{"state":"ms","name":"Mississippi","updated":"2026-10-15","checked":"2026-10-15","bounds":[-91.637,30.181,-88.099,34.996],"stats":{"projects":0,"operating":0,"facilities":23,"rule_counties":0,"moratorium_counties":0,"source_records":23,"reviewed_records":23,"status_confirmed":0,"status_unknown":23,"unreviewed_excluded":0,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":23,"manual_source_context_records":23,"published_source_context_records":23,"excluded":{},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"avaio-taurus-brandon-ms","state":"ms","kind":"facility","name":"AVAIO Digital Taurus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Rankin"],"city":"Brandon","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Hundreds of indirect jobs include construction; not a quantified permanent onsite total. No site MW or dollar exemption value supplied. Construction target not delivery proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governorreeves.ms.gov/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county-campus-represents-the-third-largest-economic-development-project-in-state-history/","host":"governorreeves.ms.gov","date":"2025-08-19","published":"2025-08-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.27,"lng":-89.99,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"announcement_date":"2025-08-19","planned_investment_usd":6000000000,"expected_direct_jobs_min":60,"construction_completion_target":"2027-H1","government_reported_tax_program_approval":"Mississippi Data Center Enterprises exemption","published_location":"East Metropolitan Center Business and Industrial Park, Brandon, Rankin County"},"notes":["Hundreds of indirect jobs include construction; not a quantified permanent onsite total. No site MW or dollar exemption value supplied. Construction target not delivery proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governorreeves.ms.gov/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county-campus-represents-the-third-largest-economic-development-project-in-state-history/","host":"governorreeves.ms.gov","date":"2025-08-19","published":"2025-08-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Brandon · Rankin · Source context reviewed"},{"id":"aws-clinton-hinds-ms","state":"ms","kind":"facility","name":"AWS Clinton Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hinds"],"city":"Clinton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Clinton municipal AWS reuse announcement. 1Bplanned investment, not actual spent or separate amount to add again to Amazon statewide25B. Reused industrial plant not newly built whole facility from scratch. Thousands of additional construction/supplychain jobs not all permanent direct onsite. Ceremony/announcement not actual customer opening; no ITMW or exact parcel in reviewed section. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://clintonms.org/awsdatacenter/","host":"clintonms.org","date":"2026-06-09","published":"2026-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.3415,"lng":-90.3218,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Clinton municipal AWS reuse announcement","fields":{"agency":"City of Clinton, Mississippi","announcement_date":"2026-06-09","project_operator":"AWS","project_use":"repurpose former Delphi manufacturing plant as data center","planned_investment_usd":1000000000,"expected_full_operation_positions_min_inclusive":100},"notes":["1Bplanned investment, not actual spent or separate amount to add again to Amazon statewide25B. Reused industrial plant not newly built whole facility from scratch. Thousands of additional construction/supplychain jobs not all permanent direct onsite. Ceremony/announcement not actual customer opening; no ITMW or exact parcel in reviewed section.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://clintonms.org/awsdatacenter/","host":"clintonms.org","date":"2026-06-09","published":"2026-06-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Clinton · Hinds · Source context reviewed"},{"id":"aws-costas-ridgeland-ms","state":"ms","kind":"facility","name":"AWS Costas Property Campus (Ridgeland)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Ridgeland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Combined investment and job commitments must not be assigned fully to each site. Warehouse and data center uses differ; historical forecast is not current delivery. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://magnoliatribune.com/?p=118379","host":"magnoliatribune.com","date":"2024-07-24","published":"2024-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.400198,"lng":-90.1818699,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Magnolia Tribune identifies Costas/Ridgeland and Canton sites within a combined Madison County AWS plan, with 2027 completion forecast.","independently_verified_current_operating_status":null},"notes":["Combined investment and job commitments must not be assigned fully to each site. Warehouse and data center uses differ; historical forecast is not current delivery.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://magnoliatribune.com/?p=118379","host":"magnoliatribune.com","date":"2024-07-24","published":"2024-07-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ridgeland · Madison · Source context reviewed"},{"id":"aws-project-atlas-madison-county-ms","state":"ms","kind":"facility","name":"AWS Project Atlas - Madison County Mega Site (Canton)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Canton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Combined one GW and ten-billion-USD investment are regional plans, not each site. Groundbreaking is not operation; quoted spring-2027 target remains a forecast. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://siteselection.com/amazon-delivers-record-package-to-mississippi/","host":"siteselection.com","date":"2024-06-19","published":"2024-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.6121,"lng":-90.039,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Site Selection reports May 20 AWS Madison County groundbreaking and two-campus development goals.","independently_verified_current_operating_status":null},"notes":["Combined one GW and ten-billion-USD investment are regional plans, not each site. Groundbreaking is not operation; quoted spring-2027 target remains a forecast.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://siteselection.com/amazon-delivers-record-package-to-mississippi/","host":"siteselection.com","date":"2024-06-19","published":"2024-06-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Canton · Madison · Source context reviewed"},{"id":"aws-project-steamboat-warren-county-ms","state":"ms","kind":"facility","name":"AWS Project Steamboat - Warren County Data Center Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"Vicksburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. AWS Mississippi statewide and county-specific investment scopes. 25B and2000jobs are Mississippi totals, not Warren-only. State totals include previously announced amounts; do not add25Bto its components. Canton2027recycled-water transition and83millionannualgallons are future other-campus plans. Renewable616MW is generation, not IT. Ratepayer/grid/water claims remain attributed forecasts. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3526,"lng":-90.8779,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"primary-source-review-round9-2026-10-14.json","scope":"AWS Mississippi statewide and county-specific investment scopes","fields":{"statewide_total_planned_investment_usd":25000000000,"statewide_expected_jobs":2000,"warren_previously_announced_planned_investment_usd":3000000000,"additional_madison_planned_investment_usd":11000000000,"hinds_planned_investment_usd":1000000000,"hinds_reuse":"former Delphi manufacturing plant"},"notes":["25B and2000jobs are Mississippi totals, not Warren-only. State totals include previously announced amounts; do not add25Bto its components. Canton2027recycled-water transition and83millionannualgallons are future other-campus plans. Renewable616MW is generation, not IT. Ratepayer/grid/water claims remain attributed forecasts.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers","host":"aboutamazon.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Vicksburg · Warren · Source context reviewed"},{"id":"cspire-starkville-ms","state":"ms","kind":"facility","name":"C Spire Starkville Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oktibbeha"],"city":"Starkville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. C Spire historical Starkville construction announcement. 23Mbuilding/electrical/cooling/securityexcludesplannedIThardware/softwarepurchases;notfullcampusactualspend.1.5MWgenerator/feedstatementnotIT. Historical2014plansnotobservedopening. Publisheddouble14footthickwallclaimimplausibleandheld,notcorrectedtoinches.52nationalTier3/4countandcertificationclaimsnotcurrentcensus/certifierproof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.cspire.com/cms/news/wireless/20600007/new-c-spire-world-class-business-enterprise-data-center-built-like-fort-knox","host":"cspire.com","date":"2014-05-20","published":"2014-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4709294,"lng":-88.7927699,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"operator-primary-review-round10-2026-10-14.json","scope":"C Spire historical Starkville construction announcement","fields":{"operator":"C Spire","announcement_date":"2014-05-20","locality":"Thad Cochran Research Technology and Economic Development Park, Starkville, Mississippi","site_acres":6.5,"initial_phase_area_sqft":23800,"initial_phase_building_systems_cost_usd":23000000,"historic_groundwork_start":"2013-11","historical_initial_phase_completion_target":"fall2014","published_generator_feed_power_mw":1.5},"notes":["23Mbuilding/electrical/cooling/securityexcludesplannedIThardware/softwarepurchases;notfullcampusactualspend.1.5MWgenerator/feedstatementnotIT. Historical2014plansnotobservedopening. Publisheddouble14footthickwallclaimimplausibleandheld,notcorrectedtoinches.52nationalTier3/4countandcertificationclaimsnotcurrentcensus/certifierproof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.cspire.com/cms/news/wireless/20600007/new-c-spire-world-class-business-enterprise-data-center-built-like-fort-knox","host":"cspire.com","date":"2014-05-20","published":"2014-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Starkville · Oktibbeha · Source context reviewed"},{"id":"clarksdale-hyperscale-data-center-ms","state":"ms","kind":"facility","name":"Clarksdale Hyperscale Data Center Project","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Coahoma"],"city":"Clarksdale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.. No data-center development application filed as ofMarch23. Zoning action does not approve