{"state":"mn","name":"Minnesota","updated":"2026-10-15","checked":"2026-10-15","bounds":[-97.229,43.501,-89.616,49.384],"stats":{"projects":0,"operating":0,"facilities":39,"rule_counties":0,"moratorium_counties":0,"source_records":39,"reviewed_records":39,"status_confirmed":0,"status_unknown":39,"unreviewed_excluded":3,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":42,"manual_source_context_records":39,"published_source_context_records":39,"excluded":{"no_manual_source_review":3},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"aaim-data-centers-blue-earth-mn","state":"mn","kind":"facility","name":"AAIM Data Centers  -  Blue Earth (Minnesota 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Faribault"],"city":"Blue Earth","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operatorstatusclaim, notindependentmeter.80MWdesigniswithin95MWfuturetotal; no175MWsum.15MWdoesnotproveallAIuse. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aaimdc.com/data-centers/minnesota/","host":"aaimdc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.635,"lng":-94.098,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_reported_online_power_mw":15,"power_basis":"online power, not explicitlycriticalIT","in_service_month":"2025-06","planned_expansion_power_mw":80,"full_build_target_mw":95,"expansion_target":"2027-Q3","facility_area_sqft_approx":10000,"published_city":"Blue Earth, Minnesota"},"notes":["Operatorstatusclaim, notindependentmeter.80MWdesigniswithin95MWfuturetotal; no175MWsum.15MWdoesnotproveallAIuse.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aaimdc.com/data-centers/minnesota/","host":"aaimdc.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Blue Earth · Faribault · Source context reviewed"},{"id":"aaim-data-centers-hutchinson-mn","state":"mn","kind":"facility","name":"AAIM Data Centers  -  Hutchinson (Minnesota 2 Energy Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["McLeod"],"city":"Hutchinson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Hutchinson city/utility FAQ,all five pages text reviewed. FAQ not underlying signed permit or PPA. Future expansion requires newCUP.20MWexpectedpeak not actual metered demand; no opening date. Document also usesMWperhour wording incorrectly, no energy calculation adopted. Utility-tariff and collateral descriptions not actual customer invoices or ratepayer-outcome measurement. UndatedJune2026file path not exact publication date. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf","host":"hutchinsonmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.8870325,"lng":-94.351735,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Hutchinson city/utility FAQ,all five pages text reviewed","fields":{"published_address":"1025 FifthAvenueSE,Hutchinson,Minnesota","city_reported_final_permit_approval_date":"2025-08-26","city_reported_power_agreement_date":"2025-09-24","developer_entity":"B-MNDataCentersInc,dbaAAIMDataCenters","initial_building_area_sqft":7500,"potential_expanded_area_sqft":15000,"expected_peak_power_mw":20,"power_basis":"expected customer load,not explicitly criticalIT","expected_jobs_less_than":5,"city_reported_local_financial_assistance":"none"},"notes":["FAQ not underlying signed permit or PPA. Future expansion requires newCUP.20MWexpectedpeak not actual metered demand; no opening date. Document also usesMWperhour wording incorrectly, no energy calculation adopted. Utility-tariff and collateral descriptions not actual customer invoices or ratepayer-outcome measurement. UndatedJune2026file path not exact publication date.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hutchinsonmn.gov/wp-content/uploads/2026/06/Data-Center-Document-Q-A.pdf","host":"hutchinsonmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hutchinson · McLeod · Source context reviewed"},{"id":"aaim-data-centers-mountain-lake-mn","state":"mn","kind":"facility","name":"AAIM Data Centers  -  Mountain Lake (Minnesota 3 Energy Park)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Cottonwood"],"city":"Mountain Lake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Mountain Lake historical council discussion. Minutes describe review request, not project approval, construction or operation. No operator named in minutes, AAIMalias requires separate match.250kannualrevenueestimate not taxaward paid.50dBexpectation without measurement/distance not achieved noise result. No exact street or researched parcelpoint. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cityofmountainlakemn.gov/wp-content/uploads/10-7-24-City-Council-Minutes.pdf","host":"cityofmountainlakemn.gov","date":"2024-10-07","published":"2024-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.941966,"lng":-94.9150665,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Mountain Lake historical council discussion","fields":{"historical_city_meeting_date":"2024-10-07","proposed_initial_power_mw":10,"power_basis":"anticipated start load,not explicitIT","proposed_location_description":"industrial district nexttoMilkSpecialtiesandBalzer","proposed_use_description":"AIonly,noBitcoinorcryptocurrency mining"},"notes":["Minutes describe review request, not project approval, construction or operation. No operator named in minutes, AAIMalias requires separate match.250kannualrevenueestimate not taxaward paid.50dBexpectation without measurement/distance not achieved noise result. No exact street or researched parcelpoint.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cityofmountainlakemn.gov/wp-content/uploads/10-7-24-City-Council-Minutes.pdf","host":"cityofmountainlakemn.gov","date":"2024-10-07","published":"2024-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Mountain Lake · Cottonwood · Source context reviewed"},{"id":"amazon-becker-mn","state":"mn","kind":"facility","name":"Amazon Becker Data Center (Suspended)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sherburne"],"city":"Becker","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.. KNSINov14,2024reportsAmazonbought348acBeckerfor73.56MfromElkRiverTechnologies/Diode,whichhadboughtfromXcel7.97MinApril. Specificcertificate/deednotindependentlyread. Laterstageunknown;publishedlandtransactionnotconstruction/energization.1Bcapital100perm1200constructionwerecompanyforecasts,notlandpricepluscapex/actualjobs. Exactclosingdayunprinted. Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://knsiradio.com/2024/11/14/amazon-purchases-348-acres-in-becker-for-data-center-development-near-retiring-sherco-plant/","host":"knsiradio.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.397,"lng":-93.876,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcome-and-source-scope-review-round48-2026-10-14.json","scope":"Datedoriginalreporting/participantrepublicationcontext,notindependentlyverifiedsignedlaw/currentoperationorcriticalIT.","fields":{"dated_reported_context":"KNSINov14,2024reportsAmazonbought348acBeckerfor73.56MfromElkRiverTechnologies/Diode,whichhadboughtfromXcel7.97MinApril. Specificcertificate/deednotindependentlyread. Laterstageunknown;publishedlandtransactionnotconstruction/energization.1Bcapital100perm1200constructionwerecompanyforecasts,notlandpricepluscapex/actualjobs. Exactclosingdayunprinted."},"notes":["KNSINov14,2024reportsAmazonbought348acBeckerfor73.56MfromElkRiverTechnologies/Diode,whichhadboughtfromXcel7.97MinApril. Specificcertificate/deednotindependentlyread. Laterstageunknown;publishedlandtransactionnotconstruction/energization.1Bcapital100perm1200constructionwerecompanyforecasts,notlandpricepluscapex/actualjobs. Exactclosingdayunprinted.","Consultrecordidentity,scope,date,power/waterandclaimed-versus-observedlimitations."],"sources":[{"url":"https://knsiradio.com/2024/11/14/amazon-purchases-348-acres-in-becker-for-data-center-development-near-retiring-sherco-plant/","host":"knsiradio.