{"state":"ks","name":"Kansas","updated":"2026-10-15","checked":"2026-10-15","bounds":[-102.054,36.995,-94.611,40.002],"stats":{"projects":0,"operating":0,"facilities":13,"rule_counties":0,"moratorium_counties":0,"source_records":13,"reviewed_records":13,"status_confirmed":0,"status_unknown":13,"unreviewed_excluded":2,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":15,"manual_source_context_records":13,"published_source_context_records":13,"excluded":{"no_manual_source_review":2},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"beale-gardner-johnson-county-ks","state":"ks","kind":"facility","name":"Beale Infrastructure Gardner Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"Gardner","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.. KCUR publishes credited JohnsonCountyPost original byMargaretMellott May7,2026. Reports Beale withdrew Gardner application May6 following city position that no incentives would be provided. May4council tookNOACTIONonproposal; withdrawal is not councildenial or permanentcountyban. 300ac near191stStreet/SouthClareRoad, initial50jobs and15 to 20kgpdwater were proposed, not built/headcount/metereduse. Comparative5MGD genericbenchmark not actualGardnerwithdrawal. Separate DeSoto3.1B project and other southernJohnsonCounty withdrawals are not the same parcel; do not copy funding, buildings or groundbreaking into Gardner. Exactsignedwithdrawal/cityrelease not read here. Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kcur.org/housing-development-section/2026-05-07/gardner-data-center-plan-withdrawn-by-company-after-resident-opposition","host":"kcur.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.81,"lng":-94.93,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"border-states-and-named-operator-review-round53-2026-10-15.json","scope":"Relevant named facility/specification/article body, not all footer stories, linked contracts, certificates or all historical events.","fields":{},"notes":["KCUR publishes credited JohnsonCountyPost original byMargaretMellott May7,2026. Reports Beale withdrew Gardner application May6 following city position that no incentives would be provided. May4council tookNOACTIONonproposal; withdrawal is not councildenial or permanentcountyban.","300ac near191stStreet/SouthClareRoad, initial50jobs and15 to 20kgpdwater were proposed, not built/headcount/metereduse. Comparative5MGD genericbenchmark not actualGardnerwithdrawal.","Separate DeSoto3.1B project and other southernJohnsonCounty withdrawals are not the same parcel; do not copy funding, buildings or groundbreaking into Gardner. Exactsignedwithdrawal/cityrelease not read here.","Source classes and project/date/power/water/financial-scope limitations apply. Not all-field or current-site certification."],"sources":[{"url":"https://www.kcur.org/housing-development-section/2026-05-07/gardner-data-center-plan-withdrawn-by-company-after-resident-opposition","host":"kcur.org","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Gardner · Johnson · Source context reviewed"},{"id":"beale-project-pilot-de-soto-ks","state":"ks","kind":"facility","name":"Beale Project Pilot (De Soto)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"De Soto","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. DeSoto incentives ceiling versus project cost and water scope. 50B is reported incentive-eligible private investment ceiling, not city general debt, actual spend or50Bpublicsubsidy. Original final agreement/bonds not inspected. Specific tenant unknown despite namechecking Google/Meta/Amazon/Microsoft. Water rights increased capacity belongs city system; generic millions-gallons/day examples not measured Pilot use. NearbyPanasonicandFlintCommerce warehouse distinct from computing buildings. No critical ITMW or current operations. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://johnsoncountypost.com/2025/08/26/de-soto-advances-3-1-billion-data-center-project-near-panasonic-plant-267209/","host":"johnsoncountypost.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.966,"lng":-94.967,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"DeSoto incentives ceiling versus project cost and water scope","fields":{"project":"Project Pilot","developer_entity":"Mount Sunflower Properties LLC, managed by Beale Infrastructure","city":"DeSoto, Kansas","reported_site_acres":290,"reported_project_investment_usd":3100000000,"reported_incentive_eligible_irb_ceiling_usd":50000000000,"planned_buildings":4,"planned_each_building_sqft":285000,"planned_combined_sqft":1140000,"first_building_target_year":2027,"fullbuildout_duration_years_range":[5,9],"reported_per_building_abatement_years":10},"notes":["50B is reported incentive-eligible private investment ceiling, not city general debt, actual spend or50Bpublicsubsidy. Original final agreement/bonds not inspected. Specific tenant unknown despite namechecking Google/Meta/Amazon/Microsoft. Water rights increased capacity belongs city system; generic millions-gallons/day examples not measured Pilot use. NearbyPanasonicandFlintCommerce warehouse distinct from computing buildings. No critical ITMW or current operations.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://johnsoncountypost.com/2025/08/26/de-soto-advances-3-1-billion-data-center-project-near-panasonic-plant-267209/","host":"johnsoncountypost.