{"state":"in","name":"Indiana","updated":"2026-10-15","checked":"2026-10-15","bounds":[-88.06,37.789,-84.802,41.76],"stats":{"projects":0,"operating":1,"facilities":37,"rule_counties":0,"moratorium_counties":0,"source_records":37,"reviewed_records":37,"status_confirmed":1,"status_unknown":36,"unreviewed_excluded":5,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":42,"manual_source_context_records":37,"published_source_context_records":37,"excluded":{"no_manual_source_review":5},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"google-fort-wayne-in","state":"in","kind":"facility","name":"Google Fort Wayne Data Center (Project Zodiac)","group":"operating","status":"Operating","raw_status":"operational","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Allen"],"city":"Fort Wayne","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Exact coordinates not established by road-intersection description. State press release establishes groundbreaking April 26, 2024, not current opening. Up to 200 jobs includes support categories; incentive term is performance based. Current operator Indiana page now explicitly confirms FortWayne operational; MichiganCity/MorganCounty in development. Current status is sourced separately from2024groundbreaking. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://events.in.gov/event/gov-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana","host":"events.in.gov","date":"2024-04-26","published":"2024-04-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://datacenters.google/locations/indiana/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.99,"lng":-85.056,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"event_status":"groundbreaking","event_date":"2024-04-26","investment_usd":2000000000,"investment_basis":"announced campus investment","jobs_max":200,"incentive":"35-year sales tax exemption for minimum800million eligible capital; additional800million increments qualify for5years each, capped50years.","current_status":"operational"},"notes":["Exact coordinates not established by road-intersection description.","State press release establishes groundbreaking April 26, 2024, not current opening. Up to 200 jobs includes support categories; incentive term is performance based. Current operator Indiana page now explicitly confirms FortWayne operational; MichiganCity/MorganCounty in development. Current status is sourced separately from2024groundbreaking.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://events.in.gov/event/gov-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana","host":"events.in.gov","date":"2024-04-26","published":"2024-04-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://datacenters.google/locations/indiana/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Fort Wayne · Allen · Source context reviewed"},{"id":"aboutbit-merom-sullivan-county-in","state":"in","kind":"facility","name":"AboutBit Merom Cryptocurrency Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Sullivan"],"city":"Merom","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Merom historical cryptocurrency supply agreement announcement. Historicalforecastnotactualopening/current2026service. Original executedWINagreementnotinspected. Liquidcooling/noimpactpromises not measurednoise/environmental findings. MiningseparatefromAI/cloud. Existingpowerstationage notDCfounding;115MWnotstationgenerationandnotper-building. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://rejournals.com/aboutbit-to-turn-portion-of-indiana-power-station-into-cryptocurrency-mining-facility/","host":"rejournals.com","date":"2022-05-18","published":"2022-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.067889,"lng":-87.513056,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Merom historical cryptocurrency supply agreement announcement","fields":{"company":"AboutBit LLC","location":"adjacent MeromGeneratingStation, SullivanCounty, Indiana","use":"cryptocurrency mining","reported_electricity_purchase_agreement_mw":115,"reported_agreement_years":5,"power_basis":"reported electricity supply agreement, not explicit IT or metered consumption","expected_new_jobs_max":15,"announced_opening_target":"within30days ofMay18,2022"},"notes":["Historicalforecastnotactualopening/current2026service. Original executedWINagreementnotinspected. Liquidcooling/noimpactpromises not measurednoise/environmental findings. MiningseparatefromAI/cloud. Existingpowerstationage notDCfounding;115MWnotstationgenerationandnotper-building.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://rejournals.com/aboutbit-to-turn-portion-of-indiana-power-station-into-cryptocurrency-mining-facility/","host":"rejournals.com","date":"2022-05-18","published":"2022-05-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Merom · Sullivan · Source context reviewed"},{"id":"agincourt-valparaiso-porter-county-in","state":"in","kind":"facility","name":"Agincourt Valparaiso Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Porter"],"city":"Valparaiso","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Valparaiso historical city-authored option statement. City-authored statement republished by local outlet, not independent signed option inspection.50Kdeposit includes10Knonrefundable, not60K. Option not purchase or construction approval.2025terms do not establish current2026continuation. No requested incentives asof2025does not mean perpetual no-incentive covenant. New moratorium reviewed separately. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Valparaiso signed moratorium and trigger-based expiry. Signed ordinance establishes adoption and conditional duration, not a fixed6or12month sunset. No assumption Agincourt has or lacks vested rights. Subsequent repeal/amendment and project outcome need separate record. Citywide restriction not allPorterCounty.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://greatnews.life/article/city-of-valparaiso-statement-on-data-center/","host":"greatnews.life","date":"2025-03-07","published":"2025-03-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://www.ci.valparaiso.in.us/Archive.aspx?ADID=6192","host":"ci.valparaiso.in.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5031027,"lng":-87.0201162,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Valparaiso historical city-authored option statement","fields":{"city_statement_date":"2025-03-07","project_company":"Agincourt Investments LLC","rdc_option_approval_date":"2025-01-09","broader_city_owned_land_acres":238,"optioned_acres_approx":180,"initial_due_diligence_days":180,"possible_additional_extension_days":120,"initial_deposit_usd":50000,"included_nonrefundable_usd":10000,"deposit_increase_per30dayextension_usd":25000,"offered_land_price_usd_min_exclusive":9000000,"statement_stage":"no pending data-center design/application asof statement"},"notes":["City-authored statement republished by local outlet, not independent signed option inspection.50Kdeposit includes10Knonrefundable, not60K. Option not purchase or construction approval.2025terms do not establish current2026continuation. No requested incentives asof2025does not mean perpetual no-incentive covenant. New moratorium reviewed separately.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://greatnews.life/article/city-of-valparaiso-statement-on-data-center/","host":"greatnews.life","date":"2025-03-07","published":"2025-03-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"Valparaiso signed moratorium and trigger-based expiry","fields":{"agency":"CityofValparaiso, Indiana","ordinance":"16-2026","adopted_date":"2026-08-10","vote":"6-0","mayor_signed_date":"2026-08-10","mayor_signed_time_local":"19:55","scope":"no approval of new data-center establishment or new land-use approvals/permits","exceptions":["existing lawful uses","routine maintenance, repair or renovation","development with established vested rights"],"expiry_trigger":"effective date of UDO amendments governing data-center development, unless repealed or extended","fixed_expiry_date":null},"notes":["Signed ordinance establishes adoption and conditional duration, not a fixed6or12month sunset. No assumption Agincourt has or lacks vested rights. Subsequent repeal/amendment and project outcome need separate record. Citywide restriction not allPorterCounty.