construction, tenant or current facility. Subsequent original decisions and current operator disclosures take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.actionnews5.com/2026/03/24/clarksdale-passes-motion-that-allows-rezoning-potential-data-center","host":"actionnews5.com","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.2006,"lng":-90.5702,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round24-2026-10-14.json","scope":"Named content personally reviewed; no whole-record certification. Dates and forecasts remain source-specific.","fields":{"reported_context":"WMC reports Clarksdale March23 motion allowing rezoning toward light industrial for648-acre potential campus.","independently_verified_current_operating_status":null},"notes":["No data-center development application filed as ofMarch23. Zoning action does not approve construction, tenant or current facility.","Subsequent original decisions and current operator disclosures take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.actionnews5.com/2026/03/24/clarksdale-passes-motion-that-allows-rezoning-potential-data-center","host":"actionnews5.com","date":"2026-03-24","published":"2026-03-24","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Clarksdale · Coahoma · Source context reviewed"},{"id":"cleanspark-clinton-ms","state":"ms","kind":"facility","name":"CleanSpark Clinton Bitcoin Mining Facilities","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Hinds"],"city":"Clinton","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. Construction-in-progress acquired, not proven completed by old target. Grouped Clinton pin may represent multiple sites. Acquisition and construction contract values are separate and not current total capex. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3560924,"lng":-90.3635037,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"asset_agreement_date":"2024-09-16","acquisition_consumated_period":"2024-09","reported_purchase_price_including_costs_usd":3020000,"separate_construction_management_agreement_usd":2888000,"old_substantial_completion_forecast":"2024-12"},"notes":["Construction-in-progress acquired, not proven completed by old target. Grouped Clinton pin may represent multiple sites. Acquisition and construction contract values are separate and not current total capex.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Clinton · Hinds · Source context reviewed"},{"id":"cleanspark-meridian-ms","state":"ms","kind":"facility","name":"CleanSpark Meridian Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Lauderdale"],"city":"Meridian","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3643,"lng":-88.7037,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_city":"Meridian","combined_three_site_purchase_closed":"2024-02-26","combined_three_site_purchase_price_including_costs_usd":19771000,"scope":"One named member of Meridian,Vicksburg,Wiggins three-site transaction."},"notes":["19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Meridian · Lauderdale · Source context reviewed"},{"id":"cleanspark-vicksburg-ms","state":"ms","kind":"facility","name":"CleanSpark Vicksburg Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Warren"],"city":"Vicksburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3526,"lng":-90.8779,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_city":"Vicksburg","combined_three_site_purchase_closed":"2024-02-26","combined_three_site_purchase_price_including_costs_usd":19771000,"scope":"One named member of Meridian,Vicksburg,Wiggins three-site transaction."},"notes":["19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Vicksburg · Warren · Source context reviewed"},{"id":"cleanspark-wiggins-ms","state":"ms","kind":"facility","name":"CleanSpark Wiggins Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Stone"],"city":"Wiggins","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.. 19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":30.8508,"lng":-89.1284,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"issuer-primary-review-round17-2026-10-14.json","scope":"Only named historical/contractual fields reviewed. No whole-record certification, current status default or exact coordinates inferred.","fields":{"named_city":"Wiggins","combined_three_site_purchase_closed":"2024-02-26","combined_three_site_purchase_price_including_costs_usd":19771000,"scope":"One named member of Meridian,Vicksburg,Wiggins three-site transaction."},"notes":["19.771M is combined, not each site. No per-site power, current operation or exact parcel established by acquisition note.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://s21.q4cdn.com/978676932/files/doc_financials/2025/ar/a9d6f8ee-78dc-47ab-be87-088d725dcd55.pdf","host":"s21.q4cdn.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Wiggins · Stone · Source context reviewed"},{"id":"greenidge-columbus-ms","state":"ms","kind":"facility","name":"Columbus Bitcoin Mining Facility (formerly Greenidge Columbus)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Lowndes"],"city":"Columbus","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.. LMFunding originalissuer September18,2025 announcement says acquisitionCLOSED forColumbusMS11MWsite/approximately2300miners fromGreenidge for4Mtotalconsideration. NowhostedunderPowerComputebrand; do notsilentlyrenamehistoricalissuer/currentownerwithoutscopeddate. Original8K,deedandcurrent2026ownershipunread. 