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Becker · Sherburne · Source context reviewed"},{"id":"oppidan-apple-valley-technology-park-mn","state":"mn","kind":"facility","name":"Apple Valley Technology Park (Oppidan/Rockport)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Apple Valley","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The expected March 26 council action is not an observed result. Distinguish withdrawn rezoning, earlier plan denial and later recommendation; do not mark the whole project finally denied from this report alone. Oppidan's Eagan facility is separate. Seven overall buildings are not seven data halls; five were described as data centers. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.limitless-news.com/local/apple-valley-technology-park-update","host":"limitless-news.com","date":"2026-03-20","published":"2026-03-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.7546223,"lng":-93.1731744,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"Limitless News reports a March 18 Apple Valley planning recommendation to deny several Oppidan/Rockport requests after a January comprehensive-plan denial and March rezoning withdrawals.","independently_verified_current_operating_status":null},"notes":["The expected March 26 council action is not an observed result. Distinguish withdrawn rezoning, earlier plan denial and later recommendation; do not mark the whole project finally denied from this report alone. Oppidan's Eagan facility is separate. Seven overall buildings are not seven data halls; five were described as data centers.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.limitless-news.com/local/apple-valley-technology-park-update","host":"limitless-news.com","date":"2026-03-20","published":"2026-03-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Apple Valley · Dakota · Source context reviewed"},{"id":"archer-datacenter-faribault-mn","state":"mn","kind":"facility","name":"Archer Datacenter Faribault","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rice"],"city":"Faribault","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Faribault official project and review chronology. City reports no formal development applications or city financial-assistance requests yet, not no possible state exemption. Court ruling summarized by city, underlying order not independently read here. July7work session not signed resolution date. 2025negative EIS decision does not establish final 2026 environmental clearance. No MW adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.faribaultmn.gov/815/Archer-Datacenters","host":"faribaultmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.3654972,"lng":-93.2871543,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Faribault official project and review chronology","fields":{"proposed_building_area_sqft_max":500000,"site_acres_approx":87,"proposed_buildings_max":6,"land_purchase_month":"2024-11","city_reported_court_environmental_review_order_date":"2026-06-08","city_reported_supplemental_review_extension_resolution_date":"2026-07-14","supplemental_review_deadline":"2027-03-31","status":"proposed; supplemental environmental review"},"notes":["City reports no formal development applications or city financial-assistance requests yet, not no possible state exemption. Court ruling summarized by city, underlying order not independently read here. July7work session not signed resolution date. 2025negative EIS decision does not establish final 2026 environmental clearance. No MW adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.faribaultmn.gov/815/Archer-Datacenters","host":"faribaultmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Faribault · Rice · Source context reviewed"},{"id":"atomic-data-minneapolis-central-mn","state":"mn","kind":"facility","name":"Atomic Data Minneapolis Central (MSP250)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Minneapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Global service specifications cannot establish a specific building MW or street. Operator explicitly lists Minneapolis Central, Minneapolis East and Dallas service locations. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.atomicdata.com/infrastructure/","host":"atomicdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.9808119,"lng":-93.2673888,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Minneapolis","location_label":"Minneapolis Central","marketed_service":"colocation"},"notes":["Global service specifications cannot establish a specific building MW or street.","Operator explicitly lists Minneapolis Central, Minneapolis East and Dallas service locations.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.atomicdata.com/infrastructure/","host":"atomicdata.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minneapolis · Hennepin · Source context reviewed"},{"id":"tract-cannon-falls-technology-park-mn","state":"mn","kind":"facility","name":"Cannon Falls Technology Park (Tract)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Goodhue"],"city":"Cannon Falls","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Annexation is jurisdiction change, not land purchase or final DC approval. Hundreds-of-millions-to-one-billion investment is a broad developer-narrative forecast, not actual capital. Conditional construction within next year and September hearings are future at publication. Roughly 250 footbuffer is described planned separation, not independently checked final standard.2,400 dollars annually for ten years is CITY payment to township under annexation, not a developer tax subsidy or annual site tax revenue. Utility/infrastructure cost intentions are not an executed ESA. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kttc.com/2025/08/27/cannon-falls-explores-major-data-center-project-following-land-annexation","host":"kttc.com","date":"2025-08-27","published":"2025-08-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.5068445,"lng":-92.9062175,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"KTTC reports Cannon Falls annexed nearly 240 acres from Randolph Township for a possible Tract data center, still needing city-council project approval.","independently_verified_current_operating_status":null},"notes":["Annexation is jurisdiction change, not land purchase or final DC approval. Hundreds-of-millions-to-one-billion investment is a broad developer-narrative forecast, not actual capital. Conditional construction within next year and September hearings are future at publication. Roughly 250 footbuffer is described planned separation, not independently checked final standard.2,400 dollars annually for ten years is CITY payment to township under annexation, not a developer tax subsidy or annual site tax revenue. Utility/infrastructure cost intentions are not an executed ESA.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kttc.com/2025/08/27/cannon-falls-explores-major-data-center-project-following-land-annexation","host":"kttc.com","date":"2025-08-27","published":"2025-08-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Cannon Falls · Goodhue · Source context reviewed"},{"id":"centersquare-shakopee-mn","state":"mn","kind":"facility","name":"Centersquare Shakopee (MSP1 Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Scott"],"city":"Shakopee","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. NamedsiteexplicitlabelutilityversusUPSversusgenerator, notcriticalIToradditive. Minneapolisismarketlabel. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.csquare.com/data-centers/minneapolis","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.7965,"lng":-93.482,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"MSP1","published_city":"Shakopee, Minnesota","raised_floor_sqft":29800,"utility_power_mw":19.1,"ups_capacity_mw":2.4,"generator_capacity_mw":3.6},"notes":["NamedsiteexplicitlabelutilityversusUPSversusgenerator, notcriticalIToradditive. Minneapolisismarketlabel.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.csquare.com/data-centers/minneapolis","host":"csquare.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Shakopee · Scott · Source context reviewed"},{"id":"centra-msp1-eagan-mn","state":"mn","kind":"facility","name":"CENTRA MSP1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Eagan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. CENTRA Eagan utility and critical capacity. 