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ci.valparaiso.in.us/Archive.aspx?ADID=6192","host":"ci.valparaiso.in.us","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Valparaiso · Porter · Source context reviewed"},{"id":"amazon-project-rainier-new-carlisle-in","state":"in","kind":"facility","name":"Amazon Project Rainier","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Joseph"],"city":"New Carlisle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical state announcement. Performance conditions and dependency on long-term electricity agreement remain; caps are not disbursements and are not added to capex. Subsequent construction/commissioning needs newer evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana","host":"iedc.in.gov","date":"2024-04-25","published":"2024-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.6978,"lng":-86.5117,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county":"St. Joseph","announced_planned_investment_usd":11000000000,"forecast_jobs_minimum":1000,"announced_sales_tax_exemption_term_years":50,"performance_based_incentive_caps_usd":{"headcount_tax_credits":18300000,"training_grants":5000000,"hoosier_business_investment_credits":55000000,"redevelopment_credits":20000000},"road_infrastructure_contribution_usd_up_to":7000000},"notes":["Historical state announcement. Performance conditions and dependency on long-term electricity agreement remain; caps are not disbursements and are not added to capex. Subsequent construction/commissioning needs newer evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana","host":"iedc.in.gov","date":"2024-04-25","published":"2024-04-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Carlisle · St. Joseph · Source context reviewed"},{"id":"american-tower-pike-township-indianapolis-in","state":"in","kind":"facility","name":"American Tower Pike Township Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marion"],"city":"Indianapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Withdrawal is not zoning denial, existing-facility closure or necessarily permanent abandonment; company did not explain motive or refiling intent. Exact withdrawal day not supplied. Existingbroadcasttower is not an operating data center. HB 1333 was prospective legislation in this account, not independently reviewed enacted law. NoMW, capex, construction orRFSadopted. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yahoo.com/news/articles/american-tower-corporation-withdraws-data-051459463.html","host":"yahoo.com","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.9241559,"lng":-86.2030783,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"WTHR viaYahoo reports AmericanTower withdrew its PikeTownship Indianapolis zoning proposal near 79 thStreet/TownshipLineRoad amid neighborhood opposition.","independently_verified_current_operating_status":null},"notes":["Withdrawal is not zoning denial, existing-facility closure or necessarily permanent abandonment; company did not explain motive or refiling intent. Exact withdrawal day not supplied. Existingbroadcasttower is not an operating data center. HB 1333 was prospective legislation in this account, not independently reviewed enacted law. NoMW, capex, construction orRFSadopted.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yahoo.com/news/articles/american-tower-corporation-withdraws-data-051459463.html","host":"yahoo.com","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indianapolis · Marion · Source context reviewed"},{"id":"aws-hobart-in","state":"in","kind":"facility","name":"AWS Hobart Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Hobart","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Northwest Indiana investment geography and Hobart announcement. 15Bregional+11Bprior=26Bstate total, not52B.15Band1100jobs not Hobart-only. Publisher expected1B15yearratepayersavings/100percentgenerationcostaccountnot independently read utility agreement, actual savings or universal future guarantee. No exact Hobart parcel, numeric ITMW or observed opening. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana","host":"nwiforum.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.517,"lng":-87.263,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Northwest Indiana investment geography and Hobart announcement","fields":{"publisher_role":"Northwest Indiana regional economic-development organization","regional_planned_aws_investment_usd":15000000000,"regional_expected_new_jobs":1100,"statewide_aws_planned_total_usd":26000000000,"prior_st_joseph_county_commitment_usd":11000000000,"hobart_agreement_announcement_date":"2025-11-25"},"notes":["15Bregional+11Bprior=26Bstate total, not52B.15Band1100jobs not Hobart-only. Publisher expected1B15yearratepayersavings/100percentgenerationcostaccountnot independently read utility agreement, actual savings or universal future guarantee. No exact Hobart parcel, numeric ITMW or observed opening.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.nwiforum.org/amazon-invests-15b-in-northwest-indiana","host":"nwiforum.org","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hobart · Lake · Source context reviewed"},{"id":"aws-portage-in","state":"in","kind":"facility","name":"AWS Portage Data Center (AmeriPlex at the Port)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Porter"],"city":"Portage","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Reported 87 million USD combines 35 million building and 52 million equipment; do not add all three. No opening timeline provided; delivery warehouse is separate. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.insideindianabusiness.com/articles/amazon-building-87m-data-center-in-portage","host":"insideindianabusiness.com","date":"2023-12-20","published":"2023-12-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.6090532,"lng":-87.170469,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Inside INdiana Business, citing Times of Northwest Indiana, reports Portage AWS project and proposed tax treatment.","independently_verified_current_operating_status":null},"notes":["Reported 87 million USD combines 35 million building and 52 million equipment; do not add all three. No opening timeline provided; delivery warehouse is separate.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.insideindianabusiness.com/articles/amazon-building-87m-data-center-in-portage","host":"insideindianabusiness.com","date":"2023-12-20","published":"2023-12-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Portage · Porter · Source context reviewed"},{"id":"aws-wheatfield-in","state":"in","kind":"facility","name":"AWS Wheatfield Campus (Project Rise)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jasper"],"city":"Wheatfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. Northwest Indiana Business June 18, 2026 reports officials approved Project Rise June 17, drawing on Northwest Indiana Forum and other attributed reporting. Exact approval instrument, all permits and current construction were not inspected. AWS Wheatfield/Jasper County identity gains context. $7 billion community investment and 250 future jobs are plans, not spending or actual headcount. $98 million described as paid in advance appears in future-deal narrative; independent payment receipt unread. $25 million public-water expansion and separately funded campus water/wastewater infrastructure are different scopes, not measured withdrawal. Annual-revenue/ten-year wording is ambiguous; no multiplied tax total adopted. 304 acres near Schahfer is attributed reporting, not surveyed parcel. 400 MW NIPSCO peaker and $643.7 million plant construction/financing describe generation, not campus IT or data-center capex. Air cooling except about 2% of the year is not 2% of water volume or zero annual use. 425-acre habitat and 110-million-gallon annual water-availability increase are commitments/projections, not completed restoration or campus use. Other regional Amazon investments are separate/possibly overlapping scopes. No complete record/current operating status, signed instruments, measured impacts or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://nwindianabusiness.com/industries/professional-services/information-technology/officials-approve-jasper-county-amazon-data-center/78353/","host":"nwindianabusiness.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.1955,"lng":-87.0586,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["Northwest Indiana Business June 18, 2026 reports officials approved Project Rise June 17, drawing on Northwest Indiana Forum and other attributed reporting. Exact approval instrument, all permits and current construction were not inspected. AWS Wheatfield/Jasper County identity gains context.","$7 billion community investment and 250 future jobs are plans, not spending or actual headcount. $98 million described as paid in advance appears in future-deal narrative; independent payment receipt unread. $25 million public-water expansion and separately funded campus water/wastewater infrastructure are different scopes, not measured withdrawal. Annual-revenue/ten-year wording is ambiguous; no multiplied tax total adopted.","304 acres near Schahfer is attributed reporting, not surveyed parcel. 