11MWfacilityminingcapacity versus7.5MWoperationalminers/157PHs are distinct; neither labeledcriticalIT.26MWfleet expectedtotalINCLUDES11, not37.1.3Msecuredloan PARTfunds4Mdeal, not5.3Mcapex. Approx3.6c/kWhpower-priceclaim notexecutedall-inrate/guaranteed2026price. Acquiredminersnotnewemployees/buildings; TampaHQnotMSpremises. Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.power-compute.com/investors/news-events/press-releases/detail/168/lm-funding-america-closes-acquisition-of-11-mw-site-and","host":"power-compute.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4957,"lng":-88.4273,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"national-original-transactions-and-legal-stage-review-round73-2026-10-15.json","scope":"Namedoriginalprojectparticipant,issuer,localreporterororiginalcourtcopy; transaction/stage/datescoped.","fields":{},"notes":["LMFunding originalissuer September18,2025 announcement says acquisitionCLOSED forColumbusMS11MWsite/approximately2300miners fromGreenidge for4Mtotalconsideration. NowhostedunderPowerComputebrand; do notsilentlyrenamehistoricalissuer/currentownerwithoutscopeddate. Original8K,deedandcurrent2026ownershipunread.","11MWfacilityminingcapacity versus7.5MWoperationalminers/157PHs are distinct; neither labeledcriticalIT.26MWfleet expectedtotalINCLUDES11, not37.1.3Msecuredloan PARTfunds4Mdeal, not5.3Mcapex. Approx3.6c/kWhpower-priceclaim notexecutedall-inrate/guaranteed2026price. Acquiredminersnotnewemployees/buildings; TampaHQnotMSpremises.","Noallfield,currentoperatingbuilding,actualimpact,executedcontractorpaidfundscertification."],"sources":[{"url":"https://www.power-compute.com/investors/news-events/press-releases/detail/168/lm-funding-america-closes-acquisition-of-11-mw-site-and","host":"power-compute.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Columbus · Lowndes · Source context reviewed"},{"id":"compass-lauderdale-meridian-ms","state":"ms","kind":"facility","name":"Compass Datacenters Lauderdale County Hyperscale Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Lauderdale"],"city":"Meridian","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. 500MW utility supply, not explicit IT. Eight-year buildout not all operating. Thousands of jobs are unspecified direct/indirect total, not exact permanent onsite employment. Certification and tax exemption described prospectively, not actual dollar tax expenditure. Quoted4Msite grant not independently executed award reviewed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/","host":"governorreeves.ms.gov","date":"2025-01-09","published":"2025-01-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.3644,"lng":-88.7037,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"announcement_date":"2025-01-09","planned_buildings":8,"expected_construction_program_years":8,"estimated_investment_at_occupancy_usd":10000000000,"investment_basis":"campus plus future tenant information-technology equipment","planned_utility_supply_mw_approx":500,"announced_income_franchise_exemption_years":10},"notes":["500MW utility supply, not explicit IT. Eight-year buildout not all operating. Thousands of jobs are unspecified direct/indirect total, not exact permanent onsite employment. Certification and tax exemption described prospectively, not actual dollar tax expenditure. Quoted4Msite grant not independently executed award reviewed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/","host":"governorreeves.ms.gov","date":"2025-01-09","published":"2025-01-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Meridian · Lauderdale · Source context reviewed"},{"id":"erdc-dsrc-vicksburg-ms","state":"ms","kind":"facility","name":"ERDC DoD Supercomputing Resource Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Warren"],"city":"Vicksburg","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. ERDC historical institutional compute-system procurement. Procurement/performance units are not MW of critical IT or building investment. Historical system installation forecast is not observed2023 commissioning or current2026 configuration. Footer program-office contact is not independently verified server-room entrance. Existing center identity supported; whole record not verified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://hpc.mil/?view=article&id=88%3Anew-hpc-systems-at-the-us-army-engineer-research-and-development-center-erdc-dod-supercomputing-resource-center-will-provide-an-additional-9-petaflops-of-computational-capability&catid=2","host":"hpc.mil","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":32.3019615,"lng":-90.8630294,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"ERDC historical institutional compute-system procurement","fields":{"agency":"HPC Modernization Program","facility":"US Army ERDC DoD Supercomputing Resource Center","city":"Vicksburg, Mississippi","procurement_fiscal_year":2022,"announced_new_system_petaflops":9,"announced_new_compute_cores":277248,"new_system_production_target_year":2023},"notes":["Procurement/performance units are not MW of critical IT or building investment. Historical system installation forecast is not observed2023 commissioning or current2026 configuration. Footer program-office contact is not independently verified server-room entrance. Existing center identity supported; whole record not verified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://hpc.mil/?view=article&id=88%3Anew-hpc-systems-at-the-us-army-engineer-research-and-development-center-erdc-dod-supercomputing-resource-center-will-provide-an-additional-9-petaflops-of-computational-capability&catid=2","host":"hpc.mil","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Vicksburg · Warren · Source context reviewed"},{"id":"gawk-enerpower-amory-ms","state":"ms","kind":"facility","name":"Gawk Enerpower Amory Bitcoin Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Monroe"],"city":"Amory","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The body does not name Gawk or Enerpower, so operator identity stays unverified. This is not described as a large hyperscale campus. August completion is an unobserved forecast, and hoped-for utility savings are not measured. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wtva.com/2026/05/30/bitcoin-mining-facility-be-built-amory/","host":"wtva.com","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.9944791,"lng":-88.5028344,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"WTVA reports an Amory cryptocurrency container facility under construction on Waterway Drive, targeting August completion.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The body does not name Gawk or Enerpower, so operator identity stays unverified. This is not described as a large hyperscale campus. August completion is an unobserved forecast, and hoped-for utility savings are not measured.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wtva.com/2026/05/30/bitcoin-mining-facility-be-built-amory/","host":"wtva.com","date":"2026-05-29","published":"2026-05-29","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Amory · Monroe · Source context reviewed"},{"id":"xai-macrohardrr-southaven-ms","state":"ms","kind":"facility","name":"MACROHARDRR (xAI Southaven Data Center III)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DeSoto"],"city":"Southaven","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not assign nearly2GW company computing power to the Mississippi building alone. Past forecast is not verified actual opening. Hundreds of jobs is not an exact number. Governor January8announcement says acquired-building retrofit and forecasts February opening; nearly2GW describes total company computing power after expansion. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. named xAI project with duplicate-record and system-power holds. Two upstreamSouthaven/MACROHARDRR labels may duplicate one facility; exact parcel/address crosswalk needed before count. Nearly2GW is expandedColossuscompany compute system including otherMemphisarea facilities, not SouthavencriticalIT.20Bcommitment not audited spend; hundreds permanentjobs not exact count. Februarytarget not observed opening. Incentive approval has no dollar tax expenditure quantified.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","host":"governorreeves.ms.gov","date":"2026-01-08","published":"2026-01-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.991886,"lng":-90.034358,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Southaven","county":"DeSoto","investment_usd_min":20000000000,"investment_basis":"announced corporate investment in Southaven project","event_status":"retrofitting as of2026-01-08","opening_forecast":"2026-02","incentive":"MDA data center sales/use exemption approved; city/county fee-in-lieu support; values not stated"},"notes":["Do not assign nearly2GW company computing power to the Mississippi building alone.","Past forecast is not verified actual opening.","Hundreds of jobs is not an exact number.","Governor January8announcement says acquired-building retrofit and forecasts February opening; nearly2GW describes total company computing power after expansion.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","host":"governorreeves.ms.gov","date":"2026-01-08","published":"2026-01-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named xAI project with duplicate-record and system-power holds","fields":{"project_name":"MACROHARDRR","historical_announcement_date":"2026-01-08","announced_project_corporate_investment_usd_min_exclusive":20000000000,"reported_existing_building_retrofit":true,"historical_operation_target_month":"2026-02","government_reported_incentive_approval":"Mississippi DataCenterIncentive sales/use exemption","local_incentive_type":"Southaven andDeSotoCounty fee-in-lieu agreements"},"notes":["Two upstreamSouthaven/MACROHARDRR labels may duplicate one facility; exact parcel/address crosswalk needed before count. Nearly2GW is expandedColossuscompany compute system including otherMemphisarea facilities, not SouthavencriticalIT.20Bcommitment not audited spend; hundreds permanentjobs not exact count. Februarytarget not observed opening. Incentive approval has no dollar tax expenditure quantified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","host":"governorreeves.ms.gov","date":"2026-01-08","published":"2026-01-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Southaven · DeSoto · Source context reviewed"},{"id":"msu-hpc2-portera-starkville-ms","state":"ms","kind":"facility","name":"Mississippi State University HPC2  -  Malcolm A. Portera High Performance Computing Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Oktibbeha"],"city":"Starkville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. MSU historical operating research system, funding scope. 