{"state":"nd","name":"North Dakota","updated":"2026-10-15","checked":"2026-10-15","bounds":[-104.048,45.933,-96.561,49.0],"stats":{"projects":0,"operating":1,"facilities":8,"rule_counties":0,"moratorium_counties":0,"source_records":8,"reviewed_records":8,"status_confirmed":3,"status_unknown":5,"unreviewed_excluded":1,"rules_reviewed":false},"coverage":{"checkpoint":"round 92","checked":"2026-10-15","inherited_records":9,"targeted_primary_followup_records":4,"latest_targeted_primary_followup":"2026-10-15","followup_scope":"Record-level field checks only; not a whole-state refresh.","manual_source_context_records":8,"published_source_context_records":8,"excluded":{"no_manual_source_review":1},"whole_records_certified":0,"meaning":"Source-context review only. Counts are inventory records, not a census of physical buildings. Zero operating or rule counts do not establish absence.","unadopted_fields":"Upstream status, narrative, operator, capacity, investment, jobs and incentives are not imported. Reviewed field evidence retains its original scope below each record."},"status_labels":{"operating":"Operating","building":"Under construction","approved":"Approved","proposed":"Proposed","paused":"Paused","stopped":"Denied, withdrawn or closed","unknown":"Status unclear","unconfirmed":"Unconfirmed lead"},"precision_labels":{"exact":"Mapped to the published site","address":"Matched to the published street address","approximate":"Approximate location, not the exact parcel","county":"Exact site not published; shown at county level"},"records":[{"id":"applied-digital-jamestown-nd","state":"nd","kind":"facility","name":"Applied Digital Jamestown Facility","group":"operating","status":"Operating","raw_status":"operating","status_field":"current_status","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Stutsman"],"city":"Jamestown","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer Form10Q Business Update, printed page42; existing Jamestown crypto-hosting facility. Period-end claim, not October15inspection. Crypto-hosting scope stays distinct from AI campuses; no measured load or parcel adopted. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.029587,"lng":-98.679092,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer reports; readiness is not metered grid demand.","fields":{"announcement_date":"2026-10-07","fiscal_quarter_ended":"2026-08-31","polaris_forge_1_reported_ready_for_service_date":"2026-10-01","polaris_forge_1_reported_operational_critical_it_mw":250,"other_named_ai_campuses_reported_stage":"Various construction stages","jamestown_crypto_facility_mw_as_of_quarter_end":106,"separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end":180,"north_dakota_ai_delivered_total_end_2026_forecast_mw":300,"potential_base_electron_generation_mw":1200},"notes":["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Atlas targeted primary-source follow-up","scope":"Issuer Form10Q Business Update, printed page42; existing Jamestown crypto-hosting facility","fields":{"current_status":"operating","status_basis":"The issuer says Jamestown continued operating at full capacity.","status_as_of":"2026-08-31","report_signed":"2026-10-07"},"notes":["Period-end claim, not October15inspection. Crypto-hosting scope stays distinct from AI campuses; no measured load or parcel adopted."],"sources":[{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"checked":"2026-10-15","capture_sha256":"13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Jamestown · Stutsman · Source context reviewed"},{"id":"applied-digital-polaris-forge-2-harwood-nd","state":"nd","kind":"facility","name":"Applied Digital Polaris Forge 2","group":"building","status":"Under construction","raw_status":"under construction","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Cass"],"city":"Harwood","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Minnkota Harwood project load and workforce forecast. 3Bdeveloper investment excludes unspecified additional tenant investment; not money already spent.280MWnot per building or measured. Utility ratepayer assurances not independently audited actual future bills. Company2021founding does not date Harwood opening. No exact parcel, current energization or customer lease read. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Issuer Form10Q Business Update, printed page42; named-campus construction statement. Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.minnkota.com/minnkota-website/our-press/data-center-faqs","host":"minnkota.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.02,"lng":-97.025,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"public-institution-review-round11-2026-10-14.json","scope":"Minnkota Harwood project load and workforce forecast","fields":{"utility":"Minnkota Power Cooperative","retail_utility":"Cass County Electric Cooperative","developer_operator":"Applied Digital","location":"near Harwood, North Dakota","planned_buildings":2,"combined_planned_area_sqft_min_exclusive":1800000,"projected_applied_digital_investment_usd_min_exclusive":3000000000,"expected_fulltime_personnel_min_exclusive":200,"expected_peak_construction_workers_approx":700,"expected_peak_electrical_usage_mw":280,"power_basis":"expected facility peak usage, not explicit critical IT"},"notes":["3Bdeveloper investment excludes unspecified additional tenant investment; not money already spent.280MWnot per building or measured. Utility ratepayer assurances not independently audited actual future bills. Company2021founding does not date Harwood opening. No exact parcel, current energization or customer lease read.