400 MW NIPSCO peaker and $643.7 million plant construction/financing describe generation, not campus IT or data-center capex. Air cooling except about 2% of the year is not 2% of water volume or zero annual use. 425-acre habitat and 110-million-gallon annual water-availability increase are commitments/projections, not completed restoration or campus use. Other regional Amazon investments are separate/possibly overlapping scopes.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://nwindianabusiness.com/industries/professional-services/information-technology/officials-approve-jasper-county-amazon-data-center/78353/","host":"nwindianabusiness.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wheatfield · Jasper · Source context reviewed"},{"id":"province-group-bristol-innovation-park-elkhart-county-in","state":"in","kind":"facility","name":"Bristol Innovation Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Elkhart"],"city":"Bristol","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The one-billion-USD plan, million square feet, jobs and five-to-seven-year buildout were forecasts. The future council meeting is not approval, and nearby Amazon/Microsoft projects do not identify the Bristol client. No current operation, utility allocation or critical IT established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvpe.org/wvpe-news/2024-09-10/undisclosed-tech-firm-plans-1-billion-data-center-for-bristol","host":"wvpe.org","date":"2024-09-10","published":"2024-09-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.7203,"lng":-85.8175,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WVPE reports Province Group's Bristol proposal for an undisclosed tech company, with a favorable planning recommendation but a delayed town-council vote.","independently_verified_current_operating_status":null},"notes":["The one-billion-USD plan, million square feet, jobs and five-to-seven-year buildout were forecasts. The future council meeting is not approval, and nearby Amazon/Microsoft projects do not identify the Bristol client. No current operation, utility allocation or critical IT established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvpe.org/wvpe-news/2024-09-10/undisclosed-tech-firm-plans-1-billion-data-center-for-bristol","host":"wvpe.org","date":"2024-09-10","published":"2024-09-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Bristol · Elkhart · Source context reviewed"},{"id":"coreweave-digital-crossroads-hammond-in","state":"in","kind":"facility","name":"CoreWeave Digital Crossroads","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Hammond","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hammond official expiration of proposed development agreement. Expired proposed-project agreement does not establish closure of all existing Digital Crossroads operations. No permanent site-wide prohibition or inability to negotiate a different future project inferred. No new operating CoreWeave campus under the expired agreement. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/","host":"gohammond.com","date":"2026-07-01","published":"2026-07-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.5836,"lng":-87.5,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Hammond official expiration of proposed development agreement","fields":{"agency":"City of Hammond, Indiana","announcement_date":"2026-07-01","project_address":"301 Digital Crossroads","agreement_parties":["City of Hammond","Hammond Redevelopment Commission","Decennial Group","CoreWeave"],"development_agreement_expired_date":"2026-06-30","previous_extensions":2,"reason":"required milestones and obligations not satisfied","city_position":"no additional extensions of the current agreement"},"notes":["Expired proposed-project agreement does not establish closure of all existing Digital Crossroads operations. No permanent site-wide prohibition or inability to negotiate a different future project inferred. No new operating CoreWeave campus under the expired agreement.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.gohammond.com/hammond-announces-expiration-of-data-center-development-agreement/","host":"gohammond.com","date":"2026-07-01","published":"2026-07-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hammond · Lake · Source context reviewed"},{"id":"dc-blox-warren-township-marion-county-in","state":"in","kind":"facility","name":"DC BLOX Warren Township Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marion"],"city":"Warren Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Developer page describes a reduced design; 28 MW is a reduction, not resulting capacity. Construction cost and labor subset are not extra investment. Schedule conditional on variance/replat approval; no opening date or approval outcome inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.dcblox.com/indianapolisdatacenter/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.78,"lng":-86.05,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"developer_current_stage":"evaluation, permitting and public engagement","planned_capital_investment_usd_range":[1800000000,2000000000],"peak_construction_jobs_up_to":600,"planned_phases":2,"building1_sqft":70000,"building2_sqft":250000,"building1_target_months_after_approval":24,"construction_cost_estimate_usd":800000000,"labor_cost_subset_usd_approx":320000000,"revised_it_load_reduction_mw":28},"notes":["Developer page describes a reduced design; 28 MW is a reduction, not resulting capacity. Construction cost and labor subset are not extra investment. Schedule conditional on variance/replat approval; no opening date or approval outcome inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.dcblox.com/indianapolisdatacenter/","host":"dcblox.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Warren Township · Marion · Source context reviewed"},{"id":"decennial-akron-fulton-county-in","state":"in","kind":"facility","name":"Decennial Group Akron Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Fulton"],"city":"Akron","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. ABC57 Kylee Leahy February 4, 2026 original open-house report identifies Decennial Group's Akron/Fulton County proposal. Developer said no specific site selected, roughly 300 acres needed, no finalized agreements or construction timeline. Commissioner said no formal proposal received. Early conversations and public open houses are not permits or project approval. $100 million to $150 million describes prospective INFRASTRUCTURE improvements such as roads, bridges and community water, not total campus capex or spent funds. Closed-loop, lighting and noise promises are design claims, not measurements. Prospective hyperscale buyer was unnamed; CoreWeave belongs to the separately described Hammond facility and is not an Akron tenant confirmation. No complete record/current operating status, signed instruments, measured impacts or all-field certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns","host":"abc57.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.0387819,"lng":-86.0282647,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["ABC57 Kylee Leahy February 4, 2026 original open-house report identifies Decennial Group's Akron/Fulton County proposal. Developer said no specific site selected, roughly 300 acres needed, no finalized agreements or construction timeline. Commissioner said no formal proposal received. Early conversations and public open houses are not permits or project approval.","$100 million to $150 million describes prospective INFRASTRUCTURE improvements such as roads, bridges and community water, not total campus capex or spent funds. Closed-loop, lighting and noise promises are design claims, not measurements. Prospective hyperscale buyer was unnamed; CoreWeave belongs to the separately described Hammond facility and is not an Akron tenant confirmation.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns","host":"abc57.