2019 announcement is historical confirmation of housed operating research system, not fresh 2026 performance/ranking or every replacement system. 22M includes system purchase, installation and operation, not exclusively building construction. No critical IT MW, exact parcel or 2026 headcount adopted. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.newsarchive.msstate.edu/newsroom/article/2019/12/msu-noaa-celebrate-orion-supercomputer","host":"newsarchive.msstate.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":33.4733639,"lng":-88.7907511,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"MSU historical operating research system, funding scope","fields":{"institution":"Mississippi State University","facility":"Malcolm A. Portera High Performance Computing Center","system":"Orion","ceremony_date":"2019-12-18","system_funding_agency":"NOAA","grants_to_purchase_install_run_system_usd":22000000,"system_cabinets":28,"processing_cores":72000,"system_ram_terabytes":350,"reported_peak_performance_petaflops":5},"notes":["2019 announcement is historical confirmation of housed operating research system, not fresh 2026 performance/ranking or every replacement system. 22M includes system purchase, installation and operation, not exclusively building construction. No critical IT MW, exact parcel or 2026 headcount adopted.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.newsarchive.msstate.edu/newsroom/article/2019/12/msu-noaa-celebrate-orion-supercomputer","host":"newsarchive.msstate.edu","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Starkville · Oktibbeha · Source context reviewed"},{"id":"navy-dsrc-stennis-space-center-ms","state":"ms","kind":"facility","name":"Navy DoD Supercomputing Resource Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hancock"],"city":"Stennis Space Center","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.. Machine acceptance is not opening of a new physical campus. The 68-million-USD amount spans two contracts, not this facility alone. Petaflops measure computation, not MW; fleet performance, maximum authorized users and named systems are not counts of data-center buildings or current utilization. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://defensescoop.com/2023/04/27/navys-powerful-new-supercomputer-nautilus-is-officially-open-for-dod-use/","host":"defensescoop.com","date":"2023-04-27","published":"2023-04-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":30.3776388,"lng":-89.5978312,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round28-2026-10-14.json","scope":"Personally read public named-source context only; no whole-record certification. See public-preview, identity and date limitations.","fields":{"reported_context":"DefenseScoop reports Navy DSRC acceptance and availability of the Nautilus supercomputer at Stennis after 2022 delivery, distinguishing it from Narwhal and the broader DSRC fleet.","independently_verified_current_operating_status":null},"notes":["Machine acceptance is not opening of a new physical campus. The 68-million-USD amount spans two contracts, not this facility alone. Petaflops measure computation, not MW; fleet performance, maximum authorized users and named systems are not counts of data-center buildings or current utilization.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://defensescoop.com/2023/04/27/navys-powerful-new-supercomputer-nautilus-is-officially-open-for-dod-use/","host":"defensescoop.com","date":"2023-04-27","published":"2023-04-27","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Stennis Space Center · Hancock · Source context reviewed"},{"id":"prado-ai-jackson-metro-ms","state":"ms","kind":"facility","name":"Prado AI / PraCon Global AI Industrial Campus","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Madison"],"city":"Ridgeland","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.. Regulatory nondecision is neither permission, denial nor finding of lawful utility exemption. Entergy/MississippiPower CPCN arguments and developer landlord-exemption argument remain competing positions, not holdings. USD25billionlong-term goal is unfinanced aspiration, not committed campus capex; AmazonUSD1billioncomparison not this project. No exact coordinates/county/municipal ordinance assignment, criticalIT, generation size or operating date independently verified. Jackson proposed six-month pause and Ridgeland April500foot ordinance are separate jurisdictions and need originals. Historical observations and forecasts are dated; no later outcome assumed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://web.archive.org/web/20260819033622/https://mississippitoday.org/2026/06/01/mississippi-ddata-center-plans/","host":"web.archive.org","date":"2026-06-01","published":"2026-06-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.4282,"lng":-90.132,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round35-2026-10-14.json","scope":"Personally read public named-project context, not whole-record certification. Excluded generic, circular or mismatched sources do not receive manual exact-site credit.","fields":{"reported_context":"MississippiToday reports PSC declined to issue requested declaratory opinion on PradoAI private generation/tenant-supply proposal because facts were insufficient and premature. Developer planned to proceed but still sought financing; exact location changed from Ridgeland to unspecified Jacksonmetro.","independently_verified_current_operating_status":null,"reported_regulatory_action":"Declined