbox=-77.92054859848552%2C39.392754288537546%2C-77.90776140151446%2C39.40263571146245&bboxSR=4326&imageSR=3857&size=1000%2C1000&format=png&f=image",
              "host": "basemap.nationalmap.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-23",
              "label": "Actually viewed setting with unknown image acquisition date"
            }
          ],
          "checked": "2026-10-23",
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "The complete original Energy Department September 24, 2024 page identifies the IRS Martinsburg facility at Kearneysville and proposes federal support for energy conservation measures. It does not independently establish present computing service, completed energy work, installed load or a new building opening. The inherited IRS Publication 4801 link now resolves to June 2026 tax return statistical estimates; selected cover pages confirm that it is not computing facility evidence. Exact current physical computing disposition remains held. No technical site drawing, aerial image, restricted system or account was requested.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "agency_efficiency_funding_proposal_current_computing_service_held",
              "scope": "The complete original Energy Department September 24, 2024 page identifies the IRS Martinsburg facility at Kearneysville and proposes federal support for energy conservation measures. It does not independently establish present computing service, completed energy work, installed load or a new building opening. The inherited IRS Publication 4801 link now resolves to June 2026 tax return statistical estimates; selected cover pages confirm that it is not computing facility evidence. Exact current physical computing disposition remains held. No technical site drawing, aerial image, restricted system or account was requested."
            },
            "source_read_scope": {
              "complete_original_energy_department_proposal_page_body_read": true,
              "energy_conservation_funding_not_computing_operation": true,
              "original_irs4801_selected_physical_pages1_through3_irrelevant_tax_statistics": true,
              "not_entire236_page_statistical_publication_read": true,
              "no_technical_site_document_map_or_restricted_account_requested": true
            }
          },
          "notes": [
            "The complete original Energy Department September 24, 2024 page identifies the IRS Martinsburg facility at Kearneysville and proposes federal support for energy conservation measures. It does not independently establish present computing service, completed energy work, installed load or a new building opening. The inherited IRS Publication 4801 link now resolves to June 2026 tax return statistical estimates; selected cover pages confirm that it is not computing facility evidence. Exact current physical computing disposition remains held. No technical site drawing, aerial image, restricted system or account was requested.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.energy.gov/nepa/articles/cx-032001-internal-revenue-service-martinsburg-enterprise-computing-center-espc",
              "host": "www.energy.gov",
              "published": "2024-09-24",
              "date": "2024-09-24",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Calculated official source street reference, not a surveyed roof or parcel",
      "summary": "Kearneysville · Berkeley · Source context reviewed"
    },
    {
      "id": "nscale-monarch-mason-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Monarch Compute Campus",
      "group": "proposed",
      "status": "Operator-listed plan",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Mason"
      ],
      "city": "Point Pleasant",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Nscale Monarch date conflict, LOI and separate generation scope. HeadingOctober14andbodyMarch16datesdiffer;donotclaimalltransactionsnewOct14orchoosedatewithoutcorroboration. LOInotexecutedbindingcomputeleaseorenergization.8GWpowerpotentialand2GWgenerationnotaddedto1.35compute. State-certifiedmicrogridclaimnotcertificatedocumentinspection. MasonWVnotMasonKYandnotsameMasonlawsuit. No currentlypaidincentivesorobservedgeneration. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory",
          "host": "nscale.com",
          "date": "",
          "published": "",
          "checked": "2026-10-14",
          "date_kind": "publication date not established",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.nscale.com/ai-infrastructure",
          "host": "www.nscale.com",
          "published": "",
          "date": "",
          "checked": "2026-10-16",
          "label": "Reviewed current operator evidence"
        }
      ],
      "loc": {
        "lat": 38.76978,
        "lng": -82.02652,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "operator-primary-review-round10-2026-10-14.json",
          "scope": "Nscale Monarch date conflict, LOI and separate generation scope",
          "fields": {
            "developer": "Nscale",
            "project": "Monarch Compute Campus",
            "county": "Mason County, West Virginia",
            "page_heading_date": "2026-10-14",
            "release_body_dateline": "2026-03-16",
            "publication_date_conflict": true,
            "announced_acquisition": "American Intelligence and Power Corporation, including Monarch campus",
            "site_acres_max": 2250,
            "microsoft_capacity_loi_gw_max": 1.35,
            "capacity_basis": "AI compute under letter of intent, not verified current critical IT",
            "onsite_microgrid_potential_gw_min_exclusive": 8,
            "first_tranche_target": "late2027",
            "caterpillar_natural_gas_generation_target_gw": 2,
            "generation_target_period": "2028-H1"
          },
          "notes": [
            "HeadingOctober14andbodyMarch16datesdiffer;donotclaimalltransactionsnewOct14orchoosedatewithoutcorroboration. LOInotexecutedbindingcomputeleaseorenergization.8GWpowerpotentialand2GWgenerationnotaddedto1.35compute. State-certifiedmicrogridclaimnotcertificatedocumentinspection. MasonWVnotMasonKYandnotsameMasonlawsuit. No currentlypaidincentivesorobservedgeneration.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory",
              "host": "nscale.com",
              "date": "",
              "published": "",
              "checked": "2026-10-14",
              "date_kind": "publication date not established",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "overnight-status-2026-10-16",
          "scope": "Named project and operator-service status review; phase and source limits retained.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "supported_label",
              "label": "Operator-listed plan",
              "basis": "The current named Monarch section describes a phased AI development with first-phase delivery targeted for early 2028. The March 16, 2026 release describes planned tranches beginning in late 2027 and a Microsoft letter of intent.",
              "checked_on": "2026-10-16"
            },
            "stage_review_limits": "These are distinct dated targets and a letter of intent, not accomplished service or proven construction. The AI deployment and potential microgrid generation remain separate; prior date and power-scope conflicts are retained."