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"De Soto · Johnson · Source context reviewed"},{"id":"crypto-colo-center-mclouth-ks","state":"ks","kind":"facility","name":"Crypto Colo Center McLouth Data Center (proposed)  -  cancelled","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Jefferson"],"city":"McLouth","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. McLouth city only recommended denial; county had jurisdiction outside city.32.4MWproposed generation not IT demand. Historical pause cannot be presumed active October2026; no current restart result verified. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://startlandnews.com/2023/03/no-crypto/","host":"startlandnews.com","date":"2023-03-06","published":"2023-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.19611,"lng":-95.20833,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"Flatland report via Startland says Crypto Colo application withdrawn February27,2023 and Jefferson County enacted twelve-month pause.","independently_verified_current_operating_status":null},"notes":["McLouth city only recommended denial; county had jurisdiction outside city.32.4MWproposed generation not IT demand. Historical pause cannot be presumed active October2026; no current restart result verified.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://startlandnews.com/2023/03/no-crypto/","host":"startlandnews.com","date":"2023-03-06","published":"2023-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"McLouth · Jefferson · Source context reviewed"},{"id":"colossus-bullock-spring-hill-ks","state":"ks","kind":"facility","name":"Data Center Proposal at 191st & Renner, Spring Hill  -  cancelled","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"Spring Hill","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Industrial rezoning withdrawn; final intended land use was not specifically confirmed by officials. No completed operating data center or citywide ban inferred. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kshb.com/news/local-news/kansas/johnson-county/developers-drop-application-to-develop-possible-data-center-in-spring-hill","host":"kshb.com","date":"2026-03-06","published":"2026-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.7430646,"lng":-94.8255166,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"KSHB reproduces Bullock/Colossus withdrawal statement, with Spring Hill mayor confirmation and cancelled March25 special meeting.","independently_verified_current_operating_status":null},"notes":["Industrial rezoning withdrawn; final intended land use was not specifically confirmed by officials. No completed operating data center or citywide ban inferred.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kshb.com/news/local-news/kansas/johnson-county/developers-drop-application-to-develop-possible-data-center-in-spring-hill","host":"kshb.com","date":"2026-03-06","published":"2026-03-06","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Spring Hill · Johnson · Source context reviewed"},{"id":"databank-overland-park-ks","state":"ks","kind":"facility","name":"DataBank MCI2 Pine Ridge Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"Overland Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/kansas-city/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.975738717441,"lng":-94.708635080112,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"MCI2","street":"10605 W.84thTerrace","city":"Overland Park","critical_it_capacity_mw":2,"it_area_sqft":11510,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/kansas-city/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/data-centers/kansas-city/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Overland Park · Johnson · Source context reviewed"},{"id":"databank-lenexa-ks","state":"ks","kind":"facility","name":"DataBank MCI3 South Lake Campus Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"Lenexa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Market14.8MW describes multiple centers, not MCI3. Campus summary66,920 ITsqft versus MCI3card69,762 ITsqft differs; retain scope-specific figures and flag conflict. Operator explicitly lists MCI3 at11200LakeviewAve and MCI2 in Overland Park. Market header says2facilities while narrative says3; do not turn market total into one-site capacity. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/kansas-city/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.925685125075,"lng":-94.769520334995,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Lenexa","street":"11200 Lakeview Ave","facility_code":"MCI3","power_mw":12.75,"power_basis":"critical IT load specification","it_area_sqft":69762},"notes":["Market14.8MW describes multiple centers, not MCI3.","Campus summary66,920 ITsqft versus MCI3card69,762 ITsqft differs; retain scope-specific figures and flag conflict.","Operator explicitly lists MCI3 at11200LakeviewAve and MCI2 in Overland Park. Market header says2facilities while narrative says3; do not turn market total into one-site capacity.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/kansas-city/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lenexa · Johnson · Source context reviewed"},{"id":"evolution-technology-bourbon-county-ks","state":"ks","kind":"facility","name":"Evolution Technology Bitcoin Mine (Bourbon County)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Bourbon"],"city":"Uniontown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. No adopted moratorium or crime finding is established. A resident's ChatGPT-derived wind-noise reference is not verified cryptocurrency law. Complaints are attributed observations, without certified acoustic measurements or health causation. Unrelated county purchases are not incentives. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://fortscott.biz/news/bourbon-county-commission-discusses-bitcoin-mining-noise-issue-cemetery-records","host":"fortscott.biz","date":"2025-10-07","published":"2025-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.8473,"lng":-94.9753,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Fort Scott Biz reports Bourbon County, Kansas discussion of Evolution Technology generator noise, an investigation and a rough moratorium draft.","independently_verified_current_operating_status":null},"notes":["No adopted moratorium or crime finding is established. A resident's ChatGPT-derived wind-noise reference is not verified cryptocurrency law. Complaints are attributed observations, without certified acoustic measurements or health causation. Unrelated county purchases are not incentives.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://fortscott.biz/news/bourbon-county-commission-discusses-bitcoin-mining-noise-issue-cemetery-records","host":"fortscott.biz","date":"2025-10-07","published":"2025-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Uniontown · Bourbon · Source context reviewed"},{"id":"kanza-park-flint-hills-emporia-ks","state":"ks","kind":"facility","name":"Flint Hills Digital Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lyon"],"city":"Emporia","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Gigawatt-scale language supplies no exact critical IT MW. Economic-development endorsement is not a permit, identified tenant, groundbreaking or observed hearing outcome. Forecast spending and jobs are not measured benefits. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wibw.com/2026/06/02/flint-hills-digital-campus-proposed-emporia/","host":"wibw.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.4040054,"lng":-96.181623,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"WIBW reports Kanza Park Place predevelopment near Emporia and a scheduled June 23 hearing.","independently_verified_current_operating_status":null},"notes":["Gigawatt-scale language supplies no exact critical IT MW. Economic-development endorsement is not a permit, identified tenant, groundbreaking or observed hearing outcome. Forecast spending and jobs are not measured benefits.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wibw.com/2026/06/02/flint-hills-digital-campus-proposed-emporia/","host":"wibw.com","date":"2026-06-02","published":"2026-06-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Emporia · Lyon · Source context reviewed"},{"id":"google-project-helium-sharon-ks","state":"ks","kind":"facility","name":"Google Data Center (Project Helium)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Barber"],"city":"Sharon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Barber County authoritative document-discovery index. County document index lists Helium agreements, presentations and forecasts but not signed contractual terms in HTML. No project MW, incentive dollars, executed effective date or actual tax receipts adopted before reading linked instruments. Public partner website link not proof of operating data center. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://barber.ks.gov/data-center.html","host":"barber.ks.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.2486335,"lng":-98.4206316,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Barber County authoritative document-discovery index","fields":{},"notes":["County document index lists Helium agreements, presentations and forecasts but not signed contractual terms in HTML. No project MW, incentive dollars, executed effective date or actual tax receipts adopted before reading linked instruments. Public partner website link not proof of operating data center.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://barber.ks.gov/data-center.html","host":"barber.ks.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sharon · Barber · Source context reviewed"},{"id":"cloverleaf-bluestem-tonganoxie-ks","state":"ks","kind":"facility","name":"Project Bluestem","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Leavenworth"],"city":"Tonganoxie","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Bluestem conceptual developer statement. Undated no-application statement is not independently current local docket check. Generic building-size FAQ not actual campus plan. Closed-loop cooling still has initial fill and domestic water. Ratepayer promises not signed tariff or independent finding. Frenchtown Michigan image attribution does not relocate Kansas project. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://bluestemdatacenter.com/","host":"bluestemdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.1097,"lng":-95.0877,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"Bluestem conceptual developer statement","fields":{"project_name":"Project Bluestem","locality":"near Tonganoxie Business Park, Leavenworth County, Kansas","developer":"Cloverleaf Infrastructure","source_described_stage":"conceptual, no formal local approval or permit requests submitted at time of undated text","expected_phase1_construction_years_min_exclusive":2,"expected_construction_jobs_min_exclusive":1000,"expected_initial_fulltime_jobs_min_exclusive":50,"expected_full_buildout_fulltime_jobs_min_exclusive":200},"notes":["Undated no-application statement is not independently current local docket check. Generic building-size FAQ not actual campus plan. Closed-loop cooling still has initial fill and domestic water. Ratepayer promises not signed tariff or independent finding. Frenchtown Michigan image attribution does not relocate Kansas project.