requested declaratory opinion due insufficient facts","regulatory_permission_verified":false,"exact_campus_location_verified":false},"notes":["Regulatory nondecision is neither permission, denial nor finding of lawful utility exemption. Entergy/MississippiPower CPCN arguments and developer landlord-exemption argument remain competing positions, not holdings. USD25billionlong-term goal is unfinanced aspiration, not committed campus capex; AmazonUSD1billioncomparison not this project. No exact coordinates/county/municipal ordinance assignment, criticalIT, generation size or operating date independently verified. Jackson proposed six-month pause and Ridgeland April500foot ordinance are separate jurisdictions and need originals.","Historical observations and forecasts are dated; no later outcome assumed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://web.archive.org/web/20260819033622/https://mississippitoday.org/2026/06/01/mississippi-ddata-center-plans/","host":"web.archive.org","date":"2026-06-01","published":"2026-06-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ridgeland · Madison · Source context reviewed"},{"id":"saxum-forest-avenue-jackson-ms","state":"ms","kind":"facility","name":"Saxum Forest Avenue Data Center Site (Northwest Jackson)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Hinds"],"city":"Jackson","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.. Application itself seeks industrial zoning without naming data centers; proposed use is established by counsel/reporting, not a named operating tenant. Planning hearing and later council sequence are future at publication, not approvals. Council TABLED the proposed 183-day moratorium for a hearing, so it was not an adopted ban in this report. Counsel forecast tens of millions of taxes OVER A DECADE is neither annual revenue nor paid incentive. No MW, construction date or verified employment. Original approvals and later observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.wlbt.com/2026/05/20/company-seeking-rezone-forest-avenue-property-jackson-data-center/","host":"wlbt.com","date":"2026-05-20","published":"2026-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":32.3705052,"lng":-90.1998927,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round32-2026-10-14.json","scope":"Personally read public project context only; no whole-record certification. Identity, date, future-outcome, permit, capacity and financial scopes remain limited.","fields":{"reported_context":"WLBT reports Saxum sought rezoning of roughly 190 Forest Avenue acres for a proposed Jackson data center, with a planning hearing expected May 27.","independently_verified_current_operating_status":null},"notes":["Application itself seeks industrial zoning without naming data centers; proposed use is established by counsel/reporting, not a named operating tenant. Planning hearing and later council sequence are future at publication, not approvals. Council TABLED the proposed 183-day moratorium for a hearing, so it was not an adopted ban in this report. Counsel forecast tens of millions of taxes OVER A DECADE is neither annual revenue nor paid incentive. No MW, construction date or verified employment.","Original approvals and later observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.wlbt.com/2026/05/20/company-seeking-rezone-forest-avenue-property-jackson-data-center/","host":"wlbt.com","date":"2026-05-20","published":"2026-05-20","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Jackson · Hinds · Source context reviewed"},{"id":"starkville-industrial-park-road-crypto-mine-ms","state":"ms","kind":"facility","name":"Starkville Industrial Park Road Cryptocurrency Mining Facility","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Oktibbeha"],"city":"Starkville","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.. No approval, executed utility agreement, current draw or critical IT verified. Resident bill reductions are explicitly unsubstantiated for this proposal. Operator identity is not established; separate CleanSpark Mississippi acquisitions cannot identify this site. Article’s local displayed date is July 13 while UTC metadata is July 14; these are time-zone representations, not two project events. General 2023 legislation claims were not independently reviewed as law. Later original decisions and observed outcomes take precedence; future events have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://cryptobriefing.com/bitcoin-mine-mississippi-starkville-energy-bills/","host":"cryptobriefing.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":33.4385866,"lng":-88.8363381,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round33-2026-10-14.json","scope":"Personally read dated project context only; no whole-record certification. Preview, identity, numerical, legal-stage and future-outcome holds remain.","fields":{"reported_context":"Crypto Briefing describes an early-review Starkville bitcoin proposal near Industrial Park Road, with up to 30 MW power and 20,000 gallons/day attributed proposed demand.","independently_verified_current_operating_status":null},"notes":["No approval, executed utility agreement, current draw or critical IT verified. Resident bill reductions are explicitly unsubstantiated for this proposal. Operator identity is not established; separate CleanSpark Mississippi acquisitions cannot identify this