{"state":"mo","name":"Missouri","updated":"2026-10-15","checked":"2026-10-15","bounds":[-95.766,35.998,-89.134,40.615],"stats":{"projects":0,"operating":0,"facilities":28,"rule_counties":0,"moratorium_counties":0,"source_records":28,"reviewed_records":28,"status_confirmed":0,"status_unknown":28,"unreviewed_excluded":3,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":31,"manual_source_context_records":28,"published_source_context_records":28,"excluded":{"no_manual_source_review":3},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"armory-innovation-district-st-louis-mo","state":"mo","kind":"facility","name":"Armory Innovation District Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":[],"city":"St. Louis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. StLouis reported conditional-use approval and employment/forecast boundaries. Conditional-use approval attributed to reporting, actual permit/recordedCBA and later appeals not inspected.3Bcombineddata+Armoryoffices not all actual DCspend.100jobscondition afteryear2 conflicts with separate50permanentDCforecast; retain scopes rather than replacing.1050construction and150office employees not same as directDCjobs. Renewable/water/noincentive provisions are reported commitments, not actual measured performance or final later compliance. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stlmag.com/news/midtown-data-center-armory-board-of-public-service/","host":"stlmag.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.636,"lng":-90.237,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round13-2026-10-14.json","scope":"StLouis reported conditional-use approval and employment/forecast boundaries","fields":{"project":"Armory Innovation District","city":"StLouis, Missouri","reported_conditional_use_approval_date":"2026-04-21","reported_vote":"5-0","reported_data_center_power_mw":120,"power_basis":"reported project MW, not explicit critical IT","reported_combined_development_investment_usd_min_exclusive":3000000000,"proposed_full_operation_deadline":"2028-12-31","reported_20year_job_obligation_schedule":[{"year":1,"jobs":25},{"year":2,"jobs":50},{"year":3,"jobs":100,"continues_through_year":20}],"reported_city10year_tax_fee_forecast_usd":432000000},"notes":["Conditional-use approval attributed to reporting, actual permit/recordedCBA and later appeals not inspected.3Bcombineddata+Armoryoffices not all actual DCspend.100jobscondition afteryear2 conflicts with separate50permanentDCforecast; retain scopes rather than replacing.1050construction and150office employees not same as directDCjobs. Renewable/water/noincentive provisions are reported commitments, not actual measured performance or final later compliance.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stlmag.com/news/midtown-data-center-armory-board-of-public-service/","host":"stlmag.com","date":"2026-04-21","published":"2026-04-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"St. Louis · Source context reviewed"},{"id":"aws-green-new-florence-mo","state":"mo","kind":"facility","name":"AWS Project Green Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"New Florence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Tax projections are scenarios, not receipts; announced county/community payments are not verified disbursement. Do not add 25-year minimum and maximum cases. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://themissouritimes.com/aws-new-facilities-near-new-florence-will-double-tax-revenue-for-montgomery-county/","host":"themissouritimes.com","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.852,"lng":-91.52,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Missouri Times describes Project Green minimum and maximum tax projections and different treatment of real and personal property.","independently_verified_current_operating_status":null},"notes":["Tax projections are scenarios, not receipts; announced county/community payments are not verified disbursement. Do not add 25-year minimum and maximum cases.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://themissouritimes.com/aws-new-facilities-near-new-florence-will-double-tax-revenue-for-montgomery-county/","host":"themissouritimes.com","date":"2026-02-04","published":"2026-02-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Florence · Montgomery · Source context reviewed"},{"id":"crusoe-callaway-county-kingdom-city-mo","state":"mo","kind":"facility","name":"Crusoe Callaway County Data Center (proposed)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Callaway"],"city":"Kingdom City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. Exact site undisclosed. Private land transaction and absence of county zoning do not eliminate other permits. Warrenton/Montgomery Google/AWS and their incentives are separate. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.komu.com/news/midmissourinews/callaway-county-hosts-open-house-for-proposed-data-center/article_906df960-8402-48dc-96b4-c23d4cf1750c.html","host":"komu.com","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.9427219,"lng":-91.9417153,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"KOMU describes Callaway County Crusoe open house, with no construction or county contract at report date.","independently_verified_current_operating_status":null},"notes":["Exact site undisclosed. Private land transaction and absence of county zoning do not eliminate other permits. Warrenton/Montgomery Google/AWS and their incentives are separate.