12MVAapparentpowernotIT.92000footprintnotnecessarilycombinedtwo-storygrossarea. TierIIIplusisoperator-designclaim,notindependentUptimecertificate. PublishedISO270001spellingnotcorrectedtoverifiedISO27001cert. DesignPUEnotmeasured. No exactopeningdate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.centradigital.com/data-centers/msp1","host":"centradigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.8288628,"lng":-93.1184514,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"CENTRA Eagan utility and critical capacity","fields":{"operator":"CENTRA Digital","site_code":"MSP1","address":"3640 Nasseff Way, Eagan, Minnesota55123","utility_capacity_mva":12,"critical_capacity_mw":8.1,"building_footprint_sqft":92000,"building_stories":2,"rack_capability_kw_max":150,"design_pue_target_max":1.35},"notes":["12MVAapparentpowernotIT.92000footprintnotnecessarilycombinedtwo-storygrossarea. TierIIIplusisoperator-designclaim,notindependentUptimecertificate. PublishedISO270001spellingnotcorrectedtoverifiedISO27001cert. DesignPUEnotmeasured. No exactopeningdate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.centradigital.com/data-centers/msp1","host":"centradigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Eagan · Dakota · Source context reviewed"},{"id":"cloudhq-msp-campus-chaska-mn","state":"mn","kind":"facility","name":"CloudHQ MSP Campus (Chaska)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carver"],"city":"Chaska","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Chaska project review and design forecasts. No final site/plat approval or energization established. City local tax relief statement not all state/federal incentives. Water forecast not measured consumption. Undated six-month study estimate cannot produce exact completion date; proposed substation not site IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.chaskamn.gov/841/Cloud-HQ","host":"chaskamn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.81068,"lng":-93.63557,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Chaska project review and design forecasts","fields":{"published_address":"2007 Schoolmaster Drive, Chaska, Minnesota","planned_area_sqft_approx":1500000,"city_council_preliminary_approval_date":"2024-10-21","city_council_conditional_use_approval_date":"2023-10-16","current_city_reported_status":"final application not submitted; no final review timeline","forecast_water_gallons_per_year":14000000,"city_reported_local_tax_relief_status":"none applied for or offered"},"notes":["No final site/plat approval or energization established. City local tax relief statement not all state/federal incentives. Water forecast not measured consumption. Undated six-month study estimate cannot produce exact completion date; proposed substation not site IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.chaskamn.gov/841/Cloud-HQ","host":"chaskamn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Chaska · Carver · Source context reviewed"},{"id":"cologix-minneapolis-511-building-mn","state":"mn","kind":"facility","name":"Cologix Minneapolis (511 Building, MIN1-MIN5)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Minneapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. MIN5expansion inside511carrierhotel, not entirebuilding. MIN1 to 5sameaddressare suites/offerings; do not count five separate physical buildings fromcodes. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cologix.com/data-centers/minneapolis/min5/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.971127,"lng":-93.2546167,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"MIN5","published_address":"511 11th Avenue South, Minneapolis, MN","additional_colocation_area_sqft":10000,"additional_power_capacity_mw":1.5,"power_basis":"power capacity, not explicitly criticalIT"},"notes":["MIN5expansion inside511carrierhotel, not entirebuilding. MIN1 to 5sameaddressare suites/offerings; do not count five separate physical buildings fromcodes.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cologix.com/data-centers/minneapolis/min5/","host":"cologix.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minneapolis · Hennepin · Source context reviewed"},{"id":"connect-data-centers-eagan-mn","state":"mn","kind":"facility","name":"Connect Data Centers - Eagan (powered by Oppidan)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Eagan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Oppidan Eagan build-to-suit groundbreaking. Year-onlycompletionforecastnotobservedopening. Onlytwoground-upactiveMinnesotaprojectsclaimishistoricaldeveloperstatementnotcurrentstatewidecensus. No numericITMW, tenantname, signedleaseorparcel. Excelsiorheadquartersnotfacility. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://oppidan.com/blog/connect-data-centers-powered-by-oppidan-breaks-ground-on-new-data-center-in-eagan","host":"oppidan.com","date":"2025-06-05","published":"2025-06-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.8278868,"lng":-93.1108726,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Oppidan Eagan build-to-suit groundbreaking","fields":{"developer":"Oppidan","project":"Connect Data Centers Eagan","groundbreaking_announcement_date":"2025-06-05","planned_area_sqft":61000,"site_description":"Argenta Trail, south of YMCA, Eagan, Minnesota","developer_role":"landlord financing and developing build-to-suit with unnamed tenant","expected_completion_year":2026},"notes":["Year-onlycompletionforecastnotobservedopening. Onlytwoground-upactiveMinnesotaprojectsclaimishistoricaldeveloperstatementnotcurrentstatewidecensus. No numericITMW, tenantname, signedleaseorparcel. Excelsiorheadquartersnotfacility.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://oppidan.com/blog/connect-data-centers-powered-by-oppidan-breaks-ground-on-new-data-center-in-eagan","host":"oppidan.com","date":"2025-06-05","published":"2025-06-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Eagan · Dakota · Source context reviewed"},{"id":"databank-brooklyn-park-mn","state":"mn","kind":"facility","name":"DataBank Brooklyn Park Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Brooklyn Park","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named source. Operator separately labels critical IT and utility feeds. No redundancy arithmetic, energized-load measurement or independent uptime claim. Dated operator assertion, not reviewed DEED certificate or legal verification of current2026tax treatment. Claimed client savings and electricity exemptions need current government law; no incentive value or award disbursement inferred.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/minneapolis/brooklyn-park-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/resources/press-releases/databank-officially-qualifies-for-minnesota-tax-incentives/","host":"databank.com","date":"2024-10-15","published":"2024-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.116,"lng":-93.386,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"MSP3","street":"8111 Oxbow Creek N","city":"Brooklyn Park","critical_it_capacity_mw":9,"it_area_sqft":82231,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/brooklyn-park-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"operator_site_code":"MSP3","published_address":"8111 Oxbow Creek N, Brooklyn Park, MN55445","campus_acres":14,"it_area_sqft":82231,"critical_it_mw":9,"utility_feeds":{"count":2,"mw_each":4.5,"utility":"Xcel Energy"}},"notes":["Operator separately labels critical IT and utility feeds. No redundancy arithmetic, energized-load measurement or independent uptime claim.