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.minnkota.com/minnkota-website/our-press/data-center-faqs","host":"minnkota.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer reports; readiness is not metered grid demand.","fields":{"announcement_date":"2026-10-07","fiscal_quarter_ended":"2026-08-31","polaris_forge_1_reported_ready_for_service_date":"2026-10-01","polaris_forge_1_reported_operational_critical_it_mw":250,"other_named_ai_campuses_reported_stage":"Various construction stages","jamestown_crypto_facility_mw_as_of_quarter_end":106,"separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end":180,"north_dakota_ai_delivered_total_end_2026_forecast_mw":300,"potential_base_electron_generation_mw":1200},"notes":["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Atlas targeted primary-source follow-up","scope":"Issuer Form10Q Business Update, printed page42; named-campus construction statement","fields":{"current_status":"under construction","status_basis":"Polaris Forge 2 is explicitly described as under construction.","status_as_of":"2026-10-07","report_period_ended":"2026-08-31"},"notes":["Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded."],"sources":[{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"checked":"2026-10-15","capture_sha256":"13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Harwood · Cass · Source context reviewed"},{"id":"applied-digital-polaris-forge-3-oliver-nd","state":"nd","kind":"facility","name":"Applied Digital Polaris Forge 3","group":"building","status":"Under construction","raw_status":"under construction","status_field":"current_status","crypto":false,"type":"Data center (inventory classification)","counties":["Oliver"],"city":"Hanover","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Application filing and repealed pause are not zoning approval. Summer groundbreaking and 18 to 24 month completion were hopes, not observed milestones. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Issuer Form10Q Business Update, printed page42; named-campus construction statement. Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded. Displayed status uses the explicitly reviewed current status field; it is a source statement, not a physical inspection.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.kfyrtv.com/2026/05/05/applied-digital-submits-rezoning-application-data-center-oliver-county/","host":"kfyrtv.com","date":"2026-05-04","published":"2026-05-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.111,"lng":-101.426,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"KFYR reports Applied Digital filed Oliver County rezoning request after county repealed its moratorium.","independently_verified_current_operating_status":null},"notes":["Application filing and repealed pause are not zoning approval. Summer groundbreaking and 18 to 24 month completion were hopes, not observed milestones.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.kfyrtv.com/2026/05/05/applied-digital-submits-rezoning-application-data-center-oliver-county/","host":"kfyrtv.com","date":"2026-05-04","published":"2026-05-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer reports; readiness is not metered grid demand.","fields":{"announcement_date":"2026-10-07","fiscal_quarter_ended":"2026-08-31","polaris_forge_1_reported_ready_for_service_date":"2026-10-01","polaris_forge_1_reported_operational_critical_it_mw":250,"other_named_ai_campuses_reported_stage":"Various construction stages","jamestown_crypto_facility_mw_as_of_quarter_end":106,"separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end":180,"north_dakota_ai_delivered_total_end_2026_forecast_mw":300,"potential_base_electron_generation_mw":1200},"notes":["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Atlas targeted primary-source follow-up","scope":"Issuer Form10Q Business Update, printed page42; named-campus construction statement","fields":{"current_status":"under construction","status_basis":"Polaris Forge 3 is explicitly described as under construction.","status_as_of":"2026-10-07","report_period_ended":"2026-08-31"},"notes":["Issuer-reported stage, not independent inspection. Delivery forecasts are not energization; no IT load, spending or geography upgraded."],"sources":[{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"checked":"2026-10-15","capture_sha256":"13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Hanover · Oliver · Source context reviewed"},{"id":"applied-digital-polaris-forge-1-ellendale-nd","state":"nd","kind":"facility","name":"Applied Digital Polaris Forge 1","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":false,"type":"Data center (inventory classification)","counties":["Dickey"],"city":"Ellendale","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Field or source context only. Do not sum phases into campus total again. 