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.komu.com/news/midmissourinews/callaway-county-hosts-open-house-for-proposed-data-center/article_906df960-8402-48dc-96b4-c23d4cf1750c.html","host":"komu.com","date":"2026-07-14","published":"2026-07-14","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kingdom City · Callaway · Source context reviewed"},{"id":"crusoe-warrenton-mo","state":"mo","kind":"facility","name":"Crusoe Warrenton Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"Warrenton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.. WarrenCountyRecord January15,2026 reports Crusoe Warrenton Planning&Zoning January8 CUP/site-plan vote8 to 2, with tree/lighting conditions and BoardofAldermen review scheduledJanuary20. Not all permits, final board action or current operating certification. Two805000sfhalls plus40000sfadmin,337cityacres and243countybuffer are proposed distinct components, not three campuses. Developer120000galannualcooling and6200gpdALLUSES are different projected water scopes, not measured consumption/zero-water. Building1Q32027operations andBuilding2Q22029 are targets, not observed completion.2000 to 2400construction/100permanent jobs and70 to 80Mannualtax are estimates. Suggested no-abatement guarantees were debated, not adopted in the reported P&Zconditions. Utility representatives described upfront/minimum-use/termination obligations; executed agreements and actual payments not read. Not whole-record, meter, current operating census, signed-contract or legal-compliance certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.warrencountyrecord.com/stories/warrenton-planning-and-zoning-approves-data-center-site-plan-conditional-use,180583","host":"warrencountyrecord.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.8125,"lng":-91.1432,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"original-operator-transaction-and-local-outcomes-round61-2026-10-15.json","scope":"Original operator, transaction participant or dated local reporting; exact premises and stage limits explicit.","fields":{},"notes":["WarrenCountyRecord January15,2026 reports Crusoe Warrenton Planning&Zoning January8 CUP/site-plan vote8 to 2, with tree/lighting conditions and BoardofAldermen review scheduledJanuary20. Not all permits, final board action or current operating certification. Two805000sfhalls plus40000sfadmin,337cityacres and243countybuffer are proposed distinct components, not three campuses.","Developer120000galannualcooling and6200gpdALLUSES are different projected water scopes, not measured consumption/zero-water. Building1Q32027operations andBuilding2Q22029 are targets, not observed completion.2000 to 2400construction/100permanent jobs and70 to 80Mannualtax are estimates. Suggested no-abatement guarantees were debated, not adopted in the reported P&Zconditions. Utility representatives described upfront/minimum-use/termination obligations; executed agreements and actual payments not read.","Not whole-record, meter, current operating census, signed-contract or legal-compliance certification."],"sources":[{"url":"https://www.warrencountyrecord.com/stories/warrenton-planning-and-zoning-approves-data-center-site-plan-conditional-use,180583","host":"warrencountyrecord.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Warrenton · Warren · Source context reviewed"},{"id":"diamond-farms-gateway-digital-villa-ridge-mo","state":"mo","kind":"facility","name":"Diamond Farms (Gateway Digital Campus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"Villa Ridge","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Planningapprovalisrecommendation,notfinalrezoningorconstructionpermission. Developer 3000 totaljobs/2000 construction/250 permanent mixscopesanddonotreconcile; no 3,000 permanentjobsoradditive 5,250 total. Waterless-than 54 homes isanonquantifiedforecast,notactualgallons. Infrastructure 100 percentpaymentpromise is not examinedbindingESA/tariff orguaranteedresidentbills. Genericbillions/tensofmillionsfromsimilarMissouriprojectsarenotsitecapex/taxagreement. NoMW/RFSorcurrentoperatingcertification. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://themissouritimes.com/franklin-county-planning-and-zoning-approves-diamond-farms-data-center-project/","host":"themissouritimes.com","date":"2026-04-23","published":"2026-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.484,"lng":-90.85,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"MissouriTimes reports FranklinPlanning/Zoning voted forward DiamondFarms/GatewayDigital nearGraySummit onover 600 acres,whileexplicitlystating finalcountycommissionapprovalstillrequired.","independently_verified_current_operating_status":null},"notes":["Planningapprovalisrecommendation,notfinalrezoningorconstructionpermission. Developer 3000 totaljobs/2000 construction/250 permanent mixscopesanddonotreconcile; no 3,000 permanentjobsoradditive 5,250 total. Waterless-than 54 homes isanonquantifiedforecast,notactualgallons. Infrastructure 100 percentpaymentpromise is not examinedbindingESA/tariff orguaranteedresidentbills. Genericbillions/tensofmillionsfromsimilarMissouriprojectsarenotsitecapex/taxagreement. NoMW/RFSorcurrentoperatingcertification.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://themissouritimes.com/franklin-county-planning-and-zoning-approves-diamond-farms-data-center-project/","host":"themissouritimes.com","date":"2026-04-23","published":"2026-04-23","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Villa Ridge · Franklin · Source context reviewed"},{"id":"edged-kansas-city-mo","state":"mo","kind":"facility","name":"Edged Kansas City","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clay"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Historic opening verified; later additions and current measured load remain unchecked. State announcement says facility opened; ribbon cutting was December 11. Capacity describes critical capacity, not measured draw. Water savings are developer comparison estimates. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million","host":"ded.mo.gov","date":"2024-12-12","published":"2024-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.1675448,"lng":-94.4651703,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"event_status":"opened","event_date":"2024-12-11","power_mw":26,"power_basis":"critical capacity","investment_usd_min":143000000,"investment_basis":"initial facility economic investment","incentive":"Data Center Sales Tax Exemption Program; no award value supplied"},"notes":["Historic opening verified; later additions and current measured load remain unchecked.","State announcement says facility opened; ribbon cutting was December 11. Capacity describes critical capacity, not measured draw. Water savings are developer comparison estimates.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million","host":"ded.mo.gov","date":"2024-12-12","published":"2024-12-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas City · Clay · Source context reviewed"},{"id":"crg-festus-data-center-mo","state":"mo","kind":"facility","name":"Festus Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jefferson"],"city":"Festus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.festusmo.gov/","host":"festusmo.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.2192,"lng":-90.399,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{},"notes":["Preferred source is a general county/city homepage or GIS landing page. It does not supply a facility-specific identity, status, power or incentives. An HTTP 200 is not verification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.festusmo.gov/","host":"festusmo.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":false,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Festus · Jefferson · Source context reviewed"},{"id":"foristell-i70-annexation-data-center-site-mo","state":"mo","kind":"facility","name":"Foristell I-70 Data Center Site (216-acre annexation)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"Foristell","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. No formal data-center application or tenant is identified. Annexation is not project approval. The two areas are not one campus. Other Missouri developments are separate; later annexation action remains unobserved. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.govtech.com/products/two-data-centers-eye-land-near-st-charles-county-mo","host":"govtech.com","date":"2026-01-05","published":"2026-01-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.8150501,"lng":-90.955972,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Post-Dispatch reporting via GovTech describes two possible Foristell sites: one seeking annexation and another already within city limits.","independently_verified_current_operating_status":null},"notes":["No formal data-center application or tenant is identified. Annexation is not project approval. The two areas are not one campus. Other Missouri developments are separate; later annexation action remains unobserved.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.govtech.com/products/two-data-centers-eye-land-near-st-charles-county-mo","host":"govtech.com","date":"2026-01-05","published":"2026-01-05","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Foristell · Warren · Source context reviewed"},{"id":"next-revolution-emerson-campus-ferguson-mo","state":"mo","kind":"facility","name":"Former Emerson Campus Data Center (Next Revolution Technologies)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Louis"],"city":"Ferguson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Proposed 1.5-billion-USD tax benefits, up-to-22-billion-USD bond authority and neighborhood/environmental contributions are not approved benefits, capex or paid funds. Rejection of the earlier incentive bill is not necessarily denial of the underlying development. Closed-loop intent is not a numeric water cap; no later vote is assumed. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stlpr.org/economy-business/2026-09-10/ferguson-tax-break-plan-data-center-emerson-redevelopment","host":"stlpr.org","date":"2026-09-10","published":"2026-09-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.744707,"lng":-90.3038975,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"St. Louis Public Radio reports a renewed Ferguson incentive proposal after a May three-three failure, with a future final vote still pending at publication.","independently_verified_current_operating_status":null},"notes":["Proposed 1.5-billion-USD tax benefits, up-to-22-billion-USD bond authority and neighborhood/environmental contributions are not approved benefits, capex or paid funds. Rejection of the earlier incentive bill is not necessarily denial of the underlying development. Closed-loop intent is not a numeric water cap; no later vote is assumed.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stlpr.org/economy-business/2026-09-10/ferguson-tax-break-plan-data-center-emerson-redevelopment","host":"stlpr.org","date":"2026-09-10","published":"2026-09-10","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ferguson · St. Louis · Source context reviewed"},{"id":"google-hunt-midwest-kc-northland-mo","state":"mo","kind":"facility","name":"Google Kansas City Data Center (Hunt Midwest Business Center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clay"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. The 400 MW statement concerns new-to-grid carbon-free electricity capacity associated with regional opportunity, not facility IT or utility service load. Excluded from site power. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://datacenters.google/locations/kansas-city-missouri/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.17256,"lng":-94.46443,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"current_operator_location_listing":"Kansas City, Missouri"},"notes":["The 400 MW statement concerns new-to-grid carbon-free electricity capacity associated with regional opportunity, not facility IT or utility service load. Excluded from site power.