          },
          "notes": [
            "These are distinct dated targets and a letter of intent, not accomplished service or proven construction. The AI deployment and potential microgrid generation remain separate; prior date and power-scope conflicts are retained.",
            "Current service and project labels are source-scoped research contexts. No entire record, physical site, technical quantity or exact parcel is certified."
          ],
          "sources": [
            {
              "url": "https://www.nscale.com/ai-infrastructure",
              "host": "www.nscale.com",
              "published": "",
              "date": "",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            },
            {
              "url": "https://www.nscale.com/press-releases/nscale-west-virginia-ai-factory",
              "host": "www.nscale.com",
              "published": "2026-03-16",
              "date": "2026-03-16",
              "checked": "2026-10-16",
              "label": "Reviewed current operator evidence"
            }
          ],
          "checked": "2026-10-16",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Point Pleasant · Mason · Source context reviewed",
      "status_scope": "Primary source review checked 2026-10-16. The current named Monarch section describes a phased AI development with first-phase delivery targeted for early 2028. The March 16, 2026 release describes planned tranches beginning in late 2027 and a Microsoft letter of intent. These are distinct dated targets and a letter of intent, not accomplished service or proven construction. The AI deployment and potential microgrid generation remain separate; prior date and power-scope conflicts are retained.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54053"
      }
    },
    {
      "id": "netl-computational-science-engineering-center-morgantown-wv",
      "state": "wv",
      "kind": "facility",
      "name": "NETL Computational Science and Engineering Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Monongalia"
      ],
      "city": "Morgantown",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Federal laboratory source dated May 22, 2025. Expansion space for research computers is not an entire regional data-center capacity; current completion remains unverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [
        [
          "2025-05-22",
          "The original NETL May 22, 2025 release explicitly reports ongoing CSE building construction in Morgantown. This dates the agency statement without establishing an exact construction start, future relocation of existing systems or present commissioned operation."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://netl.doe.gov/node/14819",
          "host": "netl.doe.gov",
          "date": "2025-05-22",
          "published": "2025-05-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.61014,
        "lng": -80.04429,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {
            "historical_status_event": "construction underway",
            "planned_center_sqft": 14000,
            "city": "Morgantown"
          },
          "notes": [
            "Federal laboratory source dated May 22, 2025. Expansion space for research computers is not an entire regional data-center capacity; current completion remains unverified.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://netl.doe.gov/node/14819",
              "host": "netl.doe.gov",
              "date": "2025-05-22",
              "published": "2025-05-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "The complete original NETL May 22, 2025 release explicitly reports construction underway on the Morgantown Computational Science and Engineering Center. This is a dated historical construction account. The selected later official discovery did not establish exact present completion, computing commissioning or continued construction as of the current check. Existing Joule and wafer scale computing work are separate from the new consolidated building opening. Prospective processing performance and energy savings are not measured results for an operating new center. Current physical stage remains held.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "historical_netl_construction_current_building_stage_held",
              "scope": "The complete original NETL May 22, 2025 release explicitly reports construction underway on the Morgantown Computational Science and Engineering Center. This is a dated historical construction account. The selected later official discovery did not establish exact present completion, computing commissioning or continued construction as of the current check. Existing Joule and wafer scale computing work are separate from the new consolidated building opening. Prospective processing performance and energy savings are not measured results for an operating new center. Current physical stage remains held."