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://bluestemdatacenter.com/","host":"bluestemdatacenter.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tonganoxie · Leavenworth · Source context reviewed"},{"id":"red-wolf-dcd-properties-project-red-wolf-ks","state":"ks","kind":"facility","name":"Project Red Wolf","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wyandotte"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Staff recommendation and scheduled meetings are not commission or board approval. The operating company is explicitly undisclosed. No power, current construction, commissioning or later outcome established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wyandottenewsdaily.com/large-data-center-project-prompts-special-planning-commission-meeting/","host":"wyandottenewsdaily.com","date":"2025-05-27","published":"2025-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.132358,"lng":-94.88035,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Wyandotte News Daily describes Red Wolf Park North rezoning and master-plan requests for over240acres and six proposed buildings, with a favorable staff recommendation and meetings scheduled.","independently_verified_current_operating_status":null},"notes":["Staff recommendation and scheduled meetings are not commission or board approval. The operating company is explicitly undisclosed. No power, current construction, commissioning or later outcome established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wyandottenewsdaily.com/large-data-center-project-prompts-special-planning-commission-meeting/","host":"wyandottenewsdaily.com","date":"2025-05-27","published":"2025-05-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas City · Wyandotte · Source context reviewed"},{"id":"powertransitions-project-yardbird-ks","state":"ks","kind":"facility","name":"Project Yardbird","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wyandotte"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Issuer marketing and conceptual plan, not executed land/tenant/utility agreement, current operating campus or delivered criticalIT.161kVtransmission voltage is not MW; new150MWon-siteGENis not additive IT or proof built. StateSB98policy eligibility is not site-specific tax award. PartnersGroup170billionAUM and team50billionexperience are not campus capex. Planned demolition/permits and power-ready dates remain forecasts. Publicly served flipbook has confidentiality/distribution notice; retained for internal source evaluation, do not redistribute presentation/media as press asset or imply NDA execution. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City","host":"wsp.cld.bz","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.147,"lng":-94.635,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"Public PowerTransitions Quindaro presentation markets40acres at3601North12thStreet KansasCityKansas and option to purchase/lease, with150MWgridpower targetedQ1-2027 and150plusadditionalMWtargetedQ1-2028, totaling300plusMWGROSS. Presentation states nonbinding until definitive written agreement.","independently_verified_current_operating_status":null,"issuer_planned_gross_grid_mw_phase1":150,"issuer_planned_gross_grid_mw_phase2_lower_bound":150,"issuer_planned_gross_grid_mw_total_lower_bound":300,"phase1_power_target":"Q1 2027","phase2_power_target":"Q1 2028","critical_it_mw":null,"executed_utility_agreement_verified":false},"notes":["Issuer marketing and conceptual plan, not executed land/tenant/utility agreement, current operating campus or delivered criticalIT.161kVtransmission voltage is not MW; new150MWon-siteGENis not additive IT or proof built. StateSB98policy eligibility is not site-specific tax award. PartnersGroup170billionAUM and team50billionexperience are not campus capex. Planned demolition/permits and power-ready dates remain forecasts. Publicly served flipbook has confidentiality/distribution notice; retained for internal source evaluation, do not redistribute presentation/media as press asset or imply NDA execution.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City","host":"wsp.cld.bz","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas City · Wyandotte · Source context reviewed"},{"id":"tierpoint-kansas-city-lenexa-ks","state":"ks","kind":"facility","name":"TierPoint Kansas City - Lenexa","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Johnson"],"city":"Lenexa","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/kansas/kansas-city-lenexa/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.9406295,"lng":-94.7552326,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":58000,"gross_area_is_lower_bound":true,"raised_floor_sqft":11000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 2.5 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/kansas/kansas-city-lenexa/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lenexa · Johnson · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}