{"state":"ga","name":"Georgia","updated":"2026-10-15","checked":"2026-10-15","bounds":[-85.607,30.357,-80.886,35.001],"stats":{"projects":0,"operating":0,"facilities":73,"rule_counties":0,"moratorium_counties":0,"source_records":73,"reviewed_records":73,"status_confirmed":0,"status_unknown":73,"unreviewed_excluded":6,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":79,"manual_source_context_records":73,"published_source_context_records":73,"excluded":{"no_manual_source_review":6},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"prime-storage-powers-ferry-place-marietta-ga","state":"ga","kind":"facility","name":"1155 Powers Ferry Place Data Center (Prime Storage conversion)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cobb"],"city":"Marietta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The 90,000-square-foot storage property is not all confirmed DC floor area. Prime Storage/Prime Group Holdings is not Prime Data Centers. The existing 1130 Powers Ferry site and other Marietta proposals are separate. Opponents' corruption/health allegations are attributed, not findings; no later vote or moratorium adoption is assumed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://atlpresscollective.com/2026/07/08/powers-ferry-road-marietta-data-center/","host":"atlpresscollective.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.926145,"lng":-84.4857377,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Atlanta Community Press Collective reports a four-three planning recommendation for Prime Storage's requested conversion of part of its Powers Ferry facility, with council action still pending.","independently_verified_current_operating_status":null},"notes":["The 90,000-square-foot storage property is not all confirmed DC floor area. Prime Storage/Prime Group Holdings is not Prime Data Centers. The existing 1130 Powers Ferry site and other Marietta proposals are separate. Opponents' corruption/health allegations are attributed, not findings; no later vote or moratorium adoption is assumed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://atlpresscollective.com/2026/07/08/powers-ferry-road-marietta-data-center/","host":"atlpresscollective.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Marietta · Cobb · Source context reviewed"},{"id":"aligned-atl-01-lithia-springs-ga","state":"ga","kind":"facility","name":"Aligned Data Centers ATL-01","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Lithia Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Generator3MW and UPS2MW lineup ratings are not whole-facility capacity. Operator lists facility address and services. Design standards are not certification. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://aligneddc.com/atlanta-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7943,"lng":-84.6602,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"street":"1551 N River Rd.","city":"Lithia Springs"},"notes":["Generator3MW and UPS2MW lineup ratings are not whole-facility capacity.","Operator lists facility address and services. Design standards are not certification.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://aligneddc.com/atlanta-data-centers/","host":"aligneddc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lithia Springs · Douglas · Source context reviewed"},{"id":"atlas-stiles-road-cartersville-ga","state":"ga","kind":"facility","name":"Atlas Development Stiles Road Data Center (Euharlee Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Petition is advocacy evidence, not originalapplication/officialhearingrecord or finaldenial. Victorybanner/2225 supporters does not independently establish government action, localresident count or courtfinding. Predicted health/noise/water/power effects are concerns, not measuredsite impacts. No signing, formsubmission or contactmade. NoMW, currentstatus, tenant orRFSverified. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.change.org/p/say-no-to-the-data-center-on-euharlee-rd","host":"change.org","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.1354,"lng":-84.89,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"Change.org opposition petition names AtlasDevelopment’s proposed 260,000 square-foot use at 208/329 StilesRoad, with aDecember 15,2025 Bartowconditional-permit hearing described.","independently_verified_current_operating_status":null},"notes":["Petition is advocacy evidence, not originalapplication/officialhearingrecord or finaldenial. Victorybanner/2225 supporters does not independently establish government action, localresident count or courtfinding. Predicted health/noise/water/power effects are concerns, not measuredsite impacts. No signing, formsubmission or contactmade. NoMW, currentstatus, tenant orRFSverified.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.change.org/p/say-no-to-the-data-center-on-euharlee-rd","host":"change.org","date":"2025-11-17","published":"2025-11-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Cartersville · Bartow · Source context reviewed"},{"id":"aws-butts-county-ga","state":"ga","kind":"facility","name":"AWS Butts County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Butts"],"city":"Jackson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AWS combined Georgia investment statement. Do not assign full two-county investment or all550jobs to Butts County alone. Amazon statewide workforce, solar household-equivalents and GDP are other scopes. Announcement is planned investment, not actual expenditure or per-campus IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.2946,"lng":-83.9663,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"AWS combined Georgia investment statement","fields":{"investment_scope":"Butts and Douglas counties, Georgia, combined","planned_investment_usd":11000000000,"expected_direct_jobs_min_inclusive":550},"notes":["Do not assign full two-county investment or all550jobs to Butts County alone. Amazon statewide workforce, solar household-equivalents and GDP are other scopes. Announcement is planned investment, not actual expenditure or per-campus IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Jackson · Butts · Source context reviewed"},{"id":"mmm-acquisitions-bells-ferry-marietta-ga","state":"ga","kind":"facility","name":"Bells Ferry Road Data Center (MMM Acquisitions)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cobb"],"city":"Marietta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The four-acre substation is within the campus, not extra site area. Staff raised unresolved variance concerns; plan approval is not a construction permit or commissioning. The readable article does not establish MMM Acquisitions as operator, confirmed power demand or actual tax receipts. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wsbtv.com/news/local/cobb-county/marietta-city-council-approves-plan-31-acre-data-center/UIDXM4QEJ5EMDGAQMPLRENRRF4/","host":"wsbtv.com","date":"2025-06-17","published":"2025-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.9916854,"lng":-84.5507217,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WSB-TV reports council plan approval for a 31-acre Bells Ferry Road data-center proposal with two buildings, a substation and a stormwater pond.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The four-acre substation is within the campus, not extra site area. Staff raised unresolved variance concerns; plan approval is not a construction permit or commissioning. The readable article does not establish MMM Acquisitions as operator, confirmed power demand or actual tax receipts.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wsbtv.com/news/local/cobb-county/marietta-city-council-approves-plan-31-acre-data-center/UIDXM4QEJ5EMDGAQMPLRENRRF4/","host":"wsbtv.com","date":"2025-06-17","published":"2025-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Marietta · Cobb · Source context reviewed"},{"id":"bridgeport-data-center-campus-coweta-ga","state":"ga","kind":"facility","name":"Bridgeport Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Coweta"],"city":"Moreland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No power estimate in DRI; 500000 gallons daily supply and 100000 wastewater are separate, not 600000 consumption. Three to five billion USD is estimated buildout value. Project Peach approval year conflicts with another report; no preferred year adopted. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/article_55ee204a-0e00-43e4-9ad1-78c92b679d06.html","host":"times-herald.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.2868748,"lng":-84.7679526,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Coweta roundup describes Bridgeport DRI and previously approved rezoning, with buildout value and water/sewage forecasts.","independently_verified_current_operating_status":null},"notes":["No power estimate in DRI; 500000 gallons daily supply and 100000 wastewater are separate, not 600000 consumption. Three to five billion USD is estimated buildout value. Project Peach approval year conflicts with another report; no preferred year adopted.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.times-herald.com/data_center/where-cowetas-five-proposed-data-centers-stand/article_55ee204a-0e00-43e4-9ad1-78c92b679d06.html","host":"times-herald.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Moreland · Coweta · Source context reviewed"},{"id":"4am-development-burkhalter-road-statesboro-ga","state":"ga","kind":"facility","name":"Burkhalter Road Data Center (4AM Development)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bulloch"],"city":"Statesboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Statesboro rezoning vote, remaining special-use hurdle and forecast scopes. Rezoning not final special-use/buildingpermit; no selectedoperatorasofreport.1.2B10yearmodelnotactualspending orlandpurchase.300gpdrestrooms and30to100gpdmakeup differ from10000galloninitialfill and1000gpdpeak. Noise50dBroughsummarynotadoptedprecisepermitlimit. No numeric criticalITMW or currentoperation. Public opposition attendance not countyopinionpoll. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.statesboroherald.com/local/statesboro-mayor-and-council-approve-rezoning-for-burkhalter-data-center-by-3-2-vote/","host":"statesboroherald.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.4049295,"lng":-81.7440222,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Statesboro rezoning vote, remaining special-use hurdle and forecast scopes","fields":{"applicant":"4AM Development LLC","location":"BurkhalterRoad, Statesboro, Georgia","reported_rezoning_approval_date":"2026-08-18","reported_vote":"3-2includingmayortiebreaker","proposed_site_acres_approx":27,"proposed_stories":2,"proposed_area_sqft_approx":230000,"reported_status":"rezoning approved; separate special-use permit still required","developer_funded_model10year_investment_usd":1200000000,"developer_model_fulltime_jobs_approx":12},"notes":["Rezoning not final special-use/buildingpermit; no selectedoperatorasofreport.1.2B10yearmodelnotactualspending orlandpurchase.300gpdrestrooms and30to100gpdmakeup differ from10000galloninitialfill and1000gpdpeak. Noise50dBroughsummarynotadoptedprecisepermitlimit. No numeric criticalITMW or currentoperation. Public opposition attendance not countyopinionpoll.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.statesboroherald.com/local/statesboro-mayor-and-council-approve-rezoning-for-burkhalter-data-center-by-3-2-vote/","host":"statesboroherald.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Statesboro · Bulloch · Source context reviewed"},{"id":"cleanspark-college-park-ga","state":"ga","kind":"facility","name":"CleanSpark College Park Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Fulton"],"city":"College Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Historical transaction agreement, supply expansion and mining draw are different scopes; April2021 completion forecast is not actual completion. No current site capacity adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-agrees-to-acquire-bitcoin-miner-atl-data-center-301190492.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6407,"lng":-84.4277,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"annual_report_property_use":"Company-owned immersion bitcoin mining property in CollegePark.","annual_report_period":"2025-09-30","historical_announcement_date":"2020-12-10","historical_atl_purchase_agreement_up_to_usd_stock":19400000,"historical_power":"20MW facility supply with planned50MW expansion; then9.6MW mining capacity use described separately."},"notes":["Historical transaction agreement, supply expansion and mining draw are different scopes; April2021 completion forecast is not actual completion. No current site capacity adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-agrees-to-acquire-bitcoin-miner-atl-data-center-301190492.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"College Park · Fulton · Source context reviewed"},{"id":"cleanspark-dalton-ga","state":"ga","kind":"facility","name":"CleanSpark Dalton Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Whitfield"],"city":"Dalton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Dalton4 energization mentioned as last week in Sept11,2024 release; exact day unknown and distinct from Dalton3. Do not sum subproject figures into current city operating load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.. MonthlyMWh are energy, not MW or criticalIT. No source records available forAbutmentRoad. Caption1850Abutment conflicts with listing850; do not resolve streetnumber silently. USD9.3millionpurchase plusUSD7millionlaterproject not automaticallycurrentcampuscapex; threeoperationsnotthreeidenticalAIbuildings.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.7698,"lng":-84.9702,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"dalton3_agreement_date":"2024-02-02","dalton3_acquisition_period":"2024-02","dalton3_reported_purchase_price_including_costs_usd":3569000,"parcel_scope":"Approximately2acres Dalton3 subproject, WhitfieldCounty, not all Dalton campuses."