            },
            "source_read_scope": {
              "complete_original_named_netl_release_body_read": true,
              "historical_may2025_construction_not_assumed_current_oct2026": true,
              "existing_computing_systems_not_new_building_commissioning": true,
              "no_future_benchmark_or_energy_savings_as_measured_result": true
            }
          },
          "notes": [
            "The complete original NETL May 22, 2025 release explicitly reports construction underway on the Morgantown Computational Science and Engineering Center. This is a dated historical construction account. The selected later official discovery did not establish exact present completion, computing commissioning or continued construction as of the current check. Existing Joule and wafer scale computing work are separate from the new consolidated building opening. Prospective processing performance and energy savings are not measured results for an operating new center. Current physical stage remains held.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://netl.doe.gov/node/14819",
              "host": "netl.doe.gov",
              "published": "2025-05-22",
              "date": "2025-05-22",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Morgantown · Monongalia · Source context reviewed",
      "event_evidence": [
        {
          "date": "2025-05-22",
          "text": "The original NETL May 22, 2025 release explicitly reports ongoing CSE building construction in Morgantown. This dates the agency statement without establishing an exact construction start, future relocation of existing systems or present commissioned operation.",
          "kind": "announced",
          "sources": [
            {
              "url": "https://netl.doe.gov/node/14819",
              "host": "netl.doe.gov",
              "published": "2025-05-22",
              "date": "2025-05-22",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ]
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54061"
      }
    },
    {
      "id": "noaa-environmental-security-computing-center-fairmont-wv",
      "state": "wv",
      "kind": "facility",
      "name": "NOAA Environmental Security Computing Center (NESCC)",
      "group": "operating",
      "status": "Institution reported computing service",
      "raw_status": "operating",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Marion"
      ],
      "city": "Fairmont",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The readable introduction is not the full linked report. The 100-million-USD supercomputer is not construction of a new campus. Coming, announced and anticipated economic effects are not accepted commissioning or measured employment. No MW or later installation outcome is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wvpress.org/breaking-news/noaas-100m-rhea-supercomputer-coming-to-fairmont-boosting-west-virginia-tech-growth/",
          "host": "wvpress.org",
          "date": "2025-09-23",
          "published": "2025-09-23",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://docs.rdhpcs.noaa.gov/systems/hera_user_guide.html",
          "host": "docs.rdhpcs.noaa.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 39.49184,
        "lng": -80.24092,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round28-2026-10-14.json",
          "scope": "Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.",
          "fields": {
            "reported_context": "WV Press reproduces a short WV News introduction about planned NOAA Rhea computing equipment at the existing Fairmont Environmental Security Computing Center.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The readable introduction is not the full linked report. The 100-million-USD supercomputer is not construction of a new campus. Coming, announced and anticipated economic effects are not accepted commissioning or measured employment. No MW or later installation outcome is established.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wvpress.org/breaking-news/noaas-100m-rhea-supercomputer-coming-to-fairmont-boosting-west-virginia-tech-growth/",
              "host": "wvpress.org",
              "date": "2025-09-23",
              "published": "2025-09-23",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "Selected original current public Hera guide overview explicitly describes available computing resources and test and development systems through NESCC. This supports institution reported computing service at the named center scope. Only public overview context was used; hardware inventory, theoretical performance, current uptime, specific workloads and exact first commissioning remain uncertified. The unavailable original Rhea announcement was not read from indexed text or obtained through another copy. This independently published current guide is separate from that announcement, and no Rhea installation or new modular building completion is inferred.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "current_public_agency_named_nescc_computing_service",
              "scope": "Selected original current public Hera guide overview explicitly describes available computing resources and test and development systems through NESCC. This supports institution reported computing service at the named center scope. Only public overview context was used; hardware inventory, theoretical performance, current uptime, specific workloads and exact first commissioning remain uncertified. The unavailable original Rhea announcement was not read from indexed text or obtained through another copy. This independently published current guide is separate from that announcement, and no Rhea installation or new modular building completion is inferred."
            },
            "source_read_scope": {
              "selected_original_public_hera_system_overview_text_read": true,
              "not_complete_guide_or_all_systems_review": true,
              "named_nescc_computing_availability_not_rhea_installation": true,
              "unavailable_original_rhea_article_not_read_or_replaced": true,
              "no_restricted_account_login_or_computing_access_requested": true,
              "no_capacity_performance_uptime_or_workload_certification": true
            }
          },
          "notes": [
            "Selected original current public Hera guide overview explicitly describes available computing resources and test and development systems through NESCC. This supports institution reported computing service at the named center scope. Only public overview context was used; hardware inventory, theoretical performance, current uptime, specific workloads and exact first commissioning remain uncertified. The unavailable original Rhea announcement was not read from indexed text or obtained through another copy. This independently published current guide is separate from that announcement, and no Rhea installation or new modular building completion is inferred.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://docs.rdhpcs.noaa.gov/systems/hera_user_guide.html",