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Akron · Fulton · Source context reviewed"},{"id":"google-michigan-city-in","state":"in","kind":"facility","name":"Google Michigan City Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["LaPorte"],"city":"Michigan City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Indiana regional page with named stages. FortWayne2Blink is not MichiganCityinvestment. Regional page supplies no exact MichiganCityopening/MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/indiana/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.7075394,"lng":-86.8950297,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"Indiana regional page with named stages","fields":{"michigan_city_announcement_year":2026,"michigan_city_stage_at_page":"in development","other_named_location_stages":{"Fort Wayne":"operational","Morgan County":"in development"}},"notes":["FortWayne2Blink is not MichiganCityinvestment. Regional page supplies no exact MichiganCityopening/MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/indiana/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Michigan City · LaPorte · Source context reviewed"},{"id":"google-project-louie-monrovia-in","state":"in","kind":"facility","name":"Google Project Louie (Morgan County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Morgan"],"city":"Monrovia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. utility procurement testimony without exact site match. AESIndianaCause46394testimonyherecoversresourceprocurementRFPdesign,evaluation andgenerationbids,notidentifiedGoogleMonroviaProjectLouiesiteapproval. Aggregate14.2GWresourcesoffered and26.7GWproposaloptionsnotdatacenterloadornewbuiltgeneration. Publicredactedcopyonly; noattempttoobtainorreconstructconfidentialattachments. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/9859d501-903e-f111-88b3-001dd802f839/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46394_AESIN_Lee+Direct+Testimony+-+3_042226.pdf","host":"iurc.portal.in.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.57,"lng":-86.35,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"utility procurement testimony without exact site match","fields":{},"notes":["AESIndianaCause46394testimonyherecoversresourceprocurementRFPdesign,evaluation andgenerationbids,notidentifiedGoogleMonroviaProjectLouiesiteapproval. Aggregate14.2GWresourcesoffered and26.7GWproposaloptionsnotdatacenterloadornewbuiltgeneration. Publicredactedcopyonly; noattempttoobtainorreconstructconfidentialattachments.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/9859d501-903e-f111-88b3-001dd802f839/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46394_AESIN_Lee+Direct+Testimony+-+3_042226.pdf","host":"iurc.portal.in.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Monrovia · Morgan · Source context reviewed"},{"id":"surge-hancock-county-megasite-buck-creek-township-in","state":"in","kind":"facility","name":"Hancock County MegaSite","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hancock"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Company response sought more specificity; withdrawal does not prove no future proposal. Different Hancock counties in Iowa, Indiana and Kentucky must remain separate. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wibc.com/623821/developer-pulls-application-to-build-data-center-in-hancock-county/","host":"wibc.com","date":"2025-05-14","published":"2025-05-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.82722,"lng":-85.89833,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-application-withdrawn","reported_finding":"WIBC reports Surge withdrew 775-acre Buck Creek / Hancock MegaSite rezoning application and planning meeting was cancelled.","report_display_date":"2025-05-14","independently_verified_current_status":null},"notes":["Company response sought more specificity; withdrawal does not prove no future proposal. Different Hancock counties in Iowa, Indiana and Kentucky must remain separate.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wibc.com/623821/developer-pulls-application-to-build-data-center-in-hancock-county/","host":"wibc.com","date":"2025-05-14","published":"2025-05-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hancock · Source context reviewed"},{"id":"heartland-industrial-park-sullivan-county-in","state":"in","kind":"facility","name":"Heartland Industrial Park (Fluidstack Sullivan County Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sullivan"],"city":"Merom","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Fluidstack Sullivan large planned valuation and scoped commitments. 65Bdevelopmentscopeunspecifiedequipment/long-termphases;notverifiedactualspend/annuallyrecurringinvestment.4.5Msubsetof50Mnotadditional54.5M. Commitmentsnotactualpayments/transferredland;contractsnotread.55dBnearestDWELLINGnotboundaryorprovenAweighting. No numericITMWorcurrentenergization. Ratepayer/waterguaranteesremainattributeddeveloperclaims. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sullivanfluidstack.io/","host":"sullivanfluidstack.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.0694,"lng":-87.5108,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Fluidstack Sullivan large planned valuation and scoped commitments","fields":{"developer":"Fluidstack","project":"Sullivan County Data Center","state":"Indiana","planned_development_value_usd":65000000000,"forecast_operations_start_year":2027,"community_enhancement_commitment_usd":50000000,"named_community_program_subset_usd":4500000,"land_donation_commitment_acres":15,"operator_named_power_provider":"WIN Energy REMC","voluntary_nearest_dwelling_sound_limit_db":55,"developer_claims_no_local_property_tax_incentives_sought":true},"notes":["65Bdevelopmentscopeunspecifiedequipment/long-termphases;notverifiedactualspend/annuallyrecurringinvestment.4.5Msubsetof50Mnotadditional54.5M. Commitmentsnotactualpayments/transferredland;contractsnotread.55dBnearestDWELLINGnotboundaryorprovenAweighting. No numericITMWorcurrentenergization. Ratepayer/waterguaranteesremainattributeddeveloperclaims.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sullivanfluidstack.io/","host":"sullivanfluidstack.io","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Merom · Sullivan · Source context reviewed"},{"id":"jefferson-proving-ground-data-center-jefferson-county-in","state":"in","kind":"facility","name":"Jefferson Proving Ground Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Madison","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.. Bob Demaree/Paxton, Madison Courier April1,2026 original Ford-family interviews/planning report:549-acre JPG airport proposal/nine buildings7,175,657sf, February site-plan approval reported CONDITIONED on federal/state permits. Not all construction approvals or an operating campus.1880-acre family property is broader, not additive. Three-to-four-year phased timeline has no exact RFS.300 future onsite jobs/$60M annual county tax are forecasts, not payroll/paid receipts. No-abatement/developer-pays-upgrades/closed-loop-water promises not executed ESA, no-rate-increase finding or measured zero site water.25M charitable commitment includes1.5M fairground allocation and500k initial expected, not all additive or verified disbursed. No actual MW stated. Not all fields, current operation, permits, exact parcel or critical IT independently verified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.madisoncourier.com/carroll_news_democrat/news/proposed-jpg-data-center-could-generate-60m-taxes-annually/article_2804a794-5c76-548f-be98-8975b84b2284.html","host":"madisoncourier.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.82,"lng":-85.4,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-issuer-filings-local-plans-and-circular-source-holds-round85-2026-10-15.json","scope":"Named project context: original issuer statement, local reporting or advocacy concerns, with source role and historical/proposed scope explicit.","fields":{},"notes":["Bob Demaree/Paxton, Madison Courier April1,2026 original Ford-family interviews/planning report:549-acre JPG airport proposal/nine buildings7,175,657sf, February site-plan approval reported CONDITIONED on federal/state permits. Not all construction approvals or an operating campus.1880-acre family property is broader, not additive. Three-to-four-year phased timeline has no exact RFS.300 future onsite jobs/$60M annual county tax are forecasts, not payroll/paid receipts. No-abatement/developer-pays-upgrades/closed-loop-water promises not executed ESA, no-rate-increase finding or measured zero site water.25M charitable commitment includes1.5M fairground allocation and500k initial expected, not all additive or verified disbursed. No actual MW stated.","Not all fields, current operation, permits, exact parcel or critical IT independently verified."],"sources":[{"url":"https://www.madisoncourier.com/carroll_news_democrat/news/proposed-jpg-data-center-could-generate-60m-taxes-annually/article_2804a794-5c76-548f-be98-8975b84b2284.html","host":"madisoncourier.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Madison · Jefferson · Source context reviewed"},{"id":"jumping-bison-greensburg-decatur-county-in","state":"in","kind":"facility","name":"Jumping Bison Greensburg Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Decatur"],"city":"Greensburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Publication date is not established. Two 400-million-USD phases form the stated 800-million-USD plan and must not be counted again. A 125-percent wage commitment is not a job count. Hotel investment and jobs in the same story belong to another project; additional approval stages remain. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wrbiradio.com/greensburg-council-approves-era-establishment-data-center-abatement/","host":"wrbiradio.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.3372,"lng":-85.4836,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WRBI reports unanimous seven-zero approval of an economic revitalization area and a ten-year, 60-percent real-property abatement for Jumping Bison's proposed two-phase Greensburg project.","independently_verified_current_operating_status":null},"notes":["Publication date is not established. Two 400-million-USD phases form the stated 800-million-USD plan and must not be counted again. A 125-percent wage commitment is not a job count. Hotel investment and jobs in the same story belong to another project; additional approval stages remain.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wrbiradio.com/greensburg-council-approves-era-establishment-data-center-abatement/","host":"wrbiradio.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Greensburg · Decatur · Source context reviewed"},{"id":"karis-critical-deep-river-merrillville-in","state":"in","kind":"facility","name":"Karis Critical Deep River Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Merrillville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.47,"lng":-87.27,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.","independently_verified_current_operating_status":null},"notes":["The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Merrillville · Lake · Source context reviewed"},{"id":"logix-reality-frankfort-clinton-county-in","state":"in","kind":"facility","name":"Logix Reality Frankfort Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clinton"],"city":"Frankfort","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The full retained article was read; the automatic largest-article excerpt incorrectly selected a related January 7 story. A reported twelve-month reconsideration restriction is not a countywide ban. The separate city zoning variance dated April 23, 2025 does not approve the county project. City-land plans and later outcomes remain unknown. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.clintoncountytoday.com/commissioners-say-no-to-the-rezoning-of-land-for-data-center/","host":"clintoncountytoday.com","date":"2026-01-20","published":"2026-01-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.2792,"lng":-86.5108,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Clinton County Today reports the commissioners' unanimous January 20 denial of Logix's 714.55-acre rezoning after a favorable January 6 planning recommendation.","independently_verified_current_operating_status":null,"reported_rezoning_status":"denied","reported_denial_date":"2026-01-20","countywide_moratorium_verified":false},"notes":["The full retained article was read; the automatic largest-article excerpt incorrectly selected a related January 7 story. A reported twelve-month reconsideration restriction is not a countywide ban. The separate city zoning variance dated April 23, 2025 does not approve the county project. City-land plans and later outcomes remain unknown.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.clintoncountytoday.com/commissioners-say-no-to-the-rezoning-of-land-for-data-center/","host":"clintoncountytoday.com","date":"2026-01-20","published":"2026-01-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Frankfort · Clinton · Source context reviewed"},{"id":"province-group-merrillville-technology-park-in","state":"in","kind":"facility","name":"Merrillville Technology Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Merrillville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.46,"lng":-87.29,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.","independently_verified_current_operating_status":null},"notes":["The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Merrillville · Lake · Source context reviewed"},{"id":"meta-jeffersonville-in","state":"in","kind":"facility","name":"Meta Jeffersonville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Jeffersonville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historical operator announcement. No completion date or delivered renewable supply established by an intent to build and match electricity. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2024/01/hello-jeffersonville/","host":"datacenters.atmeta.com","date":"2024-01-25","published":"2024-01-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.33,"lng":-85.715,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"announcement_date":"2024-01-25","planned_campus_sqft_approx":700000,"forecast_investment_usd_lower_bound":800000000,"forecast_operational_jobs_approx":100,"forecast_peak_construction_workers_lower_bound":1250},"notes":["Historical operator announcement. No completion date or delivered renewable supply established by an intent to build and match electricity.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2024/01/hello-jeffersonville/","host":"datacenters.atmeta.com","date":"2024-01-25","published":"2024-01-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Jeffersonville · Clark · Source context reviewed"},{"id":"meta-lebanon-in","state":"in","kind":"facility","name":"Meta Lebanon (Project Domino)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Boone"],"city":"Lebanon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Meta original dated February11,2026 says it is breaking ground on LebanonIndiana/BooneCounty campus designed for1GW when operational. Basis undefined; not commissionedITMW or observed2026 operation. Over10B planned infrastructure/community investment is not proven spending to date. More than4,000 peak construction jobs and about300operational jobs are forecasts, not current payroll. 1Mannually20years toBooneREMCfund, more than120Mwater/public-infrastructure investments and200Mgal/year watershed-restoration project for10years are stated commitments. They are not verified paid totals, campus water consumption or additional DC capacity. Annual clean-energy matching is not hourly physical supply. Zero water for MAJORITY of year is not zero annual use; LEEDGold is future once-operational claim. No executedESA or measured rate impact verified. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/","host":"about.fb.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.07,"lng":-86.45,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["Meta original dated February11,2026 says it is breaking ground on LebanonIndiana/BooneCounty campus designed for1GW when operational. Basis undefined; not commissionedITMW or observed2026 operation.","Over10B planned infrastructure/community investment is not proven spending to date. More than4,000 peak construction jobs and about300operational jobs are forecasts, not current payroll.","1Mannually20years toBooneREMCfund, more than120Mwater/public-infrastructure investments and200Mgal/year watershed-restoration project for10years are stated commitments. They are not verified paid totals, campus water consumption or additional DC capacity.","Annual clean-energy matching is not hourly physical supply. Zero water for MAJORITY of year is not zero annual use; LEEDGold is future once-operational claim. No executedESA or measured rate impact verified.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/","host":"about.fb.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lebanon · Boone · Source context reviewed"},{"id":"metrobloks-martindale-brightwood-indianapolis-in","state":"in","kind":"facility","name":"Metrobloks Martindale-Brightwood Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Marion"],"city":"Indianapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named operator concept or attributed original local reporting, with dates and numerical scopes.. The Indiana Lawyer May 13, 2026 republishes Taylor Wooten/Indianapolis Business Journal reporting. It reports five residents/property owners and Hoosier Environmental Council filed May 1 challenging MDC's earlier Metrobloks rezoning. Alleged environmental-justice and review failures are plaintiffs' allegations, not a ruling or adjudicated harm. Underlying complaint/docket/current disposition unread; other cited Sabey and Virginia cases are different projects. $500 million, 14 acres and 75 MW are reported project descriptions, with MW basis unspecified. Generator testing 20-to-30 hours, approximately 60,000 gallons initial cooling fill and 5,000 gallons annual top-off are reported developer/filing commitments, not measured use. WFYI's two-building fill figures differ; do not silently choose or add them. Utility-upgrade cost commitment is not proof of actual payment or executed service agreement. No complete record/current operating status, signed instruments, measured impacts or all-field certification. WFYI Farrah Anderson May 4, 2026 original reporting describes City-County Council approval of Metrobloks rezoning for nearly 14 acres at 2505 N. Sherman Ave., a former drive-in. This is a later procedural stage than MDC approval, not construction approval, occupancy or operation. Same meeting's temporary-stay resolution was explicitly NON-BINDING, not an enacted moratorium. Reported letter describes AES contracts, not an inspected executed agreement; no implication that physical residential infrastructure is unaffected. Closed-loop claim is not zero consumption. About 19,000 gallons for building one plus 47,500 for building two are initial fills, not annual consumption. Their 66,500-gallon derived sum differs from IBJ's approximate 60,000 figure; scopes/version unresolved. Community concerns retain attribution. A reported shooting is not evidence identifying who committed it, and is not generalized to opponents.