},"notes":["Dalton4 energization mentioned as last week in Sept11,2024 release; exact day unknown and distinct from Dalton3. Do not sum subproject figures into current city operating load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-to-add-5-ehs-and-increase-2024-guidance-with-acquisition-of-seven-additional-bitcoin-mining-facilities-in-tennessee-302244673.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.","fields":{"reported_context":"Local reporting separates CleanSpark AbutmentRoad and EnterpriseDrive operations. Two purchasedJune2023forUSD9.3million; third announced2024USD7million. DaltonUtilities records reportedly averaged16770MWh/month at1022Enterprise and10290at952Enterprise over prior12months.","independently_verified_current_operating_status":null},"notes":["MonthlyMWh are energy, not MW or criticalIT. No source records available forAbutmentRoad. Caption1850Abutment conflicts with listing850; do not resolve streetnumber silently. USD9.3millionpurchase plusUSD7millionlaterproject not automaticallycurrentcampuscapex; threeoperationsnotthreeidenticalAIbuildings.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Dalton · Whitfield · Source context reviewed"},{"id":"cleanspark-lafayette-ga","state":"ga","kind":"facility","name":"CleanSpark LaFayette Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Walker"],"city":"LaFayette","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Agreement day not independently specified closing day. Acquisition accounting is not new-campus construction spending, IT load or public incentive. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.7048,"lng":-85.2819,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"asset_purchase_agreement_date":"2025-05-13","seller":"MGT Capital Investments","reported_completed_asset_acquisition_usd":1413000,"cash_consideration_usd":1350000,"transaction_cost_usd":63000},"notes":["Agreement day not independently specified closing day. Acquisition accounting is not new-campus construction spending, IT load or public incentive.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"LaFayette · Walker · Source context reviewed"},{"id":"cleanspark-norcross-ga","state":"ga","kind":"facility","name":"CleanSpark Norcross Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Gwinnett"],"city":"Norcross","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Miner collateral location and subsidiary listing do not independently establish current operating status, street address, commissioning or whole-site load. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.9412,"lng":-84.2135,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"historical_named_site_evidence":"Annual report financing note locates pledged miners at CollegePark and Norcross.","site_it_mw":null},"notes":["Miner collateral location and subsidiary listing do not independently establish current operating status, street address, commissioning or whole-site load.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Norcross · Gwinnett · Source context reviewed"},{"id":"cleanspark-sandersville-ga","state":"ga","kind":"facility","name":"CleanSpark Sandersville Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Washington"],"city":"Sandersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Lease revenues are not capex, subsidies or an awarded tax incentive. Actual executed lease and ready-for-service day not inspected. Existing bitcoin campus and proposed tenant infrastructure are different phases; no new current AI load inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-reports-third-fiscal-quarter-2026-results-302845377.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.9807,"lng":-82.8071,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"lease_announcement":"2026-07-14","initial_lease_years":20,"optional_extensions_years":[5,5],"expected_initial_term_revenue_usd":6600000000,"expected_revenue_if_both_extensions_usd":11600000000,"initial_operations_launch_year":2022,"tenant":"Confidential global technology company, name unverified","september_finance_update":"October9 issuer release reports Sandersville fully funded following notes financing.","landlord_cost_scope":"Estimated10M to12M per criticalIT MW, not a disclosed total site cost."},"notes":["Lease revenues are not capex, subsidies or an awarded tax incentive. Actual executed lease and ready-for-service day not inspected. Existing bitcoin campus and proposed tenant infrastructure are different phases; no new current AI load inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/cleanspark-secures-twenty-year-lease-with-high-investment-grade-global-technology-company-for-data-center-in-sandersville-georgia-302824483.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-reports-third-fiscal-quarter-2026-results-302845377.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.prnewswire.com/news-releases/cleanspark-releases-september-2026-operational-update-302903249.html","host":"prnewswire.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sandersville · Washington · Source context reviewed"},{"id":"cleanspark-twin-city-ga","state":"ga","kind":"facility","name":"CleanSpark Twin City Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Emanuel"],"city":"Twin City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Table net5.49M differs from gross5.9M by assumed0.41M lease liability; do not add these accounting views. Agreement day not independently established closing day. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.5829,"lng":-82.1551,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"asset_purchase_agreement_date":"2025-01-21","seller":"Apex Data Centers","reported_combined_purchase_price_usd":5900000,"cash_consideration_usd":5400000,"transaction_cost_usd":90000,"assumed_lease_liability_usd":410000},"notes":["Table net5.49M differs from gross5.9M by assumed0.41M lease liability; do not add these accounting views. Agreement day not independently established closing day.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Twin City · Emanuel · Source context reviewed"},{"id":"atlas-coosa-project-gracie-floyd-ga","state":"ga","kind":"facility","name":"Coosa Data Center (Project Gracie)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Floyd"],"city":"Rome","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Atlas Gracie versus Sassy proposal identity. Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.257,"lng":-85.1647,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Atlas Gracie versus Sassy proposal identity","fields":{"developer":"Atlas Development","separate_proposals":[{"name":"Project Gracie","locality":"Coosa, FloydCounty, Georgia","proposed_acres":200,"proposed_area_sqft":2400000,"proposed_buildings":7,"target_completion_month":"2032-12","reported_planning_recommendation":"4-3 in favor; CountyBoard decision still required"},{"name":"Project Sassy","locality":"Rome, Georgia","proposed_initial_acres":178,"sought_additional_acres":15}]},"notes":["Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Rome · Floyd · Source context reviewed"},{"id":"coresite-at1-atlanta-ga-ga","state":"ga","kind":"facility","name":"CoreSite AT1 - Atlanta, GA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Atlanta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/at1-atlanta-ga","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7559857,"lng":-84.3911712,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"AT1","published_address":"55 Marietta St NW, Atlanta, GA30303","operator_labeled_area_sqft_lower_bound":62000,"area_qualifier":"plus"},"notes":["Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/at1-atlanta-ga","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Atlanta · Fulton · Source context reviewed"},{"id":"coresite-at2-marietta-data-center-ga","state":"ga","kind":"facility","name":"CoreSite AT2 - Marietta Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cobb"],"city":"Marietta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.coresite.com/data-center/at2-atlanta-ga","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.9255145,"lng":-84.4816338,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"AT2","published_address":"1130 Powers Ferry Place, Marietta, GA30067","operator_labeled_area_sqft_lower_bound":67000,"area_qualifier":"plus"},"notes":["Operator square-footage label, not proven entire shared building or whitefloor-only. NoMWfromredundancy/ACDClabels. NY3adjacenttoNY2sharespublishedstreetbutremainsnamedfacility; novalidatedparcelbuildingcount.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.coresite.com/data-center/at2-atlanta-ga","host":"coresite.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Marietta · Cobb · Source context reviewed"},{"id":"coreweave-dalton-ii-old-tilton-road-whitfield-ga","state":"ga","kind":"facility","name":"CoreWeave Dalton II / Core Scientific Old Tilton Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Whitfield"],"city":"Dalton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Old Tilton Road cadastral identity, separate ownership and tenant roles. Reference point is not independently verified building entrance. Zero-price JDA transfer is not free construction or full incentive value. Prior purchase includes other parcel 13-060-04-000; 3.6M is not this parcel-only capex. No displayed commercial structure does not prove vacancy or closure. CoreWeave tenant identity, operating stage and IT MW remain unverified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.. Neither expired forecast establishesOctoberoperation. ExistingDalton1+2at2205IndustrialSouth andDalton3atBoringDrive are distinct;50MW/142MWand1706/74712monthlyMWh not automatically thisfourthsite or its criticalIT. Main entranceEnterpriseDrive differs fromearlierOldTiltonreference.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gis.whitfieldcountyga.com/GIS/WCGIS/parceldetail.asp?txtrealkey=31339","host":"gis.whitfieldcountyga.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.69265485,"lng":-84.94183002,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Old Tilton Road cadastral identity, separate ownership and tenant roles","fields":{"agency":"Whitfield County Georgia parcel service","parcel":"13-060-01-000","realkey":31339,"owner_as_listed":"Dalton Whitfield County Joint Development Authority","situs":"0 Old Tilton Road","acres":167.56,"tax_bill_recipient":"Core Scientific Inc.","county_reference_point_latitude":34.69265485,"county_reference_point_longitude":-84.94183002,"listed_jda_transfer_date":"2025-12-16","listed_prior_multiple_parcel_purchase_date":"2024-12-20","listed_multiple_parcel_purchase_usd":3600000},"notes":["Reference point is not independently verified building entrance. Zero-price JDA transfer is not free construction or full incentive value. Prior purchase includes other parcel 13-060-04-000; 3.6M is not this parcel-only capex. No displayed commercial structure does not prove vacancy or closure. CoreWeave tenant identity, operating stage and IT MW remain unverified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gis.whitfieldcountyga.com/GIS/WCGIS/parceldetail.asp?txtrealkey=31339","host":"gis.whitfieldcountyga.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Separate named-site section personally read in original local reporting; no transfer of MCA or neighboring-site quantities.","fields":{"reported_context":"Local reporting describes fourth CoreScientific/CoreWeave development, approximately250000squarefeet and145MWundefined capacity, under construction, countyrezoningMarch2025. OriginalJuly2026completionestimate followed official belief operationbySeptember.","independently_verified_current_operating_status":null},"notes":["Neither expired forecast establishesOctoberoperation. ExistingDalton1+2at2205IndustrialSouth andDalton3atBoringDrive are distinct;50MW/142MWand1706/74712monthlyMWh not automatically thisfourthsite or its criticalIT. Main entranceEnterpriseDrive differs fromearlierOldTiltonreference.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/","host":"web.archive.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Dalton · Whitfield · Source context reviewed"},{"id":"databank-indo-cartersville-ga","state":"ga","kind":"facility","name":"DataBank Project Indo","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Technology rezoning and state review pending at report date.2027start/2028to2032delivery forecasts,2.4-billion buildoutVALUE/23-milliontax estimates not realized. No exact application year/date assumed. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html","host":"daily-tribune.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.1651,"lng":-84.7996,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Daily Tribune reports DataBank DRI/rezoning application for69-acre218IndustrialParkRoad in Cartersville.","independently_verified_current_operating_status":null},"notes":["Technology rezoning and state review pending at report date.2027start/2028to2032delivery forecasts,2.4-billion buildoutVALUE/23-milliontax estimates not realized. No exact application year/date assumed.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.daily-tribune.com/news/data-center-eyes-cartersville-industrial-site/article_effaa5c3-3a8b-56dd-bbb3-53d11fb7a072.html","host":"daily-tribune.