              "host": "docs.rdhpcs.noaa.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Fairmont · Marion · Source context reviewed",
      "status_scope": "Selected original current public Hera guide overview explicitly describes available computing resources and test and development systems through NESCC. This supports institution reported computing service at the named center scope. Only public overview context was used; hardware inventory, theoretical performance, current uptime, specific workloads and exact first commissioning remain uncertified. The unavailable original Rhea announcement was not read from indexed text or obtained through another copy. This independently published current guide is separate from that announcement, and no Rhea installation or new modular building completion is inferred.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54049"
      }
    },
    {
      "id": "starwood-tamarack-west-columbia-mason-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Project Tamarack",
      "group": "proposed",
      "status": "Company listed proposal",
      "raw_status": "proposed",
      "status_field": "current_status",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Mason"
      ],
      "city": "West Columbia",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. State-program certification is not every construction/environmental permit, executed electricity service or operation. Twelve-billion-dollar plan and over 1,000 construction/300 permanent jobs are forecasts, not spending/employment. Governor statement about no bill increases is a policy assurance, not independent tariff or economic proof. Closed-loop cooling has no quantified consumption here. Nscale’s separate 2027 completion target is not Tamarack RFS. Mason County is West Virginia, not Kentucky. Article inconsistently refers to HB 2024 and HB 2014; legal scope requires original law, not corrected by inference. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wdtv.com/2026/09/03/starwood-digital-ventures-announces-data-center-mason-county/",
          "host": "wdtv.com",
          "date": "2026-09-03",
          "published": "2026-09-03",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://projecttamarack.com/",
          "host": "projecttamarack.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        },
        {
          "url": "https://governor.wv.gov/article/governor-morrisey-announces-more-81-billion-new-investment-west-virginia-business-summit",
          "host": "governor.wv.gov",
          "published": "2026-09-03",
          "date": "2026-09-03",
          "checked": "2026-10-24",
          "label": "Reviewed government record"
        }
      ],
      "loc": {
        "lat": 38.78494,
        "lng": -82.04306,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "WSAZ reporting republished by WDTV says Starwood received West Virginia high-impact certification for Project Tamarack in Mason County, with announced investment and employment plans.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "State-program certification is not every construction/environmental permit, executed electricity service or operation. Twelve-billion-dollar plan and over 1,000 construction/300 permanent jobs are forecasts, not spending/employment. Governor statement about no bill increases is a policy assurance, not independent tariff or economic proof. Closed-loop cooling has no quantified consumption here. Nscale’s separate 2027 completion target is not Tamarack RFS. Mason County is West Virginia, not Kentucky. Article inconsistently refers to HB 2024 and HB 2014; legal scope requires original law, not corrected by inference.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wdtv.com/2026/09/03/starwood-digital-ventures-announces-data-center-mason-county/",
              "host": "wdtv.com",
              "date": "2026-09-03",
              "published": "2026-09-03",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 78",
          "scope": "The complete original Project Tamarack page explicitly describes a planned computing development in West Columbia, and the complete original Governor release describes a Starwood project designation in Mason County. This supports a company listed proposal without computing construction or operation. The project page distinguishes the former Clements State Tree Nursery as a separate property outside its ownership and control; no neighboring site is merged. Certification, ratepayer pledges, proposed cooling, sound studies, potential tax receipts and future employment are attributed plans rather than measured outcomes or verified legal compliance. The Governor statement day is not an independently established exact Tamarack certificate execution or groundbreaking day.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "original_named_tamarack_planned_campus",
              "scope": "The complete original Project Tamarack page explicitly describes a planned computing development in West Columbia, and the complete original Governor release describes a Starwood project designation in Mason County. This supports a company listed proposal without computing construction or operation. The project page distinguishes the former Clements State Tree Nursery as a separate property outside its ownership and control; no neighboring site is merged. Certification, ratepayer pledges, proposed cooling, sound studies, potential tax receipts and future employment are attributed plans rather than measured outcomes or verified legal compliance. The Governor statement day is not an independently established exact Tamarack certificate execution or groundbreaking day."
            },
            "source_read_scope": {
              "complete_original_current_project_and_governor_release_bodies_read": true,
              "state_designation_and_pledges_not_computing_operation": true,
              "former_tree_nursery_expressly_separate_not_merged": true,
              "no_water_noise_tax_jobs_or_utility_measurements_adopted": true,
              "governor_statement_not_exact_project_certificate_execution_day": true
            }
          },
          "notes": [
            "The complete original Project Tamarack page explicitly describes a planned computing development in West Columbia, and the complete original Governor release describes a Starwood project designation in Mason County. This supports a company listed proposal without computing construction or operation. The project page distinguishes the former Clements State Tree Nursery as a separate property outside its ownership and control; no neighboring site is merged. Certification, ratepayer pledges, proposed cooling, sound studies, potential tax receipts and future employment are attributed plans rather than measured outcomes or verified legal compliance. The Governor statement day is not an independently established exact Tamarack certificate execution or groundbreaking day.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://projecttamarack.com/",