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://datacenters.google/locations/kansas-city-missouri/","host":"datacenters.google","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas City · Clay · Source context reviewed"},{"id":"google-project-mica-kc-northland-mo","state":"mo","kind":"facility","name":"Google Project Mica","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clay"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Bond authorization is not public debt, taxpayer cash or construction spending. The first-phase 18-month schedule and school/career contributions are forecasts. Exact jurisdiction and current commissioning remain unverified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kctv5.com/2025/07/29/10b-500-acre-tech-campus-gets-stamp-approval-near-smithville/","host":"kctv5.com","date":"2025-07-29","published":"2025-07-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3097,"lng":-94.5845,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KCTV5 reports Port KC authorization of up to 10 billion USD in taxable revenue bonds for Google's planned five-building Northland campus near Smithville, on roughly 500 acres acquired in 2024.","independently_verified_current_operating_status":null},"notes":["Bond authorization is not public debt, taxpayer cash or construction spending. The first-phase 18-month schedule and school/career contributions are forecasts. Exact jurisdiction and current commissioning remain unverified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kctv5.com/2025/07/29/10b-500-acre-tech-campus-gets-stamp-approval-near-smithville/","host":"kctv5.com","date":"2025-07-29","published":"2025-07-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas City · Clay · Source context reviewed"},{"id":"google-spade-new-florence-mo","state":"mo","kind":"facility","name":"Google Project Spade Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Montgomery"],"city":"New Florence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. State announcement. Added electricity generation capacity is not data-center load. Energy fund covers multiple Missouri counties, not a single-site incentive. Construction and permanent roles remain forecasts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","host":"governor.mo.gov","date":"2026-05-20","published":"2026-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.791,"lng":-91.508,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county":"Montgomery","city":"New Florence","announced_planned_infrastructure_investment_usd":15000000000,"energy_impact_fund_usd":20000000,"additional_power_generation_support_mw_lower_bound":500},"notes":["State announcement. Added electricity generation capacity is not data-center load. Energy fund covers multiple Missouri counties, not a single-site incentive. Construction and permanent roles remain forecasts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governor.mo.gov/press-releases/archive/missouri-secures-15-billion-investment-google-montgomery-county","host":"governor.mo.gov","date":"2026-05-20","published":"2026-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"New Florence · Montgomery · Source context reviewed"},{"id":"hematite-bitcoin-mining-jefferson-county-mo","state":"mo","kind":"facility","name":"Hematite Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Jefferson"],"city":"Hematite","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Possible immediate startup is not observed commissioning. NYDIG and Global Connect Communications both appear but their relationship is explicitly unknown. Substation proximity is not a confirmed electrical allocation; current occupancy remains unverified. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.myleaderpaper.com/business/bitcoin-mining-facility-to-possibly-open-in-hematite/article_b383ae61-29e9-42cd-b1e0-95f291992a93.html","host":"myleaderpaper.com","date":"2025-08-28","published":"2025-08-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.126,"lng":-90.508,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round27-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"The Leader reports building and stormwater permits for the Hematite cryptocurrency proposal, with occupancy still waiting on permanent access through neighboring National Guard property.","independently_verified_current_operating_status":null},"notes":["Possible immediate startup is not observed commissioning. NYDIG and Global Connect Communications both appear but their relationship is explicitly unknown. Substation proximity is not a confirmed electrical allocation; current occupancy remains unverified.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.myleaderpaper.com/business/bitcoin-mining-facility-to-possibly-open-in-hematite/article_b383ae61-29e9-42cd-b1e0-95f291992a93.html","host":"myleaderpaper.com","date":"2025-08-28","published":"2025-08-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hematite · Jefferson · Source context reviewed"},{"id":"geronimo-jasper-county-powered-data-park-mo","state":"mo","kind":"facility","name":"Jasper County Powered Data Park","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jasper"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Operator or original local-reporting context; source dates and proposal stages retained.. KOAM March20,2026, updatedApril23, reports Geronimo Power discussions with Sarcoxie-area residents about a possible Jasper County data park. CountyRoad20 is a potential location indicated by resident-obtained images. Company says no final decisions have been made. Community opposition is documented reporting, not a final permitting decision or signed moratorium. No exact parcel, developer land ownership, tenant, MW or operation date verified. Not whole-record or current operating-census certification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.koamnewsnow.com/news/top-stories/jasper-county-residents-voice-concerns-over-proposed-data-center-development/article_6faf3e40-f7dd-40d1-ad5e-215025dbd4b5.html","host":"koamnewsnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.1414461,"lng":-94.0616037,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-and-original-local-reporting-round57-2026-10-15.json","scope":"Operator or original local-reporting context; source dates and proposal stages retained.","fields":{},"notes":["KOAM March20,2026, updatedApril23, reports Geronimo Power discussions with Sarcoxie-area residents about a possible Jasper County data park. CountyRoad20 is a potential location indicated by resident-obtained images. Company says no final decisions have been made. Community opposition is documented reporting, not a final permitting decision or signed moratorium. No exact parcel, developer land ownership, tenant, MW or operation date verified.","Not whole-record or current operating-census certification."],"sources":[{"url":"https://www.koamnewsnow.com/news/top-stories/jasper-county-residents-voice-concerns-over-proposed-data-center-development/article_6faf3e40-f7dd-40d1-ad5e-215025dbd4b5.html","host":"koamnewsnow.