250MW is operator-reported commissioned criticalIT capacity, not independently measured demand. July1release establishes75MWphase and175MW then-live campus. October2release supersedes campus live total with250MW;400MW remains contracted full buildout. Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Issuer reports; readiness is not metered grid demand.. Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed. Issuer Form10Q Business Update, printed page42; operating buildings and a building under construction. HPC campus differs from separate Ellendale crypto hosting. No whole-campus status, aggregate MW or parcel upgrade.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1","host":"ir.applieddigital.com","date":"2026-07-01","published":"2026-07-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source for campus operational it mw"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":46.003,"lng":-98.509,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"field-verification-2026-10-14.json","scope":"Field or source context only","fields":{"city":"Ellendale","event_status":"Building2Phase1ready for service","event_date":"2026-07-01","phase_operational_it_mw":75,"campus_operational_it_mw":250,"contracted_full_buildout_it_mw":400,"campus_operational_it_as_of":"2026-10-02"},"notes":["Do not sum phases into campus total again.","250MW is operator-reported commissioned criticalIT capacity, not independently measured demand.","July1release establishes75MWphase and175MW then-live campus. October2release supersedes campus live total with250MW;400MW remains contracted full buildout.","Only the listed fields were checked; imported geography, current operation, capacity and incentives require their own evidence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/157/applied-digital-delivers-second-building-at-polaris-forge-1","host":"ir.applieddigital.com","date":"2026-07-01","published":"2026-07-01","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source for campus operational it mw"}],"whole_record_certified":false},{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Issuer reports; readiness is not metered grid demand.","fields":{"announcement_date":"2026-10-07","fiscal_quarter_ended":"2026-08-31","polaris_forge_1_reported_ready_for_service_date":"2026-10-01","polaris_forge_1_reported_operational_critical_it_mw":250,"other_named_ai_campuses_reported_stage":"Various construction stages","jamestown_crypto_facility_mw_as_of_quarter_end":106,"separate_ellendale_legacy_crypto_facility_mw_as_of_quarter_end":180,"north_dakota_ai_delivered_total_end_2026_forecast_mw":300,"potential_base_electron_generation_mw":1200},"notes":["Do not merge Ellendale crypto with Polaris AI capacity. Planned generation is not IT load. Finland potential excluded from U.S. inventory. Tenant identity stays confidential where not disclosed.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results","host":"ir.applieddigital.com","date":"2026-10-07","published":"2026-10-07","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"Atlas targeted primary-source follow-up","scope":"Issuer Form10Q Business Update, printed page42; operating buildings and a building under construction","fields":{"operating_phase_context":"Two HPC buildings operate; a third is under construction.","current_status_hold":"Mixed campus stages do not certify all buildings operating."},"notes":["HPC campus differs from separate Ellendale crypto hosting. No whole-campus status, aggregate MW or parcel upgrade."],"sources":[{"url":"https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000059/apld-20260831.htm","host":"ir.applieddigital.com","date":"","published":"","checked":"2026-10-15","date_kind":"publication date not established","label":"Reviewed source"}],"checked":"2026-10-15","capture_sha256":"13de68ee1d34a5e8ababd5a28bdbdb9a6b5a6e1486988adf3804a7f522b7bd40","whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Ellendale · Dickey · Source context reviewed"},{"id":"atlas-power-williston-nd","state":"nd","kind":"facility","name":"Atlas Power Data Center (Williston)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Williams"],"city":"Williston","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.. Vendor analysis, not independent regulator determination. Do not turn historical proprietary load analysis into current metered capacity or 700 MW future expansion into existing IT power. Original executed approvals, current operator disclosures and subsequent decisions take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.yesenergy.com/blog/crypto-mining-power-consumption-atlas-power","host":"yesenergy.com","date":"2024-05-09","published":"2024-05-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":48.147,"lng":-103.618,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round22-2026-10-14.json","scope":"Named-site excerpt/source review; historical or proposed claims remain attributed. No entire-record certification.","fields":{"reported_context":"Yes Energy publishes its own historical Atlas Williston load/congestion analysis and describes