site. Article’s local displayed date is July 13 while UTC metadata is July 14; these are time-zone representations, not two project events. General 2023 legislation claims were not independently reviewed as law.","Later original decisions and observed outcomes take precedence; future events have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://cryptobriefing.com/bitcoin-mine-mississippi-starkville-energy-bills/","host":"cryptobriefing.com","date":"2026-07-13","published":"2026-07-13","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Starkville · Oktibbeha · Source context reviewed"},{"id":"xai-southaven-ms","state":"ms","kind":"facility","name":"xAI Southaven","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DeSoto"],"city":"Southaven","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named xAI project with duplicate-record and system-power holds. Two upstreamSouthaven/MACROHARDRR labels may duplicate one facility; exact parcel/address crosswalk needed before count. Nearly2GW is expandedColossuscompany compute system including otherMemphisarea facilities, not SouthavencriticalIT.20Bcommitment not audited spend; hundreds permanentjobs not exact count. Februarytarget not observed opening. Incentive approval has no dollar tax expenditure quantified. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","host":"governorreeves.ms.gov","date":"2026-01-08","published":"2026-01-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.993,"lng":-89.974,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named xAI project with duplicate-record and system-power holds","fields":{"project_name":"MACROHARDRR","historical_announcement_date":"2026-01-08","announced_project_corporate_investment_usd_min_exclusive":20000000000,"reported_existing_building_retrofit":true,"historical_operation_target_month":"2026-02","government_reported_incentive_approval":"Mississippi DataCenterIncentive sales/use exemption","local_incentive_type":"Southaven andDeSotoCounty fee-in-lieu agreements"},"notes":["Two upstreamSouthaven/MACROHARDRR labels may duplicate one facility; exact parcel/address crosswalk needed before count. Nearly2GW is expandedColossuscompany compute system including otherMemphisarea facilities, not SouthavencriticalIT.20Bcommitment not audited spend; hundreds permanentjobs not exact count. Februarytarget not observed opening. Incentive approval has no dollar tax expenditure quantified.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/","host":"governorreeves.ms.gov","date":"2026-01-08","published":"2026-01-08","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Southaven · DeSoto · Source context reviewed"},{"id":"xai-tulane-road-southaven-ms","state":"ms","kind":"facility","name":"xAI Tulane Road Data Center (Southaven)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["DeSoto"],"city":"Southaven","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.. Approval is not completed construction/RFS. Fifth regional site includes projects, not five operating campuses. SpaceXAI is source nomenclature, not independent corporate/legal-entity verification. Reported 40 million-dollarcontribution supports replacement city training facility, not a public subsidy awarded to data center or campuscapex. Adjacent StantonRoadpowerplant is separate generation; no MW assigned or added. Noise complaints/turbine extension belong to existing area facilities, not measured emissions from unbuilt Tulane campus. Related 600 million-dollarcontractor allegation is not a court award. Later originals and observed outcomes take precedence; future dates have no assumed result. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.actionnews5.com/2026/09/02/southaven-approves-new-spacexai-data-center-fifth-location-area/","host":"actionnews5.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":34.9897,"lng":-90.043,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round34-2026-10-14.json","scope":"Personally read project-specific public context only; no whole-record certification. Regional, directory, legislative and membership sources do not verify an exact building.","fields":{"reported_context":"ActionNews 5 reports Southaven aldermen approved a 660,000-square-foot data center at former 51-acre TulaneRoad training site, obtained through reported city land swap.","independently_verified_current_operating_status":null},"notes":["Approval is not completed construction/RFS. Fifth regional site includes projects, not five operating campuses. SpaceXAI is source nomenclature, not independent corporate/legal-entity verification. Reported 40 million-dollarcontribution supports replacement city training facility, not a public subsidy awarded to data center or campuscapex. Adjacent StantonRoadpowerplant is separate generation; no MW assigned or added. Noise complaints/turbine extension belong to existing area facilities, not measured emissions from unbuilt Tulane campus. Related 600 million-dollarcontractor allegation is not a court award.","Later originals and observed outcomes take precedence; future dates have no assumed result.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.actionnews5.com/2026/09/02/southaven-approves-new-spacexai-data-center-fifth-location-area/","host":"actionnews5.com","date":"2026-09-02","published":"2026-09-02","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Southaven · DeSoto · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}