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Jasper · Source context reviewed"},{"id":"lambda-kansas-city-mo","state":"mo","kind":"facility","name":"Lambda Kansas City AI Supercomputer","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Platte"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Past target does not prove launch. Program benefit is stated, but exemption value/term/executed agreement are absent. Future capacity remains potential; exact physical address not established. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city","host":"ded.mo.gov","date":"2025-10-28","published":"2025-10-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.33,"lng":-94.72,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"historical_status":"planned conversion of unoccupied building","existing_building_year":2009,"initial_power_mw":24,"initial_power_basis":"capacity, not independently defined as gross or critical IT","future_power_mw_lower_bound":100,"launch_target":"early 2026","initial_phase_investment_usd_lower_bound":500000000,"state_program_as_reported":"Data Center Sales Tax Exemption Program"},"notes":["Past target does not prove launch. Program benefit is stated, but exemption value/term/executed agreement are absent. Future capacity remains potential; exact physical address not established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city","host":"ded.mo.gov","date":"2025-10-28","published":"2025-10-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas City · Platte · Source context reviewed"},{"id":"lumon-solutions-marshfield-mo","state":"mo","kind":"facility","name":"Marshfield Data Center (Lumon Solutions)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Webster"],"city":"Marshfield","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. County report identifies a project, but does not name Lumon in the reviewed text. Facility/developer crosswalk remains pending. No analogy from a different McDonald County facility is adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://webstercountymo.gov/commission-data-center-update-may-21/","host":"webstercountymo.gov","date":"2026-05-21","published":"2026-05-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":37.36,"lng":-92.905,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"county_reported_status":"under construction","county":"Webster","site_description":"Rifle Range Road, northeast of Marshfield"},"notes":["County report identifies a project, but does not name Lumon in the reviewed text. Facility/developer crosswalk remains pending. No analogy from a different McDonald County facility is adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://webstercountymo.gov/commission-data-center-update-may-21/","host":"webstercountymo.gov","date":"2026-05-21","published":"2026-05-21","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Marshfield · Webster · Source context reviewed"},{"id":"beltline-meramec-valley-technology-park-pacific-mo","state":"mo","kind":"facility","name":"Meramec Valley Technology Park (Beltline Energy)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Franklin"],"city":"","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Caption notes application later moved to Franklin County. No final approval, measured sound, tax receipts or permanent jobs established. Diamond Farms is another proposal. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stlmag.com/business/pacific-data-center-beltline-energy-proposal/","host":"stlmag.com","date":"2026-01-28","published":"2026-01-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":38.4385316,"lng":-90.7501765,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"St Louis Magazine reports Beltline presentation for Pacific-area proposal, seeking annexation and wastewater partnership.","independently_verified_current_operating_status":null},"notes":["Caption notes application later moved to Franklin County. No final approval, measured sound, tax receipts or permanent jobs established. Diamond Farms is another proposal.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stlmag.com/business/pacific-data-center-beltline-energy-proposal/","host":"stlmag.com","date":"2026-01-28","published":"2026-01-28","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Franklin · Source context reviewed"},{"id":"meta-kansas-city-northland-mo","state":"mo","kind":"facility","name":"Meta Kansas City Northland","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clay"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Document concerns the Golden Plains Zone 3 preliminary plat, not a named Meta operating facility or its full campus. Do not infer end user, capacity or completion from a plat. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://clerk.kcmo.gov/LegislationDetail.aspx?ID=5140162&GUID=B4B56878-A985-43D7-A86E-1C499DF6EC99","host":"clerk.kcmo.