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Cartersville · Bartow · Source context reviewed"},{"id":"dcblox-atlanta-east-conyers-ga","state":"ga","kind":"facility","name":"DC BLOX Atlanta East Hyperscale Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rockdale"],"city":"Conyers","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. OriginalDecember12,2023body versus September8,2026updated header. Utility total216MWis not criticalIT. Historical delivery target is not a completed opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Page title still coming soon. Completed-and-planned total154is not all energized. Prior216MWutility commitment uses a different basis. Do not add154to216or copy total to each building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/dc-blox-to-build-hyperscale-ready-data-center-campus-rockdale-county-ga/","host":"dcblox.com","date":"2023-12-12","published":"2023-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.66,"lng":-84.02,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"acquired_acres":72,"full_build_design_area_sqft":750000,"utility_committed_total_power_mw":216,"additional_tenant_area_sqft":160000,"historical_expected_delivery":"2025-Q4"},"notes":["OriginalDecember12,2023body versus September8,2026updated header. Utility total216MWis not criticalIT. Historical delivery target is not a completed opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dc-blox-to-build-hyperscale-ready-data-center-campus-rockdale-county-ga/","host":"dcblox.com","date":"2023-12-12","published":"2023-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"published_address":"1726 Farmer Road, Conyers, GA30012","campus_buildings":4,"campus_area_sqft":747787,"critical_capacity_completed_and_planned_mw":154,"building_power_blocks_mw":[10,48,48,48],"site_preparations_started_by":"2024-09"},"notes":["Page title still coming soon. Completed-and-planned total154is not all energized. Prior216MWutility commitment uses a different basis. Do not add154to216or copy total to each building.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/data-centers/atlanta-data-centers/rockdale-county-ga-hyperscale-data-center-campus/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Conyers · Rockdale · Source context reviewed"},{"id":"dc-blox-atlanta-west-ga","state":"ga","kind":"facility","name":"DC BLOX Atlanta West (ATL1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Lithia Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. August11,2025original release body takes precedence over September16,2026updated header. Financing is not spent campus capex. Company-wide470criticalMWfooter and previous265Mloan excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/","host":"dcblox.com","date":"2025-08-11","published":"2025-08-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.7882,"lng":-84.6608,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"construction_green_loan_usd":1150000000,"initial_planned_capacity_mw":120,"additional_planned_capacity_mw":80,"additional_capacity_earliest_target":"2027","power_basis":"release capacity; critical IT versus gross not specified"},"notes":["August11,2025original release body takes precedence over September16,2026updated header. Financing is not spent campus capex. Company-wide470criticalMWfooter and previous265Mloan excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/dcblox-secures-1-15-billion-green-loan-atlanta-data-center-campus-development/","host":"dcblox.com","date":"2025-08-11","published":"2025-08-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lithia Springs · Douglas · Source context reviewed"},{"id":"digital-realty-atl11-ga","state":"ga","kind":"facility","name":"Digital Realty ATL11","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cobb"],"city":"Austell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Requested ATL11 URL returned the Atlanta regional page, which lists ATL13 and ATL14. No current ATL11 facility/address/status is supported; redirect is not closure proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/atlanta/atl11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7465605,"lng":-84.5797407,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Requested ATL11 URL returned the Atlanta regional page, which lists ATL13 and ATL14. No current ATL11 facility/address/status is supported; redirect is not closure proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/atlanta/atl11","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Austell · Cobb · Source context reviewed"},{"id":"digital-realty-atlanta-atl13-ga","state":"ga","kind":"facility","name":"Digital Realty Atlanta ATL13","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Atlanta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/atlanta/atl13","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7555186,"lng":-84.3914814,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"operator_facility_code":"ATL13","published_address":"56 Marietta Street Atlanta, GA 30303","advertised_building_sqft":84000},"notes":["Named facility page and total-building-size field matched. Gross building size is not IT white space. Current advertisement does not certify utilization, uptime, opening date or independently measured power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.digitalrealty.com/data-centers/americas/atlanta/atl13","host":"digitalrealty.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Atlanta · Fulton · Source context reviewed"},{"id":"edged-atlanta-tilford-yard-ga","state":"ga","kind":"facility","name":"Edged Atlanta (ATL01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Atlanta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named issuer release. ReleaseAugust22says ceremonyyesterday.27MWfirstbuilding is within168MWcampus, not all168opened.1.69Beconomicinvestmentregional wording not audited construction spend.70Mfuture taxes not incentive amount. Cooling-water savings design comparison not measured actual consumption; portfolioPUEnotcampusmeasurement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html","host":"prnewswire.com","date":"2024-08-22","published":"2024-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.749,"lng":-84.388,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-release-review-round6-2026-10-14.json","scope":"named issuer release","fields":{"first_building_opening_event_date":"2024-08-21","published_address":"1800 Thomas Street NW, Atlanta, GA","first_building_capacity_mw":27,"planned_campus_critical_capacity_mw":168,"campus_buildings":3,"operator_described_economic_investment_region_usd":1690000000,"tax_revenue_forecast_usd_approx":70000000,"tax_revenue_forecast_period_years":10},"notes":["ReleaseAugust22says ceremonyyesterday.27MWfirstbuilding is within168MWcampus, not all168opened.1.69Beconomicinvestmentregional wording not audited construction spend.70Mfuture taxes not incentive amount. Cooling-water savings design comparison not measured actual consumption; portfolioPUEnotcampusmeasurement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.prnewswire.com/news-releases/edged-data-centers-celebrates-grand-opening-of-new-ultra-efficient-sustainable-data-center-in-atlanta-302228778.html","host":"prnewswire.com","date":"2024-08-22","published":"2024-08-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Atlanta · Fulton · Source context reviewed"},{"id":"flexential-atlanta-alpharetta-data-center-ga","state":"ga","kind":"facility","name":"Flexential Atlanta - Alpharetta Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Alpharetta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0869864,"lng":-84.2518184,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Atlanta - Alpharetta Data Center","publisher_reported_footprint_sqft":142475,"publisher_reported_critical_power_mw":6,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alpharetta · Fulton · Source context reviewed"},{"id":"flexential-atlanta-douglasville-1-ga","state":"ga","kind":"facility","name":"Flexential Atlanta - Douglasville 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Douglasville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Page 32 gives 204,700 square feet building and 150,000 data halls; these are different floor-area scopes. This PDF does not establish a commissioning date. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7310574,"lng":-84.6160809,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Atlanta - Douglasville 1","publisher_reported_footprint_sqft":204700,"publisher_reported_critical_power_mw":22.5,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Page 32 gives 204,700 square feet building and 150,000 data halls; these are different floor-area scopes. This PDF does not establish a commissioning date.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Douglasville · Douglas · Source context reviewed"},{"id":"flexential-atlanta-douglasville-2-ga","state":"ga","kind":"facility","name":"Flexential Atlanta - Douglasville 2","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Douglasville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7307027,"lng":-84.6112398,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Atlanta - Douglasville 2","publisher_reported_footprint_sqft":358000,"publisher_reported_critical_power_mw":36,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Douglasville · Douglas · Source context reviewed"},{"id":"flexential-atlanta-norcross-atl01-02-ga","state":"ga","kind":"facility","name":"Flexential Atlanta - Norcross (ATL01/02)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Gwinnett"],"city":"Norcross","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Source heading groups Norcross without numbered-building split. Apply only to the existing grouped ATL01/02 record, never duplicate per building. Narrative nearly 40,000 square feet plus proposed additional 40,000 differs from 32,740 quick facts. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.9547396,"lng":-84.1985246,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Atlanta - Norcross (ATL01/02)","publisher_reported_footprint_sqft":32740,"publisher_reported_critical_power_mw":2.21,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Source heading groups Norcross without numbered-building split. Apply only to the existing grouped ATL01/02 record, never duplicate per building. Narrative nearly 40,000 square feet plus proposed additional 40,000 differs from 32,740 quick facts.","Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Norcross · Gwinnett · Source context reviewed"},{"id":"google-douglas-county-ga","state":"ga","kind":"facility","name":"Google Douglasville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Douglasville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7514966,"lng":-84.7477136,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Georgia statewide page, separate location milestones","fields":{"douglas_county_opening_year":2007,"announced_new_locations_year":2026,"new_locations":["LaGrange","Columbia County"],"regional_committed_investment_usd_min_exclusive":3000000000,"investment_scope":"Georgia statewide"},"notes":["2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Douglasville · Douglas · Source context reviewed"},{"id":"google-columbia-county-ga","state":"ga","kind":"facility","name":"Google Evans Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Columbia"],"city":"Evans","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.5313102,"lng":-82.2563979,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Georgia statewide page, separate location milestones","fields":{"douglas_county_opening_year":2007,"announced_new_locations_year":2026,"new_locations":["LaGrange","Columbia County"],"regional_committed_investment_usd_min_exclusive":3000000000,"investment_scope":"Georgia statewide"},"notes":["2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Evans · Columbia · Source context reviewed"},{"id":"google-lagrange-ga","state":"ga","kind":"facility","name":"Google LaGrange Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Troup"],"city":"LaGrange","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Georgia statewide page, separate location milestones. 2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.039291,"lng":-85.0313269,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Georgia statewide page, separate location milestones","fields":{"douglas_county_opening_year":2007,"announced_new_locations_year":2026,"new_locations":["LaGrange","Columbia County"],"regional_committed_investment_usd_min_exclusive":3000000000,"investment_scope":"Georgia statewide"},"notes":["2003presence/build narrative versus2007opened milestone are separate date kinds.3B+state total is not per-county capex. No exact new-site opening orMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/georgia/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"LaGrange · Troup · Source context reviewed"},{"id":"montana-property-group-high-falls-road-spalding-ga","state":"ga","kind":"facility","name":"High Falls Road Data Center Campus (Montana Property Group)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spalding"],"city":"Griffin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html","host":"griffindailynews.com","date":"2026-04-25","published":"2026-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.2468,"lng":-84.2641,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Griffin Daily News distinguishes Montana Property Group's High Falls/Alicia proposal from Spalding Investments' High Falls/South McDonough proposal, with different acreage, buildings and reported approval stages.","independently_verified_current_operating_status":null},"notes":["Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html","host":"griffindailynews.com","date":"2026-04-25","published":"2026-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Griffin · Spalding · Source context reviewed"},{"id":"thor-equities-kingston-technology-hub-bartow-ga","state":"ga","kind":"facility","name":"Kingston Technology Hub (Thor Equities)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Kingston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. DRI filing is regional-impact review, not rezoning or construction approval.150 MW is requested peak electrical demand, not critical IT/current load; power supplier named in plans is not examined executed ESA.1 billion project value/2 million annual taxes/2030 completion are forecasts. Publication date saysSeptember 8 while body includes aSeptember 22 campaign event, so date-version provenance is inconsistent; no date inferred for project action. Directory 276 statewide count and 17 DRIs are different non-exhaustive populations. Effingham/OpenAI tax effects and Floyd regulations are separate projects/jurisdictions. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newslinelocal.com/2026/09/08/another-large-data-center-proposed-in-georgia/","host":"newslinelocal.com","date":"2026-09-08","published":"2026-09-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.2367172,"lng":-84.9450325,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Center Square reporting republished by Newsline Local describes Thor Equities’ proposed Kingston DRI, quoting 350,000 squarefeet,559 acres and 150 MW peak power.","independently_verified_current_operating_status":null},"notes":["DRI filing is regional-impact review, not rezoning or construction approval.150 MW is requested peak electrical demand, not critical IT/current load; power supplier named in plans is not examined executed ESA.1 billion project value/2 million annual taxes/2030 completion are forecasts. Publication date saysSeptember 8 while body includes aSeptember 22 campaign event, so date-version provenance is inconsistent; no date inferred for project action. Directory 276 statewide count and 17 DRIs are different non-exhaustive populations. Effingham/OpenAI tax effects and Floyd regulations are separate projects/jurisdictions.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newslinelocal.com/2026/09/08/another-large-data-center-proposed-in-georgia/","host":"newslinelocal.com","date":"2026-09-08","published":"2026-09-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kingston · Bartow · Source context reviewed"},{"id":"edgeconnex-liberty-road-douglas-county-ga","state":"ga","kind":"facility","name":"Liberty Road Data Center Campus (EdgeConneX)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Villa Rica","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Planning recommendations and board votes distinguished. No current appeal result or permanent prohibition inferred. Regional stock counts and advocated tax revenue not adopted as site facts. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.douglascountysentinel.com/douglasville_sentinel/county-rejects-plans-for-700-acre-data-center-campus/article_a5761e68-bcdb-5537-a954-b2a948460ea3.html","host":"douglascountysentinel.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.7314864,"lng":-84.900079,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"land-use-and-special-use-denials","reported_finding":"Douglas County Sentinel reports 4-1 denials of land-use amendment, rezoning and special-use requests for EdgeConneX / East Dothan Village near Liberty Road.","report_display_date":"2026-07-08","independently_verified_current_status":null},"notes":["Planning recommendations and board votes distinguished. No current appeal result or permanent prohibition inferred. Regional stock counts and advocated tax revenue not adopted as site facts.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.douglascountysentinel.com/douglasville_sentinel/county-rejects-plans-for-700-acre-data-center-campus/article_a5761e68-bcdb-5537-a954-b2a948460ea3.html","host":"douglascountysentinel.com","date":"2026-07-08","published":"2026-07-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Villa Rica · Douglas · Source context reviewed"},{"id":"ln-compute-cuthbert-ga","state":"ga","kind":"facility","name":"LN Compute Cuthbert Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Randolph"],"city":"Cuthbert","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. LN Compute is not named; current operator identity needs a crosswalk. Megawatts per hour and kilowatts per hour in the report are unit errors, so no silent conversion to IT MW or energy. Household equivalence and water tests are not independently verified measurements; another county's future groundbreaking is separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.walb.com/2025/09/25/new-crypto-mine-could-pump-millions-into-south-georgia-community/","host":"walb.com","date":"2025-09-25","published":"2025-09-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.77083,"lng":-84.79361,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WALB reports an opened cryptocurrency facility in Cuthbert industrial park, interviewing manager Hao Chen.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["LN Compute is not named; current operator identity needs a crosswalk. Megawatts per hour and kilowatts per hour in the report are unit errors, so no silent conversion to IT MW or energy. Household equivalence and water tests are not independently verified measurements; another county's future groundbreaking is separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.walb.com/2025/09/25/new-crypto-mine-could-pump-millions-into-south-georgia-community/","host":"walb.com","date":"2025-09-25","published":"2025-09-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Cuthbert · Randolph · Source context reviewed"},{"id":"ln-energy-blackshear-pierce-ga","state":"ga","kind":"facility","name":"LN Energy Blackshear Bitcoin Mine","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Pierce"],"city":"Blackshear","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The original county decision and any later appeal remain unreviewed. Prior facilities sold to CleanSpark, their combined capacity and sale price are separate from this proposed site. Utility bills are not investment; noise/health allegations and curtailment promises are not measured effects or an executed contract. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theenergymag.com/news/2025-02-19/georgia-bitcoin-mining-permit-den","host":"theenergymag.com","date":"2025-02-19","published":"2025-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":31.30518,"lng":-82.24207,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Energy Magazine reports unanimous Pierce County denial of LN Energy's requested conditional use at 1199 Cason Road, citing the Blackshear Times.","independently_verified_current_operating_status":null},"notes":["The original county decision and any later appeal remain unreviewed. Prior facilities sold to CleanSpark, their combined capacity and sale price are separate from this proposed site. Utility bills are not investment; noise/health allegations and curtailment promises are not measured effects or an executed contract.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theenergymag.com/news/2025-02-19/georgia-bitcoin-mining-permit-den","host":"theenergymag.com","date":"2025-02-19","published":"2025-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Blackshear · Pierce · Source context reviewed"},{"id":"stillwater-lovejoy-panhandle-road-clayton-ga","state":"ga","kind":"facility","name":"Lovejoy Data Center Campus (Stillwater Development)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clayton"],"city":"Lovejoy","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Lovejoy is separate from unincorporated Clayton County moratorium. Original DRI contains historical applicant forecasts, not current approval, operation, spending or delivered jobs. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Historical governmental form containing applicant forecasts, separate from reported later withdrawal.. Undated captured form. None of these values proves spending, delivered jobs, tax receipts, measured demand, utility commitment or project approval. Water supply and sewage are separate flows, not additive consumption. No radio-button answer inferred from extracted not-selected labels.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.atlantanewsfirst.com/2026/08/07/proposal-clayton-county-data-center-withdrawn/","host":"atlantanewsfirst.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4794","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4516522,"lng":-84.343564,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"formal-withdrawal-reported","reported_finding":"Atlanta News First says Stillwater Lovejoy proposal formally withdrawn at special council session; mayor said residential use pursued instead.","report_display_date":"2026-08-06","independently_verified_current_status":null},"notes":["Lovejoy is separate from unincorporated Clayton County moratorium. Original DRI contains historical applicant forecasts, not current approval, operation, spending or delivered jobs.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.atlantanewsfirst.com/2026/08/07/proposal-clayton-county-data-center-withdrawn/","host":"atlantanewsfirst.com","date":"2026-08-06","published":"2026-08-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Historical governmental form containing applicant forecasts, separate from reported later withdrawal.","fields":{"dri_id":"4794","applicant":"Stillwater Development LLC","local_government":"City of Lovejoy","estimated_buildout_value_usd":13000000000,"estimated_annual_local_tax_revenue_usd":25000000,"estimated_full_time_employees":650,"estimated_peak_connected_load_mw":1250,"power_basis":"Peak connected electrical load, not explicit critical IT capacity","estimated_water_supply_mgd":0.36,"estimated_sewage_mgd":0.36},"notes":["Undated captured form. None of these values proves spending, delivered jobs, tax receipts, measured demand, utility commitment or project approval. Water supply and sewage are separate flows, not additive consumption. No radio-button answer inferred from extracted not-selected labels.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4794","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lovejoy · Clayton · Source context reviewed"},{"id":"meta-stanton-springs-newton-ga","state":"ga","kind":"facility","name":"Meta Newton Data Center (Stanton Springs)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Newton"],"city":"Social Circle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Displayed March 14, 2021 date conflicts with forward-looking construction through 2020. Do not use displayed date as original project announcement or infer current completion. Hundreds of renewable MW are offsite energy context, not IT load. Employment multipliers are not site headcounts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2021/03/hello-georgia/","host":"datacenters.atmeta.com","date":"2021-03-14","published":"2021-03-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.6551,"lng":-83.7182,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"historical_planned_structure_area_sqft":970000,"historical_completion_target_year":2020},"notes":["Displayed March 14, 2021 date conflicts with forward-looking construction through 2020. Do not use displayed date as original project announcement or infer current completion. Hundreds of renewable MW are offsite energy context, not IT load. Employment multipliers are not site headcounts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2021/03/hello-georgia/","host":"datacenters.atmeta.com","date":"2021-03-14","published":"2021-03-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Social Circle · Newton · Source context reviewed"},{"id":"microsoft-firecracker-rome-ga","state":"ga","kind":"facility","name":"Microsoft Data Center Campus - Rome, GA","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Floyd"],"city":"Rome","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending. Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/","host":"allongeorgia.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.27,"lng":-85.16,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["AllOnGeorgia October30,2023 republishes Microsoft/localdevelopmentannouncement of approximately347acres HuffakerRoadRome/Floyd purchase/closing and1B+investment/150futurejobs. Issuer-derivedpublicannouncement, not an independent secondconfirmation ofdeed/spending.","Immediatework/three-yearcompletionwere2023targets, not observed2026RFS. Azureglobal200+sites notnewUSbuildings. No ITMW, exactoperatingdate or latermoratoriumexemption established.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/","host":"allongeorgia.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Rome · Floyd · Source context reviewed"},{"id":"microsoft-douglasville-ga","state":"ga","kind":"facility","name":"Microsoft Douglasville Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Douglasville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. statewide qualification thresholds, no named-site award. Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county","host":"dor.georgia.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7547,"lng":-84.7427,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"statewide qualification thresholds, no named-site award","fields":{},"notes":["Georgia page describes minimum county investment thresholds to qualify for an exemption, not amounts actually spent or tax benefits received by Microsoft Douglasville. Aggregate-expenditure title must not be mistaken for site expenditure dataset.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county","host":"dor.georgia.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Douglasville · Douglas · Source context reviewed"},{"id":"microsoft-east-point-ben-hill-road-ga","state":"ga","kind":"facility","name":"Microsoft East Point Data Center (Ben Hill Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"East Point","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft regional Georgia context without exact Ben Hill match. Regional statement does not identify BenHillRoadspecificparcel/building or individual opening/MW. Workforce includes contractors and multiple sites, not per-campus permanent staff.2030goalsand2025renewablecoveragecommitmentnotmeasuredcurrentachievement. SouthFultonCountypagewordingnotindependentlegaljurisdictionname. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6465885,"lng":-84.5173738,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Microsoft regional Georgia context without exact Ben Hill match","fields":{"operator_region_label":"South Fulton County, Georgia","regional_workforce_forecast":"hundreds of fulltime employees and contractors across operational facilities by end2026","regional_cooling_description":"direct evaporative, no cooling water below29.4degreesCelsius"},"notes":["Regional statement does not identify BenHillRoadspecificparcel/building or individual opening/MW. Workforce includes contractors and multiple sites, not per-campus permanent staff.2030goalsand2025renewablecoveragecommitmentnotmeasuredcurrentachievement. SouthFultonCountypagewordingnotindependentlegaljurisdictionname.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"East Point · Fulton · Source context reviewed"},{"id":"microsoft-fairwater-fayetteville-ga","state":"ga","kind":"facility","name":"Microsoft Fairwater Atlanta (Azure AI Superfactory)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fayette"],"city":"Fayetteville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fayette generic incentives not Fairwater awarded benefits. Not a Microsoft Fairwater project agreement. Generic eligibility and standard abatement descriptions cannot establish an awarded Fairwater benefit or current 2026 tax rates. No project-specific parcel, IT MW, investment, current stage or actual tax payment verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://fayettega.org/doing-business/incentives-tax-rates/","host":"fayettega.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4487,"lng":-84.4549,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Fayette generic incentives not Fairwater awarded benefits","fields":{"publisher":"Fayette County Development Authority","scope":"generic incentive eligibility page","tax_table_year":2021},"notes":["Not a Microsoft Fairwater project agreement. Generic eligibility and standard abatement descriptions cannot establish an awarded Fairwater benefit or current 2026 tax rates. No project-specific parcel, IT MW, investment, current stage or actual tax payment verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://fayettega.org/doing-business/incentives-tax-rates/","host":"fayettega.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Fayetteville · Fayette · Source context reviewed"},{"id":"microsoft-palmetto-fulton-ga","state":"ga","kind":"facility","name":"Microsoft Palmetto Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Palmetto","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Microsoft Palmetto construction chronology. October2025constructiontargetnotobservedcompletionorcustomerenergization. Schoolinformation-sessionvenueandJohnsonRdviewnotverifiedfacilitystreetaddress. No MW or current construction completion in reviewed undated update. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://local.microsoft.com/blog/palmetto-datacenter-construction-update/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.5178907,"lng":-84.6696549,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Microsoft Palmetto construction chronology","fields":{"operator_site_name":"Palmetto datacenter","locality":"Palmetto, Georgia","construction_start":"2024-04","construction_start_precision":"month","historical_construction_completion_estimate":"beginning of2025-10","operator_community_information_session_date":"2024-07-23","general_contractor":"Turner Construction Company"},"notes":["October2025constructiontargetnotobservedcompletionorcustomerenergization. Schoolinformation-sessionvenueandJohnsonRdviewnotverifiedfacilitystreetaddress. No MW or current construction completion in reviewed undated update.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://local.microsoft.com/blog/palmetto-datacenter-construction-update/","host":"local.microsoft.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Palmetto · Fulton · Source context reviewed"},{"id":"microsoft-tyrone-ga","state":"ga","kind":"facility","name":"Microsoft Tyrone Campus (Project Rita)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fayette"],"city":"Tyrone","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Tyrone dated land-use and operator water forecast summary. Local zoning approval not construction permission or operating status. June2status is dated, not independentOctober14permit search. Local abatement statement not all state/federal tax treatment.4000gpdforecast not measured use; construction may use more. No utilityMWfrom generic100MWtariff threshold. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tyronega.gov/datacenter","host":"tyronega.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.494,"lng":-84.588,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Tyrone dated land-use and operator water forecast summary","fields":{"town_council_zoning_approval_date":"2024-03-28","town_reported_permit_status_as_of":"2026-06-02","town_reported_permit_status":"no site plan,land-disturbance or building-permit applications submitted","town_reported_local_incentive_status":"no abatement offered or requested","operator_estimated_operational_water_gallons_per_day_approx":4000},"notes":["Local zoning approval not construction permission or operating status. June2status is dated, not independentOctober14permit search. Local abatement statement not all state/federal tax treatment.4000gpdforecast not measured use; construction may use more. No utilityMWfrom generic100MWtariff threshold.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tyronega.gov/datacenter","host":"tyronega.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tyrone · Fayette · Source context reviewed"},{"id":"northern-data-maysville-jackson-ga","state":"ga","kind":"facility","name":"Northern Data Maysville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jackson"],"city":"Maysville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Canceled informational meeting is not a canceled project or a new denial. The city clerk's interpretation of code is attributed, not independently reviewed law. Maysville here is in Jackson County, Georgia, not Kentucky. No construction, critical IT, exact approval date or operating status established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wgtjradio.com/maysville-rezoning-controversy-just-got-more-controversial/","host":"wgtjradio.com","date":"2026-05-31","published":"2026-05-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.2527233,"lng":-83.5613446,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WGTJ reports cancellation of a Northern Data Maysville informational meeting because previous zoning/conditional-use action had already occurred and scheduling changed.","independently_verified_current_operating_status":null},"notes":["Canceled informational meeting is not a canceled project or a new denial. The city clerk's interpretation of code is attributed, not independently reviewed law. Maysville here is in Jackson County, Georgia, not Kentucky. No construction, critical IT, exact approval date or operating status established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wgtjradio.com/maysville-rezoning-controversy-just-got-more-controversial/","host":"wgtjradio.com","date":"2026-05-31","published":"2026-05-31","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maysville · Jackson · Source context reviewed"},{"id":"oakley-brown-farm-road-cartersville-ga","state":"ga","kind":"facility","name":"Oakley Real Estate Partners Brown Farm Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bartow generic agenda without exact-site evidence. Two-page September2,2026 Bartow Commissioner agenda only says zoning applications see summary sheet, which is not included. No Oakley/Brown Farm project identifier, vote or approval appears in this document. Agenda scheduling cannot establish decision or current stage. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf","host":"cms2.revize.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.1181,"lng":-84.8698,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Bartow generic agenda without exact-site evidence","fields":{},"notes":["Two-page September2,2026 Bartow Commissioner agenda only says zoning applications see summary sheet, which is not included. No Oakley/Brown Farm project identifier, vote or approval appears in this document. Agenda scheduling cannot establish decision or current stage.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf","host":"cms2.revize.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Cartersville · Bartow · Source context reviewed"},{"id":"eagle-rock-pine-ridge-tech-park-twiggs-ga","state":"ga","kind":"facility","name":"Pine Ridge Tech Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Twiggs"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Claims about notice and regional review are plaintiffs allegations; article expressly says county had not responded. No court ruling, injunction or current case outcome established. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/products/residents-sue-georgia-county-over-data-center-plans","host":"govtech.com","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.6467914,"lng":-83.4351636,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-litigation-reported","reported_finding":"Macon Telegraph reporting syndicated by GovTech describes residents suit challenging Twiggs County rezoning for Eagle Rock.","report_display_date":"2025-09-29","independently_verified_current_status":null},"notes":["Claims about notice and regional review are plaintiffs allegations; article expressly says county had not responded. No court ruling, injunction or current case outcome established.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/products/residents-sue-georgia-county-over-data-center-plans","host":"govtech.com","date":"2025-09-29","published":"2025-09-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Twiggs · Source context reviewed"},{"id":"taurus-digital-realty-project-bunkhouse-stilesboro-ga","state":"ga","kind":"facility","name":"Project Bunkhouse (Digital Realty Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Stilesboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bunkhouse filed initial proposal with operator/area holds. Description prints8,675,0000while sizefieldprints8,675,000; scope/typo conflict held, no approved canonical area. Form lists engineering contact as developer, not independentTaurus/DigitalRealty operator confirmation. InitialDRI not rezoning approval, actual build or energized capacity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4433","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.096532,"lng":-84.911951,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Bunkhouse filed initial proposal with operator/area holds","fields":{"dri_id":"4433","project_name":"ProjectBunkhouse","published_location_description":"TaffRoad southofHighway113,BartowCounty,Georgia","published_project_point":{"latitude":34.096532,"longitude":-84.911951,"geo_precision":"applicant-provided project location,not parcel centroid"},"proposed_area_sqft_size_field":8675000,"estimated_completion_year":2035,"printed_property_owner":"GainesFamilyLandLLC"},"notes":["Description prints8,675,0000while sizefieldprints8,675,000; scope/typo conflict held, no approved canonical area. Form lists engineering contact as developer, not independentTaurus/DigitalRealty operator confirmation. InitialDRI not rezoning approval, actual build or energized capacity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4433","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Stilesboro · Bartow · Source context reviewed"},{"id":"atlas-project-bus-temple-ga","state":"ga","kind":"facility","name":"Project Bus (Atlas Development Temple Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carroll"],"city":"Temple","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Page has two date labels and a corporate-location correction that conflicts with its body. Operator identity and exact publication/action dates remain qualified; 2036 is a forecast. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://gradickcommunications.com/data-center-planned-for-development-in-carroll-county/","host":"gradickcommunications.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7376,"lng":-85.0327,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Gradick reports Project Bus / Atlas Development proposal in Carroll County requiring rezoning, annexation and sewer.","independently_verified_current_operating_status":null},"notes":["Page has two date labels and a corporate-location correction that conflicts with its body. Operator identity and exact publication/action dates remain qualified; 2036 is a forecast.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://gradickcommunications.com/data-center-planned-for-development-in-carroll-county/","host":"gradickcommunications.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Temple · Carroll · Source context reviewed"},{"id":"openai-project-camellia-effingham-ga","state":"ga","kind":"facility","name":"Project Camellia (OpenAI Effingham County Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Effingham"],"city":"Rincon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Camellia county forecasts, benefit scopes and incomplete review. County explanation is not independent inspection of executed PILOT, water agreement or all approvals. Forecast PILOT and sales-tax revenue not actual collections or guaranteed sum. 4.3M meal grant is included in 80M community commitment, not extra. ECIDA relief pledge is separate entity commitment. Earlier section school2031 property32M/ESPLOST10.2M and later2032 PILOT39M/ESPLOST13.6M have distinct years/scopes. Construction and operating dates not proven. No diesel after completion is a design plan, not observed zero emissions. No measured water quantities or critical IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center","host":"effinghamcounty.