              "host": "projecttamarack.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            },
            {
              "url": "https://governor.wv.gov/article/governor-morrisey-announces-more-81-billion-new-investment-west-virginia-business-summit",
              "host": "governor.wv.gov",
              "published": "2026-09-03",
              "date": "2026-09-03",
              "checked": "2026-10-24",
              "label": "Reviewed government record"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "West Columbia · Mason · Source context reviewed",
      "status_scope": "The complete original Project Tamarack page explicitly describes a planned computing development in West Columbia, and the complete original Governor release describes a Starwood project designation in Mason County. This supports a company listed proposal without computing construction or operation. The project page distinguishes the former Clements State Tree Nursery as a separate property outside its ownership and control; no neighboring site is merged. Certification, ratepayer pledges, proposed cooling, sound studies, potential tax receipts and future employment are attributed plans rather than measured outcomes or verified legal compliance. The Governor statement day is not an independently established exact Tamarack certificate execution or groundbreaking day.",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54053"
      }
    },
    {
      "id": "fundamental-data-ridgeline-datacenter-tucker-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Ridgeline Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Tucker"
      ],
      "city": "",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The 785 MW gas plant is generation, not IT. Statements about exclusive private supply and possible grid sales have different scopes and remain qualified. An air permit is not every site permit or proof of operation; an appeal is not vacatur. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvhighlands.org/tucker-county-data-center-ridgeline-facility/",
          "host": "wvhighlands.org",
          "date": "2026-01-27",
          "published": "2026-01-27",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.11358,
        "lng": -79.56581,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round26-2026-10-14.json",
          "scope": "Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.",
          "fields": {
            "reported_context": "West Virginia Highlands Conservancy describes Ridgeline's reported 2025 air permit and its appeal.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "The 785 MW gas plant is generation, not IT. Statements about exclusive private supply and possible grid sales have different scopes and remain qualified. An air permit is not every site permit or proof of operation; an appeal is not vacatur.",
            "Current original approvals, disclosures and later outcomes take precedence.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wvhighlands.org/tucker-county-data-center-ridgeline-facility/",
              "host": "wvhighlands.org",
              "date": "2026-01-27",
              "published": "2026-01-27",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Tucker · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54093"
      }
    },
    {
      "id": "shady-spring-data-center-campus-raleigh-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Shady Spring Data Center Campus (Greenbrier Land Company rezoning)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Raleigh"
      ],
      "city": "Shady Spring",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Recommendation was not final county rezoning. January 9 vote was future at publication; no later result assumed. Confidential company remains unidentified, and Greenbrier Land Company ownership does not establish operator identity. Eight buildings, 300-foot buffer and up to 600 jobs are submitted/attributed plans, not as-built conditions or employment. Residents’ 55 to 85 dB claims are not measured site impacts. No power or current project status certified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.wvva.com/2023/12/22/shady-spring-residents-up-arms-over-proposed-rezoning-wooded-area-bordering-their-neighborhoods/",
          "host": "wvva.com",
          "date": "2023-12-22",
          "published": "2023-12-22",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 37.77115,
        "lng": -81.24818,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "WVVA reports Raleigh County planning board recommended rezoning of roughly 727 acres near Shady Spring by 4 to 3 after substantial resident opposition.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Recommendation was not final county rezoning. January 9 vote was future at publication; no later result assumed. Confidential company remains unidentified, and Greenbrier Land Company ownership does not establish operator identity. Eight buildings, 300-foot buffer and up to 600 jobs are submitted/attributed plans, not as-built conditions or employment. Residents’ 55 to 85 dB claims are not measured site impacts. No power or current project status certified.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.wvva.com/2023/12/22/shady-spring-residents-up-arms-over-proposed-rezoning-wooded-area-bordering-their-neighborhoods/",
              "host": "wvva.com",
              "date": "2023-12-22",
              "published": "2023-12-22",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Shady Spring · Raleigh · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54081"
      }
    },
    {
      "id": "silicon-foundation-warwood-wheeling-ohio-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Silicon Foundation Warwood Data Center and Energy Campus (former Centre Foundry)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Ohio"
      ],
      "city": "Wheeling",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Operator website’s initial 10 MW, next 20 to 30 MW expansion and eventual 100 MW regional hub are plans with unclear IT/gross basis; do not add all phases into 140 MW. No utility contract, energization or RFS independently verified. River access does not establish water rights or permitted withdrawal; gas access is not an issued generation permit. Headline sixth major development under a state program is not an exhaustive operating-site census. General HB2014 description is not an independently examined project eligibility/registration or blanket exemption from every law. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wvpublic.org/story/energy-environment/states-sixth-data-center-announced-near-wheeling/",