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.247,"lng":-94.705,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"neighbor-primary-review-round4-2026-10-14.json","scope":"Field or source context only","fields":{"municipal_file":"210841","plat_scope_acres_approx":374.89,"plat_proposed_lots":2,"county_in_legal_description":"Platte"},"notes":["Document concerns the Golden Plains Zone 3 preliminary plat, not a named Meta operating facility or its full campus. Do not infer end user, capacity or completion from a plat.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://clerk.kcmo.gov/LegislationDetail.aspx?ID=5140162&GUID=B4B56878-A985-43D7-A86E-1C499DF6EC99","host":"clerk.kcmo.gov","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas City · Clay · Source context reviewed"},{"id":"metrobloks-liberty-mo","state":"mo","kind":"facility","name":"Metrobloks Liberty Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Clay"],"city":"Liberty","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Metrobloks Liberty proposed three-building campus. Up-to1.4Bfutureinvestmentnotactual.150MWcampusnotperbuilding. Hundredsotherjobsincludeconstruction/security/maintenance,notsameas30directfulltime. No exactparcel,RFSdateorapprovedpermitsread. Linkedstateannouncementnotadditionalindependentsourceunlessread. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri","host":"metrobloks.com","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.2459,"lng":-94.4191,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"Metrobloks Liberty proposed three-building campus","fields":{"developer":"Metrobloks","announcement_date":"2026-03-24","locality":"Liberty, Missouri","planned_investment_usd_max":1400000000,"planned_campus_power_mw":150,"power_basis":"power, not explicit critical IT","planned_campus_sqft_approx":568800,"planned_buildings":3,"expected_fulltime_jobs_min_inclusive":30},"notes":["Up-to1.4Bfutureinvestmentnotactual.150MWcampusnotperbuilding. Hundredsotherjobsincludeconstruction/security/maintenance,notsameas30directfulltime. No exactparcel,RFSdateorapprovedpermitsread. Linkedstateannouncementnotadditionalindependentsourceunlessread.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.metrobloks.com/press-release/metrobloks-announces-data-center-investment-in-liberty-missouri","host":"metrobloks.com","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Liberty · Clay · Source context reviewed"},{"id":"nebius-independence-mo","state":"mo","kind":"facility","name":"Nebius AI Factory (Independence)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jackson"],"city":"Independence","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. First-phase computing capacity is inside the campus ambition, not additive. The page's last-modified timestamp is not a publication or groundbreaking day. Closed-loop cooling and no-rate-increase design are planned/attributed, not measured outcomes or an executed utility contract. Construction is not ready-for-service or occupied critical IT. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.arconational.com/nebius-independence-mo/","host":"arconational.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":39.089,"lng":-94.342,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"ARCO's project page labels Nebius Independence under construction and describes a first 200 MW computing-capacity building of about 490,000 square feet within a planned 1.2 GW campus.","independently_verified_current_operating_status":null},"notes":["First-phase computing capacity is inside the campus ambition, not additive. The page's last-modified timestamp is not a publication or groundbreaking day. Closed-loop cooling and no-rate-increase design are planned/attributed, not measured outcomes or an executed utility contract. Construction is not ready-for-service or occupied critical IT.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.arconational.com/nebius-independence-mo/","host":"arconational.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Independence · Jackson · Source context reviewed"},{"id":"patmos-kansas-city-mo","state":"mo","kind":"facility","name":"Patmos KC Star Building Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jackson"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. The financing amount is not verified spending or total capex. The whole 400,000-square-foot building includes proposed coworking and event uses; it is not all DC floor area. Partial operation and leases do not commission the entire building. No IT MW or named cloud tenant established. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kctv5.com/2026/01/12/company-transforming-downtown-kansas-city-landmark-announces-expansion/","host":"kctv5.com","date":"2026-01-12","published":"2026-01-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.0997,"lng":-94.5786,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round30-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"KCTV5 reports Patmos bought the former KC Star building after occupying part of it and announced a 100-million-USD clean-energy loan for further improvements.","independently_verified_current_operating_status":null},"notes":["The financing amount is not verified spending or total capex. The whole 400,000-square-foot building includes proposed coworking and event uses; it is not all DC floor area. Partial operation and leases do not commission the entire building. No IT MW or named cloud tenant established.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kctv5.com/2026/01/12/company-transforming-downtown-kansas-city-landmark-announces-expansion/","host":"kctv5.com","date":"2026-01-12","published":"2026-01-12","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas City · Jackson · Source context reviewed"},{"id":"crg-project-cumulus-st-charles-mo","state":"mo","kind":"facility","name":"Project Cumulus (St. Charles)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Charles"],"city":"St. Charles","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.. Withdrawal is not an irrevocable permanent cancellation or proof a replacement was filed. Linked original company letter separately reviewed. Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Original publicly published company email, hosted by reporter.. Email asks for receipt; acknowledgement not included. No filed replacement or later outcome established. Do not label irrevocably cancelled.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.stlpr.org/news-briefs/2025-08-18/developer-controversial-data-center-st-charles","host":"stlpr.org","date":"2025-08-18","published":"2025-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://npr.brightspotcdn.com/81/a0/8ba01da44bfd963fe7ef6281241f/crg-letter.pdf","host":"npr.brightspotcdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.783855,"lng":-90.481677,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Manual review of named-project reporting excerpts. Historical account and claims are attributed to publisher; no whole-record or current legal-status certification.","fields":{"reported_action_type":"permit-application-withdrawn","reported_finding":"CRG withdrew Cumulus conditional-use-permit application before council vote and said it intended to revise outreach and proposal.","report_display_date":"2025-08-18","independently_verified_current_status":null},"notes":["Withdrawal is not an irrevocable permanent cancellation or proof a replacement was filed. Linked original company letter separately reviewed.","Original signed law, permit, docket and any subsequent decisions take precedence. No future outcomes inferred.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.stlpr.org/news-briefs/2025-08-18/developer-controversial-data-center-st-charles","host":"stlpr.org","date":"2025-08-18","published":"2025-08-18","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-outcomes-review-round20-2026-10-14.json","scope":"Original publicly published company email, hosted by reporter.","fields":{"operator_email_sent":"2025-08-18T14:42:00","timezone_in_email":null,"application_withdrawal":"Conditional use permit consideration at August 19 council meeting","future_intent":"Revised proposal and outreach planned."},"notes":["Email asks for receipt; acknowledgement not included. No filed replacement or later outcome established. Do not label irrevocably cancelled.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://npr.brightspotcdn.com/81/a0/8ba01da44bfd963fe7ef6281241f/crg-letter.pdf","host":"npr.brightspotcdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"St. Charles · St. Charles · Source context reviewed"},{"id":"shenandoah-project-kestrel-kc-northland-mo","state":"mo","kind":"facility","name":"Project Kestrel","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Platte"],"city":"Kansas City","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Port KC Kestrel source arithmetic and project-identity limits. Source arithmetic conflict:0.25times1.8Msqft is450000, not15.75M. Hold workforce forecast pending actual agreement. Headline100B unspecified lifetime scope is not actual spent or automatically new issued bonds. No developer/tenant identity in this release sufficient to confirm preferred Shenandoah operator.50jobs perphase not50perbuilding and no total phases proven. Water replacement/carbonfree pledges not observed consumption or energy mix. No numeric critical IT MW. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/","host":"portkc.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":39.3470623,"lng":-94.7038818,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Port KC Kestrel source arithmetic and project-identity limits","fields":{"agency":"Port KC","project":"Project Kestrel","announcement_date":"2025-08-26","site":"KCI-29 industrial mega site, Kansas City, Missouri","planned_site_acres":379,"planned_hyperscale_buildings":6,"planned_full_buildout_sqft_max":1800000,"headline_projected_investment_usd":100000000000,"expected_jobs_per_phase_approx":50,"first_phase_construction_target_year":2026,"forecast_new_tax_revenue_over_bond_term_usd_min_exclusive":110000000,"stated_workforce_fee_usd_per_sqft":0.25,"stated_workforce_forecast_usd":15750000},"notes":["Source arithmetic conflict:0.25times1.8Msqft is450000, not15.75M. Hold workforce forecast pending actual agreement. Headline100B unspecified lifetime scope is not actual spent or automatically new issued bonds. No developer/tenant identity in this release sufficient to confirm preferred Shenandoah operator.50jobs perphase not50perbuilding and no total phases proven. Water replacement/carbonfree pledges not observed consumption or energy mix. No numeric critical IT MW.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://portkc.com/100-billion-data-center-development-to-bring-infrastructure-investment-and-jobs-to-the-northland/","host":"portkc.com","date":"2025-08-26","published":"2025-08-26","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Kansas City · Platte · Source context reviewed"},{"id":"tierpoint-st-louis-locust-mo","state":"mo","kind":"facility","name":"TierPoint St. Louis - Locust","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Louis city"],"city":"Saint Louis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-locust/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.633535,"lng":-90.2126613,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":135840,"gross_area_is_lower_bound":true,"raised_floor_sqft":22640,"raised_floor_is_lower_bound":false,"raised_floor_basis":"phase 1","expansion_area_sqft":45000,"backup_generator_configuration_source_statement":"Four 2.0 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-locust/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Saint Louis · St. Louis city · Source context reviewed"},{"id":"tierpoint-st-louis-millpark-mo","state":"mo","kind":"facility","name":"TierPoint St. Louis - Millpark","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Louis"],"city":"Maryland