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.theindianalawyer.com/articles/martindale-brightwood-residents-cite-environmental-concerns-in-suit-against-data-center-plan","host":"theindianalawyer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood","host":"wfyi.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.7975,"lng":-86.1197,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["The Indiana Lawyer May 13, 2026 republishes Taylor Wooten/Indianapolis Business Journal reporting. It reports five residents/property owners and Hoosier Environmental Council filed May 1 challenging MDC's earlier Metrobloks rezoning. Alleged environmental-justice and review failures are plaintiffs' allegations, not a ruling or adjudicated harm. Underlying complaint/docket/current disposition unread; other cited Sabey and Virginia cases are different projects.","$500 million, 14 acres and 75 MW are reported project descriptions, with MW basis unspecified. Generator testing 20-to-30 hours, approximately 60,000 gallons initial cooling fill and 5,000 gallons annual top-off are reported developer/filing commitments, not measured use. WFYI's two-building fill figures differ; do not silently choose or add them. Utility-upgrade cost commitment is not proof of actual payment or executed service agreement.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://www.theindianalawyer.com/articles/martindale-brightwood-residents-cite-environmental-concerns-in-suit-against-data-center-plan","host":"theindianalawyer.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"border-state-original-reporting-and-operator-stage-review-round67-2026-10-15.json","scope":"Named operator concept or attributed original local reporting, with dates and numerical scopes.","fields":{},"notes":["WFYI Farrah Anderson May 4, 2026 original reporting describes City-County Council approval of Metrobloks rezoning for nearly 14 acres at 2505 N. Sherman Ave., a former drive-in. This is a later procedural stage than MDC approval, not construction approval, occupancy or operation. Same meeting's temporary-stay resolution was explicitly NON-BINDING, not an enacted moratorium.","Reported letter describes AES contracts, not an inspected executed agreement; no implication that physical residential infrastructure is unaffected. Closed-loop claim is not zero consumption. About 19,000 gallons for building one plus 47,500 for building two are initial fills, not annual consumption. Their 66,500-gallon derived sum differs from IBJ's approximate 60,000 figure; scopes/version unresolved. Community concerns retain attribution. A reported shooting is not evidence identifying who committed it, and is not generalized to opponents.","No complete record/current operating status, signed instruments, measured impacts or all-field certification."],"sources":[{"url":"https://www.wfyi.org/wfyi-news/2026-05-04/metrobloks-data-center-gets-final-approval-for-martindale-brightwood","host":"wfyi.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Indianapolis · Marion · Source context reviewed"},{"id":"microsoft-granger-in","state":"in","kind":"facility","name":"Microsoft Granger Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Joseph"],"city":"Granger","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Advocates' generalized thousand-MW examples and other projects' cost-allocation allegations are not Granger's confirmed IT demand or a regulator's findings. Panel concerns are attributed positions. No executed development agreement, decommissioning bond, utility tariff or completed power plants were independently reviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting","host":"wvpe.org","date":"2026-02-19","published":"2026-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.73,"lng":-86.13,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WVPE reports a Granger community panel on Microsoft's proposed campus and a county official still negotiating a development agreement under an NDA.","independently_verified_current_operating_status":null},"notes":["Advocates' generalized thousand-MW examples and other projects' cost-allocation allegations are not Granger's confirmed IT demand or a regulator's findings. Panel concerns are attributed positions. No executed development agreement, decommissioning bond, utility tariff or completed power plants were independently reviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvpe.org/wvpe-news/2026-02-19/microsoft-data-center-concerns-spark-crowded-granger-meeting","host":"wvpe.org","date":"2026-02-19","published":"2026-02-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Granger · St. Joseph · Source context reviewed"},{"id":"new-carlisle-chicago-trail-data-center-st-joseph-county-in","state":"in","kind":"facility","name":"New Carlisle Chicago Trail Data Center (rezoning denied)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Joseph"],"city":"New Carlisle","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. A yes vote meant denying rezoning; do not reverse vote semantics. Article does not identify developer corporate entity or establish current resubmission outcome. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle","host":"wvpe.org","date":"2025-12-10","published":"2025-12-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.7003,"lng":-86.5089,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"rezoning-denied","reported_finding":"WVPE reports St Joseph County Council rejected rezoning needed for Chicago Trail proposal near New Carlisle after overnight meeting.","report_display_date":"2025-12-10","independently_verified_current_status":null},"notes":["A yes vote meant denying rezoning; do not reverse vote semantics. Article does not identify developer corporate entity or establish current resubmission outcome.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wvpe.org/wvpe-news/2025-12-10/council-denies-rezoning-for-data-center-near-new-carlisle","host":"wvpe.org","date":"2025-12-10","published":"2025-12-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Carlisle · St. Joseph · Source context reviewed"},{"id":"outrigger-washington-daviess-county-in","state":"in","kind":"facility","name":"Outrigger Industrial Washington Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Daviess"],"city":"Washington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Google, Meta, Amazon, hospitals and banks are examples, not tenants. Projected 250 to 500 MW has no critical-IT basis. Building and equipment cost ranges have different scopes; forecasts of jobs and ten-year tax receipts are not observed benefits. A requested will-serve letter is not an executed service agreement. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.ipm.org/news/2026-03-24/new-data-center-proposed-near-washington-ind","host":"ipm.org","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.65,"lng":-87.05,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WFIU reports Outrigger's preliminary 120-acre Washington-area concept, with water/sewer assurances, ordinance work and utility agreements still needed before an end user would commit.","independently_verified_current_operating_status":null},"notes":["Google, Meta, Amazon, hospitals and banks are examples, not tenants. Projected 250 to 500 MW has no critical-IT basis. Building and equipment cost ranges have different scopes; forecasts of jobs and ten-year tax receipts are not observed benefits. A requested will-serve letter is not an executed service agreement.