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/brooklyn-park-campus/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"historical_operator_statement":"MSP3 certified by Minnesota DEED; joins MSP2","historical_msp3_opening_year":2021},"notes":["Dated operator assertion, not reviewed DEED certificate or legal verification of current2026tax treatment. Claimed client savings and electricity exemptions need current government law; no incentive value or award disbursement inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/press-releases/databank-officially-qualifies-for-minnesota-tax-incentives/","host":"databank.com","date":"2024-10-15","published":"2024-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Brooklyn Park · Hennepin · Source context reviewed"},{"id":"databank-downtown-minneapolis-msp4-mn","state":"mn","kind":"facility","name":"DataBank Downtown Minneapolis Data Center (MSP4)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Minneapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Carrier-hotel tenant suite; group with building, not whole-building metrics. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/minneapolis/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.971127,"lng":-93.2546167,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"MSP4","street":"511 11th Avenue S","city":"Minneapolis","critical_it_capacity_mw":0.779,"it_area_sqft":8170,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Carrier-hotel tenant suite; group with building, not whole-building metrics.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minneapolis · Hennepin · Source context reviewed"},{"id":"databank-east-twin-cities-eagan-mn","state":"mn","kind":"facility","name":"DataBank East Twin Cities Data Center (MSP2)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Eagan","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named source. Dated operator assertion, not reviewed DEED certificate or legal verification of current2026tax treatment. Claimed client savings and electricity exemptions need current government law; no incentive value or award disbursement inferred. Current operator specification; not a measurement or independently reviewed FedRAMP/uptime certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/minneapolis/eagan/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://www.databank.com/resources/press-releases/databank-officially-qualifies-for-minnesota-tax-incentives/","host":"databank.com","date":"2024-10-15","published":"2024-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.8375194,"lng":-93.1454144,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"MSP2","street":"3255 Neil Armstrong Blvd","city":"Eagan","critical_it_capacity_mw":5,"it_area_sqft":48860,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/eagan/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"historical_operator_statement":"MSP3 certified by Minnesota DEED; joins MSP2","historical_msp3_opening_year":2021},"notes":["Dated operator assertion, not reviewed DEED certificate or legal verification of current2026tax treatment. Claimed client savings and electricity exemptions need current government law; no incentive value or award disbursement inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/resources/press-releases/databank-officially-qualifies-for-minnesota-tax-incentives/","host":"databank.com","date":"2024-10-15","published":"2024-10-15","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"databank-equinix-review-round5-2026-10-14.json","scope":"named source","fields":{"operator_site_code":"MSP2","it_area_sqft":48860,"critical_it_mw":5},"notes":["Current operator specification; not a measurement or independently reviewed FedRAMP/uptime certification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/eagan/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Eagan · Dakota · Source context reviewed"},{"id":"databank-west-twin-cities-edina-mn","state":"mn","kind":"facility","name":"DataBank West Twin Cities Data Center (MSP1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Edina","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization. Current operator card explicitly names this facility and separates its specification from the market/campus totals. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.databank.com/data-centers/minneapolis/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.8628296,"lng":-93.3305557,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"facility_code":"MSP1","street":"7700 FranceAveS","city":"Edina","critical_it_capacity_mw":1.35,"it_area_sqft":26240,"power_basis":"operator advertised criticalIT specification, not measured consumption","marketed_service":"colocation"},"notes":["Catalog marketing establishes identity/specification; independently verify actual commissioning date and utilization.","Current operator card explicitly names this facility and separates its specification from the market/campus totals.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.databank.com/data-centers/minneapolis/","host":"databank.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Edina · Hennepin · Source context reviewed"},{"id":"edgeconnex-msp01-eden-prairie-mn","state":"mn","kind":"facility","name":"EdgeConneX Minneapolis (EDCMSP01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Eden Prairie","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. PDFpage2visuallyreviewed.2.85MWscalableincludes1.35notextra. PDFvisiblysaysSOC2Type10; certificationclaimquarantinedratherthansilentlycorrectedtoType2. Noindependentcurrentcertificate. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.edgeconnex.com/wp-content/uploads/2024/09/Minneapolis-Data-Sheet.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.878844,"lng":-93.404156,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"operator_site_code":"MSP01","published_address":"6875 Shady Oak Road, Eden Prairie, MN55344","facility_area_sqft":32738,"raised_floor_sqft":14935,"advertised_power_mw":1.35,"scalable_power_mw":2.85,"power_basis":"N+1power, not explicitlycriticalIT"},"notes":["PDFpage2visuallyreviewed.2.85MWscalableincludes1.35notextra. PDFvisiblysaysSOC2Type10; certificationclaimquarantinedratherthansilentlycorrectedtoType2. Noindependentcurrentcertificate.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.edgeconnex.com/wp-content/uploads/2024/09/Minneapolis-Data-Sheet.pdf","host":"edgeconnex.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Eden Prairie · Hennepin · Source context reviewed"},{"id":"elk-river-capital-swervo-mn","state":"mn","kind":"facility","name":"Elk River Data Center (Elk River Capital / Swervo Development)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sherburne"],"city":"Elk River","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Requested draft one-year moratorium is not an adopted moratorium. August 3 anticipated permit denial not observed in this July article. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mprnews.org/story/2026/07/07/elk-river-rejects-changing-rules-to-allow-data-centers","host":"mprnews.org","date":"2026-07-07","published":"2026-07-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.3187147,"lng":-93.5864375,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"ordinance-amendment-rejected","reported_finding":"MPR reports Elk River rejected ordinance changes needed for Elk River Capital / Swervo project; conditional-use permit decision still expected later.","report_display_date":"2026-07-07","independently_verified_current_status":null},"notes":["Requested draft one-year moratorium is not an adopted moratorium. August 3 anticipated permit denial not observed in this July article.