          "host": "wvpublic.org",
          "date": "2026-06-24",
          "published": "2026-06-24",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 40.09698,
        "lng": -80.61889,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "West Virginia Public Broadcasting reports Silicon Foundation Energy purchased the former Centre Foundry site near Wheeling for a proposed phased data center/energy campus.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "Operator website’s initial 10 MW, next 20 to 30 MW expansion and eventual 100 MW regional hub are plans with unclear IT/gross basis; do not add all phases into 140 MW. No utility contract, energization or RFS independently verified. River access does not establish water rights or permitted withdrawal; gas access is not an issued generation permit. Headline sixth major development under a state program is not an exhaustive operating-site census. General HB2014 description is not an independently examined project eligibility/registration or blanket exemption from every law.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://wvpublic.org/story/energy-environment/states-sixth-data-center-announced-near-wheeling/",
              "host": "wvpublic.org",
              "date": "2026-06-24",
              "published": "2026-06-24",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Wheeling · Ohio · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54069"
      }
    },
    {
      "id": "ryan-stuart-summit-point-jefferson-county-wv",
      "state": "wv",
      "kind": "facility",
      "name": "Summit Point Data Center Site (Ryan Stuart Development)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jefferson"
      ],
      "city": "Summit Point",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. No end user is identified. The 100,000 to 130,000 gallons/day range is a preliminary developer estimate, not utility allocation or actual use. Utility voted to re-advertise an engineering-study RFP, not approve service or a data center. Proposed purple-line reuse and developer-funded infrastructure are intentions. Existing/planned 138/500/765 kV lines are voltage, not IT capacity, and proximity does not secure a power contract. Project section personally read; unrelated newsletter items are not evidence. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://observerwv.news/posts/data-center-in-summit-point-politics-not-as-usual",
          "host": "observerwv.news",
          "date": "2026-04-30",
          "published": "2026-04-30",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.3076,
        "lng": -77.86313,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round32-2026-10-14.json",
          "scope": "Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.",
          "fields": {
            "reported_context": "Observer Weekly reports Ryan Stuart purchased 235 acres near Summit Point on April 9 and presented early marketing plans to Charles Town Utility Board on April 29.",
            "independently_verified_current_operating_status": null
          },
          "notes": [
            "No end user is identified. The 100,000 to 130,000 gallons/day range is a preliminary developer estimate, not utility allocation or actual use. Utility voted to re-advertise an engineering-study RFP, not approve service or a data center. Proposed purple-line reuse and developer-funded infrastructure are intentions. Existing/planned 138/500/765 kV lines are voltage, not IT capacity, and proximity does not secure a power contract. Project section personally read; unrelated newsletter items are not evidence.",
            "Original approvals and later observed outcomes take precedence; future dates have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://observerwv.news/posts/data-center-in-summit-point-politics-not-as-usual",
              "host": "observerwv.news",
              "date": "2026-04-30",
              "published": "2026-04-30",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Summit Point · Jefferson · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54037"
      }
    },
    {
      "id": "uscg-operations-systems-center-kearneysville-wv",
      "state": "wv",
      "kind": "facility",
      "name": "U.S. Coast Guard Operations Systems Center",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Jefferson"
      ],
      "city": "Kearneysville",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Senator republishes a March 16, 2019 newspaper story about multiple Coast Guard offices. Four-million-dollar IT request is for the separate Martinsburg National Maritime Center, not this data center. Government hosting does not make a republished article an original facility specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.capito.senate.gov/news/in-the-news/sen-capito-us-coast-guard-commandant-visit-panhandle",
          "host": "capito.senate.gov",
          "date": "2019-03-16",
          "published": "2019-03-16",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        }
      ],
      "loc": {
        "lat": 39.31828,
        "lng": -77.87478,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "neighbor-primary-review-round4-2026-10-14.json",
          "scope": "Field or source context only",
          "fields": {},
          "notes": [
            "Senator republishes a March 16, 2019 newspaper story about multiple Coast Guard offices. Four-million-dollar IT request is for the separate Martinsburg National Maritime Center, not this data center. Government hosting does not make a republished article an original facility specification.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.capito.senate.gov/news/in-the-news/sen-capito-us-coast-guard-commandant-visit-panhandle",
              "host": "capito.senate.gov",
              "date": "2019-03-16",
              "published": "2019-03-16",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "encore-2026-10-17-batch1",
          "scope": "Limited source identity and stage review; not whole-record certification, parcel verification or a physical-site census.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "unresolved",
              "scope": "The March 2019 newspaper reprint on Senator Capito’s site describes historical Kearneysville OSC server work. The separate Martinsburg NMC budget request is not this site. Current USCG sources were access-limited; no current operation or command commissioning is established."
            }
          },
          "notes": [
            "The March 2019 newspaper reprint on Senator Capito’s site describes historical Kearneysville OSC server work. The separate Martinsburg NMC budget request is not this site. Current USCG sources were access-limited; no current operation or command commissioning is established."