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.ipm.org/news/2026-03-24/new-data-center-proposed-near-washington-ind","host":"ipm.org","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Washington · Daviess · Source context reviewed"},{"id":"posey-county-boberg-road-data-center-in","state":"in","kind":"facility","name":"Posey County Boberg Road Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Posey"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Do not convert headline or URL into completed denial vote. Two-year moratorium was residents request, not adoption. Signed NDA is not a development approval. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.14news.com/2026/08/04/posey-co-commissioners-vote-no-proposed-data-center-near-boberg-hoenert-rd/","host":"14news.com","date":"2026-08-04","published":"2026-08-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.033661,"lng":-87.7368008,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"commissioner-intention-not-recorded-vote","reported_finding":"WFIE body says commissioners would vote no on Boberg/Hoenert proposal, yet also says no official proposal received and meeting adjourned after comment.","report_display_date":"2026-08-04","independently_verified_current_status":null},"notes":["Do not convert headline or URL into completed denial vote. Two-year moratorium was residents request, not adoption. Signed NDA is not a development approval.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.14news.com/2026/08/04/posey-co-commissioners-vote-no-proposed-data-center-near-boberg-hoenert-rd/","host":"14news.com","date":"2026-08-04","published":"2026-08-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Posey · Source context reviewed"},{"id":"powerhouse-hobart-lake-county-in","state":"in","kind":"facility","name":"PowerHouse Hobart","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Hobart","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW. DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-hobart","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.5322592,"lng":-87.2550353,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["Operator Hobart page lists170acres/1.89MdevelopableSF/up tosix buildings/up totwo stories and450MW MAXUTILITYpower as development specifications. Not commissioned buildings or ITMW.","DeliveryQ22027, entitlements/design2025 to 26, construction/delivery2027 to 30 and powerdeliveryQ22027 are printed schedules. No inference that all450MW is available Q22027 or that permits/contracts have issued.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.powerhousedata.com/data-center/powerhouse-hobart","host":"powerhousedata.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hobart · Lake · Source context reviewed"},{"id":"project-shirley-eagle-creek-township-lake-county-in","state":"in","kind":"facility","name":"Project Shirley","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Eagle Creek Township","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. A five-billion-USD plan, 500 MW and promised jobs are prospective with no verified critical-IT basis. Negotiable community benefits are not paid commitments. Other Amazon/Google GenCo deals, statewide utility demand and derivative narrow census counts are not this site's capacity or an independent national census. Regulatory/tariff assertions remain attributed pending original orders; nearby land speculation is not another confirmed campus. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/","host":"latitudemedia.com","date":"2026-05-01","published":"2026-05-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.31,"lng":-87.3,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Latitude Media discusses Sentinel's proposed Eagle Creek Project Shirley and a postponed rezoning vote, saying no executed IURC service agreement had been filed at publication.","independently_verified_current_operating_status":null},"notes":["A five-billion-USD plan, 500 MW and promised jobs are prospective with no verified critical-IT basis. Negotiable community benefits are not paid commitments. Other Amazon/Google GenCo deals, statewide utility demand and derivative narrow census counts are not this site's capacity or an independent national census. Regulatory/tariff assertions remain attributed pending original orders; nearby land speculation is not another confirmed campus.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/","host":"latitudemedia.com","date":"2026-05-01","published":"2026-05-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Eagle Creek Township · Lake · Source context reviewed"},{"id":"prologis-shelbyville-in","state":"in","kind":"facility","name":"Prologis Shelbyville Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Shelby"],"city":"Shelbyville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. City explicitly requires separate applications, permits and regulatory approvals before construction. Annexation, rezoning and economic agreement are not construction/operation approval. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364","host":"shelbyville.in.gov","date":"2026-04-06","published":"2026-04-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.5214,"lng":-85.7769,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"municipal_action_date":"2026-04-06","annexation_and_rezoning_approved":true,"economic_development_resolution":"2026-06","resolution_vote":"4-2-1","site_acres_approx":429,"buildings_up_to":11,"estimated_investment_usd_approx":2000000000},"notes":["City explicitly requires separate applications, permits and regulatory approvals before construction. Annexation, rezoning and economic agreement are not construction/operation approval.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.shelbyville.in.gov/m/newsflash/Home/Detail/364","host":"shelbyville.in.gov","date":"2026-04-06","published":"2026-04-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Shelbyville · Shelby · Source context reviewed"},{"id":"provident-chesterton-porter-county-in","state":"in","kind":"facility","name":"Provident Chesterton Data Center Campus (former Brassie Golf Club)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Porter"],"city":"Chesterton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named municipal/limited original-witness or operator context; dates and source origins explicit.. Original Chesterton TownCouncil minutes datedJune10,2024, pages1 to 2, record DanaLafata referencing attorneyGregBabcock's letter on behalfofPPMChestertonLLC, BrassieDevelopmentLLC andProvidentRealtyAdvisors. Minutes state clientformallywithdrew PUDandannexationpetitions forformerBrassieGolfCourse. Page2 continues the account and records official/residentresponses. This corroborates the inherited cancelled/withdrawn stage with original municipal context, not a newly discovered2026cancellation. Underlying letter/petitionwithdrawal and citedJune7pressrelease notseparatelyinspected. No permanentcityban, laterrevival, exactparceladdress, publishedMW or new investmentfigure inferred. Unrelatedlight/HOA/publiccomment subjects are differentpropertyissues. Textpages1 to 3read;only1 to 2visuallyinspected;otherthreepagesnotread. Not full-field, exact parcel, currentoperations or independently audited numerical certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024","host":"chestertonin.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":41.6006171,"lng":-87.0910251,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-state-original-minutes-and-source-origin-review-round69-2026-10-15.json","scope":"Named municipal/limited original-witness or operator context; dates and source origins explicit.","fields":{},"notes":["Original Chesterton TownCouncil minutes datedJune10,2024, pages1 to 2, record DanaLafata referencing attorneyGregBabcock's letter on behalfofPPMChestertonLLC, BrassieDevelopmentLLC andProvidentRealtyAdvisors. Minutes state clientformallywithdrew PUDandannexationpetitions forformerBrassieGolfCourse. Page2 continues the account and records official/residentresponses.","This corroborates the inherited cancelled/withdrawn stage with original municipal context, not a newly discovered2026cancellation. Underlying letter/petitionwithdrawal and citedJune7pressrelease notseparatelyinspected. No permanentcityban, laterrevival, exactparceladdress, publishedMW or new investmentfigure inferred. Unrelatedlight/HOA/publiccomment subjects are differentpropertyissues. Textpages1 to 3read;only1 to 2visuallyinspected;otherthreepagesnotread.","Not full-field, exact parcel, currentoperations or independently audited numerical certification."],"sources":[{"url":"https://www.chestertonin.org/DocumentCenter/View/15057/Town-Council-Meeting-Minutes-6102024","host":"chestertonin.