{"state":"me","name":"Maine","updated":"2026-10-15","checked":"2026-10-15","bounds":[-71.082,43.058,-66.98,47.461],"stats":{"projects":0,"operating":0,"facilities":7,"rule_counties":0,"moratorium_counties":0,"source_records":7,"reviewed_records":7,"status_confirmed":0,"status_unknown":7,"unreviewed_excluded":1,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":8,"manual_source_context_records":7,"published_source_context_records":7,"excluded":{"no_manual_source_review":1},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"centra-portland-me","state":"me","kind":"facility","name":"CENTRA Digital Interconnect -- 340 Cumberland (PMW01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cumberland"],"city":"Portland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Headline2.5K MVA conflicts with prose up to2.5MVA; suppress malformed headline. Headline1.1K SF building footprint should be checked against tech sheet before publication. MVA is not MW without power-factor basis. Operator identifies PWM1 carrier hotel and1MW critical capacity. Page headline power/area typography conflicts with prose. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.centradigital.com/data-centers/pwm1","host":"centradigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.6578388,"lng":-70.2613785,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Portland","street":"340 Cumberland Ave","facility_code":"PWM1","critical_capacity_mw":1,"utility_potential_mva":2.5,"utility_basis":"up to2.5MVA potential, apparent power"},"notes":["Headline2.5K MVA conflicts with prose up to2.5MVA; suppress malformed headline.","Headline1.1K SF building footprint should be checked against tech sheet before publication.","MVA is not MW without power-factor basis.","Operator identifies PWM1 carrier hotel and1MW critical capacity. Page headline power/area typography conflicts with prose.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.centradigital.com/data-centers/pwm1","host":"centradigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Portland · Cumberland · Source context reviewed"},{"id":"liquidcool-loring-afb-me","state":"me","kind":"facility","name":"Loring LiquidCool Data Center (Green 4 Maine Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Aroostook"],"city":"Limestone","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification. DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/","host":"mainemorningstar.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":46.9502,"lng":-67.8849,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification.","DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/","host":"mainemorningstar.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Limestone · Aroostook · Source context reviewed"},{"id":"millcompute-bates-mill-lewiston-me","state":"me","kind":"facility","name":"MillCompute Bates Mill No. 3 AI Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Androscoggin"],"city":"Lewiston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The requested 20-year TIF/credit-enhancement terms were not awarded. Developer claims about utility prices and water were not independently verified. Rejection of this proposal is not a citywide moratorium or permanent prohibition on all later proposals. No operating facility is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mainepublic.org/business-and-economy/2025-12-17/lewiston-city-council-shoots-down-data-center-proposal","host":"mainepublic.org","date":"2025-12-17","published":"2025-12-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.0970175,"lng":-70.2183307,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Maine Public reports unanimous Lewiston council rejection on December 16 of MillCompute's Bates Mill No. 3 proposal.","independently_verified_current_operating_status":null,"reported_proposal_status":"rejected","reported_rejection_date":"2025-12-16"},"notes":["The requested 20-year TIF/credit-enhancement terms were not awarded. Developer claims about utility prices and water were not independently verified. Rejection of this proposal is not a citywide moratorium or permanent prohibition on all later proposals. No operating facility is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mainepublic.org/business-and-economy/2025-12-17/lewiston-city-council-shoots-down-data-center-proposal","host":"mainepublic.org","date":"2025-12-17","published":"2025-12-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Lewiston · Androscoggin · Source context reviewed"},{"id":"nautilus-millinocket-me","state":"me","kind":"facility","name":"Nautilus Data Technologies Data Center (Former Great Northern Paper Mill / One North)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Penobscot"],"city":"Millinocket","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. industrial remediation funding context, site match limited. Cleanup grant to OurKatahdin, not Nautilus data-center capex or a data-center approval.1400acres describes former mill complex, not specific campus footprint. No ITMW or current operation established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.epa.gov/newsreleases/investing-millinocket-epa-maine-officials-highlight-former-paper-mill-site","host":"epa.gov","date":"2025-06-09","published":"2025-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.6501257,"lng":-68.7073294,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"industrial remediation funding context, site match limited","fields":{"cleanup_property_address":"1 Katahdin Avenue,Millinocket,Maine","reported_brownfields_cleanup_grant_selection_usd":4000000,"cleanup_scope":"former paper-mill roll-storage and machine-shop buildings"},"notes":["Cleanup grant to OurKatahdin, not Nautilus data-center capex or a data-center approval.1400acres describes former mill complex, not specific campus footprint. No ITMW or current operation established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.epa.gov/newsreleases/investing-millinocket-epa-maine-officials-highlight-former-paper-mill-site","host":"epa.gov","date":"2025-06-09","published":"2025-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Millinocket · Penobscot · Source context reviewed"},{"id":"new-england-energy-sanford-woods-dc-me","state":"me","kind":"facility","name":"Sanford Woods Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["York"],"city":"Sanford","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Feasibility and a legislator's confidence are not a development commitment or operating plant. The 900-million to 1.5-billion-USD range is a generic cost-guide comparison for 100 MW, not a Sanford project budget. Utility water capacity and a crossing main are not allocated rights; future committee and legislative outcomes are unknown. The blank automatic article selection was corrected using the retained main body. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://sanfordspringvalenews.com/company-eyes-sanford-site-for-data-center/","host":"sanfordspringvalenews.com","date":"2026-02-20","published":"2026-02-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.4387179,"lng":-70.7746224,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Sanford Springvale News reports New England Energy exploring a 100 to 300 MW concept on 1,060 acres, with on-site hydrogen fuel cells/solar discussed by a legislator.","independently_verified_current_operating_status":null},"notes":["Feasibility and a legislator's confidence are not a development commitment or operating plant. The 900-million to 1.5-billion-USD range is a generic cost-guide comparison for 100 MW, not a Sanford project budget. Utility water capacity and a crossing main are not allocated rights; future committee and legislative outcomes are unknown. The blank automatic article selection was corrected using the retained main body.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://sanfordspringvalenews.com/company-eyes-sanford-site-for-data-center/","host":"sanfordspringvalenews.com","date":"2026-02-20","published":"2026-02-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Sanford · York · Source context reviewed"},{"id":"sentinel-jay-me","state":"me","kind":"facility","name":"Sentinel Data Centers Androscoggin Mill Campus, Jay","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Jay","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Support letter is not final construction authorization, operating status or legislative exemption. January 1, 2027 stripping/handover contract deadline is future, not service availability. Developer’s 150 MW solar generation, at-most 25 MW grid draw and 82 MW local supply are different scopes, not additive critical IT. Reported 300,000 gallons/day makeup and historical mill 35 to 40 million gallons/day remain attributed, not actual metered use or zero-water cooling. $550 million investment, 800 to 1,000 construction workers and 125 to 150 operating jobs are forecasts. Proposed LD307 and minority amendment were not law in this report; later enacted/vetoed outcomes govern. Auto extractor chose unrelated related story, corrected from retained main body. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://themainemonitor.org/jay-backs-data-center-plan/","host":"themainemonitor.org","date":"2026-03-25","published":"2026-03-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.5024,"lng":-70.2175,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Maine Monitor reports Jay’s board voted 4 to 0 with one abstention to prepare a letter supporting JGT2’s proposed former-mill redevelopment for identified client Sentinel.","independently_verified_current_operating_status":null},"notes":["Support letter is not final construction authorization, operating status or legislative exemption. January 1, 2027 stripping/handover contract deadline is future, not service availability. Developer’s 150 MW solar generation, at-most 25 MW grid draw and 82 MW local supply are different scopes, not additive critical IT. Reported 300,000 gallons/day makeup and historical mill 35 to 40 million gallons/day remain attributed, not actual metered use or zero-water cooling. $550 million investment, 800 to 1,000 construction workers and 125 to 150 operating jobs are forecasts. Proposed LD307 and minority amendment were not law in this report; later enacted/vetoed outcomes govern. Auto extractor chose unrelated related story, corrected from retained main body.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://themainemonitor.org/jay-backs-data-center-plan/","host":"themainemonitor.org","date":"2026-03-25","published":"2026-03-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Jay · Franklin · Source context reviewed"},{"id":"wiscasset-proposed-me","state":"me","kind":"facility","name":"Wiscasset Data Center (Old Ferry Road Site)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lincoln"],"city":"Wiscasset","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original reporter/issuer named-project context, with inference and stages explicit.. JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification. DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact. Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/","host":"mainemorningstar.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.0015,"lng":-69.6553,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-withdrawals-power-redesign-and-review-stage-round79-2026-10-15.json","scope":"Original reporter/issuer named-project context, with inference and stages explicit.","fields":{},"notes":["JuliaTilton DailyYonder originalreport syndicatedbyMaineMorningStar February23,2026, nottwoindependentnewsrooms. WiscassetNovember4,2025 discussionPAUSEandmanagerstatementongoingasofFebruary, notpassedstateban.5Bproposal/BackRiver townlandnotactualconstructionspend. LD307draft20MWthreshold/untilJuly1,2028 wasPROPOSED; no currentOctoberlawcertification.","DirectLiquidCoolHerbZieninterviewnamesLoringformerAFB:2MWinitial plus24MWwill-serveclaim gives26MWFUTURETOTAL, not28orcurrent26. Existing2MWavailabilitynotenergizedIT; underlyingVersantagreementunread. WaiverHOPEandfallback20MWnotgrantedexemption/approved26. No-waterforCOOLINGclaimnotzerofacilitywithdrawal; otherNewEnglandpricecomparisonsnotadoptednewsiteimpact.","Plans/historicalchanges/courtallegations/utilitycustomerinference not all-field,siteITorcurrentoperatingcertification."],"sources":[{"url":"https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/","host":"mainemorningstar.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wiscasset · Lincoln · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}