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.296,"lng":-81.2354,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Camellia county forecasts, benefit scopes and incomplete review","fields":{"agency":"Effingham County, Georgia","project":"Project Camellia","named_company":"OpenAI","review_stage":"initial requirements met; county/state reviews, permits and inspections remain","planned_phases":5,"minimum_required_investment_basis_usd":20000000000,"openai_community_commitment_lifetime_usd":80000000,"included_school_meal_grant_2026_27_usd":4300000,"ecida_tax_relief_commitment_annual_usd":30000000,"ecida_tax_relief_years":3,"forecast_pilot_2032_annual_usd":{"county":27000000,"schools":39000000},"forecast_buildout_year":2032,"planned_nonindustrial_neighbor_buffer_feet_min":300,"cooling_plan":"closed loop; treated surface water, not Floridan aquifer groundwater"},"notes":["County explanation is not independent inspection of executed PILOT, water agreement or all approvals. Forecast PILOT and sales-tax revenue not actual collections or guaranteed sum. 4.3M meal grant is included in 80M community commitment, not extra. ECIDA relief pledge is separate entity commitment. Earlier section school2031 property32M/ESPLOST10.2M and later2032 PILOT39M/ESPLOST13.6M have distinct years/scopes. Construction and operating dates not proven. No diesel after completion is a design plan, not observed zero emissions. No measured water quantities or critical IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.effinghamcounty.org/902/Project-Camellia-OpenAI-Data-Center","host":"effinghamcounty.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Rincon · Effingham · Source context reviewed"},{"id":"project-oak-walt-sanders-road-coweta-ga","state":"ga","kind":"facility","name":"Project Oak Data Center (Walt Sanders Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Coweta"],"city":"Newnan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Existing industrial zoning is not data-center approval. Reduced 255-acre scheme distinct from earlier footprint; applicant future plan undecided. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.times-herald.com/news/project-oak-data-center-denied-by-commissioners/article_76db6b0a-615b-48e6-aacd-5042bdd0f401.html","host":"times-herald.com","date":"2026-08-25","published":"2026-08-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4330945,"lng":-84.7301816,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-condition-change-denied","reported_finding":"Newnan Times-Herald reports unanimous Coweta denial of Project Oak request to remove office/warehouse-only condition on previously industrial-zoned land.","report_display_date":"2026-08-25","independently_verified_current_status":null},"notes":["Existing industrial zoning is not data-center approval. Reduced 255-acre scheme distinct from earlier footprint; applicant future plan undecided.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.times-herald.com/news/project-oak-data-center-denied-by-commissioners/article_76db6b0a-615b-48e6-aacd-5042bdd0f401.html","host":"times-herald.com","date":"2026-08-25","published":"2026-08-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Newnan · Coweta · Source context reviewed"},{"id":"cyrusone-project-peach-palmetto-ga","state":"ga","kind":"facility","name":"Project Peach (CyrusOne Palmetto Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Coweta"],"city":"Palmetto","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Peach described as April2025 while May2026 roundup prints April2026: approval year held for original resolution. Allegations/communications not court findings. Sail economics not Peach figures. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.desmog.com/2026/04/07/how-data-center-developers-staked-their-claim-in-rural-georgia/","host":"desmog.com","date":"2026-04-07","published":"2026-04-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.5182,"lng":-84.6693,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"DeSmog distinguishes Project Peach CyrusOne rezoning from Project Sail Atlas/Prologis approval campaign.","independently_verified_current_operating_status":null},"notes":["Peach described as April2025 while May2026 roundup prints April2026: approval year held for original resolution. Allegations/communications not court findings. Sail economics not Peach figures.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.desmog.com/2026/04/07/how-data-center-developers-staked-their-claim-in-rural-georgia/","host":"desmog.com","date":"2026-04-07","published":"2026-04-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Palmetto · Coweta · Source context reviewed"},{"id":"project-ruby-upatoi-muscogee-ga","state":"ga","kind":"facility","name":"Project Ruby (Upatoi Data Center Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Muscogee"],"city":"Columbus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Framework adoption is not approval/operating proof for Ruby. USD5.18billion,865acres,600MWand195jobs are proposal/promoter metrics, powerbasisnotcriticalITverified. USD68.7millionannual2030tax forecast is predepreciation, not cash collected or net fiscal impact. Reported500footbuffer/noise/TierIVconditions need original adopted text; ordinance applies beyond one campus. Open-meetings complaint undecided, not established violation; petition5000not verified local residents. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aol.com/articles/columbus-council-votes-rules-allow-144112000.html","host":"aol.com","date":"2026-06-16","published":"2026-06-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.5487503,"lng":-84.7399283,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Ledger-Enquirer local report syndicated onAOL says ColumbusCouncil voted6-2 June16 for a technology-overlay ordinance; ProjectRuby still needed a developer rezoning request, which had not been submitted.","independently_verified_current_operating_status":null,"reported_framework_vote":"2026-06-16","reported_vote_for":6,"reported_vote_against":2,"developer_rezoning_application_submitted_at_publication":false,"project_approval_verified":false},"notes":["Framework adoption is not approval/operating proof for Ruby. USD5.18billion,865acres,600MWand195jobs are proposal/promoter metrics, powerbasisnotcriticalITverified. USD68.7millionannual2030tax forecast is predepreciation, not cash collected or net fiscal impact. Reported500footbuffer/noise/TierIVconditions need original adopted text; ordinance applies beyond one campus. Open-meetings complaint undecided, not established violation; petition5000not verified local residents.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aol.com/articles/columbus-council-votes-rules-allow-144112000.html","host":"aol.com","date":"2026-06-16","published":"2026-06-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Columbus · Muscogee · Source context reviewed"},{"id":"prologis-project-sail-coweta-ga","state":"ga","kind":"facility","name":"Project Sail - Prologis Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Coweta"],"city":"Newnan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Coweta Project Sail nine-building concept and fiscal estimate. 100Mfutureannualestimate notpaidincentiveoractualtaxreceipt;tenyearsundatednotexact2036. GeorgiaPower2025IRPclaimedapprovalnotthissiteexecutedESA/energization. No numericcriticalITMWoractualsignedincentive/capexverified. Plannedwatercapacity/lowvisibilitystatementsnotindependentengineeringmeasurements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cowetaprojectsail.com/coweta-lp/","host":"cowetaprojectsail.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.3807,"lng":-84.7974,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Coweta Project Sail nine-building concept and fiscal estimate","fields":{"project":"Project Sail","county":"Coweta County, Georgia","planned_buildings":9,"planned_data_center_area_sqft":4340000,"estimated_annual_tax_at_fullbuildout_usd_approx":100000000,"tax_forecast_condition":"fully assessed, completed buildout in roughly10years","site_view_reference":"Wagers Mill Road"},"notes":["100Mfutureannualestimate notpaidincentiveoractualtaxreceipt;tenyearsundatednotexact2036. GeorgiaPower2025IRPclaimedapprovalnotthissiteexecutedESA/energization. No numericcriticalITMWoractualsignedincentive/capexverified. Plannedwatercapacity/lowvisibilitystatementsnotindependentengineeringmeasurements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cowetaprojectsail.com/coweta-lp/","host":"cowetaprojectsail.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Newnan · Coweta · Source context reviewed"},{"id":"atlas-project-sassy-rome-ga","state":"ga","kind":"facility","name":"Project Sassy (Atlas Development Rome Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Floyd"],"city":"Rome","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Atlas Gracie versus Sassy proposal identity. Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.257,"lng":-85.1647,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Atlas Gracie versus Sassy proposal identity","fields":{"developer":"Atlas Development","separate_proposals":[{"name":"Project Gracie","locality":"Coosa, FloydCounty, Georgia","proposed_acres":200,"proposed_area_sqft":2400000,"proposed_buildings":7,"target_completion_month":"2032-12","reported_planning_recommendation":"4-3 in favor; CountyBoard decision still required"},{"name":"Project Sassy","locality":"Rome, Georgia","proposed_initial_acres":178,"sought_additional_acres":15}]},"notes":["Separate projects not merged. Article also lists Sail/Springbank/VillaRica and statewide market totals; not assigned Gracie/Sassy. Publication day absent from saved text; relative next-month/year language not turned into calendar hearing date. Planning recommendation is not final rezoning or permit. No critical ITMW or actual operating status.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/developer-pitches-24m-sf-georgia-data-center-campus-129233","host":"bisnow.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Rome · Floyd · Source context reviewed"},{"id":"atlas-project-springbank-adairsville-ga","state":"ga","kind":"facility","name":"Project Springbank (Atlas Development Bartow County Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Adairsville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. filed initial regional-impact proposal. Initial regional-impact information form not rezoning approval, final permit or construction proof. Checkbox selection states not inferred from plain text. Closed-loop description not measured water use or zero wastewater. Mailing address in Carrollton is developer address, not site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4403","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.30926,"lng":-84.96325,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"filed initial regional-impact proposal","fields":{"dri_id":"4403","project_name":"Project Springbank","submitting_jurisdiction":"Bartow County, Georgia","developer":"Atlas Development LLC","planned_buildings":6,"planned_total_area_sqft":2274000,"published_project_location":{"latitude":34.30926,"longitude":-84.96325,"geo_precision":"applicant-provided project location; not parcel centroid"},"estimated_completion_month":"2031-12"},"notes":["Initial regional-impact information form not rezoning approval, final permit or construction proof. Checkbox selection states not inferred from plain text. Closed-loop description not measured water use or zero wastewater. Mailing address in Carrollton is developer address, not site.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4403","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Adairsville · Bartow · Source context reviewed"},{"id":"project-turbo-okelly-road-gainesville-ga","state":"ga","kind":"facility","name":"Project Turbo (Gainesville Data Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hall"],"city":"Gainesville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Material headline/body stage conflict: canonical withdrawal/approval/currentstatus stays unknown until original county record or later reporting. Do not choose abandonment from headline or construction from proposal. USD25millionannualtax is developer forecast oncefinished, not actual taxes or incentive. No119acrefootprintfrom this visible story, no IT/secured power/water independently verified. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/articles/119-acre-data-center-proposed-152324626.html","host":"yahoo.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.2246468,"lng":-83.783998,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"WSBTV story syndicated onYahoo describes ProjectTurbo proposed atOkellyRoad GainesvilleHallCounty,900000squarefeet/threebuildings/substation, USD1.2billionproposedvalue and developer-requested delay to aSeptember15planning meeting. Headline says plans abandoned while body still says proposed.","independently_verified_current_operating_status":null,"canonical_current_status":null,"headline_body_stage_conflict":true},"notes":["Material headline/body stage conflict: canonical withdrawal/approval/currentstatus stays unknown until original county record or later reporting. Do not choose abandonment from headline or construction from proposal. USD25millionannualtax is developer forecast oncefinished, not actual taxes or incentive. No119acrefootprintfrom this visible story, no IT/secured power/water independently verified.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/articles/119-acre-data-center-proposed-152324626.html","host":"yahoo.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Gainesville · Hall · Source context reviewed"},{"id":"cloverleaf-pumpkin-technology-campus-harlem-ga","state":"ga","kind":"facility","name":"Pumpkin Technology Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Columbia"],"city":"Harlem","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Publisher correction: First Bank made EDACC loan; county supplied security deposit. White Oak transaction/loan is separate from Pumpkin project. Four data buildings, two warehouses and offices are different uses; background acoustics not operational noise. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theaugustapress.com/data-center-project-proposed-along-appling-harlem-road/","host":"theaugustapress.com","date":"2025-12-15","published":"2025-12-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4145834,"lng":-82.3126237,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Augusta Press describes Pumpkin Technology Campus rezoning request and scheduled January planning review.","independently_verified_current_operating_status":null},"notes":["Publisher correction: First Bank made EDACC loan; county supplied security deposit. White Oak transaction/loan is separate from Pumpkin project. Four data buildings, two warehouses and offices are different uses; background acoustics not operational noise.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theaugustapress.com/data-center-project-proposed-along-appling-harlem-road/","host":"theaugustapress.com","date":"2025-12-15","published":"2025-12-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Harlem · Columbia · Source context reviewed"},{"id":"qts-atlanta-1-atlanta-metro-dc1-ga","state":"ga","kind":"facility","name":"QTS Atlanta 1 (Atlanta-Metro DC1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Atlanta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Campus total, not DC1 alone. Substations are planned; no energized utilization or all-building completion inferred. Company conservation acres and annual report totals excluded. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://q.com/data-centers/atlanta/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7776897,"lng":-84.4211544,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"campus_acres":99,"advertised_critical_campus_capacity_mw_lower_bound":278,"planned_dedicated_substations":3},"notes":["Campus total, not DC1 alone. Substations are planned; no energized utilization or all-building completion inferred. Company conservation acres and annual report totals excluded.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://q.com/data-centers/atlanta/","host":"q.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Atlanta · Fulton · Source context reviewed"},{"id":"qts-blue-hole-blakely-ga","state":"ga","kind":"facility","name":"QTS Project Blue Hole","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Early"],"city":"Blakely","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named original reporter/issuer context with current versus historical stage explicit.. JacklynnLambert WTVY August11,2026 originalBlakelymeetingreport sayscityapprovedMOUwithEarlyCounty,schools,developmentauthority/QTS. SOURCECORRECTED earlier TAXBREAK label.7.5Mfirstphasefollowed7Mannualpaymentsreportedcommitments, notabatementvalue/paidreceipts. Sharedfunddistributionandwater/sewer/transportdetailsSTILLTOBEAGREEDpercityattorney. Nofullyexecutedallpartycounterpartread, no unconditionalpaymentguarantee/allpermits/ITMWoroperatingdate. Do notmultiplyundefinedannualdurationoraddunrelatedcommunityprojectcosts. Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wtvy.com/2026/08/11/blakely-approves-agreement-with-qts-data-centers-related-proposed-facility/","host":"wtvy.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":31.3763,"lng":-84.9346,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-opening-land-and-approval-stage-review-round77-2026-10-15.json","scope":"Named original reporter/issuer context with current versus historical stage explicit.","fields":{},"notes":["JacklynnLambert WTVY August11,2026 originalBlakelymeetingreport sayscityapprovedMOUwithEarlyCounty,schools,developmentauthority/QTS. SOURCECORRECTED earlier TAXBREAK label.7.5Mfirstphasefollowed7Mannualpaymentsreportedcommitments, notabatementvalue/paidreceipts.","Sharedfunddistributionandwater/sewer/transportdetailsSTILLTOBEAGREEDpercityattorney. Nofullyexecutedallpartycounterpartread, no unconditionalpaymentguarantee/allpermits/ITMWoroperatingdate. Do notmultiplyundefinedannualdurationoraddunrelatedcommunityprojectcosts.","Not everyfield/currentphysicaloperation/paidfunds/issuedpermit/exactITcertified."],"sources":[{"url":"https://www.wtvy.com/2026/08/11/blakely-approves-agreement-with-qts-data-centers-related-proposed-facility/","host":"wtvy.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Blakely · Early · Source context reviewed"},{"id":"qts-eisenhower-augusta-ga","state":"ga","kind":"facility","name":"QTS Project Eisenhower","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Richmond"],"city":"Augusta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Historical pause is not proof of a moratorium still effective October 14; no later extension or current rule is assumed. Exclusion from the pause is not all permits or commissioning. The proposed one-year extension requested by residents was not the adopted 49-day measure. Neighbor concerns are not health/property-value findings, and nearby Columbia/McDuffie campuses are separate. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wrdw.com/2026/06/02/augustans-urge-city-leaders-put-data-centers-hold/","host":"wrdw.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4735,"lng":-82.0105,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WRDW reports Augusta's 49-day pause on new projects and explicit exclusion of the existing QTS Eisenhower proposal, where groundwork had been observed.","independently_verified_current_operating_status":null,"reported_moratorium_days":49,"reported_action_date":"2026-06-02","source_says_this_project_excluded":true,"moratorium_currently_effective":null},"notes":["Historical pause is not proof of a moratorium still effective October 14; no later extension or current rule is assumed. Exclusion from the pause is not all permits or commissioning. The proposed one-year extension requested by residents was not the adopted 49-day measure. Neighbor concerns are not health/property-value findings, and nearby Columbia/McDuffie campuses are separate.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wrdw.com/2026/06/02/augustans-urge-city-leaders-put-data-centers-hold/","host":"wrdw.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Augusta · Richmond · Source context reviewed"},{"id":"serverfarm-covington-hazelbrand-ga","state":"ga","kind":"facility","name":"Serverfarm Covington Data Center (Hazelbrand Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Newton"],"city":"Covington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. GrantBlankenship GPB July7 updatedJuly8,2026 original reporting of GeorgiaEPD letter: likely air-rule violation and construction pause for VoltaGrid gas generation at ServerfarmCovington. Eight of33planned engines reportedly installed before permit;33GENunits not ITMW. Agencyresponse deadline midJuly is historical, later compliance/currentpermit outcome unknown. UnderlyingEPDletter not directlyread. SELCallegations and regulatorlikely wording not final penalty/settledruling. Blackstone/Halliburton1BVoltaGridinvestment notServerfarmcampuscapex. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law","host":"gpb.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.5968,"lng":-83.8602,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["GrantBlankenship GPB July7 updatedJuly8,2026 original reporting of GeorgiaEPD letter: likely air-rule violation and construction pause for VoltaGrid gas generation at ServerfarmCovington. Eight of33planned engines reportedly installed before permit;33GENunits not ITMW. Agencyresponse deadline midJuly is historical, later compliance/currentpermit outcome unknown. UnderlyingEPDletter not directlyread. SELCallegations and regulatorlikely wording not final penalty/settledruling. Blackstone/Halliburton1BVoltaGridinvestment notServerfarmcampuscapex.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.gpb.org/news/2026/07/07/data-center-power-plant-company-texas-gets-warned-it-may-be-violating-georgia-law","host":"gpb.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Covington · Newton · Source context reviewed"},{"id":"tpa-social-circle-technology-park-ga","state":"ga","kind":"facility","name":"Social Circle Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Newton"],"city":"Social Circle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Jarred Schenke, Bisnow January17,2025 original DRI application report: TPA NewtonCountyTechnologyPark near SocialCircle planned nine buildings/about2.6Msf/317ac/$5B, with$7Mannual local-tax forecast. Filing is not approval, secured power or construction. Separate TilfordYards sale/Meta/Rivian projects not site funding or tenant proof. No MW/firm RFS. Underlying application not inspected; company did not respond. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6562,"lng":-83.7182,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Jarred Schenke, Bisnow January17,2025 original DRI application report: TPA NewtonCountyTechnologyPark near SocialCircle planned nine buildings/about2.6Msf/317ac/$5B, with$7Mannual local-tax forecast. Filing is not approval, secured power or construction. Separate TilfordYards sale/Meta/Rivian projects not site funding or tenant proof. No MW/firm RFS. Underlying application not inspected; company did not respond.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.bisnow.com/atlanta/news/deal-sheet/this-weeks-atlanta-deal-sheet-tpa-group-jumping-into-atlantas-data-center-game-with-massive-newton-county-complex-127605","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Social Circle · Newton · Source context reviewed"},{"id":"spalding-investments-high-falls-road-campus-ga","state":"ga","kind":"facility","name":"Spalding Investments Data Center Campus (High Falls Road)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Spalding"],"city":"Griffin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html","host":"griffindailynews.com","date":"2026-04-25","published":"2026-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.2468,"lng":-84.2641,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Griffin Daily News distinguishes Montana Property Group's High Falls/Alicia proposal from Spalding Investments' High Falls/South McDonough proposal, with different acreage, buildings and reported approval stages.","independently_verified_current_operating_status":null},"notes":["Do not merge the two projects or copy Wallace Jackson/75 South budgets and lawsuits to them. Future tax receipts are modeled, not paid. The article's combined tax-total formatting and Montana floor-area arithmetic are inconsistent, so no reconciled canonical total is adopted. The report says no project had requested a land-disturbance permit. Original ordinances and later permits remain unreviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.griffindailynews.com/news/data-centers-could-bring-high-tax-revenue-to-spalding-county/article_fe0871d7-695d-5ea7-924f-d89b2aeb6b33.html","host":"griffindailynews.com","date":"2026-04-25","published":"2026-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Griffin · Spalding · Source context reviewed"},{"id":"t5-atlanta-i-ga","state":"ga","kind":"facility","name":"STACK ATL01 (formerly T5@Atlanta)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Alpharetta","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. operator/name crosswalk hold. Preferred source is STACK ATL01 while upstream record is named T5 Atlanta I. This source alone does not prove historical ownership/address equivalence. All specifications held as source context until exact crosswalk established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stackinfra.com/locations/americas/atlanta/atl01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.0757915,"lng":-84.264267,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"operator/name crosswalk hold","fields":{"source_identifies_operator":"STACK","source_identifies_site_code":"ATL01","source_identifies_city":"Alpharetta, Georgia","source_campus_critical_capacity_mw":20,"source_campus_buildings":2,"source_campus_acres":18,"source_building_sections":[{"code":"ATL01A","area_sqft":105000,"power_mw":8},{"code":"ATL01B","area_sqft":133000,"power_mw":12}]},"notes":["Preferred source is STACK ATL01 while upstream record is named T5 Atlanta I. This source alone does not prove historical ownership/address equivalence. All specifications held as source context until exact crosswalk established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stackinfra.com/locations/americas/atlanta/atl01/","host":"stackinfra.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alpharetta · Fulton · Source context reviewed"},{"id":"switch-atlanta-the-keep-ga","state":"ga","kind":"facility","name":"Switch Atlanta: The KEEP","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Lithia Springs","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. corporate energy context only. Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.7550251,"lng":-84.5872685,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"corporate energy context only","fields":{},"notes":["Corporate sustainability page, not specifications for the five bound records. 179 MW refers to two Nevada solar stations under construction in 2016, not data-center IT. Las Vegas PUE 1.28 versus estimated Reno 1.20 are historical regional claims, not current individual-building measurements.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.switch.com/sustainable-data-center-designs/","host":"switch.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lithia Springs · Douglas · Source context reviewed"},{"id":"switch-keep-2-atlanta-north-cartersville-ga","state":"ga","kind":"facility","name":"Switch KEEP 2.0 Atlanta North Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Bartow"],"city":"Cartersville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Switch phased regional-impact application. 