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Chesterton · Porter · Source context reviewed"},{"id":"qlevr-charlestown-clark-county-in","state":"in","kind":"facility","name":"QLEVR Charlestown Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clark"],"city":"Charlestown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Only the public introduction was read. Encoded premium body was not decoded. The economic summary's 105-million-USD and fourteen-to-sixteen-month schedule are proposal claims, not spending or observed completion. A future plan-commission hearing is not approval; original filing and power basis remain unreviewed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newsandtribune.com/news/data-center-proposed-for-charlestowns-shadow-lake-park/article_b0967582-6664-4499-a2b4-44dfcfa4702a.html","host":"newsandtribune.com","date":"2026-05-27","published":"2026-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.4517,"lng":-85.67,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The News and Tribune's public introduction identifies QLEVR LLC's Shadow Lake request, with 12 acres, about 55,000 square feet and a proposed 3 MW facility.","independently_verified_current_operating_status":null},"notes":["Only the public introduction was read. Encoded premium body was not decoded. The economic summary's 105-million-USD and fourteen-to-sixteen-month schedule are proposal claims, not spending or observed completion. A future plan-commission hearing is not approval; original filing and power basis remain unreviewed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newsandtribune.com/news/data-center-proposed-for-charlestowns-shadow-lake-park/article_b0967582-6664-4499-a2b4-44dfcfa4702a.html","host":"newsandtribune.com","date":"2026-05-27","published":"2026-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Charlestown · Clark · Source context reviewed"},{"id":"radiusdc-plainfield-hendricks-county-in","state":"in","kind":"facility","name":"RadiusDC Plainfield Campus (Indy I / Indy II)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hendricks"],"city":"Plainfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. RadiusDC says it is DEVELOPING two facilities IndyI/IndyII at9323AllPointsParkway,PlainfieldIN46168. Each100,000sf and12MWBUILDINGUTILITYcapacity; not100,000sf/12MW shared-campus total or12MWIT. Two6MWhalls and rack power400W/sf are subfacility specs, not extra utility capacity to add. The isolated In-Service label near utility information does not override developing prose or establish both buildings are operating. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.radius-dc.com/location/indianapolis","host":"radius-dc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.7416036,"lng":-86.35343,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["RadiusDC says it is DEVELOPING two facilities IndyI/IndyII at9323AllPointsParkway,PlainfieldIN46168. Each100,000sf and12MWBUILDINGUTILITYcapacity; not100,000sf/12MW shared-campus total or12MWIT.","Two6MWhalls and rack power400W/sf are subfacility specs, not extra utility capacity to add. The isolated In-Service label near utility information does not override developing prose or establish both buildings are operating.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.radius-dc.com/location/indianapolis","host":"radius-dc.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Plainfield · Hendricks · Source context reviewed"},{"id":"vantage-pittsboro-in","state":"in","kind":"facility","name":"Vantage Pittsboro Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hendricks"],"city":"Pittsboro","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Agricultural rezoning request and futureFebruary 25 planning/March 18 earliest council review are not approvals. Building MWbasis is undefined, not commissioned critical IT.618 rezoningacreage includes 285 DCacres; do not add them. Incentives/site review were future steps and no award value is given. Vantage 13 billion debt/equity and 9.2 billion equity are global/company financing, not Pittsboro capex. Other Indiana 25 billion potential pipeline and unrelatedMorgan 391 acreproposal cannot be assigned to this site. No exact RFS or tenant verified. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.insideindianabusiness.com/articles/data-center-developer-eyeing-618-acre-site-in-hendricks-county","host":"insideindianabusiness.com","date":"2025-02-07","published":"2025-02-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.8656,"lng":-86.4675,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Inside INdiana Business publicly readable article describes Vantage’s 618-acre Pittsboro rezoning request, with about 285 acres intended for the data center and three buildings described as 256/96/48 MW.","independently_verified_current_operating_status":null},"notes":["Agricultural rezoning request and futureFebruary 25 planning/March 18 earliest council review are not approvals. Building MWbasis is undefined, not commissioned critical IT.618 rezoningacreage includes 285 DCacres; do not add them. Incentives/site review were future steps and no award value is given. Vantage 13 billion debt/equity and 9.2 billion equity are global/company financing, not Pittsboro capex. Other Indiana 25 billion potential pipeline and unrelatedMorgan 391 acreproposal cannot be assigned to this site. No exact RFS or tenant verified.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.insideindianabusiness.com/articles/data-center-developer-eyeing-618-acre-site-in-hendricks-county","host":"insideindianabusiness.com","date":"2025-02-07","published":"2025-02-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pittsboro · Hendricks · Source context reviewed"},{"id":"blue-ladder-wolcott-white-county-in","state":"in","kind":"facility","name":"Wolcott Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["White"],"city":"Wolcott","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Wolcott developer concept and conflicting buildout timing. Homepage says full build-out2029 while tax chart labels2030; keep exact completion date null. Four building footprints exclude separate office/warehouse. Noise under50dBA is proposed limit, not measured observation. No numeric ITMW or signed no-incentive agreement. Tax-cut claims and35Mcommitment not actual receipts or independent fiscal finding. NoBlueLadderlegalentityidentityinreviewedbody. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wolcottdatacenter.com/","host":"wolcottdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":40.7581,"lng":-87.0281,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Wolcott developer concept and conflicting buildout timing","fields":{"project_name":"Wolcott Data Center","county":"White County, Indiana","proposed_campus_acres":322,"planned_data_center_buildings":4,"planned_each_data_building_footprint_sqft":327612,"planned_office_sqft":50000,"planned_warehouse_sqft":100000,"expected_construction_jobs_approx":1000,"developer_community_enhancement_commitment_usd":35000000,"developer_claims_no_incentives_sought":true,"full_buildout_year_conflict":[2029,2030]},"notes":["Homepage says full build-out2029 while tax chart labels2030; keep exact completion date null. Four building footprints exclude separate office/warehouse. Noise under50dBA is proposed limit, not measured observation. No numeric ITMW or signed no-incentive agreement. Tax-cut claims and35Mcommitment not actual receipts or independent fiscal finding. NoBlueLadderlegalentityidentityinreviewedbody.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wolcottdatacenter.com/","host":"wolcottdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wolcott · White · Source context reviewed"},{"id":"wylie-capital-broadway-merrillville-in","state":"in","kind":"facility","name":"Wylie Capital Broadway Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lake"],"city":"Merrillville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":41.4828,"lng":-87.3328,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"GovTech reproduces reporting on three separate Merrillville proposals: Province Group near Colorado/Harms, Wylie near Broadway/93rd/Georgia, and Karis near 101st east of Deep River park.","independently_verified_current_operating_status":null},"notes":["The roughly two-billion-USD combined headline is not each project's budget. Separate reported plans are up to 500 million, 600 million and 900 million USD respectively. Modeled economic impact is not capex. Nearby housing counts are not DC jobs. Early plans do not establish approval, MW or operation.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/artificial-intelligence/2b-in-data-center-projects-planned-for-merrillville-ind","host":"govtech.com","date":"2024-11-25","published":"2024-11-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Merrillville · Lake · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}