          ],
          "sources": [
            {
              "url": "https://www.capito.senate.gov/news/in-the-news/sen-capito-us-coast-guard-commandant-visit-panhandle",
              "host": "www.capito.senate.gov",
              "published": "2019-03-16",
              "date": "2019-03-16",
              "checked": "2026-10-17",
              "label": "Historical news reprint"
            }
          ],
          "checked": "2026-10-17",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": false,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Kearneysville · Jefferson · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54037"
      }
    },
    {
      "id": "va-capital-region-readiness-center-martinsburg-wv",
      "state": "wv",
      "kind": "facility",
      "name": "VA Capital Region Readiness Center (Martinsburg VAMC Data Center)",
      "group": "unknown",
      "status": "Status unclear",
      "raw_status": "",
      "status_field": "",
      "crypto": false,
      "type": "Data center (inventory classification)",
      "counties": [
        "Berkeley"
      ],
      "city": "Martinsburg",
      "address": "",
      "who": "",
      "end_user": "",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Contract value is contractor-scope, not verified full campus investment or incentive.10,000 squarefeetraisedfloor is a subset, not additional building area.150 watts/squarefoot is design density, not actual critical IT or metered load. Three 2.25 MWgenerators are standby and UPSkVAis apparent-power rating; no sum or conversion becomes IT. TierIII design description is not independently checked certification.2010 is completionYEARonly;2022 publication/2026 modification metadata do not redate opening or establish present operation. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.",
      "date": "",
      "events": [],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://www.hitt.com/?p=15626",
          "host": "hitt.com",
          "date": "2022-07-31",
          "published": "2022-07-31",
          "checked": "2026-10-14",
          "date_kind": "publication",
          "label": "Reviewed source"
        },
        {
          "url": "https://www.hitt.com/projects/capital-region-readiness-center-vamc-martinsburg/",
          "host": "www.hitt.com",
          "published": "",
          "date": "",
          "checked": "2026-10-24",
          "label": "Reviewed operator source"
        }
      ],
      "loc": {
        "lat": 39.43919,
        "lng": -78.02501,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "reviewed_evidence": [
        {
          "overlay": "regional-development-review-round33-2026-10-14.json",
          "scope": "Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.",
          "fields": {
            "reported_context": "HITT’s contractor project page reports CRRC/VAMC Martinsburg completed in 2010, with 66,000 square-foot building and 33 million-dollar contract.",
            "independently_verified_current_operating_status": null,
            "contractor_reported_completion_year": 2010,
            "contractor_contract_usd": 33000000,
            "contractor_reported_building_sqft": 66000,
            "contractor_reported_raised_floor_sqft": 10000,
            "critical_it_mw": null
          },
          "notes": [
            "Contract value is contractor-scope, not verified full campus investment or incentive.10,000 squarefeetraisedfloor is a subset, not additional building area.150 watts/squarefoot is design density, not actual critical IT or metered load. Three 2.25 MWgenerators are standby and UPSkVAis apparent-power rating; no sum or conversion becomes IT. TierIII design description is not independently checked certification.2010 is completionYEARonly;2022 publication/2026 modification metadata do not redate opening or establish present operation.",
            "Later original decisions and observed outcomes take precedence; future events have no assumed result.",
            "Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."
          ],
          "sources": [
            {
              "url": "https://www.hitt.com/?p=15626",
              "host": "hitt.com",
              "date": "2022-07-31",
              "published": "2022-07-31",
              "checked": "2026-10-14",
              "date_kind": "publication",
              "label": "Reviewed source"
            }
          ],
          "whole_record_certified": false
        },
        {
          "overlay": "Codex 3 research cohort 79",
          "scope": "The selected original builder portfolio overview identifies the Capital Region Readiness Center at the Martinsburg VA campus and reports completion in 2010. This historical construction account does not independently establish present computing service, a current agency operating statement or an exact first commissioning day. Current physical computing disposition remains held. The original observed builder redirect was followed, without adopting equipment details, security certification or technical quantities.",
          "fields": {
            "current_stage_evidence": {
              "outcome": "builder_historical_completion_present_computing_service_held",
              "scope": "The selected original builder portfolio overview identifies the Capital Region Readiness Center at the Martinsburg VA campus and reports completion in 2010. This historical construction account does not independently establish present computing service, a current agency operating statement or an exact first commissioning day. Current physical computing disposition remains held. The original observed builder redirect was followed, without adopting equipment details, security certification or technical quantities."
            },
            "source_read_scope": {
              "original_builder_project_identity_completion_year_and_overview_text_read": true,
              "not_complete_current_agency_operating_review": true,
              "completion_year2010_not_invented_exact_commissioning_day": true,
              "no_equipment_security_or_capacity_claim_adopted": true
            }
          },
          "notes": [
            "The selected original builder portfolio overview identifies the Capital Region Readiness Center at the Martinsburg VA campus and reports completion in 2010. This historical construction account does not independently establish present computing service, a current agency operating statement or an exact first commissioning day. Current physical computing disposition remains held. The original observed builder redirect was followed, without adopting equipment details, security certification or technical quantities.",
            "Existing roles, identities, physical placement, jurisdiction assignments, technical quantities and exact first opening days remain unchanged. A document date does not date physical commissioning."
          ],
          "sources": [
            {
              "url": "https://www.hitt.com/projects/capital-region-readiness-center-vamc-martinsburg/",
              "host": "www.hitt.com",
              "published": "",
              "date": "",
              "checked": "2026-10-24",
              "label": "Reviewed operator source"
            }
          ],
          "checked": "2026-10-24",
          "whole_record_certified": false
        }
      ],
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": true,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Martinsburg · Berkeley · Source context reviewed",
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "withheld_unreviewed_point",
        "scope": "The available point evidence does not establish a supported site location. No site pin, nearby distance or aerial destination is published. The original coordinate and its provenance remain in research history.",
        "county_display": "54003"
      }
    },
    {
      "id": "wvnet-morgantown-data-center-wv",
      "state": "wv",
      "kind": "facility",
      "name": "WVNET Morgantown Data Center",
      "group": "unknown",
      "status": "Status unclear",
      "crypto": false,
      "type": "Data center research context",
      "counties": [
        "Monongalia"
      ],
      "city": "Morgantown",
      "address": "",
      "who": "West Virginia Network for Educational Telecomputing",
      "mw": null,
      "power": "",
      "power_note": "",
      "investment": "",
      "jobs": "",
      "acres": null,
      "utility": "",
      "water": "",
      "incentives": "",
      "note": "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
      "date": "",
      "events": [
        [
          "2026-10-26",
          "Added to the atlas. Compilation date only, not opening or construction."