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mprnews.org/story/2026/07/07/elk-river-rejects-changing-rules-to-allow-data-centers","host":"mprnews.org","date":"2026-07-07","published":"2026-07-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Elk River · Sherburne · Source context reviewed"},{"id":"tract-farmington-technology-park-mn","state":"mn","kind":"facility","name":"Farmington Technology Park (Tract)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Farmington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Farmington city planning chronology and qualified litigation update. City is a litigant; filed dismissals not independently read final court dismissal order. AUAR andpreliminarydevelopment approvals not specific operatingtenant or building occupancy. November13,2025no-specific-application statement not automatically refreshed toOctober14,2026. No currentMWorcapexadopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park","host":"farmingtonmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.606,"lng":-93.152,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Farmington city planning chronology and qualified litigation update","fields":{"city_reported_litigation_update_date":"2026-09-16","city_reported_litigation_status":"plaintiffs filed dismissals; final directions from court awaited","published_case_number":"19HA-CV-25-992","city_council_final_auar_adoption_date":"2024-11-04","city_council_preliminary_pud_plat_approval_date":"2024-11-04"},"notes":["City is a litigant; filed dismissals not independently read final court dismissal order. AUAR andpreliminarydevelopment approvals not specific operatingtenant or building occupancy. November13,2025no-specific-application statement not automatically refreshed toOctober14,2026. No currentMWorcapexadopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.farmingtonmn.gov/473/Data-Center-Farmington-Technology-Park","host":"farmingtonmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Farmington · Dakota · Source context reviewed"},{"id":"flexential-minneapolis-chaska-msp01-mn","state":"mn","kind":"facility","name":"Flexential Minneapolis - Chaska (MSP01)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carver"],"city":"Chaska","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.. Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.8516116,"lng":-93.5988964,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round14-2026-10-14.json","scope":"Named facility section; grouped base IDs remain grouped. Undated operator guide captured 2026-10-14.","fields":{"operator_named_facility":"Flexential Minneapolis - Chaska (MSP01)","publisher_reported_footprint_sqft":160838,"publisher_reported_critical_power_mw":9,"power_basis":"operator critical load UPS capacity; Douglasville sections call it critical power","current_measured_demand_mw":null,"commissioning_date":null,"exact_address_verified_by_this_document":false},"notes":["Attribute ratings to the operator document. Do not treat as current energized IT load, available capacity, permits, independently verified compliance or observed uptime.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.flexential.com/system/files/file/2025-11/flexential-fleet-tour-guide-hvc.pdf?t=1775636396","host":"flexential.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Chaska · Carver · Source context reviewed"},{"id":"google-hermantown-mn","state":"mn","kind":"facility","name":"Google Hermantown Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Louis"],"city":"Hermantown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Minnesota PUC named ESA index, no final order reviewed. Captured PUCpage says agreement under review, but passed comment deadline not a final decision. Generic statutory annual2to5Mfee is demand-dependent policy, not an awarded/paid site amount. Separate PineIsland EchoZone docket26-170 not Hermantown. No site MW from backup-generation permit thresholds. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mn.gov/puc/activities/v-l-e-c/data-centers/","host":"mn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":46.8068852,"lng":-92.2382464,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Minnesota PUC named ESA index, no final order reviewed","fields":{"hermantown_service_applicant":"Harmony Group LLC,Alphabet/Google subsidiary","hermantown_esa_filing_date":"2026-03-26","hermantown_utility_docket":"26-159","hermantown_comment_deadline":"2026-08-28"},"notes":["Captured PUCpage says agreement under review, but passed comment deadline not a final decision. Generic statutory annual2to5Mfee is demand-dependent policy, not an awarded/paid site amount. Separate PineIsland EchoZone docket26-170 not Hermantown. No site MW from backup-generation permit thresholds.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://mn.gov/puc/activities/v-l-e-c/data-centers/","host":"mn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hermantown · St. Louis · Source context reviewed"},{"id":"google-skyway-pine-island-mn","state":"mn","kind":"facility","name":"Google Project Skyway (Pine Island)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Goodhue"],"city":"Pine Island","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Pine Island land-use approval and conditional municipal subsidy summary. AUAR maximum buildout not current phase.36.5Mconditional reimbursement over28years not cash paid;290jobs assumes9stages. Page conflicts December2025versusDecember2026preliminary dates and April14PUCversusApril15city ESA date; those dates held. City says potential site energy usage unknown. Offsite wind/solar/storage excluded from ITMW; air-cooling design not zero domestic water. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://pineislandmn.gov/skyway","host":"pineislandmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.2019,"lng":-92.6496,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"Pine Island land-use approval and conditional municipal subsidy summary","fields":{"auar_study_area_acres_approx":482,"city_council_final_land_use_approval_date":"2026-01-20","city_reported_tax_abatement_approval_date":"2026-02-04","city_reported_abatement_total_usd_approx":36500000,"abatement_term_years":28,"first_stage_employment_condition_jobs":38,"city_reported_operator":"Google","utility_docket":"26-170","current_permit_stage_description":"developer pursuing state permits"},"notes":["AUAR maximum buildout not current phase.36.5Mconditional reimbursement over28years not cash paid;290jobs assumes9stages. Page conflicts December2025versusDecember2026preliminary dates and April14PUCversusApril15city ESA date; those dates held. City says potential site energy usage unknown. Offsite wind/solar/storage excluded from ITMW; air-cooling design not zero domestic water.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://pineislandmn.gov/skyway","host":"pineislandmn.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Pine Island · Goodhue · Source context reviewed"},{"id":"h5-data-centers-st-paul-mn","state":"mn","kind":"facility","name":"H5 Data Centers St. Paul","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Ramsey"],"city":"St. Paul","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Minneapolis is the market label; actual published municipality is St.Paul. A power uptime SLA is not measured uptime. Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://h5datacenters.com/minneapolis-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.974,"lng":-93.167,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"h5-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"published_address":"1125 Energy Park Dr., Suite100, St. Paul, MN 55108","advertised_facility_sqft":17000},"notes":["Minneapolis is the market label; actual published municipality is St.Paul. A power uptime SLA is not measured uptime.","Operator service/design assertions, not an independent uptime or certification audit. Repeated Ashburn42MW/Q32024 promotional footer is excluded from this location.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://h5datacenters.com/minneapolis-data-center.html","host":"h5datacenters.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"St. Paul · Ramsey · Source context reviewed"},{"id":"legacy-investing-north-loop-minneapolis-mn","state":"mn","kind":"facility","name":"Legacy Investing North Loop (former Star Tribune printing plant)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Minneapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. An agreement is not a confirmed closing. Thirteen acres converted to roughly 566,000 square feet is land area, not building floor area. The separate Sleep Number site is 30 MW and must not be added. The article reverses the moratorium threshold in one sentence; the city bulletin describes an exception up to 350,000 square feet downtown, but an original ordinance and this site's eligibility still require review. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. This is a council member account on the city bulletin service, not the adopted ordinance. It describes an interim step with later hearing and council/mayor action. Do not assume a final six-month start or expiry. The July CBS article reverses the threshold in one sentence. Land area is not building floor area and does not decide the Legacy project exemption.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cbsnews.com/minnesota/news/data-center-minnesota-star-tribune-downtown-minneapolis/","host":"cbsnews.com","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://content.govdelivery.com/accounts/MPLS/bulletins/41889b9","host":"content.govdelivery.com","date":"2026-05-22","published":"2026-05-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.9906553,"lng":-93.2766429,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"CBS Minnesota reports Legacy Investing's agreement to buy the former Star Tribune printing property for a proposed 20 MW data center and possible mixed use.","independently_verified_current_operating_status":null},"notes":["An agreement is not a confirmed closing. Thirteen acres converted to roughly 566,000 square feet is land area, not building floor area. The separate Sleep Number site is 30 MW and must not be added. The article reverses the moratorium threshold in one sentence; the city bulletin describes an exception up to 350,000 square feet downtown, but an original ordinance and this site's eligibility still require review.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cbsnews.com/minnesota/news/data-center-minnesota-star-tribune-downtown-minneapolis/","host":"cbsnews.com","date":"2026-07-30","published":"2026-07-30","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"City council member bulletin reports May 21 temporary action and a downtown exception for projects up to 350,000 square feet, with further legislative action pending.","source_reported_threshold_direction":"exception up to 350,000 square feet downtown","specific_site_exemption_verified":false},"notes":["This is a council member account on the city bulletin service, not the adopted ordinance. It describes an interim step with later hearing and council/mayor action. Do not assume a final six-month start or expiry.","The July CBS article reverses the threshold in one sentence. Land area is not building floor area and does not decide the Legacy project exemption.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://content.govdelivery.com/accounts/MPLS/bulletins/41889b9","host":"content.govdelivery.com","date":"2026-05-22","published":"2026-05-22","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minneapolis · Hennepin · Source context reviewed"},{"id":"lightedge-chaska-mn","state":"mn","kind":"facility","name":"LightEdge Chaska (fka Stream Data Centers Minneapolis I)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Carver"],"city":"Chaska","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Lightedge Chaska named address. Capacity/areaheadingswithoutvaluesinthecapture;notzero. MarketnameMinneapolisnotmunicipality. No numericITMW,currentmeteredloadoropeningday. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.lightedge.com/data-center-locations/minneapolis/","host":"lightedge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.828,"lng":-93.635,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Lightedge Chaska named address","fields":{"operator":"Lightedge","market":"Minneapolis","address":"1708 WestCreekLane, Chaska, Minnesota55318"},"notes":["Capacity/areaheadingswithoutvaluesinthecapture;notzero. MarketnameMinneapolisnotmunicipality. No numericITMW,currentmeteredloadoropeningday.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.lightedge.com/data-center-locations/minneapolis/","host":"lightedge.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Chaska · Carver · Source context reviewed"},{"id":"meta-rosemount-mn","state":"mn","kind":"facility","name":"Meta Rosemount Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Rosemount","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Announcement forecasts once completed; no exact opening or measured load.19thUSand23rdglobal are historical company fleet rankings, not current national counts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.atmeta.com/2024/03/hello-rosemount/","host":"datacenters.atmeta.com","date":"2024-03-14","published":"2024-03-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.74,"lng":-93.115,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"remaining-operators-review-round5-2026-10-14.json","scope":"named operator source","fields":{"planned_campus_area_sqft":715000,"planned_investment_usd_min_exclusive":800000000,"forecast_operational_jobs_approx":100,"forecast_peak_construction_jobs_min_exclusive":1000},"notes":["Announcement forecasts once completed; no exact opening or measured load.19thUSand23rdglobal are historical company fleet rankings, not current national counts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.atmeta.com/2024/03/hello-rosemount/","host":"datacenters.atmeta.com","date":"2024-03-14","published":"2024-03-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Rosemount · Dakota · Source context reviewed"},{"id":"microsoft-becker-mn","state":"mn","kind":"facility","name":"Microsoft Becker Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Sherburne"],"city":"Becker","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Land purchase is not data-center construction spending, secured utility service or commissioning. Microsoft declined to disclose project details. Google's canceled proposal and Elk River Technologies' separate land sale are not this site. No MW, specific design or final opening date is established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.mprnews.org/story/2024/02/21/xcel-energy-sells-land-in-becker-to-microsoft-for-data-center","host":"mprnews.org","date":"2024-02-21","published":"2024-02-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.3931821,"lng":-93.8768904,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"MPR reports Microsoft's purchase of about 295 Becker acres from Xcel for about 17.7 million USD, confirmed by Xcel and state property data cited by the reporter.","independently_verified_current_operating_status":null},"notes":["Land purchase is not data-center construction spending, secured utility service or commissioning. Microsoft declined to disclose project details. Google's canceled proposal and Elk River Technologies' separate land sale are not this site. No MW, specific design or final opening date is established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.mprnews.org/story/2024/02/21/xcel-energy-sells-land-in-becker-to-microsoft-for-data-center","host":"mprnews.org","date":"2024-02-21","published":"2024-02-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Becker · Sherburne · Source context reviewed"},{"id":"monticello-tech-park-frattalone-mn","state":"mn","kind":"facility","name":"Monticello Tech Park (Monticello Tech LLC / Frattalone)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wright"],"city":"Monticello","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.298583,"lng":-93.7994056,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Monticello Times separates Frattalone/Monticello Tech's 550-acre concept from Scannell's roughly 106-acre concept near Bertram park, explicitly saying neither project was approved or had building permits.","independently_verified_current_operating_status":null},"notes":["Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Monticello · Wright · Source context reviewed"},{"id":"geronimo-nobles-county-powered-data-park-mn","state":"mn","kind":"facility","name":"Nobles County Powered Data Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nobles"],"city":"Worthington","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Geronimo Nobles development context versus staff power portfolio. Generalpowered-data-parkandstaffbiographycontentnotapprovedNoblesDCplan.1600MW/550MWinbiographyisstaffpastprojectexperience,notNoblesITorcampuspower. Bloomingtonheadquartersnotprojectsite. Noexactparcel,opening,currentapprovalorITMW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://geronimopower.com/in-development/nobles-county-powered-data-park/","host":"geronimopower.