Heights","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-millpark/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.6993591,"lng":-90.4114091,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":23000,"gross_area_is_lower_bound":true,"raised_floor_sqft":14400,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 2 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-millpark/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Maryland Heights · St. Louis · Source context reviewed"},{"id":"tierpoint-st-louis-olive-mo","state":"mo","kind":"facility","name":"TierPoint St. Louis - Olive","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["St. Louis city"],"city":"Saint Louis","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-olive/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":38.6297601,"lng":-90.1964208,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-specifications-round3-2026-10-14.json","scope":"Field or source context only","fields":{"gross_area_sqft":124000,"gross_area_is_lower_bound":true,"raised_floor_sqft":11000,"raised_floor_is_lower_bound":true,"backup_generator_configuration_source_statement":"Two 2 MW redundant generators","current_operator_listing":"Operator currently advertises the named facility and services. This is an operator statement, not a site inspection or uptime measurement."},"notes":["Listed MW/kW values describe emergency generators. No critical IT or measured grid-load value is established by this specification.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.tierpoint.com/data-centers/missouri/st-louis-olive/","host":"tierpoint.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Saint Louis · St. Louis city · Source context reviewed"},{"id":"white-cloud-acres-barnard-mo","state":"mo","kind":"facility","name":"White Cloud Acres","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Nodaway"],"city":"Barnard","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. White Cloud source-role correction and separate nearby power plant. Upstream countygovernment label incorrect: site describes movies, podcasts, photos, stories and maps. Secondary4B/600MW/200000gallons-day/noise analogies not primary technical record and not adopted as verified. Nearby440MWMullinCreek power plant separate project, not addable IT. Exact site, permit, hearing outcome and actual service remain unknown. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://nodaway.org/6270/proposed-4-billion-white-cloud-acres-ai-data-center-in-rural-barnard/","host":"nodaway.org","date":"2026-04-29","published":"2026-04-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":40.2528,"lng":-94.9436,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"White Cloud source-role correction and separate nearby power plant","fields":{"publisher_role":"personal/local blog nodaway.org, author roger","article_date":"2026-04-29","project_name":"White Cloud Acres","developer_as_reported":"Scale Microgrids","reported_location":"rural Barnard, Nodaway County, Missouri"},"notes":["Upstream countygovernment label incorrect: site describes movies, podcasts, photos, stories and maps. Secondary4B/600MW/200000gallons-day/noise analogies not primary technical record and not adopted as verified. Nearby440MWMullinCreek power plant separate project, not addable IT. Exact site, permit, hearing outcome and actual service remain unknown.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://nodaway.org/6270/proposed-4-billion-white-cloud-acres-ai-data-center-in-rural-barnard/","host":"nodaway.org","date":"2026-04-29","published":"2026-04-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Barnard · Nodaway · Source context reviewed"},{"id":"wildwood-ranch-joplin-mo","state":"mo","kind":"facility","name":"Wildwood Ranch Industrial Complex (potential data center)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Jasper"],"city":"Joplin","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. City explicitly says construction still needs normal permits. Latest update says no construction applications and power feasibility study first; printed MondayMarch 6,2026 weekday/date is inconsistent, so preserve printed date as uncorrected source label and do not treat as freshOctoberstatus. Annexation/industrial zoning is not a DCbuilding permit, electricity-service contract or operation. DeveloperFAQlink is not itself verified impact evidence. No MW/capex/RFSadopted. Original page is primary municipal stage evidence, not a site inspection. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://mo-joplin2.civicplus.com/1286/Wildwood-Ranch-Industrial-Complex","host":"mo-joplin2.civicplus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":37.0819886,"lng":-94.583417,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"CityofJoplin’s official page records Wildwood’sDecember 4,2025 application,January 12,2026 planning hearing andFebruary 17,2026 council approval of annexation/rezoning bills 2026-256 and 2026-257 for roughly 600.4 acres.","independently_verified_current_operating_status":null,"city_recorded_annexation_rezoning_approval":"2026-02-17","construction_permit_verified":false,"source_update_weekday_date_inconsistent":true},"notes":["City explicitly says construction still needs normal permits. Latest update says no construction applications and power feasibility study first; printed MondayMarch 6,2026 weekday/date is inconsistent, so preserve printed date as uncorrected source label and do not treat as freshOctoberstatus. Annexation/industrial zoning is not a DCbuilding permit, electricity-service contract or operation. DeveloperFAQlink is not itself verified impact evidence. No MW/capex/RFSadopted. Original page is primary municipal stage evidence, not a site inspection.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://mo-joplin2.civicplus.com/1286/Wildwood-Ranch-Industrial-Complex","host":"mo-joplin2.civicplus.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Joplin · Jasper · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}