126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":34.1149,"lng":-84.7938,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Switch phased regional-impact application","fields":{"dri_id":"4061","project_name":"SwitchKEEP2.0AtlantaNorthCampus","initial_phase_site_acres":126,"initial_phase_buildings":1,"initial_phase_completion_target":"2026-Q2","overall_project_completion_target_year":2046,"published_location_description":"south ofOldAlabamaRoad/BatesRoad intersection towardPauldingCountyline,CityofCartersville"},"notes":["126acres andonebuilding are initial phase; form says6.5percent overallacreage, not fullcampus126acres.1620feet is proposed building length, not squarefeet. InitialDRI not approval or actual completion. Checkboxstates not inferred; Nevada developeraddress not site.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4061","host":"apps.dca.ga.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Cartersville · Bartow · Source context reviewed"},{"id":"t5-atlanta-iv-palmetto-ga","state":"ga","kind":"facility","name":"T5 @ Atlanta IV","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Palmetto","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site context, with limited previews/corridor crosswalks explicitly identified.. Jarred Schenke, Bisnow June 12, 2024 original Fairburn planning-director interview: early T5 proposal near I-85/Gullatt, 495,000 square feet/two buildings, land not yet owned and use permit still needed. Limited corridor crosswalk to inherited Atlanta IV/Palmetto row; exact parcel/city-boundary discrepancy and later 200/300 MW claims not resolved here. Existing Lithia Springs and Coweta proposal are separate campuses. DRI filing/review is not construction approval or current operation. Not all fields, current operation, precise parcel or critical IT independently certified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/t5-plotting-data-center-campus-in-fairburn-124663","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.548,"lng":-84.724,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-permit-scope-operator-crosswalks-and-work-resumption-round82-2026-10-15.json","scope":"Named-site context, with limited previews/corridor crosswalks explicitly identified.","fields":{},"notes":["Jarred Schenke, Bisnow June 12, 2024 original Fairburn planning-director interview: early T5 proposal near I-85/Gullatt, 495,000 square feet/two buildings, land not yet owned and use permit still needed. Limited corridor crosswalk to inherited Atlanta IV/Palmetto row; exact parcel/city-boundary discrepancy and later 200/300 MW claims not resolved here. Existing Lithia Springs and Coweta proposal are separate campuses. DRI filing/review is not construction approval or current operation.","Not all fields, current operation, precise parcel or critical IT independently certified."],"sources":[{"url":"https://www.bisnow.com/atlanta/news/data-center/t5-plotting-data-center-campus-in-fairburn-124663","host":"bisnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Palmetto · Fulton · Source context reviewed"},{"id":"ta-realty-east-tanners-church-ellenwood-ga","state":"ga","kind":"facility","name":"TA Realty East Tanners Church Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clayton"],"city":"Ellenwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Ten-year property-tax arrangement starts with 50 percent reduction in year 1 then declines; not 50 percent every year. More than 36 million savings is AJC estimate, not disclosed executed award value or paid subsidy. Forecast 93 million tax revenue is cumulative over ten years, not annual/collected. More than 700 jobs includes temporary construction; roughly 30 employees and 30 contractors are separate operating projections. End 2026 RFS remains future and 180 MW basis is undefined, not critical IT. Site-plan approval in previousOctober is reported history, not all permits/ESA. Later 2026 web modification does not redate the 2025 event. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/policy/clayton-county-ga-agency-approves-tax-break-for-data-center","host":"govtech.com","date":"2025-06-17","published":"2025-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.6101096,"lng":-84.287978,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Atlanta Journal-Constitution reporting republished by Government Technology describes Clayton development-authority approval of a TA Realty incentive package for a proposed 959 million-dollar/180 MW East Tanners Church Road data center.","independently_verified_current_operating_status":null},"notes":["Ten-year property-tax arrangement starts with 50 percent reduction in year 1 then declines; not 50 percent every year. More than 36 million savings is AJC estimate, not disclosed executed award value or paid subsidy. Forecast 93 million tax revenue is cumulative over ten years, not annual/collected. More than 700 jobs includes temporary construction; roughly 30 employees and 30 contractors are separate operating projections. End 2026 RFS remains future and 180 MW basis is undefined, not critical IT. Site-plan approval in previousOctober is reported history, not all permits/ESA. Later 2026 web modification does not redate the 2025 event.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/policy/clayton-county-ga-agency-approves-tax-break-for-data-center","host":"govtech.com","date":"2025-06-17","published":"2025-06-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ellenwood · Clayton · Source context reviewed"},{"id":"edgeconnex-union-city-campus-fulton-ga","state":"ga","kind":"facility","name":"Union City Data Center Campus (EdgeConneX / TA Realty)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Union City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The 324 MW total has an undefined basis. First-phase 2026 delivery, overall 2029 target and 2032 requirement are distinct. Land cost, tax abatement, investment and economic impact must not be summed. Original agreements were not reviewed. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.datacenterfrontier.com/hyperscale/article/55126626/details-emerge-on-microsofts-18-billion-investment-in-atlanta-data-centers-amid-tax-development-wrangles","host":"datacenterfrontier.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.5870558,"lng":-84.5424299,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Data Center Frontier names Union City's Project Steamboat, TA Realty, EdgeConneX and Microsoft end use, citing planning records.","independently_verified_current_operating_status":null},"notes":["The 324 MW total has an undefined basis. First-phase 2026 delivery, overall 2029 target and 2032 requirement are distinct. Land cost, tax abatement, investment and economic impact must not be summed. Original agreements were not reviewed.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.datacenterfrontier.com/hyperscale/article/55126626/details-emerge-on-microsofts-18-billion-investment-in-atlanta-data-centers-amid-tax-development-wrangles","host":"datacenterfrontier.com","date":"2024-07-18","published":"2024-07-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Union City · Fulton · Source context reviewed"},{"id":"vantage-douglasville-campus-ga","state":"ga","kind":"facility","name":"Vantage Data Centers Douglasville Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Douglasville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/","host":"insidetowers.com","date":"2024-08-16","published":"2024-08-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.7515,"lng":-84.7477,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Inside Towers relays Vantage DRI filings for Westlake inSouthFulton 754,000 squarefeet/January 2028 target and separate StacksRoad 697,000 squarefeet/January 2027 target, plus earlier Douglasville 1.7 million-square-foot three-building plan/December 2025 target.","independently_verified_current_operating_status":null,"site_specific_scope":"Douglasville1700000sqft/December2025forecast; Stacks Road is a different campus"},"notes":["Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/","host":"insidetowers.com","date":"2024-08-16","published":"2024-08-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Douglasville · Douglas · Source context reviewed"},{"id":"vantage-westlake-south-fulton-ga","state":"ga","kind":"facility","name":"Vantage Data Centers Westlake","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"South Fulton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/","host":"insidetowers.com","date":"2024-08-16","published":"2024-08-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.6273,"lng":-84.5646,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Inside Towers relays Vantage DRI filings for Westlake inSouthFulton 754,000 squarefeet/January 2028 target and separate StacksRoad 697,000 squarefeet/January 2027 target, plus earlier Douglasville 1.7 million-square-foot three-building plan/December 2025 target.","independently_verified_current_operating_status":null,"site_specific_scope":"Westlake754000sqft/January2028forecast"},"notes":["Keep three projects separate and never assign all floor areas or completion targets to each related ID. DRI filing is not final permit, executed service or operation. All completion dates were forecasts; no observed delivery. EightUScenters/fourstates is a historical operator portfolio description, not current audited census. No site MW or tenant independently verified. Douglasville and Fulton are distinct local jurisdictions; article discusses both, not all inFulton.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/","host":"insidetowers.com","date":"2024-08-16","published":"2024-08-16","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"South Fulton · Fulton · Source context reviewed"},{"id":"white-oak-technology-park-columbia-county-ga","state":"ga","kind":"facility","name":"White Oak Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Columbia"],"city":"Appling","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. LizOwens/EthanHunter WRDW originalFebruary25updated26,2026 plaintiffinterview reports TWOjudicialreviewpetitions filedFebruary25 reWhiteOakandPumpkinCenterrezonings. Allegations oftraffic/water/notice/comprehensiveplanfailures notcourtfindings. WhiteOak1635ApplingHarlemRdaccesschangeattributedtopetition, notsurveyedparcel. Originalpleadings/casenumbers/laterorderunread. JournalistinterpretationthatOCGA5-4-3wasoutdatednotcurrentlegalopinion; do notdeclarecaseinvalid/dismissedfromthisreport. Twofilingsnotonecombinedproject; PumpkinCenteralreadycontextreviewedelsewhere. No ITMW/newcurrentoperations. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wrdw.com/2026/02/26/citizen-files-lawsuits-over-columbia-county-data-centers/","host":"wrdw.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.6,"lng":-82.28,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["LizOwens/EthanHunter WRDW originalFebruary25updated26,2026 plaintiffinterview reports TWOjudicialreviewpetitions filedFebruary25 reWhiteOakandPumpkinCenterrezonings. Allegations oftraffic/water/notice/comprehensiveplanfailures notcourtfindings. WhiteOak1635ApplingHarlemRdaccesschangeattributedtopetition, notsurveyedparcel.","Originalpleadings/casenumbers/laterorderunread. JournalistinterpretationthatOCGA5-4-3wasoutdatednotcurrentlegalopinion; do notdeclarecaseinvalid/dismissedfromthisreport. Twofilingsnotonecombinedproject; PumpkinCenteralreadycontextreviewedelsewhere. No ITMW/newcurrentoperations.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://www.wrdw.com/2026/02/26/citizen-files-lawsuits-over-columbia-county-data-centers/","host":"wrdw.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Appling · Columbia · Source context reviewed"},{"id":"tc-atlanta-development-winston-douglas-ga","state":"ga","kind":"facility","name":"Winston Data Center (Waldrop Farms)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Winston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Reported rezoning action is not all building/environmental approvals, executed utility service or operation. Conditions concern appearance, paths/transit, utility connection, emergency access and heavy vehicles, but exact legal instrument not reviewed; internally awkward project/property reversion wording is not independently interpreted. Forecast 2.4 million/year in 2025 and 96 million over next ten years have unclear annual-versus-cumulative endpoint scope; do not infer 96 million yearly or received taxes. No MW/RFS/capital verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/douglas-county-commissioners-approve-data-210537294.html","host":"yahoo.com","date":"2025-02-05","published":"2025-02-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.725108,"lng":-84.8249382,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"WSB-TV reporting on Yahoo describes Douglas commissioners approving TC Atlanta’s two-building/substation Winston rezoning with added conditions after staff recommended denial.","independently_verified_current_operating_status":null},"notes":["Reported rezoning action is not all building/environmental approvals, executed utility service or operation. Conditions concern appearance, paths/transit, utility connection, emergency access and heavy vehicles, but exact legal instrument not reviewed; internally awkward project/property reversion wording is not independently interpreted. Forecast 2.4 million/year in 2025 and 96 million over next ten years have unclear annual-versus-cumulative endpoint scope; do not infer 96 million yearly or received taxes. No MW/RFS/capital verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/douglas-county-commissioners-approve-data-210537294.html","host":"yahoo.com","date":"2025-02-05","published":"2025-02-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Winston · Douglas · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}