        ]
      ],
      "timeline": [],
      "opened": "",
      "tier": "",
      "sources": [
        {
          "url": "https://wvnet.edu/services/purchasing/wvnet-bids/",
          "host": "wvnet.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://wvnet.edu/services/purchasing/wvnet-bids/entry/856/",
          "host": "wvnet.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://wvnet.edu/gk-download/GH-vLHkHViAjqz6qwdzCCOD_vGHFcJpjNV2lhzBDTcHY4Fnrkvx2us4oHZYbZ-_YwCUWsMzbkZPtNaNVaR5brLTNc5PtrdL6Dq3r-ut77Dndk1ggTrGGQf99qcq5DsQ-5WiIodO7qOQax7iegU49b8FsRO1wkTrxoTRPCbePjT5QW8P4dlkQHFISOA7PDpakzySnegHZedqwgxqR26XWIfPnFXlzHJVj61Haj2LLBwwVwORuh9YYwqun93CjLy1qpkdPsLQXNa90gSa3lTAbN9PSvVgYf8dxSKVO/?gv-iframe=true",
          "host": "wvnet.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://www.wvhepc.edu/wp-content/uploads/2025/06/HEPC-Meeting-Agenda-6-27-2025.pdf",
          "host": "www.wvhepc.edu",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        },
        {
          "url": "https://morgantownwv.gov/643/About-Us",
          "host": "morgantownwv.gov",
          "published": "",
          "date": "",
          "checked": "2026-10-25",
          "label": "Retained original premises or jurisdiction context"
        }
      ],
      "loc": {
        "lat": 39.64992,
        "lng": -80.031,
        "precision": "county",
        "basis": "Shown at county level only. The dot is placed inside the county for the map and is not the site, its address or a parcel."
      },
      "manual_source_reviewed": true,
      "whole_record_certified": false,
      "field_evidence_present": true,
      "inventory_label_retained": false,
      "precision_label": "Exact site not published; shown at county level",
      "summary": "Morgantown sourced data center research context. County level only.",
      "reviewed_evidence": [
        {
          "overlay": "Codex 3 inherited discovery review 17",
          "scope": "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
          "fields": {
            "source_context": {
              "name": "WVNET Morgantown Data Center",
              "operator": "West Virginia Network for Educational Telecomputing",
              "scope": "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
              "address": "",
              "exact_street_unpublished": true
            },
            "county_association": {
              "county": "Monongalia",
              "county_fips": "54061",
              "scope": "Independent retained jurisdiction evidence supports county level placement. No exact data center street or point is adopted."
            },
            "atlas_added_event": {
              "kind": "atlas_added",
              "date": "2026-10-26",
              "scope": "Intended compilation day only. Must equal actual admission day before Native commit; never a physical milestone."
            }
          },
          "notes": [
            "Named data center research context supported by retained official sources. County association only. Current operating stage, exact site point and technical capacity remain unverified.",
            "Historical schedules, permits, funding and announcements do not establish current operation."
          ],
          "sources": [
            {
              "url": "https://wvnet.edu/services/purchasing/wvnet-bids/",
              "host": "wvnet.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            },
            {
              "url": "https://wvnet.edu/services/purchasing/wvnet-bids/entry/856/",
              "host": "wvnet.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            },
            {
              "url": "https://wvnet.edu/gk-download/GH-vLHkHViAjqz6qwdzCCOD_vGHFcJpjNV2lhzBDTcHY4Fnrkvx2us4oHZYbZ-_YwCUWsMzbkZPtNaNVaR5brLTNc5PtrdL6Dq3r-ut77Dndk1ggTrGGQf99qcq5DsQ-5WiIodO7qOQax7iegU49b8FsRO1wkTrxoTRPCbePjT5QW8P4dlkQHFISOA7PDpakzySnegHZedqwgxqR26XWIfPnFXlzHJVj61Haj2LLBwwVwORuh9YYwqun93CjLy1qpkdPsLQXNa90gSa3lTAbN9PSvVgYf8dxSKVO/?gv-iframe=true",
              "host": "wvnet.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            },
            {
              "url": "https://www.wvhepc.edu/wp-content/uploads/2025/06/HEPC-Meeting-Agenda-6-27-2025.pdf",
              "host": "www.wvhepc.edu",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            },
            {
              "url": "https://morgantownwv.gov/643/About-Us",
              "host": "morgantownwv.gov",
              "published": "",
              "date": "",
              "checked": "2026-10-25",
              "label": "Retained original premises or jurisdiction context"
            }
          ],
          "checked": "2026-10-26",
          "whole_record_certified": false
        }
      ],
      "location_display": {
        "policy": "reviewed-map-references-2026-10-23",
        "decision": "no_site_point",
        "county_display": "54061"
      }
    }
  ],
  "compilation_license": "withheld_pending_owner_decision"
}