possible future phases.","independently_verified_current_operating_status":null},"notes":["Vendor analysis, not independent regulator determination. Do not turn historical proprietary load analysis into current metered capacity or 700 MW future expansion into existing IT power.","Original executed approvals, current operator disclosures and subsequent decisions take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.yesenergy.com/blog/crypto-mining-power-consumption-atlas-power","host":"yesenergy.com","date":"2024-05-09","published":"2024-05-09","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Williston · Williams · Source context reviewed"},{"id":"bitzero-nekoma-nd","state":"nd","kind":"facility","name":"Bitzero Nekoma Data Center (Stanley R. Mickelsen Safeguard Complex)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Cavalier"],"city":"Nekoma","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named government source. Acquisition agreements are not completed data-center construction. 200MW refers announced North American company buildout, not a Nekoma site allocation. Military site operational1975 is not data-center opening. Offset strategy and waste-heat greenhouse are plans, not measured environmental performance. No2026operating proof. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center","host":"governor.nd.gov","date":"2022-07-25","published":"2022-07-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":48.5894194,"lng":-98.3567389,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"government-primary-review-round7-2026-10-14.json","scope":"named government source","fields":{"historical_acquisition_redevelopment_announcement":"2022-07-25","reported_bid_acceptance_date":"2022-07-18","historical_expected_investment_usd_approx":500000000,"historical_expected_operational_jobs_min":35,"historical_expected_operational_jobs_max":50,"published_site":"Stanley R Mickelsen Safeguard Complex, Nekoma, Cavalier County, North Dakota"},"notes":["Acquisition agreements are not completed data-center construction. 200MW refers announced North American company buildout, not a Nekoma site allocation. Military site operational1975 is not data-center opening. Offset strategy and waste-heat greenhouse are plans, not measured environmental performance. No2026operating proof.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.governor.nd.gov/news/burgum-bitzero-signs-agreement-acquire-nekoma-pyramid-develop-it-highly-secure-data-center","host":"governor.nd.gov","date":"2022-07-25","published":"2022-07-25","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Nekoma · Cavalier · Source context reviewed"},{"id":"core-scientific-grand-forks-nd","state":"nd","kind":"facility","name":"Core Scientific Grand Forks Data Center (Grand Forks 1)","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Grand Forks"],"city":"Grand Forks","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. named operator source. Operatorofferingnotindependentlyverifiedcurrentenergizedload/AIoccupancy. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://corescientific.com/high-density-data-centers/grand-forks-nd/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"loc":{"lat":47.8912,"lng":-97.0434,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"captured-operator-review-round6-2026-10-14.json","scope":"named operator source","fields":{"published_address":"5601 11th Ave S, Grand Forks, ND58201","advertised_total_power_capacity_mw":100,"campus_acres":20,"total_area_sqft":90000,"power_basis":"totalpowercapacity, not explicitlycriticalIT"},"notes":["Operatorofferingnotindependentlyverifiedcurrentenergizedload/AIoccupancy.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://corescientific.com/high-density-data-centers/grand-forks-nd/","host":"corescientific.com","date":"","published":"","checked":"2026-10-14","date_kind":"publication date not established","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Grand Forks · Grand Forks · Source context reviewed"},{"id":"enerfore-pleasant-valley-tioga-nd","state":"nd","kind":"facility","name":"Enerfore Pleasant Valley Data Center","group":"unknown","status":"Status unclear","raw_status":"","status_field":"","crypto":true,"type":"Crypto/HPC (inventory classification)","counties":["Williams"],"city":"Tioga","address":"","who":"","end_user":"","mw":null,"power":"","power_note":"","investment":"","jobs":"","acres":null,"utility":"","water":"","incentives":"","note":"Manual source context is available for this inherited inventory record. The inventory label and approximate geography are retained for discovery. This is not certification of current operation, ownership, a separate physical building, technical capacity or a precise parcel. Missing fields remain unknown. Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.. The headline does not establish an issued permit. Early 2025 opening was a forecast. Dry Fork and Pleasant Valley naming needs a parcel crosswalk. Company-wide 200 MW does not belong to this facility. Original minutes are reviewed separately. Current original approvals, disclosures and later outcomes take precedence. Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building. Appeal acceptance does not grant either permit or variance. Original location failed the one-mile setback; staff had refused to accept a CUP application. Residents discuss Pleasant Valley and Dry Fork; exact parcel crosswalk still requires the later application. Claims in public comments are not findings of misconduct. Agenda is a request, not an adopted outcome. Do not move coordinates or replace township based on an incomplete parcel crosswalk. No later commissioning or current permit result established.","date":"","events":[],"timeline":[],"opened":"","tier":"","sources":[{"url":"https://www.sdxcentral.com/news/enerfore-digital-gets-go-ahead-for-data-center-proposal-in-north-dakota/","host":"sdxcentral.com","date":"2024-10-04","published":"2024-10-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://williamsnd.civicweb.net/document/174556/","host":"williamsnd.civicweb.net","date":"2024-09-17","published":"2024-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"},{"url":"https://williamsnd.civicweb.net/document/175356/","host":"williamsnd.civicweb.net","date":"2024-12-19","published":"2024-12-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"loc":{"lat":48.28,"lng":-102.9424,"precision":"approximate","basis":"Inherited Compute Atlas inventory point for the general area; exact parcel and street location are not verified."},"reviewed_evidence":[{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"SDxCentral describes Enerfore's successful appeal allowing a permit application, with a sound study and public comment still ahead.","independently_verified_current_operating_status":null,"operator_or_site_identity_needs_crosswalk":true},"notes":["The headline does not establish an issued permit. Early 2025 opening was a forecast. Dry Fork and Pleasant Valley naming needs a parcel crosswalk. Company-wide 200 MW does not belong to this facility. Original minutes are reviewed separately.","Current original approvals, disclosures and later outcomes take precedence.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://www.sdxcentral.com/news/enerfore-digital-gets-go-ahead-for-data-center-proposal-in-north-dakota/","host":"sdxcentral.com","date":"2024-10-04","published":"2024-10-04","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Original county minutes record a four-zero vote approving the appeal so Enerfore could concurrently submit a conditional-use and reduced-setback variance application.","appeal_approval_date":"2024-09-17","vote_ayes":4,"vote_nays":0,"conditional_use_permit_issuance_verified":false},"notes":["Appeal acceptance does not grant either permit or variance. Original location failed the one-mile setback; staff had refused to accept a CUP application.","Residents discuss Pleasant Valley and Dry Fork; exact parcel crosswalk still requires the later application. Claims in public comments are not findings of misconduct.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://williamsnd.civicweb.net/document/174556/","host":"williamsnd.civicweb.net","date":"2024-09-17","published":"2024-09-17","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false},{"overlay":"regional-development-review-round26-2026-10-14.json","scope":"Personally read named-source context; historical/proposed figures stay attributed. No whole-record certification.","fields":{"reported_context":"Later official agenda lists Enerfore Digital Valley request LU-0086-24 for a cryptocurrency facility in Dry Fork Township.","application_number":"LU-0086-24","printed_location":"Sublot 2 and Sublot 3, Section 4, T155N, R95W; Dry Fork Township","permit_outcome_verified":false},"notes":["Agenda is a request, not an adopted outcome. Do not move coordinates or replace township based on an incomplete parcel crosswalk.","No later commissioning or current permit result established.","Fields can apply to shared campus, regional or historical context; consult source review before assigning to a building."],"sources":[{"url":"https://williamsnd.civicweb.net/document/175356/","host":"williamsnd.civicweb.net","date":"2024-12-19","published":"2024-12-19","checked":"2026-10-14","date_kind":"publication","label":"Reviewed source"}],"whole_record_certified":false}],"manual_source_reviewed":true,"whole_record_certified":false,"field_evidence_present":true,"inventory_label_retained":true,"precision_label":"Approximate location, not the exact parcel","summary":"Tioga · Williams · Source context reviewed"}],"county_rules":{},"calendar":[],"attribution":{"inventory":{"name":"Compute Atlas","creator":"Edward Kubiak","url":"https://www.compute-atlas.com/api","license":"CC BY 4.0","license_url":"https://creativecommons.org/licenses/by/4.0/","snapshot_url":"https://www.compute-atlas.com/api/facilities","retrieved":"2026-10-14","sha256":"79ad432dab7c128e428234c9d0dd40933114b415a4a5d697db00095637d50f37","changes":"Added provenance, publication-date distinctions, display-safe wording, quarantine flags and state partitioning. Original source records retained locally."},"counties":"U.S. Census Bureau county boundaries (public domain)","research":"Field-specific source context. See the linked source and limits on each record."}}