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":43.62,"lng":-95.6,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Geronimo Nobles development context versus staff power portfolio","fields":{"developer":"Geronimo Power","project_label":"Nobles County Data Center","associated_wind_projects":["Plum Creek1","Plum Creek2","Lime Creek"]},"notes":["Generalpowered-data-parkandstaffbiographycontentnotapprovedNoblesDCplan.1600MW/550MWinbiographyisstaffpastprojectexperience,notNoblesITorcampuspower. Bloomingtonheadquartersnotprojectsite. Noexactparcel,opening,currentapprovalorITMW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://geronimopower.com/in-development/nobles-county-powered-data-park/","host":"geronimopower.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Worthington · Nobles · Source context reviewed"},{"id":"revolve-labs-glencoe-mn","state":"mn","kind":"facility","name":"Revolve Labs Glencoe","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["McLeod"],"city":"Glencoe","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Maximum headline value is not fixed spent capex. Existing mining operations, proposed AI facilities and another Windom withdrawal are different. Utility net revenue is an attributed historical claim, not project investment or guaranteed bill savings. Noise/health descriptions from elsewhere are not measured Glencoe findings. No IT capacity or later approval established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://crypto.news/bitcoin-miner-revolve-labs-proposes-60m-data-center-in-minnesota/","host":"crypto.news","date":"2024-10-21","published":"2024-10-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.7691,"lng":-94.1497,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"Crypto.news summarizes a preliminary Revolve Labs Glencoe expansion concept, reporting a40-to60-million-USDrange and around ten planned jobs.","independently_verified_current_operating_status":null},"notes":["Maximum headline value is not fixed spent capex. Existing mining operations, proposed AI facilities and another Windom withdrawal are different. Utility net revenue is an attributed historical claim, not project investment or guaranteed bill savings. Noise/health descriptions from elsewhere are not measured Glencoe findings. No IT capacity or later approval established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://crypto.news/bitcoin-miner-revolve-labs-proposes-60m-data-center-in-minnesota/","host":"crypto.news","date":"2024-10-21","published":"2024-10-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Glencoe · McLeod · Source context reviewed"},{"id":"revolve-labs-moose-lake-mn","state":"mn","kind":"facility","name":"Revolve Labs Moose Lake (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Carlton"],"city":"Moose Lake","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Public opposition also described, but cannot replace stated company reason. Land lease agreement did not establish operating mine. Future discussions remained possible. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.pinejournal.com/news/local/crypto-mining-company-withdraws-moose-lake-proposal","host":"pinejournal.com","date":"2026-03-12","published":"2026-03-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":46.4543725,"lng":-92.761976,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"conditional-use-application-withdrawn","reported_finding":"Pine Journal reports March 11 council notification that Revolve withdrew Moose Lake permit application. Company cited power-availability timing.","report_display_date":"2026-03-12","independently_verified_current_status":null},"notes":["Public opposition also described, but cannot replace stated company reason. Land lease agreement did not establish operating mine. Future discussions remained possible.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.pinejournal.com/news/local/crypto-mining-company-withdraws-moose-lake-proposal","host":"pinejournal.com","date":"2026-03-12","published":"2026-03-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Moose Lake · Carlton · Source context reviewed"},{"id":"revolve-labs-windom-mn","state":"mn","kind":"facility","name":"Revolve Labs Windom (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Cottonwood"],"city":"Windom","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Visible publication date September 26 differs from URL/metadata September 25. No exact withdrawal day adopted. Glencoe capacity is another site, not Windom. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://theenergymag.com/news/2024-09-25/revolve-bitcoin-mining-windom","host":"theenergymag.com","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":43.8663464,"lng":-95.1169366,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"withdrawal-reported-secondhand","reported_finding":"The EnergyMag reports Revolve withdrew Windom mining application, citing Minnesota Star Tribune reporting.","report_display_date":"2024-09-26","independently_verified_current_status":null},"notes":["Visible publication date September 26 differs from URL/metadata September 25. No exact withdrawal day adopted. Glencoe capacity is another site, not Windom.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://theenergymag.com/news/2024-09-25/revolve-bitcoin-mining-windom","host":"theenergymag.com","date":"2024-09-26","published":"2024-09-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Windom · Cottonwood · Source context reviewed"},{"id":"scannell-monticello-tech-park-mn","state":"mn","kind":"facility","name":"Scannell Properties Monticello Tech Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Wright"],"city":"Monticello","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.2914854,"lng":-93.8499172,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Monticello Times separates Frattalone/Monticello Tech's 550-acre concept from Scannell's roughly 106-acre concept near Bertram park, explicitly saying neither project was approved or had building permits.","independently_verified_current_operating_status":null},"notes":["Comprehensive-plan changes are not annexation, rezoning or construction approvals. Separate building areas, investment estimates and jobs cannot be combined into each project. The late-winter 2026 review target is not an observed completion. Nearby Meta Rosemount figures are comparisons, not Monticello facts; power-line proximity is not executed service.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.hometownsource.com/monticello_times/two-data-center-proposals-on-the-table-in-monticello/article_502daa86-6ea3-4728-a1f5-88ac70cbc7f7.html","host":"hometownsource.com","date":"2025-09-11","published":"2025-09-11","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Monticello · Wright · Source context reviewed"},{"id":"t5-minneapolis-1001-third-avenue-mn","state":"mn","kind":"facility","name":"T5@Minneapolis (1001 Third Avenue South)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Minneapolis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Cloud Capital Minneapolis acquisition context with exact-site gap. 21currentplus10potential=31not52. ExactT5/1001ThirdAvenuepropertycrosswalknotstatedbyrelease;capacitynotcanonicaluntilmatched. Corporate26globalassets/5.5BAUMnotthiscampuscapex/count. No saleprice,originalopeningdayorcompletedexpansion. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cloudcapital.com/cloud-capital-and-arcapita-acquire-a-21-megawatt-data-center-in-the-us-with-planned-expansion/","host":"cloudcapital.com","date":"2026-01-13","published":"2026-01-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.9714683,"lng":-93.2702827,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Cloud Capital Minneapolis acquisition context with exact-site gap","fields":{"buyers":["Cloud Capital","Arcapita"],"acquisition_announcement_date":"2026-01-13","reported_market":"Minneapolis, Minnesota","reported_stabilized_capacity_mw":21,"planned_expansion_mw":10,"planned_total_capacity_mw":31,"power_basis":"data-center capacity, not explicitly critical IT","tenant_description":"unnamed sovereign AI/cloud inference provider, primarily longterm leased"},"notes":["21currentplus10potential=31not52. ExactT5/1001ThirdAvenuepropertycrosswalknotstatedbyrelease;capacitynotcanonicaluntilmatched. Corporate26globalassets/5.5BAUMnotthiscampuscapex/count. No saleprice,originalopeningdayorcompletedexpansion.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cloudcapital.com/cloud-capital-and-arcapita-acquire-a-21-megawatt-data-center-in-the-us-with-planned-expansion/","host":"cloudcapital.com","date":"2026-01-13","published":"2026-01-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Minneapolis · Hennepin · Source context reviewed"},{"id":"tract-rosemount-technology-park-mn","state":"mn","kind":"facility","name":"Tract Rosemount Technology Park (withdrawn)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dakota"],"city":"Rosemount","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Tract Rosemount secondary institutional withdrawal report. Regional article compiles media/public sources; not direct signed Tract withdrawal or current2026 status. Second Rosemount tract not automatically all Tract holdings and not Meta Rosemount. No precise parcel/name match from reviewed narrative; exact preferred record unresolved. Regional facility counts have explicit hyperscale definition and date, not all current data centers. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.minneapolisfed.org/article/2025/massive-data-centers-lay-roots-in-the-ninth-district","host":"minneapolisfed.org","date":"2025-10-07","published":"2025-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":44.735,"lng":-92.985,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Tract Rosemount secondary institutional withdrawal report","fields":{"publisher_role":"Federal Reserve Bank of Minneapolis regional analysis","publication_date":"2025-10-07","inventory_asof":"2025-10-01","reported_tract_stage":"pulled out of a second Rosemount site, attributed to city planning officials"},"notes":["Regional article compiles media/public sources; not direct signed Tract withdrawal or current2026 status. Second Rosemount tract not automatically all Tract holdings and not Meta Rosemount. No precise parcel/name match from reviewed narrative; exact preferred record unresolved. Regional facility counts have explicit hyperscale definition and date, not all current data centers.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.minneapolisfed.org/article/2025/massive-data-centers-lay-roots-in-the-ninth-district","host":"minneapolisfed.org","date":"2025-10-07","published":"2025-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Rosemount · Dakota · Source context reviewed"},{"id":"us-signal-mn01-eden-prairie-mn","state":"mn","kind":"facility","name":"US Signal MN01 Minneapolis (Eden Prairie)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hennepin"],"city":"Eden Prairie","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. operator location index only. Network hub supplies no exact addresses or facility MW for the three bound records. 17 is operator network count, not three building capacities or independently reconciled census. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ussignal.com/data-centers","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":44.877094,"lng":-93.407686,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"operator location index only","fields":{"named_locations":["MI01 Grand Rapids","MN01 Minneapolis","WI02 Madison"],"operator_network_data_center_count":17},"notes":["Network hub supplies no exact addresses or facility MW for the three bound records. 17 is operator network count, not three building capacities or independently reconciled census.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ussignal.com/data-centers","host":"ussignal.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Eden Prairie · Hennepin · Source context reviewed"},{"id":"vaultas-alexandria-mn","state":"mn","kind":"facility","name":"Vaultas Alexandria (ALX1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Douglas"],"city":"Alexandria","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Vaultas Alexandria exact site versus global partner network. 1600plusglobaldata-centerlocationsarepartner/consultingaccessnotVaultasownedbuildings.500vendors/40yearsindustryexperienceothercontexts. No numericITMW,areaororiginalopening. Operatorphysicalsecuritycomplianceclaimsnotindependentrestrictedreport. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://vaultas.com/data-centers/minnesota/","host":"vaultas.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":45.8844516,"lng":-95.3762121,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Vaultas Alexandria exact site versus global partner network","fields":{"operator":"Vaultas","code":"ALX1","address":"720 Hawthorne Street, Alexandria, Minnesota56308"},"notes":["1600plusglobaldata-centerlocationsarepartner/consultingaccessnotVaultasownedbuildings.500vendors/40yearsindustryexperienceothercontexts. No numericITMW,areaororiginalopening. Operatorphysicalsecuritycomplianceclaimsnotindependentrestrictedreport.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://vaultas.com/data-centers/minnesota/","host":"vaultas.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Alexandria · Douglas · Source context reviewed"},{"id":"vaultas-st-cloud-mn","state":"mn","kind":"facility","name":"Vaultas St. Cloud","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Stearns"],"city":"St. Cloud","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. Preserve internal construction-status conflict and dated statements; no current operation certified.0.5 to 0.6 MW is PERMODULARNODE starting capacity, not necessarily full-site IT or current load; node count unknown. Planned opening during 2026 is unobserved. Related 100,000 dollarpartnership headline is not an examined award instrument. St.Joseph policy research, hypothetical other cities and statewide tax rules are separate contexts. Economist/utility bill-saving statements are opinions, not site-specific guaranteed tariffs or measured household savings. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stcloudlive.com/news/local/to-plug-in-or-not-to-plug-in-that-is-the-question-for-area-cities-about-data-centers-1","host":"stcloudlive.com","date":"2026-02-13","published":"2026-02-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":45.5405392,"lng":-94.2023528,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"St.CloudLive identifies Vaultas’s planned 3701 18 thStreetSouth modular-edge site and says in the developer-attributed body that construction had not yet begun, despite an introductory under-construction statement.","independently_verified_current_operating_status":null},"notes":["Preserve internal construction-status conflict and dated statements; no current operation certified.0.5 to 0.6 MW is PERMODULARNODE starting capacity, not necessarily full-site IT or current load; node count unknown. Planned opening during 2026 is unobserved. Related 100,000 dollarpartnership headline is not an examined award instrument. St.Joseph policy research, hypothetical other cities and statewide tax rules are separate contexts. Economist/utility bill-saving statements are opinions, not site-specific guaranteed tariffs or measured household savings.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stcloudlive.com/news/local/to-plug-in-or-not-to-plug-in-that-is-the-question-for-area-cities-about-data-centers-1","host":"stcloudlive.com","date":"2026-02-13","published":"2026-02-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"St. Cloud · Stearns · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}